Method for matching leakage current protection parameters in temporary power supply graded protection system
By constructing a three-level protection architecture and hierarchical coordination relationship, and adopting bottom-up calculation logic and iterative adjustment methods, the problem of low efficiency in manual setting of leakage current protection parameters is solved, and automated configuration and safety assurance are achieved.
Patent Information
- Application Number
- CN202611307984.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-26
- Publication Date
- 2026-11-17
AI Technical Summary
Existing standards only provide general requirements for the coordination of leakage current protection parameters, lacking executable automated matching algorithms. This results in low efficiency of manual setting and difficulty in ensuring selectivity, which can easily lead to safety hazards such as over-tripping or protection failure to operate.
A three-level protection architecture is constructed, a hierarchical coordination relationship is set, and a bottom-up calculation logic is used to calculate parameters level by level. The parameters are automatically adjusted through an iterative synchronous adjustment mechanism to ensure that the hierarchical coordination relationship meets the requirements. Hard constraints are introduced to ensure security.
It achieves systematic and automatic matching of leakage current protection parameters, improves configuration efficiency and accuracy, avoids over-level tripping or protection failure to operate, and ensures that the automatic matching results are within the range allowed by safety regulations.
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system relay protection technology. More specifically, this invention relates to a method for matching leakage current protection parameters in a temporary power supply graded protection system. Background Technology
[0002] In temporary power supply projects, the power distribution system typically adopts a three-level distribution and two-level protection architecture. This means that a main distribution box is followed by distribution boxes, and then switch boxes are installed below the distribution boxes, forming a three-level distribution system. Simultaneously, residual current devices (RCDs) are installed in the main distribution box, distribution boxes, and switch boxes, forming a two-level protection system. According to the requirements of standards such as JGJ / T 46-2024 "Safety Technical Standard for Temporary Power Supply at Construction Sites of Building and Municipal Engineering" and GB / T 13955-2017 "Installation and Operation of Residual Current Operated Protective Devices," the rated residual current operating current and rated residual current operating time of each level of RCD should be reasonably coordinated to provide graded and segmented protection. For example, the rated residual current operating current of the RCD in the switch box is generally no more than 30mA, and the rated residual current operating time is no more than 0.1s; the operating current of the RCD in the main distribution box is correspondingly larger, and the operating time is correspondingly longer. The operating time difference between upper and lower level residual current protection devices shall not be less than 0.2s.
[0003] Currently, the determination of parameters for various levels of residual current devices (RCDs) at construction sites mainly relies on manual selection and setting by engineering technicians according to the aforementioned specifications. However, the specifications only provide general matching requirements and do not offer specific algorithms for systematically adjusting parameters when conflicts arise between higher and lower levels or when the hierarchical relationship is not met. This method, which relies on manual experience, is inefficient and prone to improper parameter configuration due to calculation oversights or misjudgments, thus affecting the selectivity of graded protection and potentially leading to safety hazards such as over-level tripping or protection failure to operate. Therefore, there is an urgent need for a method that can automatically match RCD parameters to improve the efficiency and accuracy of parameter setting. Summary of the Invention
[0004] One object of the present invention is to solve at least the above-mentioned problems and to provide at least the advantages that will be described later.
[0005] Another objective of this invention is to provide a method for matching leakage current protection parameters in a temporary power supply graded protection system. This method addresses the problem that existing standards only provide general requirements for the reasonable coordination of leakage current protection parameters at each level, lacking executable automated matching algorithms, which leads to low efficiency and difficulty in ensuring selectivity in manual setting.
[0006] To achieve these objectives and other advantages according to the present invention, a method for matching leakage current protection parameters in a temporary power supply graded protection system is provided, comprising the following steps:
[0007] S1. Construct a three-level protection architecture, which includes three levels: switch box level, distribution box level, and main distribution box level; set the hierarchical coordination relationship between adjacent levels: the rated leakage current I of the upper level 上 With the lower rated leakage operating current I 下 Satisfy I 上 ≥I 下 ×K, Rated leakage current tripping time of the upper level t 上 Compared with the rated leakage current trip time t of the lower level 下 Satisfying t 上 ≥t 下 +ΔT, where K is the preset current level difference coefficient and ΔT is the preset time level difference threshold;
[0008] S2. Obtain the initial leakage protection parameters for each switch box, denoted as (I s ,t s ); where I s t is the rated leakage operating current of the switch box. s This is the rated leakage current trip time of the switch box;
[0009] S3. Calculate I for all switch boxes under the same distribution box. s The maximum value and t in the numerical values s The maximum value among the numerical values is denoted as I. s,max t s,max Set the leakage protection parameters (I) of the distribution box. d ,t d ), I d t is the rated leakage current of the distribution box. d The rated leakage current trip time of the distribution box, and satisfying: I d =min (I s,max ×K, 100 mA), and convert I d Round up to the nearest standard current series value; t d = t s,max +ΔT;
[0010] S4. Calculate I for each of the distribution boxes. d The maximum value and t in the numerical values d The maximum value among the numerical values is denoted as I. d,max t d,max Set the leakage protection parameters (I) of the main distribution box. m ,t m ), I m t is the rated leakage current of the main distribution box. m The rated leakage current trip time of the main distribution box, and satisfying: Im =min (I d,max ×K,300 mA) and convert I m Round up to the nearest standard current series value; t m =t d,max +ΔT;
[0011] S5. Step-by-step adaptive iterative convergence of differential steps: Verify I step by step according to the differential matching relationship in S1. 上 ≥I 下 ×K and t 上 ≥t 下 +ΔT; If the verification passes, the configuration is completed and the parameters are issued; if the verification fails, the rated leakage current parameters of the upper and lower level protection devices that do not meet the hierarchical coordination relationship are iteratively and synchronously adjusted upwards, with the upper limit of 100mA in S3 and 300mA in S4 as the constraint, until all hierarchical coordination relationships meet the requirements; if the upper limit of the specification is reached during the iteration process and convergence is still not possible, an indication that automatic matching is not possible is output.
[0012] Preferably, during the iteration process of step S5, the human body electric shock safety time integral threshold is also used as a hard constraint: the product of the current rated leakage current I of each protection device participating in the iteration and its rated leakage current t must satisfy I×t≤30mA·S.
[0013] If the current protection device's I×t in the iteration reaches or exceeds 30 mA·s, a prompt message is output first, suggesting shortening the length of the lower-level line or optimizing the line layout to reduce the inherent leakage level; if the system still cannot meet the graded matching relationship after outputting the prompt message, the iteration is forcibly terminated and an indication that automatic matching is not possible is output.
[0014] Preferably, in step S2, after obtaining the initial leakage protection parameters (I) of the switch box... s ,t s Prior to this, the process also includes the step of collecting the inherent leakage current under no-load conditions:
[0015] Under no-load conditions when the system is first powered on and no load is applied, the effective value of the inherent leakage current to ground on the outgoing side of each switch box is collected and denoted as I. Ls The I s Set to max (I Bs ,β×I Ls ), where I Bs β is the basic safety threshold determined according to the safety standards of the electricity consumption area, and it is a safety margin coefficient greater than 1.
[0016] Preferably, in step S3, the rated leakage current I of the distribution box is calculated. dPreviously, a correction factor λ for the increase in feeder-to-ground capacitance was introduced, allowing I... Cd =min (I s,max ×K×λ, 100mA), and the I Cd Round up to the standard current series value as I d The value of λ is obtained by referring to a table or by actual measurement based on the total length of the sub-circuit of the distribution box, and λ≥1.
[0017] Preferably, after the configuration is completed, an online verification step for the leakage current protection parameters is also included:
[0018] By integrating a tripless online verification module into each level of protection device, a characteristic frequency signal lower than the rated leakage current of the protection device is injected into the secondary side of the residual current transformer. The actual operating characteristics of the protection device are calculated by measuring the response deviation of the characteristic frequency signal, and the actual operating characteristics are compared with the leakage protection parameters currently configured for the protection device.
[0019] Preferably, after configuration is completed, the process also includes steps for identifying leakage fault types and correcting differential parameters.
