Rotational flow electrolysis control system

By designing the cyclone electrolysis control system, using PLC modules and computers to control motor start and stop, and collecting sensor data, remote control and automated operation in the cyclone electrolysis production environment are realized, and the safety hazards and large number of equipment in the traditional manual operation method are solved. problem, achieving high stability and corrosion resistance.

CN221822357UActive Publication Date: 2024-10-11ZHEJIANG KEFEI TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323104572.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-17
Publication Date
2024-10-11
Estimated Expiration
2033-11-17

AI Technical Summary

Technical Problem

The traditional manual operation method cannot meet the production needs in the cyclone electrolysis production process. Especially when operating electrical equipment in a humid environment, there are safety hazards, and there are a large number of equipment. A remote control system is needed to replace the traditional manual operation mode.

Method used

A cyclone electrolysis control system is designed, including a control cabinet, on-site sensors, solenoid valves and water pumps, with built-in PLC modules, circuit breakers, temperature transmitters, frequency converters, intermediate relays, AC contactors and other electrical components. Through the PLC module The computer controls the start and stop of the motor and collects sensor data to achieve remote control and automated operation.

Benefits of technology

A remote control system with good safety, high stability, simple operation and corrosion resistance is realized, which avoids the risk of electric shock for operators, saves space and reduces costs, and is suitable for applications in cyclonic electrolysis production environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822357U_ABST
    Figure CN221822357U_ABST
Patent Text Reader

Abstract

The utility model discloses a small-sized rotational flow electrolysis control system, which aims at solving the problems of automatic intelligent control and integration of control and power distribution, and is characterized in that the rotational flow electrolysis control system capable of realizing automatic remote control comprises a computer, a PLC (Programmable Logic Controller) module, a circuit breaker, an intermediate relay, a contactor, a water pump and a sensor, an electromagnetic valve and the like; the PLC module and the computer are used for controlling start and stop of the water pump and the electromagnetic valve, processing data collected by the sensor and controlling the high-frequency switching power supply to provide a direct-current power supply for electrolysis. The control component and the power distribution component are installed in the same control cabinet. The rotational flow electrolysis control system has the advantages of being good in safety, small in installation space, good in stability, high in corrosion resistance, easy to operate, free of maintenance, low in energy consumption and the like, and is suitable for application and popularization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of electrical control, and specifically designs a control system which has strong corrosion resistance, simple operation, and can be remotely controlled and is specially designed for cyclone electrolysis. Background Art

[0002] my country is a country with relatively scarce mineral resources. In order to ensure sustainable development and make full use of existing resources, a cyclone electrolysis system has been developed to extract and separate various metals from waste liquid and waste residue. During the cyclone electrolysis process, the production site environment is relatively humid, the electrolytic raw materials are mostly heavy metals, and the solutions are mostly acidic. After volatilization, the air will carry certain weak acid ions, so manual work in the production workshop for a long time is not allowed. However, cyclone electrolysis requires relatively more electrical equipment to be controlled, so the traditional manual operation production method can no longer meet the production needs. This requires the design of a control system with remote operation to replace the traditional manual operation mode. Utility Model Content

[0003] In view of the problems existing in the prior art, the purpose of the utility model is to provide a control system with simple structure, small occupation space, high stability and remote control.

[0004] The above technical purpose of the utility model is achieved through the following technical solutions: the cyclone electrolysis control system includes a control cabinet body and a cabinet door, as well as field sensors, solenoid valves, and water pumps. PLC modules, circuit breakers, temperature transmitters, frequency converters, intermediate relays, AC contactors, thermal relays, 24V DC power supplies, etc. are arranged inside the control cabinet body; touch screens, indicator lights, button panels, conversion switches, and potentiometers are arranged on the outer surface of the cabinet door. The sensors are composed of temperature sensors, flow sensors, liquid level sensors, and DC sensors.

