Dynamic coupling modeling method and system for power information physical system
By constructing a dynamic coupling modeling method for power cyber-physical systems using a workflow engine and a rule engine, the problems of unclear dynamic coupling mechanism and insufficient adaptive business logic in cyber-physical system simulation modeling are solved. This method enables cross-level closed-loop simulation verification and iterative model updates for the AGC control process, thereby improving the safety, stability, and flexibility of the power system.
Patent Information
- Application Number
- CN202511069269.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-31
- Publication Date
- 2025-11-18
AI Technical Summary
Existing simulation modeling methods for power information physical systems cannot effectively represent real-time information-physical data interaction, resulting in delayed control command transmission, difficulty in achieving cross-level closed-loop verification, inability to adapt to dynamic business logic requirements, lack of proactive reconstruction mechanism for coupling relationships, and inability to iteratively update during closed-loop simulation.
The dynamic coupling modeling method of power cyber-physical systems is adopted. By constructing a workflow engine and a rule engine, the business data flow of the AGC control process is analyzed, the information node model and information branch model of the information system are generated, the network matrix model of the information system is established, and the cyber-physical coupling model is updated based on the actual business strategy to achieve cross-level closed-loop simulation verification.
It achieves accurate characterization of the dynamic coupling characteristics of cyber-physical systems during AGC control, supports real-time dynamic adjustment of business status, enhances the flexibility and security stability of the system, provides a closed-loop simulation basic model, locates hidden risks, and optimizes control strategies.
Smart Images

Figure CN120972614A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application belongs to the technical field of power dispatch automation, and particularly relates to a power information physical system dynamic coupling modeling method and system. BACKGROUND
[0002] The profound changes in the structure of power sources, power grids and load sides of a new power system are typical power information physical systems (CPS systems) that deeply integrate advanced computing, communication and control technologies. With the transformation of the new power system to high-proportion renewable energy and high-proportion power electronic devices, the fluctuation of power source structure is intensified, the form of power grid is complicated, and the demand for active participation in regulation and control of the load side is surging. The operation and control of the power system has changed from the traditional "source following load" to "source-grid-load-storage multi-element collaboration". The core control software such as automatic generation control (AGC) is not only a key means to ensure the stability of the power grid frequency, but also bears emerging functions such as coordinating distributed resources and supporting real-time clearing of the power market. The depth of information-physical coupling and the system-level risk of the AGC are significantly improved, and the quantification analysis of the information-physical system risk needs to be realized through power information physical hybrid simulation to find potential risks of the system. However, the existing power information physical coupling system hybrid simulation needs to build a hardware-in-the-loop environment of the information system. When the business process is restructured or the control strategy is upgraded, the interface protocol and hardware topology need to be redesigned, which has the problems of high modification cost and long iteration period.
[0003] The traditional AGC closed-loop control process simulation modeling method usually models the information layer (control algorithm, communication network and other information modules) and the physical layer (units, loads and other electrical modules) independently, and only transmits power and instructions through a simple interface, which cannot represent the real-time data interaction of information-physical. If the coupling model does not consider the time scale difference between the two, the control instructions may lag behind the actual power shortage due to the transmission between the two independent systems, and the dynamic coupling mechanism is not clear. Moreover, the AGC control process of the new power system involves power grid data acquisition, communication transmission, optimization calculation, instruction issuance and other multi-link hybrid interaction. A single information layer or physical layer simulation tool cannot realize cross-level closed-loop verification, the impact of information system failure on the physical power grid cannot be simulated in an independent simulation environment, and it is difficult to find the implicit risk of the information-physical system. Finally, the information layer of the traditional method is constructed based on the correlation matrix of the physical structure layer, which focuses on the static connection of information system technical components (such as devices and networks), and the information-physical fusion model is based on static association rules (such as fixed communication topology mapping), which ignores the influence of dynamic business function demand on system coupling. The dynamic nature of business logic does not match the system flexibility requirement, lacks an active reconfiguration mechanism for coupling relationships, and cannot automatically update in the closed-loop simulation process.
[0004] Therefore, it is urgent to construct a cyber-physical system coupling model dynamic modeling capable of describing the AGC control process, realize the business function and the dynamic association reconstruction of the cyber-physical coupling model, and provide a flexible and efficient hybrid simulation basic model for a new power system. SUMMARY
[0005] In view of the above problems, the application provides a power cyber-physical system dynamic coupling modeling method and system, which provides a basic model for AGC process cross-level closed-loop simulation verification, solves the problems of unclear information physical dynamic coupling mechanism, insufficient business logic adaptive mapping and model iteration self-updating, and provides a guarantee for the safe and stable operation of a large power grid.
[0006] The technical scheme adopted by the application to solve the technical problems is: In a first aspect, the application provides a power cyber-physical system dynamic coupling modeling method, comprising: Obtaining section data of a power grid to be predicted, and preprocessing the section data; Analyzing AGC control process business data flow, and constructing a workflow engine; Classifying nodes according to measurement data and business functions required by the AGC control process, generating an information system information node model and an information branch model, and constructing a rule engine based on the information system information node model and the information branch model; Constructing an information system network matrix model based on the rule engine, and establishing a preset business strategy based on the information system network matrix model; Constructing an information physical coupling model of the AGC control process; According to the actual business of the AGC, based on the cooperative action of the workflow engine and the rule engine, loading the preset business strategy established by the information system network matrix model, and updating the information physical coupling model.
[0007] As a further improvement of the application, the analysis of the AGC control process business data flow and the construction of the workflow engine comprise: Characteristic analysis of the interaction relationship between the business processes and information elements involved in the AGC control process; Classification and analysis of the dispatching automation system main substation business functions and corresponding information elements involved in the AGC control process; According to the internal functional characteristics and external interaction mechanism of the AGC function nodes, and based on the results of the characteristic analysis and classification analysis, the association relationship between the AGC business functions and the corresponding information elements is established; Based on the association relationship between the AGC business functions and the corresponding information elements, the workflow engine is constructed.
