Filling slope protection structure in frozen earth area under rainfall condition
By designing polyurethane insulation boards, gravel breathable layer and planting soil protective layer on the filling slopes of frozen soil areas, and setting up hydrophobic systems for longitudinal and transverse drainage ditches and seepage trenches, rainfall infiltration and freezing in the frozen soil areas are solved. The impact of melt circulation on slope stability has achieved improvements in slope stability and safety.
Patent Information
- Application Number
- CN202420757478.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-12
AI Technical Summary
The prior art is difficult to effectively reduce the effects of rainfall infiltration and freeze-thaw cycle on the stability of fill slopes in frozen soil areas.
A fill slope structure including polyurethane insulation board, gravel breathable layer and planting soil protective layer was designed, equipped with longitudinal and transverse drainage ditches, seepage troughs and drainage pipes to form a hydrophobic system to guide surface water and to the protective layer Lay geogrids in the middle to prevent soil infiltration.
It effectively reduces the impact of freezing, thawing, and improves the stability and safety of the fill slope. At the same time, the structure is simple and convenient for construction.
Smart Images

Figure CN222065514U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of fill slope protection, in particular to a fill slope protection structure in a frozen soil area under rainfall conditions. Background Art
[0002] As the contradiction between the huge demand for construction land in mountainous areas and the shortage of available land resources becomes increasingly prominent, a large number of land reclamation projects have been formed by cutting mountains and filling ditches. The increasing number of high-fill projects has achieved certain results, but also generated many new technical, theoretical and engineering problems. One of the most prominent core problems in the high-fill construction process is the stability of the high-fill slope. The main factors affecting the stability of the fill slope in frozen soil areas are rainfall infiltration and freeze-thaw cycles.
[0003] At present, the main method for protecting the fill slope surface is to cover it with waterproof materials such as stone and concrete and to plant greening. However, in frozen areas, the existing protection methods cannot effectively reduce the impact of rainfall infiltration and freeze-thaw cycles on the stability of the fill slope. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a fill slope protection structure in a frozen soil area under rainfall conditions which can effectively guide surface water and reduce the influence of frost heave and thaw settlement in the frozen soil area.
[0005] In order to solve the above problems, the utility model describes a fill slope protection structure for frozen soil areas under rainfall conditions, including a slope main body, characterized in that: the slope surface of the slope main body includes an insulation layer composed of a polyurethane insulation board laid from bottom to top, a breathable layer composed of crushed stone and a protective layer composed of planting soil; a plurality of longitudinal drainage ditches are arranged on the slope surface of the slope main body, and a plurality of infiltration grooves are pre-buried; a plurality of transverse drainage ditches are arranged between two adjacent longitudinal drainage ditches; a plurality of infiltration grooves are arranged at the bottom of the breathable layer in the square area formed by the longitudinal drainage ditches and the transverse drainage ditches, and a drainage pipe is fixedly arranged between two adjacent infiltration grooves in front and behind; a drainage channel is arranged at the bottom of the slope of the slope main body; the drainage pipe is connected to the drainage channel.
[0006] The interiors of the longitudinal drainage ditch and the transverse drainage ditch are connected, and both are arranged in the protective layer on the slope.
[0007] The heights of the longitudinal drainage ditch and the transverse drainage ditch are greater than the height of the protective layer.
[0008] The longitudinal drainage grooves and the transverse drainage grooves are both linear.
[0009] A geogrid is laid in the protective layer.
[0010] A grid plate is arranged inside the water seepage trough, the air permeable layer is arranged on the top of the grid plate, and the drainage pipe is arranged on the bottom of the grid plate.
[0011] Compared with the prior art, the utility model has the following advantages:
[0012] 1. The utility model diverts water into different areas by setting longitudinal drainage ditches and transverse drainage ditches on the slope surface. Water that cannot be diverted on the slope surface and water that infiltrates from the soil will flow into the seepage trough through the air permeable layer, and the water inside the seepage trough will flow into the drainage channel through the connected drainage pipe. At the same time, the thermal insulation layer, air permeable layer and protective layer on the slope surface can effectively reduce the influence of "frost heave and thaw sinking" in frozen soil areas, thereby effectively reducing the influence of freeze-thaw cycles and rainfall infiltration on fill slopes, and ensuring the stability and safety of the slopes.
[0013] 2. The utility model has a simple structure and is easy to construct. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings.
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0016] Figure 2 It is a sectional view of the overall structure of the utility model.
[0017] Figure 3 It is a cross-sectional view of the internal structure of the water seepage trough of the utility model.
[0018] In the figure: 1 - main body of the slope; 2 - insulation layer; 3 - breathable layer; 4 - protective layer; 5 - longitudinal drainage ditch; 6 - transverse drainage ditch; 7 - seepage trough; 8 - drainage pipe; 9 - drainage channel; 10 - grating plate. DETAILED DESCRIPTION
[0019] like Figures 1 to 3 As shown, a fill slope protection structure for frozen soil areas under rainfall conditions includes a slope body 1. The slope surface of the slope body 1 includes an insulation layer 2 composed of polyurethane insulation boards laid from bottom to top, a breathable layer 3 composed of crushed stones, and a protective layer 4 composed of planting soil; a plurality of longitudinal drainage ditches 5 are arranged on the slope surface of the slope body 1, and a plurality of infiltration grooves 7 are pre-buried; a plurality of transverse drainage ditches 6 are arranged between two adjacent longitudinal drainage ditches 5; a plurality of infiltration grooves 7 are arranged at the bottom of the breathable layer 3 of the square area formed by the longitudinal drainage ditches 5 and the transverse drainage ditches 6, and a drainage pipe 8 is fixedly arranged between two adjacent infiltration grooves 7 in front and behind; a drainage channel 9 is arranged at the bottom of the slope of the slope body 1; the drainage pipe 8 is connected to the water channel 9, so that the water collected and infiltrated in the infiltration groove 7 can be quickly discharged into the drainage channel 9 through the drainage pipe 8.
