A full-automatic deployment system and method for a power survey field multi-site temporary network

By using automated identification and configuration technology, the problems of low efficiency, high error rate and high operation and maintenance threshold in the multi-site network deployment of power surveying have been solved. It has achieved fully automated deployment and secure and reliable network connection, adapts to different scales and media requirements, and supports independent operation by personnel without network expertise.

CN122420103APending Publication Date: 2026-07-17POWER CHINA KUNMING ENG CORP LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
POWER CHINA KUNMING ENG CORP LTD
Filing Date
2026-06-01
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the scenario of parallel operations at multiple sites in the field of power surveying, existing technologies suffer from problems such as low efficiency of manual configuration, high error rate, address and routing conflicts, lack of adaptability of configuration strategies, poor compatibility of outgoing media, and high threshold for on-site operation and maintenance. They cannot achieve automated deployment of heterogeneous network devices or independent operation by personnel without network expertise.

Method used

The system employs modules for automatic identification of device and egress types, automatic allocation of network segments across multiple construction sites, adaptive matching of scale and templates, automatic rendering and distribution of configurations, and automatic establishment of a headquarters VPN. It identifies devices through ICMP Echo Requests and TCP 22 port scanning combined with SSH interactive pseudo-terminals, generates globally unique network segments based on MAC address hash modulo, and achieves quantitative determination of network scale and adaptive matching of configuration templates. It uses SSH multi-threaded distribution and automated establishment of IPsec VPN encrypted tunnels, combined with a multi-dimensional verification mechanism to ensure the accuracy and reliability of deployment.

Benefits of technology

It has achieved fully automated deployment of temporary networks at multiple construction sites in the field of power surveying, significantly improving deployment efficiency and reliability, reducing configuration error rate, supporting conflict-free parallel networking at multiple construction sites, adapting to different network scales and egress media, lowering the threshold for on-site operation and maintenance, and ensuring the security and real-time performance of data transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122420103A_ABST
    Figure CN122420103A_ABST
Patent Text Reader

Abstract

本发明属于网络与通信技术领域,涉及一种电力勘测野外多工地临时网络全自动部署系统及方法。通过设备与出口类型自动识别、网络规模量化判定、基于出口网关MAC地址哈希取模的多工地网段自动分配、规模‑模板自适应匹配、配置动态渲染与多线程下发、IPsec VPN加密隧道自动化建立及业务全维度验证等步骤,实现了野外临时网络的全流程自动化部署,根据设备数量与角色组合自适应匹配不同规模配置模板,基于硬件唯一标识生成全局唯一内网网段,有效解决多工地并行组网时的地址冲突问题,并支持多种出口介质。本发明显著提升部署效率,降低配置误码率,实现下联终端的即插即用无感知接入,降低现场运维门槛,适用于电力勘测野外多工地并行作业场景。
Need to check novelty before this filing date? Find Prior Art