A BIM-based planning scheme approval management method and system
By adopting a BIM-based approach to planning scheme approval management, the problems of inaccuracy and neglect of practical effects in manual review have been solved. This approach enables automated and scientific review and optimization of planning schemes, ensuring compliance and practical applicability, and improving review efficiency and accuracy.
Patent Information
- Application Number
- CN202510985465.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-17
- Publication Date
- 2026-02-13
- Estimated Expiration
- 2045-07-17
Smart Images

Figure CN120875790B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application belongs to the technical field of planning scheme approval management, and relates to a planning scheme approval management method and system based on BIM. BACKGROUND
[0002] In the field of construction engineering, the approval management of planning schemes is a key link in project implementation. With the popularization and application of BIM technology in engineering construction, the traditional planning scheme approval management mode relying on manual operation and paper document circulation has gradually failed to adapt to the needs of digital management.
[0003] There are still several problems in the existing planning scheme approval management technology: 1. When manually reviewing planning schemes, the subjective factors have a great influence, and it is difficult to accurately analyze and evaluate the planning index parameters. For the review of hard planning index parameters, manual comparison and calculation are prone to errors, and the accuracy of the review results cannot be guaranteed.
[0004] 2. When matching historical input operation schemes, there is a lack of scientific similarity analysis method, and it is difficult to accurately find the most similar historical scheme to the target planning scheme, and it is difficult to fully utilize historical data to provide reference for the review and optimization of the current scheme.
[0005] 3. When reviewing planning schemes, only the compliance of the scheme is concerned, and the actual effect after the scheme is put into operation is ignored. The planning scheme cannot be evaluated based on historical operation data, which may lead to various problems in the actual operation of the selected scheme, affecting the social and economic benefits of the project. SUMMARY
[0006] In view of this, in order to solve the problems raised in the background art, a planning scheme approval management method and system based on BIM are proposed.
[0007] The purpose of the application can be achieved by the following technical solutions: the first aspect of the application provides a planning scheme approval management method based on BIM, comprising: S1, preliminary verification of reporting materials: collecting each planning scheme reported by the target residential planning area, extracting the material directory reported by each planning scheme, and the target approval platform preliminarily verifying the reporting materials of each planning scheme based on the preset reporting material rules, and screening each preliminary review scheme.
[0008] S2, collaborative review by the review department: based on BIM, the planning information of each preliminary review scheme is automatically extracted, and each hard planning index parameter of the review department is extracted, based on which the collaborative review of the review department is performed on each preliminary review scheme, and each target planning scheme is screened.
[0009] S3, planning index fit degree evaluation: based on the audit department collaborative audit rules, the index fit degree of each target planning scheme and the audit department is evaluated.
[0010] S4, input operation scheme matching: each input operation scheme is extracted from historical approval cases, and the planning information of each input operation scheme is extracted, and accordingly the target input operation scheme corresponding to each target planning scheme is matched.
[0011] S5, actual operation applicability evaluation: the operation investigation information of the target input operation scheme corresponding to each target planning scheme is extracted, and the actual operation applicability of the target input operation scheme corresponding to each target planning scheme is evaluated based on the operation investigation information.
[0012] S6, best planning scheme confirmation: based on the index fit degree and the actual operation applicability, the best planning scheme corresponding to the target residential planning area is confirmed.
[0013] The second aspect of the present application provides a BIM-based planning scheme approval management system, comprising: a reporting material preliminary verification module, collecting each planning scheme corresponding to the target residential planning area, extracting the material directory reported by each planning scheme, and the target approval platform performing preliminary verification on the reporting materials of each planning scheme through the preset material reporting rules, and screening out each preliminary examination scheme.
[0014] The audit department collaborative audit module automatically extracts the planning information of each preliminary examination scheme based on BIM, and extracts each hard planning index parameter of the audit department, and accordingly performs audit department collaborative audit on each preliminary examination scheme, and screens out each target planning scheme.
[0015] The planning index fit degree evaluation module evaluates the index fit degree of each target planning scheme and the audit department based on the audit department collaborative audit rules.
[0016] The input operation scheme matching module extracts each input operation scheme from historical approval cases, and extracts the planning information of each input operation scheme, and accordingly matches the target input operation scheme corresponding to each target planning scheme.
