Super high-rise building construction garbage pipeline
By setting up tube -wall spring shock absorption devices and outsourcing sound insulation cotton in the garbage pipe system construction construction of ultra -high -rise buildings, and a buffer device at the discharge port, it solves the problem of noise and impact force when the garbage pipeline generates noise and impact when the garbage drops. Improve construction safety and environmental friendship.
Patent Information
- Application Number
- CN202420412315.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-03-04
AI Technical Summary
During the construction of super high-rise buildings, the garbage pipes that pass through the pipeline will produce noise and great impact when the garbage falls, affecting the construction safety and environment.
A garbage pipeline system that includes the main pipeline and branch pipelines is designed. The inside of the main pipeline is set with a tube wall spring shock absorption device, the outer parcel is wrapped in sound insulation cotton, and a buffer device is set at the outlet port to absorb the impact.
Effectively reduce the noise and impact when the garbage drops, and improve the safety and environmental friendship of construction.
Smart Images

Figure CN222413873U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a garbage pipeline for super high-rise building construction. Background Art
[0002] At present, most of the garbage pipes used in super high-rise building construction are straight pipes, without buffer deceleration and sound insulation devices, which causes the garbage to collide with the pipe wall and cause noise when it falls, and also causes a large impact on the floor. For this reason, this paper provides a garbage pipe for super high-rise building construction. Utility Model Content
[0003] The utility model aims to provide a garbage pipe for super high-rise building construction which has a simple structure and can effectively solve the impact of garbage pipes.
[0004] The utility model is achieved through the following measures:
[0005] A garbage pipeline for super high-rise building construction, characterized in that it comprises a main pipeline, a branch pipeline connected to the main pipeline is obliquely arranged on one side of the main pipeline near the lower end, a solid garbage collection pool is arranged just below the outlet of the main pipeline, a liquid garbage collection pool is arranged below the outlet of the branch pipeline, the main pipeline runs through the floor slabs of each floor and is further fixed by a pipeline tie hoop, and a corresponding garbage inlet is opened on the main pipeline of each floor;
[0006] The outer sides of the main pipe and the branch pipe are wrapped with sound insulation cotton, the inner side of the main pipe is provided with a plurality of groups of cylinder wall spring shock absorbing devices, and the inner side wall at the outlet of the main pipe is provided with a discharge port buffer device.
[0007] The specific features of the utility model also include:
[0008] The main pipeline comprises a plurality of branch pipelines, and the plurality of branch pipelines are connected to form the main pipeline via pipeline connecting clamps.
[0009] The main pipeline includes a plurality of branch pipelines, and the plurality of branch pipelines are connected to form the main pipeline through flange plates 1. Specifically, adjacent flange plates 1 are connected through bolts.
[0010] The cylinder wall spring shock-absorbing device includes a round tube that matches the inner diameter of the main pipeline, and one end of the round tube is provided with a flange plate 2 that matches the flange plate 1. The flange plate 2 is connected between two adjacent flange plates 1 by bolts. A pair of shock-absorbing parts staggered up and down are provided on the inner wall of the round tube. As another embodiment, when the main pipeline is connected with the pipeline connecting clamp, the flange plate 2 can be replaced with a structure that matches the pipeline connecting clamp.
[0011] The shock absorbing part comprises a fixed block arranged on the inner wall of the circular tube, a buffer part is arranged on one side of the fixed block, the buffer part comprises an arc plate slidably matched with the inner wall of the circular tube, a semicircular block is arranged on the lower side of the arc plate, the outer arc surface of the semicircular block faces the axis of the circular tube, a trapezoidal groove is arranged on the vertical side surface of the semicircular block, the trapezoidal groove comprises a vertical surface and inclined surface 1 on both sides of the vertical surface, and inclined surface 2 corresponding to the inclined surface 1 is arranged at both upper and lower ends of the fixed block;
[0012] A plurality of springs 1 are arranged between the vertical side surface of the fixing block and the vertical surface, one end of the spring 1 is fixed on the fixing block, and the other end of the spring 1 is fixed on the semicircular block;
[0013] A plurality of springs 2 are arranged between the inclined plane 2 and the corresponding inclined plane 1 on the upper and lower sides, one end of the spring 2 is fixed on the inclined plane 2, and the other end of the spring 2 is fixed on the corresponding inclined plane 1.