[0020] When any level protection device trips due to leakage fault, the residual current waveform characteristic parameters of the protection device before and after the trip are extracted. The waveform characteristic parameters include the current change rate, waveform distortion rate and high frequency component amplitude.
[0021] Based on the waveform characteristic parameters, leakage faults are classified into transient faults and persistent faults:
[0022] If the rate of change of current exceeds the first preset threshold and the amplitude of the high-frequency component exceeds the second preset threshold, it is determined to be a transient fault, and only the fault event is recorded while the current leakage protection parameters remain unchanged.
[0023] If the current change rate is lower than the third preset threshold and the waveform distortion rate exceeds the fourth preset threshold, it is determined to be a persistent fault. If the severity level of the persistent fault exceeds the preset safety threshold, a trip command or alarm signal is output first, and the subsequent parameter correction procedure is stopped. If the severity level of the persistent fault does not exceed the safety threshold, a differentiated parameter correction procedure is triggered: the fault severity level is determined according to the waveform characteristic parameters, and the step size of the iterative synchronous adjustment in step S5 is adaptively determined according to the fault severity level. The higher the fault severity level, the larger the step size. The corrected leakage protection parameters are sent to the protection devices involved in the correction.
[0024] Preferably, after configuration is complete, the process also includes fault coordination recording and cascading judgment steps:
[0025] When the protection device trips due to a leakage fault, record the protection device's operating parameters, the residual current waveform and trend at the moment of operation, and the currently configured leakage protection parameters.
[0026] Using the fault action time window as the association benchmark, the action records of the same fault event at each level are bound across levels to form a three-level fault collaborative record data package;
[0027] If there is an action record at the switch box level, it is determined to be a normal selective protection; if there is no action record at the switch box level but there is an action record at the distribution box level, it is determined to be an over-level trip caused by the failure of the corresponding switch box under the distribution box to operate; if there is no action record at the distribution box level but there is an action record at the main distribution box level, it is determined to be an over-level trip caused by the failure of the corresponding distribution box under the main distribution box to operate.
[0028] Preferably, if the tripping is determined to be an over-level trip, the downstream protection device that failed to operate is marked as faulty and a maintenance alarm is output; the rated leakage current parameter of the upstream protection device is adjusted downward to provide temporary backup protection before the downstream device recovers; the adjustment step size is determined according to an adaptive step size, and the adjusted leakage protection parameter is sent to the protection device involved in the adjustment.
[0029] The present invention has at least the following beneficial effects:
[0030] This invention, by constructing a three-level protection architecture and setting clear hierarchical coordination relationships, transforms the parameter tuning process, which originally relied on manual experience, into a systematic and automatically executable matching process. This effectively avoids the problem of oversights in manual calculations and significantly improves configuration efficiency and accuracy. Simultaneously, it employs a bottom-up calculation logic, using the maximum value of the switch box parameters as a benchmark to calculate the parameters of the next higher level and rounding them up to the standard current series value. This ensures that each level of parameter has a clear hierarchical difference. When the hierarchical difference verification fails, an iterative synchronous adjustment mechanism automatically adjusts until the coordination relationship is met. This algorithm guarantees the selectivity of the graded protection and effectively avoids over-level tripping or protection failure. Furthermore, using the upper limits of 100mA and 300mA as hard constraints for iterative adjustment ensures that the automatic matching results are always within the allowable range of safety regulations, balancing automated configuration with electrical safety.
[0031] Other advantages, objectives and features of the present invention will become apparent in part from the following description, and in part from those skilled in the art through study and practice of the invention. Detailed Implementation
[0032] The present invention will be further described in detail below with reference to embodiments, so that those skilled in the art can implement it based on the description.
[0033] This invention discloses a method for matching leakage current protection parameters in a temporary power supply graded protection system, comprising the following steps:
[0034] S1. Construct a three-level protection architecture, which includes three levels: switch box level, distribution box level, and main distribution box level; set the hierarchical coordination relationship between adjacent levels: the rated leakage current I of the upper level 上 With the lower rated leakage operating current I 下 Satisfy I 上 ≥I 下 ×K, Rated leakage current tripping time of the upper level t 上 Compared with the rated leakage current trip time t of the lower level 下 Satisfying t 上 ≥t 下 +ΔT, where K is the preset current level difference coefficient and ΔT is the preset time level difference threshold;
[0035] S2. Obtain the initial leakage protection parameters for each switch box, denoted as (I s ,t s ); where I s t is the rated leakage operating current of the switch box. s This is the rated leakage current trip time of the switch box;
[0036] S3. Calculate I for all switch boxes under the same distribution box. s The maximum value and t in the numerical values s The maximum value among the numerical values is denoted as I. s,max t s,max Set the leakage protection parameters (I) of the distribution box. d ,t d ), I d t is the rated leakage current of the distribution box. d The rated leakage current trip time of the distribution box, and satisfying: I d =min (I s,max ×K, 100 mA), and convert I d Round up to the nearest standard current series value; t d = t s,max +ΔT;
[0037] S4. Calculate I for each of the distribution boxes. d The maximum value and t in the numerical values d The maximum value among the numerical values is denoted as I. d,max t d,max Set the leakage protection parameters (I) of the main distribution box. m ,t m ), I mt is the rated leakage current of the main distribution box. m The rated leakage current trip time of the main distribution box, and satisfying: I m =min (I d,max ×K,300 mA) and convert I m Round up to the nearest standard current series value; t m =t d,max +ΔT;
[0038] S5. Step-by-step adaptive iterative convergence of differential steps: Verify I step by step according to the differential matching relationship in S1. 上 ≥I 下 ×K and t 上 ≥t 下 +ΔT; If the verification passes, the configuration is completed and the parameters are issued; if the verification fails, the rated leakage current parameters of the upper and lower level protection devices that do not meet the hierarchical coordination relationship are iteratively and synchronously adjusted upwards, with the upper limit of 100mA in S3 and 300mA in S4 as the constraint, until all hierarchical coordination relationships meet the requirements; if the upper limit of the specification is reached during the iteration process and convergence is still not possible, an indication that automatic matching is not possible is output.
[0039] In the above technical solution, when implementing this method, a three-level protection architecture is first constructed, which includes a switch box level, a distribution box level, and a main distribution box level. The main distribution box can be located at the beginning of the temporary power supply and distribution line, the distribution boxes can be located at each branch node of the power supply and distribution line, and the switch box can be located at the end of the outgoing line from the distribution box to each electrical device. The protection devices at each level can be connected through a communication bus to realize parameter distribution and status reporting.
[0040] After the architecture is built, the hierarchical coordination relationship between adjacent levels is set. This hierarchical coordination relationship includes the coordination of rated leakage current and rated leakage time. The hierarchical coefficient K of the rated leakage current can be between 1.5 and 2.5, preferably 2. The specific value can be adaptively adjusted according to the power supply distance, load type and number of equipment at the construction site. The hierarchical threshold ΔT of the rated leakage time can be between 0.1s and 0.3s, preferably 0.2s.
[0041] Subsequently, the initial leakage current protection parameters for each switch box are obtained, including the rated leakage current I of that switch box. s and rated leakage current action time t s I s and t sThe value can be predetermined by technicians based on the environmental conditions of the power consumption area. Generally, 30mA can be used in normal environments, 15mA in humid environments, and 10mA in particularly humid environments. s A time of 0.1s is generally acceptable. This initial parameter can be obtained through input via a human-computer interaction interface, reading from storage media, or being sent by the higher-level system.
[0042] After acquiring the initial parameters of the switch box, the I0 of all switch boxes under the same distribution box is calculated using the data acquisition unit or centralized controller installed at the distribution box. s The maximum value I in the numerical value s,max and t s The maximum value t in the numerical values s,max Next, the leakage protection parameters of the distribution box are set, including the rated leakage operating current I of the distribution box. d and rated leakage current action time t d I d Formula I d =min(I s,max The calculation is performed using the formula (×K, 100mA), and the result is rounded up to the nearest standard current series value. This standard current series conforms to GB / T 22710 and can include 6mA, 10mA, 30mA, 100mA, 300mA, 500mA, and 1A. For example, when the calculated value is 60mA, it is rounded up to 100mA; when the calculated value is 130mA, it is rounded up to 100mA because the upper limit is 100mA. d The value is t s,max The sum of ΔT and ΔT. The leakage protection parameters of this distribution box can be transmitted via the communication bus and stored inside the protection device of the distribution box.
