A communication cable digital management system and management method

By establishing a dictionary of physical reference points and performing intersection operations on multiple types of evidence mappings, combined with precise positioning measurements and reverse verification, the problems of false triggering and resource ledger contamination in the digital management of communication optical cables were solved, achieving accurate optical cable fault location and resource management.

CN122226133APending Publication Date: 2026-06-16ZIGONG POWER SUPPLY COMPANY STATE GRID SICHUAN ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610365877.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-03-24
Publication Date
2026-06-16

AI Technical Summary

Technical Problem

In existing digital management solutions for optical fiber cables, maintenance of a single acquisition chain or a single system can easily lead to problems such as false triggering of precision positioning tests, inaccurate candidate intervals, ambiguous distance values, and pollution of resource ledgers.

Method used

A dictionary of physical reference point intervals is established. Candidate intervals are determined through mapping and intersection operations of multiple types of heterogeneous evidence. Combined with precise positioning measurements and reverse verification, the unique positioning results are written back to the resource database.

Benefits of technology

This reduces fiber optic cable segment mismatches, minimizes false triggers, avoids resource ledger contamination, and improves positioning accuracy and resource management reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122226133A_ABST
    Figure CN122226133A_ABST
Patent Text Reader

Abstract

The application discloses a kind of communication optical cable digitization management system and management method, it is related to communication optical cable digitization management technical field.The present application is with physical reference point interval as minimum comparison unit, establishes physical reference point interval dictionary;With the same segment of multiple acquisition chain abnormal evidence normalization to interval ID;In the preset time window, through heterogeneous evidence, candidate determination is carried out;Based on the intersection constraint of resource layer and network management layer triplet, determine the interval to be refined positioning;After executing refined positioning measurement, through distance pair and reference point pair information, reverse check unification is carried out;After successful unification, positioning result is written back to object state record and executes formal resource backwrite.The present application can effectively reduce instantaneous false triggering and error measurement, avoid distance landing point ambiguity, prevent unverified result from polluting resource account, realize abnormal sensing and fault positioning closed loop.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of digital management technology for communication optical cables, specifically a digital management system and method for communication optical cables. Background Technology

[0002] Existing digital management solutions for optical fiber cables typically combine online monitoring, alarm information, performance information, resource management systems, network management systems, and geographic information systems to achieve optical fiber cable fault analysis, fault location, resource maintenance, and work order processing.

[0003] In one type of existing solution, abnormal links are analyzed based on optical time-domain reflectometry test results, baseline curves, or reference point information, and the fault location is determined by combining this with topology relationships. In another type of existing solution, suspected optical cable segments are identified based on alarm information, performance anomaly information, or service interruption information, and then a precise location test is triggered. In yet another type of existing solution, a mapping relationship is established between the resource layer and the network management layer for ports, fiber cores, junction boxes, optical fibers, and physical routes to facilitate physical optical path search, service data comparison, and resource accuracy verification.

[0004] While the above solutions can address some of the issues, they still have the following shortcomings in the context of digital management of optical fiber communication cables: First, relying solely on a single acquisition chain or a single abnormal event can easily lead to momentary false triggers, causing unnecessary precise positioning tests to be initiated; Second, relying solely on the mapping relationship maintained by a single system can easily result in excessively large candidate intervals and inaccurate candidate objects; Third, relying solely on distance values ​​or single reference points for conversion can easily lead to ambiguity in the landing point, causing the same distance value to correspond to multiple candidate physical reference point intervals; Fourth, if the positioning results are directly written back to the resource database without completing uniqueness verification, it can easily cause pollution of the resource ledger, thereby affecting subsequent scheduling, maintenance, and recovery judgments. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide a digital management method for communication optical cables, comprising the following processes: A physical reference point interval dictionary is established, which includes multiple physical reference point intervals defined by two adjacent reference points, an interval ID corresponding to each physical reference point interval, a starting reference point identifier, an ending reference point identifier, and an interval length deviation envelope for each physical reference point interval. Obtain abnormal evidence from multiple acquisition chains, and map each abnormal piece of evidence to a corresponding interval ID according to its occurrence location to form an evidence set normalized by interval ID; Within a preset time window, each set of evidence is judged as a candidate; if at least two types of heterogeneous evidence exist simultaneously in the set of evidence corresponding to the same interval ID, and at least one of the at least two types of heterogeneous evidence is non-OTDR evidence and at least the other type can be mapped to port ID or fiber core ID, the physical reference point interval corresponding to the interval ID is determined as a candidate interval, and a set of candidate intervals is formed. Obtain the resource layer edge set and the network management layer edge set. Perform an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triple. The triple that is simultaneously true in the resource layer edge set and the network management layer edge set is determined as the intersection triple. The candidate interval corresponding to the intersection triple is determined as the interval to be precisely located. Perform fine positioning measurements on the interval to be precisely positioned to output the distance value of the event point and the reference point pair information corresponding to the event point; The event point distance value is mapped to the candidate interval set, and for each candidate interval, the distance pair of the event point distance value relative to the starting reference point and ending reference point of the candidate interval is calculated. Then, it is determined whether the distance pair falls within the allowable fluctuation range represented by the interval length deviation envelope; whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and ending reference point identifier of the candidate interval; and the mapping result is reverse-checked to ensure uniqueness. When the number of candidate intervals that simultaneously meet the above criteria is 1, the positioning result, which includes the interval ID, port ID or fiber core ID, reference point pair identifier, evidence category, and time window identifier, is written back to the object status record in the resource library, and a formal resource write-back is performed.

