A hybrid measurement system near the drill bit

By integrating a near-end measurement device within the near-bit measurement sub and employing short-distance transmission with wireless transmitting and receiving coils, the problems of poor signal stability of wireless near-bit measurement and the lag in wired near-bit measurement are solved. This enables omnidirectional wellbore scanning and stable signal transmission during directional drilling, making it suitable for oil and gas horizontal wells and directional drilling of thin reservoirs.

CN123109632APending Publication Date: 2026-11-17WEIKE TUORUI OIL & GAS TECHNICAL SERVICES (SUZHOU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611295682.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-25
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional wireless near-bit measurement technology suffers from poor signal stability, is prone to wear, and has high maintenance costs; wired near-bit measurement technology suffers from measurement lag and cannot scan the wellbore circumference in all directions during directional drilling.

Method used

A hybrid measurement system is adopted, combining wired and wireless technologies. The near-bit measurement section integrates a near-end measurement device, which transmits wirelessly over short distances through a wireless transmitting coil and a receiving coil. The wire passage is set along the rotating part during directional drilling to achieve signal stability and timely measurement.

Benefits of technology

It solves the problems of poor signal stability and measurement lag, realizes all-round wellbore scanning during directional drilling, takes into account the stability of signal transmission and cost control, and has stronger field applicability and scalability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109632A_ABST
    Figure CN123109632A_ABST
Patent Text Reader

Abstract

The present application relates to the technical fields of drilling while drilling logging, and particularly relates to a mixed measurement system near a drill bit, which comprises: a wireless receiving shell; a proximal end measurement device, which is integrated into the wall of the drill collar of a near-drill-bit measurement short section; a battery assembly, which is accommodated in a hollow cavity arranged in a screw assembly; a wireless transmitting device, which comprises a wireless transmitting coil arranged at the top end of the screw assembly; the battery assembly is connected to and supplies power to the proximal end measurement device and the wireless transmitting device respectively; the wireless receiving device comprises a wireless receiving coil, which is integrated into the wall of the drill collar of the wireless receiving shell, and the wireless transmitting coil and the wireless receiving coil are short-distance wireless transmission; the wireless receiving device is externally connected to an MWD system. The mixed measurement system of the present application solves the technical problems of poor signal stability of the wireless scheme, technical measurement lag of the existing wired scheme, and inability to perform full-range scanning on the well wall in directional drilling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of logging while drilling technology, and specifically to a near-bit hybrid measurement system. Background Technology

[0002] With the localization and popularization of near-bit measurement technology in China, drilling efficiency and oil and gas reservoir encounter rates have been significantly improved, providing core technical support for increasing single-well production. Specifically, near-bit measurement technology can acquire formation and engineering parameters close to the drill bit in real time, which is of great significance for directional drilling and geological steering. The industry has put forward higher requirements for the miniaturization, signal transmission stability and working life of near-bit measurement systems.

[0003] In related technologies, traditional near-bit measurement technologies are mainly divided into wireless near-bit measurement technologies and wired near-bit measurement technologies (also known as "integrated screw near-bit measurement instruments"). Wireless near-bit measurement technologies typically integrate the power supply battery and wireless transmission circuitry within the near-bit measurement section, transmitting data wirelessly to the upper receiving device. The near-bit measurement parameters are then wirelessly transmitted across the screw drill string (8-10m) to the upper receiving device, and then forwarded to the MWD system (Measurement While Drilling) and the ground. Wired near-bit measurement technologies (also known as "integrated screw near-bit measurement instruments") commonly used in China install the near-end measurement circuitry within the side wall of the curved housing. The power / signal wires are routed through the upper side wall of the curved housing, upwards through the motor stator housing, and then through the anti-drop housing side wall, directly connecting to the MWD. ​​In other words, the wires penetrate the upper part of the screw curved housing and are connected to the MWD. ​​Power is supplied to the lower near-end measurement circuitry via the MWD system's battery or generator. Specifically, the circuit of the near-end measurement section inside the curved housing is transmitted to the MWD system and the ground via a hard connection through the upper part of the housing of the screw drill bit (6-7m through the upper part of the curved housing, and about 2m without through the lower part of the curved housing and transmission assembly).