[0008] As a further improvement of the application, the AGC control process comprises: The AGC application software reads the full network tide flow measurement data for calculation, transmits the calculation results to the SCADA application, the SCADA application forwards the data to the FES front-end device for processing, and then forwards to the RTU device, and finally distributes the control instructions to the corresponding unit through the substation system plant controller PLC to change the operation state of the physical power grid, and the physical power grid transmits the current state to the dispatching automation system through the reverse link. The physical power grid includes multiple types of power plants, each plant interacts with the information layer through a dedicated dispatching substation to execute data interaction and control instructions, the physical power grid is modeled as a system physical layer, and the dispatching automation system, the RTU device and the substation system are modeled as a system information layer according to the business logic.
[0009] As a further improvement of the application, the AGC workflow engine is constructed, comprising: 1) reading the power system measurement data required for the AGC control process, including obtaining the latest AGC model definition and real-time values required for calculation and their quality codes from the SCADA; 2) verifying the power system measurement data required for the AGC control process, checking whether the real-time data is valid according to the real-time data reading result, and outputting valid real-time data; 3) obtaining the calculation frequency modulation, peak shaving collaborative control target and control object section adjustment information from the valid data as the target value or constraint condition of AGC calculation; according to the collaborative control demand, the actual regional regulation amount required for the power grid to reach the balanced state under the current power grid deviation is calculated; 4) the AGC centralized decision-making link includes calculation of control objects participating in power distribution and instruction generation; the control object is a control unit in the AGC control process, which calculates the control instruction of the control object according to the control object section adjustment information and regional regulation demand, planned prediction data or winning information in the frequency modulation and peak shaving auxiliary service market; 5) before the instruction is issued, the regional instruction export needs to be locked and verified; the control instruction of the control object is obtained to generate a set of issued control instructions; the current control instruction of the control object, the real-time power of the current control object and the regional frequency are integrated into the set of issued control instructions, which are forwarded to the next level of data forwarding device RTU through FES; 6) the RTU device receives the data forwarded by the FES and forwards it to the substation system control object PLC, which controls the PLC mechanism to distribute the control instruction target value to each unit in the plant according to the current power proportion, capacity proportion or equal division, and each unit climbs according to the target power until the current power of the unit is equal to the AGC issued instruction target value; the physical power grid updates the unit power to cause the full network tide flow to update, and the AGC software collects data again to form a complete closed-loop control process.
[0010] As a further improvement of the application, the real-time data is checked for validity according to the real-time data reading results, and valid real-time data is output, including: First, according to whether the quality code is normal initial screening valid data, then according to the reasonable data threshold value to judge the update of the current latest valid data value, including obtaining valid frequency measurement value according to the reasonable upper limit of frequency measurement, the reasonable lower limit of frequency measurement, the frequency measurement non-refresh judgment time and the maximum allowed deviation of frequency measurement multi-measuring point; obtaining valid frequency measurement value according to the reasonable upper limit of tie line active power, the reasonable lower limit of tie line active power, the tie line active power non-refresh judgment time and the maximum allowed deviation of tie line measurement multi-measuring point; unnecessary measurement is attributed to a redundant set.
[0011] As a further improvement of the application, the calculation of frequency modulation and peak regulation cooperative control target and the cross-section adjustment information of the control object are obtained from the valid data, which are used as the target value or constraint condition of AGC calculation, including: The regional peak regulation and frequency modulation demand is issued as the target value of AGC control process; According to the forward limit value and reverse limit value requirements, the target value and constraint condition of AGC control process are obtained; The grid frequency, tie line active power, tie line exchange plan and telemetry ACE are obtained, and the current ACE value, ACE effective state and ACE running area data are calculated; The current ACE value, ACE running area (dead zone, normal zone, secondary emergency zone and emergency zone) and frequency modulation and peak regulation cooperative control quantity are obtained, and the regional regulation demand and the whole network active regulation quantity are calculated; The ACE effective state, current ACE value and grid frequency value are obtained according to the ACE running area threshold value, and the regional running state is calculated.
[0012] As a further improvement of the application, the control instruction of the control object is calculated according to the cross-section adjustment information of the control object and the regional regulation demand, the predicted data or the power market frequency modulation and peak regulation auxiliary service market bid information, including: The current control object real-time data and effective state, power market bid information are obtained, and the latest control mode data of the control object is calculated; The cross-section adjustment information of the control object, the latest control mode of the control object, the charge and discharge locking signal of the energy storage, the ascending and descending power locking signal of the control object are obtained, and the control upper and lower limits of the control object, the prohibition regulation flag of the control object, etc. are calculated, to judge whether the control object participates in the AGC process; The regional regulation power, the real-time active data of the control object, the planned value of the control object, the control upper and lower limits of the control object, the prohibition regulation flag of the control object, etc. are obtained, and the regulation power of the control object, the base point power of the control object and the target output of the control object are calculated. Obtaining a target output of a control object, an energy storage charge-discharge locking signal, and a lifting and lowering power locking signal of the control object, and calculating a control instruction of the current control object.
[0013] As a further improvement of the application, the node classification is performed according to the measurement data and service functions required by the AGC control process, the information system information node model and the information branch model are generated, and the rule engine is constructed based on the information system information node model and the information branch model, including: The node classification is performed according to the measurement data and service functions required by the AGC control process, and the information node model containing the measurement node, the secondary function node, the instruction node and the redundant node is established; Based on the information node model, the information branch model is constructed, each information branch model enables data to be mapped from an input node to an output node through a specific function; and a redundant branch is constructed, and the rule engine collects redundant data to the branch of the redundant node.
[0014] As a further improvement of the application, the information system network matrix model is constructed based on the rule engine, and the preset service strategy is established based on the information system network matrix model, including: Constructing a virtual topology matrix Characterizing the topological connection relationship between the information node and the information branch:
[0015] In the branch model, a mapping function is constructed , combined with the virtual topology matrix , to solve the information system network matrix model :
[0016] is a network element parameter diagonal matrix, is the transpose matrix of ; A rule engine flow topology mapping mechanism is established, the function modules of the service flow are mapped to the function units in the correlation matrix, and the correlation path is dynamically generated; An event-driven update mechanism of the workflow engine is established, the workflow engine triggers local update of the correlation matrix; the correlation matrix is arranged according to the service execution sequence, if a function module is added, deleted or modified, the rule engine topology mapping mechanism adds, deletes or modifies the rows and columns of the information node and the branch at the corresponding function position in the correlation matrix, and updates the information system network matrix model.