[0005] The cyclone electrolysis control system includes a control cabinet, a sensor, a solenoid valve, and a water pump;

[0006] The control cabinet is composed of a body and a cabinet door, and the control cabinet body and the cabinet door are sealed; electrical components are installed inside the control cabinet, and the electrical components include:

[0007] PLC module; frequency converter; DC 24V switching power supply; temperature transmitter; AC contactor; thermal relay; intermediate relay; transfer switch; indicator light, button; circuit breaker; potentiometer;

[0008] The circuit breakers include a control device main power circuit breaker, a PLC module power circuit breaker, and a water pump power circuit breaker;

[0009] The sensors are installed at the on-site monitoring points to provide signal input and output points, including:

[0010] Temperature sensor input and output points;

[0011] Liquid level sensor output input point position;

[0012] Flow sensor output and input points;

[0013] DC sensor output and input points;

[0014] The solenoid valve is installed at the controlled point on site to provide input and output points, including:

[0015] The input and output points of the main liquid inlet valve;

[0016] Vent valve input and output points.

[0017] Furthermore, the cyclone electrolysis control system further includes the following switches:

[0018] (1) Main switch, 1 in total; (2) Pump main switch: 4 in total; (3) Pump main control power switch, 8 in total; (4) PLC power switch, 1 in total; Control loop main switch, 1 in total; (5) 24-switch power supply and its branch switches, 2 in total; (6) Solenoid valve power switch, 1 in total; (7) Instrument power switch, 1 in total.

[0019] Furthermore, the cyclone electrolysis control system further includes the following control loop:

[0020] (1) 10 water pump control circuits; (2) 11 stop status indicator light circuits; (3) 11 running status indicator light circuits; (4) 5 PLC module output circuits; the intermediate relay of the water pump control circuit is DC220V; the intermediate relay of other circuits is DC24V.

[0021] Furthermore, the total number of AC contactors is 4; the total number of thermal relays is 4; the total number of indicator lights, buttons, and conversion switches is 24 sets, including start buttons and stop buttons, a total of 8; manual / automatic switches, a total of 4; run, stop, and fault indicator lights, a total of 12.

[0022] Furthermore, the total number of the DC 24V switching power supplies is 1 set; the total number of the frequency converters is 2 sets; the total number of the temperature transmitters is 1 set, with a rated working voltage of DC24V; the number of the solenoid valves is 11, with a rated working voltage of AC220V.

[0023] Furthermore, the number of sensors is 13, namely: front liquid tank temperature sensor TE2001, circulation tank temperature sensor TE2002; front liquid delivery pump flow sensor FT2001, solution circulation pump flow sensor FT2002; front liquid tank level sensor LT2001, circulation tank level sensor LT2002, rear liquid tank level sensor LT2003, low level tank level sensor LT2004; electrolytic cell 1# DC sensor AT2001, electrolytic cell 2# DC sensor AT2002, electrolytic cell 3# DC sensor AT2003, electrolytic cell 4# DC sensor AT2004, electrolytic cell 5# DC sensor AT2005.

[0024] Note: This system needs to be used in conjunction with a high-frequency switching power supply, which provides DC power for cyclone electrolysis to achieve the purpose of electrolyzing the solution. However, the high-frequency power supply does not belong to the control system and can only be used as a controlled object.

[0025] The control logic of the cyclone electrolysis system is as follows:

[0026] (1) First, the PLC control system is powered on and initialized. The internal program scans the feedback values ​​of sensors TE2001, TE2002, FT2001, FT2002, LT2001, LT2002, LT2003, LT2004, AT2001, AT2002, AT2003, AT2004, and AT2005 in turn.

[0027] (2) When the LT2001 liquid level (front liquid tank) reaches the set value, 1M (front liquid delivery pump) is started to deliver solution to the circulation tank;

[0028] (3) It is detected that the liquid level of LT2002 (circulation tank) reaches the set value. First, control 6QT1 to be in the open position, and the drain valves 1QT1, 1QT2, 2QT1, 2QT2, 3QT1, 3QT2, 4QT1, 4QT2, 5QT1, and 5QT2 to be in the closed position; then start 2M (solution circulation pump) to transport solution to electrolytic cells 1#, 2#, 3#, 4#, and 5#;

[0029] (4) 2M (solution circulation pump) starts, starts the high-frequency DC switching power supply, and transmits DC power to electrolytic cells 1#, 2#, 3#, 4#, and 5#;

[0030] (5) When the DC power supply output feedback value is greater than 2000A, the electrolysis timing starts. When the time is up, the DC power supply, the circulation pump, and the front liquid pump are turned off;

[0031] (6) During the electrolysis process, when TE2001 (front liquid tank temperature) and TE2002 (circulation tank temperature) reach the set value, valve 6QT2 is started to input the cooling equipment. When TE2001 (front liquid tank temperature) and TE2002 (circulation tank temperature) are lower than the set value, valve 6QT2 is closed to cut off the cooling equipment;

