Node update methods, apparatus, computer equipment, storage media, and program products

By acquiring and analyzing a knowledge graph of dependencies between multiple technology platforms, health and update information is generated, solving the problem of high node update costs in traditional technologies and enabling efficient node updates across multiple platforms.

CN123114513APending Publication Date: 2026-11-17CHINA CONSTRUCTION BANK +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611502859.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In traditional technologies, node updates are performed from the perspective of a single technology platform that makes local decisions, which makes it difficult to accommodate multiple technology platforms and results in high technical costs.

Method used

By acquiring a knowledge graph of the dependencies between various technology platforms, performing inference and analysis, generating health information and update information, and updating nodes based on this information.

Benefits of technology

It enables node updates to be supported across multiple technology platforms, reducing technical costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123114513A_ABST
    Figure CN123114513A_ABST
Patent Text Reader

Abstract

This application relates to a node update method, apparatus, computer device, storage medium, and program product. The method includes: acquiring a knowledge graph representing the dependencies between nodes corresponding to multiple technology platforms, and initial update information of the nodes; performing inductive analysis on the initial update information based on the knowledge graph to obtain inductive analysis results; generating health information representing the health status of multiple technology platforms based on the knowledge graph; generating update information for updating nodes among multiple technology platforms based on the health information, demand information of multiple technology platforms, and inductive analysis results; and performing a current update on the nodes based on the update information. This method can reduce technical costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of artificial intelligence technology, and in particular to a node update method, apparatus, computer equipment, storage medium, and program product. Background Technology

[0002] With the development of enterprise information technology (IT), the annual inventory and planning of various technology platforms is a core task of technology architecture management for large enterprises. Among them, the aforementioned technology platforms may include at least two of the following technology platforms: distributed platform, big data platform, and artificial intelligence platform, etc.

[0003] Traditional technologies determine the local decisions affecting multiple technology platforms from the perspective of a single technology platform, and then update these local decisions in advance based on the determined local decisions. However, this node update technology struggles to accommodate all technology platforms, resulting in high technical costs. Summary of the Invention

[0004] Therefore, it is necessary to provide a node update method, apparatus, computer equipment, storage medium, and program product to address the above-mentioned technical problems and reduce technical costs.

[0005] Firstly, this application provides a node update method, including:

[0006] Obtain a knowledge graph representing the dependencies between nodes corresponding to various technology platforms, as well as the initial update information of the nodes;

[0007] The initial updated information is analyzed and deduced based on the knowledge graph to obtain the analysis results.

[0008] Based on knowledge graphs, generate health information to represent the health status of multiple technology platforms;

[0009] Based on health information, demand information from multiple technology platforms, and inductive analysis results, update information is generated for updating nodes across multiple technology platforms;

[0010] The node is updated based on the updated information.

[0011] In one embodiment, based on a knowledge graph, health information representing the health status of multiple technology platforms is generated, including:

[0012] The health of component nodes in the knowledge graph is evaluated by a health assessment engine to obtain the health status of the component nodes.

[0013] The cost accounting engine is used to calculate the cost of the knowledge graph's technology stack, resulting in the global cost of the technology stack.

[0014] Health information is determined based on knowledge graphs, health status, and global cost.

[0015] In one embodiment, health information is determined based on a knowledge graph, health score, and global cost, including:

[0016] The risk identification engine is used to identify risks in the knowledge graph, and the risk identification results of the knowledge graph are obtained.

[0017] Health information is determined based on health status, overall cost, and risk identification results.

[0018] In one embodiment, the deductive analysis results include a first analysis result, a second analysis result, and a third analysis result. Based on a knowledge graph, the initial updated information is analyzed to obtain the deductive analysis results, which include:

[0019] The scope of the impact of initial update information on multiple technology platforms was analyzed using knowledge graphs, yielding the first analysis results.

[0020] The second analysis result is obtained by using knowledge graph analysis to examine how initial update information affects the update costs of various technology platforms.

[0021] Furthermore, by utilizing knowledge graph analysis to examine the risks of initial update information affecting multiple technology platforms, a third analytical result was obtained.

[0022] In one embodiment, the current update of a node based on the update information includes:

[0023] From the updated information, determine the initial policy information of the node;

[0024] The initial strategy information is encoded to obtain encoded strategy information;

[0025] During the node deployment phase, the node is updated according to the encoding strategy information.

[0026] In one embodiment, the method further includes:

[0027] After updating the node based on the updated information, new platform data corresponding to each technology platform is collected, and the data from multiple new platforms is integrated and processed to obtain a new knowledge graph. The new knowledge graph is used to update the node for the next time.

[0028] Secondly, this application also provides a node update device, comprising:

[0029] The acquisition module is used to acquire a knowledge graph that represents the dependencies between nodes corresponding to various technology platforms, as well as the initial update information of the nodes;

[0030] The deduction module is used to perform deduction and analysis on the initial updated information based on the knowledge graph and obtain the deduction and analysis results.