[0006] Furthermore, in the physical reference point interval dictionary, the starting reference point identifier, the ending reference point identifier, the interval ID, and the interval length deviation envelope are established in a one-to-one correspondence with each physical reference point interval.

[0007] Furthermore, the non-OTDR evidence is obtained from at least one of the following: remote optical signal loss alarm, service alarm signal, port-level performance anomaly, and optical power anomaly; the evidence that can be mapped to port ID or fiber core ID includes at least one of the following: port-level performance anomaly evidence, fiber core-level alarm evidence, and OTDR event evidence after port-fiber core association mapping.

[0008] Furthermore, the resource layer edge set is generated from the port relationship table, fiber core association table, and interval mapping table in the resource layer; the network management layer edge set is generated from the port service relationship table, fiber core bearer relationship table, and interval mapping table in the network management layer.

[0009] Furthermore, the precise positioning measurement includes: selecting the corresponding test channel based on the port ID in the intersection triplet, performing OTDR measurement on the fiber core associated with the port ID, and outputting the distance value of the event point and the reference point pair information corresponding to the event point.

[0010] Furthermore, the distance pair includes a first distance of the event point distance value relative to the starting reference point of the candidate interval and a second distance relative to the ending reference point of the candidate interval; when the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range characterized by the interval length deviation envelope of the corresponding candidate interval, and the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of the candidate interval, the candidate interval is determined as a candidate interval that meets the verification conditions; when the number of candidate intervals that meet the verification conditions is 1, the reverse verification uniqueness is determined to be successful.

[0011] Furthermore, the object status record includes at least an interval ID, a port ID or fiber core ID, a reference point pair identifier, an evidence category, a time window identifier, and a status field; each object status record corresponds to an interval ID; when a candidate interval is formed, the status field is updated to a pending verification status; after performing precise positioning measurement, the status field is updated to a located status; and after determining that the reverse verification uniqueness is successful and performing formal resource write-back, the status field is updated to a verified status.

[0012] Furthermore, in the reverse verification uniqueness process, when the number of candidate intervals that meet the verification conditions is greater than 1, the object status record corresponding to each candidate interval that meets the verification conditions is kept in the located state, on-site verification work orders are generated respectively, and the corresponding work order identifier is written into the object status record of the corresponding interval ID, wherein each on-site verification work order is used to perform on-site verification on the corresponding candidate interval.

[0013] Furthermore, upon receiving work order feedback indicating that the fault repair of a candidate interval corresponding to a certain on-site verification work order has been completed, and when the interval ID corresponding to the on-site verification work order exits the candidate interval set within a subsequent preset time window, the object status record corresponding to the interval ID of the on-site verification work order is updated to the recovered status and written back to the resource library.