[0004] However, traditional wireless near-bit measurement technology and wired near-bit measurement technology have the following technical problems: For wireless near-bit measurement technology, the transmitting antenna is close to the drill bit, making it prone to contact and wear against the well wall, resulting in a high failure rate and high maintenance costs. Furthermore, long-distance wireless transmission is susceptible to interference from formation resistivity and mud type, leading to poor signal stability. For wired near-bit measurement technology, the measurement point is usually 2 meters away from the drill bit, causing measurement lag. During directional drilling, the entire drill string, including the curved housing, cannot rotate. At this time, the measurement circuit inside the curved housing cannot rotate either, making it impossible to perform a full-range circumferential scan of the well wall and thus preventing the measurement of imaging data such as azimuth gamma. Summary of the Invention

[0005] This application provides a near-bit hybrid measurement system that combines the advantages of wired and wireless technologies. It adopts a novel wired method that balances signal transmission stability, measurement timeliness, and comprehensive circumferential scanning of the wellbore during drilling. This solves the technical problems of poor signal stability in wireless solutions, measurement lag in existing wired solutions, and the inability to perform comprehensive circumferential scanning of the wellbore during directional drilling.

[0006] This application provides a hybrid measurement system for near-bit drilling, wherein the near-bit includes a near-bit measurement sub and a screw assembly connected sequentially from bottom to top, and the hybrid measurement system comprises: The wireless receiver housing is located above the screw assembly; The near-end measuring device is integrated into the drill collar wall of the near-bit measuring sub; The battery assembly is housed in a hollow cavity within the screw assembly; A wireless transmitter includes a wireless transmitting coil disposed at the top of a screw assembly; a battery assembly is connected to and supplies power to the near-end measuring device and the wireless transmitter. A wireless receiving device includes a wireless receiving coil integrated within the drill collar wall of the wireless receiving housing, wherein the wireless transmitting coil and the wireless receiving coil perform non-contact short-range wireless transmission; the wireless receiving device is externally connected to an MWD system.

[0007] In one embodiment, the near-bit measuring sub has several strip-shaped cavities formed in the drill collar wall outside the intermediate mud channel; the length of the near-bit measuring sub is shortened to 0.5-0.6 meters. The proximal measurement device also includes a gamma probe, a measurement circuit, and at least one backup sensor. The measurement circuit is connected to the gamma probe and all backup sensors, and the battery assembly powers the measurement circuit.

[0008] In one embodiment, the wireless transmitting device further includes a wireless transmitting circuit, which is housed within a hollow cavity. The wireless transmitting coil is connected to the top of the anti-drop shaft at the top of the motor rotor of the screw assembly; the wireless transmitting coil is located inside the wireless receiving housing; the wireless transmitting circuit is connected to the battery assembly and the wireless transmitting coil respectively.

[0009] In one embodiment, the hybrid measurement system further includes a transmitter housing sealed to the top of the anti-drop shaft, a wireless transmitting coil housed within the transmitter housing, and the wireless transmitting coil being connected to a wireless transmitting circuit via a coil signal line passing through the anti-drop shaft.

[0010] In one embodiment, the wireless receiving device further includes a receiving circuit disposed within the drill collar wall outside the intermediate mud channel of the wireless receiving housing; the receiving circuit is connected to the wireless receiving coil and the MWD system.

[0011] In one embodiment, the near-bit measuring sub and screw assembly are adaptively provided with a wire connection channel that is first eccentric and then concentric with respect to the axis, while avoiding the mud flow channel. The hard-wired connections of the battery assembly, which supply power to the near-end measuring device and the wireless transmitting device, are all laid along the over-wire connection channel.