[0032] (7) When too much electrolytic metal is stored in electrolytic cells 1#, 2#, 3#, 4#, and 5#, the electrolytic system can be manually stopped, 1QT2, 2QT2, 3QT2, 4QT2, 5QT2, 1QT1, 2QT1, 3QT1, 4QT1, and 5QT1 can be controlled to be in the open position, 4M (low-level tank delivery pump) can be started to pump the electrolyte in the electrolytic cell into the low-level tank to take out the metal obtained by electrolysis; 1QT2, 2QT2, 3QT2, 4QT2, 5QT2, 1QT1, 2QT1, 3QT1, 4QT1, and 5QT1 can be controlled to be in the closed position; and then the electrolysis can be restarted;

[0033] (8) When it is detected that the liquid level of LT2004 (low-level tank) reaches the set value, 4M (low-level tank delivery pump) is started to pump the solution in the low-level tank into the circulation tank; when the liquid level of LT2004 (low-level tank) is lower than the set value, 4M (low-level tank delivery pump) is turned off;

[0034] (9) When the LT2003 liquid level (rear liquid tank) reaches the set value, start 3M (rear liquid delivery pump) to deliver the solution in the rear liquid tank to the next process; when the LT2003 liquid level (rear liquid tank) is lower than the set value, turn off 3M (rear liquid delivery pump)

[0035] The cyclone electrolysis system described above includes a computer, a PLC module, a circuit breaker and an intermediate relay. The PLC module and the computer are used to control the start and stop of the motor, and the data collected by the sensor is recorded and processed. This system has the advantages of good safety, good stability, simple operation, corrosion resistance, and oxidation resistance. In addition, all control components and distribution components are placed in the same cabinet, which can isolate corrosive liquids and avoid electric shocks during operation. It can also save space and reduce costs. The utility model cyclone electrolysis control system is a simple structure, small space occupation, high stability, good safety, strong corrosion resistance, simple operation, maintenance-free, etc., and is suitable for popularization and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is the power distribution main circuit and control main circuit of the utility model;

[0037] Figure 2 This is a schematic diagram of the control cabinet of the utility model;

[0038] Figure 3 This is the control principle diagram of the variable frequency motor of the utility model;

[0039] Figure 4 This is a common motor control principle diagram of the utility model;

[0040] Figure 5 This is the wiring diagram of the CPU module of the utility model;

[0041] Figure 6 Wiring the PLC module of the utility model Figure 1 ;

[0042] Figure 7 Wiring the PLC module of the utility model Figure 2 ;

[0043] Figure 8 Wiring the PLC module of the utility model Figure 3 ;

[0044] Fig. 9 Wiring the PLC module of the utility model Figure 4 ;

[0045] Fig.10 Wiring the PLC module of the utility model Figure 5 ;

[0046] Fig.11 Wiring the PLC module of the utility model Figure 6 ;

[0047] Fig.12 Wiring the PLC module of the utility model Figure 7 ;

[0048] Fig.13 Wiring the PLC module of the utility model Figure 8 ;

[0049] Fig.14 Terminal wiring for the utility model Figure 1 ;

[0050] Fig.15 Terminal wiring for the utility model Figure 2 ;

[0051] Fig.16 It is the frequency feedback program of the variable frequency motor 1M of the utility model;

[0052] Fig.17 It is the start and stop procedure of the variable frequency motor 1M of the utility model;

[0053] Fig.18 It is the start and stop procedure of the variable frequency motor 2M of the utility model;

[0054] Fig.19 It is the 3M start-stop procedure of the common motor of the utility model;

[0055] Fig. 20 It is the ordinary motor 4M start-stop procedure of the utility model;

[0056] Fig.21 It is the DC power supply voltage feedback program of the utility model;

[0057] Fig. 22 It is the DC power supply current feedback program of the utility model;

[0058] Fig.23 It is the remote start and stop program of the DC power supply of the utility model;

[0059] Fig.24 It is the DC power supply current setting program of the utility model;

[0060] Fig.25 It is the electrolytic cell current feedback program of the utility model;

[0061] Fig.26 The temperature sensor program of the utility model;