[0031] The first generation module is used to generate health information based on knowledge graphs to represent the health status of various technology platforms;

[0032] The second generation module is used to generate update information for updating nodes across multiple technology platforms based on health information, demand information from multiple technology platforms, and inference analysis results.

[0033] The update module is used to perform the current update on the node based on the update information.

[0034] Thirdly, this application also provides a computer device, including a memory and a processor, the memory storing a computer program, the processor executing the steps of the node update method in the first aspect described above.

[0035] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the node update method in the first aspect described above.

[0036] Fifthly, this application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the node update method described in the first aspect above.

[0037] The aforementioned node update method, apparatus, computer equipment, storage medium, and program product acquire a knowledge graph representing the dependencies between nodes corresponding to multiple technology platforms, as well as initial update information for the nodes; perform deductive analysis on the initial update information based on the knowledge graph to obtain deductive analysis results; generate health information representing the health status of multiple technology platforms based on the knowledge graph; generate update information for updating nodes among multiple technology platforms based on the health information, demand information of multiple technology platforms, and deductive analysis results; and perform the current update on the nodes based on the update information. Since the node update process involves generating update information for updating nodes among multiple technology platforms based on the generated health information, demand information of multiple technology platforms, and deductive analysis results, and then performing the current update on the nodes based on the aforementioned update information, and since the deductive analysis results are obtained by deductive analysis of the acquired initial update information based on the acquired knowledge graph, and the health information is generated based on the acquired knowledge graph, this achieves the goal of accommodating node updates across multiple technology platforms, thereby solving the technical problem of high technical costs and achieving the technical effect of reducing technical costs. Attached Figure Description

[0038] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0039] Figure 1 This is a diagram illustrating the application environment of a node update method in one embodiment.

[0040] Figure 2 This is a flowchart illustrating a node update method in one embodiment;

[0041] Figure 3 This is a schematic diagram of the process for generating health information in one embodiment;

[0042] Figure 4 This is a structural block diagram of a dynamic governance system for enterprise technology capabilities based on real-time data perception and intelligent decision-making, as shown in one embodiment.

[0043] Figure 5 This is a structural block diagram of a node update device in one embodiment;

[0044] Figure 6 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation

[0045] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application. It should be noted that existing industry solutions such as software, components, and models may be mentioned in the embodiments of this application. These should be considered exemplary and are intended only to illustrate the feasibility of implementing the technical solutions of this application, but do not imply that the applicant has already used or necessarily used such solutions.

[0046] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of related data must comply with relevant regulations. The acquisition, storage, use and processing of data in the technical solution of this application all comply with the relevant provisions of national laws and regulations.

[0047] The terms "first," "second," etc., used in this application may be used to describe various relationships, but the elements are not limited by these terms. These terms are only used to distinguish between the first and second relationships. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.

[0048] With the development of enterprise information technology (IT), the annual inventory and planning of various technology platforms is a core task of technology architecture management for large enterprises.

[0049] Traditional techniques determine local decisions from the perspective of a single technology platform, and then pre-update relevant nodes affecting multiple technology platforms based on these local decisions. When applying these node update techniques, technology selection is based on the single technology platform itself, pursuing locally optimal solutions such as development efficiency. However, it lacks a global perspective, that is, it lacks technology selection based on multiple technology platforms. Therefore, these node update techniques struggle to accommodate all technology platforms, leading to high technical costs.

[0050] The node update method provided in this application embodiment can be applied to, for example, Figure 1In the application environment shown, computer device 101 can communicate with technology platform 102 via a network. Computer device 101 can acquire a knowledge graph representing the dependencies between nodes corresponding to multiple technology platforms, as well as initial update information of the nodes. Based on the knowledge graph, it performs inference and analysis on the initial update information to obtain the inference and analysis results. Based on the knowledge graph and the inference and analysis results, it generates update information for updating nodes across multiple technology platforms, and performs the current update on the nodes based on the update information. Computer device 101 can be, but is not limited to, various personal computers and laptops.

[0051] In one exemplary embodiment, such as Figure 2 As shown, a node update method is provided, which is applied to... Figure 1 Taking a computer device as an example, the explanation includes the following steps S201 to S205. Wherein:

[0052] S201, Obtain the knowledge graph used to represent the dependencies between nodes corresponding to multiple technology platforms, as well as the initial update information of the nodes.

[0053] The various technology platforms in this embodiment may include the following types of technology platforms: distributed platforms, big data platforms, and artificial intelligence platforms, etc.

