Fast-assembly tower mast device for 5G miniaturized base station

By designing the 5G miniaturized base station quick loading tower mast device and using counterweight blocks and standard modules to achieve rapid assembly, the problems of difficult construction and long construction cycle of traditional tower mast devices are solved, and the effects of rapid deployment and flexible adjustment are achieved.

CN222962586UActive Publication Date: 2025-06-10GUOMAI TECHNOLOGIES INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422020801.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2025-06-10
Estimated Expiration
2034-08-20

AI Technical Summary

Technical Problem

The tower mast device of traditional ground stations is difficult to construct, covers a large area, has a long construction cycle and is high in investment costs, making it difficult to meet the needs of 5G deep coverage construction.

Method used

A 5G miniaturized base station quick loading tower mast device is designed, using counterweight blocks as the basis and equipped with multiple standard modules to facilitate rapid assembly and disassembly and adapt to the construction needs of different scenarios.

Benefits of technology

The device does not require long-term foundation maintenance, greatly shortens the site construction cycle, can complete the site construction within one day, simplifies the construction process, and facilitates maintenance, upgrades or migrations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222962586U_ABST
    Figure CN222962586U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of 5G base stations, in particular to a 5G miniaturized base station fast-assembly tower mast device which comprises a base, a balancing weight, at least two holding poles and connecting pieces. The balancing weight is installed on the base, the at least two holding poles are perpendicularly arranged on the base, the balancing weight is located around the holding poles, the holding poles are used for hanging the 5G miniaturized base station, the connecting pieces are arranged between the two adjacent holding poles, and the two ends of each connecting piece are connected with the two adjacent holding poles correspondingly. And the upper end part of one of the at least two holding poles is provided with a mounting part for mounting a lightning rod. According to the counter weight type fast-assembly tower mast device, the counter weight is adopted as a foundation, long-time maintenance is not needed, the station building period is greatly shortened, station building can be completed within one day, and the construction period is greatly shortened. Meanwhile, the fast-assembly tower mast device is composed of a plurality of standard modules, each module can be independently produced, transported and stored, and standardized construction can be achieved for different scenes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of 5G base stations, in particular to a quick-install tower mast device for a 5G miniaturized base station. Background Art

[0002] The tower mast device of traditional ground stations involves tower base foundation construction. Affected by factors such as geology and environment, it has problems such as large occupied space, high construction difficulty, long construction period, and high investment cost, and it is difficult to meet the needs of 5G deep coverage construction. Miniaturized base stations are favored by operators because of their characteristics such as low construction difficulty, short construction period, low investment cost, fast deployment, and can be flexibly moved and adjusted in site location according to the needs of 5G network deep coverage, accurately meeting the service coverage requirements, and playing an increasingly important role in network construction.

[0003] During the construction of 5G miniaturized base stations, traditional ground tower construction usually requires on-site pouring of concrete foundations, which not only takes a lot of time and manpower, but also has a long foundation curing process, often affecting the overall progress of the project. Summary of the Utility Model

[0004] In view of this, the purpose of the utility model is to provide a quick-install tower mast device for a 5G miniaturized base station.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:

[0006] A quick-install tower mast device for a 5G miniaturized base station includes a base, a counterweight, at least two holding poles and connecting pieces; the counterweight is installed on the base, at least two holding poles are vertically arranged on the base and the counterweight is located around the holding poles, the holding poles are used for hanging a 5G miniaturized base station, the connecting pieces are arranged between two adjacent holding poles and both ends of the connecting pieces are respectively connected to two adjacent holding poles, and an installation part for installing a lightning rod is provided at the upper end of one of the at least two holding poles.

[0007] Further, the base is formed by enclosing a space with four channel steels in a rectangular distribution. Inside the space, there is a counterweight installation part formed by strip angle irons and a holding pole fixing part formed by strip channel steels. The counterweight installation part is distributed on the opposite sides or around the holding pole fixing part.

[0008] Further, installation holes are provided on both the strip angle iron and the channel steel opposite to the strip angle iron. The counterweight is provided with through holes. A locking rod passes through one installation hole and a through hole in sequence and is then connected to the other installation hole.

