Offshore self-propelled breakwater pipe gallery integrated construction platform
By integrating a self-propelled offshore breakwater utility tunnel construction platform with floating bases and auxiliary operation units, the problems of low reuse rate of temporary trestle bridges and significant impact on the marine environment in traditional construction have been solved, achieving efficient and stable utility tunnel construction.
Patent Information
- Application Number
- CN202610374049.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-25
- Publication Date
- 2026-05-08
AI Technical Summary
Traditional breakwater pipe gallery construction suffers from problems such as low reuse rate of temporary trestle bridges, long construction period, significant impact from sea winds, waves and currents, and high difficulty in pile positioning, resulting in high construction costs, low efficiency and poor accuracy.
The construction platform adopts an integrated construction platform for breakwater and pipe gallery, which integrates floating box base units, operation auxiliary units and multi-dimensional adjustment mechanisms to achieve autonomous navigation, fixed-point anchoring and multi-dimensional heavy-load transfer, avoiding the construction of temporary piers and integrating navigation, anchoring, operation and transfer functions into one.
It has achieved stable, controllable, and standardized cyclical construction operations for offshore utility tunnels, shortened the construction cycle, improved construction efficiency and precision, and reduced costs.
Smart Images

Figure CN121990120A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of breakwater pipe gallery construction technology, specifically to an integrated construction platform for a self-propelled marine breakwater pipe gallery. Background Technology
[0002] Breakwater utility tunnels are enclosed corridor structures integrated within the hydraulic structure of coastal breakwaters, combining the stability of the breakwater structure with the intensive laying of pipelines. They are important supporting hydraulic facilities for nearshore ports, port-adjacent industrial zones, and coastal development projects. Relying on the core protective capabilities of breakwaters to resist wind and waves and prevent erosion, various municipal and industrial pipelines such as power and communication, water supply and drainage, and oil and gas transportation can be safely and intensively laid within the corridor. This not only avoids damage to pipelines from ocean waves, tidal erosion, and ship collisions, but also significantly extends the service life of pipelines and reduces operation and maintenance risks. At the same time, it does not occupy additional water or land space in the port, perfectly meeting the space utilization and safety protection needs of nearshore projects. Refer to the relevant patent CN118880875A. Its essence is to build a forward-cantilevered guiding operation platform based on the completed bridge deck structure. Through an integrated pile positioning and limiting structure, it solves the industry pain point of steel pipe piles being difficult to position and easily deviated by water flow / wind impact in marine environments. At the same time, through the cyclic reuse of core tooling, it realizes the continuous operation of "constructing one span and moving one span forward" of the trestle bridge, which greatly improves the accuracy, efficiency and safety of trestle bridge construction and reduces construction costs.
[0003] Currently, the conventional approach for offshore construction of breakwater utility tunnels is to "first erect a temporary trestle, then carry out utility tunnel construction." This involves using cantilever guide frames to complete the driving of steel pipe piles and the paving of the bridge deck structure span by span. The completed temporary trestle serves as a construction passage, equipment support foundation, and work platform. Supporting hoisting and transfer equipment is used to transport utility tunnel components and carry out on-site installation. In some scenarios, a construction method using work vessels in conjunction with tugboats for relocation is also employed. This approach presents several inconveniences: First, temporary trestle bridges are one-time temporary facilities that need to be erected span by span and dismantled as a whole after completion. The reuse rate of tools and materials is extremely low, the installation and dismantling process is cumbersome, and the investment of manpower and machinery is large, which significantly increases construction costs. Second, the erection of the trestle bridge and the construction of the main pipe gallery are sequential and step-by-step processes. Subsequent pipe gallery work cannot be carried out before the entire trestle bridge is completed, which greatly extends the overall construction cycle. Moreover, the driving of steel pipe piles for the trestle bridge is greatly affected by the impact of sea waves and water currents, making it difficult to control the pile position and verticality, which can easily lead to construction deviations and further delay the construction period. Therefore, the traditional step-by-step construction approach should be abandoned, and the procedural barriers between trestle erection and utility tunnel construction should be broken down. An integrated, reusable construction equipment should be developed that combines autonomous navigation and relocation, seabed anchoring and stabilization, expandable operating space, and multi-dimensional heavy-load transport functions. This equipment integrates the entire process of navigation, anchoring, operation, and relocation onto a single platform, eliminating the need for temporary trestle erection to complete the entire breakwater and utility tunnel construction process. Simultaneously, it avoids the adverse effects of marine conditions on operational stability, significantly reducing the construction cycle, lowering costs, and improving construction accuracy and efficiency. To address these issues, we provide a self-propelled marine breakwater and utility tunnel integrated construction platform. Summary of the Invention
[0004] The purpose of this invention is to provide an integrated construction platform for a self-propelled breakwater and utility tunnel at sea, in order to solve the problems mentioned in the background art.
