Country mobile energy storage load prediction error compensation optimization system and method
By constructing a Transformer-based time-series forecasting model and multiple error compensation models, the problem of large forecasting errors in rural electricity load has been solved, achieving high-precision and stable load forecasting, and improving the safety of power grid operation and the capacity for renewable energy absorption.
Patent Information
- Application Number
- CN202610280061.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-09
- Publication Date
- 2026-06-09
AI Technical Summary
Existing technologies are insufficient for accurately predicting the diverse electricity loads in rural areas. In particular, the load prediction error is large due to the volatility and seasonality of distributed renewable energy output, which affects the safe and stable operation of the power grid and the absorption of renewable energy.
We employ a Transformer-based time series prediction model combined with BiLSTM, GRU, and XGBoost error models. Through multi-dimensional dataset construction, DBSCAN anomaly detection, Lagrange interpolation, and data normalization, we construct multi-type error prediction models. Finally, we select the optimal error compensation model through LA-Kmeans clustering to achieve accurate compensation for prediction errors.
It has improved the accuracy of rural energy load forecasting, enhanced the model's adaptability and stability in complex scenarios, and achieved high-precision forecasting and intelligent error compensation for electricity load in multiple rural scenarios.