Heat preservation and ice melting equipment for power transmission tower in cold region and construction method of heat preservation and ice melting equipment

By designing the insulation and ice melting equipment for transmission towers in cold areas and using ground source heat pump heating and water circulation systems for heat exchange, the problems of high cost and low efficiency of cleaning the snow and ice layer of the transmission tower in the prior art are solved, and the effect of improving the structural stability and use safety of the transmission tower is achieved.

CN120150041AInactive Publication Date: 2025-06-13SUZHOU UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510144696.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-10
Publication Date
2025-06-13
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the method of regularly cleaning the snow and ice of the transmission tower by manually or helicoptering or helicoptering is costly, low efficiency and insufficient timeliness, resulting in safety hazards in the use of the transmission tower.

Method used

A heat insulation and ice melting equipment for transmission towers in cold areas is designed, including insulation components and installation components, which are heated through ground source heat pumps, and heat exchange is used to use the water circulation system to melt snow and ice layers, and the equipment disassembly and assembly efficiency is improved by installing components.

Benefits of technology

It effectively avoids non-uniform additional loads caused by snow and ice in the transmission tower, improves the structural stability and use safety of the transmission tower, and at the same time shortens the construction time and improves safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120150041A_ABST
    Figure CN120150041A_ABST
Patent Text Reader

Abstract

The invention discloses a cold region power transmission tower heat preservation and ice melting device and a construction method thereof, and relates to the technical field of power transmission tower heat preservation, the cold region power transmission tower heat preservation and ice melting device comprises a heat preservation assembly, a power transmission tower support, a transfer box, a connecting pipe, a first heat exchange pipe, a mounting pipe, a second heat exchange pipe and a communicating pipe, the connecting pipe is fixed to the bottom of the transfer box, a mounting hole is formed in the power transmission tower support, the connecting pipe is located in the mounting hole, the first heat exchange pipe is communicated with the connecting pipe, and the mounting pipe is fixed to the side face of the transfer box. According to the ice melting equipment, heat exchange can be conducted on the power transmission tower support in snowy weather through the heat preservation assembly so that accumulated snow accumulated on the cross beam can be melted, it is avoided that too much accumulated snow and ice layers are accumulated on the upper portion of the power transmission tower, and use of the power transmission tower is affected; and the construction time of climbing operation personnel is greatly shortened, and the safety is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of transmission tower thermal insulation, in particular to a thermal insulation and ice melting device for transmission towers in cold regions and its construction method. Background Art

[0002] Transmission towers are key infrastructure in the power transmission system and are of great significance for ensuring the electricity consumption of residents and maintaining the balance of the power grid. In cold northern regions, snow and ice often accumulate on the surface of metal iron towers. Especially for the horizontal members of the iron tower, it is easier to cause the accumulation of snow and ice. Snow or ice will generate additional loads on the iron tower. For the windward side of the transmission tower, the volume of snow or ice will be larger, which may cause non-uniform additional loads on the transmission tower. The generation of these additional loads will have a significant impact on the structural stability of the transmission tower. In the prior art, generally, the method of manually clearing snow regularly or using a helicopter to clear it is adopted, but these methods have the problems of high cost, low efficiency and insufficient timeliness, which makes the transmission tower have certain potential safety hazards during long-term use. Summary of the Invention

[0003] Object of the Invention: The problem to be solved by the present invention is that in the prior art, generally, the method of manually clearing snow regularly or using a helicopter to clear it is adopted, but these methods have the problems of high cost, low efficiency and insufficient timeliness, which makes the transmission tower have certain potential safety hazards during long-term use.

