Water permeability testing tool for cabinet processing
By designing a permeability testing fixture for cabinet processing, automated loading and unloading and all-round air drying are achieved, solving the problems of low automation and efficiency in existing permeability testing technologies, reducing the labor intensity of workers, and improving testing efficiency and accuracy.
Patent Information
- Application Number
- CN202423196332.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-24
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-12-24
AI Technical Summary
The current testing of water permeability of cabinet panels has a low degree of automation and efficiency, requiring manual loading and unloading, which increases the labor intensity of workers and results in poor tooling practicality.
A water permeability testing fixture for cabinet processing was designed, comprising a handling mechanism, a testing mechanism, a sealing mechanism, and a drying mechanism. It enables automated loading and unloading, pressure testing, and all-round drying, reducing manual operation and improving testing efficiency and accuracy.
Automated loading and unloading and all-round air drying process reduce the labor intensity of workers, improve the efficiency and accuracy of water permeability testing, and enhance the practicality of the tooling.
Smart Images

Figure CN223565523U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a cabinet test technical field especially relates to a water permeability test frock for cabinet processing. BACKGROUND
[0002] The cabinet is the platform that stores kitchenware and cooks in the kitchen, usually by cabinet, door board, hardware and table top etc. composition, along with people's living standards improve, people's requirement to cabinet is also higher and higher, because cabinet often contacts liquid, the water permeability of cabinet becomes the point that user pays great attention to. In the processing process of cabinet, the staff needs to use water permeability testing device to detect the water permeability of cabinet board, to ensure the quality of finished product cabinet.
[0003] Compared with the prior art, the existing cabinet board water permeability test has low automation degree and efficiency, and manual feeding and discharging of the board is needed, which increases the labor intensity of workers and leads to poor practicality of the frock. Therefore, the water permeability test frock for cabinet processing is proposed to solve the above problems. UTILITY MODEL CONTENTS
[0004] The utility model discloses a water permeability test frock for cabinet processing which overcomes the defects of the prior art.
[0005] The utility model discloses a water permeability test frock for cabinet processing which overcomes the defects of the prior art.
[0006] The utility model discloses a water permeability test frock for cabinet processing which overcomes the defects of the prior art.
[0007] As a further scheme of the utility model: one side of the mounting base is provided with a control panel.
[0008] As a further scheme of the utility model: the outside of the mounting base is provided with a material placing table.
[0009] As a further scheme of the utility model: the test mechanism includes installation bottom plate, installation bottom plate is fixed on the inner wall of water storage tank through bolt, the top of installation bottom plate is fixed with a plurality of hydraulic rod A, the top of hydraulic rod A is fixed with support frame, the top of support frame is fixed with a plurality of vacuum chuck A, the bottom of installation support is fixed with air pump through bolt, one side of air pump is fixed with gas pipe, gas pipe is connected with water storage tank.
[0010] As a further scheme of the utility model: the sealing mechanism includes hydraulic rod B, hydraulic rod B is fixed on one side of installation support through bolt, one end of hydraulic rod B is fixed with sealing plate, the outside of sealing plate is slidably connected with installation sliding slot, installation sliding slot is fixedly connected with water storage tank.
[0011] As a further scheme of the utility model: the first air-drying mechanism includes connecting plate A, connecting plate A is fixed on the side wall of sliding seat through bolt, the bottom of connecting plate A is fixed with rotating seat A through bolt, one side of rotating seat A is fixed with adjusting motor A, the output end of adjusting motor A is fixed with driving seat A, the outside of driving seat A is fixed with high-speed fan A through bolt.
[0012] As a further scheme of the utility model: the second air-drying mechanism includes connecting plate B, connecting plate B is fixed on the side wall of sliding seat through bolt, the bottom of connecting plate B is fixed with rotating seat B through bolt, one side of rotating seat B is fixed with adjusting motor B, the output end of adjusting motor B is fixed with driving seat B, the outside of driving seat B is fixed with high-speed fan B through bolt.
[0013] In summary, due to the adoption of the above technical scheme, the utility model has the beneficial effects that:
[0014] 1. The carrying mechanism is arranged to automatically load and unload the plate, so that manual operation is not needed, the labor intensity of workers is reduced, and the automation degree of the test operation is improved.
[0015] 2. The test mechanism is arranged to test the plate under pressure, so that the penetration speed of water on the plate is accelerated, and the test operation efficiency is improved.