[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows: A self-propelled breakwater pipe gallery integrated construction platform for marine includes a floating box base unit with self-propelled capability and fixed-point anchoring, and an operation auxiliary unit with adjustable working position and auxiliary support is provided on the top surface of the floating box base unit. The pontoon base unit includes a pontoon, the bottom surface of which is provided with a foldable and retractable movable support, the bottom surface of which is provided with a jet propulsion unit that can adjust the jet angle to change the direction of travel, and the top surface of which is provided with a limiting groove that restricts the movement trajectory of the work auxiliary unit. The work assistance unit includes a limiting slider that is slidably connected inside the limiting groove. A work platform is fixedly connected to the top surface of the limiting slider. A hydraulic anchor rod that provides auxiliary support is fixedly connected to the top surface of the work platform. A groove for construction work is provided on the top surface of the work platform. A gantry that assists in construction work is fixedly connected to the top surface of the work platform.
[0006] A further improvement of the technical solution of the present invention is that: the bottom surface of the working platform is rotatably connected to a heavy-duty drive gear, the number of the limiting sliders is two and they are respectively located at the left and right ends of the bottom surface of the working platform, and the number of the hydraulic anchor rods is four and they are evenly distributed and fixedly connected to the top surface of the working platform.
[0007] A further improvement of the technical solution of the present invention is that: a multi-segment hydraulic rod is fixedly connected to the middle of one end of the top surface of the working platform; a limiting slide rod is fixedly connected inside the gantry; a sliding sleeve is slidably connected to the outer surface of the limiting slide rod; a crossbeam is fixedly connected to the side of the sliding sleeve; and the output end of the multi-segment hydraulic rod is fixedly connected to the middle of the side of the crossbeam.
[0008] A further improvement of the technical solution of the present invention is that: a rack is fixedly connected to the top surface of the crossbeam, a slide block is slidably connected to the outer surface of the crossbeam, an adjusting gear is rotatably connected inside the top surface of the slide block, the adjusting gear meshes with the rack, and an auger is provided inside the bottom surface of the slide block.
[0009] A further improvement of the technical solution of the present invention is that: the number of the limiting slide grooves is two and they are respectively located at the left and right ends of the top surface of the float box; the top surface of the float box is provided with two material loading bins; a heavy-duty rack is fixedly connected to the middle of the top surface of the float box; and the heavy-duty drive gear meshes with the heavy-duty rack.
[0010] A further improvement of the technical solution of the present invention is that: a directional hydraulic rod is movably connected to the bottom side of the float box, the output end of the directional hydraulic rod is movably connected to the side of the jet propulsion device, a fixed seat is fixedly connected to the side of the float box, and an auxiliary sleeve is fixedly connected to the bottom side of the float box.
[0011] A further improvement of the technical solution of the present invention is that: a fixing buckle is fixedly connected to the top surface of the jet propulsion device, the fixing buckle is rotatably connected to the bottom surface of the fixing base, and a liquid inlet pipe is provided at the input end of the jet propulsion device, the liquid inlet pipe being rotatably connected to the inside of the auxiliary sleeve.
[0012] A further improvement of the technical solution of the present invention is that: a rotating auxiliary support is fixedly connected inside the jet propulsion device, an acceleration paddle wheel is rotatably connected to the side of the rotating auxiliary support, a drive rod is fixedly connected to the side of the acceleration paddle wheel, and the drive rod is rotatably connected inside the jet propulsion device.