[0014] A digital management system for optical fiber cables, using the aforementioned digital management method for optical fiber cables, includes: a dictionary establishment module, an evidence normalization module, a candidate determination module, an intersection operation module, a precise positioning trigger module, a reverse verification module, a status write-back module, and a data processing module; The dictionary building module, evidence normalization module, candidate judgment module, intersection operation module, fine positioning trigger module, reverse verification module, and status write-back module are respectively connected to the data processing module. The dictionary building module is used to build a dictionary of physical reference point intervals. The evidence normalization module is used to acquire abnormal evidence from multiple acquisition chains and map each abnormal piece of evidence to a corresponding interval ID according to its occurrence location, so as to form an evidence set normalized by interval ID. The candidate determination module is used to perform candidate determination on each of the evidence sets within a preset time window; The intersection operation module is used to obtain the resource layer edge set and the network management layer edge set, perform an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triple, determine the triple that is simultaneously true in the resource layer edge set and the network management layer edge set as the intersection triple, and determine the candidate interval corresponding to the intersection triple as the interval to be precisely located. The fine positioning trigger module is used to perform fine positioning measurement on the interval to be finely positioned, so as to output the distance value of the event point and the reference point pair information corresponding to the event point; The reverse verification module is used to map the event point distance value to the candidate interval set, and calculate the first distance of the event point distance value relative to the starting reference point of the corresponding candidate interval and the second distance relative to the ending reference point of the corresponding candidate interval for each candidate interval to form a distance pair. It then determines whether the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range represented by the interval length deviation envelope of the corresponding candidate interval, and whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of the corresponding candidate interval. When both the distance pair judgment and the reference point pair information judgment are true, the corresponding candidate interval is determined as a candidate interval that meets the verification conditions. The aforementioned status write-back module is used to write the positioning result, which includes the interval ID, port ID or fiber core ID, reference point pair identifier, evidence category and time window identifier, back to the object status record in the preset resource library when the number of candidate intervals that meet the verification conditions is 1, and to perform formal resource write-back.

[0015] The beneficial effects of this invention are: Using the interval ID as the smallest comparison unit and implementing segment normalization can reduce object mismatch caused by the mixing of different terms such as optical cable segment, faulty optical line segment, and routing segment.

[0016] Hard gating, which employs at least two types of heterogeneous evidence, including non-OTDR evidence, within a preset time window, can suppress single anomalies, transient anomalies, and false triggers caused solely by changes in the OTDR curve.

[0017] Precise positioning measurements are only triggered when the port ID-fiber core ID-interval ID triplet of the resource layer edge set and the network management layer edge set is simultaneously true, which can reduce mismeasurements caused by single-system mapping errors.

[0018] The distance value of the event point is first mapped to the candidate interval set, and then the uniqueness is verified by the distance pair judgment and the reference point pair information judgment. This can avoid the ambiguity of the landing point caused by directly writing the distance value back.

[0019] When the number of candidate intervals that meet the verification conditions is greater than 1, verification can continue through on-site verification work orders to prevent unverified results from contaminating the resource ledger.

[0020] Work order feedback serves only as a status supplement or recovery trigger condition, and does not replace the location judgment in reverse, thus preventing management semantics from intruding into the main technology line. Attached Figure Description

[0021] Figure 1 This is a flowchart illustrating the diesel generator control method based on grid-connected collaborative control. Detailed Implementation

[0022] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings, but the scope of protection of the present invention is not limited to the following description.

[0023] The features and performance of the present invention will be further described in detail below with reference to embodiments.

[0024] Example 1

[0025] like Figure 1 As shown, a digital management method for communication optical cables includes the following processes: A physical reference point interval dictionary is established, which includes multiple physical reference point intervals defined by two adjacent reference points, an interval ID corresponding to each physical reference point interval, a starting reference point identifier, an ending reference point identifier, and an interval length deviation envelope for each physical reference point interval. Obtain abnormal evidence from multiple acquisition chains, and map each abnormal piece of evidence to a corresponding interval ID according to its occurrence location to form an evidence set normalized by interval ID; Within a preset time window, each set of evidence is judged as a candidate; if at least two types of heterogeneous evidence exist simultaneously in the set of evidence corresponding to the same interval ID, and at least one of the at least two types of heterogeneous evidence is non-OTDR evidence and at least the other type can be mapped to port ID or fiber core ID, the physical reference point interval corresponding to the interval ID is determined as a candidate interval, and a set of candidate intervals is formed. Obtain the resource layer edge set and the network management layer edge set. Perform an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triple. The triple that is simultaneously true in the resource layer edge set and the network management layer edge set is determined as the intersection triple. The candidate interval corresponding to the intersection triple is determined as the interval to be precisely located. Perform fine positioning measurements on the interval to be precisely positioned to output the distance value of the event point and the reference point pair information corresponding to the event point; The event point distance value is mapped to the candidate interval set, and for each candidate interval, the distance pair of the event point distance value relative to the starting reference point and ending reference point of the candidate interval is calculated. Then, it is determined whether the distance pair falls within the allowable fluctuation range represented by the interval length deviation envelope; whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and ending reference point identifier of the candidate interval; and the mapping result is reverse-checked to ensure uniqueness. When the number of candidate intervals that simultaneously meet the above criteria is 1, the positioning result, which includes the interval ID, port ID or fiber core ID, reference point pair identifier, evidence category, and time window identifier, is written back to the object status record in the resource library, and a formal resource write-back is performed.