[0043] Subsequently, the I of each distribution box was calculated using the monitoring unit installed at the main distribution box. d The maximum value I in the numerical value d,max and t d The maximum value t in the numerical values d,max And set the leakage protection parameters of the main distribution box, including the rated leakage operating current I of the main distribution box. m and rated leakage current action time t m I m Formula I m =min(I d,max Calculate (×K, 300mA) and round the result up to the nearest standard current series value; t m The value is t d,max The sum of ΔT and ΔT. The leakage current protection parameters of the main distribution box can be stored in the internal memory of the protection device in the main distribution box.
[0044] After completing the above parameter calculations, the adaptive iterative convergence step is initiated. Following the hierarchical coordination relationship set in S1, the system verifies whether Iupper ≥ Ilower × K and tupper ≥ tlower + ΔT hold true, starting from the switch box level and proceeding upwards. If the parameter relationships between all adjacent levels meet the above conditions, the verification passes. At this point, the leakage protection parameters for each level are sent to the corresponding protection devices for configuration. If one or more levels do not meet the requirements, the verification fails. In this case, constrained by the upper limit of 100mA for the distribution box and 300mA for the main distribution box, the rated leakage current parameters of the upper and lower level protection devices that do not meet the hierarchical coordination relationship are iteratively and synchronously adjusted upwards. The rated leakage current at the switch box level should not exceed the limit specified in its safety standard during the adjustment process. The step size for each adjustment can be 5mA or 10mA, which can be selected based on the system scale or accuracy requirements, until all hierarchical coordination relationships meet the requirements. If, during the iteration process, the rated leakage current of a certain level of protection device reaches the upper limit of the specification and the level coordination relationship is still not satisfied, the iteration will stop and an indication that automatic matching is not possible will be output. This indication can be issued by an audible and visual alarm, displayed on a screen, or sent to the management terminal via a wireless communication module.
[0045] Through the above steps, this method transforms the setting process of leakage current protection parameters at all levels in temporary power systems from traditional manual experience-based judgment to a systematic automatic calculation process, effectively avoiding improper parameter configuration caused by human calculation oversights or judgment errors. This method adopts a bottom-up, hierarchical calculation logic, using the actual parameters of the terminal switch box as a benchmark to progressively calculate the parameters of the next higher level, ensuring the initial guarantee of the hierarchical coordination relationship between parameters at each level during the calculation stage. Based on this, through the iterative synchronous adjustment mechanism of S5, when verification reveals that the hierarchical difference is not met, the parameters are automatically adjusted until the coordination requirements are met. From an algorithmic perspective, this ensures that protection devices at all levels can operate according to the preset hierarchical sequence when a fault occurs, avoiding cascading tripping or protection failure to operate. Simultaneously, this method uses the standard upper limit of 100mA for the distribution box and 300mA for the main distribution box as a hard constraint for iterative adjustment, ensuring that the automatic matching results are always within the range allowed by safety regulations, balancing the convenience of automated configuration with electrical safety. This method can be widely applied to the configuration of protection device parameters in various temporary power supply scenarios such as construction sites, temporary activity venues, and field operations, and has strong engineering practical value.
[0046] In another technical solution, during the iteration process of step S5, the human body electric shock safety time integral threshold is also used as a hard constraint: the product of the current rated leakage current I of each protection device participating in the iteration and its rated leakage time t must satisfy I×t≤30mA·S.
[0047] If the current protection device's I×t in the iteration reaches or exceeds 30 mA·s, a prompt message is output first, suggesting shortening the length of the lower-level line or optimizing the line layout to reduce the inherent leakage level; if the system still cannot meet the graded matching relationship after outputting the prompt message, the iteration is forcibly terminated and an indication that automatic matching is not possible is output.
[0048] In the above technical solution, during the iterative synchronous adjustment process of step S5 according to the aforementioned method, the human body electric shock safety time integral threshold is also used as a hard constraint condition for iteration. The physical meaning of this threshold is that when leakage current flows through the human body, the degree of harm caused depends not only on the magnitude of the current but also on the duration of the current. If the product of these two exceeds a certain limit, it may trigger serious consequences such as ventricular fibrillation. In this embodiment, the safety time integral threshold is set to 30 mA·s, a value determined based on research findings regarding the ventricular fibrillation threshold in GB / T 13870.1 "Effects of Current on Humans and Livestock".
[0049] After each iteration's adjustment, the product of the rated leakage current I and the rated leakage operating time t of the current protection device participating in the iteration is calculated. Here, I is the rated leakage current value of the current protection device participating in the iteration, and t is the corresponding rated leakage operating time value of the protection device. The calculated product is compared with 30 mA·s. If the product does not reach 30 mA·s, the iteration continues normally; if the product reaches or exceeds 30 mA·s, the hard constraint condition is triggered.
[0050] When a hard constraint is triggered, the system first outputs a prompt message. This message can suggest that on-site personnel shorten the length of downstream lines or optimize the line layout to reduce the inherent leakage current level to ground, thereby physically reducing the leakage current and enabling the system to meet the differential coordination requirements at a lower operating current level. This prompt message can be displayed through a human-machine interface located at the main distribution box, which can be placed on the cabinet door; or it can be transmitted to the mobile terminal of on-site management personnel or the upper-level monitoring system via a wireless communication module, which can be integrated into the control unit of the main distribution box.
[0051] After outputting the above prompt message, the system waits for a preset time interval, which can be 30 to 60 seconds. After the wait, the system re-verifies the differential coordination relationship. If, after outputting the prompt message, the system detects that the line leakage level has decreased and the recalculated protection parameters at each level can meet the differential coordination relationship, then the iteration convergence is complete, and the subsequent configuration issuance steps continue. If, after re-verification, the system still cannot meet the differential coordination relationship, that is, the product of I and t of the current protection device is still maintained above 30 mA·s, then the iteration process is forcibly terminated, and an indication that automatic matching is not possible is output. This forced termination indication can adopt the same output method as the indication of termination due to reaching the upper limit of the specification in claim 1, for example, by issuing an alarm through an audible and visual alarm, which can be installed on the top of the casing of the main distribution box or the sub-distribution box; or by displaying the specific termination reason and the current parameter status through the LCD display panel of each protection device.
[0052] By introducing this hard constraint, this method ensures that the combination of rated action parameters of each level of protection device will not exceed the safety limit for electric shock during the automatic parameter matching process. This achieves differential coordination while taking into account the basic requirements for personal safety protection. At the same time, when the iteration terminates due to reaching the threshold, the system has indicated the operable rectification direction to the on-site personnel through prompt information, which helps to fundamentally improve the insulation status and leakage characteristics of the line.
[0053] In another technical solution, in step S2, the initial leakage protection parameters (I) of the switch box are obtained. s ,t s Prior to this, the process also includes the step of collecting the inherent leakage current under no-load conditions:
[0054] Under no-load conditions when the system is first powered on and no load is applied, the effective value of the inherent leakage current to ground on the outgoing side of each switch box is collected and denoted as I. Ls The I s Set to max (I Bs ,β×I Ls ), where I Bs β is the basic safety threshold determined according to the safety standards of the electricity consumption area, and it is a safety margin coefficient greater than 1.
[0055] In the above technical solution, before performing step S2 according to the aforementioned method, the inherent leakage current under no-load conditions is first collected. Inherent leakage current refers to the leakage current to ground generated by the insulation resistance and distributed capacitance of the electrical line when it is energized without load. In temporary power supply sites, lines are usually laid along the ground or on supports, and there is inevitably a certain leakage path between the cable insulation layer and the ground. Coupled with factors such as a humid construction environment and long cables, the inherent leakage current may reach several milliamperes or even more than ten milliamperes. If a fixed safety threshold is directly applied without compensation, the protection device may frequently malfunction even in a fault-free state. Therefore, this method collects data under no-load conditions when the system is first energized and the load has not yet been applied, to ensure that the measurement results reflect the insulation characteristics of the line itself rather than the leakage component introduced by the load equipment.
