Method for calculating the ramp-up reserve capacity of interconnected power systems

By constructing a tie-line ramping capacity assessment model in an interconnected power system, taking into account the limitations of unit output changes, the problem of the infeasibility of tie-line ramping reserve in traditional methods is solved, and accurate assessment of tie-line ramping reserve capacity and safe and reliable system operation are achieved.

CN123073716APending Publication Date: 2026-11-10ZHUHAI POWER SUPPLY BUREAU GUANGDONG POWER GIRD CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611235214.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-14
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Traditional methods for quantifying the ramp-up reserve capacity of interconnected power grid tie lines neglect the limitations of unit output variations, resulting in calculated tie-up reserve capacity that is actually infeasible, misjudging the actual adjustability of the system, and increasing operational risks.

Method used

By obtaining the power sample set of the regional system under the feasible power domain of the tie line, the generator output set is obtained by optimal power flow calculation, and a tie line ramping capacity assessment model is constructed by combining polynomial chaotic expansion. Taking into account the ramping reserve capacity coupled between adjacent time periods, an analytical mapping relationship between tie line power and ramping reserve capacity is established to realize the rapid assessment of tie line ramping reserve capacity in the next time period.

Benefits of technology

The climbing backup capacity of the tie line was accurately quantified, reflecting the actual adjustability of the system, reducing operational risks, and ensuring the safe and reliable operation of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123073716A_ABST
    Figure CN123073716A_ABST
Patent Text Reader

Abstract

This invention discloses a method for calculating tie-line ramp reserve capacity in interconnected power systems, relating to the fields of power system operation optimization and interconnected dispatching technology. It addresses the problem that current methods often calculate tie-line ramp reserve capacity as practically infeasible, leading to misjudgments of the system's actual adjustability and even exposing the system to serious operational risks. The interconnected power system comprises multiple interconnected regional systems. For any regional system, a power sample set is obtained within its tie-line power feasible domain. Based on the power sample set, the generator output set is obtained through optimal power flow calculation, and the ramp reserve capacity set considering adjacent time periods is solved accordingly. Based on the power sample set and the ramp reserve capacity set, a tie-line ramp capacity assessment model is constructed through polynomial chaotic expansion. The tie-line power operating point of the regional system in the current time period is obtained and substituted into the tie-line ramp capacity assessment model to calculate the tie-line ramp reserve capacity for the next time period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system operation optimization and interconnection dispatch technology, and in particular to a method for calculating the ramp-up reserve capacity of interconnected power system tie lines, a device for calculating the ramp-up reserve capacity of interconnected power system tie lines, an electronic device, and a storage medium. Background Technology

[0002] In recent years, the installed capacity of renewable energy units such as wind power and photovoltaics has continued to grow, becoming an important power source component of my country's power system. However, due to the strong uncertainty in wind and photovoltaic output, high-proportion renewable energy power systems struggle to maintain real-time power balance, leading to a surge in potential operational risks. Reserve capacity is an indispensable means of addressing potential power system risks. Among numerous reserve resources, interconnection lines, as an important source of external ramp-up reserve capacity, are receiving widespread attention. In-depth research into the ramp-up reserve capacity of interconnection lines and its calculation methods, accurate assessment of ramp-up reserve capacity, and quantification of the system's flexible adjustment capabilities will not only help absorb renewable energy output but also ensure the safe and reliable operation of the power system.

[0003] Traditional methods for quantifying the ramp-up reserve capacity of interconnected power grid tie lines use the difference between the maximum transmission power and the current tie line power as the up-ramp reserve capacity, and the difference between the current tie line power and the minimum transmission power as the down-ramp reserve capacity. However, this method overlooks the fact that changes in generator output caused by changes in tie line ramp-up power may be limited by generator ramp-up conditions, rendering tie line ramp-up reserve practically infeasible. This method overestimates the ramp-up reserve capacity of tie lines, leading to a misjudgment of the system's actual adjustability and potentially exposing the system to serious operational risks during actual operation. Summary of the Invention

[0004] This invention provides a method for calculating the ramp-up reserve capacity of interconnected power lines, a device for calculating the ramp-up reserve capacity of interconnected power lines, an electronic device, and a storage medium, to solve or partially solve the technical problem that the ramp-up reserve calculated by current means is actually infeasible, leading to misestimation of the actual adjustability of the system, and even causing the system to face serious operational risks.

[0005] This invention provides a method for calculating the ramp-up reserve capacity of tie lines in an interconnected power system, wherein the interconnected power system includes multiple interconnected regional systems; for any one of the regional systems, the method includes:

[0006] Obtain the power sample set of the regional system in the tie-line power feasible region;

[0007] Based on the power sample set, the generator output set is obtained through optimal power flow calculation, and the ramp reserve capacity set considering the coupling of adjacent time periods is solved based on the generator output set.

[0008] Based on the power sample set and the ramp reserve capacity set, a climb capability assessment model for the connecting line is constructed through polynomial chaotic expansion.

[0009] Obtain the tie-line power operating point for the current time period of the regional system, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity for the next time period of the regional system.

[0010] Optionally, the tie-line power feasible region includes power feasible sub-regions at different time periods; the power sample set includes power sample subsets of each of the power feasible sub-regions; and the step of obtaining the generator output set based on the power sample set through optimal power flow calculation includes:

[0011] Construct the optimal power flow model for the regional system;

[0012] For each time period, the tie-line power samples in the power sample subset are substituted one by one into the optimal power flow model, and the optimal power flow calculation is performed under preset network constraints with the goal of minimizing the generation cost, to solve for the generator output of each tie-line power sample.

[0013] By integrating the generator output of each of the tie-line power samples, a subset of generator output corresponding to the power sample subset is obtained;

[0014] By integrating the generator output subsets from all time periods, the generator output set of the regional system under the feasible power domain of the tie line is obtained.

[0015] Optionally, the generator output set includes subsets of generator output from different time periods; each subset of generator output includes multiple generator outputs; the step of solving for the ramp reserve capacity set considering the coupling of adjacent time periods based on the generator output set includes:

[0016] For each generator output in each adjacent time period, based on the difference between the generator output in the next time period and the previous time period, and in conjunction with the upper limit and lower limit of the generator's ramp power, a generator ramp constraint coupled between adjacent time periods is constructed.

[0017] By combining the generator ramping constraint and the preset network constraint, the tie line output power is optimized and solved to obtain the ramping reserve capacity of the tie line output power in the previous time period under the consideration of the coupling between adjacent time periods.

[0018] Integrate all the ramp reserve capacity of the subsequent time period as a subset of the ramp reserve capacity of the tie line output power of the previous time period in the subsequent time period.

[0019] Integrate all the aforementioned ramp reserve capacity subsets as the ramp reserve capacity set corresponding to the power sample set.

[0020] Optionally, the step of combining the generator ramping constraint and the preset network constraint to optimize the tie-line output power and obtain the ramping reserve capacity of the tie-line output power in the previous time period considering the coupling of adjacent time periods includes:

[0021] To maximize the tie-line output power of the regional system in the later time period, a first power upper limit function is constructed, and to minimize the tie-line output power of the regional system in the later time period, a first power lower limit function is constructed.

[0022] Based on the first power upper limit function and the first power lower limit function, a first power feasible region function of the regional system in the later time period is constructed.

[0023] Based on the first power feasible region function, and in conjunction with the generator ramping constraint and the preset network constraint conditions, a first power feasible region model is constructed.

[0024] The first power feasible region model is optimized and solved to obtain the upper limit of the first tie line power and the lower limit of the first tie line power of the regional system in the later time period.

[0025] Based on the first tie line power upper limit and the first tie line power lower limit, determine the ramp-up reserve capacity of the tie line output power in the previous period, taking into account the coupling of adjacent periods.