[0026] Specifically, the method of this scheme can be executed by a communication optical cable digital management server. This server is communicatively connected to the OTDR test chain, the non-OTDR acquisition chain, the resource library, the network management system, the work order system, and the geographic information system. The non-OTDR acquisition chain is used to output non-OTDR evidence, and the OTDR test chain is used to output precise positioning measurement results after triggering.

[0027] In this scheme, a physical reference point interval refers to a physical interval of optical cable located between two adjacent reference points. The reference point is a fixed point object that can be located in the resource library, and the fixed point object includes at least one of the following: equipment room wiring frame fixed point, optical junction box fixed point, splice box fixed point, fiber distribution box fixed point, well location fixed point, and pole line fixed point. A physical reference point interval is defined between two adjacent reference points, and a unique interval ID is assigned to this physical reference point interval.

[0028] The physical reference point interval dictionary in this scheme includes at least an interval ID, a starting reference point identifier, an ending reference point identifier, and an interval length deviation envelope. The interval length deviation envelope describes the allowable fluctuation range of the distance between the corresponding physical reference point interval and the starting and ending reference points. The interval length deviation envelope can be generated based on the engineering archive length, reserved fiber length, splice loss compensation value, and historical test correction values. The interval length deviation envelope is used for reverse verification of subsequent fine positioning results.

[0029] In this solution, abnormal evidence is entered into the system in the form of event logs. Each event log includes at least an interval ID, evidence source category, evidence occurrence time, port ID or fiber core ID, and the original value. According to the evidence source category, abnormal evidence is divided into OTDR evidence and non-OTDR evidence. Non-OTDR evidence includes at least one of the following: remote optical signal loss alarms, service alarm signals, port-level performance anomalies, and optical power anomalies. Evidence that can be mapped to a port ID or fiber core ID includes at least one of the following: port-level performance anomaly evidence, fiber core-level alarm evidence, and OTDR event evidence after port-fiber core association mapping.

[0030] In this scheme, segment normalization refers to mapping abnormal evidence obtained from different acquisition chains to the interval ID corresponding to the same physical reference point interval. Specifically, the original abnormal events output by alarm sources, power sources, optical power sources, and OTDR sources are first converted to the corresponding interval IDs through the port-fiber core relationship, fiber core-interval relationship, and device-interval relationship in the resource library, and then written into the evidence set normalized by interval ID.

[0031] The preset time window in this scheme is used to determine whether evidence from multiple acquisition chains simultaneously hits the same interval ID. The preset time window is uniformly defined by the communication optical cable digital management server, and the events of each acquisition chain are aligned based on the server time. As long as the occurrence time of the event records falls within the same preset time window, they are considered to be within the same time sequence judgment range.

[0032] In this scheme, the resource layer edge set is generated from the port relationship table, fiber core association table, and interval mapping table in the resource layer. Each edge record is a triplet of port ID—fiber core ID—interval ID. Similarly, the network management layer edge set is generated from the port service relationship table, fiber core bearer relationship table, and interval mapping table in the network management layer. Each edge record is also represented by a triplet of port ID—fiber core ID—interval ID. Only triples that appear simultaneously in both the resource layer edge set and the network management layer edge set are considered intersection triples.

[0033] The candidate interval set in this scheme is generated by the time window gating results. Specifically, when the same interval ID hits at least two types of heterogeneous evidence simultaneously within the same preset time window, and at least one type of heterogeneous evidence is non-OTDR evidence, and at least the other type of heterogeneous evidence can be mapped to a port ID or fiber core ID, the physical reference point interval corresponding to that interval ID is added to the candidate interval set.

[0034] The precise positioning measurement in this scheme is used to measure the distance between the sections to be precisely positioned. In one implementation, the precise positioning measurement is an OTDR measurement. The communication optical cable digital management server selects the corresponding test channel based on the port ID in the intersection triplet, and performs OTDR measurement on the fiber core associated with that port ID to obtain the distance value of the event point and the reference point pair information corresponding to the event point.