[0016] 3. The second air-drying mechanism is arranged to dry the lower surface of the plate, and the first air-drying mechanism cooperates with the second air-drying mechanism to perform all-round air-drying treatment on the plate, so that the water droplets attached to the plate do not interfere with the test result, and the accuracy of the test operation is ensured. BRIEF DESCRIPTION OF DRAWINGS
[0017] Figure 1 A perspective view of the utility model is shown.
[0018] Figure 2 A schematic diagram of a shaft measurement cross-sectional structure is shown according to an embodiment of the present application.
[0019] Figure 3 A schematic diagram of a part A enlarged structure is shown according to an embodiment of the present application. Figure 2
[0020] Figure 4 A schematic diagram of a part B enlarged structure is shown according to an embodiment of the present application. Figure 2
[0021] Figure 5 A schematic diagram of a front view cross-sectional structure is shown according to an embodiment of the present application.
[0022] Figure 6 A schematic diagram of a part C enlarged structure is shown according to an embodiment of the present application. Figure 5
[0023] Figure 7 A schematic diagram of a partial structure is shown according to an embodiment of the present application.
[0024] Legend:
[0025] 100 mounting base, 110 control panel, 120 water storage tank, 130 mounting support, 140 material placing table, 210 mounting bottom plate, 220 hydraulic rod A, 230 support frame, 231 vacuum chuck A, 240 air pump, 241 air conveying pipe, 310 hydraulic rod B, 320 sealing plate, 330 mounting sliding groove, 410 mounting rail, 420 driving motor, 421 screw rod, 430 sliding seat, 440 tension sensor, 450 connecting support, 460 hydraulic rod C, 470 clamping plate, 471 vacuum chuck B, 510 connecting plate A, 520 rotating seat A, 530 adjusting motor A, 540 driving seat A, 550 high-speed fan A, 610 connecting plate B, 620 rotating seat B, 630 adjusting motor B, 640 driving seat B, 650 high-speed fan B. DETAILED DESCRIPTION
[0026] In the description of the present application, it should be understood that the orientation or positional relationship indicated by the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present application.
[0027] In the description of the utility model, the meaning of "multiple" is two or more than two, unless otherwise explicitly specified and limited.
[0028] In the description of the utility model, it is necessary to explain that, unless otherwise explicitly specified and limited, the terms "installation" "set with" "sleeve / interface" "connection" and the like should be understood broadly, for example "connection", can be fixed connection, can be detachable connection, or integrally connected;Can be mechanical connection, can be electrical connection;Can be directly connected, can be indirectly connected through intermediate medium, can be the communication inside two elements.For the ordinary skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
[0029] Please refer to Figures 1-7 The utility model provides a technical scheme: including installation base 100, one side of installation base 100 is provided with control panel 110, the top of installation base 100 is fixed with water storage tank 120 through bolt, the inside of water storage tank 120 is provided with testing mechanism, the side wall of installation base 100 is fixed with installation support 130 through bolt, the outside of installation base 100 is provided with material placing table 140, one side of installation support 130 is provided with sealing mechanism, the top of installation support 130 is provided with handling mechanism;The handling mechanism includes installation rail 410, drive motor 420, screw rod 421, sliding seat 430, tension sensor 440, connecting support 450, hydraulic rod C 460, clamping plate 470 and vacuum chuck B 471, the side wall of sliding seat 430 is provided with first air drying mechanism, the side wall of sealing mechanism is provided with second air drying mechanism;Through the setting handling mechanism is carried out automatic feeding and discharging operation to plate material, does not need manual operation, reduces the labor intensity of worker, improves the automation degree of testing operation, through testing mechanism is carried out to plate material pressure test, can accelerate the penetration speed of water to plate material, improves the efficiency of testing operation, and then improves the practicality of tooling.
[0030] Specifically, the testing mechanism includes a mounting plate 210, the mounting plate 210 is fixed to the inner wall of the water storage tank 120 by bolts, a plurality of hydraulic rods A 220 are fixed to the top of the mounting plate 210, a support frame 230 is fixed to the top of the hydraulic rod A 220, a plurality of vacuum chucks A 231 are fixed to the top of the support frame 230, a gas pump 240 is fixed to the bottom of the installation support 130 by bolts, a gas pipe 241 is fixed to one side of the gas pump 240, and the gas pipe 241 is connected with the water storage tank 120;Through the setting testing mechanism is carried out to plate material pressure test, can accelerate the penetration speed of water to plate material, improves the efficiency of testing operation.