[0017] The actual operation applicability evaluation module extracts the operation investigation information of the target input operation scheme corresponding to each target planning scheme, and evaluates the actual operation applicability of the target input operation scheme corresponding to each target planning scheme based on the operation investigation information.
[0018] The best planning scheme confirmation module confirms the best planning scheme corresponding to the target residential planning area based on the index fit degree and the actual operation applicability.
[0019] Compared with the prior art, the embodiments of the present application have at least the following advantages or beneficial effects: (1) The present application preliminarily checks the reported materials through the target approval platform, realizes the automation of material review, reduces manual operation, improves the review efficiency, and realizes the real-time sharing and collaborative processing of information through the collaborative review of each review department based on BIM technology, greatly shortening the approval period.
[0020] (2) The present application automatically extracts planning information and hard planning index parameters by using BIM technology, evaluates the index fitting degree through scientific calculation and analysis methods, reduces the influence of subjective factors, and improves the accuracy and scientificity of the review results.
[0021] (3) The present application accurately matches the historical input operation scheme through a scientific similarity analysis method, fully utilizes historical data to provide reference for the review and optimization of the current scheme, and improves the quality and feasibility of the scheme.
[0022] (4) The present application evaluates the actual operation applicability of the target input operation scheme, fully considers the satisfaction and rectification timeliness of the scheme in actual operation, and ensures that the selected scheme is not only compliant, but also has good actual operation effect. BRIEF DESCRIPTION OF DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following will briefly introduce the drawings needed to be used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creative labor.
[0024] Figure 1 The present application is a method step flowchart.
[0025] Figure 2 The present application is a system structure connection schematic diagram.
[0026] Figure 3 The present application is a reported material review process schematic diagram. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only some embodiments of the present application, not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor are within the scope of protection of the present application.
[0028] Please refer to Figure 1As shown, the first aspect of the present application provides a BIM-based planning scheme approval management method, comprising: S1, preliminary checking of reported materials: collecting each planning scheme reported by the target residential planning area, extracting the material directory reported by each planning scheme, and the target approval platform performing preliminary checking of reported materials on each planning scheme through a preset material reporting rule to screen out each preliminary examination scheme.
[0029] Please refer to Figure 3 As shown, in a specific embodiment of the present application, the specific process of screening out each preliminary examination scheme is: extracting each material name from the material directory reported by each planning scheme, and performing word segmentation processing on each material name to obtain the material keywords of each material reported by each planning scheme.
[0030] In a specific embodiment of the present application, the material keywords include but are not limited to project approval, land ownership certificate, design achievement file, environmental protection commitment, technical analysis file, fire special specification, etc.
[0031] Extract the hard keyword library corresponding to the reported material from the preset material reporting rule, and match the material keywords of each material reported by each planning scheme with the hard keyword library.
[0032] If the material keywords of each material reported by a planning scheme do not completely satisfy each keyword in the hard keyword library, it indicates that the reported materials of the planning scheme are not complete, otherwise, if the material keywords of each material reported by a planning scheme completely satisfy each keyword in the hard keyword library, it indicates that the reported materials of the planning scheme are complete, and the planning scheme is recorded as a preliminary examination scheme, thereby obtaining each preliminary examination scheme.
[0033] S2, collaborative review by the review department: based on BIM, automatically extracting planning information of each preliminary examination scheme, and extracting each hard planning index parameter of the review department, thereby performing collaborative review by the review department on each preliminary examination scheme, and screening out each target planning scheme.
[0034] It should be noted that each hard planning index parameter of the review department is extracted from the review reference file of the review department.
[0035] In a specific embodiment of the present application, each hard planning index parameter of each review department includes but is not limited to volumetric ratio, building density, green space ratio, building height, building setback distance, and number of parking spaces of the planning department. Building spacing, fire access width, and seismic fortification grade of the housing department. Number of entrances, number of traffic lights, and number of zebra crossings of the traffic department. Fire partition area, length and width of evacuation passage, and number of fire facility configurations of the fire department. Area and protection level of civil air defense engineering of the civil air defense department.