[0017] As a further improvement of the application, the information-physical coupling model of the AGC control process is constructed, including: The physical system and the information system are coupled through the control device PLC of the mechanism control module and the corresponding control unit, and a coupling connection matrix is established :
[0018] wherein n represents n physical nodes, m represents m information nodes, represents the ithj element of the coupling connection matrix, including whether to install the control device , the running state , the uploaded active power , the issued control instruction ; The physical power grid is based on the classical power system analysis theory, and according to the actual physical topological structure and the running state of the regional power grid, a physical layer matrix model is established :
[0019]
[0020] wherein n represents n physical nodes, represents the ithj element of the physical layer matrix, including the physical power grid topological structure , the physical power grid network node parameters , the connected state , the running data ; According to the information system topological structure and the running state, an information layer matrix model is established :
[0021]
[0022] wherein m represents m information nodes, represents the ithj element of the information layer matrix, including the information system topological structure , the information network matrix model parameters , the connected state , the delay time ; represents whether there is a topological connection relationship between node i and node j; Therefore, an information-physical coupling model is established : .
[0023] As a further improvement of the present application, the information physical coupling model is updated according to the actual AGC business based on the synergistic effect of the workflow engine and the rule engine, and the preset business strategy established based on the information system network matrix model is loaded, and specifically includes: The workflow engine parses the AGC business logic, and defines the information-physical interaction timing and data dependency relationship of each link; the rule engine reconstructs the coupling relationship, loads the preset business strategy established based on the information system network matrix model, and checks and corrects the correlation matrix; When an abnormal event is detected, the node elements involved in the physical layer, the coupling layer and the information layer in the information physical coupling model are triggered 、 and correlation calculation, real-time update of the information physical coupling model as the basic model of the closed-loop simulation verification; the updated coupling model is injected into the information physical hybrid simulation environment to verify the AGC control performance; the matrix update strategy of the workflow engine and the rule engine is optimized according to the simulation result.
[0024] In a second aspect, the present application provides an automatic generation control process-oriented power information physical system dynamic coupling modeling system based on the automatic generation control process-oriented power information physical system dynamic coupling modeling method, which includes: A workflow engine construction module is used to analyze the AGC control process business data flow and construct a workflow engine; A rule engine construction module is used to classify nodes according to the measurement data and business functions required by the AGC control process business, generate an information system information node model and an information branch model, and construct a rule engine based on the information system information node model and the information branch model; An information system network matrix model construction module is used to construct an information system network matrix model based on the rule engine, and establish a preset business strategy based on the information system network matrix model; An information physical coupling model construction module is used to construct an information physical coupling model of the AGC control process; An information physical coupling model updating module is used to update the information physical coupling model according to the actual AGC business based on the synergistic effect of the workflow engine and the rule engine, and load the preset business strategy established based on the information system network matrix model.
[0025] In a third aspect, the present application provides an electronic device including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the automatic generation control process-oriented power information physical system dynamic coupling modeling method.
[0026] In a fourth aspect, the present application provides a computer readable storage medium, which stores a computer program, and the computer program is executed by a processor to implement the power information physical system dynamic coupling modeling method for an automatic generation control process.
[0027] In a fifth aspect, the present application provides a computer program product, which comprises computer instructions, and the computer instructions instruct a computer to execute the power information physical system dynamic coupling modeling method for an automatic generation control process.
[0028] The present application has the following beneficial effects: The present application is based on a workflow engine information system modeling method, which takes the AGC control process business function as the core, defines the execution order, trigger condition and data dependency relationship between business functions in a modular way, solves the limitation of traditional methods which focus on the static model of information system technical components (such as equipment, network), and the model directly serves the business target, improving the practicability and pertinence of modeling. The present application adopts a rule engine flow topology mapping mechanism and a workflow engine event-driven updating mechanism for an AGC control process information physical coupling system, the traditional information physical coupling matrix depends on the pre-defined relationship between each level layer component, and it is difficult to flexibly respond to the change of information system business process. The present application realizes the automatic updating of the coupling matrix by combining the workflow engine or the rule engine through the modular definition of the business function, and supports the dynamic adjustment of the coupling relationship of the real-time business state. The method provides a cross-level basic model for a closed-loop simulation system, the dynamic coupling mechanism has high explainability, provides a means for positioning the implicit risk of the information physical system, and supports the reverse optimization of the workflow engine and the rule engine matrix updating strategy according to the simulation result, forms a "modeling-verification-optimization" closed loop, and enhances the flexibility of the system. BRIEF DESCRIPTION OF DRAWINGS
[0029] Figure 1 A power information physical system dynamic coupling modeling method for an automatic generation control process is provided for the present application; Figure 2 An AGC control process schematic diagram is provided for the present application; Figure 3 An AGC business function module and its information element schematic diagram are provided for the present application; Figure 4 An AGC information node classification schematic diagram is provided for the present application; Figure 5 A virtual topology matrix construction information system schematic diagram is provided for the present application; Figure 6 An AGC control process information physical system model schematic diagram is provided for the present application; Figure 7 A power information physical system dynamic coupling modeling system is provided for the present application. DETAILED DESCRIPTION
[0030] The technical solutions of the present application will be described clearly and completely below by means of embodiments with reference to the drawings. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.
[0031] Embodiment one As shown in the figure, the present application provides a power information physical system dynamic coupling modeling method for an automatic generation control process, comprising: Figure 1 Step (1) analyzing AGC control process business data flow, constructing a workflow engine.
[0032] Step (2) classifying nodes according to the measurement data required by the AGC control process business and the business function, generating an information system information node model and an information branch model, and constructing a rule engine based on the information system information node model and the information branch model.
[0033] Step (3) constructing an information system network matrix model based on the rule engine, and establishing a preset business strategy based on the information system network matrix model, including constructing an information node state model and a virtual topology matrix.
[0034] Step (4) constructing an information physical coupling model of the AGC control process.
[0035] Step (5) according to the AGC actual business, based on the synergistic effect of the workflow engine and the rule engine, loading the preset business strategy established by the information system network matrix model, and updating the information physical coupling model.