[0026] Optionally, the tie-line power feasible domain includes power feasible subdomains for different time periods; the power sample set includes power sample subsets for each of the power feasible subdomains; the ramp-up reserve capacity set includes ramp-up reserve capacity subsets corresponding to each of the power sample subsets; the step of constructing a tie-line ramp-up capability assessment model based on the power sample set and the ramp-up reserve capacity set through polynomial chaotic expansion includes:

[0027] For each time period, an input variable set is constructed based on the power sample subset, and an output set is constructed based on the ramp-up reserve capacity subset;

[0028] Based on the set of input variables and the set of output variables, and combined with the upper and lower bound constraints of the tie line power during the time period, an explicit analytical expression for the tie line ramping reserve capacity is constructed using Legendre polynomials as orthogonal basis functions, based on polynomial chaotic expansion.

[0029] By combining optimal power flow calculation and least squares regression, the coefficients of the polynomial chaotic expansion of the orthogonal basis functions are solved, and the explicit analytical expression is solved back by substituting the coefficients of the polynomial chaotic expansion to obtain the climbing capacity assessment model of the connecting line.

[0030] Optionally, the tie-line power feasible region includes power feasible sub-regions for different time periods; obtaining the power sample set of the regional system under the tie-line power feasible region includes:

[0031] For each time period, uniform sampling is performed within the power feasible subdomain corresponding to the time period to obtain a preset number of tie-line power samples, and based on the preset number of tie-line power samples, a power sample subset of the time period under the power feasible subdomain is constructed.

[0032] By integrating power sample subsets from all time periods, a power sample set for the regional system under the feasible power domain of the tie line is constructed.

[0033] Optionally, the process for constructing the feasible power domain of the tie line includes:

[0034] For each time period, a second power upper limit function is constructed with the objective of maximizing the tie-line output power of the regional system during that time period, and a second power lower limit function is constructed with the objective of minimizing the tie-line output power of the regional system during that time period.

[0035] Based on the second power upper limit function and the second power lower limit function, a second power feasible region function of the regional system in the time period is constructed;

[0036] Based on the second power feasible region function and combined with the preset network constraints, a second power feasible region model is constructed.

[0037] The second power feasible region model is optimized and solved to obtain the upper limit and lower limit of the second tie line power of the regional system in the time period.

[0038] Based on the upper limit of the second tie line power and the lower limit of the second tie line power, the power feasible subdomain of the time period is determined;

[0039] By integrating the power feasible subdomains for all time periods, the tie-line power feasible domain of the regional system is constructed.

[0040] The present invention also provides a tie-line ramp reserve capacity calculation device for an interconnected power system, the interconnected power system comprising multiple interconnected regional systems; for any one of the regional systems, the device comprises:

[0041] A power sample set acquisition unit is used to acquire the power sample set of the regional system in the tie-line power feasible region.

[0042] The ramp reserve capacity set solution unit is used to obtain the generator output set based on the power sample set through optimal power flow calculation, and to solve the ramp reserve capacity set considering the coupling of adjacent time periods based on the generator output set.

[0043] The tie-line ramping capacity assessment model construction unit is used to construct a tie-line ramping capacity assessment model based on the power sample set and the ramping reserve capacity set through polynomial chaotic expansion.

[0044] The tie-line ramping reserve capacity calculation unit is used to obtain the tie-line power operating point of the regional system in the current time period, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity of the regional system in the next time period.

[0045] Optionally, the tie-line power feasible region includes power feasible sub-regions at different time periods; the power sample set includes power sample subsets of each of the power feasible sub-regions; the ramp reserve capacity set solution unit includes:

[0046] An optimal power flow model construction unit is used to construct the optimal power flow model of the regional system.

[0047] The generator output solution unit is used to, for each time period, substitute the tie-line power samples in the power sample subset one by one into the optimal power flow model, and perform optimal power flow calculation under preset network constraints with the goal of minimizing the generation cost, to solve the generator output of each tie-line power sample.

[0048] A generator output subset integration unit is used to integrate the generator output of each of the tie line power samples to obtain the generator output subset corresponding to the power sample subset.

[0049] The generator output set integration unit is used to integrate the generator output subsets of all time periods to obtain the generator output set of the regional system under the feasible power domain of the tie line.

[0050] Optionally, the generator output set includes subsets of generator output at different times; each subset of generator output includes multiple generator outputs; the ramp reserve capacity set solution unit includes:

[0051] The generator ramping constraint construction unit is used to construct the generator ramping constraint coupled between adjacent time periods for each group of generators based on the difference between the generator output of the next time period and the previous time period, and in combination with the upper limit and lower limit of the ramping power of the generator.

[0052] The unit for calculating the ramp reserve capacity for the next time period is used to combine the generator ramp constraint and the preset network constraint to optimize the output power of the tie line and obtain the ramp reserve capacity of the tie line output power in the previous time period under the consideration of the coupling between adjacent time periods.

[0053] A ramp-up reserve capacity subset integration unit is used to integrate all the ramp-up reserve capacity of the next time period as a subset of the ramp-up reserve capacity of the previous time period's tie-line output power in the next time period.

[0054] The ramp reserve capacity set integration unit is used to integrate all the ramp reserve capacity subsets as the ramp reserve capacity set corresponding to the power sample set.

[0055] Optionally, the unit for calculating the ramp reserve capacity for the next time period includes:

[0056] The first power upper and lower limit function construction unit is used to construct a first power upper limit function with the goal of maximizing the tie-line output power of the regional system in the later time period, and to construct a first power lower limit function with the goal of minimizing the tie-line output power of the regional system in the later time period.

[0057] The first power feasible region function construction unit is used to construct the first power feasible region function of the regional system in the later time period based on the first power upper limit function and the first power lower limit function.

[0058] The first power feasible region model construction unit is used to construct a first power feasible region model based on the first power feasible region function, and in combination with the generator ramping constraint and the preset network constraint conditions.

[0059] The first tie-line power upper and lower limit solution unit is used to optimize and solve the first power feasible region model to obtain the upper limit of the first tie-line power and the lower limit of the first tie-line power of the regional system in the later time period.

[0060] The ramp reserve capacity determination unit for the next time period is used to determine the ramp reserve capacity of the tie line output power in the previous time period, taking into account the coupling of adjacent time periods, based on the upper limit of the first tie line power and the lower limit of the first tie line power.

[0061] Optionally, the tie-line power feasible domain includes power feasible subdomains for different time periods; the power sample set includes power sample subsets for each of the power feasible subdomains; the ramp reserve capacity set includes ramp reserve capacity subsets corresponding to each of the power sample subsets; the tie-line ramp capacity assessment model construction unit includes:

[0062] The input variable set and output set construction unit is used to construct the input variable set based on the power sample subset for each time period, and to construct the output set based on the ramp-up reserve capacity subset;

[0063] An explicit analytical formula construction unit is used to construct an explicit analytical formula for the tie-line ramp-up reserve capacity based on the input variable set and the output set, combined with the tie-line power upper and lower bound constraints of the time period, using Legendre polynomials as orthogonal basis functions, based on polynomial chaotic expansion.

[0064] The explicit analytical solution unit is used to combine optimal power flow calculation and least squares regression to solve the coefficients of the polynomial chaotic expansion of the orthogonal basis functions, and to substitute back the explicit analytical expression based on the coefficients of the polynomial chaotic expansion to obtain the climbing capacity assessment model of the connecting line.

[0065] Optionally, the tie-line power feasible region includes power feasible sub-regions for different time periods; the power sample set acquisition unit includes:

[0066] A power sample subset construction unit is used to uniformly sample within the power feasible subdomain corresponding to each time period to obtain a preset number of tie-line power samples, and construct a power sample subset of the time period under the power feasible subdomain based on the preset number of tie-line power samples.

[0067] A power sample set construction unit is used to integrate power sample subsets from all time periods to construct the power sample set of the regional system under the power feasible domain of the tie line.

[0068] Optionally, the apparatus further includes a tie-line power feasible region construction unit; the tie-line power feasible region construction unit includes:

[0069] The second power upper and lower limit function construction unit is used to construct a second power upper limit function for each time period with the goal of maximizing the tie-line output power of the regional system in that time period, and to construct a second power lower limit function with the goal of minimizing the tie-line output power of the regional system in that time period.