[0012] In one embodiment, the plurality of rotating components during directional drilling are arranged sequentially from bottom to top as a near-bit measuring sub, a drive shaft, a water cap, a universal joint, a motor rotor, and an anti-drop shaft; the wire connection channel passes sequentially through the sidewall of the near-bit measuring sub, the sidewall of the drive shaft, the sidewall of the water cap, the axis of the universal joint, the axis of the motor rotor, and the axis of the anti-drop shaft.

[0013] In one embodiment, the wireless transmitting coil and the wireless receiving coil are arranged in parallel, and the distance between them is controlled within 40 to 60 mm.

[0014] In one embodiment, a centering device for radial alignment and centering is also installed in the hollow cavity of the motor rotor.

[0015] In one embodiment, the battery assembly increases battery capacity based on the length of the motor rotor and the inner diameter of the hollow cavity.

[0016] The beneficial effects of the technical solutions provided in this application include: 1. The near-bit hybrid measurement system of this application, compared with the near-bit measurement sub in wireless near-bit measurement technology, has no battery cavity, no insulation structure and no transmitting antenna inside the near-bit measurement sub. The near-end measurement device is integrated only in the drill collar wall of the near-bit measurement sub. The near-end measurement device is used to collect drill bit data. The near-end measurement device has no contact with the well wall, no risk of wear and damage, and good safety and reliability. Compared to wired near-bit measurement technology, where the cable passage is set along the sidewalls of several non-rotating components during directional drilling (i.e., along the sidewalls of the curved housing, motor stator, and anti-drop housing), this application firstly adds a near-bit measurement section. A near-end measurement device is installed within this section, making it closer to the drill bit and allowing for more timely measurements. This solves the technical problem of measurement lag caused by the distance between the measurement point and the drill bit in existing wired solutions. Secondly, the near-end measurement device (containing several sensors) is integrated within the drill collar wall of the near-bit measurement section. The near-bit measurement section is a rotating component during directional drilling, which, compared to the curved housing of wired near-bit measurement technology (i.e., along the sidewalls of the curved housing, motor stator, and anti-drop housing during directional drilling), provides a more timely measurement. (Non-rotating parts), this application can scan the entire circumference of the well wall and acquire circumferential data during directional drilling. The scanning is comprehensive, solving the technical problem that existing wired solutions cannot perform a full-range circumferential scan of the well wall during directional drilling. More importantly, the wire passage of this application is set along several rotating parts during directional drilling. At the same time, there is a non-contact short-range wireless transmission gap between the wireless transmitting coil and the wireless receiving coil. The hard wire connection no longer needs to be directly connected to the MWD system, so that rotation does not hinder the wire harness and signal transmission can be carried out normally while rotating. This eliminates the wire passage method of non-rotating parts during directional drilling and takes into account the stability of signal transmission. The data acquired by the near-end measuring device of this application is transmitted to the wireless transmitting device through a hard wire connection of the wire passage of several rotating parts during directional drilling. A non-contact short-range wireless transmission is formed between the wireless transmitting coil and the wireless receiving coil. The wireless transmission adopts electromagnetic wave short transmission technology. The hard wire connection and short-range wireless transmission are not affected by the formation and mud type, and the signal transmission stability is strong. This application takes into account the stability of signal transmission and cost control, has stronger field applicability and scalability, and is highly practical.

[0017] 2. The near-bit hybrid measurement system of this application has no internal battery, antenna, or other structures in the near-bit measurement sub. This not only allows for ample space to lengthen the connector and increase the cavity to expand measurement parameters, but also allows the length of the near-bit measurement sub to be shortened to 0.5-0.6 meters without internal battery, antenna, or other structures. This is much shorter than the 0.9-1.1 meter length of similar subs in the industry and far below the safety distance requirement from the screw bend to the bottom of the drill bit (the bend distance plus the near-bit length should not exceed 2.5 meters), ensuring higher drilling safety and higher build-up rate requirements. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a schematic diagram of the hybrid near-bit measurement system provided in an embodiment of this application; Figure 2 This is a schematic diagram of the near-bit measurement sub provided in an embodiment of this application; Figure 3 for Figure 2 AA section view in the middle; Figure 4 A schematic diagram of the screw assembly, the internal structure of the motor rotor, and the wireless transmitter provided in the embodiments of this application; Figure 5 for Figure 4 BB section view in the middle; In the diagram: 1. Near-bit measuring section; 2. Screw assembly; 4. Drive shaft; 5. Water cap; 6. Universal joint; 7. Bent housing; 9. Motor rotor; 12. Wireless transmitting coil; 13. Motor stator; 14. Anti-drop shaft; 15. Anti-drop housing; 16. Wireless receiving coil; 17. Receiving circuit; 18. Wireless receiving housing; 19. Mud channel; 21. Strip cavity; 22. Drill bit connecting female thread; 23. Gamma probe; 24. Spare sensor; 25. Measuring circuit; 26. Centralizer; 27. Battery assembly; 28. Wireless transmitting circuit; 29. ​​Hollow cavity; 30. Wiring connection channel. Detailed Implementation