[0062] Fig. 27 The electromagnetic flowmeter program of the utility model;

[0063] Fig.28 It is the LT2001 program of the liquid level meter of the utility model;

[0064] Fig.29 It is the LT2002 program of the liquid level meter of the utility model;

[0065] Fig.30 It is the electrolysis time setting program of the utility model;

[0066] Fig.31 It is the electrolysis timing procedure of the utility model;

[0067] Fig.32 To stop the system and confirm the end of electrolysis;

[0068] Fig.33 It is the startup procedure of the main valve 6QT1 of the utility model;

[0069] Fig.34 This is the closing procedure of the main valve 6QT1 of the utility model;

[0070] Fig.35 It is the startup procedure of the cooling valve 6QT2 of the utility model;

[0071] Fig.36 This is the closing procedure of the cooling valve 6QT2 of the utility model;

[0072] Fig.37It is the start-up procedure of the liquid discharge valve of the utility model;

[0073] Fig.38 It is the closing procedure of the drain valve of the utility model;

[0074] Fig.39 It is the flow high and low limit alarm program of the utility model;

[0075] Fig.40 It is the liquid level high limit alarm program of the utility model;

[0076] Fig.41 It is the liquid level low limit alarm program of the utility model;

[0077] Fig.42 It is the current low limit alarm program of the utility model;

[0078] Fig.43 It is the temperature high and low limit alarm program of the utility model;

[0079] Fig.44 It is the motor fault alarm program of the utility model;

[0080] Fig.45 It is the motor disconnection alarm program of the utility model;

[0081] Fig.46 It is the valve failure alarm program of the utility model;

[0082] Fig.47 It is the flow accumulation procedure of the utility model;

[0083] Fig.48 It is the flow clearing procedure of the utility model;

[0084] Fig.49 It is the electricity accumulation procedure of the utility model;

[0085] Fig.50 It is the power clearing procedure of the utility model;

[0086] Fig.51 It is the PID control program of the utility model. DETAILED DESCRIPTION

[0087] The utility model is further described below in conjunction with the drawings of the specification: This embodiment takes 5 electrolytic cells as an example, and the number can be increased in practice.

[0088] A main power distribution diagram of a cyclone electrolysis control system is shown in Figure 1As shown, it consists of the main power distribution circuit and the PLC main circuit, mainly including: 1. 11 circuit breakers; 2. 2 AC contactors; 3. 2 thermal relays; 4. 2 frequency converters; 5. 1 switching power supply; 6. 1 temperature transmitter; 7. Several 24V / 220V intermediate relays; 8. CPU module; 9. Input and output module; 10. Several terminal blocks and fuses; 11. Several indicator lights, conversion switches, and push button switches; 12. Touch screen; 13. Frequency meter; 14. Potentiometer; All components are installed in the control cabinet or on the door panel. The control cabinet layout is shown in the figure below. Figure 2 As shown, it consists of a cabinet door and a cabinet body. Shutters are opened at the back of the cabinet to dissipate heat. Electrical components are installed in the cabinet. Indicator lights, push button switches, transfer switches, frequency meters, potentiometers, touch screens, etc. are installed on the cabinet door. Figure 3 , Figure 4 Complete the wiring of the variable frequency water pump and the ordinary water pump control circuit; Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 , Fig.12 , Fig.13 , Fig.14 , Fig.15 The PLC system wiring is completed.

[0089] Main steps of electrolysis process:

[0090] First: First close the main power circuit breaker and PLC control circuit breaker in the control cabinet, the PLC is powered on, and the CPU is powered on and initialized. Figure 5 is the wiring diagram of PLC-CPU; then Figure 6 , 7 As shown in Figure 13, the measured values ​​of the following numbered thermometers, flowmeters, level meters, and current transformers are transmitted into the PLC through the analog input module: thermometer number: TE2001, TE2002; flowmeter number: FT2001, FT2002; level meter number: LT2001, LT2002, LT2003, LT2004; current transformer number: AT2001, AT2002, AT2003, AT2004, AT2005;

[0091] Second: Fig.28 As shown in the figure, the input signal of LT2001 (liquid level of the front liquid tank) is converted into an actual value through the internal program of the PLC. When the actual value of LT2001 reaches the interlocking value, the program Fig.17 Start 1M (front liquid delivery pump) and use the touch screen to Fig.16 Control the operating frequency of 1M (front liquid delivery pump) to deliver the electrolytic solution in the circulation tank;