[0070] The second power feasible region function construction unit is used to construct the second power feasible region function of the regional system in the time period based on the second power upper limit function and the second power lower limit function;

[0071] The second power feasible region model construction unit is used to construct a second power feasible region model based on the second power feasible region function and in combination with preset network constraints.

[0072] The second tie-line power upper and lower limit solution unit is used to optimize and solve the second power feasible region model to obtain the upper limit of the second tie-line power and the lower limit of the second tie-line power of the regional system in the time period.

[0073] A power feasible subdomain determination unit is used to determine the power feasible subdomain of the time period based on the upper limit of the second tie line power and the lower limit of the second tie line power.

[0074] The tie-line power feasible domain integration unit is used to integrate the power feasible subdomains of all time periods to construct the tie-line power feasible domain of the regional system.

[0075] The present invention also provides an electronic device, the device comprising a processor and a memory:

[0076] The memory is used to store program code and transmit the program code to the processor;

[0077] The processor is configured to execute, according to instructions in the program code, the tie-line ramp-up reserve capacity calculation method for interconnected power systems as described in any of the preceding claims.

[0078] The present invention also provides a computer-readable storage medium for storing program code for executing the tie-line ramp reserve capacity calculation method for interconnected power systems as described in any of the preceding claims.

[0079] As can be seen from the above technical solutions, the present invention has the following advantages:

[0080] A method for calculating tie-line ramp reserve capacity in an interconnected power system is provided. The interconnected power system comprises multiple interconnected regional systems. For any regional system, a power sample set is obtained within the feasible power domain of the tie-line, serving as the data basis for subsequent calculations and reflecting different system operating states within the feasible power domain. Based on the power sample set, the generator output set is obtained through optimal power flow calculation, and the ramp reserve capacity set considering the coupling between adjacent time periods is solved based on the generator output set. Thus, through optimal power flow calculation, the generator states of the power samples within the power sample set are determined, and the obtained states can be used to construct generator ramp constraints considering the coupling between adjacent time periods to further solve for the ramp reserve capacity of the tie-line. Based on the power sample set and the ramp reserve capacity set, a tie-line ramp capacity assessment model is constructed through polynomial chaotic expansion. Therefore, based on polynomial chaotic expansion, an analytical mapping relationship between tie-line power and ramp reserve capacity is established. Based on this analytical mapping relationship, the tie-line ramp capacity of the system in the next time period can be quickly assessed solely based on the tie-line power operating point of the current time period. When a practical standby capacity assessment is required, the current operating point of the tie line power in the regional system is obtained, and this point is directly substituted into the tie line ramp-up capacity assessment model to quickly calculate the tie line ramp-up reserve capacity for the next period. This invention, in analyzing the tie line ramp-up reserve capacity, fully considers the unit ramp-up limitations caused by changes in unit output due to changes in tie line ramp-up power, overcoming the practical infeasibility of tie line ramp-up reserve calculations in traditional schemes. Compared to traditional methods, this invention, based on the constructed tie line ramp-up capacity assessment model, can calculate the corresponding dynamic reserve interval in real time according to the current operating point of the tie line power, thus more realistically reflecting the actual adjustable capacity of the system and significantly reducing the operational risks the system may face. Attached Figure Description

[0081] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0082] Figure 1 A flowchart illustrating the steps involved in calculating the ramp-up reserve capacity of tie lines in an interconnected power system.

[0083] Figure 2 A schematic diagram of the overall process for calculating the ramp-up reserve capacity of tie lines in an interconnected power system;

[0084] Figure 3This is a modified schematic diagram of an IEEE 30-node system in a specific example;

[0085] Figure 4 This is a comparison chart of the spare intervals obtained by the present invention and the Monte Carlo sampling method in a specific example;

[0086] Figure 5 This is a structural block diagram of a tie-line ramp-up standby capacity calculation device for an interconnected power system. Detailed Implementation

[0087] This invention provides a method for calculating the ramp-up reserve capacity of interconnected power lines, a device for calculating the ramp-up reserve capacity of interconnected power lines, an electronic device, and a storage medium, to solve or partially solve the technical problem that the ramp-up reserve capacity of interconnected power lines calculated by current means is actually infeasible, leading to misestimation of the actual adjustability of the system, or even causing the system to face serious operational risks.

[0088] To make the objectives, features, and advantages of this invention more apparent and understandable, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the embodiments described below are only some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this invention.

[0089] As an example, among the numerous reserve resources in a power system, interconnected grid links, as an important source of external ramp-up reserve capacity, are receiving widespread attention. In-depth research into the ramp-up reserve capacity of interconnected grid links and its calculation methods, accurate assessment of link ramp-up reserve, and quantification of the system's flexible adjustment capabilities will not only help absorb renewable energy output but also ensure the safe and reliable operation of the power system.

[0090] Traditional methods for quantifying the ramp-up reserve capacity of interconnected power grid tie lines use the difference between the maximum transmission power and the current tie line power as the up-ramp reserve capacity, and the difference between the current tie line power and the minimum transmission power as the down-ramp reserve capacity. However, this method overlooks the fact that changes in generator output caused by changes in tie line ramp-up power may be limited by generator ramp-up conditions, rendering tie line ramp-up reserve practically infeasible. This method overestimates the ramp-up reserve capacity of tie lines, leading to an underestimation of the system's actual adjustability and potentially exposing the system to serious operational risks during actual operation.

[0091] This invention, through further analysis, considers the coupling effect of tie-line power ramping on unit output, accurately quantifies the tie-line ramping reserve capacity, and ensures that the power regulated by the tie-line can cope with the uncertainty of renewable energy output while the system units operate within the practically feasible domain. This is crucial for the safe and reliable operation of high-proportion renewable energy systems. Furthermore, the tie-line ramping reserve capacity, assessed considering constraints such as unit ramping within the system, can accurately provide the interconnected power system with the acceptable tie-line dispatch range of this system without disclosing relevant information, effectively protecting privacy and security.

[0092] Therefore, one of the core inventive points of this invention is to provide a method for calculating the ramp-up reserve capacity of interconnected power system tie lines, considering time-period coupling characteristics, for the scenario of assessing the ramp-up reserve capacity of interconnected power grid tie lines containing renewable energy. First, a regional system of the interconnected power system is taken as the research object, and it is connected to the external system via tie lines. Second, the upper and lower limits of the transmission capacity of the tie lines in this regional system for each time period are solved. For each time period, a large number of tie line power samples are uniformly sampled within their corresponding upper and lower limit intervals to reflect different system operating states during that time period. Then, using an optimal power flow model, the generator state (generator output) corresponding to each tie line power sample is recorded. The obtained state is used to construct the generator ramp-up constraints of the system under the tie line power sample for that time period and the next time period. Under the premise of satisfying the ramp-up constraint and all network constraints, the maximum / minimum value of the tie line power in the next time period is solved to determine the ramp-up reserve capacity (ramp-up reserve capacity) of the tie line. Finally, an explicit analytical expression between the tie line power ramp-up capacity and the current tie line power point is constructed based on Polynomial Chaos Expansion (PCE). Based on this analytical expression, the tie-line ramping capability of the system in the next time period can be quickly evaluated solely by relying on the tie-line power operating point of the current time period.

[0093] Reference Figure 1 This document illustrates a flowchart of a method for calculating the ramp-up reserve capacity of a tie line in an interconnected power system, provided by an embodiment of the present invention. The interconnected power system includes multiple interconnected regional systems; for any one of the regional systems, the method may specifically include the following steps:

[0094] Step 101: Obtain the power sample set of the regional system in the feasible domain of tie-line power;

[0095] In this step, for any regional system in any interconnected power system, a power sample set of the regional system under the tie-line power feasible domain is obtained for subsequent related calculations.

[0096] Specifically, in any interconnected power system, taking a specific regional power system as an example, a tie-line power feasible region encompassing each time period (i.e., operating segment) of that regional power system is constructed. In some embodiments, the construction process of the tie-line power feasible region may include the following steps S01 to S06:

[0097] Step S01: For each time period, construct a second power upper limit function with the objective of maximizing the tie-line output power of the regional system in that time period, and construct a second power lower limit function with the objective of minimizing the tie-line output power of the regional system in that time period.