[0014] The discharge port buffer device includes a buffer plate that is movably and obliquely arranged on the inner side of the main pipe outlet, and a plurality of springs three are arranged between the buffer plate and the inner wall of the main pipe, one end of the spring three is fixed to the buffer plate, and the other end of the spring three is fixed to the inner wall of the main pipe. Specifically, the plurality of springs three include a plurality of springs of different lengths to meet the requirement of oblique arrangement of the buffer plate.
[0015] A shock-absorbing floor is arranged on the inner bottom surface of the solid waste collection pool, and a steel plate is arranged on the shock-absorbing floor to protect the bottom plate of the solid waste collection pool.
[0016] The beneficial effects of the utility model are as follows: the patent solves the problem of noise and large impact force generated when garbage falls by arranging a buffer speed bump inside the pipe and wrapping sound insulation cotton outside the pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model.
[0018] Figure 2 It is a schematic structural diagram of the cylinder wall spring shock absorbing device in the embodiment of the utility model.
[0019] Figure 3 It is a schematic structural diagram of the shock absorbing part in the embodiment of the utility model.
[0020] Figure 4 for Figure 1 A is an enlarged view of the middle image.
[0021] Among them, the figures are marked as: 1. main pipeline; 2. floor; 3. pipeline tie hoop; 4. garbage inlet; 5. pipeline connecting clamp; 6. cylinder wall spring shock absorber; 7. discharge port buffer device; 8. branch pipeline; 9. liquid garbage collection tank; 10. solid garbage collection tank; 11. steel plate; 12. shock-absorbing floor; 13. round tube; 14. shock-absorbing part; 15. arc plate; 16. spring two; 17. fixed block; 18. spring one; 19. semicircular block; 20. spring two; 21. buffer plate. DETAILED DESCRIPTION
[0022] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0023] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0025] In order to clearly illustrate the technical features of this solution, this solution is described below through a specific implementation method.
[0026] Example 1
[0027] See also Figure 1A garbage pipeline for super high-rise building construction, comprising a main pipeline 1, a branch pipeline 8 connected to the main pipeline 1 is obliquely arranged on one side near the lower end of the main pipeline 1, a solid garbage collection tank 10 is arranged just below the outlet of the main pipeline 1, and a liquid garbage collection tank 9 is arranged below the outlet of the branch pipeline 8. The main pipeline 1 passes through the floor slabs 2 of each floor and is further fixed by a pipeline tie hoop 3. A corresponding garbage inlet 4 is opened on the main pipeline 1 of each floor;
[0028] The outer sides of the main pipe 1 and the branch pipe 8 are wrapped with sound insulation cotton, a plurality of groups of cylinder wall spring shock absorbing devices 6 are arranged on the inner side of the main pipe 1, and a discharge port buffer device 7 is arranged on the inner side wall at the outlet of the main pipe 1.
[0029] Example 2
[0030] See also Figure 1 A garbage pipeline for super high-rise building construction, comprising a main pipeline 1, a branch pipeline 8 connected to the main pipeline 1 is obliquely arranged on one side near the lower end of the main pipeline 1, a solid garbage collection tank 10 is arranged just below the outlet of the main pipeline 1, and a liquid garbage collection tank 9 is arranged below the outlet of the branch pipeline 8. The main pipeline 1 passes through the floor slabs 2 of each floor and is further fixed by a pipeline tie hoop 3. A corresponding garbage inlet 4 is opened on the main pipeline 1 of each floor;
[0031] The outer sides of the main pipe 1 and the branch pipe 8 are wrapped with sound insulation cotton, a plurality of groups of cylinder wall spring shock absorbing devices 6 are arranged on the inner side of the main pipe 1, and a discharge port buffer device 7 is arranged on the inner side wall at the outlet of the main pipe 1.