[0092] Third: Fig.29 As shown in the figure, the LT2002 (circulation tank liquid level) input signal is converted into an actual value through the PLC internal program. When the LT2002 actual value reaches the interlocking value, the program Fig.33 Control the main valve 6QT1 to be in the open position, and then Fig.38 The procedure shown will close the drain valves 1QT1, 1QT2, 2QT1, 2QT2, 3QT1, 3QT2, 4QT1, 4QT2, 5QT1, 5QT2; then, the procedure Fig.18 Start 2M (solution circulation pump), and control the operating frequency of 1M (front liquid delivery pump) by the touch screen to deliver electrolytic solution to electrolytic cells 1#, 2#, 3#, 4#, and 5#.

[0093] Fourth: Observe the 2M (solution circulation pump) operation signal light through the touch screen. After the light is on, confirm that electrolytic cells 1#, 2#, 3#, 4#, and 5# are full of electrolyte. Fig.23 The program remotely starts the high-frequency DC switching power supply. Fig.24 The program sets the output current of the DC power supply to deliver DC power to electrolytic cells 1#, 2#, 3#, 4#, and 5# for electrolysis. Fig.25 The procedure shown observes the real-time electrolysis current value of the electrolytic cell on the touch screen.

[0094] Fifth: Pass Fig.30 The program sets the electrolysis time, and then Fig.21 , 22 The program feeds back the DC power supply current and voltage to the PLC. When the DC power supply output current value is greater than 2000A Fig.31 The electrolysis timing program shown starts to count and displays the remaining time. When the time is up, the end of electrolysis is output to the touch screen.

[0095] Sixth: When the electrolysis time is up, the PLC system Fig.32 When electrolysis is finished, the system will automatically shut down the DC power supply, 1M (front liquid delivery pump) and 2M (solution circulation pump); if you need to restart the electrolysis system, you must Fig.32 Confirm the end of electrolysis. The procedure must confirm the end of the last electrolysis before resetting 1M (front liquid delivery pump) and 2M (solution circulation pump) and restarting the electrolysis system. If the end of the last electrolysis is not confirmed, the electrolysis system cannot start automatically.

[0096] Seventh: During the electrolysis process, the front tank continuously pumps electrolyte into the circulation tank, and a certain circulation is formed between the circulation tank and the electrolytic tank. When the solution inside the circulation tank is higher than the position of the connection port between the circulation tank and the rear tank, part of the electrolyte in the circulation tank will flow to the rear tank. If the speed of injecting electrolyte into the front tank is greater than the speed of the circulation tank flowing to the rear tank, the liquid level in the circulation tank will be higher than the high-alarm level indicated by the liquid level gauge LT2002, and 1M (front liquid delivery pump) will be automatically closed at this time; after the liquid level in the circulation tank is lower than the high-alarm level indicated by the liquid level gauge LT2002, 1M (front liquid delivery pump) will be reopened; if during this process the liquid level in the rear tank continues to rise, causing the liquid level gauge LT2003 to be greater than the interlocking value, through Fig.19 The program shown automatically starts 3M (rear liquid delivery pump) to deliver the solution in the rear liquid tank to the next process. If the liquid level gauge LT2003 is greater than the high alarm value, 1M (front liquid delivery pump) will be automatically closed. When the liquid level in the rear liquid tank is lower than the high alarm value shown by the liquid level gauge LT2003, 1M (front liquid delivery pump) will be reopened to form an electrolysis cycle in sequence.

[0097] Eighth: Follow the above steps to run the electrolysis system normally.

[0098] Electrolysis Assisted Process

[0099] First: After a certain number of electrolysis cycles, the metal produced by electrolysis will be stored inside electrolytic cells 1#, 2#, 3#, 4#, and 5#. When a certain amount of metal is stored, 1M (front liquid delivery pump), 2M (solution circulation pump), and high-frequency switch power supply are turned off; first, Fig.34 The procedure shown in the figure closes the main valve 6QT1, and then Fig.37 The procedure shown starts the drain valves 1QT1, 1QT2, 2QT1, 2QT2, 3QT1, 3QT2, 4QT1, 4QT2, 5QT1, 5QT2; after making sure that the main valve is in the closed state and the drain valve is in the open state, Fig. 20 The procedure shown in the figure starts 4M (low-level tank delivery pump) to pump the electrolyte in electrolytic cells 1#, 2#, 3#, 4#, and 5# into the low-level tank. After the electrolyte in the electrolytic cell is completely pumped into the low-level tank, the entire system is closed and the electrolytic cell is opened to take out the metal stored inside. After the metal is taken out, Fig.38 Close the drain valves 1QT1, 1QT2, 2QT1, 2QT2, 3QT1, 3QT2, 4QT1, 4QT2, 5QT1, 5QT2; then start the main valve 6QT1, and then the next electrolysis can be carried out.