[0020] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present application.

[0021] This application provides a near-bit hybrid measurement system that combines the advantages of wired and wireless technologies. It employs a novel wired cable routing method (abandoning the existing upper-part wired routing from the casing), solving the technical problems of poor signal stability in wireless solutions, measurement lag in existing wired solutions, and the inability to perform omnidirectional scanning of the wellbore during directional drilling. This application balances signal transmission stability, measurement timeliness, and comprehensive circumferential scanning of the wellbore during drilling. It also achieves miniaturization of the near-bit measurement sub, extends the working time of a single well entry, and allows for scalable measurement parameters, resulting in stronger field applicability and scalability. The near-bit hybrid measurement system of this application involves near-bit geological steering, cable routing screws, and electromagnetic wave wireless short-transmission technology, and is suitable for real-time formation identification and wellbore trajectory control in oil and gas horizontal wells and thin-reservoir directional drilling.

[0022] It should be noted beforehand that traditional wireless near-bit measurement technology has... Figure 1 Near-bit measurement section 1. Traditional wired near-bit measurement technology, without... Figure 1 The mid-to-near drill bit measuring section 1 connects the drill bit directly to the drive shaft 4, while several sensors used for measurement are installed inside the side wall of the curved housing 7. The wire passage passes from bottom to top through the curved housing, the motor stator, the anti-drop housing, and then directly connects to the MWD.

[0023] In traditional wireless near-drill bit measurement technology, during directional drilling, the curved housing 7 and motor stator 13 are non-rotating components, while the drive shaft 4, water cap 5, universal joint 6, motor rotor 9, and anti-drop shaft 14 are rotating components; the entire cable passage is set along the non-rotating components of the directional drilling.

[0024] like Figures 1 to 5 As shown, this application discloses an embodiment of a hybrid measurement system for near-bit measurement. The near-bit includes a near-bit measurement sub 1 and a screw assembly 2 connected sequentially from bottom to top. The relevant structures of the near-bit measurement sub 1 and the screw assembly 2 are similar to those of wired near-bit measurement technology, and will not be described in detail here.

[0025] The hybrid measurement system includes a wireless receiver housing 18, a near-end measurement device, a battery assembly 27, a wireless transmitter, and a wireless receiver.

[0026] The wireless receiver housing 18 is located at the top of the screw assembly 2. It is worth noting that, compared to wired near-drill bit measurement technology, the technical solution of this application, on the one hand, eliminates the complex high-pressure sealing structures such as the original length compensation assembly and rotary slip ring assembly at the top of the screw assembly 2, replacing them with the wireless receiver housing 18; on the other hand, the motor rotor 9 of this application maintains eccentric motion and a certain axial displacement relative to the motor stator 13, yet it can still perform normal measurements.

[0027] The near-end measurement device is integrated into the drill collar wall of the near-bit measurement sub 1. It is worth noting that, compared with wireless near-bit measurement technology, the near-bit measurement sub 1 has no battery cavity, no insulation structure, and no transmitting antenna.

[0028] The battery assembly 27 is housed in the hollow cavity 29 of the motor rotor 9 disposed within the screw assembly 2.