[0036] The core goal of AGC is to maintain the stability of power system frequency and the balance of tie-line power by adjusting the generator output in real time, and its process relies on the close cooperation of information system (measurement, communication, decision) and physical system (generator, load, power transmission network): the information system provides the physical system with the support of "perception-decision-control" (such as measurement data driving control instruction generation); the state change of the physical system (such as frequency deviation, power fluctuation) in turn triggers the strategy adjustment of the information system (such as instruction correction, communication topology reconstruction). This method realizes the modeling of the characteristics of "two-way influence, real-time interaction" by constructing information system model, coupling relationship model step by step, and introducing dynamic updating mechanism.
[0037] The method solves the problems of "separation of information system and physical system" and "difficulty of static model to adapt to dynamic working conditions" in traditional AGC modeling through the logical chain of "process standardization (workflow engine) -> information system quantification (rule engine + network matrix) -> coupling relationship modeling -> dynamic updating", realizes accurate description of the dynamic coupling characteristics of CPS "information driving physical and physical reacting on information" in the AGC process, and provides a reliable model basis for AGC control strategy optimization, fault warning and other applications. The following is based on Figure 1 The above steps of the application will be described in detail: I. Step (1) is to analyze the AGC control process business data flow, build a workflow engine and a rule engine, which specifically includes: The interaction relationship between the business processes and information elements involved in the AGC control process is analyzed. The main and substation business functions and their corresponding information elements are classified and sorted, and the internal functional characteristics and external interaction mechanisms of each functional node of AGC are considered, and the software types such as SCADA, power generation plan, new energy prediction and input and output are fully considered, to establish the correlation between AGC business functions and their corresponding information elements.
[0038] The AGC control process is shown in Figure 2 The AGC application software reads the full network tidal flow measurement data for calculation, transmits the calculation results (control instructions) to the SCADA application, the SCADA application forwards the data to the FES front-end device for processing, and then transmits to the RTU device, and finally distributes the control instructions to the corresponding unit through the substation system plant station controller PLC, changes the physical power grid running state, and the physical power grid transmits the current state to the dispatching automation system through the reverse link, and thus circulates to achieve the purpose of frequency regulation and peak regulation. The physical power grid includes thermal power, hydropower, pumped storage, wind power, photovoltaic and other types of power plants, and each plant realizes data interaction and control instruction execution with the information layer through the exclusive dispatching substation. The physical power grid is modeled as the system physical layer, and the dispatching automation system, RTU device and substation system are modeled as the system information layer according to the business logic.
[0039] The dispatching automation system main and substation information elements and interaction relationship involved in the AGC control process are analyzed, the main and substation information elements are classified and sorted, and the interaction logic between each information element is analyzed, wherein the dispatching main station includes real-time monitoring, analysis and verification, new energy prediction, spot market, operation evaluation and other AGC control process related nodes, and the AGC business function modules and related information elements are shown in Figure 3 . Figure 3 AGC business function modules and information elements.
[0040] Wherein, the AGC workflow engine is constructed, and AGC service function is modularized, and service function flow execution sequence and data dependency are as follows: (1) Real-time data reading, specifically including: The power system measurement data required by the AGC control process is read, and the information elements involved include SCADA applications, including real-time monitoring modules and the like.
[0041] 1) Real-time data reading: Obtain the latest AGC model definition and real-time values required for calculation and their quality codes from SCADA, including frequency measurement, tie-line active power measurement, tie-line plan, telemetry ACE, unit and other device active power measurement, section measurement and the like.
[0042] (2) Data verification, specifically including: The power system measurement data required by the AGC control process is verified, and the information elements involved include SCADA applications, including analysis and review modules and the like.
[0043] 1) Data rationality verification, specifically including: According to the real-time data reading result, it is verified whether the real-time data is valid, and valid real-time data is output. First, according to whether the quality code is normal initial screening valid data, then according to the reasonable data threshold value to judge the update of the current latest valid data value. Including obtaining valid frequency measurement values according to the reasonable upper limit of frequency measurement, the reasonable lower limit of frequency measurement, the frequency measurement non-refresh judgment time and the maximum allowed deviation of frequency measurement multi-measurement points; obtaining valid frequency measurement values according to the reasonable upper limit of tie-line active power, the reasonable lower limit of tie-line active power, the tie-line active power non-refresh judgment time and the maximum allowed deviation of tie-line measurement multi-measurement points and the like. Unnecessary measurements are summarized to a redundant set.
[0044] (3) Cooperative control, specifically including: The calculation frequency modulation, peak regulation cooperative control target and control object section adjustment information are obtained from the valid data, as the target value or constraint condition of AGC calculation. According to the cooperative control requirement, the actual regional regulation amount required to make the power grid reach the balanced state under the current power grid deviation is calculated. The information elements involved include plan prediction type applications and power market clearing results.
[0045] 1) Frequency modulation and peak regulation demand cooperation: The regional issued peak regulation and frequency modulation demand is used as the target value of the AGC control process.
[0046] 2) Section safety constraint cooperation: According to the requirements of the forward limit value and the reverse limit value of the section, the target value and the constraint condition of the AGC control process are obtained.
[0047] 3) ACE calculation process: Obtain grid frequency, tie-line active power, tie-line exchange plan, telemetry ACE, calculate current ACE value, ACE effective state, ACE belonging to operation area (dead zone, normal zone, sub-emergency zone, emergency zone) and other data.
[0048] 4) Frequency modulation and peak shaving demand calculation: Obtain current ACE value, ACE belonging to operation area (dead zone, normal zone, sub-emergency zone, emergency zone) and frequency modulation and peak shaving collaborative control amount, calculate regional regulation demand and total network active regulation amount.
[0049] 5) Regional operation state processing: Obtain ACE effective state, current ACE value and grid frequency value according to ACE operation area threshold value, calculate regional operation state (RUN, PAUS, STOP) and the like.