[0004] Technical Solution: A thermal insulation and ice melting device for a transmission tower in a cold region of the present invention includes a thermal insulation component, which includes a transmission tower support, a transfer box, a connecting pipe, a first heat exchange pipe, a mounting pipe, a second heat exchange pipe and a communicating pipe. The transfer box is arranged on the top of the transmission tower support, the connecting pipe is fixed to the bottom of the transfer box, a mounting hole is formed on the transmission tower support, the connecting pipe is located in the mounting hole, the first heat exchange pipe is communicated with the connecting pipe, the mounting pipe is fixed to the side of the transfer box, the second heat exchange pipe is located in the mounting pipe, the communicating pipe is fixed in the transfer box and is communicated with the connecting pipe and the mounting pipe; and a mounting component, which is arranged on the connecting pipe and includes a movable pipe, a fastener, a fixing ring, a convex block, a receiving plate, a sealing member, a guiding plate, a pre-tightening member and a mounting member. The movable pipe slides on the surface of the connecting pipe, the fastener is arranged on the movable pipe and is located in the mounting hole, the fixing ring is fixed on the surface of the first heat exchange pipe, the convex block is fixed around the fixing ring, a track matching with it is formed at the bottom of the movable pipe, the receiving plate is fixed to the inner wall of the connecting pipe, the sealing member is arranged at the end of the first heat exchange pipe, the guiding plate is fixed to both sides of the second heat exchange pipe, the pre-tightening member is arranged on both sides of the mounting pipe, and the mounting member cooperates with the pre-tightening member.

[0005] Furthermore, the fastener of the device includes a first rotating plate, a second rotating plate, and a support plate. Through holes are formed around the movable tube. The first rotating plate is rotatably connected to the inner wall of the through hole. The second rotating plate is rotatably connected to the outer side of the connecting tube. The support plate is rotatably connected to the ends of the two rotating plates.

[0006] Furthermore, the fastener of the device further includes a limiting ring and a first spring. The limiting ring is fixed on the surface of the connecting tube. The two ends of the first spring are respectively fixed to the limiting ring and the movable tube.

[0007] Furthermore, the seal of the device includes a convex plate, a baffle, a connecting rod, a pressing ring, a sealing ring, and a mounting ring. The convex plate is fixed around the top of the first heat exchange tube, and an installation groove is formed inside it. The baffle is fixed on one side of the top of the receiving plate. The connecting rod slides in the installation groove. The pressing ring slides on the first heat exchange tube. The bottom end of the connecting rod is fixed to the pressing ring. The sealing ring is located above the pressing ring. The mounting ring is fixed on the first heat exchange tube and is located above the sealing ring.

[0008] Furthermore, the seal of the device further includes a pushing plate, a guiding rod, and a second spring. The pushing plate is fixed on the top of the receiving plate. The guiding rod is fixed in the installation groove. The connecting rod slides on the guiding rod. The two ends of the second spring are respectively fixed to the inner wall of the installation groove and the connecting rod.

[0009] Furthermore, the pre-tightening member of the device includes a hook plate, a movable frame, a pressing block, an extension rod, and a cross bar. The hook plate is fixed on the outer side of the guiding plate. Fixing grooves are formed on both sides of the installation tube. The movable frame slides in the fixing grooves. The pressing block is fixed on the inner wall of the movable frame and cooperates with the hook plate. The extension rod is fixed to the bottom of the movable frame. The cross bar is fixed between two adjacent extension rods.

[0010] Furthermore, the pre-tightening member of the device further includes a fixing rod, a fixing block, and a third spring. The fixing rod is fixed on the top of the movable tube, and its top end extends above the cross bar. The fixing block is fixed to the top end of the fixing rod. The two ends of the third spring are respectively fixed to the fixing block and the cross bar.

[0011] Furthermore, the installation member of the device includes an installation block, an insertion rod, a fixing plate, and a triggering block. The installation block is fixed on the outer side of the guiding plate. An installation hole communicating with the fixing groove is formed at the top of the fixing groove. The insertion rod slides in the installation hole. The fixing plate is fixed to the top end of the insertion rod. The triggering block is fixed to the bottom of the fixing plate and is located in the fixing groove.

[0012] Furthermore, the mounting member of the device further includes a connecting block and a fourth spring. The connecting block is fixed in the mounting hole, and both ends of the fourth spring are fixed to the connecting block and the fixing plate respectively.

[0013] Furthermore, a preferred embodiment of the device and its construction method is as follows: The following construction steps are further included:

[0014] Place the adapter box at the corresponding position of the angle iron of the transmission tower bracket, and install the second heat exchange pipes on both sides on the adapter box;

[0015] Install the first heat exchange pipe correspondingly, and at the same time fix the adapter box and the second heat exchange pipes through the installation assembly;

[0016] Connect with the ground source heat pump through the second heat exchange pipe, supply hot water to the first heat exchange pipe, and perform heat exchange on the surface of the transmission tower bracket through the water circulation setting.