[0054] The knowledge graph in this embodiment can be used to represent the dependencies between nodes corresponding to various technology platforms. The knowledge graph presents a complex and interconnected network structure, rather than a simple tree structure. Since nodes in the knowledge graph may be connected to multiple application nodes, the knowledge graph displays that a node is a shared technology component; that is, attribute labels are attached next to the node. For example, next to the technology component node "MySQL5.7" it displays "Health: Poor (Outdated Version)", and next to the "Team A" node it displays "Global Cost: High". This demonstrates the combination of knowledge graph and quantitative analysis.

[0055] The nodes corresponding to the various technology platforms in this embodiment may include at least one of the following: team nodes, application / service nodes, technical component nodes, and server / infrastructure nodes, etc. The above dependencies may include at least one of the following: "deployed on", "depends on", and "maintained by... team", etc. For example, the above knowledge graph can be a knowledge graph of enterprise technology assets, the above team nodes can be labeled as "team A", "team B", etc., the above application / service nodes can be labeled as "application service X", "frontend application Y", "data service Z", the above technical component nodes can be labeled as "MySQL 5.7", "Redis 6.0", "Spring Boot 2.3", "Kubernetes", and the above server / infrastructure nodes can be labeled as "cloud server cluster A". The above dependencies can be represented by lines with arrows and labels between nodes. This is only an example and is not specifically limited.

[0056] For example, the dependency between "Team A" and "Application Service X" can be represented by "Team A" --- [Maintenance] ---> "Application Service X"; the dependency between "Application Service X" and "Technical Component Node MySQL 5.7" can be represented by "Application Service X" --- [Dependency] ---> "MySQL 5.7"; the dependency between "Application Service X" and "Data Service Z" can be represented by "Application Service X" --- [Call] ---> "Data Service Z"; and the dependency between "Frontend Application Y" and "Technical Component Node Redis 6.0" is as follows. The dependency between "Application Service X" and "Frontend Application Y" and "Technical Component Node Kubernetes" can be represented by "Application Service X" and "Frontend Application Y" --- "Deployed on" ---> "Kubernetes". The dependency between "Technical Component Node Kubernetes" and "Server / Instrumentation Node Cloud Server Cluster A" can be represented by "Kubernetes" --- "Runs on" ---> "Cloud Server Cluster A".

[0057] In this embodiment, the initial update information can be user-inputted initial update information, and the initial update information can include the node's hypothetical update conditions. For example, the hypothetical update conditions can be any of the following: "Force upgrade all Java applications to the Java Development Kit (JDK) 17", "Migrate the database of business line A from MySQL to PostgreSQL", or "Force upgrade all applications using Spring Boot 2.3 to Spring Boot 3.0".

[0058] In this embodiment, platform data corresponding to each technology platform is collected in real time. This platform data may include: code repository data, continuous integration / deployment (CI / CD) pipeline data, container orchestration platform data, artifact repository data, cloud management platform data, and monitoring system data. The code repository data may include the number of projects, programming languages, dependency library lists, and commit frequency for each technology platform. The CI / CD pipeline data may include the number of builds, deployment frequency, and success rate for each technology platform. The container orchestration platform data may include the container images, resource utilization, and service call relationships during platform runtime. The artifact repository data may include the versions and distribution of third-party libraries used by each technology platform. The cloud management platform data may include the code templates and resource consumption costs for each technology platform. The monitoring system data may include application performance and availability data for each technology platform. Based on the dependencies between nodes corresponding to various technology platforms, the platform data corresponding to each technology platform is correlated and integrated to obtain a knowledge graph. Simultaneously, the system detects whether a user has triggered an input operation. If an input operation is detected, the initial update information input by the user through the input operation is obtained.

[0059] S202, based on the knowledge graph, perform inference and analysis on the initial update information to obtain the inference and analysis results.

[0060] In this embodiment, the deductive analysis results may include the scope of the impact of the initial update information on multiple technology platforms (i.e., the scope of impact), the update cost affecting multiple technology platforms (i.e., cost-effectiveness), and the risk of the initial update information affecting multiple technology platforms (i.e., the assessed risk).

[0061] In this embodiment, after obtaining the knowledge graph and initial update information, a simulation inference tool is triggered to perform inference analysis on the obtained initial update information using the knowledge graph, and obtain the inference analysis results. For example, the simulation inference tool can be a "What-if" simulation inference tool.

[0062] As an example, in the simulation inference layer of the simulation inference engine, the scope of the impact of initial update information on multiple technology platforms is analyzed using knowledge graphs, as are the update costs of the initial update information on multiple technology platforms and the risks of the initial update information on multiple technology platforms, to obtain the inference analysis results.

[0063] S203, based on knowledge graphs, generates health information to represent the health status of multiple technology platforms.

[0064] In this embodiment, the health information can be used to represent the health status of various technology platforms, whereby the health status can be the current health condition of the technology assets. For example, the health information may include health scores, cost data, and risk lists for various technology platforms, and this health information can be presented in the form of a comprehensive simulation report.

