A guide rail type energy storage charging system and a power supply method thereof
The rail-mounted energy storage and charging system determines energy storage during off-peak hours and discharge during peak hours by using date, electricity price, and load factor. This solves the problems of existing charging piles occupying parking spaces and high costs, and improves energy utilization and coverage efficiency.
Patent Information
- Application Number
- CN202610709407.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-05-21
- Publication Date
- 2026-06-26
Smart Images

Figure CN122275678A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of new energy vehicle charging technology, and in particular to a rail-mounted energy storage charging system and its power supply method. Background Technology
[0002] Existing parking lot charging piles are generally installed on the ground, which occupies parking spaces, has high site rental costs, and has limited coverage. In addition, traditional rail-mounted mobile charging devices only enable terminal movement and do not integrate energy storage functions. They cannot take advantage of the peak-valley price difference of the power grid to reduce operating costs, nor do they have the ability to store energy during off-peak hours or provide emergency power supply. Overall, the investment and operating costs are high and the energy utilization rate is low. Summary of the Invention
[0003] This invention provides a power supply method for a rail-mounted energy storage charging system to solve the problem that charging piles in the prior art lack peak-shaving energy storage capabilities.
[0004] On one hand, the present invention provides a power supply method for a rail-mounted energy storage charging system, the method comprising: S1: Get the current date, real-time electricity price, grid load factor, and preset holiday data; S2: Match preset holiday data based on the current date, and distinguish the date type of the current date, which is weekday, rest day or holiday; S3: Based on the date type, real-time electricity price, and grid load factor, determine whether the current time period is a valley, flat, or peak period; S4: When the valley section is determined, the control power supply module charges the energy storage module integrated on the guide rail mechanism to store energy. S5: When the peak period is determined, the energy storage module is prioritized to discharge to the mobile charging terminal. S6: When the energy storage module's power level is lower than a preset threshold, the system switches to the grid discharging power to the mobile charging terminal, and the mobile charging terminal is kept powered continuously during the switching process.
[0005] A further solution is that, in step S2, the preset holiday data includes statutory holidays and adjusted workdays; the current date is matched with the preset holiday data, and if it matches a statutory holiday, it is determined to be a holiday; if it matches an adjusted workday, it is determined to be a workday; if it matches a weekend (not an adjusted workday), it is determined to be a rest day; and other dates are determined to be workdays.
[0006] A further solution is that step S3 includes: matching the corresponding electricity price time period benchmark table according to the date type; when the real-time electricity price is lower than the benchmark valley threshold, it is initially determined to be a valley period; when the real-time electricity price is between the benchmark valley threshold and the benchmark peak threshold, it is initially determined to be a flat period; when the real-time electricity price is higher than the benchmark peak threshold, it is initially determined to be a peak period.
[0007] A further embodiment of the scheme is that step S3 further includes: correcting the preliminary judgment result based on the grid load rate; maintaining the preliminary judgment result when the grid load rate is lower than the preset load threshold; correcting the initially judged flat segment to a peak segment when the grid load rate is higher than or equal to the preset load threshold, and keeping the initially judged valley segment unchanged.
[0008] A further solution is that, in step S4, when the energy storage module reaches the full charge threshold, it automatically stops charging and goes into standby mode.
[0009] A further solution is that, in step S4, the individual voltage of the energy storage module is detected in real time by the BMS, and charging of the energy storage module is stopped when the individual voltage reaches a preset upper limit value.
