Building construction steel pipe fixing device

By designing a combination of chutes, sliders, clamping blocks, and rollers, the problems of high friction and poor size adaptability during steel pipe transportation are solved, achieving convenient and labor-saving steel pipe removal and multi-size adaptability fixing effect.

CN223575010UActive Publication Date: 2025-11-21WEST INVESTMENT GROUP (HAINAN) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423192351.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-11-21
Estimated Expiration
2034-12-24

AI Technical Summary

Technical Problem

In the existing technology, the use of frame-type fixing devices during the transportation of steel pipes results in high friction, requiring a lot of manpower and time to remove the steel pipes, and the existing devices are difficult to adapt to steel pipes of different sizes.

Method used

A fixing device including a fixed frame, a slide, a slider, a clamping block and rollers is designed. The lateral friction is reduced by the cooperation of fasteners and rollers, and the adjustable telescopic rod and the two-way screw can adapt to steel pipes of different diameters.

Benefits of technology

This device makes it easier and more convenient to remove steel pipes, and can accommodate steel pipes of various sizes, thus improving the practicality and stability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223575010U_ABST
    Figure CN223575010U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of steel pipe fixing, and discloses a building construction steel pipe fixing device which comprises a fixing frame, a fixing rod is arranged above the fixing frame, first sliding grooves are formed in one side of the fixing frame and one side of the fixing rod, and sliding blocks are connected to the two sides in the two first sliding grooves in a sliding mode. One ends of the four sliding blocks are fixedly connected with first clamping blocks, one sides of the four first clamping blocks are rotationally connected with rolling wheels, the two sides of one side of the fixing frame are fixedly connected with mounting rods, one sides of the two mounting rods are slidably connected with movable rods, one ends of the two movable rods are fixedly connected with second clamping blocks, and the other ends of the two movable rods are fixedly connected with the second clamping blocks. The two edges of one side of each second clamping block are fixedly connected with an anti-skid pad. According to the steel pipe fixing device, when the steel pipe needs to be taken down from the fixing device, the steel pipe can be easily taken down through the steps, the clamping and fixing stability of the fixing device and the steel pipe is guaranteed, and meanwhile labor and time for disassembly are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to steel pipe fixing technical field especially relates to a building construction steel pipe fixing device. BACKGROUND

[0002] In the process of building construction, a large number of different sizes of steel pipes need to be used, and the steel pipes need to be fixed by using a fixing device when being transported and stacked to avoid safety hazards caused by rolling of the steel pipes.

[0003] After searching, the existing Chinese patent with publication number CN210650387U provides a building construction steel pipe fixing device, which comprises a mounting side plate and a steel pipe. One side of the mounting side plate is fixedly connected with a mounting bottom plate at the bottom end. A threaded hole is arranged at the top of the mounting side plate. An adjusting screw is installed in the threaded hole. The adjusting screw is matched with the threaded hole through threads. A fixed top plate is installed on the adjusting screw. A hinge seat is arranged at the bottom end of the fixed top plate and the top end of the mounting bottom plate. Two hinge seats are arranged on the fixed top plate and the mounting bottom plate. The hinge seats on the fixed top plate and the mounting bottom plate are arranged in a rectangular shape. The steel pipe is fixed between the hinge seats on the fixed top plate and the mounting bottom plate. A support block is installed on the hinge seat. A backing plate is installed on the support block. The height of the device can be adjusted by the adjusting screw. The support block can rotate on the hinge seat to fix steel pipes of different sizes, which is more convenient to use.

[0004] However, in the prior art, a frame-shaped fixing device is usually used to snare the outside of the steel pipe to prevent the steel pipe from rolling during transportation. However, due to the large friction between the steel pipe and the fixing device, and the heavy weight of the steel pipe itself, it consumes a lot of manpower and time to remove the steel pipe from the fixing device. A solution is proposed to solve the problem in the background art. UTILITY MODEL CONTENTS

[0005] To make up for the above shortcomings, the utility model provides a building construction steel pipe fixing device to improve the problem that a frame-shaped fixing device is usually used to snare the outside of the steel pipe to prevent the steel pipe from rolling during transportation. However, due to the large friction between the steel pipe and the fixing device, and the heavy weight of the steel pipe itself, it consumes a lot of manpower and time to remove the steel pipe from the fixing device.

