Novel prefabricated inspection well-in-well
By using the combination of L-shaped blocks, trapezoidal baffles and fixed components in the maintenance well, the cumbersome problem of the existing maintenance well splicing process is solved, and the fast and stable well body splicing is achieved, and the splicing efficiency of the maintenance well is improved.
Patent Information
- Application Number
- CN202421798542.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-29
AI Technical Summary
During the splicing process of existing maintenance wells, multiple screws and locking nuts are connected, which is cumbersome and laborious, reducing the splicing efficiency.
A new prefabricated inspection well is adopted, including well body, L-shaped block, trapezoidal baffle and fixed components. Through the plugging of the L-shaped block and the clamping groove, the closure of the trapezoidal baffle and the fixing of the fixing components, the fast splicing of the well body is achieved.
The well body splicing process is simplified, and the tedious operation of fixing multiple screws and nuts is eliminated, the splicing efficiency of the inspection well is improved, and the stability between the well bodies is enhanced.
Smart Images

Figure CN222796646U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of inspection wells, in particular to a novel prefabricated inspection well in a inspection well. Background Art
[0002] In the drainage engineering of municipal projects, some drainage pipes are constructed by jacking construction, and the working wells for the jacking machine to enter and exit are constructed by caisson construction technology. According to the design requirements, new inspection wells (i.e. "wells in wells") are required in some working wells. The inspection wells are made of cast-in-place concrete structures. Since the newly built inspection wells are at a high height and are located in the caisson, they are limited working spaces. The one-time pouring is more dangerous and has low work efficiency, so the cast-in-place wells are converted into segmented prefabricated wells on site.
[0003] A Chinese utility model patent with publication number CN218970185U discloses a sewage pipe inspection well, including a well seat, a pipe sleeve, a well cover and a plurality of well rings. The pipe sleeve is used to insert the sewage pipe, the well seat is provided with a positioning groove, the pipe sleeve is fitted into the positioning groove, and a plurality of well rings and well covers are stacked on the well seat in a bottom-up order and bonded in sequence with an adhesive. The outer sides of the well seat, well rings and well covers are also fixedly connected to lugs.
[0004] With respect to the above-mentioned related technologies, the inventors believe that the following defects exist: the upper and lower well rings in the above-mentioned patents are connected by multiple screws and locking nuts, and multiple locking nuts need to be screwed in sequence during splicing and disassembly, which is cumbersome and laborious, and is not convenient for rapid splicing and installation of the inspection well, thus reducing the efficiency of splicing the inspection well. Utility Model Content
[0005] In order to solve the above problems, the utility model provides a novel prefabricated maintenance well-in-well.
[0006] The above-mentioned technical purpose of the utility model is achieved through the following technical solutions: a new type of prefabricated maintenance well in a well, including a well body, a groove is provided at the intersection between the bottom of the well body and the inner wall of the well body, a convex groove matching with the groove is provided at the intersection between the top of the well body and the side wall of the well body, a clamping groove is provided at the intersection between the inner wall of the well body and the top of the well body, an L-shaped block plug-inly matched with the clamping groove is fixed at the bottom of the well body, a flaring groove connected with the clamping groove is provided at the intersection between the inner wall of the well body and the top of the well body, a trapezoidal baffle for closing the flaring groove is hinged on the inner wall of the well body, and a fixing component for fixing the trapezoidal baffle and the L-shaped block is installed on the trapezoidal baffle.
[0007] By adopting the above technical solution, when the well body needs to be spliced, the staff will hoist the upper well body to the top of the lower well body, align the L-shaped block with the flaring groove and insert it downward, move the upper well body to one side of the clamping groove, so that the L-shaped block is inserted into the clamping groove, and then rotate the trapezoidal baffle to close the flaring groove, and fix the trapezoidal baffle and the L-shaped block through the fixing assembly to complete the splicing of the well body, eliminating the tedious operation of fixing with multiple screws and nuts, facilitating the rapid splicing and installation of the inspection well, and improving the efficiency of the splicing of the inspection well.
