High-reliability resource scheduling method of central domain controller, controller and medium
By pooling M-core resources in the central domain controller and flexibly scheduling them according to task response time, the problem of response time not meeting safety level requirements caused by M-core binding relationship is solved, thereby improving the reliability of task execution and the safety of the whole vehicle.
Patent Information
- Application Number
- CN202610018866.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-07
- Publication Date
- 2026-05-26
AI Technical Summary
In sudden high-load scenarios, the binding relationship between the M core and tasks in the traditional central domain controller causes the worst-case response time of critical tasks to fail to meet the functional safety level requirements, resulting in poor overall vehicle safety.
By abstracting the resources of the M-core cluster into a unified resource pool, tasks are flexibly scheduled to matching processing units based on their response time. Processing strategies and scheduling methods corresponding to different response time ranges are adopted, including the division of the basic resource pool and the elastic resource pool, to ensure exclusive processing of urgent tasks and flexible allocation of other tasks.
This improves the reliability of task execution and the safety of the entire vehicle, and provides suitable hardware resources to support tasks with different real-time requirements, thereby improving system resource utilization and overall vehicle safety.