[0010] On the other hand, the present invention provides a rail-mounted energy storage and charging system for implementing the power supply method of the rail-mounted energy storage and charging system described in any of the above embodiments, including a rail mechanism, an energy storage module, a mobile charging terminal, a control module, a power supply module, and a fixed installation component; The fixed installation assembly is used to hoist and fix the guide rail mechanism to the top of the parking lot; The guide rail mechanism is used to carry the mobile charging terminal and provide it with a moving path. The guide rail mechanism integrates a power supply sliding contact line and a signal transmission line. The power supply sliding contact line is used to transmit electrical energy, and the signal transmission line is used to transmit control signals. The energy storage module is integrated and fixed at the end or middle of the guide rail mechanism. The energy storage module is used to store electrical energy and release electrical energy during peak periods. The mobile charging terminal is movably connected to the guide rail mechanism and can move along the guide rail mechanism; The control module is connected to the energy storage module, the mobile charging terminal, and the power supply module respectively. The control module is used to perform time period determination, energy storage control, discharge control, and terminal scheduling. The power supply module input terminal is used to connect to the power grid, and the power supply module output terminal is electrically connected to the power supply sliding contact line and the energy storage module respectively. The power supply module is used to convert the power grid power into an adaptive voltage and distribute it to the energy storage module or mobile charging terminal.
[0011] A further embodiment is that the mobile charging terminal includes a charging gun, a cable winding assembly, a mobile drive assembly, and an identification assembly. The charging gun is used to connect to the vehicle's charging interface to transmit electrical energy. The cable winding assembly is electrically connected to the charging gun, and the cable winding assembly is used to store or release the connecting cable of the charging gun. The mobile drive component is connected to the guide rail mechanism via a transmission, and the mobile drive component is used to drive the mobile charging terminal to move along the guide rail mechanism. The identity recognition component is connected to the control module via a signal. The identity recognition component is used to identify the user's identity and trigger the charging start / stop.
[0012] A further embodiment is that the cable winding assembly is an automatic winding structure, which is configured to release the cable during charging and retract the cable after charging is completed.
[0013] A further embodiment is that the identity recognition component is a QR code recognition module, a card swipe recognition module, or an APP-linked recognition module, which is used to realize multi-method user authentication.
[0014] The technical solutions provided in the embodiments of the present invention have the following advantages compared with the prior art: This rail-mounted energy storage and charging system adopts a top-mounted design, which does not occupy ground parking spaces. It accurately distinguishes between peak and off-peak periods by determining the date, electricity price, and load rate, enabling energy storage during off-peak hours and energy release during peak hours, significantly reducing operating costs. The energy storage module is integrated into the rail, making it compact and easy to install. A single rail can cover 10-20 parking spaces, greatly improving coverage efficiency. Power supply switching is uninterrupted, and charging stability is strong. Overall investment costs are reduced, making it suitable for large-scale deployment in various parking lots. Attached Figure Description
[0015] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a schematic flowchart illustrating a power supply method for a rail-mounted energy storage charging system provided in an embodiment of the present invention. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0019] Example Figure 1 This is a schematic flowchart illustrating a power supply method for a rail-mounted energy storage and charging system according to an embodiment of the present invention. The present invention proposes a power supply method for a rail-mounted energy storage and charging system; specifically, see [link to documentation]. Figure 1 The power supply method of the rail-mounted energy storage charging system includes the following steps S1-S6.
[0020] S1 retrieves the current date, real-time electricity price, grid load factor, and preset holiday data.
[0021] S2: Match preset holiday data based on the current date, and distinguish the date type of the current date, which is weekday, rest day or holiday.
[0022] S3: Based on the date type, real-time electricity price, and grid load factor, determine whether the current time period is a valley period, a flat period, or a peak period.
[0023] S4: When the valley section is determined, the control power supply module charges and stores energy to the energy storage module integrated on the guide rail mechanism.
[0024] S5: When the peak period is determined, the energy storage module is prioritized to discharge to the mobile charging terminal.
[0025] S6: When the energy storage module's power level is lower than a preset threshold, the system switches to the grid discharging power to the mobile charging terminal, and the mobile charging terminal is kept powered continuously during the switching process.
