AI Technical Summary

Technical Problem

During the HVAC water supply and drainage installation and construction, the connection and fixing of pipes requires manual operation, which is time-consuming and labor-intensive, and poses safety risks, especially when the installer needs to manually fix pipes with higher heights.

Method used

A HVAC water supply and drainage installation and construction equipment is designed, using supporting base, brake universal wheel, electric telescopic rod, limit block, clamping block and laser ranging sensor. Through the combination of threaded rod, slide chute, slide block and clamping block, automatic clamping and angle adjustment of the pipeline is achieved. The electric telescopic rod is used for height adjustment and laser ranging sensor assists in pipe connection.

Benefits of technology

The equipment can automatically clamp and adjust the position of the pipes, reducing the time and labor intensity of manual operation, and improving the safety and efficiency of installation and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222669179U_ABST
    Figure CN222669179U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of heating and ventilation water supply and drainage installation construction equipment, and discloses heating and ventilation water supply and drainage installation construction equipment which comprises a supporting base, two pairs of brake universal wheels are movably connected to the bottom end of the supporting base, and an electric telescopic rod is fixedly connected to the center of the top end of the supporting base. The top end of the electric telescopic rod is fixedly connected with a limiting block. According to the device, through combined use of a threaded rod, a sliding groove, a sliding block, a first clamping block and a second clamping block, pipelines of various models can be clamped and fixed, through arrangement of an electric telescopic rod, the height of the device can be conveniently adjusted according to the installation height of the pipelines, and through matched use of a connecting block, a rotating block, a rotating shaft and a limiting block, the device is convenient to use and high in practicability. Angle adjustment can be conducted according to installation requirements, pipelines at different angles can be fixed, manual supporting of the pipelines by personnel is not needed, time and labor are saved, and the safety of heating, ventilation, water supply and drainage installation construction is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of HVAC water supply and drainage installation and construction equipment, and more specifically, particularly relates to HVAC water supply and drainage installation and construction equipment. Background Art

[0002] The content of HVAC includes heating, refrigeration, ventilation, boilers, air conditioning, cleaning, filtration, etc. Now many places also include power majors, including steam, compressed air, municipal gas, etc. There are mainly three aspects of water supply and drainage, water supply engineering, drainage engineering and building water supply and drainage. Pipeline installation is an important part of the HVAC water supply and drainage installation and construction process.

[0003] When performing HVAC water supply and drainage installation and construction, it is necessary to install and connect each pipe together according to the drawings. Now, when installing pipes indoors, the connection and fixation between pipes usually require manual operation. The installers need to manually fix the position of the pipes, and then other installers need to weld the fixed pipes. This is time-consuming and labor-intensive, and the weight of the pipes is generally heavy. When the installers manually fix the pipes at a high height, the pipes can easily fall out of their hands and hit the installers, posing a greater safety hazard.

[0004] Therefore, in view of this, the existing structure and deficiencies are studied and improved, and a HVAC water supply and drainage installation and construction equipment is provided, in order to achieve a more practical purpose. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a HVAC water supply and drainage installation construction equipment, which is achieved by the following specific technical means:

[0006] A HVAC water supply and drainage installation and construction equipment comprises a support base, the bottom end of the support base is movably connected with two pairs of brake universal wheels, the top center position of the support base is fixedly connected with an electric telescopic rod, the top of the electric telescopic rod is fixedly connected with a limiting block, the top of the limiting block is fixedly connected with a support block, the top of the support block is fixedly connected with a rotating block, the rotating block is rotatably connected with an equipment block, the top of the equipment block is provided with a slide groove, the slide groove is slidably connected with a slider, the top of the slider is fixedly connected with a first clamping block, the top of the equipment block is fixedly connected with a second clamping block corresponding to the first clamping block, and the first clamping block and the second clamping block have the same size.

[0007] Furthermore, a laser ranging sensor is provided on one side of the equipment block.

[0008] Furthermore, a pair of connecting blocks are fixedly connected to the bottom end of the equipment block, adjacent sides of the pair of connecting blocks are provided with rotation grooves, and the rotation grooves pass through both sides of the connecting blocks, the rotating block is located between the pair of connecting blocks, and through grooves are provided on both sides of the rotating block corresponding to the rotation grooves, one of the pair of rotating grooves is movably connected with a rotating shaft, and the other end of the rotating shaft passes through the through groove and is connected to the other of the pair of rotating grooves.

[0009] Furthermore, a threaded block is provided at one end of the rotating shaft, and the rotating shaft is connected to a limiting ring via a thread.

[0010] Furthermore, a threaded rod is rotatably connected in the slide groove, one end of the threaded rod passes through the slide groove and extends to the outside of the equipment block, one end of the threaded rod passing through the slide groove is fixedly connected to a knob, and the threaded rod is also threadedly connected to a limiting nut at a position between the knob and the equipment block.

[0011] Furthermore, rubber blocks are arranged on adjacent sides of the first clamping block and the second clamping block.