[0017] Beneficial effects: Compared with the prior art, the remarkable advantages of the present invention are as follows: Through the heat preservation assembly, heat exchange can be performed on the transmission tower bracket in snowy weather to melt the snow accumulated on its cross beam, avoiding excessive accumulation of snow and ice on its upper part, which affects the use of the transmission tower. At the same time, through the setting of the installation assembly, the disassembly and assembly efficiency of the ice melting device can be improved, greatly shortening the construction time of the high-altitude operation personnel and having higher safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is the overall structure diagram of the heat preservation and ice melting device for transmission towers in cold regions and its construction method;

[0019] Figure 2 It is the cross-sectional view of the heat preservation assembly of the heat preservation and ice melting device for transmission towers in cold regions and its construction method;

[0020] Figure 3 It is for the heat preservation and ice melting device for transmission towers in cold regions and its construction method Figure 2 Enlarged view of part A inside;

[0021] Figure 4 It is the side view of the movable pipe of the heat preservation and ice melting device for transmission towers in cold regions and its construction method;

[0022] Figure 5 It is the cross-sectional view of the seal of the heat preservation and ice melting device for transmission towers in cold regions and its construction method;

[0023] Figure 6 It is the top view of the seal of the heat preservation and ice melting device for transmission towers in cold regions and its construction method;

[0024] Figure 7Another perspective view of the seal for the thermal insulation and ice melting equipment of transmission towers in cold regions and its construction method;

[0025] Figure 8 Cross-sectional view of the installation part of the thermal insulation and ice melting equipment of transmission towers in cold regions and its construction method;

[0026] Figure 9 Another perspective view of the installation part of the thermal insulation and ice melting equipment of transmission towers in cold regions and its construction method;

[0027] Figure 10 Cross-sectional view of the pre-tightening part of the thermal insulation and ice melting equipment of transmission towers in cold regions and its construction method. Detailed implementation manners

[0028] The technical solutions of the present invention will be further described in detail below with reference to the accompanying drawings.

[0029] Secondly, the so-called "one embodiment" or "embodiment" refers to specific features, structures or characteristics that can be included in at least one implementation manner of the present invention. The "in one embodiment" that appears in different places in this specification does not all refer to the same embodiment, nor is it a separate or alternative embodiment that is mutually exclusive with other embodiments.

[0030] Embodiment 1

[0031] Refer to Figure 1 and Figure 2 , which is the first embodiment of the present invention. This embodiment provides a thermal insulation and ice melting equipment for transmission towers in cold regions and its construction method. The thermal insulation and ice melting equipment for transmission towers in cold regions includes a thermal insulation component 100 and an installation component 200. The thermal insulation component 100 has the effect of heating and warming the transmission tower, melting the accumulated snow and ice on its top, improving the safety of the transmission tower during use. At the same time, the installation component 200 improves the disassembly and assembly efficiency of the equipment. When the climbers install and maintain the equipment, they do not need to carry too many tools, and the construction efficiency and safety are both higher.

[0032] Specifically, the thermal insulation component 100 includes a transmission tower support 101, a transfer box 102, a connecting pipe 103, a first heat exchange pipe 104, an installation pipe 105, a second heat exchange pipe 106 and a connecting pipe 107. The transfer box 102 is arranged on the top of the transmission tower support 101. The connecting pipe 103 is fixed to the bottom of the transfer box 102. An installation hole S is provided on the transmission tower support 101. The connecting pipe 103 is located in the installation hole S. The first heat exchange pipe 104 is communicated with the connecting pipe 103. The installation pipe 105 is fixed to the side of the transfer box 102. The second heat exchange pipe 106 is located in the installation pipe 105. The connecting pipe 107 is fixed in the transfer box 102 and is communicated with the connecting pipe 103 and the installation pipe 105.