[0056] In practical operation, first confirm that no electrical loads are connected to the outgoing lines of all switch boxes, i.e., the load switches are in the open position. Then, energize the system to bring all levels of the circuits into an unloaded energized state. On the outgoing line side of each switch box, the effective value of the leakage current to ground for that circuit can be collected using a residual current transformer. The residual current transformer can be installed on the outside of all phase lines and neutral lines on the outgoing line side of the switch box, and its secondary output signal is connected to the data acquisition unit. The data acquisition unit can be located inside the switch box or centrally located at the distribution box. The collected analog signal is filtered and amplified, then converted into a digital quantity by an analog-to-digital converter, and the effective value is calculated to obtain the effective value of the inherent leakage current to ground on the outgoing line side of the switch box, denoted as I. Ls The data acquisition time can last for several power frequency cycles, such as 5 to 10 cycles. The average value of multiple samples is taken as the final I. Ls Values are adjusted to reduce the impact of random interference. The I0 value for each switch box... Ls The value can be stored in the internal memory of the switch box protection device, or it can be uploaded to the monitoring unit of the distribution box or main distribution box via the communication bus for backup.
[0057] The inherent leakage current I of each switch box is obtained. Ls Then, the basic safety threshold I is determined according to the safety standards of the electricity consumption area. Bs This basic safety threshold represents the minimum operating current required for protection against electric shock, without considering inherent leakage in the circuit. According to GB / T 13955-2017 "Installation and Operation of Residual Current Operated Protective Devices," 30mA can be selected for general environments, 15mA for humid environments, and 10mA for particularly humid environments. Based on this, a safety margin factor β is introduced, where β is a value greater than 1, and can be between 1.5 and 2.0, for example, 1.5. β is then compared with I... Ls The product of I BsThe larger of the two values is taken as the rated leakage current I of the switch box. s , that is I s =max(I Bs ,β×I Ls The purpose of this treatment is to ensure that when the inherent leakage current of the line is small, I... s by I Bs The decision is made to maintain the normal sensitivity of the protection device; when the line is long or the environment is humid, resulting in a large inherent leakage current, I s From β×I Ls The decision was made to appropriately increase the setting value to avoid malfunctions caused by normal leakage current. Simultaneously, because the operating current is appropriately increased, the sensitivity to operation when a genuine leakage fault occurs is slightly reduced, which can be compensated for by adjusting the operating time in subsequent steps. The adjusted I... s The value replaces the initial I obtained in the original S2 step. s The value serves as the basis for calculations in subsequent steps S3 to S5.
[0058] Through the above-described steps of collecting and compensating for inherent leakage current under no-load conditions, this method can differentiate the rated leakage current of each switch box according to the actual insulation status of each outgoing circuit. This effectively avoids false tripping of protection devices due to large inherent leakage in the lines, improving the accuracy of protection actions and the continuity of power supply on site. Furthermore, this step only needs to be performed once when the system is first powered on, making it simple to operate, not affecting normal construction progress, and highly practical for engineering applications.
[0059] In another technical solution, in step S3, the rated leakage current I of the distribution box is calculated. d Previously, a correction factor λ for the increase in feeder-to-ground capacitance was introduced, allowing I... Cd =min (I s,max ×K×λ, 100mA), and the I Cd Round up to the standard current series value as I d The value of λ is obtained by referring to a table or by actual measurement based on the total length of the sub-circuit of the distribution box, and λ≥1.
[0060] In the above technical solution, the rated leakage current I of the distribution box is calculated according to step S3 of the aforementioned method. dPreviously, we introduced the feeder-to-ground capacitance increase correction factor λ. In temporary power supply and distribution lines, there is an objective distributed capacitance between the cable conductor and the ground. The magnitude of this distributed capacitance is closely related to factors such as the cable length, cross-sectional area, dielectric constant of the insulation material, and laying method. When the line is energized, this distributed capacitance generates a capacitive current to ground. This current is superimposed on the line's leakage current, causing the residual current value detected by the protection device to be greater than the actual fault leakage current value. As the line length increases, the capacitive current increases accordingly, potentially causing the rated leakage operating current I calculated at the distribution box to increase. d It cannot accurately reflect the actual leakage current situation of the downstream lines, and may even affect the reliability of the differential coordination. Therefore, in calculating I... d Previously, a correction coefficient λ was introduced for I. s,max The product of ×K is amplified and corrected to compensate for the influence of line capacitance current on leakage current detection.
[0061] The value of λ can be obtained by looking up a table or by actual measurement based on the total length of the lines under the distribution box. In the table lookup method, a table corresponding to λ and line length can be pre-established for different voltage levels and cable cross-sections. For example, for a 380V / 220V low-voltage distribution system, λ can be taken as 1.0 when the line length does not exceed 50m; λ can be taken as 1.05 to 1.10 when the line length is 50m to 100m; λ can be taken as 1.10 to 1.20 when the line length is 100m to 200m; and λ can be taken as 1.20 to 1.30 when the line length exceeds 200m. These numerical ranges can be adjusted appropriately according to cable type, cross-section, and laying environment. In the actual measurement method, the actual ground capacitance current value on the outgoing side of the distribution box can be measured using a residual current transformer under no-load conditions. λ is obtained by dividing the measured value by the theoretically calculated value or a reference value. The total length of the lines can be calculated from the cable lengths marked on the construction drawings or obtained through actual on-site measurements. The total length of the lines under the distribution box can be pre-stored in the data storage unit of the distribution box or entered by on-site personnel through a human-machine interface.
[0062] After obtaining λ, the rated leakage current I of the distribution box is calculated according to the modified formula. d . Specifically, let I Cd = min(I s,max ×K×λ, 100mA), where I s,max The maximum rated leakage current of all switch boxes under the same distribution box is given by I, where K is the preset current differential coefficient and λ is the feeder-to-ground capacitance increase correction coefficient. Cd Round up to the nearest standard current series value as the rated leakage current I of this distribution box. dThis standard current series conforms to GB / T 22710 and can include 6mA, 10mA, 30mA, 100mA, 300mA, 500mA, and 1A. For example, when I... s,max When I is 30mA, K is 2, and λ is 1.1, s,max ×K×λ= 66mA, rounded down to I d It is 100mA. The corrected I d Replace the value of I calculated in the original S3 step. d The value of λ serves as the basis for calculations in subsequent steps S4 and S5. The value of λ can be determined during the system initialization phase and remain unchanged during system operation, or it can be periodically updated based on changes in line length or environmental conditions.
[0063] By introducing a feeder-to-ground capacitance increase correction factor λ, this method can compensate and correct the calculated value of the rated leakage current based on the actual length of the lines under the distribution box. This effectively avoids malfunctions of protection devices or improper step coordination caused by large capacitive currents in long lines, improving the accuracy of parameter matching and the reliability of protection actions. This correction factor can be obtained through table lookup or actual measurement, adapting to the actual conditions of different construction sites, and has strong flexibility and engineering practicality.
[0064] In another technical solution, after the configuration is completed, an online verification step for leakage current protection parameters is also included:
[0065] By integrating a tripless online verification module into each level of protection device, a characteristic frequency signal lower than the rated leakage current of the protection device is injected into the secondary side of the residual current transformer. The actual operating characteristics of the protection device are calculated by measuring the response deviation of the characteristic frequency signal, and the actual operating characteristics are compared with the leakage protection parameters currently configured for the protection device.
[0066] In the above technical solution, after configuring and distributing the leakage current protection parameters at each level to each protection device according to the aforementioned method, an online verification step for the leakage current protection parameters can be further performed. The purpose of this online verification step is to test the actual operating characteristics of each level of protection device under normal energized operation to confirm whether the configured parameters have been correctly executed and whether the protection device itself has any performance deviations or faults. Because the equipment operating environment at construction sites is relatively harsh, the actual operating current or operating time of the protection device may deviate from the set value due to factors such as temperature changes, component aging, vibration, or moisture during operation. If not detected and corrected in time, this may affect the reliability of the protection. Therefore, performing online verification periodically or as needed after configuration helps to promptly identify the above-mentioned problems.