[0036] In the embodiment of the present application, the specific process of screening out each target planning scheme is: extracting each planning index parameter from the planning information of each preliminary examination scheme, and comparing each planning index parameter of each preliminary examination scheme with each hard planning index parameter of the examination department.
[0037] If a planning index parameter in a preliminary examination scheme is less than the hard planning index parameter of the examination department, it indicates that the preliminary examination scheme does not meet the planning requirements, and if any planning index parameter in a preliminary examination scheme is greater than or equal to the hard planning index parameter of the examination department, it indicates that the preliminary examination scheme meets the planning requirements, and it is recorded as a secondary examination scheme, thereby obtaining each target planning scheme.
[0038] The embodiment of the present application realizes the automation of material examination, reduces manual operation, improves examination efficiency, realizes real-time sharing and collaborative processing of information through collaborative examination of each examination department based on BIM technology, and greatly shortens the reporting period.
[0039] S3, planning index matching degree evaluation: based on the collaborative examination rules of the examination department, the index matching degree of each target planning scheme and the examination department is evaluated.
[0040] In the embodiment of the present application, the specific process of evaluating the index matching degree of each target planning scheme and the examination department is: screening each hard planning index parameter of each examination department from each hard planning index parameter of the examination department, and extracting each planning index parameter of each target planning scheme from each planning index parameter of each preliminary examination scheme.
[0041] Matching each hard planning index parameter of each examination department with each planning index parameter of each target planning scheme obtains each planning index parameter of each examination department belonging to each target planning scheme.
[0042] The difference between each planning index parameter of each examination department belonging to each target planning scheme and the hard planning index parameter of the examination department is calculated, and the difference is divided by the hard planning index parameter of the examination department, to obtain the matching degree of each planning index parameter of each examination department belonging to each target planning scheme, and the mean value is calculated to obtain the index matching degree of each examination department belonging to each target planning scheme.
[0043] The index matching degree of each examination department belonging to each target planning scheme is weighted and summed with the examination proportion weight of each examination department in the target project stored in the database to obtain the index matching degree of each target planning scheme and the examination department.
[0044] In one specific embodiment of the present application, the proportion of the review of each review department in the target project stored in the database can be determined according to policy guidance, project type characteristics, historical approval data, expert evaluation and local management priorities.
[0045] Exemplarily, taking a new residential community project in a core area of a city as an example, the planning department needs to control core indicators such as plot ratio, and the weight is set to 30%. The traffic department needs to focus on the evaluation of the number of entrances and exits, the number of traffic lights and the number of zebra crossings, and the weight is 25%. The fire department considers that the residential community is densely populated and has high fire safety requirements, and the weight is 20%. The housing and construction department is responsible for building structure safety and construction standards, and the weight is 15%. The air defense department considers the air defense engineering area and protection level of the project, and the weight is 10%. The setting of each weight matches the key needs of the project in space planning, traffic relief, safety protection, etc., ensuring that the review focus matches the risk points of the project.
[0046] In the embodiment of the present application, the planning information and the hard planning index parameters are automatically extracted by using the BIM technology, and the index matching degree is evaluated by a scientific calculation and analysis method, thereby reducing the influence of subjective factors and improving the accuracy and scientificity of the review results.
[0047] S4, input operation scheme matching: extracting each input operation scheme from historical approval cases, and extracting planning information of each input operation scheme, thereby matching the target input operation scheme corresponding to each target planning scheme.
[0048] In the specific embodiment of the present application, the specific process of matching the target input operation scheme corresponding to each target planning scheme is as follows: extracting each planning index parameter from the planning information of each input operation scheme, and performing similarity analysis based on each planning index parameter of each target planning scheme to obtain the planning index similarity between each target planning scheme and each input operation scheme.
[0049] In the specific embodiment of the present application, the specific process of obtaining the planning index similarity between each target planning scheme and each input operation scheme is as follows: performing corresponding difference on each planning index parameter of each target planning scheme and each planning index parameter of each input operation scheme, taking the absolute value of the difference, and obtaining the planning index parameter deviation between each target planning scheme and each input operation scheme.
[0050] The deviation value of the set reference is subtracted from each planning index parameter deviation, and the difference value is divided by the deviation value of the set reference to obtain the similarity of each planning index parameter between each target planning scheme and each input operation scheme, and the mean value is calculated to obtain the planning index similarity between each target planning scheme and each input operation scheme.