[0065] In this embodiment, a health information prediction model and a knowledge graph are used to predict health information representing the health status of multiple technology platforms. The health information prediction model is trained based on knowledge graph samples and health information samples. Alternatively, health assessments are performed on component nodes in the knowledge graph, cost calculations are performed on the technology stack of the knowledge graph, and risk identification is performed on the knowledge graph to obtain health information representing the health status of multiple technology platforms.

[0066] S204 generates update information for updating nodes across multiple technology platforms, based on health information, demand information from multiple technology platforms, and inductive analysis results.

[0067] In this embodiment, the demand information can be used to represent the needs of various technology platforms for update nodes. For example, the demand information can be a corporate strategic goal, which may include cost reduction and efficiency improvement for the technology platform, as well as enhancing the stability of the technology platform.

[0068] The update information in this embodiment can be used to update nodes across multiple technology platforms. For example, the update information may include a roadmap for updating nodes across multiple technology platforms, as well as control strategies for the technologies corresponding to the nodes. These control strategies could include prohibiting the use of technology A in a new project; this is merely an example and not a specific limitation.

[0069] In this embodiment, after generating health information, if the health information is abnormal, the future process of the updating node is evolved using demand information and deductive processing results to obtain updated information. The abnormal health information can represent at least one technology platform with an abnormal health state among multiple technology platforms. If the health information is normal, real-time data from each technology platform is re-collected, and the re-collected real-time data is correlated and integrated to obtain a new knowledge graph. This process continues until the health information generated based on the new knowledge graph is abnormal. Then, the future process of the updating node is evolved using demand information and deductive processing results to obtain updated information.

[0070] S205, perform the current update on the node based on the updated information.

[0071] In this embodiment, after generating update information, the node is updated based on the update information. As an example, a roadmap for updating the node across multiple technology platforms and the control strategy for the corresponding technology are extracted from the update information. The node is updated according to the roadmap, and during the update, the usage of the corresponding technology is controlled at the node according to the control strategy for the technology corresponding to the node.

[0072] As another example, a roadmap for updating nodes across multiple technology platforms is extracted from the aforementioned update information. A feasibility analysis is then performed on this roadmap. If the feasibility analysis indicates that the roadmap's feasibility is greater than a feasibility threshold, the node is updated according to this roadmap. If the feasibility analysis indicates that the roadmap's feasibility is less than or equal to the feasibility threshold, the roadmap is adjusted, and the node is updated according to the adjusted roadmap. This achieves the goal of accommodating node updates across multiple technology platforms.

[0073] The aforementioned node update method acquires a knowledge graph representing the dependencies between nodes corresponding to multiple technology platforms, as well as initial node update information; it then performs deductive analysis on the initial update information based on the knowledge graph to obtain the deductive analysis results; based on the knowledge graph, it generates health information representing the health status of multiple technology platforms; based on the health information, the demand information of multiple technology platforms, and the deductive analysis results, it generates update information for updating nodes across multiple technology platforms; and finally, it performs the current update on the node based on the update information. Since the node update process involves generating update information for updating nodes across multiple technology platforms based on the generated health information, the demand information of multiple technology platforms, and the deductive analysis results, and then performing the current update on the node based on this update information, and since the deductive analysis results are obtained by deducing and analyzing the acquired initial update information based on the acquired knowledge graph, and the health information is generated based on the acquired knowledge graph, this method achieves the goal of accommodating node updates across multiple technology platforms, thereby solving the technical problem of high technical costs and achieving the technical effect of reducing technical costs.

[0074] In one exemplary embodiment, such as Figure 3 As shown, step S203 includes steps S301 to S303. Wherein:

[0075] S301 uses a health assessment engine to evaluate the health of component nodes in the knowledge graph and obtain the health status of the component nodes.

[0076] In this embodiment, component nodes can represent technical components corresponding to various technology platforms, and risk identification results can represent risk points in the knowledge graph. For example, these risk points may include technical debt risk points and security vulnerability risk points; these are merely illustrative examples and not specific limitations. In this embodiment, the health assessment engine evaluates the health of component nodes in the knowledge graph to obtain their health status. For example, a health score is assigned to each component node in the knowledge graph to obtain its health score.

[0077] S302 uses a cost accounting engine to calculate the cost of the knowledge graph's technology stack, obtaining the global cost of the technology stack.

[0078] In this embodiment, the cost accounting engine performs cost accounting on the technology stack of the knowledge graph to obtain the global cost of the technology stack. For example, the costs of multiple technology stacks of the knowledge graph are calculated, and the costs of each technology stack are summarized to obtain the global cost.

[0079] S303 determines health information based on knowledge graphs, health status, and global cost.