[0031] Specific, the sealing mechanism includes hydraulic rod B310, the hydraulic rod B310 is fixed on one side of the mounting bracket 130 by bolt, one end of the hydraulic rod B310 is fixed with sealing plate 320, the outer side of the sealing plate 320 is slidably connected with mounting groove 330, the mounting groove 330 is fixedly connected with the water storage tank 120;By setting the sealing mechanism, the clamping and positioning of the plate is completed, the hydraulic rod B310 drives the sealing plate 320 to move, the water storage tank 120 is sealed by the sealing plate 320, and the sealing property of the water storage tank 120 during the test operation is ensured.
[0032] Specific, the first drying mechanism includes connecting plate A510, the connecting plate A510 is fixed on the side wall of the sliding seat 430 by bolt, the bottom of the connecting plate A510 is fixed with rotating seat A520 by bolt, one side of the rotating seat A520 is fixed with adjusting motor A530, the output end of the adjusting motor A530 is fixed with driving seat A540, the outer side of the driving seat A540 is fixed with high-speed fan A550 by bolt;The upper surface of the plate is dried by setting the first drying mechanism.
[0033] Specific, the second drying mechanism includes connecting plate B610, the connecting plate B610 is fixed on the side wall of the sliding seat 430 by bolt, the bottom of the connecting plate B610 is fixed with rotating seat B620 by bolt, one side of the rotating seat B620 is fixed with adjusting motor B630, the output end of the adjusting motor B630 is fixed with driving seat B640, the outer side of the driving seat B640 is fixed with high-speed fan B650 by bolt;The lower surface of the plate is dried by setting the second drying mechanism, the first drying mechanism and the second drying mechanism cooperate to dry the plate in all directions, avoid the water droplets attached to the plate from interfering with the test result, and ensure the accuracy of the test operation.
[0034] Working principle: in use, the operation of the tool is controlled through the control panel 110, the plate is placed through the material placing table 140, the driving motor 420 is started, the driving motor 420 drives the screw rod 421 to rotate, the screw rod 421 drives the sliding seat 430 to move, and then drives the clamping plate 470 and the vacuum chuck B 471 to move, the hydraulic rod C 460 is started, the hydraulic rod C 460 drives the clamping plate 470 and the vacuum chuck B 471 to move to the plate position, the plate is adsorbed and clamped through the vacuum chuck B 471, the weight of the undetected plate is detected through the tension sensor 440, and it is carried to the test mechanism part, realizing the automatic feeding operation of the plate, a sufficient amount of water is injected into the water storage tank 120, the hydraulic rod A 220 is started, the hydraulic rod A 220 drives the supporting frame 230 and the vacuum chuck A 231 to move upwards, the plate is adsorbed and clamped through the vacuum chuck A 231, after the clamping and positioning of the plate are completed, the hydraulic rod B 310 is started, the hydraulic rod B 310 drives the sealing plate 320 to move, the sealing plate 320 seals the water storage tank 120, the air pump 240 is started, the air pump 240 fills the inside of the water storage tank 120 through the gas conveying pipe 241 to pressurize, which can accelerate the penetration speed of water to the plate, after the test is completed, the plate is clamped and moved to the top through the carrying mechanism, the high-speed fan A 550 is started, air is blown to the upper surface of the plate through the high-speed fan A 550, in the process, the adjusting motor A 530 is started, the adjusting motor A 530 drives the driving seat A 540 to rotate, the driving seat A 540 drives the high-speed fan A 550 to rotate, which can adjust the blowing angle of the high-speed fan A 550, realize the air drying operation of the upper surface of the plate, the high-speed fan B 650 is started, air is blown to the upper surface of the plate through the high-speed fan B 650, in the process, the adjusting motor B 630 is started, the adjusting motor B 630 drives the driving seat B 640 to rotate, the driving seat B 640 drives the high-speed fan B 650 to rotate, which can adjust the blowing angle of the high-speed fan B 650, realize the air drying operation of the lower surface of the plate, the first air drying mechanism and the second air drying mechanism cooperate to realize the all-round air drying treatment of the plate, finally, the weight of the plate is detected again through the tension sensor 440, and compared with the detection data of the first time, the water permeability of the plate is obtained according to the detected weight difference.