[0026] In this embodiment, the current date refers to the real-time Gregorian calendar date and weekday information; the real-time electricity price refers to the real-time peak-valley electricity price of the power grid; the power grid load factor refers to the current load of the power grid as a percentage of its rated capacity; the preset holiday data refers to a database containing statutory holidays and adjusted workdays; the date type refers to weekdays, rest days, and public holidays; valley / flat / peak periods are electricity consumption periods divided according to electricity price and load; the energy storage module refers to the energy storage battery pack integrated on the top of the guide rail; the mobile charging terminal is a charging device that can move along the guide rail; and continuous power supply means that there is no power interruption during the switching process.
[0027] In a specific embodiment, an underground parking garage in a residential community has 50 parking spaces arranged longitudinally, with a concrete beam ceiling. The system uses a 50-meter linear aluminum alloy guide rail, which is fixed to the bottom of the beam via an adjustable hoisting bracket. A 100kWh lithium manganese iron phosphate energy storage module is integrated at the end of the guide rail, and two mobile charging terminals are configured.
[0028] From 23:00 to 7:00 the next day, the system obtains the current date (Monday, a working day), real-time electricity price of 0.35 yuan / kWh, and grid load factor of 65%. It checks the holiday database to confirm there are no holidays, thus classifying it as an off-peak period. The system then controls the 380V power supply module to charge the energy storage module until it is fully charged to 100kWh.
[0029] From 10:00 to 16:00 daily, the system obtains a real-time electricity price of 0.85 yuan / kWh and a grid load rate of 90%, which is considered peak time. Priority is given to controlling the energy storage module to discharge to the mobile charging terminal. When the remaining power of the energy storage module drops to 10kWh, the system automatically switches to direct grid supply. The switching process takes 150ms, and the vehicle charging is uninterrupted.
[0030] In one embodiment, in step S2 above, the preset holiday data includes statutory holidays and adjusted workdays; the current date is matched with the preset holiday data, and if it matches a statutory holiday, it is determined to be a holiday; if it matches an adjusted workday, it is determined to be a workday; if it matches a weekend (not an adjusted workday), it is determined to be a rest day; and other dates are determined to be workdays.
[0031] In this embodiment, statutory holidays include Spring Festival, National Day, May Day, Dragon Boat Festival, Mid-Autumn Festival, etc.; adjusted workdays refer to working / rest days adjusted before and after holidays; adjusted workdays refer to weekends that are changed to workdays; and weekends that are not adjusted workdays refer to normal Saturdays and Sundays.
[0032] In a specific embodiment, the system has a built-in holiday database for 2025, which includes: statutory holidays January 1, January 29–February 4, May 1–May 5, June 10–June 12, September 17–September 19, and October 1–October 7; and adjusted workdays January 26, February 8, May 6, September 22, and October 11.
[0033] September 28, 2025 (Sunday, not a day off in lieu of a work day) is determined to be a rest day according to the system's holiday database; September 22, 2025 (Sunday, a day off in lieu of a work day) is determined to be a work day; October 1, 2025 is determined to be a holiday; October 8, 2025 is determined to be a work day.
[0034] Accurately identifies work schedule adjustments to avoid misjudging peak and off-peak periods; avoids energy storage during peak holiday periods and stores energy during off-peak periods on weekdays to maximize returns; adapts to work schedule adjustment systems and is highly applicable.
[0035] In one embodiment, step S3 includes: matching the corresponding electricity price time period benchmark table according to the date type; initially determining the real-time electricity price as a valley period when it is lower than the benchmark valley period threshold, initially determining the real-time electricity price as a flat period when it is between the benchmark valley period threshold and the benchmark peak period threshold, and initially determining the real-time electricity price as a peak period when it is higher than the benchmark peak period threshold.
[0036] In this embodiment, the electricity price time period benchmark table refers to the electricity price threshold preset according to the date type; the benchmark off-peak threshold, for example: weekdays ≤ 0.4 yuan / kWh, rest days ≤ 0.45 yuan / kWh, holidays ≤ 0.5 yuan / kWh; the benchmark peak threshold, for example: weekdays ≥ 0.75 yuan / kWh, rest days ≥ 0.8 yuan / kWh, holidays ≥ 0.85 yuan / kWh.