[0029] The wireless transmitter includes a wireless transmitting coil 12, which is located at the top of the screw assembly 2. The battery assembly 27 is connected to and powers both the near-end measuring device and the wireless transmitter. The wiring passage of the hybrid measuring system is arranged along several rotating parts during directional drilling and connects to the wireless transmitting coil 12; the wiring passage accommodates all signal lines and electrical wires.

[0030] The wireless receiving device includes a wireless receiving coil 16, which is integrated into the drill collar wall of the wireless receiving housing 18. The wireless transmitting coil 12 and the wireless receiving coil 16 perform non-contact short-range wireless transmission, and the signal of the wireless receiving device is externally connected to the MWD system.

[0031] The MWD system is used to acquire data and also indirectly powers the wireless receiver. The MWD system enables the acquisition, transmission, and ground analysis of near-drill bit data.

[0032] Preferably, the battery assembly 27 is a 28V battery assembly, located in the upper middle part inside the motor rotor, and uses a high-temperature lithium battery.

[0033] The hybrid near-bit measurement system of this application, compared to the near-bit measurement section 1 in wireless near-bit measurement technology, has no internal battery cavity, insulation structure, or transmitting antenna in the near-bit measurement section 1. Instead, a near-end measurement device is integrated within the drill collar wall of the near-bit measurement section 1. This near-end measurement device is used to acquire drill bit data. The near-end measurement device has no contact with the well wall, eliminating the risk of wear and damage, and ensuring high safety and reliability. Compared to wired near-bit measurement technology where the cable passage is set along the sidewalls of several non-rotating components during directional drilling (i.e., along the sidewalls of the curved housing, motor stator, and anti-drop housing), this application first adds the near-bit measurement section 1, within which a near-bit measurement section 1 is installed... The near-end measurement device is closer to the drill bit, enabling more timely measurements and solving the technical problem of measurement lag caused by the distance between the measurement point and the drill bit in existing wired solutions. Secondly, the near-end measurement device (containing several sensors) is integrated into the drill collar wall of the near-drill bit measurement section 1. The near-drill bit measurement section 1 is a rotating component during directional drilling. Compared to the curved housing 7 (i.e., a non-rotating component during directional drilling) in wired near-drill bit measurement technology, this application can scan the entire circumference of the wellbore and acquire circumferential data during directional drilling, providing a comprehensive scan and solving the technical problem of existing wired solutions being unable to perform a full-range circumferential scan of the wellbore during directional drilling. More importantly, the cable passage in this application is along the directional... The drilling process incorporates several rotating components, and a non-contact, short-range wireless transmission gap exists between the wireless transmitting coil 12 and the wireless receiving coil 16. This eliminates the need for direct connection to the MWD system via hardwired connections, ensuring that rotation does not obstruct the wiring harness and allowing for simultaneous signal transmission while rotating. This eliminates the need for non-rotating component wire-passing methods used in directional drilling, while maintaining signal transmission stability. Furthermore, this application removes the complex high-pressure sealing structures such as the length compensation assembly and rotating slip ring assembly at the top of the screw assembly 2 in the fully wired screw technology. (Specifically, in existing wired near-drill bit measurement technology, the motor rotor moves eccentrically relative to the motor stator, and the motor rotor also generates a small axial reciprocating motion.) The displacement necessitates the use of complex high-pressure sealing structures such as the aforementioned length compensation assembly and rotary slip ring assembly for wired near-bit measurement technology, making manufacturing and maintenance difficult. Data acquired by the near-end measurement device of this application is transmitted to the wireless transmitter via a hard-wired connection through the wire passage of several rotating components during directional drilling. A non-contact, short-range wireless transmission is established between the wireless transmitting coil 12 and the wireless receiving coil 16. The wireless transmission employs electromagnetic short-range transmission technology. Both the hard-wired connection and the short-range wireless transmission are unaffected by formation or mud type interference, resulting in strong signal transmission stability. This application balances signal transmission stability with cost control, possesses stronger field applicability and scalability, and is highly practical.