[0035] The reverse verification uniqueness in this scheme includes the following actions: First, the event point distance value obtained from precise positioning is mapped to each candidate interval in the candidate interval set; second, the first distance of the event point distance value relative to the starting reference point of each candidate interval and the second distance relative to the ending reference point of each candidate interval are calculated to form a distance pair; third, it is determined whether the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range represented by the interval length deviation envelope of the corresponding candidate interval, and whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of the candidate interval; the candidate interval that simultaneously satisfies the above judgments is determined as the candidate interval that meets the verification conditions; finally, when the number of candidate intervals that meet the verification conditions is 1, the reverse verification uniqueness is considered successful.

[0036] In this scheme, the object status record is used to carry the positioning results and status transition information. Each object status record corresponds to a range ID. When there are multiple candidate ranges in the candidate range set, corresponding object status records are established according to the range IDs of each candidate range. The object status record includes at least the range ID, port ID or fiber core ID, reference point pair identifier, evidence category, time window identifier, status field, and work order feedback field. The status field includes pending verification status, located status, verified status, and recovered status. It should be noted that the formal resource write-back in this invention refers to writing the uniquely confirmed positioning results into the formal location field, formal association field, and verified status field in the resource library; in the on-site verification path, the work order identifier is written into the work order feedback field.

[0037] Specifically, the digital management server for optical fiber cables maintains multiple physical reference point interval dictionary entries along an optical fiber route. Let's define a physical reference point interval with interval ID I004 between two adjacent reference points R3 and R4. This interval dictionary entry includes: interval ID I004, starting reference point identifier R3, ending reference point identifier R4, and the interval length deviation envelope corresponding to this interval.

[0038] Within the first preset time window, the service-side device corresponding to port P17 reports a remote optical signal loss alarm; within the same time window, port P17 reports a port-level performance anomaly again. The communication optical cable digital management server treats the remote optical signal loss alarm as the first type of non-OTDR evidence and the port-level performance anomaly as the second type of evidence that can be mapped to the port ID, and normalizes the two types of evidence to the physical reference point interval with interval ID I004 through the port-fiber-interval mapping relationship in the resource library.

[0039] Because the evidence set with the same interval ID I004 hits two types of heterogeneous evidence simultaneously within the same first preset time window, and one type is non-OTDR evidence while the other type can be mapped to a port ID, the communication optical cable digital management server adds the physical reference point interval with interval ID I004 to the candidate interval set and updates the status field in the object status record with the corresponding interval ID I004 to the pending verification status.

[0040] Subsequently, the communication optical cable digital management server reads the triple (P17, F24, I004) from both the resource layer edge set and the network management layer edge set. Since this triple is true in both the resource layer edge set and the network management layer edge set, it is identified as the intersection triple, and the candidate interval with interval ID I004 is identified as the interval to be precisely located.

[0041] The communication optical cable digital management server performs OTDR measurements on port P17 and fiber core F24 corresponding to the interval to be precisely located, obtaining the event point distance value and the corresponding reference point pair information. The event point distance value is first mapped to a candidate interval set. Then, for interval I004, a first distance relative to the starting reference point of interval I004 and a second distance relative to the ending reference point of interval I004 are calculated to form a distance pair. It is then determined whether the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range represented by the interval length deviation envelope of interval I004, and whether the reference point pair information corresponding to the event point is consistent with the starting and ending reference point identifiers of interval I004. Since the number of candidate intervals satisfying the verification conditions is 1, the reverse verification uniqueness is successful.

[0042] After successful reverse verification of uniqueness, the communication optical cable digital management server writes the positioning result with interval ID I004, fiber core ID F24, reference point pair identifier R3-R4, evidence category of remote optical signal loss alarm and port-level performance anomaly, and time window identifier of the first preset time window back to the corresponding object status record in the resource library; the status field of the object status record is first updated to the located status, and then updated to the verified status after the formal resource write-back is completed.

[0043] Example 2

[0044] The proposed method is implemented using a non-OTDR first evidence specification approach.

[0045] Suppose that the physical reference point interval with interval ID I011 is located between reference point R8 and reference point R9.

[0046] Within the second preset time window, the optical fiber cable digital management server first receives an optical power anomaly event, and then receives a performance anomaly event corresponding to port P35. The server treats the optical power anomaly event as the first type of non-OTDR evidence, and the performance anomaly event as the second type of evidence that can be mapped to the port ID, and maps both types of evidence to the physical reference point interval with interval ID I011.