[0080] In this embodiment, health information is determined based on the knowledge graph, health score, and global cost. For example, the health score and global cost are used as health information, or a weighted fusion of the health score and global cost is performed to obtain a weighted fusion value as initial health information. If the difference between the health score corresponding to the knowledge graph and the initial health information is less than a preset difference, the initial health information is determined as health information; if the difference between the health score corresponding to the knowledge graph and the initial health information is greater than or equal to a preset difference, the health score corresponding to the knowledge graph is determined as health information.

[0081] In this embodiment, since the health information is determined based on knowledge graph, health level, and global cost, it plays a role in ensuring the reliability of the source of health information and achieves the technical effect of improving the accuracy of health information.

[0082] Based on the above embodiments, as an optional implementation method, step S303 includes: performing risk identification on the knowledge graph through a risk identification engine to obtain the risk identification result of the knowledge graph; and determining health information based on health level, global cost, and risk identification result.

[0083] In this embodiment, a risk identification engine is used to identify risks in the knowledge graph, resulting in risk identification results. For example, technical debt risk points and security vulnerability risk points are identified from the knowledge graph, and these identified risk points constitute the risk identification results.

[0084] In this embodiment, health information is determined based on health level, global cost, and risk identification results. For example, the aforementioned health level, global cost, and risk identification results are determined as health information; or, the aforementioned health level, global cost, and risk identification results are weighted and fused to obtain a weighted fused value of the three as health information.

[0085] In this embodiment, since the health information is determined based on health status, global cost, and risk identification results, it plays a role in ensuring the reliability of the source of health information and achieves the technical effect of improving the accuracy of health information.

[0086] Based on the above embodiments, as an optional implementation method, step S202 includes: using knowledge graph analysis to determine the scope of the impact of initial update information on multiple technology platforms and obtaining a first analysis result; using knowledge graph analysis to determine the impact of initial update information on the update costs of multiple technology platforms and obtaining a second analysis result; and using knowledge graph analysis to determine the risks of initial update information impacting multiple technology platforms and obtaining a third analysis result.

[0087] In this embodiment, the analysis results may include a first analysis result, a second analysis result, and a third analysis result. The first analysis result can represent the scope of the impact of the analyzed initial update information on multiple technology platforms; the second analysis result can represent the impact of the analyzed initial update information on the update costs of multiple technology platforms; and the third analysis result can represent the risks of the analyzed initial update information impacting multiple technology platforms.

[0088] In this embodiment, after obtaining the knowledge graph and initial update information, the knowledge graph is used to analyze the scope of the impact of the initial update information on multiple technology platforms in the three parallel simulation layers of the simulation inference engine to obtain the first analysis result; the knowledge graph is used to analyze the update cost of the initial update information on multiple technology platforms to obtain the second analysis result; and the knowledge graph is used to analyze the risk of the initial update information on multiple technology platforms to obtain the third analysis result.

[0089] In other words, since the above three parallel simulation layers include: the impact scope analysis layer, the cost-benefit analysis layer, and the risk assessment layer, the impact scope analysis layer uses knowledge graph analysis to determine the scope of the impact of initial update information on the application nodes, team nodes, and dependencies of various technology platforms, resulting in the first analysis result. The cost-benefit analysis layer uses knowledge graph analysis to determine the impact of initial update information on the human resource costs and long-term maintenance benefits of upgrading various technology platforms, resulting in the second analysis result. Finally, the risk assessment layer uses knowledge graph analysis to determine the technical risks and rollback schemes of initial update information on the upgrading process of various technology platforms, resulting in the third analysis result.

[0090] For example, a simulation engine allows users (e.g., architects) to input hypothetical update conditions or control strategies. The simulation engine then calls upon the underlying technology asset map and analysis model to perform impact scope analysis, cost-benefit analysis, and risk assessment on the initial update information. This yields the analyzed scope of the initial update information's impact on multiple technology platforms, the analyzed risks associated with the initial update information's impact on multiple technology platforms, and the analyzed risks associated with the initial update information's impact on multiple technology platforms. For instance, the analyzed scope of the initial update information's impact on multiple technology platforms could be affecting 15 application nodes and involving 3 team nodes; the analyzed update cost could be an estimated investment of 200 person-days with annual license cost savings of 500,000 yuan; and the analyzed risk could be the high risk of component A being incompatible with the new version.

[0091] In this embodiment, the knowledge graph is used to perform impact range analysis, cost-benefit analysis, and risk assessment on the initial updated information to obtain the inference analysis results. This ensures the richness of the inference analysis results and achieves the technical effect of improving the accuracy of the inference analysis results.

[0092] Based on the above embodiments, as an optional implementation method, step S204 includes: determining the initial policy information of the node from the update information; encoding the initial policy information to obtain encoded policy information; and updating the node according to the encoded policy information during the node deployment phase.

[0093] In this embodiment, the initial strategy information can be used to represent the control strategy for the technology corresponding to the node. For example, the control strategy described above could be a strategy to prohibit the use of technology A in a new project. This is only an example and is not intended to be specific.