[0067] During online verification, a non-tripping online verification module integrated into each level of the protection device is used to inject a characteristic frequency signal into the secondary side of the residual current transformer of the protection device. The frequency of this characteristic frequency signal should be clearly distinct from the power frequency of 50Hz and its integer multiples to avoid confusion with the power frequency leakage current signal in the line. For example, a specific frequency within the range of 100Hz to 500Hz can be selected, preferably 200Hz. The amplitude of the characteristic frequency signal should be lower than the rated leakage current of the protection device to ensure that the injected signal does not cause the protection device to malfunction. Specifically, the current amplitude of the characteristic frequency signal can be set between 30% and 70% of the rated leakage current of the protection device. For example, when the rated leakage current is 100mA, the amplitude of the injected signal can be a fixed value between 30mA and 70mA, preferably 50mA. The trip-free online verification module can include a signal generation unit and a signal coupling unit. The signal generation unit can be integrated into the control circuit board of the protection device, and the signal coupling unit can be connected between the output terminal of the secondary side of the residual current transformer and the signal processing unit. The signal injection time can last for several power frequency cycles, such as 200ms to 500ms, to ensure that the signal processing unit has sufficient sampling data for analysis.
[0068] Simultaneously with the injection of a characteristic frequency signal, the response signal of this characteristic frequency signal after passing through the residual current transformer and the detection circuit of the protection device is measured by the signal acquisition and processing unit. Since the transmission characteristics of the residual current transformer and the amplitude-frequency characteristics of the protection device's detection circuit exhibit different responses at different frequencies, the measured operating characteristics of the protection device under the current state can be calculated by comparing the amplitude changes and phase shifts between the injected signal and the response signal. These characteristics include the measured operating current value and the measured operating time value. Specifically, a bandpass filter can be set in the signal processing unit of the protection device. The center frequency of this bandpass filter is consistent with the frequency of the characteristic frequency signal, and it is used to extract the characteristic frequency response component from the mixed signal containing power frequency components and various noises. By performing amplitude demodulation and phase demodulation on the extracted response component, the gain and delay characteristics of the protection device's detection circuit at the current frequency can be obtained. By comparing these gain and delay characteristics with the reference characteristics stored in the protection device's factory calibration or historical verification, the offset of the current measured operating current relative to the rated operating current and the offset of the measured operating time relative to the rated operating time can be calculated. The calculation process can be completed by the microprocessor integrated in each level of protection device, or the collected response signal can be uploaded to the central processing unit of the main distribution box for centralized calculation.
[0069] The calculated measured operating characteristics are compared with the rated leakage protection parameters currently configured for the protection device. If the deviation between the measured operating current and the rated operating current is within the allowable range, and the deviation between the measured operating time and the rated operating time is also within the allowable range, the verification is considered successful, and the protection device is in normal condition. If either deviation exceeds the allowable range, the verification is considered unsuccessful, and an alarm message can be output to prompt on-site personnel to inspect or recalibrate the protection device. Through the above-mentioned non-tripping online verification steps, the actual operating characteristics of protection devices at all levels can be periodically or as needed without interrupting power supply or causing malfunctions in the protection devices. This helps to promptly detect performance degradation caused by component aging or environmental factors, improving the long-term reliability and safety of temporary power systems. This online verification step can be executed automatically as a routine self-test procedure after system startup, or it can be manually triggered by on-site personnel through the operating interface.
[0070] In another technical solution, after configuration is completed, the steps of identifying leakage fault types and correcting differential parameters are also included:
[0071] When any level protection device trips due to leakage fault, the residual current waveform characteristic parameters of the protection device before and after the trip are extracted. The waveform characteristic parameters include the current change rate, waveform distortion rate and high frequency component amplitude.
[0072] Based on the waveform characteristic parameters, leakage faults are classified into transient faults and persistent faults:
[0073] If the rate of change of current exceeds the first preset threshold and the amplitude of the high-frequency component exceeds the second preset threshold, it is determined to be a transient fault, and only the fault event is recorded while the current leakage protection parameters remain unchanged.
[0074] If the current change rate is lower than the third preset threshold and the waveform distortion rate exceeds the fourth preset threshold, it is determined to be a persistent fault. If the severity level of the persistent fault exceeds the preset safety threshold, a trip command or alarm signal is output first, and the subsequent parameter correction procedure is stopped. If the severity level of the persistent fault does not exceed the safety threshold, a differentiated parameter correction procedure is triggered: the fault severity level is determined according to the waveform characteristic parameters, and the step size of the iterative synchronous adjustment in step S5 is adaptively determined according to the fault severity level. The higher the fault severity level, the larger the step size. The corrected leakage protection parameters are sent to the protection devices involved in the correction.
[0075] In the above technical solution, after configuring and distributing the leakage current protection parameters at each level to each protection device according to the aforementioned method, when any level protection device trips due to a leakage current fault, the leakage current fault type identification and differentiated parameter correction steps can be further executed. In temporary power supply sites, the causes of leakage current protection device tripping are diverse, such as lightning overvoltage, impact leakage during the startup of large equipment, moisture-induced aging of cable insulation, and line damage leading to grounding. Different types of faults have different degrees of impact on system safety, and the corresponding response strategies should also differ. If the same parameter adjustment method is used for all tripping events, it may lead to overreaction to transient faults or insufficient response to persistent faults. Therefore, after a trip, the residual current waveform characteristic parameters of the protection device before and after the tripping moment are first extracted to distinguish the nature of the fault.
[0076] The residual current waveform can be acquired through a waveform recording and storage unit internal to the protection device. This unit may include a high-speed sampling analog-to-digital converter and a ring buffer to continuously record residual current waveform data from several cycles before to several cycles after the operation. For example, it can record 5 cycles before to 10 cycles after the operation, with a sampling rate set to 128 or 256 points per power frequency cycle. Feature parameters extracted from the recorded waveform can include the current change rate, waveform distortion rate, and high-frequency component amplitude. The current change rate reflects the drastic change of the residual current over time and can be obtained by calculating the difference between adjacent sampling points, with units of mA / ms. The waveform distortion rate reflects the degree of distortion of the waveform relative to a standard sine wave and can be obtained by calculating the ratio of the effective values of each harmonic to the effective value of the fundamental wave after performing a Fourier transform on the waveform, usually expressed as a percentage. The high-frequency component amplitude reflects the energy of frequency components in the waveform higher than the fundamental frequency and can be obtained by extracting the amplitude of specific frequency bands after bandpass filtering or wavelet transform of the waveform.
[0077] After obtaining the aforementioned waveform characteristic parameters, leakage faults are classified into transient or persistent faults based on these parameters. If the waveform characteristics show a large rate of change of current and a high amplitude of high-frequency components, i.e., the rate of change of current exceeds the first preset threshold and the amplitude of high-frequency components exceeds the second preset threshold, then the fault is determined to be a transient fault. Transient faults are usually caused by lightning strikes, switching overvoltages, or short-term impacts during equipment startup. They are characterized by short duration, steep waveforms, and abundant high-frequency components. The fault current often disappears on its own after the protection device operates. The first preset threshold can be 5mA / ms, and the second preset threshold can be 30% or more of the fundamental amplitude. The specific values can be adjusted based on actual field measurement data. If a transient fault is determined, only the fault event and its waveform data are recorded, keeping the leakage protection parameters of the current protection devices at all levels unchanged, without triggering any parameter correction procedures to avoid unnecessary parameter adjustments affecting the normal operation of subsequent protections. If the waveform characteristics show a small rate of change of current and a high waveform distortion rate, i.e., the rate of change of current is below the third preset threshold and the waveform distortion rate exceeds the fourth preset threshold, then the fault is determined to be a persistent fault. Persistent faults are typically caused by structural factors such as deteriorated line insulation, damp cables, and internal equipment leakage. They are characterized by long duration, severe waveform distortion, and relatively few high-frequency components. The third preset threshold can be set to 2mA / ms, and the fourth preset threshold can be set to 10%. The specific values can also be set according to the site conditions.