[0013] A further improvement of the technical solution of the present invention is that: a sealed storage compartment is fixedly connected to the bottom surface of the float box, the movable support is movably connected to the inside of the sealed storage compartment, multiple hydraulic push rods are fixedly connected to the inside of the side of the movable support, an anchor rod is fixedly connected to the output end of the multiple hydraulic push rods, a hydraulic adjustment rod is movably connected to the top surface of the movable support, and the other end of the hydraulic adjustment rod is movably connected to the top surface inside the sealed storage compartment.
[0014] Due to the adoption of the above technical solution, the technical progress achieved by this invention compared to the prior art is as follows: 1. This invention provides an integrated construction platform for offshore breakwater pipe gallery using a self-propelled offshore method. Through a retractable, fixable, and integrated operating platform design, it overcomes the core pain points of offshore pipe gallery construction, such as limited working area, unstable working conditions, complex process coordination, and low site transfer efficiency. It transforms offshore floating operations into stable, controllable, and standardized land-based construction operations.
[0015] 2. This invention provides an integrated construction platform for offshore self-propelled breakwater pipe gallery. Through a switchable structural design that allows for navigation, deployment, and anchoring, it fundamentally addresses the industry pain points of floating construction vehicles being greatly affected by sea waves, having unstable operating benchmarks, and having low anchoring and relocation efficiency. It transforms the originally wave-floating pontoon platform into a rigid and stable operating benchmark anchored to the seabed, similar to land, providing core support for the precise construction of the upper operation units, while also adapting to the efficient cyclical requirements of continuous construction in multiple sections.
[0016] 3. This invention provides an integrated construction platform for a self-propelled breakwater and pipe gallery at sea. By using pump-jet propulsion technology as the core, it integrates power drive, navigation and displacement, and omnidirectional steering functions into one, solving the core pain point of traditional ship propeller drive in nearshore construction. It enables the floating box carrier to navigate and move autonomously, smoothly, accurately, and with high resistance to disturbance without external assistance, providing core navigation power support for the entire process of the construction equipment. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the storage three-dimensional structure of the present invention; Figure 2 This is a three-dimensional structural diagram of the working state of the present invention; Figure 3 This is a schematic diagram of the operation assistance unit of the present invention; Figure 4 For the present invention Figure 3 Schematic diagram of the middle gantry; Figure 5 For the present invention Figure 4 Schematic diagram of the middle crossbeam; Figure 6 This is a schematic diagram of the structure of the floating box base unit of the present invention; Figure 7 For the present invention Figure 6 Schematic diagram of the internal structure of the buoy box; Figure 8 For the present invention Figure 6 Schematic diagram of the bottom structure of the buoy box; Figure 9 For the present invention Figure 6 Schematic diagram of the mid-jet propulsion system; Figure 10 For the present invention Figure 6 Schematic diagram of the movable support structure.
[0018] In the diagram: 1. Floating box base unit; 11. Floating box; 12. Loading bin; 13. Jet propulsion unit; 14. Limiting slide; 15. Orienting hydraulic rod; 16. Heavy-duty rack; 17. Sealed storage bin; 18. Fixed seat; 19. Auxiliary sleeve; 110. Movable support; 111. Fixing buckle; 112. Rotating auxiliary support; 113. Accelerating paddle wheel; 114. Drive rod; 115. Liquid inlet pipe; 116. Multi-segment hydraulic push rod; 117. Anchor rod; 118. Hydraulic adjusting rod; 2. Operation auxiliary unit; 21. Operation platform; 22. Heavy-duty drive gear; 23. Limiting slider; 24. Hydraulic anchor rod; 25. Gantry; 26. Multi-segment hydraulic rod; 27. Crossbeam; 28. Slide seat; 29. Limiting slide rod; 210. Orienting gear; 211. Sliding sleeve; 212. Rack; 213. Screwdriver. Detailed Implementation
[0019] The present invention will be further described in detail below with reference to embodiments: Example 1: As Figure 1-10 As shown, the present invention provides an integrated construction platform for a self-propelled breakwater pipe gallery at sea, including a floating box base unit 1 with self-propelled capability and fixed anchorage. The top surface of the floating box base unit 1 is provided with an operation auxiliary unit 2 that can adjust the working position and provide auxiliary support. The operation auxiliary unit 2 includes a limiting slider 23 slidably connected inside the limiting slide groove 14. The top surface of the limiting slider 23 is fixedly connected to the working platform 21. The top surface of the working platform 21 is fixedly connected to a hydraulic anchor rod 24 that provides auxiliary support. The top surface of the working platform 21 has a groove for construction operations. The top surface of the working platform 21 is fixedly connected to a gantry 25 that assists in construction operations. The top surface of the