[0037] In a specific embodiment, the system pre-stores three benchmark tables: Weekday benchmark rates: Off-peak period ≤ 0.4 yuan / kWh, Average period 0.4–0.75 yuan / kWh, Peak period ≥ 0.75 yuan / kWh; Rest day benchmark table: ≤0.45 yuan / kWh during off-peak hours, 0.45–0.8 yuan / kWh during average hours, and ≥0.8 yuan / kWh during peak hours; Holiday benchmark rates: ≤0.5 yuan / kWh during off-peak hours, 0.5–0.85 yuan / kWh during normal hours, and ≥0.85 yuan / kWh during peak hours.
[0038] On May 2, 2025 (holiday), the real-time electricity price was 0.48 yuan / kWh, which matches the holiday benchmark table and is preliminarily determined to be the off-peak period; the real-time electricity price was 0.72 yuan / kWh, which is preliminarily determined to be the flat period; and the real-time electricity price was 0.9 yuan / kWh, which is preliminarily determined to be the peak period.
[0039] Differentiated pricing based on date aligns with power grid patterns; the judgment criteria are quantifiable and easy to implement; providing a precise basis for load correction.
[0040] In one embodiment, step S3 further includes: correcting the preliminary judgment result based on the grid load rate; maintaining the preliminary judgment result when the grid load rate is lower than a preset load threshold; correcting the initially judged flat segment to a peak segment when the grid load rate is higher than or equal to the preset load threshold, and keeping the initially judged valley segment unchanged.
[0041] In this embodiment, the grid load factor refers to the real-time load ratio; the preset load threshold is usually set to 85%.
[0042] In a specific embodiment, on June 15, 2025 (a working day), the real-time electricity price was 0.6 yuan / kWh, which was initially determined to be a flat period; the grid load factor was 88%, exceeding the 85% threshold, and was corrected to a peak period.
[0043] On June 16, 2025 (a working day), the real-time electricity price was 0.38 yuan / kWh, which was initially determined to be in the off-peak period; the grid load factor was 92%, and the off-peak period remained unchanged.
[0044] On June 17, 2025 (a rest day), the real-time electricity price was 0.5 yuan / kWh, which was initially determined to be a flat period; the grid load factor was 78%, which was lower than the threshold, and the flat period was maintained.
[0045] Dynamic correction avoids misjudgment of electricity prices; peak-hour suppression of energy storage reduces grid pressure; off-peak hours ensure energy storage revenue, balancing economy and safety.
[0046] In one embodiment, in step S4, when the energy storage module reaches the full charge threshold, it automatically stops charging and goes into standby mode.
[0047] In this embodiment, the full charge threshold refers to the rated capacity of the energy storage module, such as 100kWh or 120kWh.
[0048] In a specific embodiment, the energy storage module is a 100kWh lithium manganese iron phosphate battery pack, with a full-charge threshold set at 100kWh. During off-peak charging, the system monitors the power level in real time. When the power level reaches 100kWh, charging immediately stops and the system enters standby mode, waiting for the next off-peak period.
[0049] The energy storage module is a 120kWh secondary battery pack, with a full charge threshold set at 120kWh. It automatically shuts down when the charge reaches 120kWh.
[0050] Avoid overcharging and extend battery life; operate automatically without manual intervention; save energy and reduce losses.
[0051] In one embodiment, in step S4, the individual voltage of the energy storage module is detected in real time by the BMS, and charging of the energy storage module is stopped when the individual voltage reaches a preset upper limit value.
[0052] In this embodiment, BMS stands for Battery Management System; single cell voltage refers to the voltage of a single cell; the preset upper limit is typically 3.65V.
[0053] In a specific embodiment, the energy storage module uses lithium manganese iron phosphate cells, with a nominal voltage of 3.2V per cell. The BMS collects the voltage of each cell in real time. During off-peak charging, if the voltage of any single cell reaches the upper limit of 3.65V, the BMS immediately sends a stop charging command, and the power supply module cuts off the charging circuit to prevent damage to the single cell due to overvoltage. For cells used in cascaded applications, where consistency is slightly lower, the upper limit is still set at 3.65V, and real-time monitoring is used to prevent single cell overvoltage.