[0078] If the fault is determined to be persistent, its severity level is further assessed. The severity level can be determined based on a comprehensive assessment of factors such as waveform distortion rate, residual current amplitude, and the trend of residual current change over a period of time prior to operation. Specifically, multiple severity level thresholds can be set, for example, dividing the severity level into three levels: minor, moderate, and severe. The corresponding waveform distortion rates could be 10% to 20%, 20% to 35%, and over 35%, respectively, or the corresponding effective residual current values could be 1 to 2 times, 2 to 4 times, and over 4 times the rated value, respectively. If the severity level of the persistent fault exceeds a preset safety threshold, which corresponds to the aforementioned "severe" level, a trip command or alarm signal is output first, keeping the activated protection device in the open state and stopping subsequent parameter correction procedures. This is because a severe persistent fault indicates significant insulation damage to the line or equipment, rendering it unsafe for continued operation. In this case, power supply should not be maintained through parameter adjustments but should only be restored after the fault is cleared.
[0079] If the severity level of the persistent fault does not exceed the preset safety threshold, a differentiated parameter correction procedure is triggered. In this correction procedure, the fault severity level is determined based on the extracted waveform characteristic parameters, and the step size for iterative adjustment in step S5 is adaptively determined according to this severity level. Specifically, a larger step size, such as 15mA to 20mA, can be used when the fault severity level is high to allow for rapid parameter adjustment; a smaller step size, such as 3mA to 5mA, can be used when the fault severity level is low for fine-tuning. This step size replaces the default step size value in step S5. The corrected leakage current protection parameters are sent to the protection device involved in the correction. After the correction is completed, the protection device can attempt to reclose the circuit breaker to restore power. If the fault persists after reclosing, and the protection device trips again, the above identification and correction process is repeated until the fault is eliminated or the number of corrections reaches the preset upper limit.
[0080] Through the aforementioned steps of identifying leakage fault types and adjusting differentiated parameters, this method can automatically distinguish between transient and persistent faults based on the physical characteristics of the fault waveform. For transient faults, a "record only, no correction" strategy is adopted to avoid unnecessary parameter adjustments. For persistent faults, they are treated differently according to severity: severe faults are prioritized for isolation and automatic correction is prohibited to ensure safety; minor to moderate faults undergo adaptive parameter adjustments within safety thresholds to maintain power supply continuity as much as possible while ensuring personal and equipment safety. This step endows the protection system with a certain degree of fault self-diagnosis and parameter self-adjustment capabilities, improving the intelligent and refined management level of temporary power systems in dealing with various leakage faults.
[0081] In another technical solution, after configuration is completed, fault collaborative recording and bypass judgment steps are also included:
[0082] When the protection device trips due to a leakage fault, record the protection device's operating parameters, the residual current waveform and trend at the moment of operation, and the currently configured leakage protection parameters.
[0083] Using the fault action time window as the association benchmark, the action records of the same fault event at each level are bound across levels to form a three-level fault collaborative record data package;
[0084] If there is an action record at the switch box level, it is determined to be a normal selective protection; if there is no action record at the switch box level but there is an action record at the distribution box level, it is determined to be an over-level trip caused by the failure of the corresponding switch box under the distribution box to operate; if there is no action record at the distribution box level but there is an action record at the main distribution box level, it is determined to be an over-level trip caused by the failure of the corresponding distribution box under the main distribution box to operate.
[0085] In the above technical solution, after identifying the leakage fault type according to the aforementioned method, or when any level of protection device trips due to a leakage fault, a further fault coordination recording and cascading judgment step is performed. When a protection device trips due to a leakage fault, the fault recording unit inside the protection device automatically records the relevant data of this trip. The recorded data may include the operating parameters of the protection device, such as the actual operating current value and the actual operating time value; the residual current waveform and its trend before and after the operating moment; and the rated leakage operating current and rated leakage operating time currently configured for the protection device.
[0086] The residual current waveform can be acquired through a high-speed sampling module within the protection device. The sampling rate can be set to 128 or 256 points per power frequency cycle, and the recording range can cover 5 cycles before the action to 10 cycles after the action. If the protection device has a superior protection device, a fault notification is sent to the superior device after the action. If the protection device has a subordinate protection device, it queries the subordinate device to see if there are any action records within a preset time window. This preset time window can be based on the current fault action, extending forward by 200ms to backward by 200ms to ensure that action records at all levels belonging to the same fault event can be associated. Communication between protection devices at all levels can be achieved through a communication bus, which can be an RS485 bus or a CAN bus. Each protection device is connected to this bus as a communication node to send fault notifications and query action records.
[0087] After collecting the action records of the protection devices at this level and those at higher and lower levels, the action records of the same fault event at each level are cross-level bound using the fault action time window as the correlation benchmark, forming a three-level fault collaborative record data package. The specific method for cross-level binding is as follows: taking the action time of the protection device that first detects the fault current as the time origin, a correlation time window is set. The width of this correlation time window can be between 200ms and 500ms, for example, 300ms. Within this correlation time window, if the higher or lower level protection devices also have action records, they are bound as correlation records for the same fault event. Time synchronization of the protection devices at each level can be achieved through synchronization signals transmitted in the communication bus, or by calibration using the real-time clock built into each protection device. The time synchronization accuracy can be controlled within 10ms to ensure the accuracy of cross-level binding.
[0088] The three-level fault collaborative recording data package can include action records at the switch box level, distribution box level, and main distribution box level. Each level's action record can include the protection device number, action time, measured action current, measured action time, and a characteristic summary of the residual current waveform before action. This data package can be stored in the memory of the central processing unit located at the main distribution box, or it can be uploaded to a remote monitoring platform or management terminal via a wireless communication module.
[0089] After completing the cross-level binding, the type of fault is determined based on whether there are action records of the protection devices at each level. If there is an action record at the switch box level, it is determined to be normal selective protection. The logic of this determination rule is that the fault point is located within the power supply range of the switch box, the protection device of the switch box operates correctly after the fault occurs, and the fault current is cut off, which meets the design expectation of graded protection, and no additional processing or parameter adjustment is required. If there is no action record at the switch box level but there is an action record at the distribution box level, it is determined to be a cascading trip caused by the failure of the corresponding switch box under the distribution box to operate. The logic of this determination rule is that the fault current has flowed past the switch box level to the distribution box level, indicating that the fault point is located on the outgoing side of the switch box or the side of the electrical equipment protected by the switch box, but the protection device of the switch box failed to operate in time for some reason, forcing the upper-level protection device to operate to cut off the fault. If there is no action record at the distribution box level but there is an action record at the main distribution box level, it is determined to be a cascading trip caused by the failure of the corresponding distribution box under the main distribution box to operate. The logic of this judgment rule is similar to the former. If the fault current has crossed the distribution box level, it indicates that the protection device of that distribution box failed to operate, and backup protection is provided by the protection device of the main distribution box. If multiple levels have operation records simultaneously, the protection device that operated earliest is used as the candidate fault source, because the protection device that operated earliest is closest to the fault point and its detected fault current is the most direct. The above judgment results and fault source candidate location information can be stored together with the three-level fault collaborative recording data package in the memory of the central processing unit and displayed through the human-machine interface for reference by on-site technicians.
[0090] Through the aforementioned fault collaborative recording and cascading determination steps, this method can automatically associate and cross-level bind the action records of the same fault event in protection devices at various levels. Based on the existence of records and the level at which the records exist, it accurately determines the occurrence of cascading tripping and its level of responsibility. This method transforms the relatively vague qualitative description of cascading tripping in traditional concepts into quantifiable determination rules, making fault location more accurate and efficient. It helps technicians quickly identify the levels of protection devices in poor condition and carry out timely maintenance, shortening fault troubleshooting time and improving the fault response capability and maintenance efficiency of temporary power systems.
[0091] In another technical solution, if it is determined to be an over-level trip, the downstream protection device that failed to operate is marked as faulty and a maintenance alarm is output; the rated leakage current parameter of the upstream protection device is adjusted downward to provide temporary backup protection before the downstream device recovers; the adjustment step size is determined according to an adaptive step size, and the adjusted leakage protection parameter is sent to the protection device involved in the adjustment.