[0006] In order to achieve the above object, the utility model discloses the following technical scheme: including fixed frame, the upper portion of fixed frame is provided with fixed rod, and the one side of fixed frame and fixed rod is all seted up with one sliding slot, and the both sides of two one sliding slot interiors are all slidably connected with sliding block, and the one end of four sliding blocks is all fixedly connected with one clamping block, and the one side of four one clamping blocks is all rotatably connected with gyro wheel, and the both sides of fixed frame one side are all fixedly connected with mounting rod, and the one side of two mounting rods is all slidably connected with movable rod, and the one end of two movable rods is all fixedly connected with two clamping blocks, and the both sides of two two clamping blocks one side are all fixedly connected with antiskid pad, and the upper portion of two mounting rods is all fixedly connected with one sliding rod, and the middle part of two movable rods is all seted up with two sliding slots, and the outer surface of two one sliding rods is slidably connected with two two sliding slots respectively, and the outer surface of two one sliding rods is all screwed with one fastener.

[0007] Further description of the above technical scheme: when the fixed steel pipe needs to be removed from the device, the one fastener is first rotated to release the position limitation of the one sliding rod, then the movable rods on both sides are slid to separate the two clamping blocks on both sides of the steel pipe, then the device can be pulled to one end of the steel pipe, the one clamping blocks around the steel pipe will move to the end of the steel pipe and be removed, and when the one clamping blocks move, the gyro wheels can roll when the one clamping blocks move, so that the transverse friction between the one clamping blocks and the outer surface of the steel pipe is reduced, and the movement is more convenient and labor-saving.

[0008] Preferably, the both sides of the lower end of the fixed rod are fixedly connected with telescopic rods, and the outer surfaces of the two telescopic rods are slidably connected with the both sides of the fixed frame.

[0009] Further description of the above technical scheme: the telescopic rods can slide on both sides of the fixed frame after the position limitation is released, and are used for adjusting the longitudinal distance between the one clamping blocks.

[0010] Preferably, the both sides of the fixed frame are seted up with three sliding slots, and the one side of two telescopic rods is fixedly connected with two sliding rods.

[0011] Further description of the above technical scheme: the three sliding slots are used for guiding the sliding track of the telescopic rods.

[0012] Preferably, the outer surfaces of the two telescopic rods are slidably connected with the interiors of the two three sliding slots, and the outer surfaces of the two telescopic rods are screwed with two fasteners.

[0013] Further description of the above technical scheme: the two fasteners can fix the positions of the two telescopic rods after being screwed, and are used for fixing the positions of the telescopic rods.

[0014] Preferably, one side of the fixed frame and the fixed rod is fixedly connected with a mounting rack, and one side of the two mounting racks is rotatably connected with a bidirectional screw rod.

[0015] As a further description of the above technical solution: the mounting rack can be used to fix the two bidirectional screw rods on the side of the fixed rod and the fixed frame.

[0016] Preferably, the outer surfaces of the two bidirectional screw rods are threadedly connected with one side of the four sliding blocks, one end of the two bidirectional screw rods is fixedly connected with a connecting rod, and one end of the two connecting rods is rotatably connected with a rotating rod.

[0017] As a further description of the above technical solution: the bidirectional screw rod can drive the sliding blocks to separate or gather after rotation.

[0018] Preferably, the lower side of one of the mounting racks is fixedly connected with a bottom plate, and the outer surface of the bottom plate is uniformly provided with anti-skid lines.

[0019] As a further description of the above technical solution: the bottom plate can be used to release the support area of the bottom of the ground increasing device.

[0020] Preferably, the two sides of the two second clamping blocks are fixedly connected with a first reinforcing rib, and the periphery of the upper end of the bottom plate is fixedly connected with a second reinforcing rib.

[0021] As a further description of the above technical solution: the first reinforcing rib and the second reinforcing rib can be used to enhance the structural strength of the device.

[0022] Compared with the prior art, the device has the advantages and positive effects that,

[0023] 1、In the utility model, when the fixed steel pipe needs to be taken off from the device, the first fastener is first rotated to release the limitation of the first fastener on the first sliding rod, then the movable rods on both sides are slid to make the second clamping blocks clamped on both sides of the steel pipe separate from each other, then the device is pulled towards one end of the steel pipe, the first clamping blocks around the steel pipe move to the end of the steel pipe and are taken off, and when the first clamping blocks move, the rollers can roll when the first clamping blocks move, so that the transverse friction between the first clamping blocks and the outer surface of the steel pipe is reduced, the movement is more convenient and labor-saving, and by this method, when the steel pipe needs to be taken off from the fixing device, it can be easily taken off by the above steps, the stability of the fixing device and the clamping and fixing of the steel pipe is ensured, and the manpower and time during disassembly are reduced.