working platform 21 has a groove, and the overall structure is approximately U-shaped. Its internal cavity provides operating space for construction operations. The bottom of the multi-segment hydraulic rod 26 is equipped with a support bracket to ensure operational stability. Two sets of limiting sliders 23 are arranged on the bottom surface of the working platform 21, which can achieve a stable connection between the floating box base unit 1 and the working auxiliary unit 2, while providing the working auxiliary unit 2 with a directional linear displacement degree of freedom. The side of the heavy-duty drive gear 22 is equipped with an integrated drive mechanism of motor and gearbox. The bottom surface of the work platform 21 is rotatably connected to a heavy-duty drive gear 22. There are two limit sliders 23, which are located at the left and right ends of the bottom surface of the work platform 21. There are four hydraulic anchor rods 24, which are evenly distributed and fixedly connected to the top surface of the work platform 21. The output end of the hydraulic anchor rod 24 is equipped with a ground cone for anchoring into the soil and a support pad for bearing stability; the hydraulic anchor rods 24 fixed to the side of the working platform 21 are independently controlled and are respectively arranged at the four ends of the working platform 21; the four sets of hydraulic anchor rods 24 can adjust their stroke independently to adapt to the terrain conditions of most working sites. A multi-segment hydraulic rod 26 is fixedly connected to the middle of one end of the top surface of the working platform 21. A limit slide rod 29 is fixedly connected inside the gantry 25. A sliding sleeve 211 is slidably connected to the outer surface of the limit slide rod 29. A crossbeam 27 is fixedly connected to the side of the sliding sleeve 211. The output end of the multi-segment hydraulic rod 26 is fixedly connected to the middle of the side of the crossbeam 27. A rack 212 is fixedly connected to the top surface of the crossbeam 27. A slide seat 28 is slidably connected to the outer surface of the crossbeam 27. An adjusting gear 210 is rotatably connected inside the top surface of the slide seat 28. The adjusting gear 210 meshes with the rack 212. An auger 213 is provided inside the bottom surface of the slide seat 28. There are two sets of gantry 25, which are arranged opposite to each other at the two ends of the opening on the top surface of the working platform 21; the crossbeam 27 forms a sliding fit with the outer wall of the limiting slide rod 29 through the sliding sleeve 211; the rack 212 arranged on the top surface of the crossbeam 27 can mesh with the adjusting gear 210 built into the slide 28 to drive the slide 28 to achieve linear displacement; there are two sets of slides 28, which are placed at the left and right ends of the crossbeam 27 respectively.
[0020] In this embodiment, when the equipment is in a sailing state, the operation auxiliary unit 2 is housed on the top surface of the pontoon base unit 1, forming a stable ship-like structure with the pontoon base unit 1 to ensure smooth navigation. When the equipment as a whole sails to the target operation point and the opening end of the operation platform 21 is aligned with the construction area, the heavy-duty drive gear 22, driven by the matching drive mechanism, moves along the heavy-duty rack 16. Under the guidance and limiting cooperation of the limit slider 23 and the limit groove 14, the operation platform 21 moves in a straight line towards the target construction area until the opening area of the operation platform 21 completely covers the required construction surface. Subsequently, four sets of hydraulic anchor rods 24 extend synchronously and independently until the ground cone at the output end and the support pad are anchored in the soil, supporting and fixing the operation platform 21 to a stable state. Driven by the multi-segment hydraulic rod 26, the crossbeam 27 completes vertical linear displacement along the limiting slide rod 29, causing the slide block 28 on its surface to adjust to the target working position; subsequently, the adjusting gear 210 built into the slide block 28, driven by the drive mechanism, meshes with the rack 212, causing the slide block 28 to adjust along the crossbeam 27 to the designated lateral working position. Through the coordinated operation of the above-mentioned multi-dimensional adjusting mechanism and the screw conveyors 213 arranged on the bottom surface of the two sets of slide blocks 28, the transfer operation of heavy components in the construction of the breakwater pipe gallery can be completed; at the same time, the U-shaped open structure of the working platform 21 can provide a stable installation and operation foundation for construction personnel and equipment, effectively reducing the adverse impact of the harsh marine working environment on the construction progress and avoiding delays in the construction period; After a single section of construction is completed, the hydraulic anchor rod 24 retracts and resets synchronously. Under reverse drive, the heavy-duty drive gear 22 drives the working platform 21 back to the top surface of the floating box base unit 1. Subsequently, the entire equipment travels to the next construction section and repeats the above operation process to complete the corresponding construction task. This cyclical operation mode can significantly shorten the overall construction cycle of the breakwater pipe gallery and significantly improve on-site construction efficiency.
