Urban rail fault detection device

By installing snow cleaning components and installation components on the rail inspection truck, the problem of the impact of detection accuracy of the track snow in extreme weather is solved, automatic snow cleaning and efficient fault detection are achieved, which improves work efficiency and reduces resistance.

CN119843532APending Publication Date: 2025-04-18SUZHOU IND PARK CIVICISM COMMUNAL ENG CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411989865.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-04-18

AI Technical Summary

Technical Problem

Under extreme weather conditions, the operation and detection accuracy of rail inspection trolleys will be affected. The existing methods rely on manual removal of snow on tracks, resulting in inefficient fault detection.

Method used

A urban rail fault detection device is designed, equipped with an on-rail inspection vehicle, including snow cleaning components and installation components. The snow cleaning assembly includes a push rack with a left and right symmetrical shaft. The front end of the push rack is equipped with a shovel head, and a connecting piece and a connecting frame are provided on the push rack. The mounting assembly is used to fix the snow cleaning assembly and allows the angle of the connecting piece to be adjusted according to the thickness of the snow.

Benefits of technology

It realizes automatic removal of snow when the on-rail inspection vehicle is detected, reducing the need for manual cleaning, improving the working efficiency of fault detection, and reducing the resistance of the rail inspection vehicle to travel by adjusting the angle of the connecting plate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119843532A_ABST
    Figure CN119843532A_ABST
Patent Text Reader

Abstract

The invention provides an urban rail fault detection device which comprises a rail inspection vehicle arranged on a rail, a snow cleaning assembly and an installation assembly used for installing the snow cleaning assembly are arranged on the front side of the rail inspection vehicle, the snow cleaning assembly comprises two push frames arranged in a bilateral symmetry mode, shovel heads are arranged at the front ends of the push frames, and connecting pieces are arranged on the push frames. A connecting frame used for adjusting the angle of the connecting piece is arranged at the rear end of the connecting piece, and the mounting assembly comprises a first mounting structure arranged on the side wall of the rail inspection vehicle and used for mounting the connecting frame and a second mounting structure arranged at the bottom of the rail inspection vehicle and used for mounting the push frame; when the track is inspected by the track inspection vehicle, accumulated snow on the track is removed, manual cleaning is not needed, and the working efficiency is improved; when accumulated snow is cleaned, the angle of the connecting piece can be adjusted according to the thickness of the accumulated snow, the advancing resistance of the rail inspection vehicle is reduced while the accumulated snow cleaning effect is guaranteed, and the device is simple in structure, convenient and rapid to use, low in production cost and convenient to produce and use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field related to urban rail fault detection, and in particular to an urban rail fault detection device. Background Art

[0002] Smart urban rail refers to the use of emerging information technologies such as cloud computing, big data, the Internet of Things, artificial intelligence, 5G, satellite communications, blockchain, etc. to comprehensively perceive, deeply interconnect, and intelligently integrate physical information such as passengers, facilities, equipment, and the environment, so as to achieve autonomous evolution, innovate service, operation, and construction management models, and build a new generation of Chinese-style smart urban rail transit system that is safe, convenient, efficient, green, and economical.

[0003] During the operation of smart urban rail, real-time monitoring and fault diagnosis of key components of the urban rail system can promptly identify potential safety hazards, avoid accidents, and ensure the safety of passengers and staff. The fault detection system can quickly locate the source of the fault, reduce troubleshooting time, and speed up maintenance response, thereby reducing operational interruption time caused by faults and improving the operating efficiency of the entire urban rail system.

[0004] The track inspection vehicle plays an important role in railway track inspection. It can detect the internal and external geometric states of the track. However, under extreme weather conditions, such as snow accumulation, the operation and detection accuracy of the track inspection vehicle will be affected. Snow accumulation on the track not only affects the normal movement of the track inspection vehicle, but also reduces the accuracy of detection. When snow accumulates on the track, manual snow removal is generally used, which is time-consuming and labor-intensive, seriously affecting the efficiency of fault detection. Summary of the invention

[0005] The present invention aims to provide an urban rail fault detection device, which can remove snow on the track while a track inspection vehicle is inspecting the track, without the need for manual cleaning, thereby increasing work efficiency.

[0006] To this end, the technical solution adopted by the present invention is: an urban rail fault detection device, comprising a track inspection vehicle arranged on a track, a snow removal assembly and a mounting assembly for mounting the snow removal assembly are arranged at the front side of the track inspection vehicle, the snow removal assembly comprises two push frames arranged symmetrically on the left and right, a shovel head is arranged at the front end of the push frame, a connecting piece is arranged on the push frame, a connecting frame for adjusting the angle of the connecting piece is arranged at the rear end of the connecting piece, the mounting assembly comprises a first mounting structure for mounting the connecting frame arranged on the side wall of the track inspection vehicle and a second mounting structure for mounting the push frame arranged at the bottom of the track inspection vehicle;

[0007] The first mounting structure includes a fixed block arranged on the side wall of the track inspection vehicle, a limit block is arranged on the outer side of the fixed block, and a stop block is rotatably connected to the outer side of the limit block through a rotating shaft. The second mounting structure includes a limit frame arranged at the front end of the bottom of the track inspection vehicle and matching with the corresponding push frame, and also includes a limit slot arranged at the bottom of the track inspection vehicle, and the push frame passes through the limit frame and is inserted into the limit slot.