[0098] Step S02: Based on the second power upper limit function and the second power lower limit function, construct the second power feasible region function of the regional system in this time period;

[0099] Step S03: Construct the second power feasible region model based on the second power feasible region function and in conjunction with the preset network constraints;

[0100] Step S04: Optimize and solve the second power feasible region model to obtain the upper limit and lower limit of the second tie line power of the regional system during this time period;

[0101] Step S05: Based on the upper limit and lower limit of the second tie line power, determine the power feasible subdomain for this time period;

[0102] Step S06: Integrate the power feasible subdomains of all time periods to construct the tie-line power feasible domain of the regional system.

[0103] Specifically, firstly, the maximum output power of the tie line is achieved at each time period. and minimize the output power of the tie line Let be the objective function. Then, under the premise of satisfying the complete network constraints of the system (including node power balance, branch power flow constraints, unit output constraints, etc.), solve for the maximum power that the tie lines can output in this region of the system at each time period. and minimum power .

[0104] The model objective function (the second power feasible region function of the regional system in time period t) is as follows:

[0105] (1)

[0106] In this embodiment of the invention, the preset network constraints include power balance constraints, thermal power unit output constraints, new energy unit output constraints, line transmission power constraints, and tie line power constraints. In practice, those skilled in the art can also set other reasonable network constraints according to actual needs. It is understood that this invention does not impose any limitations on this.

[0107] The power balance constraint is shown in equation (2) below:

[0108] (2)

[0109] In the formula, These represent the number of thermal power units, wind power units, photovoltaic units, and the total number of nodes in the system, respectively. This represents the node load during time period t; This represents the output of the thermal power unit during time period t; This represents the output of the wind turbine during time period t; This indicates the output of the photovoltaic unit during time period t; This represents the power of the tie line during time period t.

[0110] The output constraint of the thermal power unit is shown in equation (3) below:

[0111] (3)

[0112] In the formula, This represents the upper limit of the output of thermal power units during time period t.

[0113] The output constraints of the new energy generating units are shown in equations (4) to (5) below:

[0114] (4)

[0115] (5)

[0116] In the formula, This represents the predicted output of wind and solar power during time period t.

[0117] The line transmission power constraints are shown in equations (6) to (7) below:

[0118] (6)

[0119] (7)

[0120] In the formula, This represents the active power flow vector of all lines in the regional power grid; This indicates the active power transmission of the line during time period t; This is the power transmission transfer distribution factor matrix, where each term in parentheses represents the equivalent nodal active power injection into the regional power grid. as well as These represent the node access matrices for thermal power units, wind power, and photovoltaic power, as well as the correlation matrices between boundary nodes and tie-line power, respectively. and These represent the upper and lower limits of active power transmission on the line during time period t, respectively.

[0121] The tie-line power constraint is shown in equation (8) below:

[0122] (8)

[0123] In the formula, and These represent the maximum and minimum allowable transmission power of the tie line during time period t, respectively.

[0124] Through the aforementioned steps, a power feasible subdomain corresponding to any time period t of the tie line can be constructed. By integrating the power feasible subdomains, a tie line power feasible domain encompassing multiple time periods can be obtained.

[0125] As discussed above, the feasible power domain of a tie line can include feasible power subdomains for different time periods. In some embodiments, the implementation process for obtaining a power sample set of the regional system within the feasible power domain of the tie line includes: for each time period, uniformly sampling within the feasible power subdomain corresponding to the time period to obtain a preset number of tie line power samples, and constructing a power sample subset of the time period within the feasible power subdomain based on the preset number of tie line power samples; and integrating the power sample subsets of all time periods to construct a power sample set of the regional system within the feasible power domain of the tie line.

[0126] Specifically, for each time period, uniform sampling is performed within the corresponding feasible subdomain of tie-line power to extract a preset number of tie-line power samples (the same number of samples are extracted in each time period) to construct a power sample subset, as shown in equation (9) below:

[0127] (9)

[0128] In the formula, These represent the minimum and maximum power that the system tie line can output during time period t, respectively. This represents the power feasible region of the system tie line at time t; This represents the i-th sample drawn within the feasible subdomain of the tie-line power corresponding to time period t; This represents the maximum number of time periods. Number of tie-line power samples taken in each time period t.

[0129] Through the above construction steps, a power sample subset corresponding to the power feasible subdomain of the tie line in any time period t can be constructed. By integrating the power sample subsets, a power sample set encompassing power samples from multiple time periods can be obtained.

[0130] Step 102: Based on the power sample set, obtain the generator output set through optimal power flow calculation, and solve the ramp reserve capacity set considering the coupling of adjacent time periods based on the generator output set.

[0131] Building upon the preceding steps, this step primarily aims to solve for the ramp reserve capacity considering time-period coupling characteristics. Specifically, based on the power sample set, the generator output set is obtained through optimal power flow calculation, and based on the generator output set, the ramp reserve capacity set considering the coupling between adjacent time periods is solved. This step is mainly achieved through two key steps: first, solving for the generator operating state corresponding to each tie-line power sample in each time period; second, solving for the ramp reserve capacity (ramp reserve capacity) of the tie-lines in adjacent time periods considering time-period coupling constraints.

[0132] The first step is to solve for the power samples of each tie line in each time period. The corresponding generator operating status. Specifically, an optimal DC power flow model of the regional system is constructed, and tie-line power sample points for each time period are used. Substituting into the model, with minimizing power generation cost as the objective function, we solve for the power sample points of each tie line under the network constraints of the systems introduced earlier. Corresponding generator output (generator operating status) And record it. The specific solution model for this process is shown in equation (10) below:

[0133] (10)

[0134] In the formula, Let be the cost coefficient of the i-th generator; Indicates the number of generators in the system; This indicates that when the tie line power is And the generator output corresponding to the minimum power generation cost.

[0135] The power samples of each tie line are obtained by solving the above model (10). This allows us to obtain the generator output (generator operating status) corresponding to all tie-line power samples.

[0136] Based on the foregoing discussion, the tie-line power feasible region includes power feasible sub-regions at different time periods. The power sample set includes a subset of power samples from each power feasible sub-region. In some embodiments, the execution flow of obtaining the generator output set based on the power sample set through optimal power flow calculation may include steps S11 to S14:

[0137] Step S11: Construct the optimal power flow model for the regional system;

[0138] Step S12: For each time period, substitute the tie-line power samples in the power sample subset into the optimal power flow model one by one, and perform optimal power flow calculation under preset network constraints with the goal of minimizing generation cost, to solve for the generator output of each tie-line power sample.

[0139] Step S13: Integrate the generator output of each tie line power sample to obtain the generator output subset corresponding to the power sample subset;

[0140] Step S14: Integrate the generator output subsets for all time periods to obtain the generator output set of the regional system under the feasible power domain of the tie line.

[0141] Based on obtaining the generator output set of the regional system under the feasible domain of tie line power by solving, the adjacent time period tie line ramping reserve capacity considering time period coupling constraints is solved.

[0142] Specifically, based on the tie-line power samples obtained in the preceding steps Corresponding generator set output As the initial state value of the unit for time period t, the corresponding generator ramping constraint is then constructed. This is shown in equation (11) below:

[0143] (11)

[0144] In the formula, These represent the generator's maximum uphill and downhill climbing power, respectively.

[0145] Generator ramp constraint Substituting these values ​​into the objective function (1), we can find the maximum value that the tie-line power can reach in time period t+1, while satisfying the generator ramping constraint and the complete network constraint. and minimum value The complete model is shown in equation (12) below:

[0146] (12)

[0147] In the formula, For the i-th tie-line power sample in time period t The climbing ability at time t+1 corresponds to the maximum power that the tie-line port can output at each time period, as solved by equations (1)-(8). and minimum power .