[0021] Example 2: Figure 1-10 As shown, based on Embodiment 1, the present invention provides a technical solution: Preferably, the float base unit 1 includes a float 11, the bottom surface of the float 11 is provided with a foldable and retractable movable bracket 110, the bottom surface of the float 11 is provided with an adjustable jet propulsion device 13 that can change the direction of travel by adjusting the jet angle, the top surface of the float 11 is provided with a limiting groove 14 that restricts the movement trajectory of the operation auxiliary unit 2, there are two limiting grooves 14 and they are respectively located at the left and right ends of the top surface of the float 11, the top surface of the float 11 is provided with two material bins 12, and a heavy-duty rack 16 is fixedly connected to the middle of the top surface of the float 11, and the heavy-duty drive gear 22 meshes with the heavy-duty rack 16. The top surface of the pontoon 11 is provided with two sets of limiting grooves 14, and the positions of the limiting grooves 14 and the limiting sliders 23 correspond one-to-one. The guiding and limiting cooperation between the two can not only realize the stable connection between the operation auxiliary unit 2 and the pontoon base unit 1, but also ensure that the operation auxiliary unit 2 completes linear feed motion in a preset direction. The two sets of material bins 12 arranged on the top surface of the pontoon 11 can be used to store the necessary materials for construction, and the maximum stacking height of the materials in the bins shall not exceed the top surface elevation of the pontoon 11. A sealed storage compartment 17 is fixedly connected to the bottom surface of the float 11. A movable support 110 is movably connected to the inside of the sealed storage compartment 17. A multi-section hydraulic push rod 116 is fixedly connected to the inside of the side of the movable support 110. An anchor rod 117 is fixedly connected to the output end of the multi-section hydraulic push rod 116. A hydraulic adjustment rod 118 is movably connected to the top surface of the movable support 110. The other end of the hydraulic adjustment rod 118 is movably connected to the top surface inside the sealed storage compartment 17. The bottom surface of the pontoon 11 is provided with a sealed storage compartment 17 for storing the movable support 110 components, while ensuring the watertight performance of the main body of the pontoon 11. The movable support 110 is equipped with four sets of supporting components, which are divided into two groups and arranged opposite each other in the sealed storage compartment 17 on the bottom surface of the pontoon 11.
[0022] In this embodiment, driven by the jet propulsion unit 13, the pontoon 11 propels the entire equipment to the target working position. Subsequently, the hydraulic adjustment rod 118 drives the movable support 110 to extend outward from the sealed storage compartment 17 until the main body of the support points vertically to the seabed. Driven by the multi-segment hydraulic push rods 116 built into the movable support 110, the anchor rods 117 at the front end of the multi-segment hydraulic push rods 116 are inserted into the seabed strata. Through the coordinated adjustment of the four sets of multi-segment hydraulic push rods 116, the pontoon 11 is raised to the preset working elevation, providing a stable working benchmark for the construction work of the work auxiliary unit 2. During construction, the pontoon 11 remains stable and stationary under its own weight and the anchoring support of the movable support 110. Small waves during construction are effectively blocked by the main body of the pontoon 11, further ensuring the stability of the construction environment in the work area. After the construction is completed, the movable support 110 first retracts the multiple hydraulic push rods 116 and anchor rods 117, and then is completely stored back into the sealed storage compartment 17. It is then re-deployed after the equipment sails to the next construction area, ensuring that construction in each section can be carried out quickly and stably.