[0094] In this embodiment, the encoding strategy information can be used to represent the executable strategy obtained from the encoding process, and the deployment stage can be the CI / CD stage.

[0095] In this embodiment, after generating update information, the initial policy information of the node is extracted from the update information. The initial policy information is then encoded to obtain encoded policy information. For example, the control policy of the technology corresponding to the node is extracted from the update information, and the extracted control policy is encoded into an executable policy.

[0096] In this embodiment, during the node deployment phase, the node is updated according to the encoding strategy information. For example, in the CI / CD phase, the nodes related to technology A are isolated in the knowledge graph according to the executable policy corresponding to "new projects are prohibited from using technology A". That is, the technical components corresponding to the nodes mentioned above are isolated among multiple technology platforms.

[0097] In this embodiment, the node is updated according to the encoding strategy information, which enables dynamic updating of the node and achieves the technical effect of reducing technical costs.

[0098] Based on the above embodiments, as an optional implementation method, the method further includes: after updating the node based on the update information, collecting new platform data corresponding to each technology platform, integrating and processing the multiple new platform data to obtain a new knowledge graph; the new knowledge graph is used to update the node for the next time.

[0099] In this embodiment, after a node completes its current update, new platform data corresponding to each technology platform is re-collected. The new platform data corresponding to each technology platform is then correlated and integrated to obtain a new knowledge graph. Based on the new knowledge graph, the node's new initial update information is analyzed to obtain new analysis results. Based on the new knowledge graph and the new analysis results, new update information for updating the node across multiple technology platforms is generated. The node is then updated again based on this new update information. It should be noted that the specific process of the next update can be found in steps S201 to S205, which pertain to the current update process.

[0100] A dynamic governance system based on enterprise technology capabilities, grounded in real-time data perception and intelligent decision-making, can perform current or future updates on nodes. For example, Figure 4 Here is a structural block diagram of a dynamic governance system for enterprise technology capabilities based on real-time data perception and intelligent decision-making, as shown in one embodiment. Figure 4 As shown, the system may include: a data acquisition and perception layer, an analysis, evaluation and quantification layer, a simulation planning and decision-making layer, and a governance intervention and feedback layer.

[0101] The aforementioned data acquisition and perception layer can automatically connect to and collect platform data from various technology platforms within the enterprise through built-in multi-source data connectors. This platform data can include: code repository data, CI / CD pipeline data, container orchestration platform data, artifact repository data, cloud management platform data, and monitoring system data. The data acquisition and perception layer can then integrate and correlate the collected platform data through a built-in technology asset graph construction module, building a dynamic and visualized knowledge graph of the enterprise's technology assets. This knowledge graph can be used to clearly display the dependencies between technologies, applications, teams, and infrastructure.

[0102] The aforementioned analysis, evaluation, and quantification layer can be used to perform the following steps: Utilizing a health assessment engine to automatically score the health of each technical component (e.g., a database version, a front-end framework) based on preset rules (e.g., version obsolescence, number of security vulnerabilities, and community activity); Utilizing a total cost of ownership (TOO) calculation engine to quantify the global TOO of each technology stack or platform by combining procurement costs, maintenance manpower costs, and resource consumption costs; and Utilizing a risk identification engine to automatically identify at least one of the following risk points: technical debt risk points, single point of failure risk points, license compliance risk points, and security vulnerability concentration risk points, etc.

[0103] The aforementioned simulation planning and decision-making layer can be used to simulate and extrapolate the potential impact of initial information updates based on the knowledge graph and dependencies of technical assets. This includes: impact scope analysis: how many applications and teams will be affected; cost-benefit analysis: what are the migration costs, and how much licensing fee can be saved in the long term; risk assessment: how great are the technical risks during the migration process. This simulation planning and decision-making layer can also be used to combine the results of the first, second, and third analyses, outputting the combined results as a comprehensive simulation report. The content of this comprehensive simulation report can be output in the form of a display box, containing key conclusions. For example, the content of the comprehensive simulation report could be: "Total impact: High, Cost-benefit: Positive in the medium to long term, Risk: Medium to high (component A compatibility issues need to be resolved first)." This is only an example and not a specific limitation.

[0104] The aforementioned governance intervention and feedback layer can be used to automatically generate actionable, phased technology evolution roadmap recommendations based on corporate strategic goals, the current health status of technology assets, and the results of extrapolation and analysis. The technology evolution roadmap recommendations can also be dynamically adjusted based on feedback data from the technology platform.

[0105] In summary, the following steps can be executed through the enterprise technology capability dynamic governance system based on real-time data perception and intelligent decision-making:

[0106] Step 1: Continuously collect platform data from various technology platforms.

[0107] After continuously collecting platform data from various technology platforms, step two is executed: constructing and dynamically updating the knowledge graph of technology assets.