[0050] (4) Control object allocation and instruction generation (centralized decision), specifically including: The AGC centralized decision-making link includes calculation of control objects participating in power distribution and instruction generation. The control object refers to the control unit in the AGC control process, generally a plant station controller (PLC). According to the control object section adjustment information and regional regulation demand, plan and prediction data or power market frequency modulation and peak shaving auxiliary service market bid information, the control instruction of the control object is calculated. The information elements involved include plan and prediction and power market application. Plan and prediction applications include power generation plan and new energy prediction. Power market applications include spot market, power market frequency modulation and peak shaving auxiliary service market and the like. Since the new energy power prediction accuracy of some regional power grids is low, the AGC system does not use new energy power prediction data as the criterion for new energy station power generation capacity, but only uses the tracking AGC instruction value of new energy stations as the power generation capacity of each new energy station; or some regions do not access some types of power market, and only rely on plan and prediction data for AGC target value setting, so the work flow engine sets this part as an optional item, and the associated matrix is generated by the rule engine later.
[0051] 1) Control object state update and mode switching: Obtain current control object real-time data and effective state (active power, power generation plan, instruction return value, AGC remote controllable signal and AGC remote operation signal and the like), power market bid information, calculate the latest control mode of the control object and other data.
[0052] 2) Control object up / down state and limit value processing: Obtain control object section adjustment information, control object latest control mode, energy storage charging (discharging) lock signal, control object power increase (decrease) lock signal, calculate control object control upper and lower limits, control object prohibition regulation flag and the like, and judge whether the control object participates in the AGC process.
[0053] 3) Control object target output calculation: Obtain regional regulation power, control object real-time active power data, control object output planned value, control object control upper and lower limits, control object regulation prohibition flag, etc., to calculate control object regulation power, control object base point power, control object target output, etc.
[0054] 4) Control instruction verification: Obtain control object target output, energy storage charging (discharging) lock signal, control object ascending (descending) power lock signal, to calculate current control object control instruction.
[0055] (5) Regional instruction outlet lock verification (instruction issuance), specifically including: Before issuing instructions, regional instruction outlet lock verification is required. Obtain control object control instruction to generate issued control instruction set. Information elements involved include operation evaluation, FES application, etc. Obtain current control object control instruction, current control object real-time power, and regional frequency, integrate the data into the issued control instruction set, and forward it to the next level data forwarding device RTU through FES.
[0056] (6) Mechanism control, specifically including: RTU device receives data forwarded by FES and forwards it to substation system control object PLC. PLC mechanism control distributes control instruction target value to each unit in the plant station according to current power proportion, capacity proportion, or equal division. Each unit climbs according to the target power until the current power of the unit equals the AGC issued instruction target value. Physical power grid updates the unit power, causing the whole network power flow to update, and AGC software performs data acquisition again to form a complete closed-loop control process.
[0057] II. The step (2) is to classify and construct information node and information branch model, and to construct rule engine, specifically including: First, classify nodes according to the measurement data and business functions required by AGC control process, such as Figure 4 as shown to establish an information node model containing measurement nodes, secondary function nodes, and instruction nodes. Specifically including: (1) Measurement node: Measurement nodes include physical power grid measurement data and AGC control model related measurement parameters, etc. For example, power grid power flow, frequency, ACE, PLC regulation upper and lower limits, regulation rate, etc.
[0058] (2) Secondary function node: Secondary function nodes include business function modules required in AGC control process and required external applications. Including frequency regulation calculation required by AGC business process, substation control module, and external platform bus, SCADA application, dispatching plan, new energy prediction, master-backup switching, master substation channel, etc.
[0059] (3) Command Node: The command node includes the command issuance and command verification modules required in the AGC control process. After generating the command, the AGC application forwards it to the plant controller PLC to realize the coupling of the cyber-physical system.
[0060] (4) Redundant nodes: Redundant nodes are a set of variables that are no longer used in the AGC control process. The rule engine will uniformly collect nodes that no longer participate in the control process due to changes in business processes into redundant nodes.
[0061] Then, an information branch model is constructed. Each functional module maps data from the input node to the output node through a specific function. Therefore, based on the data processing and transmission characteristics, dynamic temporal information network branches are established between the nodes as follows:
[0062] in, Indicates branch l The input node, Indicates branch l The output node, where the operator This represents the mapping function, i.e., the data processing function after passing through a certain functional module. Constructing redundant branches refers to the branches where the rule engine aggregates redundant data to redundant nodes. It is 0.
[0063] Third, step (3) involves constructing an information system network matrix model based on a rule engine, and establishing preset business strategies based on the information system network matrix model. Specifically, this includes: Constructing a virtual topology matrix The topological connection relationship between information nodes and information branches is represented as follows: Figure 5 As shown:
[0064] In the proposed branch model, a mapping function is constructed. Combined with virtual topology matrix It can solve the network matrix model of information systems. :
[0065] It is a diagonal matrix of network element parameters. yes The transpose of .
[0066] A rule engine process topology mapping mechanism is established to map the functional modules of the business flow to the functional units in the association matrix, and to dynamically generate an association path (business function→information node classification→information branch construction→association matrix update). At the same time, a workflow engine event-driven update mechanism is established. When a node in the business flow changes, such as a change from reading the unit target value from the planned prediction application to reading the unit target value from the spot market application in a certain regional power grid, the workflow engine triggers a local update of the association matrix. The association matrix is arranged according to the business execution sequence. If a functional module is added, deleted or modified, the rule engine topology mapping mechanism adds, deletes or modifies the information nodes and branches in the corresponding functional position of the association matrix, and updates the information system network matrix model.
[0067] Four, the step (4) is to build an information-physical coupling model of AGC control process, specifically comprising: An information-physical system connection diagram of the AGC control process is constructed as shown in Figure 6 The physical power grid is divided into three regions, including two provincial regions and one network region, representing the interaction between the upper and lower power grids of AGC, and the lines directly connecting the provincial power grid and the network power grid as tie lines. Provincial region 1 has three generator units (G30, G37, G38) and two tie lines (L1 and L3), provincial region 2 has four generator units (G33, G34, G35, G36) and two tie lines (L14-1 and L14-2), and the network region has three directly controlled generator units (G31, G32, G39).