[0051] Extract the input operation scheme corresponding to the maximum planning index similarity from the planning index similarity between each target planning scheme and each input operation scheme, and take the input operation scheme as the target input operation scheme corresponding to each target planning scheme.
[0052] The embodiment of the present application accurately matches the historical input operation scheme by a scientific similarity analysis method, fully utilizes the historical data to provide a reference for the review and optimization of the current scheme, and improves the quality and feasibility of the scheme.
[0053] S5, actual operation applicability evaluation: extracting the operation investigation information of the target input operation scheme corresponding to each target planning scheme, and evaluating the actual operation applicability of the target input operation scheme corresponding to each target planning scheme based on the operation investigation information.
[0054] In the embodiment of the present application, the specific process of evaluating the actual operation applicability of the target input operation scheme corresponding to each target planning scheme is: extracting the historical unsatisfied complaint times of each planning index parameter correlation level and the complaint time point and rectification time point corresponding to each unsatisfied complaint from the operation investigation information of the target input operation scheme corresponding to each target planning scheme, and analyzing the actual operation satisfaction and rectification timeliness of the target input operation scheme corresponding to each target planning scheme.
[0055] It should be noted that the historical unsatisfied complaint times of each planning index parameter correlation level and the complaint time point and rectification time point corresponding to each unsatisfied complaint are all extracted from the property management system of the target input operation scheme.
[0056] In one embodiment of the present application, for the planning scheme of a residential area, the planning index parameter correlation level mainly includes but is not limited to the living environment (such as insufficient green space ratio of the community, too high building density), supporting facilities (insufficient number of parking spaces leading to parking difficulty complaints), traffic travel (unreasonable number of community entrances leading to congestion), safety guarantee (too narrow length and width of evacuation passage leading to safety hazard complaints), sunlight and lighting (too close building spacing leading to insufficient lighting of some residents), etc. The historical complaint times, complaint and rectification time points of these dimensions can directly reflect the satisfaction of residents to the actual operation effect of the planning scheme and the rectification efficiency.
[0057] In the embodiment of the present application, the specific way of analyzing the actual operation satisfaction of the target input operation scheme corresponding to each target planning scheme is: accumulating the historical unsatisfied complaint times of each planning index parameter correlation level of the target input operation scheme corresponding to each target planning scheme to obtain the historical unsatisfied complaint times of the target input operation scheme corresponding to each target planning scheme.
[0058] The complaint number set as a reference is subtracted from the historical unsatisfactory complaint number, and the difference is divided by the complaint number set as a reference, to obtain the actual operation satisfaction degree of the target input operation scheme corresponding to each target planning scheme.
[0059] It should be noted that the specific process of analyzing the rectification timeliness of the target input operation scheme corresponding to each target planning scheme is that the complaint time point and the rectification time point corresponding to each unsatisfactory complaint at the level of each planning index parameter correlation are compared, the rectification response time length corresponding to each unsatisfactory complaint at the level of each planning index parameter correlation is obtained, and the average rectification response time length at the level of each planning index parameter correlation is obtained by taking the average value.
[0060] The rectification response time length set as a reference is subtracted from the average rectification response time length at the level of each planning index parameter correlation, and the difference is divided by the rectification response time length set as a reference, to obtain the rectification timeliness at the level of each planning index parameter correlation, and the rectification timeliness of the target input operation scheme corresponding to each target planning scheme is obtained by taking the average value.
[0061] The actual operation satisfaction degree and the rectification timeliness of the target input operation scheme corresponding to each target planning scheme are weighted and summed according to the corresponding proportion weight, to obtain the actual operation applicability of the target input operation scheme corresponding to each target planning scheme.
[0062] In one specific embodiment of the present application, for the building planning of a residential community, the proportion weight of the actual operation satisfaction degree is usually larger, because the residential community directly serves the daily life of residents, and the quality of the living experience has a profound impact on the happiness of residents. The satisfaction degree of residents on the living environment, supporting facilities, property services, etc. is directly related to the long-term reputation and social stability of the community. Although the rectification timeliness is also very important, in the case of reasonable planning scheme design and careful consideration in the early stage, the rectification demand is relatively limited, and the ultimate goal of the rectification timeliness is still to improve the satisfaction degree of residents. Therefore, in the weight distribution, the actual operation satisfaction degree occupies the dominant position, so the proportion weights of the actual operation satisfaction degree and the rectification timeliness can be 0.65 and 0.35 respectively.