[0047] Since two types of heterogeneous evidence are simultaneously established within the same interval ID I011 and the same second preset time window, the server adds interval I011 to the candidate interval set. Subsequently, the server performs an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triple, and determines (P35,F52,I011) as the intersection triple, and then determines the candidate interval corresponding to this intersection triple as the interval to be precisely located.

[0048] The server selects the corresponding test channel based on the intersection triple (P35, F52, I011), triggers OTDR measurement, and obtains the event point distance value and the corresponding reference point pair information. After the event point distance value is mapped to the candidate interval set, the server calculates the first distance of the event point distance value relative to the starting reference point of interval I011 and the second distance relative to the ending reference point of interval I011 to form a distance pair. It then determines whether the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range represented by the interval length deviation envelope of interval I011, and whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of interval I011. When the number of candidate intervals that meet the verification conditions is 1, the server performs a formal resource write-back and completes the verified status update of the object status record.

[0049] Example 3

[0050] This is used to illustrate the on-site verification path when reverse verification fails.

[0051] Suppose there are two candidate intervals in the candidate interval set: the physical reference point interval with interval ID I021 and the physical reference point interval with interval ID I022. Both have passed the dual-condition gating within the preset time window, and their corresponding triples are simultaneously true in both the resource layer edge set and the network management layer edge set. Therefore, both are retained as intervals to be precisely located.

[0052] The communication optical cable digital management server performs OTDR measurements on the corresponding fiber cores and obtains the event point distance values. After mapping the event point distance values ​​to a set of candidate intervals, the server calculates the first distance relative to the respective starting reference point and the second distance relative to the respective ending reference point for intervals I021 and I022, respectively, to form distance pairs. It then determines whether the distance pairs formed by the first and second distances fall within the allowable fluctuation range characterized by the length deviation envelope of their respective intervals, and whether the reference point pair information corresponding to the event point is consistent with the starting and ending reference point identifiers of the corresponding candidate intervals. After reverse verification, the number of candidate intervals that meet the verification conditions is 2.

[0053] In this case, the communication optical cable digital management server keeps the status field of the corresponding object status record of interval I021 and interval I022 as located, and generates on-site verification work orders respectively. The work order identifier of each on-site verification work order is written into the work order feedback field of the object status record of the corresponding interval ID.

[0054] After arriving at the candidate range corresponding to any on-site verification work order, on-site personnel read the port ID, fiber ID, and device identifier of the objects within that range using electronic ID tags or intelligent management terminals. The read results are then transmitted back to the object status record corresponding to the range ID of the on-site verification work order for verification of the port ID-fiber ID-range ID triplet. This step enhances the consistency between on-site verification results and object status records.

[0055] Once the on-site repair of a candidate interval corresponding to a certain on-site verification work order is completed, the work order system reports the repair completion result of the on-site verification work order to the communication optical cable digital management server. The server continues to monitor the evidence set corresponding to the interval ID of the on-site verification work order within a subsequent third preset time window; if the interval ID exits the candidate interval set within the subsequent third preset time window, the status record of the object corresponding to the interval ID of the on-site verification work order is updated to the restored status and written back to the resource database.

[0056] Example 4

[0057] A digital management system for optical fiber cables, using the aforementioned digital management method for optical fiber cables, includes: a dictionary establishment module, an evidence normalization module, a candidate determination module, an intersection operation module, a precise positioning trigger module, a reverse verification module, a status write-back module, and a data processing module; The dictionary building module, evidence normalization module, candidate judgment module, intersection operation module, fine positioning trigger module, reverse verification module, and status write-back module are respectively connected to the data processing module. The dictionary building module is used to build a physical reference point interval dictionary, which includes multiple physical reference point intervals defined by two adjacent reference points, interval IDs corresponding to each physical reference point interval, start reference point identifiers, end reference point identifiers, and interval length deviation envelopes for each physical reference point interval. The evidence normalization module is used to acquire abnormal evidence from multiple acquisition chains and map each abnormal piece of evidence to a corresponding interval ID according to its occurrence location, so as to form an evidence set normalized by interval ID; The candidate determination module is used to determine the candidates for each of the evidence sets within a preset time window; when there are at least two types of heterogeneous evidence in the evidence set corresponding to the same interval ID, and at least one of the at least two types of heterogeneous evidence is non-OTDR evidence and at least the other type can be mapped to port ID or fiber core ID, the physical reference point interval corresponding to the corresponding interval ID is determined as the candidate interval, forming a candidate interval set, and an object status record corresponding to the corresponding candidate interval is established. The intersection operation module is used to obtain the resource layer edge set and the network management layer edge set, perform an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triplet, determine the triplet that is simultaneously true in the resource layer edge set and the network management layer edge set as the intersection triplet, and determine the candidate interval corresponding to the intersection triplet as the interval to be finely located; The fine positioning trigger module is used to perform fine positioning measurements on the interval to be finely positioned, so as to output the distance value of the event point and the reference point pair information corresponding to the event point; The reverse verification module is used to map the event point distance value to the candidate interval set, and calculate the first distance of the event point distance value relative to the starting reference point of the corresponding candidate interval and the second distance relative to the ending reference point of the corresponding candidate interval for each candidate interval to form a distance pair. It then determines whether the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range represented by the interval length deviation envelope of the corresponding candidate interval, and whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of the corresponding candidate interval. When both the distance pair judgment and the reference point pair information judgment are true, the corresponding candidate interval is determined as a candidate interval that meets the verification conditions. The status write-back module is used to write the positioning result, which includes the interval ID, port ID or fiber core ID, reference point pair identifier, evidence category and time window identifier, back to the object status record in the preset resource library when the number of candidate intervals that meet the verification conditions is 1, and to perform formal resource write-back.