[0035] The motor involved in the embodiment, the matched control system, the electromagnetic switch and the pipeline line can also be provided by the manufacturer. In addition, the power supply module, the circuit and the electronic components and the control module involved in the utility model are all prior art, and a person skilled in the art can realize them without further description. The content protected by the utility model does not involve improvement of internal structure and method.
[0036] The utility model discloses although disclosed the embodiment and drawing, but the technical personnel of the art can understand: in not departing from the spirit and scope of the utility model and the attached claim, various substitutions, changes and modifications are possible, therefore, the range of the utility model is not limited to the content disclosed in the embodiment and drawing.
Claims
1. A water permeability test jig for cabinet processing, characterized by, The application relates to a water storage and testing device, which comprises a mounting base (100), the top of the mounting base (100) is fixed with a water storage tank (120) through bolts, the inside of the water storage tank (120) is provided with a testing mechanism, the sidewall of the mounting base (100) is fixed with a mounting support (130) through bolts, one side of the mounting support (130) is provided with a sealing mechanism, and the top of the mounting support (130) is provided with a carrying mechanism. The carrying mechanism comprises a mounting rail (410), the mounting rail (410) is fixed to the top of the mounting support (130) through bolts, one end of the mounting rail (410) is fixed with a driving motor (420) through bolts, the output end of the driving motor (420) is fixed with a lead screw (421), the outer side of the lead screw (421) is provided with a sliding seat (430), the inner wall of the sliding seat (430) is fixed with a tension sensor (440) through bolts, the bottom of the tension sensor (440) is fixed with a connecting support (450) through bolts, the outer side of the connecting support (450) is fixed with a hydraulic rod C (460), the bottom of the hydraulic rod C (460) is fixed with a clamping plate (470), the bottom of the clamping plate (470) is provided with a plurality of vacuum suction cups B (471), the sidewall of the sliding seat (430) is provided with a first air drying mechanism, and the sidewall of the sealing mechanism is provided with a second air drying mechanism.
2. The water permeability test tool for cabinet processing according to claim 1, wherein One side of the mounting base (100) is provided with a control panel (110).
3. The water permeability test tool for cabinet processing according to claim 2, characterized by The outer side of the mounting base (100) is provided with a material placing table (140).
4. The water permeability test tool for cabinet processing according to claim 1, wherein The testing mechanism comprises a mounting bottom plate (210), the mounting bottom plate (210) is fixed to the inner wall of the water storage tank (120) through bolts, the top of the mounting bottom plate (210) is fixed with a plurality of hydraulic rods A (220), the top of the hydraulic rod A (220) is fixed with a supporting frame (230), the top of the supporting frame (230) is fixed with a plurality of vacuum suction cups A (231), the bottom of the mounting support (130) is fixed with an air pump (240) through bolts, one side of the air pump (240) is fixed with a gas conveying pipe (241), and the gas conveying pipe (241) is connected with the water storage tank (120).
5. The water permeability test tool for cabinet processing according to claim 1, wherein The sealing mechanism comprises a hydraulic rod B (310), the hydraulic rod B (310) is fixed to one side of the mounting support (130) through bolts, one end of the hydraulic rod B (310) is fixed with a sealing plate (320), the outer side of the sealing plate (320) is slidably connected with a mounting sliding groove (330), and the mounting sliding groove (330) is fixedly connected with the water storage tank (120).
6. The water permeability test tool for cabinet processing according to claim 1, wherein The first air-drying mechanism comprises a connecting plate A (510) fixed to the side wall of the sliding seat (430) by bolts, the bottom of the connecting plate A (510) is fixed with a rotating seat A (520) by bolts, one side of the rotating seat A (520) is fixed with an adjusting motor A (530), the output end of the adjusting motor A (530) is fixed with a driving seat A (540), the outer side of the driving seat A (540) is fixed with a high-speed fan A (550) by bolts.
7. The water permeability testing tool for cabinet processing according to claim 5, characterized in that, The second air-drying mechanism comprises a connecting plate B (610) fixed to the side wall of the sliding seat (430) by bolts, the bottom of the connecting plate B (610) is fixed with a rotating seat B (620) by bolts, one side of the rotating seat B (620) is fixed with an adjusting motor B (630), the output end of the adjusting motor B (630) is fixed with a driving seat B (640), the outer side of the driving seat B (640) is fixed with a high-speed fan B (650) by bolts.