[0063] The embodiment of the present application evaluates the actual operation applicability of the target input operation scheme, fully considers the satisfaction degree and the rectification timeliness of the scheme in the actual operation, and ensures that the selected scheme is not only compliant, but also has good actual operation effect.
[0064] S6, best planning scheme confirmation: based on the index matching degree and the actual operation applicability, the best planning scheme corresponding to the target residential planning area is confirmed.
[0065] In specific embodiments of the present application, the specific way of confirming the optimal planning scheme corresponding to the target residential planning area is as follows: the index fitting degree of each target planning scheme with the auditing department and the actual operation applicability of the target input operation scheme corresponding to each target planning scheme are respectively weighted and summed with the corresponding proportion weight to obtain a comprehensive adaptation index of each target planning scheme, and the target planning scheme corresponding to the maximum comprehensive adaptation index is extracted as the optimal planning scheme corresponding to the target residential planning area.
[0066] In one specific embodiment of the present application, the actual operation applicability weight proportion is larger for the building planning of the residential community, because the residential community directly faces the life of residents, and its functional practicability and living experience are crucial. The actual operation applicability covers core dimensions such as resident satisfaction and rectification efficiency, and directly affects the living quality and social benefits. Although the index fitting degree ensures that the scheme meets the regulations and technical standards, it is more necessary to focus on the actual effect after the scheme is implemented on the basis of meeting the basic compliance. Therefore, the actual operation applicability occupies the dominant position in the weight distribution to ensure that the selected optimal scheme has both compliance and people's livelihood value, so the proportion weight of the index fitting degree and the actual operation applicability can be respectively 0.4 and 0.6.
[0067] Referring to Figure 2 The second aspect of the present application provides a BIM-based planning scheme approval management system, which comprises: a reporting material preliminary verification module, an auditing department collaborative auditing module, a planning index fitting degree evaluation module, an input operation scheme matching module, an actual operation applicability evaluation module, and an optimal planning scheme confirmation module.
[0068] It should be noted that the present application also includes a database for storing the auditing proportion weight of each auditing department in the target project.
[0069] The reporting material preliminary verification module and the auditing department collaborative auditing module are connected, the auditing department collaborative auditing module and the planning index fitting degree evaluation module are connected, the auditing department collaborative auditing module and the input operation scheme matching module are connected, the input operation scheme matching module and the actual operation applicability evaluation module are connected, the planning index fitting degree evaluation module and the actual operation applicability evaluation module are both connected to the optimal planning scheme confirmation module, and the planning index fitting degree evaluation module is connected to the database.
[0070] The reporting material preliminary verification module collects each planning scheme corresponding to the reporting of the target residential planning area, extracts the material directory reported by each planning scheme, and the target approval platform performs preliminary verification on the reporting materials of each planning scheme through the preset reporting material rules to screen out each preliminary examination scheme.
[0071] The auditing department cooperative auditing module automatically extracts planning information of each preliminary examination scheme based on BIM, extracts hard planning index parameters of the auditing department, and performs auditing department cooperative auditing on each preliminary examination scheme according to the planning information and the hard planning index parameters, and screens out each target planning scheme.
[0072] The planning index fitting degree evaluation module evaluates the index fitting degree of each target planning scheme and the auditing department based on auditing department cooperative auditing rules.
[0073] The operation scheme matching module extracts each operation scheme from historical examination cases, extracts planning information of each operation scheme, and matches each target planning scheme with a target operation scheme according to the planning information.
[0074] The actual operation applicability evaluation module extracts operation investigation information of the target operation scheme corresponding to each target planning scheme, and evaluates the actual operation applicability of the target operation scheme corresponding to each target planning scheme based on the operation investigation information.
[0075] The best planning scheme confirmation module confirms the best planning scheme corresponding to the target residential planning area based on the index fitting degree and the actual operation applicability.