[0148] Using the above method, the maximum tie-line power that any tie-line power sample in each time period can achieve in the next time period can be obtained. and minimum tie line power . and then obtain The maximum range of change in the next time period is its actual achievable climbing reserve capacity:

[0149] (13)

[0150] In the formula, and They are respectively Prepare for uphill and downhill sections during time period t.

[0151] Based on the preceding discussion, the generator output set can include subsets of generator output from different time periods. Each subset of generator output includes the output of multiple generators. In the specific implementation, the process of solving the ramp-up reserve capacity set considering the coupling of adjacent time periods, based on the generator output set, can further include steps S21 to S24:

[0152] Step S21: For each adjacent time period (i.e., time period t and time period t+1), the output of each generator group ( and Based on the difference in generator output between the next time period (time period t+1) and the previous time period (time period t). Simultaneously, by combining the upper and lower limits of the generator's ramp power, a generator ramp constraint coupled between adjacent time periods is constructed. ;

[0153] Step S22: Combining generator ramping constraints The tie-line output power is optimized by applying the preset network constraints (Equations (2) to (8)) to obtain the tie-line output power of the previous time period (time period t). Considering the ramp-up reserve capacity in the next time period (t+1 time period) under the coupling of adjacent time periods;

[0154] Furthermore, the implementation process of step S22 may include the following steps S31 to S35:

[0155] Step S31: Construct a first power upper limit function with the objective of maximizing the tie-line output power of the regional system in the next time period (t+1), and simultaneously construct a first power lower limit function with the objective of minimizing the tie-line output power of the regional system in the next time period (t+1).

[0156] Step S32: Based on the first power upper limit function and the first power lower limit function, construct the first power feasible region function of the regional system in the next time period (time period t+1). ;

[0157] Step S33: Based on the first power feasible region function, and combining the generator ramping constraint and the preset network constraint conditions, construct the first power feasible region model. ;

[0158] Step S34: Optimize the first power feasible region model to obtain the upper limit of the first tie-line power of the regional system in the next time period (t+1 time period). Lower power limit of the first tie line ;

[0159] Step S35: Based on the first tie-line power limit Lower power limit of the first tie line Determine the output power of the tie line in the previous time period (time period t). Considering the coupling between adjacent time periods, the ramp reserve capacity for the next time period (time period t+1) (corresponding to the ramp and downhill reserves for time period t) ).

[0160] Step S23: Integrate all the ramp-up reserve capacity of the next time period as a subset of the ramp-up reserve capacity of the tie-line output power of the previous time period in the next time period.

[0161] Step S24: Integrate all ramp reserve capacity subsets as the ramp reserve capacity set corresponding to the power sample set.

[0162] Step 103: Based on the power sample set and the ramp reserve capacity set, construct a tie-line ramp capability assessment model through polynomial chaotic expansion.

[0163] Building upon the preceding steps, this step involves constructing a tie-line ramp-up capability assessment model using a polynomial chaotic expansion, based on a power sample set and a ramp-up reserve capacity set. The key to this step lies in constructing an explicit analytical formula for the tie-line ramp-up reserve capacity based on polynomial chaotic expansion.

[0164] As discussed above, the feasible power domain of a tie line includes feasible power subdomains for different time periods. The power sample set includes power sample subsets for each feasible power subdomain. The ramp-up reserve capacity set includes ramp-up reserve capacity subsets corresponding to each power sample subset. In the specific implementation, the process of constructing a tie line ramp-up capability assessment model based on the power sample set and the ramp-up reserve capacity set through polynomial chaotic expansion can include the following steps S41 to S43:

[0165] Step S41: For each time period, construct an input variable set based on the power sample subset, and construct an output set based on the ramp-up reserve capacity subset;

[0166] Based on the principle of polynomial chaotic expansion, the following set of input variables is defined:

[0167] (14)

[0168] In the formula, The set of tie-line "running points" uniformly sampled within the feasible subdomain of tie-line power during time period t, and the corresponding output set is:

[0169] (15)

[0170] Step S42: Based on the set of input variables and the set of output variables, and combined with the upper and lower bound constraints of the tie line power during the time period, based on polynomial chaotic expansion, Legendre polynomials are used as orthogonal basis functions to construct an explicit analytical expression for the tie line ramping reserve capacity.

[0171] Assume that the input variables all follow a uniform distribution, and their range is the upper and lower bounds of the tie-line power for each time period solved in equations (1)-(8), as shown in equation (16) below:

[0172] (16)

[0173] In the formula, Indicates the sampling range of tie-line power; This represents the lower and upper bounds of the tie-line power during time period t; This represents the i-th sample point in time period t.

[0174] Then, based on the principle of polynomial chaos expansion, Legendre polynomials are used as orthogonal basis functions to construct an explicit analytical expression for the connection ramp reserve capacity considering time-period coupling constraints for the above inputs and outputs, as shown in equation (17) below:

[0175] (17)

[0176] In the formula, This is the expansion coefficient vector corresponding to the k-th basis function; These are basis functions for multivariate orthogonal polynomials; This represents the total number of basis functions.

[0177] Step S43: Combining optimal power flow calculation and least squares regression, solve for the coefficients of the polynomial chaotic expansion of the orthogonal basis functions, and then substitute back to solve for the explicit analytical expression based on the coefficients of the polynomial chaotic expansion to obtain the climbing capacity assessment model of the connecting line.

[0178] Multivariate orthogonal basis functions can be constructed using tensor products of univariate Legendre polynomials as shown in equation (18):

[0179] (18)

[0180] In the formula, Represents about variables of Legendre polynomial.

[0181] The key to ensuring the accuracy of the explicit analytical expression for tie-line ramp-up reserve capacity lies in accurately obtaining the coefficients of the expansion term in equation (17). The inputs and outputs mentioned above can be viewed as generating N training samples within the feasible domain of tie-line power:

[0182] (19)

[0183] The above sample data is input into the optimal power flow model to obtain the corresponding system response. Specifically, for a set of sample responses... ,in , Let represent the input sample set and the corresponding model output result, respectively. Based on this, the least squares regression method is used to solve for the coefficients in the polynomial chaotic expansion by minimizing the sum of squared residuals, as shown in equation (20) below:

[0184] (20)

[0185] In the formula, ; ;in, , .

[0186] Taking the partial derivative of equation (20), we can obtain the solution for the coefficients of the expansion term as follows:

[0187] (twenty one)

[0188] Based on the coefficients of the expanded terms obtained from the solution, and substituting them into equation (17), the tie-line ramping capacity assessment model can be obtained. Using the constructed tie-line ramping capacity assessment model, in subsequent ramping reserve capacity calculations, it is only necessary to determine the power operating point of the tie-line for any given time period (corresponding to a specific moment) and substitute it into equation (17) to determine the coefficients of the expanded terms, thus obtaining the tie-line ramping reserve capacity for the next time period. Adjusting the tie-line power within this capacity range will not cause changes in the system's generator power to be limited by ramping constraints.

[0189] By implementing the aforementioned steps, this invention constructs an analytical model of the ramp-up reserve capacity of interconnected power system tie lines offline. This model precisely equates complex unit timing ramp-up constraints and internal network constraints into an analytical expression related to tie-up power ramp-up reserve. In practical computing scenarios, this offline-constructed analytical expression allows for the calculation of the tie-up reserve capacity for the next time period using only the tie-up power for the current time period. This approach eliminates the need to provide unit information for the current system, effectively transmitting acceptable tie-up power ramp-up reserve capacity to another system while protecting the privacy of the current system. This, in turn, protects system privacy in interconnected power system dispatching.

[0190] Step 104: Obtain the tie-line power operating point of the regional system for the current time period, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity of the regional system for the next time period.

[0191] After obtaining the tie-line ramping capacity assessment model through the previous steps, the tie-line power operating point of the regional system at any time period (such as the current time period) can be obtained. The tie-line power operating point is then substituted into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity of the regional system in the next time period, i.e., the tie-line ramping reserve capacity.