[0108] After constructing and dynamically updating the knowledge graph of the technology assets, proceed to step three to conduct a health, cost, and risk assessment of the knowledge graph.

[0109] If risks / optimization points are identified, proceed to step four to evaluate governance options and develop decisions and roadmaps in the What-if simulation. If no risks / optimization points are identified, return to step one.

[0110] After making decisions and developing a roadmap, proceed to step five, which involves implementing control strategies through automated means such as CI / CD access control.

[0111] After implementing the control strategy through automated means such as CI / CD access control, proceed to step six: monitor the control effect and collect feedback data from the technology platform.

[0112] In this embodiment, since the knowledge graph is dynamically generated, it can be used to dynamically deduce and analyze the initial updated information, thereby improving the accuracy of the deduction and analysis results.

[0113] In this embodiment, the text object to be corrected is determined from each editable text object based on the similarity of each editable text object. This ensures the effectiveness of screening the text object to be corrected and achieves the technical effect of improving the accuracy of the text object to be corrected.

[0114] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.

[0115] Based on the same inventive concept, this application also provides an apparatus for implementing the node update method described above. The solution provided by this apparatus is similar to the implementation described in the above method; therefore, the specific limitations in one or more node update apparatus embodiments provided below can be found in the limitations of the node update method described above, and will not be repeated here.

[0116] In one exemplary embodiment, such as Figure 5 As shown, a node update device is provided, including: an acquisition module 51, a deduction module 52, a first generation module 53, a second generation module 54, and an update module 55, wherein:

[0117] The acquisition module 51 is used to acquire a knowledge graph that represents the dependency relationships between nodes corresponding to various technology platforms, as well as the initial update information of the nodes.

[0118] The inference module 52 is used to perform inference analysis on the initial updated information based on the knowledge graph and obtain the inference analysis results.

[0119] The first generation module 53 is used to generate health information representing the health status of multiple technology platforms based on a knowledge graph.

[0120] The second generation module 54 is used to generate update information for updating nodes across multiple technology platforms based on health information, demand information from multiple technology platforms, and inference analysis results.

[0121] Update module 55 is used to perform the current update on the node based on the update information.

[0122] Based on the above embodiments, the first generation module 53 includes:

[0123] The evaluation unit is used to evaluate the health of component nodes in the knowledge graph through the health evaluation engine, and obtain the health of the component nodes.

[0124] The cost accounting unit is used to perform cost accounting on the technology stack of the knowledge graph through the cost accounting engine to obtain the global cost of the technology stack;

[0125] The unit is defined to determine health information based on knowledge graph, health status, and global cost.

[0126] Based on the above embodiments, the determining unit includes:

[0127] The identification subunit is used to identify risks in the knowledge graph through the risk identification engine and obtain the risk identification results of the knowledge graph.

[0128] Define sub-units to determine health information based on health status, global cost, and risk identification results.

[0129] Based on the above embodiments, the above-mentioned deduction module 52 includes:

[0130] The first inference unit is used to analyze the scope of the impact of the initial update information on the technology platform using the knowledge graph, and obtain the first analysis result;

[0131] The second deduction unit is used to analyze the impact of initial update information on the update cost of the technology platform using knowledge graph analysis, and to obtain the second analysis result;

[0132] The third inference unit is used to analyze the risks of initial update information affecting the technology platform using knowledge graphs, and obtain the third analysis result.

[0133] Based on the above embodiments, the update module 54 includes:

[0134] The determining unit is used to determine the initial strategy information of a node from the updated information;

[0135] The encoding unit is used to encode the initial policy information to obtain encoded policy information;

[0136] The update unit is used to perform the current update on the node according to the encoding strategy information during the node deployment phase.

[0137] Based on the above embodiments, the device further includes:

[0138] The integration module is used to collect new platform data corresponding to various technology platforms after the current update of the node based on the updated information, integrate and process the data from multiple new platforms to obtain a new knowledge graph; the new knowledge graph is used to update the node for the next time.

[0139] The node update device provided in this embodiment can execute the above method embodiment, and its implementation principle and technical effect are similar, so it will not be described again here.

[0140] Each module in the aforementioned data response device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the memory of a computer device as software, so that the processor can invoke and execute the operations corresponding to each module.

[0141] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 6As shown, the computer device includes a processor, memory, input / output interfaces, a communication interface, a display unit, and an input device. The processor, memory, and input / output interfaces are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interfaces. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The input / output interfaces are used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When the computer program is executed by the processor, it implements a node update method. The display unit is used to form a visually visible image and can be a display screen, a projection device, or a virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.

[0142] Those skilled in the art will understand that Figure 6 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0143] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps of the node update method in the first aspect described above.

[0144] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps of the node update method in the first aspect described above.

[0145] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps of the node update method in the first aspect described above.