[0076] The above content is merely an example and a description of the concept of the present application, and those skilled in the art can make various modifications or supplements to the described specific embodiments or use similar ways to replace them, as long as they do not deviate from the concept of the present application or exceed the scope defined by the present application, and they should belong to the protection scope of the present application.
Claims
1. A BIM-based planning scheme examination management method, characterized in that, Comprise: S1, report material preliminary check: collect the planning schemes reported by the target residential planning area, extract the material directory reported by each planning scheme, and the target approval platform performs preliminary check on the reported materials of each planning scheme according to the preset material reporting rules, and selects each preliminary examination scheme; S2, collaborative review of the department: based on BIM, the planning information of each preliminary examination scheme is automatically extracted, and the hard planning index parameters of the review department are extracted, and the target planning scheme is selected according to the collaborative review of the department; S3, planning index matching degree evaluation: based on the collaborative review rules of the department, the index matching degree of each target planning scheme and the department is evaluated; S4, input operation scheme matching: extract each input operation scheme from the historical approval cases, and extract the planning information of each input operation scheme, and match the target input operation scheme corresponding to each target planning scheme; S5, actual operation applicability evaluation: extract the operation investigation information of the target input operation scheme corresponding to each target planning scheme, and evaluate the actual operation applicability of the target input operation scheme corresponding to each target planning scheme based on the operation investigation information; S6, best planning scheme confirmation: based on the index matching degree and the actual operation applicability, the best planning scheme corresponding to the target residential planning area is confirmed; The specific process of evaluating the index matching degree of each target planning scheme and the department is: Selecting each hard planning index parameter of each audit department from each hard planning index parameter of the audit department, and extracting each planning index parameter of each target planning scheme from each planning index parameter of each preliminary examination scheme; Match each hard planning index parameter of each audit department with each planning index parameter of each target planning scheme to obtain each planning index parameter of each audit department in each target planning scheme; Difference is made between each planning index parameter of each audit department in each target planning scheme and the hard planning index parameter of the audit department, and the difference is compared with the hard planning index parameter of the audit department to obtain the matching degree of each planning index parameter of each audit department in each target planning scheme, and the mean value is calculated to obtain the index matching degree of each audit department in each target planning scheme; The index matching degree of each audit department in each target planning scheme and the audit proportion weight of each audit department in the target project stored in the database is weighted and summed to obtain the index matching degree of each target planning scheme and the department; The specific process of evaluating the actual operation applicability of the target input operation scheme corresponding to each target planning scheme is: From the operation investigation information of the target input operation scheme corresponding to each target planning scheme, extract the historical number of dissatisfied complaints related to each planning index parameter and the complaint time point and rectification time point corresponding to each dissatisfied complaint, and analyze the actual operation satisfaction and rectification timeliness of the target input operation scheme corresponding to each target planning scheme according to the above. The actual operational satisfaction and rectification timeliness of the target implementation plan corresponding to each target planning scheme are weighted and summed with their corresponding proportions to obtain the actual operational applicability of the target implementation plan corresponding to each target planning scheme.
2. The BIM-based planning scheme examination and approval management method according to claim 1, characterized in that: The specific process for selecting each preliminary review scheme is as follows: Extract the names of each material from the material catalog submitted by each planning scheme, and perform word segmentation on each material name to obtain the material keywords of each material submitted by each planning scheme. Extract the hard keyword library corresponding to the reported materials from the preset material reporting rules, and match the material keywords of each material reported by each planning scheme with the hard keyword library; If the keywords in the materials submitted for a planning scheme do not fully meet all the keywords in the hard keyword library, it indicates that the submitted materials for the planning scheme are incomplete. Conversely, if the keywords in the materials submitted for a planning scheme fully meet all the keywords in the hard keyword library, it indicates that the submitted materials for the planning scheme are complete, and the planning scheme is recorded as a preliminary review scheme, thus obtaining each preliminary review scheme.
3. The BIM-based planning scheme examination and approval management method according to claim 1, characterized in that: The specific process for selecting each target planning scheme is as follows: Extract planning indicator parameters from the planning information of each preliminary review plan, and compare each planning indicator parameter of each preliminary review plan with the hard planning indicator parameters of the review department. If a planning indicator parameter in a preliminary review plan is less than the mandatory planning indicator parameter of the reviewing department, it indicates that the preliminary review plan does not meet the planning requirements. If any planning indicator parameter in a preliminary review plan is greater than or equal to the mandatory planning indicator parameter of the reviewing department, it indicates that the preliminary review plan meets the planning requirements and is recorded as a secondary review plan, thus obtaining each target planning plan.