[0023] Example 3: As Figure 1-10 As shown, based on Embodiment 1, the present invention provides a technical solution: Preferably, a directional hydraulic rod 15 is movably connected to the bottom side of the float 11, the output end of the directional hydraulic rod 15 is movably connected to the side of the jet propulsion unit 13, a fixed seat 18 is fixedly connected to the side of the float 11, an auxiliary sleeve 19 is fixedly connected to the bottom side of the float 11, a fixed buckle 111 is fixedly connected to the top surface of the jet propulsion unit 13, the fixed buckle 111 is rotatably connected to the bottom surface of the fixed seat 18, an inlet pipe 115 is provided at the input end of the jet propulsion unit 13, the inlet pipe 115 is rotatably connected to the inside of the auxiliary sleeve 19, a rotating auxiliary support 112 is fixedly connected to the inside of the jet propulsion unit 13, an acceleration paddle wheel 113 is rotatably connected to the inside of the side of the rotating auxiliary support 112, a drive rod 114 is fixedly connected to the side of the acceleration paddle wheel 113, and the drive rod 114 is rotatably connected to the inside of the jet propulsion unit 13. Four jet thrusters 13 are arranged in two groups at the front and rear ends of the bottom surface of the pontoon 11. With the matching connection of the fixing buckle 111 and the fixing seat 18, and the liquid inlet pipe 115 and the auxiliary sleeve 19, the main body of the jet thruster 13 can be stably installed, while retaining the preset angle adjustment freedom. Inside the independent compartment of the jet thruster 13, there is an integrated drive mechanism of motor and gearbox; the drive rod 114 passes through the side wall of the jet thruster 13 and is fixedly connected to the output end of the drive mechanism; the matching liquid inlet pipe 115 is always arranged towards the seabed.
[0024] In this embodiment, the drive mechanism drives the drive rod 114 to rotate at high speed. The acceleration rotor 113 on the drive rod 114 pressurizes and accelerates the seawater entering the jet propulsion device 13 through the inlet pipe 115. The high-speed water jet is then ejected through the flow channel and nozzle structure of the jet propulsion device 13, providing sufficient propulsion power for the pontoon 11. The four jet propulsion devices 13 work together to ensure that the pontoon 11 completes navigation and displacement at a low speed and with stability. At the same time, it can effectively avoid the risk of entanglement and impact damage to the traditional propeller drive structure caused by floating objects in nearshore waters. When the equipment needs to adjust its course or direction of travel, the directional hydraulic rod 15 can drive the jet propulsion unit 13 to adjust the jet angle. The maximum adjustable angle of the jet propulsion unit 13 is up to 90°, which can meet the equipment's driving needs as it approaches or moves away from the coast. Relying on its own integrated power system, the equipment can complete autonomous navigation and relocation without the need for external tugboats or other auxiliary equipment, greatly improving the equipment's on-site operational flexibility and ease of use.
[0025] The working principle of this self-propelled breakwater and utility tunnel integrated construction platform will be explained in detail below.