[0068] Since the system has three control regions, a CPS model needs to be generated for each region. The information-physical model of provincial region 1 is shown on the right side of Figure 6 , including 63 data nodes and their corresponding information branches. Although the three control regions have different CPS models, their information flow expressions are similar. Therefore, taking provincial region 1 as an example, these information flows can be divided into six simple steps, and the corresponding actual functions. AGC controllers PLC30, PLC37, PLC38 correspond to control units G30, G37, G38 respectively. As shown in Figure 6 , the information-physical system model of the AGC control process.
[0069] The physical system and the information system are coupled through the control device PLC of the mechanism control module and its corresponding control unit, and a coupling connection matrix is established:
[0070] Where n represents n physical nodes, and m represents m information nodes, represents the i-th element of the coupling matrix, including whether the control device is installed , operating state (normal is 1), uploaded active power , issued control instruction .
[0071] The physical power grid is based on classical power system analysis theory, and according to the actual physical topology structure and operating state of the regional power grid, a physical layer matrix model is established :
[0072]
[0073] Wherein, n represents n physical nodes, represents the i-th element of the physical layer matrix, including the physical power grid topology structure , physical power grid network node parameters (node admittance matrix) , connection state (normal is 1), operating data .
[0074] According to the information system topology structure and operating state, an information layer matrix model is established :
[0075]
[0076] Wherein, m represents m information nodes, represents the i-th element of the information layer matrix, including the information system topology structure , information network matrix model parameters , connection state (normal is 1), delay time The topology structure in this matrix is different from the virtual topology matrix A established in step (3), represents whether there is a topological connection relationship between node i and node j.
[0077] Therefore, the information physical coupling model is established :
[0078] Five, the step (5) is according to the information physical coupling model generated in step (4), combining with the actual business scene of AGC, through the synergistic effect of workflow engine and rule engine, the dynamic iteration update of information physical coupling model is realized. Specifically includes: The workflow engine parses the AGC business logic, defines the information-physical interaction timing and data dependency relationship of each link; the rule engine reconstructs the coupling relationship, loads the preset business strategy established in step (3), checks and corrects the association matrix; when an abnormal event (such as instruction overrun, communication interruption) is detected, the nodes involved in the physical layer, the coupling layer and the information layer in the information-physical coupling model are triggered 、 and association calculation, real-time update of the information-physical coupling model as the basic model of closed-loop simulation verification. The updated coupling model is injected into the information-physical hybrid simulation environment to verify the AGC control performance; at the same time, the simulation results can be used to optimize the workflow engine and rule engine matrix update strategy in reverse, forming a "modeling-verification-optimization" closed loop.
[0079] Embodiment Two As shown in Figure 4 , a power information-physical system dynamic coupling modeling system for an automatic generation control process, based on a power information-physical system dynamic coupling modeling method for an automatic generation control process, comprises: A workflow engine construction module 100 for analyzing AGC control process business data flow and constructing a workflow engine; A rule engine construction module 200 for classifying nodes according to the measurement data and business functions required by the AGC control process, generating an information system information node model and an information branch model, and constructing a rule engine based on the information system information node model and the information branch model; An information system network matrix model construction module 300 for constructing an information system network matrix model based on the rule engine, and establishing a preset business strategy based on the information system network matrix model; An information-physical coupling model construction module 400 for constructing an information-physical coupling model of the AGC control process; An information-physical coupling model updating module 500 for updating the information-physical coupling model based on the preset business strategy established by the information system network matrix model according to the AGC actual business, based on the cooperative action of the workflow engine and the rule engine.
[0080] Embodiment Three An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following power information-physical system dynamic coupling modeling method for an automatic generation control process when executing the computer program, comprising: analyzing AGC control process business data flow and constructing a workflow engine; According to the measurement data and business functions required by the AGC control process, node classification is performed, information system information node models and information branch models are generated, and a rule engine is constructed based on the information system information node models and the information branch models; An information system network matrix model is constructed based on the rule engine, and preset business strategies are established based on the information system network matrix model; An information-physical coupling model of the AGC control process is constructed; According to the actual business of the AGC, the preset business strategies established based on the information system network matrix model are loaded, and the information-physical coupling model is updated based on the cooperative action of the workflow engine and the rule engine.
[0081] Embodiment Four A fourth object of the embodiments of the present application is to provide a computer readable storage medium storing a computer program, which, when executed by a processor, implements the above-mentioned power information-physical system dynamic coupling modeling method for an automatic generation control process, including: A workflow engine is constructed by analyzing AGC control process business data flow; According to the measurement data and business functions required by the AGC control process, node classification is performed, information system information node models and information branch models are generated, and a rule engine is constructed based on the information system information node models and the information branch models; An information system network matrix model is constructed based on the rule engine, and preset business strategies are established based on the information system network matrix model; An information-physical coupling model of the AGC control process is constructed; According to the actual business of the AGC, the preset business strategies established based on the information system network matrix model are loaded, and the information-physical coupling model is updated based on the cooperative action of the workflow engine and the rule engine.
[0082] Embodiment Five A fifth object of the embodiments of the present application is to provide a computer program product including computer instructions instructing a computer to execute the above-mentioned power information-physical system dynamic coupling modeling method for an automatic generation control process, including: A workflow engine is constructed by analyzing AGC control process business data flow; According to the measurement data and business functions required by the AGC control process, node classification is performed, information system information node models and information branch models are generated, and a rule engine is constructed based on the information system information node models and the information branch models; An information system network matrix model is constructed based on the rule engine, and preset business strategies are established based on the information system network matrix model; Constructing information-physical coupling model of AGC control process; According to AGC actual business, based on the synergistic effect of workflow engine and rule engine, load preset business strategy established by information system network matrix model, update information-physical coupling model.
[0083] It should be noted that embodiment one, embodiment two, embodiment three, embodiment four and embodiment five are all a kind of power information-physical system dynamic coupling modeling method for automatic generation control process.
[0084] These computer program instructions can also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer readable memory produce a product including instruction devices, which realize the functions specified in the flow Figure 1 One or more flows and / or blocks Figure 1 One or more blocks or multiple blocks.
[0085] These computer program instructions can also be loaded into a computer or other programmable data processing device, so that a series of operation steps are performed on the computer or other programmable device to produce a computer implemented process, so that the instructions executed on the computer or other programmable device provide steps for realizing the functions specified in the flow Figure 1 One or more flows and / or blocks Figure 1 One or more blocks or multiple blocks.