4. The BIM-based planning scheme examination and approval management method according to claim 3, characterized in that: The specific process of matching the target implementation plan corresponding to each target planning scheme is as follows: The planning indicator parameters are extracted from the planning information of each operational scheme, and a similarity analysis is performed based on the planning indicator parameters of each target planning scheme to obtain the planning indicator similarity between each target planning scheme and each operational scheme. Extract the operational scheme corresponding to the highest similarity of planning indicators among the planning indicators of each target planning scheme and each operational scheme, and use this operational scheme as the target operational scheme corresponding to each target planning scheme.
5. The BIM-based planning scheme examination and approval management method according to claim 4, characterized in that: The specific process for obtaining the similarity of planning indicators between each target planning scheme and each operational scheme is as follows: The planning index parameters of each target planning scheme are compared with the planning index parameters of each operational scheme, and the absolute value of the difference is taken to obtain the deviation of each planning index parameter between each target planning scheme and each operational scheme. The deviation value of the set reference is subtracted from the deviation of each planning indicator parameter, and the difference is compared with the deviation value of the set reference to obtain the similarity of each planning indicator parameter between each target planning scheme and each operational scheme. The average value is then calculated to obtain the similarity of planning indicators between each target planning scheme and each operational scheme.
6. The BIM-based planning scheme examination and approval management method according to claim 5, characterized in that: The specific manner of analyzing the actual operation satisfaction degree of the target input operation scheme corresponding to each target planning scheme is: The historical unsatisfied complaint times of each planning index parameter correlation level of the target input operation scheme corresponding to each target planning scheme are accumulated to obtain the historical unsatisfied complaint times of the target input operation scheme corresponding to each target planning scheme; The set reference complaint times are subtracted from the historical unsatisfied complaint times, and the difference is divided by the set reference complaint times to obtain the actual operation satisfaction degree of the target input operation scheme corresponding to each target planning scheme.
7. The BIM-based planning scheme examination and approval management method according to claim 1, characterized in that: The specific manner of confirming the best planning scheme corresponding to the target residential planning area is: the index fitting degree of each target planning scheme and the actual operation applicability of the target input operation scheme corresponding to each target planning scheme are respectively weighted calculated and summed with the corresponding proportion weight to obtain the comprehensive adaptation index of each target planning scheme, and the target planning scheme corresponding to the maximum comprehensive adaptation index is extracted as the best planning scheme corresponding to the target residential planning area. 8.A BIM-based planning scheme examination management system applied to the BIM-based planning scheme examination management method of claim 1, characterized in that, Comprise: The preliminary verification module of the reported material collects each planning scheme reported by the target residential planning area, extracts the material directory reported by each planning scheme, and the target approval platform performs preliminary verification on the reported materials of each planning scheme through the preset material reporting rules to screen out each preliminary examination scheme; The collaborative review module of the audit department automatically extracts the planning information of each preliminary examination scheme based on BIM, and extracts each hard planning index parameter of the audit department, thereby performing collaborative review of the audit department on each preliminary examination scheme to screen out each target planning scheme; The planning index fitting degree evaluation module evaluates the index fitting degree of each target planning scheme based on the audit department collaborative review scoring rule; The input operation scheme matching module extracts each input operation scheme from the historical approval cases, and extracts the planning information of each input operation scheme, thereby matching the target input operation scheme corresponding to each target planning scheme; The actual operation applicability evaluation module extracts the operation investigation information of the target input operation scheme corresponding to each target planning scheme, and evaluates the actual operation applicability of the target input operation scheme corresponding to each target planning scheme based on the operation investigation information; The best planning scheme confirmation module confirms the best planning scheme corresponding to the target residential planning area based on the index fitting degree and the actual operation applicability.
Citation Information
Patent Citations
BIM-based approval supervision method and system
CN114581060A
Building information model automation compliance examination method driven by large language model
CN119887118A