[0008] Furthermore, the side wall of the L-shaped block is provided with a fixing groove, the side wall of the trapezoidal baffle close to the L-shaped block is provided with a mounting groove matching the fixing groove, the side wall of the trapezoidal baffle is provided with a sliding groove connected to the mounting groove, and the fixing component includes a fixing block slidably connected to the inner wall of the mounting groove and plug-matched with the fixing groove, and a moving rod fixed to the side wall of the fixing block and slidably connected to the inner wall of the sliding groove.
[0009] By adopting the above technical solution, after the trapezoidal baffle closes the flared groove, the staff moves the fixed block into the fixed groove by moving the rod and plugs it into the fixed groove to fix the trapezoidal baffle and the L-shaped block, reducing the probability of the trapezoidal baffle opening automatically, enhancing the stability of the trapezoidal baffle and the L-shaped block, and further enhancing the stability of the splicing between the well bodies.
[0010] Furthermore, a spring is arranged in the installation groove, one end of the spring is fixed to the inner wall of the installation groove, and the other end of the spring is fixed to the side wall of the fixing block.
[0011] By adopting the above technical solution, the fixing block maintains an inserted state with the fixing groove under the elastic force of the spring, thereby reducing the probability of the fixing block detaching from the fixing groove and causing the trapezoidal baffle to open.
[0012] Furthermore, the side wall of the fixing block is provided with a yielding portion cooperating with the side wall of the L-shaped block.
[0013] By adopting the above technical solution and opening the yielding part, the trapezoidal baffle can squeeze the fixing block into the installation groove through the L-shaped block during the closing process. When the installation groove is aligned with the fixing groove, the fixing block is automatically inserted into the fixing groove under the elastic force of the spring, eliminating the tedious operation of the staff to manually pull the moving rod, and facilitating the rapid fixation of the trapezoidal baffle and the L-shaped block.
[0014] Furthermore, a lifting hole is formed through the side wall of the well body, a steel rod is arranged in the lifting hole, and two groups of symmetrically arranged lifting components are installed on the steel rod, and the two groups of lifting components are respectively arranged on the inside and outside of the well body, and each group of the lifting components includes a clamping ring that is sleeved on the steel rod and slidably connected, a screw rod fixed to the end of the steel rod, and a fixing nut that is sleeved on the screw rod and threadedly connected to the screw rod.
[0015] By adopting the above technical solution, the steel rod is inserted into the lifting hole, the clamping rings on both sides are put on the steel rod, and the clamping rings on both sides are fixed by fixing nuts, so that the lifting assembly is installed on the well body, which is convenient for lifting the well body by buckling the steel wire rope on the clamping ring.
[0016] Furthermore, the cross-section of the steel rod and the cross-section of the lifting hole are rectangular.
[0017] By adopting the above technical solution, the rectangular cross-section steel rod and the lifting hole prevent the steel rod from rotating in the lifting hole, thereby enhancing the stability of the well body lifting.
[0018] Furthermore, a plurality of climbing frames are fixed to the inner wall of the well body.
[0019] By adopting the above technical solution and setting up a climbing frame, the staff can enter the well body through the climbing frame, which is convenient for entering the well body to control the trapezoidal baffle for splicing, and is also convenient for entering the maintenance well for construction at a later time.