[0009] Further, one end of the holding pole fixed to the base is provided with a flange plate. The flange plate is provided with reinforcing ribs and locking holes. A locking part is fixedly connected to the strip channel steel on the base through the locking holes.

[0010] Further, the number of the guyed masts is two, the height of each guyed mast is 3 meters, the diameter is 76 mm, and the wall thickness is 5 mm; the number of the counterweights is six, the weight of each counterweight is 94 KG, the maximum height of the connecting piece is not higher than 1.2 meters, and the hanging weight of each guyed mast does not exceed 40 KG.

[0011] Further, every three of the counterweights are divided into a group, and the two groups of counterweights are symmetrically distributed on the horizontal two sides of the bar channel steel.

[0012] Further, the number of the connecting pieces is two, the two connecting pieces are arranged vertically and parallel to each other, and the two connecting pieces are used for installing wall-mounted devices.

[0013] Further, a retaining device is further arranged on the base, and the retaining device is arranged corresponding to the position of the guyed mast.

[0014] Further, the counterweight is a cement counterweight.

[0015] Further, the lightning rod is a hot-dip galvanized round steel with a diameter of 22 mm, and the top end of the hot-dip galvanized round steel is needle-shaped.

[0016] The beneficial effects of the present utility model are as follows:

[0017] A 5G miniaturized base station quick-installation tower mast device provided by the present utility model comprises a base, counterweights, at least two guyed masts and connecting pieces; the counterweights are installed on the base, at least two guyed masts are vertically arranged on the base and the counterweights are located around the guyed masts, the guyed masts are used for hanging a 5G miniaturized base station, the connecting pieces are arranged between two adjacent guyed masts and two ends of the connecting pieces are respectively connected with the two adjacent guyed masts, and an installation part for installing a lightning rod is arranged at the upper end of one of the at least two guyed masts. Compared with the traditional ground tower construction which usually requires on-site pouring of concrete foundation, this not only takes a lot of time and manpower, but also the foundation curing process is relatively long, which often affects the overall progress of the project. While the counterweight type quick-installation tower mast device of the present utility model uses counterweights as the foundation, without the need for long-term curing, greatly shortening the station construction period, and can complete the station construction within one day, greatly shortening the construction period. At the same time, the quick-installation tower mast device is composed of multiple standard modules, each module can be produced, transported and stored separately, and standardized construction can be realized for different scenarios. Compared with the fixed foundation, it is also easy to disassemble and reassemble, facilitating maintenance, upgrading or migration. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 The figure shows the front view of a 5G miniaturized base station quick-installation tower mast device of the present utility model;

[0019] Figure 2 The figure shows a top view of a quick - installation tower mast device for a 5G miniaturized base station of the present utility model;

[0020] Figure 3 The figure shows a top view of a counterweight of a quick - installation tower mast device for a 5G miniaturized base station of the present utility model;

[0021] Figure 4 The figure shows a side view of a counterweight of a quick - installation tower mast device for a 5G miniaturized base station of the present utility model;

[0022] Figure 5 The figure shows a structural schematic diagram of an enclosure device of a quick - installation tower mast device for a 5G miniaturized base station of the present utility model;

[0023] Figure 6 The figure shows a structural schematic diagram of a lightning rod of a quick - installation tower mast device for a 5G miniaturized base station of the present utility model;

[0024] Explanation of the reference numerals in the drawings:

[0025] 1 - Base; 2 - Counterweight; 3 - Mast; 4 - Connector; 5 - Enclosure device; 6 - Lightning rod; 7 - Lock rod; 8 - Wall - mounted equipment;

[0026] 11 - Channel steel; 12 - Strip - shaped angle iron; 13 - Strip - shaped channel steel; 21 - Through - hole; 31 - Flange; 32 - Reinforcing rib; 33 - Lock hole. Detailed implementation manners

[0027] The following further describes the present utility model in conjunction with the drawings and specific embodiments:

[0028] As Figures 1-6 shown, a quick - installation tower mast device for a 5G miniaturized base station provided by the present utility model includes a base, a counterweight, at least two masts and connectors; the counterweight is installed on the base, at least two masts are vertically arranged on the base and the counterweight is located around the masts, the masts are used for mounting a 5G miniaturized base station, the connectors are arranged between adjacent masts and both ends of the connectors are respectively connected to adjacent masts, and an installation part for installing a lightning rod is provided at the upper end of one of the at least two masts.