[0033] The adapter box 102 is used to fix the heat exchange pipes of the adapter. The connecting pipe 103 is arranged based on the extended position of the transmission tower support 101 and is used to guide and fix the second heat exchange pipe 106. The first heat exchange pipe 104 and the installation pipe 105 are fixed at the bottom of the adapter box 102. The first heat exchange pipe 104 is connected to an external ground source heat pump and conveys the hot water from the heat exchange of the ground source heat pump into the second heat exchange pipe 106. Since there will be no snow accumulation in the vertical direction, a layer of thermal insulation material is coated on the surface of the first heat exchange pipe 104 during construction to prevent excessive heat loss when the hot water is conveyed upward, which may affect the snow and ice removal efficiency. The connecting pipe 107 is used to connect the first heat exchange pipe 104 and the second heat exchange pipe 106 to facilitate the conveyance of hot water to the second heat exchange pipe 106. Moreover, the first heat exchange pipe 104, the second heat exchange pipe 106 and the ground source heat pump form a water circulation system (not shown in the figure). The specific installation position can be set as required by those skilled in the art. This is prior art and will not be elaborated here.

[0034] The installation assembly 200 is arranged on the connecting pipe 103 and includes a movable pipe 201, a fastener 202, a fixing ring 203, a convex block 204, a receiving plate 205, a seal 206, a guiding plate 207, a pre-tightening member 208 and an installation member 209. The movable pipe 201 slides on the surface of the connecting pipe 103. The fastener 202 is arranged on the movable pipe 201 and is located within the installation hole S. The fixing ring 203 is fixed on the surface of the first heat exchange pipe 104. The convex block 204 is fixed around the fixing ring 203. A track P matching therewith is formed at the bottom of the movable pipe 201. The receiving plate 205 is fixed on the inner wall of the connecting pipe 103. The seal 206 is arranged at the end of the first heat exchange pipe 104. The guiding plate 207 is fixed on both sides of the second heat exchange pipe 106. The pre-tightening member 208 is arranged on both sides of the installation pipe 105. The installation member 209 cooperates with the pre-tightening member 208.

[0035] The movable pipe 201 is sleeved on the surface of the connecting pipe 103. Limit rods are fixed around the connecting pipe 103, and the movable pipe 201 slides on the limit rods to limit it and prevent it from shifting or rotating during the up-and-down movement. The fastener 202 is used to fix this mechanism on the transmission tower bracket 101, and without excessive screws, etc., greatly improving the construction efficiency of the staff. The fixing ring 203 and the convex block 204 are used to drive the movable pipe 201 to move downward during installation for fastening operation, and the fixation can be completed only by the weight of the first heat exchange pipe 104 itself. There are at least four receiving plates 205, evenly distributed on the inner wall of the connecting pipe 103. The seal 206 is used to seal the connecting pipe 103 and the first heat exchange pipe 104 to prevent water leakage. The guide plate 207 is used to guide the second heat exchange pipe 106, and a corresponding guide groove is provided on the inner wall of the installation pipe 105 to improve the installation efficiency of the second heat exchange pipe 106. The pre-tightening member 208 performs a pre-tightening operation during the installation of the second heat exchange pipe 106, and then the installation member 209 further fastens the second heat exchange pipe 106 to complete the installation.

[0036] Embodiment 2

[0037] Refer to Figures 1 to 10 , which is the second embodiment of the present invention, and this embodiment is based on the previous embodiment.

[0038] Specifically, the fastener 202 includes a first rotating plate 202a, a second rotating plate 202b, and a support plate 202c. Through holes K are provided around the movable pipe 201. The first rotating plate 202a is rotatably connected to the inner wall of the through hole K, the second rotating plate 202b is rotatably connected to the outside of the connecting pipe 103, and the support plate 202c is rotatably connected to the ends of the two rotating plates.

[0039] There are at least four groups of fasteners 202, evenly distributed around the movable pipe 201. When the movable pipe 201 moves up and down, it can drive the first rotating plate 202a to move. Thus, when the first rotating plate 202a approaches or moves away from the second rotating plate 202b, it can drive the support plate 202c to move outward or inward, so as to fasten the adapter box 102 through the frictional force and supporting force between the support plate 202c and the inner wall of the installation hole S. And because the downward movement of the movable pipe 201 is driven by the pulling of the convex block 204 and the weight of the first heat exchange pipe 104 itself, the installation is more stable, and the staff does not need to carry too many installation devices, with higher safety.

[0040] The fastener 202 further includes a limit ring 202d and a first spring 202e. The limit ring 202d is fixed on the surface of the connecting pipe 103, and the two ends of the first spring 202e are respectively fixed to the limit ring 202d and the movable pipe 201.