[0146] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.

[0147] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0148] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A node update method, characterized in that, The method includes: Obtain a knowledge graph representing the dependencies between nodes corresponding to multiple technology platforms, as well as the initial update information of the nodes; Based on the knowledge graph, the initial update information is analyzed and deduced to obtain the analysis results. Based on the knowledge graph, health information is generated to represent the health status of the various technology platforms; Based on the health information, the demand information of the various technology platforms, and the inference and analysis results, update information is generated for updating the node among the various technology platforms; The node is updated based on the updated information.

2. The method according to claim 1, characterized in that, The step of generating health information based on the knowledge graph to represent the health status of the various technology platforms includes: The health of the component nodes in the knowledge graph is evaluated by a health assessment engine to obtain the health of the component nodes. The cost of the knowledge graph's technology stack is calculated using a cost accounting engine to obtain the global cost of the technology stack. The health information is determined based on the knowledge graph, the health score, and the global cost.

3. The method according to claim 2, characterized in that, The process of determining the health information based on the knowledge graph, the health score, and the global cost includes: The risk identification engine is used to identify risks in the knowledge graph to obtain the risk identification results of the knowledge graph; The health information is determined based on the health status, the global cost, and the risk identification results.

4. The method according to claim 1, characterized in that, The inference and analysis results include a first analysis result, a second analysis result, and a third analysis result. The inference and analysis based on the knowledge graph of the initial updated information to obtain the inference and analysis results includes: The knowledge graph is used to analyze the extent to which the initial update information affects the multiple technology platforms, thus obtaining the first analysis result; The knowledge graph is used to analyze the impact of the initial update information on the update costs of the various technology platforms, resulting in the second analysis result. The third analysis result is obtained by analyzing the risks of the initial update information affecting the various technology platforms using the knowledge graph.

5. The method according to claim 1, characterized in that, The step of updating the node based on the updated information includes: From the updated information, the initial policy information of the node is determined; The initial strategy information is encoded to obtain encoded strategy information; During the deployment phase of the node, the node is updated according to the encoding strategy information.

6. The method according to any one of claims 1 to 5, characterized in that, The method includes: After the node is updated based on the updated information, new platform data corresponding to each of the technology platforms is collected, and the new platform data is integrated and processed to obtain a new knowledge graph; the new knowledge graph is used to update the node for the next time.

7. A node update device, characterized in that, The device includes: The acquisition module is used to acquire a knowledge graph that represents the dependencies between nodes corresponding to multiple technology platforms, as well as the initial update information of the nodes; The deduction module is used to perform deduction and analysis on the initial update information based on the knowledge graph to obtain the deduction and analysis results. The first generation module is used to generate health information representing the health status of the various technology platforms based on the knowledge graph. The second generation module is used to generate update information for updating the node among the multiple technology platforms based on the health information, the demand information of the multiple technology platforms, and the inference analysis results. The update module is used to perform the current update on the node based on the update information.

8. The apparatus according to claim 7, characterized in that, The first generation module includes: An evaluation unit is used to evaluate the health of component nodes in the knowledge graph through a health evaluation engine, and obtain the health of the component nodes. The cost accounting unit is used to perform cost accounting on the technology stack of the knowledge graph through the cost accounting engine to obtain the global cost of the technology stack. A determining unit is used to determine the health information based on the knowledge graph, the health score, and the global cost.

9. The apparatus according to claim 8, characterized in that, The determining unit includes: The identification subunit is used to identify risks in the knowledge graph through a risk identification engine, and obtain the risk identification result of the knowledge graph. A subunit is defined for determining the health information based on the health level, the global cost, and the risk identification result.

10. The apparatus according to claim 7, characterized in that, The inference and analysis results include the first analysis result, the second analysis result, and the third analysis result; The deduction module includes: The first inference unit is used to analyze the scope of the impact of the initial update information on the technology platform using the knowledge graph, and to obtain the first analysis result; The second inference unit is used to analyze the impact of the initial update information on the update cost of the technology platform using the knowledge graph, and to obtain the second analysis result; The third inference unit is used to analyze the risk of the initial update information affecting the technology platform using the knowledge graph, and obtain the third analysis result.

11. The apparatus according to claim 7, characterized in that, The update module includes: A determining unit is configured to determine the initial strategy information of the node from the updated information; An encoding unit is used to encode the initial strategy information to obtain encoded strategy information; An update unit is used to perform the current update on the node according to the encoding strategy information during the deployment phase of the node.

12. The apparatus according to any one of claims 7 to 11, characterized in that, The device further includes: An integration module is used to collect new platform data corresponding to each of the technology platforms after the node is updated based on the update information, and to integrate and process the multiple new platform data to obtain a new knowledge graph; the new knowledge graph is used to update the node for the next time.

13. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 6.

14. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 6.

15. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 6.