[0100] Second: During the operation of the electrolysis system, Fig.26The temperature sensor program PLC system monitors that TE2001 (front liquid tank temperature) and TE2002 (circulation tank temperature) have reached high values, and will Fig.35 The cooling valve 6QT2 startup program opens the 6QT2 valve to put the cooling equipment into cooling. When TE2001 (front liquid tank temperature) and TE2002 (circulation tank temperature) are lower than the low alarm value, Fig.36 Cooling valve 6QT2 closing procedure Close the 6QT2 valve to cut off the cooling equipment.

[0101] Third: If the LT2001 (liquid level in the front liquid tank) and LT2002 (liquid level in the circulation tank) instruments are damaged during the operation of the electrolysis system, the interlocking control between the instruments and the water pump can be cut off through the touch screen, and manual control can be performed manually to ensure that the electrolysis is successfully completed before maintenance.

[0102] fourth: Fig.47 It is a flow accumulation program, which counts and displays the accumulated flow of 1M (front liquid delivery pump) and 2M (solution circulation pump); Fig.48 The accumulated flow of 1M (front liquid delivery pump) and 2M (solution circulation pump) can be cleared.

[0103] fifth: Fig.49 It is a power accumulation program that counts and displays the power generated by the direct current delivered by the high-frequency direct current power supply; Fig.50 The power statistics can be cleared.

[0104] sixth: Fig.51 It is a PID control program, the purpose is to control the flow of 1M (front liquid delivery pump) and 2M (solution circulation pump) to be constant, to ensure that the electrolysis process is in a stable state. The control method is as follows: after starting 1M (front liquid delivery pump) and 2M (solution circulation pump), select the PID mode through the touch screen, such as Fig.51 As shown. Fig. 27 The program detects the current flow rate and sets the constant flow rate required for the current work.

[0105] Alarm system:

[0106] First: Through Fig.39The flow rate high and low limit alarm program shown can remotely detect the electrolysis status of the electrolysis system. FT2001 detects the flow rate of 1M (front liquid delivery pump), and FT2002 detects the flow rate of 2M (solution circulation pump). The speed of the flow rate determines the state of electrolysis. The flow rates of 1M (front liquid delivery pump) and 2M (solution circulation pump) can be set manually. The PLC controls the flow rates of 1M (front liquid delivery pump) and 2M (solution circulation pump) through the PID program to keep them consistent with the set values. If the flow rate high and low limit alarm appears, it is necessary to check whether the setting is correct. If it is correct, it proves that there is a fault and the system needs to be stopped for maintenance.

[0107] Second: Through Fig.40 and Fig.41 The liquid level high limit alarm program can remotely detect the liquid level of the front liquid tank, circulation tank, rear liquid tank, and low-level tank. If an alarm message appears, you need to observe the operation of the water pump. If the operation of the water pump is abnormal, you need to stop the system for maintenance;

[0108] Third: Pass Fig.43 The high and low temperature limit alarm program shown can remotely detect the temperature inside the front liquid tank and the circulation tank. If a high temperature alarm occurs, it is necessary to observe whether 6QT2 is started and is in the open position after 30S. If an abnormality occurs, the system needs to be stopped for maintenance; after 6QT2 is in the open position, the alarm information disappears. After a period of time, a low temperature alarm occurs. It is necessary to observe whether 6QT2 is closed and is in the closed position after 30S. If an abnormality occurs, the system needs to be stopped for maintenance; after 6QT2 is in the open position, the alarm information disappears.

[0109] Fourth: Pass Fig.44 The motor fault alarm program shown can remotely detect whether 1M (front liquid delivery pump), 2M (solution circulation pump), 3M (rear liquid delivery pump), and 4M (low-level tank delivery pump) are normal. If an alarm occurs, it is necessary to stop the system to inspect the motor and circuit.