[0020] In summary, the utility model has the following beneficial effects:
[0021] 1. In the present application, when the well body needs to be spliced, the staff hoists the upper well body to the top of the lower well body, and inserts the L-shaped block downwardly into the expansion slot, and moves the upper well body to one side of the clamping slot, so that the L-shaped block is inserted into the clamping slot, and then rotates the trapezoidal baffle to close the expansion slot, and fixes the trapezoidal baffle and the L-shaped block through the fixing assembly to complete the splicing of the well body, eliminating the tedious operation of fixing through multiple screws and nuts, facilitating the rapid splicing and installation of the inspection well, and improving the efficiency of the splicing of the inspection well;
[0022] 2. In the present application, after the trapezoidal baffle closes the flared groove, the staff moves the fixed block into the fixed groove by moving the rod and plugs it into the fixed groove to fix the trapezoidal baffle and the L-shaped block, which reduces the probability of the trapezoidal baffle opening automatically, enhances the stability of the trapezoidal baffle and the L-shaped block, and further enhances the stability of the splicing between the well bodies;
[0023] 3. In the present application, the opening of the yielding portion enables the trapezoidal baffle to squeeze the fixing block into the mounting groove through the L-shaped block during the closing process. When the mounting groove is aligned with the fixing groove, the fixing block is automatically inserted into the fixing groove under the elastic force of the spring, eliminating the tedious operation of the staff manually pulling the moving rod, and facilitating the rapid fixation of the trapezoidal baffle and the L-shaped block. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model;
[0025] Figure 2It is a schematic cross-sectional structure diagram of an embodiment of the utility model;
[0026] Figure 3 yes Figure 2 The enlarged schematic diagram of point A in the middle;
[0027] Figure 4 yes Figure 2 The enlarged schematic diagram of point B in the middle;
[0028] Figure 5 The embodiment of the utility model is a schematic diagram of a cross-sectional structure for highlighting an L-shaped block.
[0029] In the figure: 1, well body; 11, groove; 12, convex groove; 13, snap-in groove; 14, flared groove; 15, lifting hole; 2, L-shaped block; 21, fixing groove; 3, trapezoidal baffle; 31, installation groove; 32, slide groove; 4, fixing assembly; 41, fixing block; 411, yielding part; 42, moving rod; 43, spring; 5, steel rod; 6, lifting assembly; 61, clamping ring; 62, screw rod; 63, fixing nut; 7, climbing frame. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.
[0031] like Figure 1-5 As shown, an embodiment of the present application discloses a novel prefabricated maintenance well-in-well, comprising a well body 1, an L-shaped block 2, a trapezoidal baffle 3 and a fixing assembly 4.
[0032] The well body 1 has a rectangular cross section, a groove 11 is provided at the intersection between the bottom of the well body 1 and the inner wall of the well body 1, a convex groove 12 matching with the groove 11 is provided at the intersection between the top of the well body 1 and the side wall of the well body 1, a clamping groove 13 is provided at the intersection between the inner wall of the well body 1 and the top of the well body 1, and an expansion groove 14 connected with the clamping groove 13 is provided at the intersection between the inner wall of the well body 1 and the top of the well body 1. The L-shaped block 2 is a block structure with an L-shaped cross section, the L-shaped block 2 is plugged into the clamping groove 13, and a fixing groove 21 is provided on the side wall of the L-shaped block 2. The trapezoidal baffle 3 is a plate structure with a right-angled trapezoidal cross section, the trapezoidal baffle 3 is hinged on the inner wall of the well body 1, and is used for closing and expanding, the side wall of the trapezoidal baffle 3 close to the L-shaped block 2 is provided with a mounting groove 31 matching with the fixing groove 21, and the side wall of the trapezoidal baffle 3 is provided with a sliding groove 32 connected with the mounting groove 31.
[0033] The fixing assembly 4 is installed on the trapezoidal baffle 3 and is used to fix the trapezoidal baffle 3 and the L-shaped block 2. The fixing assembly 4 includes a fixing block 41, a moving rod 42 and a spring 43. The fixing block 41 is slidably connected to the inner wall of the mounting groove 31, and the fixing block 41 is plugged into the fixing groove 21. The moving rod 42 is a horizontally arranged rectangular rod-shaped structure, the moving rod 42 is fixed to the side wall of the fixing block 41, and the moving rod 42 is slidably connected to the inner wall of the sliding groove 32. The spring 43 is arranged in the mounting groove 31, one end of the spring 43 is fixed to the inner wall of the mounting groove 31, and the other end of the spring 43 is fixed to the side wall of the fixing block 41.