[0086] The present application can be in the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present application can take the form of a computer program product implemented on one or more computer-usable storage media (including, but not limited to, disk storage, readable storage media, optical storage, etc.) containing computer-usable program code.
[0087] The present application is described with reference to flowcharts and / or block diagrams according to the method, device (system) and computer program product of the embodiments of the present application. It should be understood that each flow and / or block in the flowchart and / or block diagram, and the combination of the flows and / or blocks in the flowchart and / or block diagram can be realized by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a means for realizing the functions specified in the flow Figure 1 One or more flows and / or blocks Figure 1 One or more blocks or multiple blocks.
[0088] Obviously, the described embodiments are only part of the embodiments of the present application, but not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative labor should belong to the protection scope of the present application.
[0089] Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present application, but not to limit them. Although the present application has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that the specific embodiments of the present application can be modified or replaced equivalently without departing from the spirit and scope of the present application, and any modification or equivalent replacement without departing from the spirit and scope of the present application should be covered in the protection scope of the claims of the present application.
Claims
1. A method for dynamic coupling modeling of cyber-physical systems for automatic generation control process, characterized in that, The application comprises the following steps: analyzing AGC control process business data flow, constructing workflow engine; classifying nodes according to the measurement data and business functions required by AGC control process, generating information system information node model and information branch model, and constructing rule engine based on the information system information node model and information branch model; constructing information system network matrix model based on the rule engine, and establishing preset business strategy based on the information system network matrix model; constructing information-physical coupling model of AGC control process; updating the information-physical coupling model according to AGC actual business, based on the cooperative action of the workflow engine and the rule engine, loading the preset business strategy established by the information system network matrix model.
2. The method of claim 1, wherein, The analysis of AGC control process business data flow and the construction of workflow engine comprise the following steps: characteristic analysis of the interaction relationship between the business processes and information elements involved in the AGC control process; classification and analysis of the dispatching automation system master substation business functions and corresponding information elements involved in the AGC control process; establishing the association relationship between the AGC business functions and corresponding information elements based on the internal functional characteristics and external interaction mechanism of each functional node of AGC, and the results of the characteristic analysis and classification analysis; constructing the workflow engine based on the association relationship between the AGC business functions and corresponding information elements.
3. The method of claim 2, wherein, The AGC control process comprises the following steps: AGC application software reads the full network tide flow measurement data for calculation, transmits the calculation results to SCADA application, SCADA application forwards the data to FES front-end device for processing, and then forwards the data to RTU device, finally, the control instructions are distributed to the corresponding units through the substation system plant station controller PLC to change the operation state of the physical power grid, and the current state of the physical power grid is transmitted to the dispatching automation system through the reverse link; wherein, the physical power grid contains multiple types of power plants, each plant realizes data interaction and control instruction execution with the information layer through the exclusive dispatching substation, the physical power grid is modeled as the system physical layer, and the dispatching automation system, RTU device and substation system are modeled as the system information layer according to the business logic.
4. The method of claim 2, wherein, The construction of AGC workflow engine comprises the following steps: 1) reading the power system measurement data required by AGC control process, including obtaining the latest AGC model definition and real-time values required for calculation and their quality codes from SCADA; 2) verifying the power system measurement data required by AGC control process, checking whether the real-time data is valid according to the real-time data reading result, and outputting the valid real-time data; 3) obtaining the calculation frequency modulation, peak regulation and coordinated control target, and the control object section adjustment information from the valid data as the target value or constraint condition of AGC calculation; according to the coordinated control requirement, the actual regional regulation amount required to make the power grid reach the balanced state under the current power grid deviation is calculated. 4) AGC centralized decision-making link includes calculation of control objects participating in power distribution and instruction generation; the control object refers to a control unit in the AGC control process, and the control instruction of the control object is calculated according to the cross-section adjustment information and regional regulation demand, plan prediction data or power market frequency modulation, peak shaving auxiliary service market bid information and the like; 5) Before the instruction is issued, the regional instruction outlet needs to be locked and verified; the control instruction of the control object is obtained, and the issued control instruction set is generated; the current control instruction of the control object, the real-time power of the current control object and the regional frequency are obtained, the data is integrated into the issued control instruction set, and the FES is forwarded to the next level data forwarding device RTU; 6) The RTU device receives the data forwarded by the FES and forwards it to the substation system control object PLC, the PLC mechanism control, the control instruction target value is distributed to each unit in the plant station according to the current power proportion, capacity proportion or equal division, each unit climbs according to the target power until the current power of the unit is equal to the AGC issued instruction target value; the physical power grid updates the unit power, and the AGC software performs data acquisition again to form a complete closed-loop control process.
5. The method of claim 4, wherein, According to the real-time data reading result, whether the real-time data is valid is checked, and the valid real-time data is output, including: First, whether the quality code is normal initial screening valid data is checked, then the current latest valid data value is updated according to the reasonable data threshold value, including obtaining valid frequency measurement value according to frequency measurement reasonable upper limit, frequency measurement reasonable lower limit, frequency measurement non-refresh judgment time and frequency measurement maximum allowable deviation of multiple measurement points; obtaining valid frequency measurement value according to tie line active reasonable upper limit, tie line active reasonable lower limit, tie line active non-refresh judgment time and tie line measurement maximum allowable deviation of multiple measurement points; unnecessary measurement is summarized to a redundant set.
6. The method of claim 4, wherein, The calculation of the frequency modulation and peak shaving cooperative control target and the cross-section adjustment information of the control object are obtained from the valid data, which are used as the target value or constraint condition of AGC calculation, including: The regional issued peak shaving and frequency modulation demand is used as the target value of the AGC control process; According to the forward limit value and reverse limit value requirements, the target value and constraint condition of the AGC control process are obtained; The grid frequency, tie line active power, tie line exchange plan and telemetry ACE are obtained, and the current ACE value, ACE effective state and ACE running area data are calculated; The current ACE value, ACE running area and frequency modulation and peak shaving cooperative control quantity are obtained, and the regional regulation demand and the total active regulation quantity of the grid are calculated; According to the ACE running area threshold value, the ACE effective state, the current ACE value and the grid frequency value are obtained, and the regional running state is calculated.