[0029] It can be seen from the above description that the present utility model has the following beneficial effects:

[0030] A quick-installation tower mast device for a 5G miniaturized base station provided by the utility model includes a base, a counterweight, at least two mast poles, and a connecting piece; the counterweight is installed on the base, at least two mast poles are vertically arranged on the base and the counterweight is located around the mast poles, the mast poles are used for mounting the 5G miniaturized base station, the connecting piece is arranged between two adjacent mast poles and both ends of the connecting piece are respectively connected with two adjacent mast poles, and an installation part for installing a lightning rod is arranged at the upper end of one of the at least two mast poles. Compared with the traditional ground tower construction which usually requires on-site pouring of concrete foundation, this not only takes a lot of time and manpower, but also the foundation curing process is relatively long, which often affects the overall progress of the project. While the counterweight quick-installation tower mast device of the utility model uses a counterweight as the foundation, without the need for long-term curing, greatly shortening the station construction period, and can complete the station construction within one day, greatly shortening the construction period. At the same time, the quick-installation tower mast device is composed of multiple standard modules, each module can be produced, transported and stored separately, and standardized construction can be realized for different scenarios. Compared with the fixed foundation, it is also easy to disassemble and reassemble, facilitating maintenance, upgrading or migration.

[0031] Further, the base is formed by enclosing a space with four channel steels distributed in a rectangle. Inside the space, there is a counterweight installation part formed by strip angle steels and a mast pole fixing part formed by strip channel steels. The counterweight installation parts are distributed on the opposite sides or around the mast pole fixing part.

[0032] As can be seen from the above description, the base is formed through the above structure, and the counterweight installation part and the mast pole fixing part are formed on the base.

[0033] Further, both the strip angle steels and the channel steels opposite to the strip angle steels are provided with installation holes, the counterweight is provided with through holes, and the locking rod passes through one installation hole and the through hole in sequence and then is connected with the other installation hole.

[0034] As can be seen from the above description, through the above structure, the quick assembly of the counterweight and the base is realized.

[0035] Further, one end of the mast pole fixed to the base is provided with a flange plate, the flange plate is provided with reinforcing ribs and locking holes, and the locking piece is fixedly connected with the strip channel steel on the base through the locking holes.

[0036] As can be seen from the above description, through the above structure, the assembly of the mast pole and the strip channel steel on the base is realized, and the structural strength is improved by adding reinforcing ribs.

[0037] Further, the number of the mast poles is two, the height of each mast pole is 3 meters, the diameter is 76mm, and the wall thickness is 5mm; the number of the counterweights is six, the weight of each counterweight is 94KG, the maximum height of the connecting piece is not higher than 1.2 meters, and the hanging weight of each mast pole does not exceed 40KG.

[0038] From the above description, it can be seen that the wind resistance and anti-overturning capability of the system can be met through the above specific parameter configuration.

[0039] Furthermore, every three counterweight blocks are divided into a group, and two groups of counterweight blocks are symmetrically distributed on both horizontal sides of the strip channel steel.

[0040] It can be seen from the above description that the above specific layout makes the overall structure more stable and balanced.

[0041] Furthermore, the number of the connecting pieces is two, the two connecting pieces are arranged vertically and parallel to each other, and the two connecting pieces are used to install the wall-mounted equipment.

[0042] From the above description, it can be seen that providing the connecting piece not only improves the stability of the pole, but can also be used to install wall-mounted equipment to improve its utilization rate.

[0043] Furthermore, a blocking device is provided on the base, and the blocking device is arranged corresponding to the position of the holding pole.

[0044] From the above description, it can be seen that the fencing device not only has a safety protection function, but can also be used as an advertising column. It can not only beautify the site environment and enhance the corporate image, but also achieve value-added effects.

[0045] Furthermore, the counterweight block is a cement counterweight block.