[0034] like Figure 2 and Figure 3As shown, in one embodiment, the near-bit measuring sub 1 has several strip-shaped cavities 21 formed in the drill collar wall outside the intermediate mud channel 19. The length of the near-bit measuring sub 1 is shortened to 0.5 to 0.6 meters.

[0035] The near-end measurement device also includes a gamma probe 23, a measurement circuit 25, and at least one backup sensor 24. The measurement circuit 25 is connected to the gamma probe 23 and all backup sensors 24. The battery assembly 27 powers the measurement circuit 25.

[0036] Specifically, several strip-shaped cavities 21 are evenly arranged along the circumference of the near-drill bit measuring sub 1, and the length of each strip-shaped cavity 21 extends along the axial direction.

[0037] Preferably, the backup sensor 24 is a sensor that collects annular pressure, resistivity, drilling engineering parameters, etc.

[0038] Four or five strip-shaped cavities 21 are opened inside the drill collar wall of the near-drill bit measuring section 1. The length of the strip-shaped cavity 21 can be adapted to a suitable length to accommodate the installation requirements of more measuring circuits 25 and sensors.

[0039] The hybrid measurement system near the drill bit of this application has no internal battery, antenna, or other structures in the near-drill bit measurement section 1. This not only allows for ample space to lengthen the connector and increase the cavity to expand measurement parameters, but also enables the length of the near-drill bit measurement section 1 to be shortened to 0.5-0.6 meters without internal battery, antenna, or other structures. This is much shorter than the 0.9-1.1 meter length of similar sections in the industry and far below the safety distance requirement from the screw bend to the bottom of the drill bit (the bend distance plus the near-drill bit length should not exceed 2.5 meters), ensuring higher drilling safety and higher build-up rate requirements.

[0040] Furthermore, in one embodiment, the wireless transmitting device further includes a wireless transmitting circuit 28, which is housed within the hollow cavity 29.

[0041] The wireless transmitting coil 12 is connected to the top of the anti-drop shaft 14 located at the top of the motor rotor 9 of the screw assembly 2. The wireless transmitting coil 12 is located inside the wireless receiving housing 18.

[0042] The wireless transmitting circuit 28 is connected to the battery assembly 27 and the wireless transmitting coil 12 respectively.

[0043] Specifically, the wireless transmitting circuit 28 is connected to the wireless transmitting coil 12 via a coil signal line. The coil signal line passes through the axis of the anti-drop shaft 14, and the coil signal line has no contact with the well wall, so there is no risk of wear and damage.

[0044] Specifically, the wireless transmitting circuit 28 and the battery assembly 27 are both housed within the hollow cavity 29 of the motor rotor 9 of the screw assembly 2.

[0045] The battery assembly 27 is located inside the motor rotor 9 and provides power to the near-end measuring device of the near-bit measuring sub 1 and the wireless transmission circuit 28. The working time of a single well entry can be greatly increased by increasing the battery capacity. The wireless transmission circuit is located inside the motor rotor and is directly connected to the upper end of the battery assembly.

[0046] Furthermore, the hybrid measurement system also includes a transmitter housing, which is sealed to the top of the anti-drop shaft 14, and the wireless transmitter coil 12 is housed within the transmitter housing. The transmitter housing is located in the mud channel and serves to isolate the mud.

[0047] The wireless transmitting coil 12 is connected to the wireless transmitting circuit 28 via a coil signal line passing through the anti-drop shaft 14.

[0048] Preferably, the transmitter connector housing is made of a material that facilitates short-range wireless transmission.

[0049] The near-bit hybrid measurement system of this application has the wireless transmitting coil 12 encapsulated entirely within the transmitting connector housing, with no contact with the well wall, eliminating the risk of wear and damage, and adapting to the high-wear and high-corrosion environment downhole.

[0050] Furthermore, in one embodiment, the wireless receiving device further includes a receiving circuit 17 disposed within the drill collar wall outside the intermediate mud channel 19 of the wireless receiving housing 18. The receiving circuit 17 is connected to the wireless receiving coil 16 and the MWD system.

