Ship bow and method of building a ship bow

CN120902873BActive Publication Date: 2026-07-24SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD
Filing Date
2025-09-12
Publication Date
2026-07-24

AI Technical Summary

Technical Problem

In existing technologies, the bow section of a ship needs to be built separately, resulting in poor integrity of the outer plating, numerous joints, and easy damage to the paint.

Method used

The bow section is divided into the bow outer plating, the first side section, and the second side section. The outer plating is made using a large-area covering method, and the side pipes are installed in the segmentation stage to reduce high-altitude operations and connection seams.

Benefits of technology

It improves the integrity of the outer panel and construction efficiency, reduces the safety risks of working at heights, and lowers the probability of paint damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120902873B_ABST
    Figure CN120902873B_ABST
Patent Text Reader

Abstract

The application relates to the ship manufacturing technical field, in particular to a ship bow and a ship bow construction method, the ship bow comprises a bow section segment, a first side section segment and a second side section segment; the bow section segment comprises a bow plate, the height of the bow plate extends along the height direction of the ship, and the width of the bow plate extends along the width direction of the ship; the first side section segment comprises a first side plate and is arranged on one side of the ship; the second side section segment comprises a second side plate and is arranged on the other side of the ship. The ship bow provided by the application can realize the assembly line production of the plate parts of the bow section segment, the first side section segment and the second side section segment in the thin plate production stage, the construction efficiency is greatly improved, the degree of complexity of the complicated process which needs to be separately produced due to the different curvatures of the plates of different deck layers is greatly reduced, the bow plate and the side plate adopt the large-area covering mode, the integrity of the plate is greatly improved, the high-altitude operation of the plate is reduced, and the safety of the workers in the plate connecting process is improved.
Need to check novelty before this filing date? Find Prior Art