[0046] From the above description, it can be seen that cement counterweight blocks are easy to obtain and have low cost.

[0047] Furthermore, the lightning rod is a hot-dip galvanized round steel with a diameter of 22 mm, and the top of the hot-dip galvanized round steel is needle-shaped.

[0048] From the above description, it can be seen that the use of lightning rods of the above specifications meets actual needs.

[0049] Several preferred embodiments or application examples are listed below to help those skilled in the art better understand the technical content of the utility model and the technical contribution made by the utility model relative to the prior art:

[0050] Preferred embodiment one:

[0051] like Figures 1 through 6 As shown, the utility model provides a 5G miniaturized base station quick-install tower mast device, including a base 1, six counterweights 2, two holding poles 3, two connecting pieces 4, two enclosure devices 5 and a lightning rod 6;

[0052] The base 1 is horizontally arranged and surrounded by four channel steels 11 in a rectangular distribution to form a space. Inside the space, there is a counterweight installation part formed by strip angle irons 12 and a mast fixing part formed by strip channel steels 13. The counterweight installation parts are distributed on the opposite sides of the mast fixing part. Specifically, the number of strip angle irons 12 is two, and the number of strip channel steels 13 is one. The three are parallel to each other and arranged at intervals. The two strip angle irons 12 are located on the left and right sides of one strip channel steel 13 and are both parallel to a group of opposite channel steels in the base.

[0053] In this embodiment, the counterweight 2 is installed on the base 1. Specifically, the counterweight installation part is jointly composed of one strip angle iron 12 and one channel steel 11 in the base opposite to the strip angle iron. And installation holes are provided on both the strip angle iron 12 and the channel steel 11. A through hole 21 is provided on the counterweight 2. The lock rod 7 is sequentially passed through one installation hole and the through hole and then connected to the other installation hole, so as to realize the rapid assembly of the counterweight on the counterweight installation part. The counterweight is a cement counterweight, such as made of C20 concrete, which is convenient for obtaining materials and has low cost. The number of the counterweights is six, and the weight of each counterweight is 94KG. The counterweights are in the shape of a cuboid, with square upper and lower end faces, a side length of 500mm, and a height of 150mm. The two through holes are symmetrically distributed with respect to the center axis of the counterweight, the aperture of the through hole is 20mm, and the distance from the side is 50mm. Every three of the counterweights are divided into a group, and the two groups of counterweights are symmetrically distributed on the horizontal sides of the strip channel steel.

[0054] The number of the masts 3 is two. The height of each mast 3 is 3 meters, the diameter is 76mm, and the wall thickness is 5mm; the windward area of each mast should be less than 0.4m². The masts 3 are vertically arranged on the base 1 and the counterweights 2 are located around the masts. The hanging weight of each mast does not exceed 40KG. The masts are used for hanging 5G miniaturized base stations. The device design meets the relevant wireless coverage indicators and electrical indicators, and the device structure is simple and firm, and does not affect the operation and maintenance requirements of the equipment after installation. One end of the mast 3 fixed to the base is provided with a flange 31, and the flange 31 is provided with a reinforcing rib 32 and a lock hole 33. The locking part is fixedly connected to the strip channel steel on the base through the lock hole 33. Through the above structure, the assembly of the mast and the strip channel steel on the base is realized, and the structural strength is improved by adding a reinforcing rib.

[0055] The number of the connecting members 4 is two. The two connecting members 4 are arranged vertically and parallel to each other, and the two connecting members 4 are used for installing wall-mounted devices. The connecting members 4 are arranged between two adjacent pole towers 3, and both ends of the connecting members 4 are respectively connected to two adjacent pole towers 3. The connecting members and the pole towers can be fixed by using the existing hoop structure. The maximum height of the connecting member is not higher than 1.2 meters. In this embodiment, the maximum height is 1160 mm. The setting of the connecting member not only plays a role in improving the stability of the pole tower, but also can be used for installing wall-mounted devices 8 to improve its utilization rate. In this embodiment, the connecting member is a flat iron of -6×60 mm. The installation position should not be set too high, otherwise it will affect the hanging capacity of the pole tower and deteriorate the stability of the pole tower. The upper galvanized flat iron strip should not exceed 1.2 m from the channel steel base, and the lower galvanized flat steel can be flexibly adjusted according to the equipment size.