[0041] The first spring 202e applies an upward pulling force to the movable pipe 201. When the bump 204 disengages from the track P, the first spring 202e pulls the movable pipe 201 back to its original position, which can make the support plate 202c move away from the inner wall of the mounting hole S. At this time, the adapter box 102 can be removed.

[0042] The seal 206 includes a convex plate 206a, a baffle 206b, a connecting rod 206c, a pressing ring 206d, a sealing ring 206e, and a mounting ring 206f. The convex plate 206a is fixed around the top of the first heat exchange pipe 104, and an installation groove V is formed inside it. The baffle 206b is fixed to one side of the top of the receiving plate 205. The connecting rod 206c slides in the installation groove V. The pressing ring 206d slides on the first heat exchange pipe 104. The bottom end of the connecting rod 206c is fixed to the pressing ring 206d. The sealing ring 206e is located on the top of the pressing ring 206d. The mounting ring 206f is fixed on the first heat exchange pipe 104 and is located above the sealing ring 206e.

[0043] The number of the convex plates 206a corresponds to that of the receiving plates 205. During installation, the convex plates 206a are first moved above the receiving plates 205 until they contact the baffles 206b, and then they move downward due to the gravity of the first heat exchange pipe 104 itself, so that the convex plates 206a are located on the tops of the receiving plates 205, and thus the first heat exchange pipe 104 can be fixed by the receiving plates 205 and the convex plates 206a.

[0044] The connecting rod 206c is L-shaped. In the initial state, the sealing ring 206e is located on the top of the pressing ring 206d and there is a certain space between it and the mounting ring 206f. When the convex plate 206a is located on the top of the receiving plate 205, the connecting rod 206c moves upward in the installation groove V and drives the pressing ring 206d and the sealing ring 206e to move upward, causing the sealing ring 206e to be squeezed between the sealing ring 206e and the mounting ring 206f. At this time, the sealing ring 206e deforms and has a good sealing effect.

[0045] The seal 206 further includes a push plate 206g, a guide rod 206h, and a second spring 206i. The push plate 206g is fixed to the top of the receiving plate 205. The guide rod 206h is fixed in the installation groove V. The connecting rod 206c slides on the guide rod 206h. The two ends of the second spring 206i are respectively fixed to the inner wall of the installation groove V and the connecting rod 206c.

[0046] The push plate 206g is inserted into the installation groove V. By pushing the push plate 206g, the connecting rod 206c is moved. Since the gravity of the convex plate 206a and the first heat exchange tube 104 acts downward, the push plate 206g can always apply a large thrust to the connecting rod 206c, making the sealing effect of the sealing ring 206e better. At the same time, due to the limiting effect of the push plate 206g, the first heat exchange tube 104 cannot rotate during use, thereby making its installation more stable.

[0047] The guide rod 206h limits the connecting rod 206c to make its up and down movement more stable. The second spring 206i applies a downward pulling force to the connecting rod 206c. When the first heat exchange tube 104 is pushed upward, the second spring 206i drives the connecting rod 206c to reset, so that the sealing ring 206e resets, facilitating the removal of the first heat exchange tube 104.

[0048] The pre-tightening member 208 includes a hook plate 208a, a movable frame 208b, a pressing block 208c, an extension rod 208d, and a cross bar 208e. The hook plate 208a is fixed to the outside of the guide plate 207. Fixed slots Y are provided on both sides of the installation pipe 105. The movable frame 208b slides in the fixed slots Y. The pressing block 208c is fixed to the inner wall of the movable frame 208b and cooperates with the hook plate 208a. The extension rod 208d is fixed to the bottom of the movable frame 208b, and the cross bar 208e is fixed between two adjacent extension rods 208d.

[0049] The hook plate 208a is L-shaped. When installing the second heat exchange tube 106, first install the second heat exchange tube 106 correspondingly in the installation pipe 105. At this time, the hook plate 208a will move into the movable frame 208b. Then, when the first heat exchange tube 104 drives the movable tube 201 to move downward, the extension rod 208d and the movable frame 208b are driven to move downward by the movable tube 201. At this time, the hook plate 208a and the second heat exchange tube 106 are pressed towards the inside of the installation pipe 105 by the pressing block 208c. And a sealing gasket is fixed at the end of the installation pipe 105. When the second heat exchange tube 106 moves towards the inside of the installation pipe 105, its end can be in closer extrusion contact with the sealing gasket, thereby improving its sealing effect.