[0192] In this embodiment of the invention, a method for calculating the ramp-up reserve capacity of interconnected power systems considering time-period coupling characteristics is provided. First, based on a power maximization and minimization model of the tie-line power, the feasible region of the tie-line satisfying system operation constraints for each time period of any region within any interconnected power system is solved. A large number of tie-line power samples are then extracted from each feasible region using a uniform sampling method. Next, each tie-line power sample is substituted into an optimal power flow model with the objective function of minimizing generation cost, and the generator operating state (generator output) corresponding to each tie-line power sample is solved. Using the obtained generator operating state as the initial state, considering generator ramp-up constraints and system operation constraints in adjacent time periods, and with the objective function of maximizing and minimizing the tie-line power in the next time period, the ramp-up reserve capacity value of the tie-line considering time-period coupling constraints is evaluated. Finally, using the tie-line power samples of each time period as input and the corresponding tie-line ramp-up reserve capacity value as output, an explicit analytical formula for the ramp-up reserve capacity of the tie-line considering time-period coupling constraints is constructed based on polynomial chaotic expansion, serving as the tie-line ramp-up capacity evaluation model. This evaluation model can accurately reflect the ramp-up reserve capacity within the feasible power range of the tie line simply by determining the tie line power operating point for the current period.

[0193] For better illustration, refer to Figure 2This diagram illustrates the overall flow of a method for calculating the ramp-up reserve capacity of interconnected power systems according to an embodiment of the present invention. It should be noted that this embodiment only provides a brief description of the general flow of calculating the ramp-up reserve capacity of interconnected power systems. The specific implementation process of each step can be understood by referring to the relevant content in the foregoing embodiments, and will not be elaborated here. It is understood that the present invention does not impose any limitations on this.

[0194] Step 201: Based on the tie-line power model of maximizing and minimizing the regional system, solve for the tie-line power feasible subdomain that satisfies the system operation constraints in each time period;

[0195] Step 202: By uniformly sampling, a preset number of tie-line power samples are extracted from each tie-line power feasible subdomain to construct a power sample subset;

[0196] Step 203: Construct a power sample set of the regional system in the feasible power domain of each tie line based on the power sample subsets of each tie line power feasible subdomain;

[0197] Step 204: Based on the power sample set, obtain the generator output set through optimal power flow calculation, and solve the ramp reserve capacity set considering the coupling constraints of adjacent time periods based on the generator output set;

[0198] Step 205: Based on the power sample set and the ramp-up reserve capacity set, construct a tie-line ramp-up capability assessment model through polynomial chaotic expansion;

[0199] Step 206: Obtain the tie-line power operating point for the current time period of the regional system, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity for the next time period of the regional system.

[0200] To enable those skilled in the art to better understand the technical solutions of the present invention, the following specific example is used to illustrate the embodiments of the present invention.

[0201] Figure 3 A schematic diagram of the modified IEEE 30-node system used in this example is shown. This simulation experiment sets up three wind farms and two photovoltaic power plants in the IEEE 30 example: wind farm nodes 4, 17, and 6; photovoltaic nodes 9 and 10; and tie-line node 7.

[0202] by Figure 3Taking the IEEE 30-node system as an example, it is connected to an external system via a tie line. The analytical expression for the tie line's ramp-up reserve capacity (tie line ramp-up reserve capacity assessment model) is solved using the method described in the preceding embodiments. Specifically, a set of tie line power samples from eight time periods is randomly sampled, and the corresponding ramp-up reserve capacity is solved using the fitted analytical expression for ramp-up reserve capacity. The ramp-up reserve capacity of the tie line under the same sample is then solved using Monte Carlo sampling to verify the effectiveness of the technical solution of this invention.

[0203] Specifically, firstly, based on the tie-line power maximization and minimization model, the feasible region of tie-lines satisfying system operation constraints for each time period of the IEEE 30-bus system is solved, and a large number of tie-line power samples are extracted from each feasible region using a uniform sampling method. Then, each tie-line power sample is substituted into an optimal power flow model with the objective function of minimizing generation cost, and the generator operating state (generator output) corresponding to each tie-line power sample is solved. Using the obtained generator operating states as the initial state, considering generator ramping constraints and system operation constraints in adjacent time periods, and taking the maximization and minimization of tie-line power in the next time period as the objective function, the tie-line ramping reserve capacity value considering time-period coupling constraints is evaluated. Finally, using the tie-line power samples of each time period as input and the corresponding tie-line ramping reserve capacity value as output, an explicit analytical formula for the tie-line ramping reserve capacity considering time-period coupling constraints is constructed based on polynomial chaotic expansion, serving as the tie-line ramping capacity evaluation model.

[0204] Figure 4 A comparison chart of the spare intervals obtained by the present invention and the Monte Carlo sampling method in the above example is shown. Figure 4 As shown, the horizontal axis represents the time period of system operation, and the vertical axis represents the tie-line power. Red dots represent a set of randomly and uniformly sampled tie-line power points; black lines are the lines connecting the tie-line power points in each time period; blue dashed lines represent the maximum or minimum boundaries that these sample points can reach in their respective next time period, as solved by the method proposed in this invention—that is, the maximum or minimum boundaries in the next time period corresponding to the tie-line power state represented by the red dots; the blue shaded area represents the range of change of the tie-line power state represented by the red dots in the next time period. Similarly, the red dashed lines and red shaded areas represent the boundaries and corresponding ranges of change obtained by the Monte Carlo sampling method.

[0205] from Figure 4As can be seen, the reserve interval boundaries obtained by the method proposed in this invention maintain a high degree of consistency with the results obtained by the Monte Carlo sampling method. This demonstrates that the hill-climbing reserve analytical model constructed based on polynomial chaotic expansion can accurately characterize the mapping relationship between the connection line operating point and the adjustable capacity in the next time period. In particular, under most time periods, the upper and lower boundaries obtained by the two methods basically coincide, verifying that the analytical model proposed in this invention has high accuracy in characterizing reserve capacity.

[0206] In addition, from Figure 4 Furthermore, it can be observed that the upper and lower boundaries of the reserve interval are not perfectly symmetrical. For example, during certain periods, the increase in reserve capacity is significantly greater than the decrease in reserve capacity. This indicates that the system's forward and reverse adjustment capabilities differ under different operating conditions. Traditional methods using fixed reserve capacity are insufficient to accurately reflect this dynamic characteristic. The method proposed in this invention, however, can calculate the corresponding dynamic reserve interval in real time based on the current operating point of the tie line, thus more realistically reflecting the system's actual adjustable capacity.

[0207] Furthermore, compared to the results obtained by the standard method of directly solving point-by-point using Monte Carlo random sampling, the method proposed in this invention establishes an analytical mapping relationship between tie-line power and ramp-up reserve capacity through polynomial chaotic expansion. By implementing the technical solution of this invention, rapid calculation and online evaluation of reserve capacity can be achieved while maintaining high computational accuracy. This is of great significance for the optimal allocation of reserve capacity and real-time scheduling decisions in large-scale interconnected power grids.

[0208] Based on the technical solutions provided in the preceding embodiments and combined with simulation example experimental results, this invention proposes a method for calculating the ramping reserve capacity of interconnected power system tie-line power considering time-period coupling characteristics. Specifically, this method is based on the principle of polynomial chaotic expansion, fully considering the ramping coupling constraints of generator units in adjacent time periods, aggregating flexibility resources within the region, mapping the ramping constraints of generators in each time period to boundary transmission variables, and explicitly characterizing the relationship between the ramping constraints of aggregated flexibility resources in adjacent time periods and tie-line power. This allows for rapid online evaluation of the system tie-line ramping capacity in the next time period, relying solely on the tie-line power operating point value in the current time period, while protecting subsystem privacy. Finally, this invention also integrates three wind farms and two photovoltaic power plants into the IEEE 30-node system. An analytical expression for tie-line power ramping in eight time periods was constructed, and a set of tie-line power samples from eight time periods was uniformly sampled. Based on the fitted analytical expression for ramping, the corresponding tie-line power ramping reserve capacity interval for each time period was solved. Using the same tie-line power sample and the ramping reserve capacity interval obtained by Monte Carlo sampling as a standard, the results obtained by the proposed method were compared, verifying the accuracy of the method.