[0020] Among them: the heat-insulating layer 2 is made of polyurethane heat-insulating board, which can protect the slope body 1 and prevent it from freezing and thawing; the breathable layer 3 is made of crushed stones, and ventilation is achieved through the gaps between the crushed stones.
[0021] The interiors of the longitudinal drainage ditch 5 and the transverse drainage ditch 6 are connected and are both arranged in the slope protection layer 4 .
[0022] The height of the longitudinal drainage ditch 5 and the transverse drainage ditch 6 is greater than the height of the protective layer 4. The parts of the longitudinal drainage ditch 5 and the transverse drainage ditch 6 protruding from the protective layer 4 play a blocking role on the planting soil, preventing the soil from flowing away with the water flow.
[0023] The longitudinal drainage ditch 5 and the transverse drainage ditch 6 are both in a straight line shape, so that the structure is simple and easy to construct.
[0024] Geogrids are laid in the protective layer 4. Since the protective layer 4 is composed of planting soil, slope protection plants suitable for frozen soil areas can be planted in the planting soil to reduce soil erosion on the slope, achieve vegetation greening, and protect the ecological environment.
[0025] A grid plate 10 is provided inside the water seepage trough 7, a breathable layer 3 is provided on the top of the grid plate 10, and a drainage pipe 8 is provided at the bottom of the grid plate 10. The grid plate 10 is fixed inside the water seepage trough 7, and the grid plate 10 and the breathable layer 3 can prevent the soil from entering the water seepage trough 7 when the soil in the soil infiltrates into the water seepage trough 7, thereby preventing the soil from entering the water seepage trough 7 and clogging the drainage pipe 8.
[0026] Working principle:
[0027] In frozen soil areas, the thermal insulation layer 2, the air permeable layer 3 and the protective layer 4 on the slope of the main body 1 of the slope can effectively reduce the impact of "frost heave and thaw settlement" and ensure the safety and stability of the main body 1 of the slope. Under rainfall conditions, the rainwater on the slope of the main body 1 of the slope will first be drained through the longitudinal drainage ditch 5 and the transverse drainage ditch 6 and flow into the drainage channel 9, while the rainwater falling on the soil between the longitudinal drainage ditch 5 and the transverse drainage ditch 6 will seep into the soil below while flowing along the soil slope, and finally flow away through the longitudinal drainage ditch 5 and the transverse drainage ditch 6 again. When the rainwater seeps downward, when the water content in the soil reaches a certain amount, the soil water content reaches saturation. At this time, the excess seeped water will be filtered by the gravel of the air permeable layer 3 and the grid plate 10 to prevent the soil from being carried into the seepage trough 7 by water and causing the drainage pipe 8 to be blocked. After filtration, the water entering the seepage trough 7 will flow downward through the drainage pipe 8 and flow into the drainage channel 9 for drainage.
Claims
1. A fill slope protection structure in a frozen soil area under rainfall conditions, comprising a slope body (1), characterized in that: The slope surface of the slope body (1) comprises an insulation layer (2) formed of a polyurethane insulation board laid from bottom to top, a breathable layer (3) formed of crushed stone, and a protective layer (4) formed of planting soil; a plurality of longitudinal drainage ditches (5) are provided on the slope surface of the slope body (1), and a plurality of water seepage grooves (7) are pre-buried; a plurality of transverse drainage ditches (6) are provided between two adjacent longitudinal drainage ditches (5); a plurality of water seepage grooves (7) are provided at the bottom of the air permeable layer (3) in a square area formed by the longitudinal drainage ditches (5) and the transverse drainage ditches (6), and a drainage pipe (8) is fixedly provided between two adjacent water seepage grooves (7) in front and behind; a drainage channel (9) is provided at the bottom of the slope of the slope body (1); and the drainage pipe (8) is connected to the drainage channel (9).
2. The fill slope protection structure in frozen soil areas under rainfall conditions as claimed in claim 1, characterized in that: The interiors of the longitudinal drainage ditch (5) and the transverse drainage ditch (6) are connected, and both are arranged in the protective layer (4) on the slope.
3. A fill slope protection structure in a frozen soil area under rainfall conditions as claimed in claim 2, characterized in that: The height of the longitudinal drainage ditch (5) and the transverse drainage ditch (6) is greater than the height of the protective layer (4).
4. A fill slope protection structure in a frozen soil area under rainfall conditions as claimed in claim 3, characterized in that: The longitudinal drainage groove (5) and the transverse drainage groove (6) are both linear.
5. The fill slope protection structure in frozen soil areas under rainfall conditions as claimed in claim 3, characterized in that: A geogrid is laid in the protective layer (4).
6. The fill slope protection structure in frozen soil areas under rainfall conditions as claimed in claim 1, characterized in that: A grid plate (10) is provided inside the water seepage trough (7), the top of the grid plate (10) is provided with the air permeable layer (3), and the bottom of the grid plate (10) is provided with the drainage pipe (8).
Citation Information
Cited By
Safety protection structure for surface mine side slope shallow surface rock mass freeze-thaw damage
CN120575585A
Safety protection structure for freeze-thaw damage of surface layer rock mass of open-pit mine slope
CN120575585B