Construction progress dynamic prediction and optimization method and device, electronic equipment and storage medium

By collecting and integrating multi-source heterogeneous data from construction sites, a construction progress feature set is constructed and a deep learning model is used for prediction to generate dynamic adjustment plans. This solves the problem of relying on experience in construction progress management and realizes intelligent optimization of construction plans and efficient allocation of resources.

CN122414641APending Publication Date: 2026-07-17PIPECHINA SOUTH CHINA CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-04-16
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing construction progress management methods rely heavily on personal experience, leading to unreasonable resource allocation, project delays, and cost overruns. They also have limited intelligence levels and cannot adapt to complex construction scenarios.

Method used

By collecting multi-source heterogeneous data, performing data fusion and feature extraction, a construction progress feature set is constructed. A pre-trained deep learning model is used to predict the progress and generate a dynamic adjustment plan. Combined with a visual interactive interface, decision support is provided.

Benefits of technology

It enables dynamic and automated adjustment of construction progress, improves decision-making efficiency and accuracy, provides intuitive and reliable intelligent support for project management, and reduces forecasting bias and resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122414641A_ABST
    Figure CN122414641A_ABST
Patent Text Reader

Abstract

本发明公开了一种施工进度动态预测与优化方法、装置、电子设备及存储介质,包括:采集与目标施工现场相对应的多源异构数据,并对多源异构数据进行数据融合确定结构化施工数据集;根据结构化施工数据集确定与目标施工现场相对应的施工进度特征集;基于施工进度特征集确定与目标施工现场相对应的施工进度预测结果,并根据施工进度预测结果确定施工进度动态调整方案。基于上述技术方案,通过对施工现场的多维数据进行特征提取和筛选得到施工进度特征集,根据施工进度特征集进行进度预设并确定施工进度动态调整方案,实现对施工计划的动态、自动化调整,并且为项目管理人员提供直观、可靠的智能化决策支持,显著提升决策效率和准确性。