[0209] Therefore, given the high penetration rate of renewable energy, the method proposed in this invention can accurately reflect the ramp-up capability of system interconnection power under various operating conditions. This method, while protecting system privacy, provides a new approach for achieving grid dispatching in different regions and promoting the inter-regional consumption of renewable energy.

[0210] Reference Figure 5 This diagram illustrates a structural block diagram of a tie-line ramp-up reserve capacity calculation device for an interconnected power system, provided by an embodiment of the present invention. The interconnected power system includes multiple interconnected regional systems; for any one of the regional systems, the device may specifically include:

[0211] The power sample set acquisition unit 501 is used to acquire the power sample set of the regional system in the tie-line power feasible domain.

[0212] The ramp reserve capacity set solving unit 502 is used to obtain the generator output set based on the power sample set through optimal power flow calculation, and solve the ramp reserve capacity set considering the coupling of adjacent time periods based on the generator output set.

[0213] The tie line ramping capacity assessment model construction unit 503 is used to construct a tie line ramping capacity assessment model based on the power sample set and the ramping reserve capacity set through polynomial chaotic expansion.

[0214] The tie-line ramping reserve capacity calculation unit 504 is used to obtain the tie-line power operating point of the regional system in the current time period, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity of the regional system in the next time period.

[0215] In one optional embodiment, the tie-line power feasible domain includes power feasible subdomains for different time periods; the power sample set includes power sample subsets for each of the power feasible subdomains; the ramp reserve capacity set solving unit 502 includes:

[0216] An optimal power flow model construction unit is used to construct the optimal power flow model of the regional system.

[0217] The generator output solution unit is used to, for each time period, substitute the tie-line power samples in the power sample subset one by one into the optimal power flow model, and perform optimal power flow calculation under preset network constraints with the goal of minimizing the generation cost, to solve the generator output of each tie-line power sample.

[0218] A generator output subset integration unit is used to integrate the generator output of each of the tie line power samples to obtain the generator output subset corresponding to the power sample subset.

[0219] The generator output set integration unit is used to integrate the generator output subsets of all time periods to obtain the generator output set of the regional system under the feasible power domain of the tie line.

[0220] In one optional embodiment, the generator output set includes subsets of generator output at different time periods; each subset of generator output includes multiple generator outputs; the ramp reserve capacity set solving unit 502 includes:

[0221] The generator ramping constraint construction unit is used to construct the generator ramping constraint coupled between adjacent time periods for each group of generators based on the difference between the generator output of the next time period and the previous time period, and in combination with the upper limit and lower limit of the ramping power of the generator.

[0222] The unit for calculating the ramp reserve capacity for the next time period is used to combine the generator ramp constraint and the preset network constraint to optimize the output power of the tie line and obtain the ramp reserve capacity of the tie line output power in the previous time period under the consideration of the coupling between adjacent time periods.

[0223] A ramp-up reserve capacity subset integration unit is used to integrate all the ramp-up reserve capacity of the next time period as a subset of the ramp-up reserve capacity of the previous time period's tie-line output power in the next time period.

[0224] The ramp reserve capacity set integration unit is used to integrate all the ramp reserve capacity subsets as the ramp reserve capacity set corresponding to the power sample set.

[0225] In one optional embodiment, the ramp reserve capacity calculation unit for the later time period includes:

[0226] The first power upper and lower limit function construction unit is used to construct a first power upper limit function with the goal of maximizing the tie-line output power of the regional system in the later time period, and to construct a first power lower limit function with the goal of minimizing the tie-line output power of the regional system in the later time period.

[0227] The first power feasible region function construction unit is used to construct the first power feasible region function of the regional system in the later time period based on the first power upper limit function and the first power lower limit function.

[0228] The first power feasible region model construction unit is used to construct a first power feasible region model based on the first power feasible region function, and in combination with the generator ramping constraint and the preset network constraint conditions.

[0229] The first tie-line power upper and lower limit solution unit is used to optimize and solve the first power feasible region model to obtain the upper limit of the first tie-line power and the lower limit of the first tie-line power of the regional system in the later time period.

[0230] The ramp reserve capacity determination unit for the next time period is used to determine the ramp reserve capacity of the tie line output power in the previous time period, taking into account the coupling of adjacent time periods, based on the upper limit of the first tie line power and the lower limit of the first tie line power.

[0231] In one optional embodiment, the tie-line power feasible domain includes power feasible subdomains for different time periods; the power sample set includes power sample subsets for each of the power feasible subdomains; the ramp reserve capacity set includes ramp reserve capacity subsets corresponding to each of the power sample subsets; the tie-line ramp capability assessment model construction unit 503 includes:

[0232] The input variable set and output set construction unit is used to construct the input variable set based on the power sample subset for each time period, and to construct the output set based on the ramp-up reserve capacity subset;

[0233] An explicit analytical formula construction unit is used to construct an explicit analytical formula for the tie-line ramp-up reserve capacity based on the input variable set and the output set, combined with the tie-line power upper and lower bound constraints of the time period, using Legendre polynomials as orthogonal basis functions, based on polynomial chaotic expansion.

[0234] The explicit analytical solution unit is used to combine optimal power flow calculation and least squares regression to solve the coefficients of the polynomial chaotic expansion of the orthogonal basis functions, and to substitute back the explicit analytical expression based on the coefficients of the polynomial chaotic expansion to obtain the climbing capacity assessment model of the connecting line.

[0235] In one optional embodiment, the tie-line power feasible domain includes power feasible sub-domains for different time periods; the power sample set acquisition unit 501 includes:

[0236] A power sample subset construction unit is used to uniformly sample within the power feasible subdomain corresponding to each time period to obtain a preset number of tie-line power samples, and construct a power sample subset of the time period under the power feasible subdomain based on the preset number of tie-line power samples.

[0237] A power sample set construction unit is used to integrate power sample subsets from all time periods to construct the power sample set of the regional system under the power feasible domain of the tie line.

[0238] In one alternative embodiment, the apparatus further includes a tie-line power feasible region construction unit; the tie-line power feasible region construction unit includes:

[0239] The second power upper and lower limit function construction unit is used to construct a second power upper limit function for each time period with the goal of maximizing the tie-line output power of the regional system in that time period, and to construct a second power lower limit function with the goal of minimizing the tie-line output power of the regional system in that time period.

[0240] The second power feasible region function construction unit is used to construct the second power feasible region function of the regional system in the time period based on the second power upper limit function and the second power lower limit function;

[0241] The second power feasible region model construction unit is used to construct a second power feasible region model based on the second power feasible region function and in combination with preset network constraints.

[0242] The second tie-line power upper and lower limit solution unit is used to optimize and solve the second power feasible region model to obtain the upper limit of the second tie-line power and the lower limit of the second tie-line power of the regional system in the time period.

[0243] A power feasible subdomain determination unit is used to determine the power feasible subdomain of the time period based on the upper limit of the second tie line power and the lower limit of the second tie line power.

[0244] The tie-line power feasible domain integration unit is used to integrate the power feasible subdomains of all time periods to construct the tie-line power feasible domain of the regional system.

[0245] As the device embodiment is basically similar to the method embodiment, it is described in a relatively simple way. For relevant details, please refer to the description of the method embodiment above.

[0246] It should be noted that, in order to enable those skilled in the art to better distinguish between data of the same type but with different actual meanings, some technical features in the embodiments of the present invention are distinguished by the terms "first" and "second". "First" and "second" are used only for data differentiation and have no other special meaning. It is understood that the present invention does not impose any limitations on them.

[0247] This invention also provides an electronic device, which includes a processor and a memory:

[0248] The memory is used to store program code and transfer the program code to the processor;

[0249] The processor is used to execute the tie-line ramp-up reserve capacity calculation method of any embodiment of the present invention for interconnected power systems according to the instructions in the program code.