[0026] like Figure 1-10 As shown, when the equipment is in a navigation state, the operation auxiliary unit 2 is completely housed on the top surface of the pontoon base unit 1. The two together form a stable structure similar to a ship, ensuring smooth navigation. The propulsion for the equipment is provided by jet thrusters 13: the drive mechanism drives the drive rod 114 to rotate at high speed, and through the acceleration wheel 113 on the rod, the seawater entering the jet thruster 13 channel through the inlet pipe 115 is pressurized and accelerated, and then the high-speed water jet is ejected through the channel and nozzle, providing sufficient propulsion power for the pontoon 11. The four jet thrusters 13 are arranged in two groups at opposite ends of the bottom surface of the pontoon 11. Working together, they can ensure that the pontoon 11 completes navigation and displacement at low speed and in a stable state, while effectively avoiding the risk of entanglement and impact damage to the traditional propeller drive structure caused by near-shore floating objects. When the equipment needs to adjust its course or direction of travel, the directional hydraulic rod 15 can drive the jet propulsion unit 13 to adjust the jet angle. The maximum adjustable angle is 90°, which can meet the equipment's travel needs when approaching or moving away from the coast. Relying on its own integrated power system, the equipment can complete autonomous navigation and relocation without the need for external tugboats or other auxiliary equipment, which greatly improves the flexibility and convenience of on-site operations. Driven by the jet propulsion unit 13, the pontoon 11 propels the entire equipment to the target working position. First, the pontoon base unit 1 is anchored: the hydraulic adjusting rod 118 drives the movable support 110 to extend outward from the sealed storage compartment 17 until the main body of the support points vertically towards the seabed. Then, driven by the multi-segment hydraulic push rods 116 built into the movable support 110, the anchoring rod 117 at the front end of the push rod inserts into the seabed strata. Through the coordinated adjustment of the four sets of multi-segment hydraulic push rods 116, the pontoon 11 is raised to the preset working elevation, providing a stable working benchmark for the subsequent construction work of the auxiliary unit 2. During the construction operation, the pontoon 11 remains stable and stationary under its own weight and the anchoring support of the movable support 110. Small waves during construction can be effectively blocked by the main body of the pontoon 11, further ensuring the stability of the construction environment in the working area. After the floating box base unit 1 is fixed, the operation auxiliary unit 2 starts the positioning process: when the open end of the operation platform 21 is aligned with the construction area, the heavy-duty drive gear 22 moves along the heavy-duty rack 16 under the drive of the matching drive mechanism; under the guidance and limiting cooperation of the limit slider 23 and the limit groove 14, the operation platform 21 moves in a straight line towards the target construction area until its open area completely covers the construction surface required for construction; then the four sets of hydraulic anchor rods 24 extend synchronously and independently until the ground cone at the output end and the support pad are anchored in the soil, supporting and fixing the operation platform 21 to a stable working state; Once the work platform is fixed in place, construction work can commence: Driven by the multi-segment hydraulic rod 26, the crossbeam 27 completes vertical linear displacement along the limiting slide rod 29, causing the slide seats 28 mounted on its surface to adjust to the target working height; subsequently, the adjusting gear 210 built into the slide seat 28, driven by the drive mechanism, meshes with the rack 212 on the top surface of the crossbeam 27, causing the slide seat 28 to adjust along the crossbeam 27 to the designated lateral working position. Through the coordinated operation of the aforementioned multi-dimensional adjusting mechanism and the augers 213 mounted on the bottom surfaces of the two sets of slide seats 28, the transfer of heavy components during the construction of the breakwater pipe gallery can be completed. Simultaneously, the U-shaped open structure of the work platform 21 provides a stable foundation for the installation and operation of construction personnel and equipment, effectively reducing the adverse impact of the harsh marine working environment on the construction progress and avoiding delays in the project schedule. After a single construction segment is completed, the equipment is reset and moved according to the following procedure: First, the hydraulic anchor rod 24 is retracted, and the heavy-duty drive gear 22 reverses its direction, driving the working platform 21 back to the top surface of the floating box base unit 1; then, the movable support 110 retracts the multiple hydraulic push rods 116 and anchor rods 117, and the entire equipment is stored and reset in the sealed storage compartment 17; finally, the equipment is moved to the next construction segment, and the above process is repeated to complete the corresponding construction task. This cyclical operation mode can significantly shorten the overall construction cycle of the breakwater pipe gallery and significantly improve on-site construction efficiency. In summary, this paper addresses the core pain points of traditional offshore utility tunnel construction by using modular integrated design of the floating box carrier. It transforms the offshore operation, which is highly dependent on sea conditions, involves complex coordination of multiple equipment, and is inefficient, into a standardized operation that is autonomous, controllable, stable, efficient, and capable of continuous cyclical construction.
[0027] The present invention has been described in detail above. However, modifications or improvements can be made to it, which will be obvious to those skilled in the art. Therefore, any modifications or improvements made without departing from the spirit of the present invention are within the scope of protection of the present invention.