[0034] When the well body 1 needs to be spliced, the staff hoists the upper well body 1 to the top of the lower well body 1, and inserts the L-shaped block 2 downwardly into the expansion groove 14, moves the upper well body 1 to the side of the clamping groove 13, so that the L-shaped block 2 is inserted into the clamping groove 13, and then rotates the trapezoidal baffle 3 to close the expansion groove 14, and moves the fixing block 41 into the fixing groove 21 through the moving rod 42 and plugs into the fixing groove 21, so as to fix the trapezoidal baffle 3 and the L-shaped block 2, and reduce the ladder. The probability of automatic opening of the trapezoidal baffle 3 is enhanced, the stability of the trapezoidal baffle 3 and the L-shaped block 2 is enhanced, and the stability of the splicing between the well body 1 is further enhanced, and the splicing of the well body 1 is completed, eliminating the tedious operation of fixing with multiple screws 62 and nuts, which is convenient for rapid splicing and installation of the inspection well, and improves the efficiency of splicing of the inspection well. The fixing block 41 maintains the plug-in state with the fixing groove 21 under the elastic force of the spring 43, reducing the probability of the fixing block 41 detaching from the fixing groove 21 and causing the trapezoidal baffle 3 to open.
[0035] In order to facilitate the rapid fixation of the trapezoidal baffle 3 and the L-shaped block 2, a paving portion 411 is provided on the side wall of the fixing block 41 to cooperate with the side wall of the L-shaped block 2. The opening of the paving portion 411 allows the trapezoidal baffle 3 to squeeze the fixing block 41 into the mounting groove 31 through the L-shaped block 2 during the closing process. When the mounting groove 31 is aligned with the fixing groove 21, the fixing block 41 is automatically inserted into the fixing groove 21 under the elastic force of the spring 43, eliminating the tedious operation of the staff manually pulling the moving rod 42, thereby facilitating the rapid fixation of the trapezoidal baffle 3 and the L-shaped block 2.
[0036] In order to facilitate the lifting of the well body 1, a lifting hole 15 is opened through the side wall of the well body 1, and a steel rod 5 is arranged in the lifting hole 15. Two groups of symmetrically arranged lifting components 6 are installed on the steel rod 5. The two groups of lifting components 6 are respectively arranged on the inside and outside of the well body 1. Each group of lifting components 6 includes a clamping ring 61, a screw rod 62 and a fixing nut 63. The cross section of the clamping ring 61 is U-shaped, and the clamping ring 61 is sleeved on the steel rod 5 and slidably connected. The screw rod 62 is a horizontally arranged rod-shaped structure, and the screw rod 62 is fixed to the end of the steel rod 5. The fixing nut 63 is sleeved on the screw rod 62 and is threadedly connected to the screw rod 62, and the axis of the fixing nut 63 coincides with the axis of the screw rod 62. Insert the steel rod 5 into the lifting hole 15, put the clamping rings 61 on both sides on the steel rod 5, and fix the clamping rings 61 on both sides by fixing nuts 63, so as to install the lifting assembly 6 on the well body 1, so as to facilitate the lifting of the well body 1 by buckling the steel wire rope on the clamping ring 61.
[0037] In order to enhance the stability of the hoisting of the well body 1 , the cross-section of the steel rod 5 and the cross-section of the hoisting hole 15 are rectangular. The rectangular cross-section of the steel rod 5 and the hoisting hole 15 prevents the steel rod 5 from rotating in the hoisting hole 15 , thereby enhancing the stability of the hoisting of the well body 1 .
[0038] In order to facilitate entering the well body 1 to control the trapezoidal baffle 3 for splicing, a plurality of climbing frames 7 are fixed to the inner wall of the well body 1. The setting of the climbing frames 7 allows the staff to enter the well body 1 through the climbing frames 7, thereby facilitating entering the well body 1 to control the trapezoidal baffle 3 for splicing, and at the same time facilitating later entry into the maintenance well for construction.