[0092] In the above technical solution, after determining that a tripping cascade has occurred according to the aforementioned method, a differentiated processing step following the tripping cascade is executed. This processing step includes two parallel aspects: processing the refusing lower-level protection device and processing the upper-level protection device. When the determination result is that the tripping cascade is caused by the switch box refusing to operate, the refusing lower-level protection device is the corresponding switch box protection device; when the determination result is that the tripping cascade is caused by the distribution box refusing to operate, the refusing lower-level protection device is the corresponding distribution box protection device. After identifying the refusing lower-level protection device, it is first marked as faulty. This fault status can be stored in the non-volatile memory inside the protection device, or it can be stored in the database of the central processing unit located at the main distribution box. Protection devices marked as faulty will be excluded from the normal parameter iteration calculation range in subsequent operation until they are inspected and confirmed to have returned to normal and the fault mark is manually removed by technicians.
[0093] While marking the fault status, a maintenance alarm message is output for the downstream protection device that failed to operate. This alarm message may include the protection device's number, installation location, failure time, measured residual current at the time of the fault, and currently configured rated leakage current operating parameters. The alarm message can be output in several ways: it can be displayed through the human-machine interface of the main distribution box, which can be located on the cabinet door; it can be continuously alarmed via an audible and visual alarm, which can be installed on the top of the main distribution box or on the wall of the control room; or it can be sent to the mobile terminal of the field management personnel or a remote monitoring platform via a wireless communication module, which can be integrated into the control unit of the main distribution box. The alarm message can be continuously displayed or continuously sent until the fault marker is manually cleared, ensuring that field personnel are promptly notified of the failure to operate and can arrange maintenance.
[0094] While marking and alarming the malfunctioning lower-level protection device, the parameters of the upper-level protection device for that malfunctioning lower-level protection device are adjusted downwards. The purpose of this adjustment is to temporarily increase the sensitivity of the upper-level protection device since the lower-level protection device is no longer functioning properly. This allows it to provide faster temporary backup protection before the lower-level protection device recovers, thus enabling faster fault isolation and reducing the scope of the fault's impact when a leakage fault occurs again in that branch. Specifically, the rated leakage current parameter of the upper-level protection device before the fault occurred is used as a reference, and it is adjusted downwards by one or more steps. The step size used for this adjustment is based on the aforementioned step size adaptively determined according to the fault severity level; that is, the step size is related to the current fault severity level. If the fault severity level is high, the step size can be larger, for example, 15mA to 20mA; if the fault severity level is low, the step size can be smaller, for example, 3mA to 5mA. The reduced rated leakage current of the upstream protection device should not be lower than its minimum safe operating limit. This minimum limit can be 1.5 to 2 times the normal leakage current of the line protected by the upstream protection device, so as to ensure that the reduced operating value is still higher than the inherent leakage level of the line under normal operation, and to avoid the protection device from malfunctioning in a fault-free state.
[0095] After the downward adjustment is completed, the corrected rated leakage current parameters are sent to the upstream protection devices involved in the adjustment. This sending process can be achieved through a communication bus, which can be an RS485 bus or a CAN bus. The corrected parameters are encapsulated into configuration frames by the central processing unit of the main distribution box and transmitted to the communication interface of the target protection device through the communication bus. The microprocessor of the target protection device receives the frames and writes them into its internal memory, replacing the original rated leakage current parameters. After the parameters are successfully sent, the target protection device returns an acknowledgment signal to the central processing unit. Upon receiving the acknowledgment signal, the central processing unit records the time of the adjustment operation, the parameter values before and after the adjustment, and the operation result, storing them in its internal memory for future reference. If the parameter sending fails, the central processing unit can resend the configuration frame a preset number of times, such as 3 times. If it still fails to send successfully, a communication fault alarm is output, prompting on-site personnel to check the communication line or manually set the parameters.
[0096] By marking and alarming the refusing-to-operate lower-level protection devices and adjusting the operating values of the upper-level devices accordingly, this method can quickly pinpoint the fault responsibility level after an cascading trip occurs and prompt on-site personnel to conduct targeted maintenance. Simultaneously, by adjusting the operating values of the upper-level protection devices, it provides temporary backup protection, ensuring the system retains a certain degree of leakage current protection capability until the refusing-to-operate device recovers, thus reducing the risk of cascading trips in the event of a recurrence. This differentiated handling approach neither excessively penalizes normally operating upper-level protection devices nor simply ignores refusing-to-operate lower-level protection devices; instead, it adopts targeted countermeasures for each, improving the system's ability to handle cascading trip events and its fault recovery efficiency.
[0097] Example 1
[0098] The temporary power supply system at a construction site adopts a three-level power distribution architecture. The main distribution box is located at the site entrance, the sub-distribution boxes are located at the branch nodes of each construction area, and the switch boxes are located at the outgoing lines from the sub-distribution boxes to each piece of electrical equipment. There are three sub-distribution boxes on the construction site: Sub-distribution box 1, Sub-distribution box 2, and Sub-distribution box 3.
[0099] Distribution box 1 has three sub-boxes, labeled Switch Box A, Switch Box B, and Switch Box C. The power consumption areas of all three switch boxes are in general environments. Based on environmental conditions, the on-site technicians set the initial rated leakage current of all three switch boxes to 30mA and the rated leakage current operating time to 0.1s. The step difference coefficient K is set to 2, the time step difference threshold ΔT is set to 0.2s, and the iterative adjustment step size is set to 5mA. Standard current series values of 6mA, 10mA, 30mA, 100mA, 300mA, and 500mA are used.
[0100] First, the switch box level parameters are obtained. The initial parameters for the three switch boxes are as follows: I of switch box A. s 30mA, t s It is 0.1s; the I of switch box B s 30mA, t s It is 0.1s; the I of switch box C s 30mA, t s The value is 0.1s. Calculate the value of all switch boxes I under the same distribution box. s The maximum value I in the numerical value s,max I of three switch boxes s The values are all 30mA, therefore I s,max The current is 30mA; calculate t. s The maximum value t in the numerical values s,max The three switch boxes of t s The values are all 0.1s, therefore t s,max The value is 0.1s. Then, the leakage protection parameters for distribution box 1 are set. d=min(I s,max ×K, 100mA)=min(30×2,100)=min(60, 100)=60mA, round up to the nearest standard current series value, 60mA is between 30mA and 100mA, after rounding up I d It is 100mA. d =t s,max + ΔT=0.1+0.2=0.3s. The initial settings for the leakage current protection parameters of distribution box 1 are: rated leakage current 100mA and rated leakage current action time 0.3s. The initial parameters of the switch boxes under distribution box 2 and distribution box 3 are the same as those of distribution box 1, and their respective I... d Both are 100mA, t d Both were 0.3s.
[0101] Calculate all distribution boxes I d The maximum value I in the numerical value d,max I of distribution boxes 1, 2, and 3 d The values are all 100mA, therefore I d,max 100mA; calculate t d The maximum value t in the numerical values d,max The three distribution boxes' t d The values are all 0.3s, therefore t d,max The time is 0.3s. Then, set the leakage protection parameters for the main distribution box. m =min(I d,max ×K, 300mA)=min(100×2, 300) = min(200, 300)=200mA, round up to the nearest standard current series value, 200mA is between 100mA and 300mA, after rounding up I m It is 300mA. m =t d,max +ΔT=0.3+0.2=0.5s. The initial settings for the leakage current protection parameters of the main distribution box are: rated leakage current of 300mA and rated leakage current action time of 0.5s.
[0102] Enter the differential adaptive iterative convergence step. First, verify the differential coordination relationship between distribution box 1 and switch box A. The I of distribution box 1... d For 100mA, the I of switch box A s The current is 30mA, and K is 2. Verify I. 上 ≥ I 下 Does K hold true? If 100 ≥ 30 × 2, then 100 ≥ 60, and therefore holds true. Verify t. 上 ≥ t 下+ Whether ΔT holds true: 0.3 ≥ 0.1 + 0.2, i.e., 0.3 ≥ 0.3, holds true. The hierarchical coordination relationship between distribution box 1 and switch boxes B and C holds true similarly. Next, verify the hierarchical coordination relationship between the main distribution box and distribution box 1. The I of the main distribution box... m For 300mA, the I of distribution box 1 d The current is 100mA, and K is 2. Verify I. 上 ≥ I 下 Does × K hold true? 300 ≥ 100 × 2, i.e., 300 ≥ 200, therefore it holds true. Verify t. 上 ≥ t 下 + ΔT is valid: 0.5 ≥ 0.3 + 0.2, i.e., 0.5 ≥ 0.5, which is valid. The hierarchical coordination relationship between the main distribution box and sub-distribution boxes 2 and 3 is similarly valid. All hierarchical coordination relationships have been verified and no iterative synchronous adjustment is required. The final configuration result is: all three switch boxes are 30mA, 0.1s; all three sub-distribution boxes are 100mA, 0.3s; and the main distribution box is 300mA, 0.5s.