[0008] As a preferred embodiment of the above scheme, the connecting frame is a strip structure, and "J"-shaped buckles connected to the limit blocks are arranged at intervals on one side of the connecting frame. The width of the bent part of the buckles gradually decreases, and the front ends are close together. The sides of the buckles are hollowed out to form a lightweight groove. The connecting piece is a curved surface and is inclined outward. The rear end of the connecting piece is provided with a protruding portion protruding upward, and the rear end of the protruding portion is connected to the connecting frame.

[0009] Further preferably, the push frame is made of elastic material, the push frame is arc-shaped, and the side and top of the push frame are hollowed out to form a lightweight groove.

[0010] Further preferably, the push frame includes a curved segment for connecting to the limiting groove, the front end of the curved segment is connected to a straight segment, the front end of the straight segment is connected to an inclined segment inclined outward, the front end of the inclined segment is connected to the shovel head, and the lightweight groove is arranged in the straight segment and the inclined segment.

[0011] Further preferably, the limiting groove includes a first limiting groove arranged at the front side of the track inspection vehicle and a second limiting groove arranged at the rear side of the track inspection vehicle.

[0012] The beneficial effects of the present invention are as follows: a snow-clearing component is provided, so that the snow on the track can be cleared while the track inspection vehicle is inspecting the track, without the need for manual cleaning, thereby increasing work efficiency; a mounting structure is provided to fix the snow-clearing component, and when clearing the snow, the angle of the connecting piece can be adjusted according to the thickness of the snow, thereby reducing the resistance of the track inspection vehicle while ensuring the snow clearing effect. The device has a simple structure, is quick and easy to use, and has a low production cost, making it easy to produce and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 The structure of the present invention is schematically shown in FIG. Figure 1 .

[0014] Figure 2 The structure of the present invention is schematically shown in FIG. Figure 2 .

[0015] Figure 3 yes Figure 2 Enlarged view of point A.

[0016] Figure 4 It is a structural schematic diagram of the snow clearing component in the present invention.

[0017] Figure 5 The structure of the present invention is schematically shown in FIG. Figure 3 .

[0018] Figure 6 yes Figure 5 Enlarged view of point B. DETAILED DESCRIPTION

[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0020] like Figure 1-6 As shown, a city rail fault detection device includes a track inspection vehicle 1 arranged on a track, a snow removal component and an installation component for installing the snow removal component are arranged on the front side of the track inspection vehicle 1, the snow removal component includes two push frames 9 arranged symmetrically on the left and right, a shovel head 11 is arranged at the front end of the push frame 9, a connecting piece 12 is arranged on the push frame 9, and a connecting frame 14 for adjusting the angle of the connecting piece 12 is arranged at the rear end of the connecting piece 12, the installation component includes a first installation structure for installing the connecting frame 14 arranged on the side wall of the track inspection vehicle 1 and a second installation structure for installing the push frame 9 arranged at the bottom of the track inspection vehicle 1.

[0021] The first mounting structure includes a fixed block 3 arranged on the side wall of the track inspection vehicle 1, a limit block 4 is arranged on the outer side of the fixed block 3, and a stop block 6 is rotatably connected to the outer side of the limit block 4 through a rotating shaft 5. The second mounting structure includes a limit frame 2 arranged at the front end of the bottom of the track inspection vehicle 1 and matching with the corresponding push frame 9, and also includes a limit groove arranged at the bottom of the track inspection vehicle 1, and the push frame 9 passes through the limit frame 2 and is inserted into the limit groove.

[0022] The connecting frame 14 is a strip-shaped structure. A "J"-shaped buckle 15 connected to the limit block 4 is arranged at intervals on one side of the connecting frame 14. The width of the curved part of the buckle 15 gradually decreases, and the front end is close together. The side of the buckle 15 is hollowed out to form a lightweight groove 10. The connecting piece 12 is a curved surface and tilted outward. The rear end of the connecting piece 12 is provided with a protruding portion 13 protruding upward, and the rear end of the protruding portion 13 is connected to the connecting frame 14. A plurality of buckles 15 are arranged on the connecting frame 14 for connecting with the limit block 4. The buckles 15 at different positions are connected with the limit block 4, and the position of the connecting frame 14 is changed, thereby adjusting the inclination angle of the connecting piece 12, while ensuring the cleaning effect, reducing the resistance of the track inspection vehicle 1. By arranging the protruding portion 13 on the upper part of the connecting piece 12, the snow will no longer approach the track inspection vehicle 1 upward when it reaches the protruding portion 13, so that the snow can slide along the connecting piece 12 tilted outward to both sides of the track, thereby ensuring that the track inspection vehicle 1 can perform normal inspection.