[0032] The main pipeline 1 includes a plurality of branch pipelines, which are connected to form the main pipeline 1 via pipeline connecting clamps 5 .
[0033] Example 3
[0034] See also Figure 1-4 A garbage pipeline for super high-rise building construction, comprising a main pipeline 1, a branch pipeline 8 connected to the main pipeline 1 is obliquely arranged on one side near the lower end of the main pipeline 1, a solid garbage collection tank 10 is arranged just below the outlet of the main pipeline 1, and a liquid garbage collection tank 9 is arranged below the outlet of the branch pipeline 8. The main pipeline 1 passes through the floor slabs 2 of each floor and is further fixed by a pipeline tie hoop 3. A corresponding garbage inlet 4 is opened on the main pipeline 1 of each floor;
[0035] The outer sides of the main pipe 1 and the branch pipe 8 are wrapped with sound insulation cotton, a plurality of groups of cylinder wall spring shock absorbing devices 6 are arranged on the inner side of the main pipe 1, and a discharge port buffer device 7 is arranged on the inner side wall at the outlet of the main pipe 1.
[0036] The main pipeline 1 includes a plurality of branch pipelines, and the plurality of branch pipelines are connected to form the main pipeline 1 through flange plates 1. Specifically, adjacent flange plates 1 are connected through bolts.
[0037] The cylinder wall spring shock-absorbing device 6 includes a round tube 13 that matches the inner diameter of the main pipeline 1. A flange 2 that matches the flange 1 is provided at one end of the round tube 13. The flange 2 is connected between two adjacent flanges 1 by bolts. A pair of shock-absorbing parts 14 staggered up and down are provided on the inner wall of the round tube 13. As another embodiment, when the main pipeline 1 is connected with a pipeline connecting clamp 5, the flange 2 can be replaced with a structure that matches the pipeline connecting clamp 5.
[0038] The shock absorbing part 14 includes a fixed block 17 arranged on the inner wall of the circular tube 13, a buffer part is arranged on one side of the fixed block 17, and the buffer part includes an arc plate 15 that slides with the inner wall of the circular tube 13, a semicircular block 19 is arranged on the lower side of the arc plate 15, the outer arc surface of the semicircular block 19 faces the axis of the circular tube 13, and a trapezoidal groove is arranged on the vertical side of the semicircular block 19, the trapezoidal groove includes a vertical surface and inclined surface 1 on both sides of the vertical surface, and inclined surface 2 corresponding to inclined surface 1 is arranged at both upper and lower ends of the fixed block 17;
[0039] A plurality of springs 18 are arranged between the vertical side and the vertical surface of the fixed block 17, one end of the spring 18 is fixed to the fixed block 17, and the other end of the spring 18 is fixed to the semicircular block 19;
[0040] A plurality of springs 16 are arranged between the upper and lower inclined surfaces 2 and the corresponding inclined surfaces 1. One end of the spring 16 is fixed on the inclined surface 2, and the other end of the spring 16 is fixed on the corresponding inclined surface 1.
[0041] The discharge port buffer device 7 includes a buffer plate 21 which is movably and obliquely arranged on the inner side of the outlet of the main pipe 1. A plurality of springs 20 are arranged between the buffer plate 21 and the inner wall of the main pipe 1. One end of the spring 20 is fixed to the buffer plate 21, and the other end of the spring 20 is fixed to the inner wall of the main pipe 1. Specifically, the plurality of springs 20 include a plurality of springs of different lengths to meet the requirement of oblique arrangement of the buffer plate 21.