[0050] A set of extension rods 208d are provided on both sides of each installation pipe 105, and two adjacent extension rods 208d are fixedly connected by a cross bar 208e, improving the convenience of its disassembly and assembly.

[0051] The pre-tightening member 208 further includes a fixed rod 208f, a fixed block 208g, and a third spring 208h. The fixed rod 208f is fixed to the top of the movable tube 201, and its top extends above the cross bar 208e. The fixed block 208g is fixed to the top of the fixed rod 208f, and the two ends of the third spring 208h are respectively fixed to the fixed block 208g and the cross bar 208e.

[0052] The fixed rod 208f slides in the middle of the cross bar 208e. When the movable tube 201 moves up and down, it can drive the fixed rod 208f to move up and down, thereby driving the movable frame 208b to move up and down, squeezing the hook plate 208a. The third spring 208h applies a restoring force to the cross bar 208e and the extension rod 208d, improving the convenience of its reset. When it is necessary to remove the second heat exchange tube 106, the movable tube 201 moves up and resets, driving the fixed rod 208f to move up. At this time, the third spring 208h drives the extension rod 208d and the movable frame 208b to move up, so that they are separated from the hook plate 208a, and the removal of the second heat exchange tube 106 can be completed.

[0053] The installation part 209 includes an installation block 209a, a plug rod 209b, a fixing plate 209c and a trigger block 209d. The installation block 209a is fixed to the outside of the guide plate 207. An installation hole N communicating with it is opened at the top of the fixed groove Y. The plug rod 209b slides in the installation hole N. The fixing plate 209c is fixed to the top end of the plug rod 209b. The trigger block 209d is fixed to the bottom of the fixing plate 209c and is located in the fixed groove Y.

[0054] The installation block 209a is rectangular. When the movable frame 208b moves downward, the movable frame 208b is separated from the trigger block 209d, and the plug rod 209b can be correspondingly inserted into the insertion hole opened at the top of the installation block 209a, thereby fixing the position of the second heat exchange tube 106 and preventing it from detaching from the installation tube 105.

[0055] The installation part 209 further includes a connection block 209e and a fourth spring 209f. The connection block 209e is fixed in the installation hole N. The two ends of the fourth spring 209f are respectively fixed to the connection block 209e and the fixing plate 209c.

[0056] The connection block 209e is fixed by means such as screws, which is convenient for the disassembly and assembly of the fixing plate 209c and the plug rod 209b. This part is not shown in the figure. The fourth spring 209f applies a downward thrust to the fixing plate 209c, making the plug rod 209b more firmly inserted into the insertion hole at the top of the installation block 209a.

[0057] Embodiment 3

[0058] Refer to Figures 1 to 10 , this is the third embodiment of the present invention, and this embodiment is based on the first two embodiments.

[0059] Specifically, the following construction steps are further included:

[0060] Place the adapter box 102 at the position of the angle iron of the transmission tower bracket 101, and install the second heat exchange tubes 106 on both sides on the adapter box 102, and pre-tighten and fix their positions through the pre-tightening parts 208 for subsequent operations;

[0061] Then install the first heat exchange tube 104 correspondingly. At the same time, fix the adapter box 102 and the second heat exchange tubes 106 through the installation assembly 200. At this time, first move the convex plate 206a above the receiving plate 205, rotate the first heat exchange tube 104 so that the convex plate 206a contacts the baffle 206b, and then move downward by the gravity of the first heat exchange tube 104 itself, so that the convex plate 206a is located on the top of the receiving plate 205. In this way, the first heat exchange tube 104 can be fixed by the receiving plate 205 and the convex plate 206a. At this time, push the connecting rod 206c to move through the push plate 206g. The connecting rod 206c moves upward in the installation groove V and drives the extrusion ring 206d and the sealing ring 206e to move upward, so that extrusion occurs between the sealing ring 206e and the installation ring 206f. At this time, the sealing ring 206e deforms and has a good sealing effect;