[0051] Specifically, the MWD system not only receives signals, but also supplies power to the receiving circuit 17 and forwards the received data to the ground.

[0052] The wireless receiving coil 16 and the receiving circuit 17 are encapsulated inside the drill collar wall of the wireless receiving housing 18, completely isolated from the outside world, and there is no risk of wear.

[0053] like Figure 1 As shown, further, in one embodiment, the near-bit measuring section 1 and the screw assembly 2 are adaptively provided with a wire connection channel 30 that is first eccentric and then concentric with respect to the axis while avoiding the mud flow channel 19.

[0054] The hard connection cables connecting and powering the near-end measuring device and the wireless transmitter are laid along the over-wire connection channel 30.

[0055] Specifically, a hard-wired connection includes both electrical wires and signal wires.

[0056] Furthermore, during directional drilling, several rotating components are arranged sequentially from bottom to top as follows: near-bit measuring section 1, drive shaft 4, water cap 5, universal joint 6, motor rotor 9, and anti-drop shaft 14. The cable connection channel 30 passes sequentially through the sidewalls of the near-bit measuring section 1, the drive shaft 4, the water cap 5, the axis of the universal joint 6, the axis of the motor rotor 9, and the axis of the anti-drop shaft 14.

[0057] The passageways in this application all pass through rotating components used in directional drilling.

[0058] This application also relates to a curved housing 7, a motor stator 13, an anti-drop housing 15, and a drill bit connecting nut 22. The curved housing 7 is coaxially spaced outside the universal joint 6, the motor stator 13 is located outside the motor rotor 9, and the anti-drop housing 15 is coaxially located outside the anti-drop shaft 14. The curved housing 7, the motor stator 13, and the anti-drop housing 15 are connected sequentially from bottom to top. The drill bit connecting nut 22 is located at the bottom and is used to connect the drill bit.

[0059] Furthermore, in one embodiment, the wireless transmitting coil 12 and the wireless receiving coil 16 are arranged in parallel, and the distance between them is controlled within 40-60mm to ensure the reliability of wireless short transmission. By adopting electromagnetic wave short transmission technology, real-time and reliable transmission of measurement data can be achieved without interference from formation resistivity and mud type.

[0060] Furthermore, a centralizer 26 for radial alignment and centering is also installed inside the hollow cavity 29 of the motor rotor 9.

[0061] Furthermore, in one embodiment, the battery assembly 27 increases the battery capacity based on the length of the motor rotor 9 and the inner diameter of the hollow cavity 29, achieving a single well entry working time of more than 500 hours, far exceeding the industry standard.

[0062] Preferably, the length of the motor rotor 9 is 4 to 5 meters.

[0063] The near-bit hybrid measurement system of this application is as follows: The sensor in the near-bit measurement section 1 collects near-bit formation gamma (or expandable parameters such as annular pressure and resistivity), converts the analog signal into a digital signal, and transmits it to the wireless transmission circuit 28 in the motor rotor 9 through the hard connection line of the line connection channel 30. The wireless transmission circuit 28 encodes and modulates the data and transmits it outward in the form of electromagnetic waves through the wireless transmission coil 12. After receiving the signal, the wireless receiving coil 16 demodulates and decodes it by the receiving circuit and transmits the data to the upper MWD system. Finally, the data is transmitted to the ground control system through the MWD system to realize real-time monitoring of near-bit parameters and geological guidance decision-making.

[0064] In the description of this application, it should be noted that the terms "upper," "lower," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application. Unless otherwise expressly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication between two elements. For those skilled in the art, the specific meaning of the above terms in this application can be understood according to the specific circumstances.