[0058] The above description is merely a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the forms disclosed herein and should not be construed as excluding other embodiments. It can be used in various other combinations, modifications, and environments, and can be altered within the scope of the concept described herein through the above teachings or related technologies or knowledge. Modifications and variations made by those skilled in the art that do not depart from the spirit and scope of the present invention should be within the protection scope of the appended claims.

Claims

1. A digital management method for communication optical cables, characterized in that, The process includes the following: A physical reference point interval dictionary is established, which includes multiple physical reference point intervals defined by two adjacent reference points, an interval ID corresponding to each physical reference point interval, a starting reference point identifier, an ending reference point identifier, and an interval length deviation envelope for each physical reference point interval. Obtain abnormal evidence from multiple acquisition chains, and map each abnormal piece of evidence to a corresponding interval ID according to its occurrence location to form an evidence set normalized by interval ID; Within a preset time window, each set of evidence is judged as a candidate; if at least two types of heterogeneous evidence exist simultaneously in the set of evidence corresponding to the same interval ID, and at least one of the at least two types of heterogeneous evidence is non-OTDR evidence and at least the other type can be mapped to port ID or fiber core ID, the physical reference point interval corresponding to the interval ID is determined as a candidate interval, and a set of candidate intervals is formed. Obtain the resource layer edge set and the network management layer edge set. Perform an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triple. The triple that is simultaneously true in the resource layer edge set and the network management layer edge set is determined as the intersection triple. The candidate interval corresponding to the intersection triple is determined as the interval to be precisely located. Perform fine positioning measurements on the interval to be precisely positioned to output the distance value of the event point and the reference point pair information corresponding to the event point; The event point distance value is mapped to the candidate interval set, and for each candidate interval, the distance pair of the event point distance value relative to the starting reference point and ending reference point of the candidate interval is calculated. Then, it is determined whether the distance pair falls within the allowable fluctuation range represented by the interval length deviation envelope; whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and ending reference point identifier of the candidate interval; and the mapping result is reverse-checked to ensure uniqueness. When the number of candidate intervals that simultaneously meet the above criteria is 1, the positioning result, which includes the interval ID, port ID or fiber core ID, reference point pair identifier, evidence category, and time window identifier, is written back to the object status record in the resource library, and a formal resource write-back is performed.

2. The digital management method for communication optical cables according to claim 1, characterized in that, In the physical reference point interval dictionary, the starting reference point identifier, the ending reference point identifier, the interval ID, and the interval length deviation envelope are established in a one-to-one correspondence with each physical reference point interval.

3. The digital management method for communication optical cables according to claim 1, characterized in that, The non-OTDR evidence is obtained from at least one of the following: remote optical signal loss alarm, service alarm signal, port-level performance anomaly, and optical power anomaly; the evidence that can be mapped to port ID or fiber core ID includes at least one of the following: port-level performance anomaly evidence, fiber core-level alarm evidence, and OTDR event evidence after port-fiber core association mapping.

4. The digital management method for communication optical cables according to claim 1, characterized in that, The resource layer edge set is generated from the port relationship table, fiber core association table, and interval mapping table in the resource layer; the network management layer edge set is generated from the port service relationship table, fiber core bearer relationship table, and interval mapping table in the network management layer.