[0039] The use principle of a new type of prefabricated inspection well in the present embodiment is as follows: when the well body 1 needs to be spliced, the staff hoists the upper well body 1 above the lower well body 1, and inserts the L-shaped block 2 downwardly into the expansion groove 14, moves the upper well body 1 to one side of the clamping groove 13, so that the L-shaped block 2 is inserted into the clamping groove 13, and then rotates the trapezoidal baffle 3 to close the expansion groove 14, and moves the fixed block 41 into the fixed groove 21 through the moving rod 42 and plugs into the fixed groove 21, so as to align the trapezoidal baffle 3 and the L-shaped block 21. The L-shaped block 2 is fixed, which reduces the probability of the trapezoidal baffle 3 opening automatically, enhances the stability of the trapezoidal baffle 3 and the L-shaped block 2, and further enhances the stability of the splicing between the well body 1, completes the splicing of the well body 1, and eliminates the tedious operation of fixing with multiple screws 62 and nuts, facilitates the rapid splicing and installation of the inspection well, and improves the efficiency of the splicing of the inspection well. The fixing block 41 maintains the plug-in state with the fixing groove 21 under the elastic force of the spring 43, which reduces the probability of the fixing block 41 detaching from the fixing groove 21 and causing the trapezoidal baffle 3 to open.
[0040] The above is only a preferred embodiment of the present invention. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A novel prefabricated maintenance well in a well, comprising a well body (1), characterized in that: A groove (11) is provided at the intersection between the bottom of the well body (1) and the inner wall of the well body (1); a convex groove (12) matching with the groove (11) is provided at the intersection between the top of the well body (1) and the side wall of the well body (1); a clamping groove (13) is provided at the intersection between the inner wall of the well body (1) and the top of the well body (1); an L-shaped block (2) plug-fitting with the clamping groove (13) is fixed to the bottom of the well body (1); an expansion groove (14) connected with the clamping groove (13) is provided at the intersection between the inner wall of the well body (1) and the top of the well body (1); a trapezoidal baffle (3) for closing the expansion groove (14) is hingedly connected to the inner wall of the well body (1); a fixing component (4) for fixing the trapezoidal baffle (3) and the L-shaped block (2) is installed on the trapezoidal baffle (3).
2. A novel prefabricated inspection well in a well according to claim 1, characterized in that: The side wall of the L-shaped block (2) is provided with a fixing groove (21), the side wall of the trapezoidal baffle (3) close to the L-shaped block (2) is provided with a mounting groove (31) matched with the fixing groove (21), the side wall of the trapezoidal baffle (3) is provided with a slide groove (32) connected with the mounting groove (31), and the fixing assembly (4) comprises a fixing block (41) slidably connected to the inner wall of the mounting groove (31) and plug-matched with the fixing groove (21), and a moving rod (42) fixed to the side wall of the fixing block (41) and slidably connected to the inner wall of the slide groove (32).
3. A novel prefabricated maintenance well in a well according to claim 2, characterized in that: A spring (43) is arranged in the installation groove (31), one end of the spring (43) is fixed to the inner wall of the installation groove (31), and the other end of the spring (43) is fixed to the side wall of the fixing block (41).
4. A novel prefabricated inspection well in a well according to claim 3, characterized in that: The side wall of the fixing block (41) is provided with a yielding portion (411) that cooperates with the side wall of the L-shaped block (2).
5. The novel prefabricated manhole-in-well according to claim 1 is characterized by: A lifting hole (15) is formed through the side wall of the well body (1), a steel rod (5) is arranged in the lifting hole (15), and two groups of symmetrically arranged lifting components (6) are installed on the steel rod (5). The two groups of lifting components (6) are respectively arranged on the inner side of the well body (1) and the outer side of the well body (1), and each group of the lifting components (6) includes a clamping ring (61) sleeved on the steel rod (5) and slidably connected, a screw rod (62) fixed to the end of the steel rod (5), and a fixing nut (63) sleeved on the screw rod (62) and threadedly connected to the screw rod (62).
6. A novel prefabricated manhole-in-well according to claim 5, characterized in that: The cross-section of the steel rod (5) and the cross-section of the hanging hole (15) are rectangular.
7. The novel prefabricated maintenance well in a well according to claim 1 is characterized by: A plurality of climbing frames (7) are fixed to the inner wall of the well body (1).