[0065] It should be noted that in this application, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0066] The above description is merely a specific embodiment of this application, enabling those skilled in the art to understand or implement this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A hybrid measurement system of a near-bit, the near-bit comprising, from bottom to top, a near-bit measurement sub (1) and a screw assembly (2) connected in sequence, characterized in that, The hybrid measurement system includes: A wireless receiver housing (18) is disposed above the screw assembly (2); The near-end measuring device is integrated into the drill collar wall of the near-bit measuring sub (1); The battery assembly (27) is housed in a hollow cavity (29) within the screw assembly (2); A wireless transmitter includes a wireless transmitter coil (12) disposed at the top of a screw assembly (2); a battery assembly (27) is connected to and supplies power to the near-end measuring device and the wireless transmitter; the wire passage of the hybrid measuring system is disposed along several rotating parts during directional drilling and is connected to the wireless transmitter coil (12). A wireless receiving device includes a wireless receiving coil (16), which is integrated into the drill collar wall of the wireless receiving housing (18). The wireless transmitting coil (12) and the wireless receiving coil (16) perform non-contact short-range wireless transmission. The wireless receiving device is externally connected to the MWD system.

2. The near-bit hybrid measurement system according to claim 1, characterized in that: The near-bit measurement sub (1) has several strip-shaped cavities (21) inside the drill collar wall outside the intermediate mud channel (19); the length of the near-bit measurement sub (1) is shortened to 0.5 to 0.6 meters; The proximal measurement device also includes a gamma probe (23), a measurement circuit (25) and at least one backup sensor (24), the measurement circuit (25) being connected to the gamma probe (23) and all backup sensors (24), and the battery assembly (27) supplying power to the measurement circuit (25).

3. The near-bit hybrid measurement system according to claim 1, characterized in that: The wireless transmitting device further includes a wireless transmitting circuit (28), which is housed within a hollow cavity (29); The wireless transmitting coil (12) is connected to the top of the anti-drop shaft (14) at the top of the motor rotor (9) of the screw assembly (2); the wireless transmitting coil (12) is located inside the wireless receiving housing (18); the wireless transmitting circuit (28) is connected to the battery assembly (27) and the wireless transmitting coil (12) respectively.

4. The hybrid measurement system of a near-bit according to claim 3, wherein: The hybrid measurement system also includes a transmitter housing sealed to the top of the anti-drop shaft (14), a wireless transmitter coil (12) housed within the transmitter housing, and the wireless transmitter coil (12) connected to the wireless transmitter circuit (28) via a coil signal line passing through the anti-drop shaft (14).

5. The near-bit hybrid measurement system according to claim 1, characterized in that: The wireless receiving device also includes a receiving circuit (17) disposed in the drill collar wall outside the intermediate mud channel (19) of the wireless receiving housing (18); the receiving circuit (17) is connected to the wireless receiving coil (16) and the MWD system.

6. The near-bit hybrid measurement system according to claim 1, characterized in that: The near-bit measuring section (1) and screw assembly (2) are adapted to have a wire connection channel (30) that is first eccentric and then concentric with respect to the axis while avoiding the mud flow channel (19). The hard-wired connections of the battery assembly (27) to the near-end measuring device and the wireless transmitter are laid along the over-wire connection channel (30).

7. The near-bit hybrid measurement system according to claim 6, characterized in that: The rotating components for directional drilling are arranged from bottom to top as follows: a near-drill bit measuring section (1), a drive shaft (4), a water cap (5), a universal joint (6), a motor rotor (9), and an anti-drop shaft (14). The wire connection channel (30) passes sequentially through the side wall of the near-drill bit measuring section (1), the side wall of the drive shaft (4), the side wall of the water cap (5), the axis of the universal joint (6), the axis of the motor rotor (9), and the axis of the anti-drop shaft (14).

8. The hybrid measurement system of a near-bit according to claim 1, wherein: The wireless transmitting coil (12) and the wireless receiving coil (16) are arranged in parallel, and the distance between them is controlled within 40 to 60 mm.

9. The near-bit hybrid measurement system according to claim 3, characterized in that: A centering device (26) for radial alignment and centering is also installed in the hollow cavity (29) of the motor rotor (9).

10. The near-bit hybrid measurement system according to claim 3, characterized in that: The battery assembly (27) increases battery capacity based on the length of the motor rotor (9) and the inner diameter of the hollow cavity (29).