[0062] At the same time, the convex block 204 rotates correspondingly into the track P. During the downward movement of the first heat exchange tube 104, it drives the movable tube 201 to move downward. By driving the movable tube 201, the first rotating plate 202a is driven to move. Thus, when the first rotating plate 202a approaches or moves away from the second rotating plate 202b, the support plate 202c can be driven to move outward. The adapter box 102 is fastened through the frictional force and supporting force between the support plate 202c and the inner wall of the installation hole S. And because the downward movement of the movable tube 201 is pulled by the convex block 204 and the self-weight of the first heat exchange tube 104, the installation is more stable, and there is no need for the staff to carry too many installation devices, and the safety is higher;

[0063] While the movable tube 201 moves downward, it drives the extension rod 208d and the movable frame 208b to move downward. At this time, the hook plate 208a and the second heat exchange tube 106 are pressed inward into the installation tube 105 through the extrusion block 208c. And a sealing gasket is fixed at the end of the installation tube 105. When the second heat exchange tube 106 moves inward into the installation tube 105, its end can be more closely pressed against the sealing gasket, thereby improving its sealing effect. When the movable frame 208b separates from the trigger block 209d, the insertion rod 209b can be correspondingly inserted into the insertion hole opened at the top of the installation block 209a, so as to fix the position of the second heat exchange tube 106 and prevent it from detaching from the installation tube 105;

[0064] Connect the second heat exchange tube 106 to the ground source heat pump and supply hot water to the first heat exchange tube 104. Through the setting of the water circulation, heat exchange is carried out on the surface of the transmission tower bracket 101, so as to melt the snow and ice, and improve the safety of the transmission tower.

Claims

1. A thermal insulation and ice melting device for transmission towers in cold regions, characterized by: include, The heat preservation assembly (100) comprises a transmission tower support (101), a transfer box (102), a connecting pipe (103), a first heat exchange pipe (104), a mounting pipe (105), a second heat exchange pipe (106) and a connecting pipe (107), wherein the transfer box (102) is arranged on the top of the transmission tower support (101), the connecting pipe (103) is fixed to the bottom of the transfer box (102), and the transmission tower support (101) is provided with a mounting hole ( S), the connecting pipe (103) is located in the mounting hole (S), the first heat exchange pipe (104) is connected to the connecting pipe (103), the mounting pipe (105) is fixed to the side of the adapter box (102), the second heat exchange pipe (106) is located in the mounting pipe (105), the connecting pipe (107) is fixed in the adapter box (102) and is connected to the connecting pipe (103) and the mounting pipe (105); and, The mounting assembly (200) is arranged on the connecting pipe (103), comprising a movable pipe (201), a fastener (202), a fixing ring (203), a bump (204), a receiving plate (205), a sealing member (206), a guide plate (207), a pre-tightening member (208) and a mounting member (209); the movable pipe (201) slides on the surface of the connecting pipe (103); the fastener (202) is arranged on the movable pipe (201) and is located in the mounting hole (S); the fixing ring (203) is fixed to the first heat exchange The surface of the tube (104), the protrusion (204) is fixed around the fixing ring (203), the bottom of the movable tube (201) is provided with a track (P) that cooperates with it, the receiving plate (205) is fixed to the inner wall of the connecting tube (103), the sealing member (206) is arranged at the end of the first heat exchange tube (104), the guide plate (207) is fixed to both sides of the second heat exchange tube (106), the pre-tightening member (208) is arranged on both sides of the mounting tube (105), and the mounting member (209) cooperates with the pre-tightening member (208).

2. The cold region transmission tower insulation and ice melting equipment according to claim 1, characterized in that: The fastener (202) comprises a first rotating plate (202a), a second rotating plate (202b) and a supporting plate (202c); through holes (K) are provided around the movable tube (201); the first rotating plate (202a) is rotatably connected to the inner wall of the through hole (K); the second rotating plate (202b) is rotatably connected to the outer side of the connecting tube (103); and the supporting plate (202c) is rotatably connected to the ends of the two rotating plates.

3. The cold region transmission tower insulation and ice melting equipment as claimed in claim 2, characterized in that: The fastener (202) further comprises a limiting ring (202d) and a first spring (202e); the limiting ring (202d) is fixed to the surface of the connecting tube (103); and two ends of the first spring (202e) are respectively fixed to the limiting ring (202d) and the movable tube (201).