[0012] Furthermore, the top ends of the two pairs of brake universal wheels are provided with screws, and the support base is provided with mounting holes corresponding to the two pairs of screws. The top ends of the screws extend through the mounting holes to the outside of the top end of the support base and are fixedly connected with fixing nuts.

[0013] Furthermore, a controller is provided on one side of the top end of the support base.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] In the utility model, through the combined use of the threaded rod, the slide groove, the slider, the first clamping block and the second clamping block, various types of pipes can be clamped and fixed. Through the setting of the electric telescopic rod, the height of the equipment can be conveniently adjusted according to the installation height of the pipe. Through the coordinated use of the connecting block, the rotating block, the rotating shaft and the limit block, the angle can be adjusted according to the installation requirements, and the pipes at different angles can be fixed without manual support of the pipes. It not only saves time and effort, but also improves the safety of HVAC and water supply and drainage installation and construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0017] Figure 2 It is a side sectional schematic diagram of the utility model.

[0018] Figure 3 This utility model Figure 2 A magnified schematic diagram of the A structure.

[0019] Figure 4 It is a schematic diagram of the overall structure of the limit block of the utility model.

[0020] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:

[0021] 1. Support base; 2. Brake universal wheel; 3. Electric telescopic rod; 4. Limit block; 5. Support block; 6. Rotation block; 7. Equipment block; 8. Slide groove; 9. Slider; 10. First clamping block; 11. Second clamping block; 12. Laser ranging sensor; 13. Connecting block; 14. Rotation groove; 15. Through groove; 16. Rotation shaft; 17. Threaded block; 18. Limit ring; 19. Threaded rod; 20. Knob; 21. Limit nut; 22. Rubber block; 23. Screw; 24. Mounting hole; 25. Fixing nut; 26. Controller. DETAILED DESCRIPTION

[0022] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.

[0023] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] Example:

[0026] As attached Figure 1 To Attachment Figure 4 As shown:

[0027] The utility model provides a HVAC water supply and drainage installation construction equipment, comprising a support base 1, the bottom end of the support base 1 is movably connected with two pairs of brake universal wheels 2, the top center position of the support base 1 is fixedly connected with an electric telescopic rod 3, the top of the electric telescopic rod 3 is fixedly connected with a limiting block 4, the top of the limiting block 4 is fixedly connected with a support block 5, the top of the support block 5 is fixedly connected with a rotating block 6, the rotating block 6 is rotatably connected with an equipment block 7, the top of the equipment block 7 is provided with a slide groove 8, the slide groove 8 is slidably connected with a slider 9, the top of the slider 9 is fixedly connected with a first clamping block 10, the top of the equipment block 7 is fixedly connected with a second clamping block 11 corresponding to the first clamping block 10, and the first clamping block 10 and the second clamping block 11 have the same size.

[0028] Among them, a laser distance measuring sensor 12 is arranged on one side of the equipment block 7. The laser distance measuring sensor 12 can conveniently measure the distance between the pipes to be connected, so as to facilitate the installation of the pipes.

[0029] Among them, a pair of connecting blocks 13 are fixedly connected to the bottom end of the equipment block 7, and adjacent sides of the pair of connecting blocks 13 are provided with rotation grooves 14, and the rotation grooves 14 run through both sides of the connecting blocks 13. The rotating block 6 is located between the pair of connecting blocks 13, and through grooves 15 are provided on both sides of the rotating block 6 corresponding to the rotation grooves 14. One of the pair of rotating grooves 14 is movably connected with a rotating shaft 16, and the other end of the rotating shaft 16 passes through the through groove 15 and is connected to the other of the pair of rotating grooves 14.

[0030] A threaded block 17 is disposed at one end of the rotating shaft 16 , and the rotating shaft 16 is connected to a limiting ring 18 via threads, and the limiting ring 18 can fix the rotating shaft 16 .

[0031] Among them, a threaded rod 19 is rotatably connected in the slide groove 8, one end of the threaded rod 19 passes through the slide groove 8 and extends to the outside of the equipment block 7, one end of the threaded rod 19 passing through the slide groove 8 is fixedly connected to a knob 20, and the threaded rod 19 is also threadedly connected to a limiting nut 21 at a position between the knob 20 and the equipment block 7.

[0032] Among them, rubber blocks 22 are arranged on adjacent sides of the first clamping block 10 and the second clamping block 11. The rubber blocks 22 can increase the friction between the first clamping block 10 and the second clamping block 11 and the pipeline, so that the first clamping block 10 and the second clamping block 11 can clamp the pipeline more stably.

[0033] Among them, the top ends of the two pairs of brake universal wheels 2 are each provided with a screw rod 23, and the support base 1 is provided with mounting holes 24 corresponding to the two pairs of screw rods 23. The top ends of the screw rods 23 extend through the mounting holes 24 to the outside of the top end of the support base 1 and are fixedly connected with a fixing nut 25.