[0110] Fifth: Pass Fig.45 The motor disconnection alarm program shown can remotely detect whether the power supply of 1M (front liquid delivery pump), 2M (solution circulation pump), 3M (rear liquid delivery pump), and 4M (low-level tank delivery pump) is normal. If an alarm occurs, it is necessary to stop the system and repair the line.

[0111] Sixth: Pass Fig.46 The valve fault alarm program shown can remotely detect the status of the main valve 6QT1, cooling valve 6QT2, drain valves 1QT1, 1QT2, 2QT1, 2QT2, 3QT1, 3QT2, 4QT1, 4QT2, 5QT1, 5QT2. If an alarm occurs, the system needs to be stopped to inspect the valve.

[0112] Seventh: During the electrolysis process, Fig.42 The current low limit alarm program shown can detect whether the current in each electrolytic cell meets the electrolysis requirements, and an alarm will be triggered if it is too low.

Claims

1. Cyclone electrolysis control system, characterized by: Including control cabinet, sensor, solenoid valve; Water pump; The control cabinet is composed of a body and a cabinet door, and the control cabinet body and the cabinet door are sealed; electrical components are installed inside the control cabinet, and the electrical components include: PLC module; frequency converter; DC 24V switching power supply; temperature transmitter; AC contactor; thermal relay; intermediate relay; transfer switch; indicator light, button; circuit breaker; potentiometer; The circuit breakers include a control device main power circuit breaker, a PLC module power circuit breaker, and a water pump power circuit breaker; The sensors are installed at the on-site monitoring points to provide signal input and output points, including: Temperature sensor input and output points; Liquid level sensor output input point position; Flow sensor output and input points; DC sensor output and input points; The solenoid valve is installed at the controlled point on site to provide input and output points, including: The input and output points of the main liquid inlet valve; Vent valve input and output points.

2. The cyclone electrolysis control system according to claim 1, characterized in that: Also includes the following switches: Main switch, 1 in total; Pump main switch, 4 in total; Water pump main control power switch, 8 in total; PLC power switch, 1 in total; control circuit main switch, 1 in total; 24 switching power supplies and their branch switches, 2 in total; Solenoid valve power switch, 1 in total; Instrument power switch, 1 in total.

3. The cyclone electrolysis control system according to claim 2, characterized in that: It also includes the following control loops: 10 water pump control circuits; 11 stop status indicator light circuits; 11 operating status indicator light circuits; PLC module output circuit 5; The intermediate relay of the water pump control circuit is DC220V; the intermediate relays of other circuits are DC24V.

4. The cyclone electrolysis control system according to claim 1, characterized in that: The total number of the AC contactors is 4; the total number of the thermal relays is 4.

5. The cyclone electrolysis control system according to claim 1, characterized in that: The total number of indicator lights, buttons and conversion switches is 24 sets; there are 8 start buttons and stop buttons; there are 4 manual / automatic switches; there are 12 running, stop and fault indicator lights.

6. The cyclone electrolysis control system according to claim 1, characterized in that: The total number of the DC 24V switching power supply is 1 set; the total number of the frequency converter is 2 sets.

7. The cyclone electrolysis control system according to claim 1, characterized in that: The total number of the temperature transmitters is 1 set, and the rated working voltage is DC24V; the number of the solenoid valves is 11, and the rated working voltage is AC220V.

8. The cyclone electrolysis control system according to claim 1, characterized in that: The number of sensors is 13, namely: front liquid tank temperature sensor TE2001, circulation tank temperature sensor TE2002; front liquid delivery pump flow sensor FT2001, solution circulation pump flow sensor FT2002; front liquid tank level sensor LT2001, circulation tank level sensor LT2002, rear liquid tank level sensor LT2003, low level tank level sensor LT2004; electrolytic cell 1# DC sensor AT2001, electrolytic cell 2# DC sensor AT2002, electrolytic cell 3# DC sensor AT2003, electrolytic cell 4# DC sensor AT2004, electrolytic cell 5# DC sensor AT2005.

Citation Information

Cited By

  • Automatic control system and method for adjusting solution concentration according to voltage of rotational flow electrolytic cell

    CN121951619A

  • Automatic control device and method for rotational flow electrolysis of powder

    CN122131867A