7. The method of claim 4, wherein, The control instruction of the control object is calculated according to the cross-section adjustment information of the control object and the regional regulation demand, the plan prediction data or the power market frequency modulation, peak shaving auxiliary service market bid information and the like, including: The current control object real-time data and effective state and power market bid information are obtained, and the latest control mode data of the control object are calculated; Acquire the section adjustment information of the control object, the latest control mode of the control object, the energy storage charge and discharge locking signal, the control object's power up and down locking signal, calculate the control upper and lower limits of the control object, the control object's prohibition adjustment flag, and judge whether the control object participates in the AGC process; Acquire the regional regulation power, the control object's real-time active data, the control object's output planning value, the control object's control upper and lower limits, the control object's prohibition adjustment flag, and calculate the control object's regulation power, the control object's base point power, and the control object's target output. Acquire the control object's target output, the energy storage charge and discharge locking signal, and the control object's power up and down locking signal, and calculate the control instruction of the current control object.
8. The method of claim 1, wherein, The node classification is performed according to the measurement data and business functions required by the AGC control process business, the information system information node model and the information branch model are generated, and the rule engine is constructed based on the information system information node model and the information branch model, including: The node classification is performed according to the measurement data and business functions required by the AGC control process business, the information system information node model and the information branch model are generated, and the rule engine is constructed based on the information system information node model and the information branch model, including: Based on the information node model, the information branch model is constructed, each information branch model makes the data from the input node mapped to the output node through a specific function; a redundant branch is constructed, and the rule engine collects redundant data to the branch of the redundant node.
9. The method of claim 1, wherein, The information system network matrix model is constructed based on the rule engine, and the preset business strategy is established based on the information system network matrix model, including: Constructing a virtual topology matrix Characterizing the topological connection relationship of information nodes and information branches: In the branch model, by constructing mapping function , combined with virtual topology matrix , the information system network matrix model is solved. is a network element parameter diagonal matrix, is the transpose matrix of A rule engine flow topology mapping mechanism is established, which maps the function modules of the business flow to the functional units in the correlation matrix, and dynamically generates the correlation path; An event-driven update mechanism of the workflow engine is established, and the workflow engine triggers local update of the correlation matrix; the correlation matrix is arranged according to the business execution sequence, if a function module is added, deleted or modified, the rule engine topology mapping mechanism adds, deletes or modifies the information node and the branch in the corresponding function position of the correlation matrix, and updates the information system network matrix model.
10. The method of claim 1, wherein, The information-physical coupling model of the AGC control process is constructed, including: The physical system and the information system are coupled through the control device PLC of the mechanism control module and its corresponding control unit to establish a coupling connection matrix : Wherein, n represents n physical nodes, m represents m information nodes, Indicates the coupling connection matrix the first ij element, including whether to install control device , operating state , upload active power , issue control instruction ; The physical power grid is based on classical power system analysis theory, and a physical layer matrix model is established according to the actual physical topology structure and operating state of the regional power grid : Wherein, n represents n physical nodes, represents the first ij element of the physical layer matrix, including the physical power grid topology , physical power grid network node parameters , connection state , operation data ; According to the information system topology and running state, an information layer matrix model is established : wherein m represents m information nodes, represents the ith element of the information layer matrix, including the information system topology , information network matrix model parameters , connection state , delay time ; represents whether there is a topological connection relationship between node i and node j; A physical information coupling model is established : 。 11. The method of claim 1, wherein, According to the AGC actual business, the preset business strategy established by loading the information system network matrix model is loaded based on the cooperative action of the workflow engine and the rule engine, and the information-physical coupling model is updated, specifically including: The workflow engine analyzes the AGC business logic, defines the information-physical interaction timing and data dependency relationship of each link; the rule engine reconstructs the coupling relationship, loads the preset business strategy established by the information system network matrix model, and checks and corrects the correlation matrix; When an abnormal event is detected, the node elements involved in the physical layer, coupling layer and information layer in the cyber-physical coupling model are triggered 、 and Correlation calculation, real-time update of cyber-physical coupling model as the basis of closed-loop simulation verification; inject the updated coupling model into the information-physical hybrid simulation environment to verify the AGC control performance; according to the simulation results, the work flow engine and rule engine matrix update strategy are optimized in reverse.
12. A power information-physical system dynamic coupling modeling system for automatic generation control process, based on the power information-physical system dynamic coupling modeling method for automatic generation control process according to any one of claims 1-11, characterized in that, It includes: The workflow engine construction module is used for analyzing the AGC control process business data flow and constructing the workflow engine; The rule engine construction module is used for classifying nodes according to the measurement data and business functions required by the AGC control process business, generating the information system information node model and the information branch model, and constructing the rule engine based on the information system information node model and the information branch model; The information system network matrix model construction module is configured to construct an information system network matrix model based on a rule engine, and to establish a preset business policy based on the information system network matrix model. The information-physical coupling model construction module is configured to construct an information-physical coupling model of the AGC control process. The information-physical coupling model updating module is configured to update the information-physical coupling model according to the AGC actual business, based on the preset business policy established by the information system network matrix model, and based on the collaborative action of the workflow engine and the rule engine.
13. An electronic device, comprising: The computer readable storage medium stores a computer program, and the computer program is executed by the processor to implement the power information-physical system dynamic coupling modeling method for the automatic generation control process according to any one of claims 1-11.
14. A computer-readable storage medium, characterized in that, The computer readable storage medium stores a computer program, and the computer program is executed by the processor to implement the power information-physical system dynamic coupling modeling method for the automatic generation control process according to any one of claims 1-11.
15. A computer program product comprising computer instructions, characterized in that, The computer instructions instruct the computer to execute the power information-physical system dynamic coupling modeling method for the automatic generation control process according to any one of claims 1-11.
Citation Information
Cited By
Communication and power distribution collaborative low-interaction compression networking and partitioning method, equipment and medium
CN122136829A
Communication and power distribution collaborative low-interaction compression networking and partitioning method, device and medium
CN122136829B