[0054] Precise individual cell protection to prevent damage; extended battery life and reduced maintenance costs; improved system safety.
[0055] This invention also proposes a rail-mounted energy storage and charging system to implement the power supply method of the rail-mounted energy storage and charging system described in any of the above embodiments. The rail-mounted energy storage and charging system includes a rail mechanism, an energy storage module, a mobile charging terminal, a control module, a power supply module, and a fixed installation assembly. The fixed installation assembly is used to hoist and fix the rail mechanism to the top of a parking lot. The rail mechanism carries the mobile charging terminal and provides it with a movement path. The rail mechanism integrates a power supply sliding contact line and a signal transmission line; the power supply sliding contact line transmits electrical energy, and the signal transmission line transmits control signals. The energy storage module is integrated and fixed at the end or middle of the guide rail mechanism. The energy storage module is used to store electrical energy and release electrical energy during peak periods. The mobile charging terminal is movably connected to the guide rail mechanism and can move along the guide rail mechanism. The control module is signal-connected to the energy storage module, the mobile charging terminal, and the power supply module respectively. The control module is used to perform time period determination, energy storage control, discharge control, and terminal scheduling. The input end of the power supply module is used to connect to the power grid, and the output end of the power supply module is electrically connected to the power supply sliding contact line and the energy storage module respectively. The power supply module is used to convert the grid electrical energy into an adapted voltage and distribute it to the energy storage module or the mobile charging terminal.
[0056] In this embodiment, the fixed installation component refers to the adjustable hoisting bracket; the guide rail mechanism includes linear / annular aluminum alloy guide rails; the power supply sliding contact line is typically a 380V power transmission sliding contact line; the signal transmission line refers to the cable used to transmit control signals; the energy storage module refers to the battery pack integrated at the end / middle of the guide rail mechanism; the mobile charging terminal refers to the charging device that can be moved by the control module; the control module refers to the PLC controller; and the power supply module refers to the AC / DC integrated unit.
[0057] In a specific embodiment, a shopping mall's above-ground parking lot has 80 circular parking spaces with a steel structure ceiling. The guide rail mechanism uses an 80-meter circular aluminum alloy guide rail, fixed to the steel structure ceiling via adjustable hoisting brackets with a 2-meter spacing between the brackets, without damaging the original structure. The guide rail integrates a 380V power supply sliding contact line and an RS485 signal line. The energy storage module consists of two 120kWh lithium manganese iron phosphate battery packs, fixed symmetrically at positions along the circular guide rail. Three mobile charging terminals are movably connected to the guide rail. The control module is a PLC, installed within the energy storage module, and connected to the energy storage, terminals, and power supply modules. The power supply module's input is connected to the municipal 380V power grid, and its output is connected to the sliding contact line and the energy storage module.
[0058] Top-mounted installation does not occupy parking spaces and requires zero rental; a single guide rail covers 10-20 parking spaces; integrated energy storage reduces costs by 60%; installation is convenient and scaling up is rapid.
[0059] In one embodiment, the mobile charging terminal includes a charging gun, a cable winding assembly, a movement drive assembly, and an identification component; the charging gun is used to connect to a vehicle charging interface to transmit electrical energy; the cable winding assembly is electrically connected to the charging gun and is used to store or release the charging gun's connecting cable; the movement drive assembly is driven by a guide rail mechanism and is used to drive the mobile charging terminal to move along the guide rail mechanism; the identification component is signal-connected to a control module and is used to identify the user's identity and trigger charging start / stop.
[0060] In this embodiment, the charging gun includes both fast and slow charging guns; the cable winding assembly refers to a device with automatic cable winding; the motion drive assembly includes a servo motor and a gear rack; and the identity recognition assembly includes a barcode scanning module, a card swiping module, and an APP module.