[0250] This invention also provides a computer-readable storage medium for storing program code for executing the tie-line ramp-up reserve capacity calculation method for interconnected power systems according to any embodiment of this invention.

[0251] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0252] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this invention are all information and data authorized by the user or fully authorized by all parties. Furthermore, the collection, use and processing of related data must comply with the relevant laws, regulations and standards of the relevant countries and regions, and corresponding operation entry points are provided for users to choose to authorize or refuse.

[0253] In the embodiments provided by this invention, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection between devices or units through some interfaces, and may be electrical, mechanical, or other forms.

[0254] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0255] Furthermore, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.

[0256] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0257] The above-described embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for calculating the ramp-up reserve capacity of tie lines in an interconnected power system, characterized in that, The interconnected power system includes multiple interconnected regional systems; for any one of the regional systems, the method includes: Obtain the power sample set of the regional system in the tie-line power feasible region; Based on the power sample set, the generator output set is obtained through optimal power flow calculation, and the ramp reserve capacity set considering the coupling of adjacent time periods is solved based on the generator output set. Based on the power sample set and the ramp reserve capacity set, a climb capability assessment model for the connecting line is constructed through polynomial chaotic expansion. Obtain the tie-line power operating point for the current time period of the regional system, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity for the next time period of the regional system.

2. The method for calculating the ramp-up reserve capacity of interconnected power systems according to claim 1, characterized in that, The tie-line power feasible region includes power feasible sub-regions at different time periods; the power sample set includes power sample subsets of each of the power feasible sub-regions; the step of obtaining the generator output set based on the power sample set through optimal power flow calculation includes: Construct the optimal power flow model for the regional system; For each time period, the tie-line power samples in the power sample subset are substituted one by one into the optimal power flow model, and the optimal power flow calculation is performed under preset network constraints with the goal of minimizing the generation cost, to solve for the generator output of each tie-line power sample. By integrating the generator output of each of the tie-line power samples, a subset of generator output corresponding to the power sample subset is obtained; By integrating the generator output subsets from all time periods, the generator output set of the regional system under the feasible power domain of the tie line is obtained.

3. The method for calculating the ramp-up reserve capacity of interconnected power systems according to claim 1, characterized in that, The generator output set includes subsets of generator output at different times; Each of the aforementioned subsets of generator output includes multiple generator outputs; The step of solving for the ramp reserve capacity set considering the coupling of adjacent time periods based on the generator output set includes: For each generator output in each adjacent time period, based on the difference between the generator output in the next time period and the previous time period, and in conjunction with the upper limit and lower limit of the generator's ramp power, a generator ramp constraint coupled between adjacent time periods is constructed. By combining the generator ramping constraint and the preset network constraint, the tie line output power is optimized and solved to obtain the ramping reserve capacity of the tie line output power in the previous time period under the consideration of the coupling between adjacent time periods. Integrate all the ramp reserve capacity of the subsequent time period as a subset of the ramp reserve capacity of the tie line output power of the previous time period in the subsequent time period. Integrate all the aforementioned ramp reserve capacity subsets as the ramp reserve capacity set corresponding to the power sample set.

4. The method for calculating the ramp-up reserve capacity of interconnected power systems according to claim 3, characterized in that, The step of optimizing the tie-line output power by combining the generator ramping constraint and the preset network constraint conditions to obtain the ramping reserve capacity of the tie-line output power in the next time period under the consideration of the coupling between adjacent time periods includes: To maximize the tie-line output power of the regional system in the later time period, a first power upper limit function is constructed, and to minimize the tie-line output power of the regional system in the later time period, a first power lower limit function is constructed. Based on the first power upper limit function and the first power lower limit function, a first power feasible region function of the regional system in the later time period is constructed. Based on the first power feasible region function, and in conjunction with the generator ramping constraint and the preset network constraint conditions, a first power feasible region model is constructed. The first power feasible region model is optimized and solved to obtain the upper limit of the first tie line power and the lower limit of the first tie line power of the regional system in the later time period. Based on the first tie line power upper limit and the first tie line power lower limit, determine the ramp-up reserve capacity of the tie line output power in the previous period, taking into account the coupling of adjacent periods.

5. The method for calculating the ramp-up reserve capacity of interconnected power systems according to claim 1, characterized in that, The tie-line power feasible domain includes power feasible subdomains for different time periods; the power sample set includes power sample subsets for each of the power feasible subdomains; the ramp reserve capacity set includes ramp reserve capacity subsets corresponding to each of the power sample subsets. The step of constructing a tie-line ramping capability assessment model based on the power sample set and the ramping reserve capacity set through polynomial chaotic expansion includes: For each time period, an input variable set is constructed based on the power sample subset, and an output set is constructed based on the ramp-up reserve capacity subset; Based on the set of input variables and the set of output variables, and combined with the upper and lower bound constraints of the tie line power during the time period, an explicit analytical expression for the tie line ramping reserve capacity is constructed using Legendre polynomials as orthogonal basis functions, based on polynomial chaotic expansion. By combining optimal power flow calculation and least squares regression, the coefficients of the polynomial chaotic expansion of the orthogonal basis functions are solved, and the explicit analytical expression is solved back by substituting the coefficients of the polynomial chaotic expansion to obtain the climbing capacity assessment model of the connecting line.

6. The method for calculating the ramp-up reserve capacity of interconnected power systems according to claim 1, characterized in that, The tie-line power feasible region includes power feasible sub-regions at different time periods; obtaining the power sample set of the regional system under the tie-line power feasible region includes: For each time period, uniform sampling is performed within the power feasible subdomain corresponding to the time period to obtain a preset number of tie-line power samples, and based on the preset number of tie-line power samples, a power sample subset of the time period under the power feasible subdomain is constructed. By integrating power sample subsets from all time periods, a power sample set for the regional system under the feasible power domain of the tie line is constructed.

7. The method for calculating the ramp-up reserve capacity of interconnected power systems according to claim 6, characterized in that, The process for constructing the feasible power domain of the tie line includes: For each time period, a second power upper limit function is constructed with the objective of maximizing the tie-line output power of the regional system during that time period, and a second power lower limit function is constructed with the objective of minimizing the tie-line output power of the regional system during that time period. Based on the second power upper limit function and the second power lower limit function, a second power feasible region function of the regional system in the time period is constructed; Based on the second power feasible region function and combined with the preset network constraints, a second power feasible region model is constructed. The second power feasible region model is optimized and solved to obtain the upper limit and lower limit of the second tie line power of the regional system in the time period. Based on the upper limit of the second tie line power and the lower limit of the second tie line power, the power feasible subdomain of the time period is determined; By integrating the power feasible subdomains for all time periods, the tie-line power feasible domain of the regional system is constructed.

8. A device for calculating the ramp-up reserve capacity of interconnected power lines in an interconnected power system, characterized in that, The interconnected power system includes multiple interconnected regional systems; for any one of the regional systems, the device includes: A power sample set acquisition unit is used to acquire the power sample set of the regional system in the tie-line power feasible region. The ramp reserve capacity set solution unit is used to obtain the generator output set based on the power sample set through optimal power flow calculation, and to solve the ramp reserve capacity set considering the coupling of adjacent time periods based on the generator output set. The tie-line ramping capacity assessment model construction unit is used to construct a tie-line ramping capacity assessment model based on the power sample set and the ramping reserve capacity set through polynomial chaotic expansion. The tie-line ramping reserve capacity calculation unit is used to obtain the tie-line power operating point of the regional system in the current time period, and substitute the tie-line power operating point into the tie-line ramping capacity assessment model to calculate the tie-line ramping reserve capacity of the regional system in the next time period.

9. An electronic device, characterized in that, The device includes a processor and a memory: The memory is used to store program code and transmit the program code to the processor; The processor is used to execute the tie-line ramp-up reserve capacity calculation method for interconnected power systems according to the instructions in the program code as described in any one of claims 1-7.

10. A computer-readable storage medium, characterized in that, The computer-readable storage medium is used to store program code for executing the tie-line ramp-up reserve capacity calculation method for interconnected power systems according to any one of claims 1-7.