[0023] The push frame 9 is made of elastic material, the push frame 9 is arc-shaped, and the side and top of the push frame 9 are hollowed out to form a lightweight groove 10. Prevent snow from accumulating on the surface of the push frame 9 during snow clearing, increasing the weight of the push frame, reducing the efficiency of snow clearing, and affecting snow clearing.

[0024] The push frame 9 includes a curved section for connecting with the limiting groove, the front end of the curved section is connected with a straight section, the front end of the straight section is connected with an inclined section inclined outward, the front end of the inclined section is connected with the shovel head 11, and the lightweight groove 10 is arranged between the straight section and the inclined section.

[0025] The limiting grooves include a first limiting groove 7 arranged at the front side of the track inspection vehicle 1 and a second limiting groove 8 arranged at the rear side of the track inspection vehicle 1. Two limiting grooves are provided, which are used for installation and fixation of the snow removal assembly in the working state and the non-working state respectively.

[0026] While clearing the snow, the track is inspected through a laser detector installed on top of the track inspection vehicle 1, and the track information is collected to generate images and transmitted back to the control center. The track is fully inspected and fault problems are analyzed (this is existing technology and will not be repeated here).

[0027] When there is no snow to be cleared, remove the "J"-shaped buckle 15 from the limit block 4 and fit it together with the push frame 9, take the push frame 9 out of the first limit groove 7, move it to the rear side and insert it into the second limit groove 8, so that the snow clearing assembly is stored at the bottom of the track inspection vehicle 1 to save space.

[0028] A snow-clearing component is provided, so that the snow on the track can be cleared while the track inspection vehicle 1 is inspecting the track, without the need for manual cleaning, thereby increasing work efficiency; a mounting structure is provided to fix the snow-clearing component, and the angle of the connecting piece 12 can be adjusted according to the thickness of the snow when clearing the snow, thereby reducing the resistance of the track inspection vehicle 1 while ensuring the snow clearing effect. The device has a simple structure, is quick and easy to use, and has a low production cost, making it easy to produce and use.

[0029] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A fault detection device for urban rail, characterized in that: The invention comprises a track inspection vehicle (1) arranged on a track, wherein a snow-clearing assembly and a mounting assembly for mounting the snow-clearing assembly are arranged at the front side of the track inspection vehicle (1), wherein the snow-clearing assembly comprises two push frames (9) arranged symmetrically on the left and right, wherein a shovel head (11) is arranged at the front end of the push frame (9), wherein a connecting piece (12) is arranged on the push frame (9), wherein a connecting frame (14) for adjusting the angle of the connecting piece is arranged at the rear end of the connecting piece (12), wherein the mounting assembly comprises a first mounting structure for mounting the connecting frame (14) arranged on the side wall of the track inspection vehicle (1) and a second mounting structure for mounting the push frame (9) arranged at the bottom of the track inspection vehicle (1); The first mounting structure comprises a fixed block (3) arranged on the side wall of the track inspection vehicle (1), a limit block (4) is arranged on the outer side of the fixed block (3), and the outer side of the limit block (4) is rotatably connected to a stop block (6) via a rotating shaft (5); the second mounting structure comprises a limit frame (2) arranged at the front end of the bottom of the track inspection vehicle (1) and matching with the corresponding push frame (9), and also comprises a limit groove arranged at the bottom of the track inspection vehicle (1), and the push frame (9) passes through the limit frame (2) and is inserted into the limit groove.

2. The urban rail fault detection device according to claim 1, characterized in that: The connecting frame (14) is a strip-shaped structure. A "J"-shaped buckle (15) connected to the limit block (4) is arranged at intervals on one side of the connecting frame (14). The width of the curved portion of the buckle (15) gradually decreases, and the front ends are close together. The side of the buckle (15) is hollowed out to form a lightweight groove (10). The connecting piece (12) is a curved surface and is inclined outward. The rear end of the connecting piece (12) is provided with a protruding portion (13) protruding upward, and the rear end of the protruding portion (13) is connected to the connecting frame (14).

3. The urban rail fault detection device according to claim 1, characterized in that: The push frame (9) is made of elastic material and is arc-shaped. The side and top of the push frame (9) are hollowed out to form a lightweight groove (10).

4. The urban rail fault detection device according to claim 1, characterized in that: The push frame (9) comprises a curved surface segment for connecting to the limiting groove, the front end of the curved surface segment is connected to a straight line segment, the front end of the straight line segment is connected to an inclined segment inclined outward, the front end of the inclined segment is connected to the shovel head (11), and the lightweight groove (10) is arranged between the straight line segment and the inclined segment.

5. The urban rail fault detection device according to claim 4, characterized in that: The limiting groove comprises a first limiting groove (7) arranged at the front side of the track inspection vehicle (1) and a second limiting groove (8) arranged at the rear side of the track inspection vehicle (1).