4. The cold region transmission tower insulation and ice melting equipment as claimed in claim 3, characterized in that: The sealing member (206) comprises a convex plate (206a), a baffle (206b), a connecting rod (206c), an extrusion ring (206d), a sealing ring (206e) and a mounting ring (206f); the convex plate (206a) is fixed around the top of the first heat exchange tube (104) and has a mounting groove (V) therein; the baffle (206b) is fixed to one side of the top of the receiving plate (205); the connecting rod (206c) slides in the mounting groove (V); the extrusion ring (206d) slides on the first heat exchange tube (104); the bottom end of the connecting rod (206c) is fixed to the extrusion ring (206d); the sealing ring (206e) is located at the top of the extrusion ring (206d); and the mounting ring (206f) is fixed to the first heat exchange tube (104) and is located above the sealing ring (206e).

5. The cold region transmission tower insulation and ice melting equipment as claimed in claim 4, characterized in that: The sealing member (206) further comprises a push plate (206g), a guide rod (206h) and a second spring (206i), wherein the push plate (206g) is fixed to the top of the receiving plate (205), the guide rod (206h) is fixed in the mounting groove (V), the connecting rod (206c) slides on the guide rod (206h), and the two ends of the second spring (206i) are respectively fixed to the inner wall of the mounting groove (V) and the connecting rod (206c).

6. The cold region transmission tower insulation and ice melting equipment as claimed in claim 5, characterized in that: The preload member (208) comprises a hook plate (208a), a movable frame (208b), an extrusion block (208c), an extension rod (208d) and a cross bar (208e), wherein the hook plate (208a) is fixed to the outer side of the guide plate (207), and fixing grooves (Y) are provided on both sides of the mounting tube (105), the movable frame (208b) slides in the fixing grooves (Y), the extrusion block (208c) is fixed to the inner wall of the movable frame (208b) and cooperates with the hook plate (208a), the extension rod (208d) is fixed to the bottom of the movable frame (208b), and the cross bar (208e) is fixed between two adjacent extension rods (208d).

7. The cold region transmission tower insulation and ice melting equipment according to claim 6, characterized in that: The preload member (208) further comprises a fixing rod (208f), a fixing block (208g) and a third spring (208h); the fixing rod (208f) is fixed to the top of the movable tube (201), and its top end extends above the cross bar (208e); the fixing block (208g) is fixed to the top of the fixing rod (208f); and two ends of the third spring (208h) are respectively fixed to the fixing block (208g) and the cross bar (208e).

8. The cold region transmission tower insulation and ice melting equipment as claimed in claim 7, characterized in that: The mounting member (209) comprises a mounting block (209a), an insertion rod (209b), a fixing plate (209c) and a trigger block (209d); the mounting block (209a) is fixed to the outside of the guide plate (207); a mounting hole (N) connected to the fixing groove (Y) is provided at the top; the insertion rod (209b) slides in the mounting hole (N); the fixing plate (209c) is fixed to the top of the insertion rod (209b); the trigger block (209d) is fixed to the bottom of the fixing plate (209c) and is located in the fixing groove (Y).

9. The cold region transmission tower insulation and ice melting equipment as claimed in claim 8, characterized in that: The mounting member (209) further comprises a connecting block (209e) and a fourth spring (209f), wherein the connecting block (209e) is fixed in the mounting hole (N), and two ends of the fourth spring (209f) are respectively fixed to the connecting block (209e) and the fixing plate (209c).

10. A construction method for heat preservation and ice melting equipment of transmission towers in cold regions, characterized in that: The invention comprises the transmission tower insulation and ice-melting device according to any one of claims 1 to 9, and further comprises the following construction steps: Placing the transfer box (102) at a position corresponding to the angle iron of the transmission tower support (101), and installing the second heat exchange tubes (106) on both sides on the transfer box (102); The first heat exchange tube (104) is installed accordingly, and the adapter box (102) and the second heat exchange tube (106) are fixed by means of the installation assembly (200); The second heat exchange pipe (106) is connected to the ground source heat pump, and hot water is supplied to the first heat exchange pipe (104). Through the water circulation setting, heat exchange is performed on the surface of the transmission tower support (101).