[0042] A shock-absorbing floor 12 is arranged on the inner bottom surface of the solid waste collection pool 10 , and a steel plate 11 is arranged on the shock-absorbing floor 12 to protect the bottom plate of the solid waste collection pool 10 .
[0043] Technical features not described in the present invention can be achieved through or by adopting existing technologies, and will not be elaborated here. Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention should also fall within the scope of protection of the present invention.
Claims
1. A garbage pipeline for super high-rise building construction, characterized in that: It comprises a main pipeline (1), a branch pipeline (8) connected to the main pipeline (1) is obliquely arranged on one side of the main pipeline (1) near the lower end, a solid waste collection tank (10) is arranged directly below the outlet of the main pipeline (1), and a liquid waste collection tank (9) is arranged below the outlet of the branch pipeline (8); The outer surfaces of the main pipe (1) and the branch pipe (8) are wrapped with sound insulation cotton, a plurality of groups of cylinder wall spring shock absorbing devices (6) are arranged on the inner side of the main pipe (1), and a discharge port buffer device (7) is arranged on the inner side wall at the outlet of the main pipe (1).
2. The super high-rise building construction garbage pipeline according to claim 1 is characterized in that: The main pipeline (1) comprises a plurality of branch pipeline sections, and the plurality of branch pipeline sections are connected to form the main pipeline (1) via pipeline connecting clamps (5).
3. The super high-rise building construction garbage pipeline according to claim 1 is characterized in that: The main pipeline (1) comprises a plurality of branch pipeline sections, and the plurality of branch pipeline sections are connected to form the main pipeline (1) via a flange.
4. The super high-rise building construction garbage pipeline according to claim 3 is characterized in that: The cylinder wall spring shock absorbing device (6) comprises a round tube (13) matched with the inner diameter of the main pipeline (1), one end of the round tube (13) is provided with a flange plate 2 matched with the flange plate 1, the flange plate 2 is connected between two adjacent flange plates 1 by bolts, and a pair of shock absorbing parts (14) staggered up and down are provided on the inner wall of the round tube (13).
5. The super high-rise building construction garbage pipeline according to claim 4 is characterized in that: The shock absorbing part (14) comprises a fixed block (17) arranged on the inner wall of the circular tube (13); a buffer part is arranged on one side of the fixed block (17); the buffer part comprises an arc plate (15) slidably matched with the inner wall of the circular tube (13); a semicircular block (19) is arranged on the lower side of the arc plate (15); the outer arc surface of the semicircular block (19) faces the axis of the circular tube (13); a trapezoidal groove is arranged on the vertical side surface of the semicircular block (19); the trapezoidal groove comprises a vertical surface and inclined surfaces 1 on both sides of the vertical surface; and inclined surfaces 2 corresponding to the inclined surface 1 are arranged at both upper and lower ends of the fixed block (17); A plurality of springs (18) are arranged between the vertical side surface of the fixing block (17) and the vertical surface, one end of the spring (18) is fixed on the fixing block (17), and the other end of the spring (18) is fixed on the semicircular block (19); A plurality of springs (16) are arranged between the inclined planes (2) and the corresponding inclined planes (1) on the upper and lower sides, one end of the springs (16) is fixed on the inclined plane (2), and the other end of the springs (16) is fixed on the corresponding inclined plane (1).
6. The super high-rise building construction garbage pipeline according to claim 1 is characterized in that: The outlet buffer device (7) comprises a buffer plate (21) movably and obliquely arranged on the inner side of the outlet of the main pipeline (1), a plurality of springs (20) are arranged between the buffer plate (21) and the inner wall of the main pipeline (1), one end of the spring (20) is fixed to the buffer plate (21), and the other end of the spring (20) is fixed to the inner wall of the main pipeline (1).
7. The super high-rise building construction garbage pipeline according to claim 1 is characterized in that: A shock-absorbing floor (12) is arranged on the inner bottom surface of the solid waste collection pool (10), and a steel plate (11) is arranged on the shock-absorbing floor (12).