[0061] In a specific embodiment, the mobile charging terminal's outer shell is made of flame-retardant ABS material, and internally integrates: a national standard 60kW fast charging gun and a 7kW slow charging gun; a 12-meter charging cable connected to a spring-loaded winding assembly; a servo motor and a rack and pinion transmission pair meshing with a guide rail rack; and a QR code scanning module. The charging gun and winding assembly are electrically connected, the drive assembly is driven by the guide rail, and the scanning module is connected to the PLC signal. The terminal's positioning error is ≤5cm, allowing it to be accurately moved above the parking space.
[0062] The terminal has complete functions and is compatible with the charging needs of all vehicle models; it automatically retracts cables to prevent tangling and dragging; the servo drive provides accurate positioning and fast response; and it offers convenient multi-mode recognition for a good user experience.
[0063] In one embodiment, the cable winding assembly is an automatic winding structure configured to release the cable during charging and retract the cable after charging is complete.
[0064] In this embodiment, the automatic winding structure is a cable winding device with a built-in spring and torsion bar.
[0065] In a specific embodiment, the cable winding assembly has a built-in spring, and the cable is initially wound inside the terminal. When the user takes the charging gun and pulls the cable to the vehicle's charging port, the spring stores force; when charging is complete and the user puts the charging gun back, the spring releases its torque, causing the cable to automatically retract into the terminal. No manual handling is required throughout the process, and the cable is neither dragged nor crushed.
[0066] Automatic winding prevents cables from getting tangled or dragged and damaged; no manual handling is required, making operation convenient; it extends cable life and reduces maintenance costs.
[0067] In one embodiment, the identity recognition component is a QR code recognition module, a card swipe recognition module, or an APP-linked recognition module, which is used to implement multi-method user authentication.
[0068] In this embodiment, the barcode scanning module refers to a QR code scanner; the card swiping module includes an RFID card reader; and the APP-linked identification module includes a Bluetooth communication module.
[0069] In a specific embodiment, three types of identification components can be selected: first, a QR code scanner, where the user scans the terminal's QR code, and the system verifies the scan to start charging; second, an RFID card reader, where the user swipes their card for verification; and third, a Bluetooth module, where the user's mobile app connects via Bluetooth for verification. All three methods are connected to the PLC signal, and charging start / stop is triggered upon successful verification.
[0070] Supports multiple authentication methods to adapt to different user habits; simple operation and fast startup; improves charging safety and convenience.
[0071] The embodiments of the present invention can achieve the following advantages: This rail-mounted energy storage and charging system adopts a top-mounted design, which does not occupy ground parking spaces. It accurately distinguishes between peak and off-peak periods by determining the date, electricity price, and load rate, enabling energy storage during off-peak hours and energy release during peak hours, significantly reducing operating costs. The energy storage module is integrated into the rail, making it compact and easy to install. A single rail can cover 10-20 parking spaces, greatly improving coverage efficiency. Power supply switching is uninterrupted, and charging stability is strong. Overall investment costs are reduced, making it suitable for large-scale deployment in various parking lots.
[0072] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.
[0073] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Since these modifications and variations fall within the scope of the claims and their equivalents, this invention also intends to include these modifications and variations.
[0074] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.
Claims
1. A power supply method for a rail-mounted energy storage and charging system, characterized in that, The method includes the following steps: S1: Get the current date, real-time electricity price, grid load factor, and preset holiday data; S2: Match preset holiday data based on the current date, and distinguish the date type of the current date, which is weekday, rest day or holiday; S3: Based on the date type, real-time electricity price, and grid load factor, determine whether the current time period is a valley, flat, or peak period; S4: When the valley section is determined, the control power supply module charges the energy storage module integrated on the guide rail mechanism to store energy. S5: When the peak period is determined, the energy storage module is prioritized to discharge to the mobile charging terminal. S6: When the energy storage module's power level is lower than a preset threshold, the system switches to the grid discharging power to the mobile charging terminal, and the mobile charging terminal is kept powered continuously during the switching process.