[0056] An installation part for installing a lightning rod 6 is provided at the upper end of any one of the two pole towers 3. The installation part can adopt the existing hoop structure. The lightning rod 6 is a hot-dip galvanized round steel with a diameter of 22 mm, and the top end of the hot-dip galvanized round steel is needle-shaped.

[0057] The enclosure device 5 is arranged corresponding to the position of the pole tower. The height of the enclosure device 5 is 1200 mm, and the horizontal length is 1900 mm. The enclosure device not only has a safety protection function, but also can be used as an advertising billboard, which can not only beautify the site environment, enhance the corporate image, but also achieve an added value effect.

[0058] The 5G miniaturized base station quick-installation tower mast device formed by the above specific structure and parameters is detected to meet the wind resistance capacity with a wind pressure of 0.75 Kpa.

[0059] The present utility model has been described by the above related embodiments and drawings. However, the above embodiments are only examples for implementing the present utility model. It must be pointed out that the disclosed embodiments do not limit the scope of the present utility model. On the contrary, modifications and equivalent settings included in the spirit and scope of the claims are all included in the scope of the present utility model.

Claims

1. A 5G miniaturized base station quick-install tower mast device, characterized in that: It includes a base, a counterweight, at least two poles and a connecting piece; the counterweight is installed on the base, at least two poles are vertically arranged on the base and the counterweight is located around the poles, the poles are used to mount a 5G miniaturized base station, the connecting piece is arranged between two adjacent poles and the two ends of the connecting piece are respectively connected to the two adjacent poles, and the upper end of one of the at least two poles is provided with a mounting portion for installing a lightning rod.

2. A 5G miniaturized base station quick-install tower mast device according to claim 1, characterized in that: The base is formed by four channel steels arranged in a rectangular shape to enclose a space, in which a counterweight installation portion formed by strip angle irons and a pole fixing portion formed by strip channel steels are provided, and the counterweight installation portion is distributed on opposite sides or around the pole fixing portion.

3. A 5G miniaturized base station quick-install tower mast device according to claim 2, characterized in that: The strip angle iron and the channel steel opposite to the strip angle iron are both provided with mounting holes, the counterweight block is provided with a through hole, and the locking rod passes through one mounting hole and the through hole in sequence and is connected with the other mounting hole.

4. A 5G miniaturized base station quick-install tower mast device according to claim 2, characterized in that: A flange is provided at one end of the holding rod fixed to the base, and a reinforcing rib and a locking hole are provided on the flange. The locking piece is fixedly connected to the strip channel steel on the base through the locking hole.

5. A 5G miniaturized base station quick-install tower mast device according to claim 2, characterized in that: There are two holding poles, each of which has a height of 3 meters, a diameter of 76 mm, and a wall thickness of 5 mm; there are six counterweights, each of which weighs 94 kg; the maximum height of the connecting piece is not higher than 1.2 meters, and the mounting weight of each holding pole does not exceed 40 kg.

6. A 5G miniaturized base station quick-install tower mast device according to claim 5, characterized in that: Every three of the counterweight blocks are divided into one group, and two groups of counterweight blocks are symmetrically distributed on two horizontal sides of the strip channel steel.

7. A 5G miniaturized base station quick-install tower mast device according to claim 1, characterized in that: The number of the connecting pieces is two, and the two connecting pieces are arranged vertically and parallel to each other, and the two connecting pieces are used to install the wall-mounted equipment.

8. A 5G miniaturized base station quick-install tower mast device according to claim 1, characterized in that: The base is also provided with a blocking device, which is arranged corresponding to the position of the holding pole.

9. A 5G miniaturized base station quick-install tower mast device according to claim 1, characterized in that: The counterweight block is a cement counterweight block.

10. A 5G miniaturized base station quick-install tower mast device according to claim 1, characterized in that: The lightning rod is a hot-dip galvanized round steel with a diameter of 22 mm, and the top of the hot-dip galvanized round steel is in the shape of a needle tip.