[0034] Among them, a controller 26 is arranged on one side of the top end of the support base 1 , and the controller 26 is convenient for controlling the electric telescopic rod 3 and the laser ranging sensor 12 .

[0035] Working principle of this embodiment: In the utility model, the installer places the pipe to be installed between the first clamping block 10 and the second clamping block 11 according to the drawing, and then rotates the knob 20 by hand. The rotation of the knob 20 drives the threaded rod 19 to rotate, and the threaded rod 19 rotates in the slide groove 8, driving the slider 9 to move in the slide groove 8. The slider 9 drives the first clamping block 10 to move toward the second clamping block 11. The first clamping block 10 and the second clamping block 11 thus firmly clamp the pipe, and then rotates the limit nut 21 to fix the threaded rod 19 so that it no longer rotates. According to the length of the pipe, the device can also be used at other parts of the pipe. The pipeline is clamped. After the pipeline is clamped, the angle of the equipment block 7 can be adjusted according to the installation requirements. The rotating shaft 16 will drive the connecting block 13 to rotate, so that the equipment block 7 also rotates synchronously. When the adjustment is completed, the limit ring 18 is rotated to fix the rotating shaft 16 so that the angle can be fixed. Then the controller 26 is operated, and the electric telescopic rod 3 will raise the pipeline to a suitable installation height. At the same time, the laser ranging sensor 12 is turned on to assist the pipeline to be connected. At this time, the installer can push the equipment, and the brake universal wheel 2 drives the entire equipment to move, so that the pipeline can be moved to a suitable installation position, which is convenient for the installer to carry out the installation work.

[0036] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific purposes.

Claims

1. A heating, ventilation, water supply and drainage installation and construction equipment, comprising a support base (1), characterized in that: The bottom end of the support base (1) is movably connected with two pairs of brake universal wheels (2); the center position of the top end of the support base (1) is fixedly connected with an electric telescopic rod (3); the top end of the electric telescopic rod (3) is fixedly connected with a limit block (4); the top end of the limit block (4) is fixedly connected with a support block (5); the top end of the support block (5) is fixedly connected with a rotating block (6); the rotating block (6) is rotatably connected with a device block (7); a slide groove (8) is provided at the top end of the device block (7); a slider (9) is slidably connected to the slide groove (8); the top end of the slider (9) is fixedly connected with a first clamping block (10); the top end of the device block (7) is fixedly connected with a second clamping block (11) corresponding to the first clamping block (10); and the first clamping block (10) and the second clamping block (11) have the same size.

2. A HVAC water supply and drainage installation construction equipment as claimed in claim 1, characterized in that: A laser distance measuring sensor (12) is arranged on one side of the equipment block (7).

3. A HVAC water supply and drainage installation construction equipment as claimed in claim 1, characterized in that: A pair of connecting blocks (13) are fixedly connected to the bottom end of the equipment block (7); adjacent sides of the pair of connecting blocks (13) are provided with rotation grooves (14), and the rotation grooves (14) run through both sides of the connecting block (13); the rotating block (6) is located between the pair of connecting blocks (13); and through grooves (15) are provided on both sides of the rotating block (6) corresponding to the rotation grooves (14); one of the pair of rotating grooves (14) is movably connected with a rotating shaft (16), and the other end of the rotating shaft (16) passes through the through groove (15) and is connected to the other of the pair of rotating grooves (14).

4. A HVAC water supply and drainage installation construction equipment as claimed in claim 3, characterized in that: A threaded block (17) is provided at one end of the rotating shaft (16), and the rotating shaft (16) is connected to a limit ring (18) via a thread.

5. A HVAC water supply and drainage installation construction equipment as claimed in claim 1, characterized in that: A threaded rod (19) is rotatably connected in the slide groove (8), one end of the threaded rod (19) passes through the slide groove (8) and extends to the outside of the equipment block (7), one end of the threaded rod (19) passing through the slide groove (8) is fixedly connected to a knob (20), and the threaded rod (19) is also threadedly connected to a limit nut (21) at a position between the knob (20) and the equipment block (7).

6. A HVAC water supply and drainage installation construction equipment as claimed in claim 1, characterized in that: Rubber blocks (22) are provided on adjacent sides of the first clamping block (10) and the second clamping block (11).

7. A HVAC water supply and drainage installation construction equipment as claimed in claim 1, characterized in that: The top ends of the two pairs of brake universal wheels (2) are each provided with a screw rod (23), and the support base (1) is provided with mounting holes (24) corresponding to the two pairs of screw rods (23). The top ends of the screw rods (23) extend through the mounting holes (24) to the outside of the top end of the support base (1) and are fixedly connected with a fixing nut (25).

8. The HVAC water supply and drainage installation construction equipment according to claim 1, characterized in that: A controller (26) is provided on one side of the top end of the support base (1).

Citation Information

Cited By

  • Heating and ventilation water supply and drainage installation construction equipment

    CN224107774U