2. The method according to claim 1, characterized in that, In step S2, the preset holiday data includes statutory holidays and adjusted workdays; The current date is matched against preset holiday data. If it matches a statutory holiday, it is determined as a holiday; if it matches a workday that is adjusted for workdays, it is determined as a workday; if it matches a weekend that is not adjusted for workdays, it is determined as a rest day; and other dates are determined as workdays.
3. The method according to claim 1, characterized in that, Step S3 includes: Match the corresponding electricity price time period benchmark table based on the date type; When the real-time electricity price is lower than the benchmark valley threshold, it is initially determined to be a valley segment; when the real-time electricity price is between the benchmark valley threshold and the benchmark peak threshold, it is initially determined to be a flat segment; when the real-time electricity price is higher than the benchmark peak threshold, it is initially determined to be a peak segment.
4. The method according to claim 1, characterized in that, Step S3 further includes: Based on the preliminary judgment results of grid load factor correction; When the grid load factor is lower than the preset load threshold, the preliminary judgment result is maintained; when the grid load factor is higher than or equal to the preset load threshold, the initially judged flat segment is corrected to a peak segment, and the initially judged valley segment is left unchanged.
5. The method according to claim 1, characterized in that, In step S4, when the energy storage module reaches the full charge threshold, it automatically stops charging and goes into standby mode.
6. The method according to claim 1, characterized in that, In step S4, the individual voltage of the energy storage module is monitored in real time by the BMS. When the individual voltage reaches the preset upper limit value, charging of the energy storage module is stopped.
7. A rail-mounted energy storage and charging system for implementing the method described in any one of claims 1 to 6, characterized in that, It includes a guide rail mechanism, energy storage module, mobile charging terminal, control module, power supply module, and fixed installation components; The fixed installation assembly is used to hoist and fix the guide rail mechanism to the top of the parking lot; The guide rail mechanism is used to carry the mobile charging terminal and provide it with a moving path. The guide rail mechanism integrates a power supply sliding contact line and a signal transmission line. The power supply sliding contact line is used to transmit electrical energy, and the signal transmission line is used to transmit control signals. The energy storage module is integrated and fixed at the end or middle of the guide rail mechanism. The energy storage module is used to store electrical energy and release electrical energy during peak periods. The mobile charging terminal is movably connected to the guide rail mechanism and can move along the guide rail mechanism; The control module is connected to the energy storage module, the mobile charging terminal, and the power supply module respectively. The control module is used to perform time period determination, energy storage control, discharge control, and terminal scheduling. The power supply module input terminal is used to connect to the power grid, and the power supply module output terminal is electrically connected to the power supply sliding contact line and the energy storage module respectively. The power supply module is used to convert the power grid power into an adaptive voltage and distribute it to the energy storage module or mobile charging terminal.
8. The system according to claim 7, characterized in that, The mobile charging terminal includes a charging gun, a cable winding assembly, a mobility drive assembly, and an identification assembly. The charging gun is used to connect to the vehicle's charging interface to transmit electrical energy. The cable winding assembly is electrically connected to the charging gun, and the cable winding assembly is used to store or release the connecting cable of the charging gun. The mobile drive component is connected to the guide rail mechanism via a transmission, and the mobile drive component is used to drive the mobile charging terminal to move along the guide rail mechanism. The identity recognition component is connected to the control module via a signal. The identity recognition component is used to identify the user's identity and trigger the charging start / stop.
9. The system according to claim 8, characterized in that, The cable winding assembly is an automatic winding structure, which is configured to release the cable during charging and retract the cable after charging is completed.
10. The system according to claim 7, characterized in that, The identity recognition component is a QR code recognition module, a card swipe recognition module, or an APP-linked recognition module. The QR code recognition module, card swipe recognition module, or APP-linked recognition module is used to realize multi-method user identity verification.