[0103] Under another operating condition, some switch boxes, due to being in a humid environment, may experience initial I... s If set to 15mA, then I s,max 15mA, I d =min(15×2, 100) = 30mA, rounded up to 30mA. At this point, distribution box I... d 30mA, t d The time is 0.3s, and the main distribution box I... m =min(30×2, 300)=60mA, round up to 100mA, tm is 0.5s. Verify the difference: 100mA in the main distribution box ≥ 30mA × 2 = 60mA, which is true; 0.5s ≥ 0.3s + 0.2s = 0.5s, which is true, and the configuration is complete.
[0104] Although embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the specification and embodiments. They can be applied to various fields suitable for the present invention. For those skilled in the art, other modifications can be easily made. Therefore, without departing from the general concept defined by the claims and their equivalents, the present invention is not limited to the specific details and embodiments shown and described herein.
Claims
1. A method for matching leakage current protection parameters in a temporary power supply graded protection system, characterized in that, Includes the following steps: S1. Construct a three-level protection architecture, which includes three levels: switch box level, distribution box level, and main distribution box level. Establish the hierarchical coordination relationship between adjacent levels: the rated leakage current I of the upper level 上 With the lower rated leakage operating current I 下 Satisfy I 上 ≥I 下 ×K, rated leakage current action time of the upper level t 上 Compared with the rated leakage current trip time t of the lower level 下 Satisfy t 上 ≥t 下 +ΔT, where K is the preset current level difference coefficient and ΔT is the preset time level difference threshold; S2. Obtain the initial leakage protection parameters for each switch box, denoted as (I s ,t s ); where I s t is the rated leakage operating current of the switch box. s This is the rated leakage current trip time of the switch box; S3. Calculate I for all switch boxes under the same distribution box. s The maximum value and t in the numerical values s The maximum value among the numerical values is denoted as I. s,max t s,max Set the leakage protection parameters (I) of the distribution box. d ,t d ), I d t is the rated leakage current of the distribution box. d The rated leakage current trip time of the distribution box, and satisfying: I d =min (I s,max ×K, 100 mA) and convert I d Round up to the nearest standard current series value; t d = t s,max +ΔT; S4. Calculate I for each of the distribution boxes. d The maximum value and t in the numerical values d The maximum value among the numerical values is denoted as I. d,max t d,max Set the leakage protection parameters (I) of the main distribution box. m ,t m ), I m t is the rated leakage current of the main distribution box. m The rated leakage current trip time of the main distribution box, and satisfying: I m =min (I d,max ×K,300 mA) and convert I m Round up to the nearest standard current series value; t m =t d,max +ΔT; S5. Step-by-step adaptive iterative convergence of differential steps: Verify I step by step according to the differential matching relationship in S1. 上 ≥I 下 ×K and t 上 ≥t 下 +ΔT; If the verification passes, the configuration is completed and the parameters are issued; if the verification fails, the rated leakage current parameters of the upper and lower level protection devices that do not meet the hierarchical coordination relationship are iteratively and synchronously adjusted upwards, with the upper limit of 100mA in S3 and 300mA in S4 as the constraint, until all hierarchical coordination relationships meet the requirements; if the upper limit of the specification is reached during the iteration process and convergence is still not possible, an indication that automatic matching is not possible is output.
2. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 1, characterized in that, During the iteration process of step S5, the human body electric shock safety time integral threshold is also used as a hard constraint: the product of the current rated leakage current I of each protection device participating in the iteration and its rated leakage current t must satisfy I×t≤30mA·S. If the current protection device's I×t in the iteration reaches or exceeds 30 mA·s, a prompt message is output first, suggesting shortening the length of the lower-level line or optimizing the line layout to reduce the inherent leakage level; if the system still cannot meet the hierarchical matching relationship after outputting the prompt message, the iteration is forcibly terminated and an indication that automatic matching is not possible is output.
3. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 1, characterized in that, In step S2, the initial leakage protection parameters (I) of the switch box are obtained. s ,t s Prior to this, the process also includes the step of collecting the inherent leakage current under no-load conditions: Under no-load conditions when the system is first powered on and no load is applied, the effective value of the inherent leakage current to ground on the outgoing side of each switch box is collected and denoted as I. Ls The I s Set to max (I) Bs ,β×I Ls ), where I Bs β is the basic safety threshold determined according to the safety standards of the electricity consumption area, and it is a safety margin coefficient greater than 1.
4. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 1, characterized in that, In step S3, the rated leakage current I of the distribution box is calculated. d Previously, a correction factor λ for the increase in feeder-to-ground capacitance was introduced, making I Cd =min (I s,max ×K×λ, 100mA), and the I Cd Rounded up to the standard current series value as I d The value of λ is obtained by referring to a table or by actual measurement based on the total length of the sub-circuit of the distribution box, and λ≥1.
5. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 1, characterized in that, After the configuration is completed, the online verification step for leakage protection parameters is also included: By integrating a tripless online verification module into each level of protection device, a characteristic frequency signal lower than the rated leakage current of the protection device is injected into the secondary side of the residual current transformer. The actual operating characteristics of the protection device are calculated by measuring the response deviation of the characteristic frequency signal, and the actual operating characteristics are compared with the leakage protection parameters currently configured for the protection device.
6. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 1, characterized in that, After the configuration is completed, the process also includes steps for identifying leakage fault types and correcting differential parameters: When any level protection device trips due to leakage fault, the residual current waveform characteristic parameters of the protection device before and after the trip are extracted. The waveform characteristic parameters include the current change rate, waveform distortion rate and high frequency component amplitude. Based on the waveform characteristic parameters, leakage faults are classified into transient faults and persistent faults: If the rate of change of current exceeds the first preset threshold and the amplitude of the high-frequency component exceeds the second preset threshold, it is determined to be a transient fault, and only the fault event is recorded while the current leakage protection parameters remain unchanged. If the current change rate is lower than the third preset threshold and the waveform distortion rate exceeds the fourth preset threshold, it is determined to be a persistent fault. If the severity level of the persistent fault exceeds the preset safety threshold, a trip command or alarm signal is output first, and the subsequent parameter correction procedure is stopped. If the severity level of the persistent fault does not exceed the safety threshold, a differentiated parameter correction procedure is triggered: the fault severity level is determined according to the waveform characteristic parameters, and the step size of the iterative synchronous adjustment in step S5 is adaptively determined according to the fault severity level. The higher the fault severity level, the larger the step size. The corrected leakage protection parameters are sent to the protection devices involved in the correction.
7. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 6, characterized in that, After configuration is complete, the process also includes fault coordination recording and cascading judgment steps: When the protection device trips due to a leakage fault, record the protection device's operating parameters, the residual current waveform and trend at the moment of operation, and the currently configured leakage protection parameters. Using the fault action time window as the association benchmark, the action records of the same fault event at each level are bound across levels to form a three-level fault collaborative record data package; If there is an action record at the switch box level, it is determined to be a normal selective protection; if there is no action record at the switch box level but there is an action record at the distribution box level, it is determined to be an over-level trip caused by the failure of the corresponding switch box under the distribution box to operate. If there is no action record at the distribution box level but there is an action record at the main distribution box level, it is determined that the tripping is caused by the failure of the corresponding distribution box under the main distribution box to operate.
8. The method for matching leakage protection parameters in a temporary power supply graded protection system as described in claim 7, characterized in that, If it is determined to be an over-level trip, the downstream protection device that failed to operate is marked as faulty and a maintenance alarm is output. The rated leakage current parameters of the upstream protection device are adjusted downward to provide temporary backup protection before the downstream device recovers. The adjustment step size is determined adaptively, and the adjusted leakage protection parameters are sent to the protection devices involved in the adjustment.