Claims
1. A self-propelled marine breakwater and utility tunnel integrated construction platform, characterized in that: It includes a floating box base unit (1) with self-propulsion capability and fixed anchorage, and the top surface of the floating box base unit (1) is provided with an operation auxiliary unit (2) that can adjust the operation position and provide auxiliary support. The float base unit (1) includes a float (11), the bottom surface of the float (11) is provided with a foldable and retractable movable bracket (110), the bottom surface of the float (11) is provided with a jet propulsion device (13) that can adjust the jet angle and thus change the direction of travel, and the top surface of the float (11) is provided with a limiting groove (14) that restricts the movement trajectory of the operation auxiliary unit (2). The operation assistance unit (2) includes a limiting slider (23) slidably connected inside the limiting groove (14). The top surface of the limiting slider (23) is fixedly connected to the operation platform (21). The top surface of the operation platform (21) is fixedly connected to a hydraulic anchor rod (24) that plays an auxiliary support role. The top surface of the operation platform (21) is provided with a groove for construction operations. The top surface of the operation platform (21) is fixedly connected to a gantry (25) that can assist in construction operations.
2. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 1, characterized in that: The bottom surface of the work platform (21) is rotatably connected to a heavy-duty drive gear (22), there are two limit sliders (23) and they are located at the left and right ends of the bottom surface of the work platform (21), and there are four hydraulic anchor rods (24) that are evenly distributed and fixedly connected to the top surface of the work platform (21).
3. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 2, characterized in that: A multi-segment hydraulic rod (26) is fixedly connected to the middle of one end of the top surface of the work platform (21). A limiting slide rod (29) is fixedly connected inside the gantry (25). A sliding sleeve (211) is slidably connected to the outer surface of the limiting slide rod (29). A crossbeam (27) is fixedly connected to the side of the sliding sleeve (211). The output end of the multi-segment hydraulic rod (26) is fixedly connected to the middle of the side of the crossbeam (27).
4. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 3, characterized in that: A rack (212) is fixedly connected to the top surface of the crossbeam (27), a slide block (28) is slidably connected to the outer surface of the crossbeam (27), an adjusting gear (210) is rotatably connected to the top surface of the slide block (28), the adjusting gear (210) meshes with the rack (212), and an auger (213) is provided inside the bottom surface of the slide block (28).
5. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 4, characterized in that: The number of the limiting slide grooves (14) is two and they are respectively located at the left and right ends of the top surface of the float box (11). The top surface of the float box (11) is provided with two material bins (12). A heavy-duty rack (16) is fixedly connected to the middle of the top surface of the float box (11). The heavy-duty drive gear (22) meshes with the heavy-duty rack (16).
6. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 5, characterized in that: The bottom side of the float (11) is movably connected to a directional hydraulic rod (15), the output end of the directional hydraulic rod (15) is movably connected to the side of the jet propulsion unit (13), the side of the float (11) is fixedly connected to a fixed seat (18), and the bottom side of the float (11) is fixedly connected to an auxiliary sleeve (19).
7. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 6, characterized in that: The top surface of the jet propulsion unit (13) is fixedly connected to a fixing buckle (111), which is rotatably connected to the bottom surface of the fixing seat (18). The input end of the jet propulsion unit (13) is provided with a liquid inlet pipe (115), which is rotatably connected to the inside of the auxiliary sleeve (19).
8. The integrated construction platform for a self-propelled breakwater and utility tunnel at sea according to claim 7, characterized in that: The jet propulsion unit (13) is fixedly connected to a rotating auxiliary support (112) inside. An acceleration paddle wheel (113) is rotatably connected to the side of the rotating auxiliary support (112). A drive rod (114) is fixedly connected to the side of the acceleration paddle wheel (113). The drive rod (114) is rotatably connected inside the jet propulsion unit (13).
9. A self-propelled marine breakwater and utility tunnel integrated construction platform according to claim 8, characterized in that: The bottom surface of the float (11) is fixedly connected to a sealed storage compartment (17). The movable support (110) is movably connected inside the sealed storage compartment (17). The side surface of the movable support (110) is fixedly connected to multiple hydraulic push rods (116). The output end of the multiple hydraulic push rods (116) is fixedly connected to an anchor rod (117). The top surface of the movable support (110) is movably connected to a hydraulic adjusting rod (118). The other end of the hydraulic adjusting rod (118) is movably connected to the top surface inside the sealed storage compartment (17).
Citation Information
Patent Citations
Temporary trestle construction method for breakwater pipe gallery channel construction
CN118880875A