5. The digital management method for communication optical cables according to claim 1, characterized in that, The precise positioning measurement includes: selecting the corresponding test channel based on the port ID in the intersection triplet, performing OTDR measurement on the fiber core associated with the port ID, and outputting the distance value of the event point and the reference point pair information corresponding to the event point.

6. The digital management method for communication optical cables according to claim 5, characterized in that, The distance pair includes a first distance of the event point distance value relative to the starting reference point of the candidate interval and a second distance relative to the ending reference point of the candidate interval; when the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range characterized by the interval length deviation envelope of the corresponding candidate interval, and the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of the candidate interval, the candidate interval is determined as a candidate interval that meets the verification conditions; when the number of candidate intervals that meet the verification conditions is 1, the reverse verification uniqueness is determined to be successful.

7. The digital management method for communication optical cables according to claim 6, characterized in that, The object status record includes at least an interval ID, a port ID or fiber core ID, a reference point pair identifier, an evidence category, a time window identifier, and a status field; each object status record corresponds to an interval ID; when a candidate interval is formed, the status field is updated to a pending verification status; after performing precise positioning measurement, the status field is updated to a located status; and after determining that the reverse verification uniqueness is successful and performing formal resource write-back, the status field is updated to a verified status.

8. The digital management method for communication optical cables according to claim 7, characterized in that, In the reverse verification uniqueness process, when the number of candidate intervals that meet the verification conditions is greater than 1, the object status record corresponding to each candidate interval that meets the verification conditions is kept in the located state, and on-site verification work orders are generated respectively. The corresponding work order identifier is written into the object status record of the corresponding interval ID. Each on-site verification work order is used to perform on-site verification on the corresponding candidate interval.

9. A digital management method for communication optical cables according to claim 8, characterized in that, When a work order feedback indicating that the fault repair of a candidate interval corresponding to a certain on-site verification work order has been completed is received, and the interval ID corresponding to the on-site verification work order exits the candidate interval set within a subsequent preset time window, the object status record corresponding to the interval ID of the on-site verification work order is updated to the recovered status and written back to the resource library.

10. A digital management system for communication optical cables, characterized in that, The digital management method for communication optical cables according to any one of claims 1-9 includes: a dictionary establishment module, an evidence normalization module, a candidate determination module, an intersection operation module, a precise positioning trigger module, a reverse verification module, a status write-back module, and a data processing module; The dictionary building module, evidence normalization module, candidate judgment module, intersection operation module, fine positioning trigger module, reverse verification module, and status write-back module are respectively connected to the data processing module. The dictionary building module is used to build a dictionary of physical reference point intervals. The evidence normalization module is used to acquire abnormal evidence from multiple acquisition chains and map each abnormal piece of evidence to a corresponding interval ID according to its occurrence location, so as to form an evidence set normalized by interval ID. The candidate determination module is used to perform candidate determination on each of the evidence sets within a preset time window; The intersection operation module is used to obtain the resource layer edge set and the network management layer edge set, perform an intersection operation on the resource layer edge set and the network management layer edge set according to the port ID-fiber core ID-interval ID triple, determine the triple that is simultaneously true in the resource layer edge set and the network management layer edge set as the intersection triple, and determine the candidate interval corresponding to the intersection triple as the interval to be precisely located. The fine positioning trigger module is used to perform fine positioning measurement on the interval to be finely positioned, so as to output the distance value of the event point and the reference point pair information corresponding to the event point; The reverse verification module is used to map the event point distance value to the candidate interval set, and calculate the first distance of the event point distance value relative to the starting reference point of the corresponding candidate interval and the second distance relative to the ending reference point of the corresponding candidate interval for each candidate interval to form a distance pair. It then determines whether the distance pair formed by the first distance and the second distance falls within the allowable fluctuation range represented by the interval length deviation envelope of the corresponding candidate interval, and whether the reference point pair information corresponding to the event point is consistent with the starting reference point identifier and the ending reference point identifier of the corresponding candidate interval. When both the distance pair judgment and the reference point pair information judgment are true, the corresponding candidate interval is determined as a candidate interval that meets the verification conditions. The aforementioned status write-back module is used to write the positioning result, which includes the interval ID, port ID or fiber core ID, reference point pair identifier, evidence category and time window identifier, back to the object status record in the preset resource library when the number of candidate intervals that meet the verification conditions is 1, and to perform formal resource write-back.