[0024] 2、The utility model discloses a fixed frame, a mounting rod, an extension rod, a fixed rod, a bidirectional screw rod, a sliding block, a connecting rod, a rotating rod, a first clamping block, a roller, a No. 3 sliding groove, a No. 2 fastener, a No. 2 sliding rod, a mounting frame, a No. 2 reinforcing rib, a bottom plate, an antiskid pattern, a No. 1 fastener, a movable rod, a No. 1 sliding groove, a No. 1 sliding rod, a No. 2 sliding groove, a No. 1 reinforcing rib and a No. 2 clamping block are provided. BRIEF DESCRIPTION OF DRAWINGS

[0025] Figure 1 A perspective view of a building construction steel pipe fixing device is provided for the utility model.

[0026] Figure 2 A top view of a limiting machine in the building construction steel pipe fixing device is provided for the utility model.

[0027] Figure 3 A sectional view of a fixed frame and a fixed rod in the building construction steel pipe fixing device is provided for the utility model.

[0028] Figure 4 A movable rod and a No. 2 clamping block in the building construction steel pipe fixing device are provided for the utility model.

[0029] LEGEND:

[0030] 1, fixed frame, 2, mounting rod, 3, extension rod, 4, fixed rod, 5, bidirectional screw rod, 6, sliding block, 7, connecting rod, 8, rotating rod, 9, first clamping block, 10, roller, 11, No. 3 sliding groove, 12, No. 2 fastener, 13, No. 2 sliding rod, 14, mounting frame, 15, No. 2 reinforcing rib, 16, bottom plate, 17, antiskid pattern, 18, No. 1 fastener, 19, movable rod, 20, No. 1 sliding groove, 21, No. 1 sliding rod, 22, No. 2 sliding groove, 23, No. 1 reinforcing rib, 24, No. 2 clamping block, 25, antiskid pad. DETAILED DESCRIPTION

[0031] With reference to the drawings of the embodiments of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the present application.

[0032] Referring to Figures 1 to 4 An embodiment provided by the present application: including fixed frame 1, the upper portion of fixed frame 1 is provided with fixed rod 4, one side of fixed frame 1 and fixed rod 4 is provided with one sliding slot 20, the two sides of the inside of two one sliding slot 20 are slidably connected with sliding block 6, one end of four sliding blocks 6 is fixedly connected with one clamping block 9, one side of four one clamping block 9 is rotatably connected with roller 10, the two sides of one side of fixed frame 1 are fixedly connected with mounting rod 2, one side of two mounting rods 2 is slidably connected with movable rod 19, one end of two movable rods 19 is fixedly connected with two clamping blocks 24, the two sides of one side of two two clamping blocks 24 are fixedly connected with non-slip mat 25, the upper portion of two mounting rods 2 is fixedly connected with one sliding rod 21, the middle portion of two movable rods 19 is provided with two sliding slots 22, the outer surface of two one sliding rods 21 is slidably connected with the inside of two two sliding slots 22, and the outer surface of two one sliding rods 21 is threadedly connected with one fastener 18.

[0033] In the embodiment, when the fixed steel pipe needs to be taken off from the device, one fastener 18 can be rotated first to release the limitation of one sliding rod 21, then the movable rods 19 on both sides are slid to separate the two clamping blocks 24 on both sides of the steel pipe, then the device can be pulled to one end of the steel pipe, and the one clamping blocks 9 around the steel pipe can be moved to the end of the steel pipe and taken off, and when the one clamping blocks 9 move, the rollers 10 can roll when the one clamping blocks 9 move, so that the transverse friction between the one clamping blocks 9 and the outer surface of the steel pipe is reduced, and the movement is more convenient and labor-saving. By the above steps, the device can be easily taken off when the steel pipe needs to be taken off from the fixing device, which reduces the manpower and time when disassembling while ensuring the stability of the fixing device and the clamping and fixing of the steel pipe.

[0034] Embodiment 2, as Figures 1 to 4As shown, the lower end of the fixed rod 4 is fixedly connected with the telescopic rod 3, the outer surface of the two telescopic rods 3 is respectively slidably connected with the two sides of the fixed frame 1, the two sides of the fixed frame 1 is respectively provided with the three number sliding groove 11, one side of the two telescopic rods 3 is fixedly connected with the second sliding rod 13, the outer surface of the two second sliding rods 13 is respectively slidably connected with the inside of the two three number sliding grooves 11, the outer surface of the two second sliding rods 13 is respectively screwed with the second fastener 12, one side of the fixed frame 1 and the fixed rod 4 is fixedly connected with the mounting bracket 14, one side of the two mounting brackets 14 is rotatably connected with the bidirectional screw rod 5, the outer surface of the two bidirectional screw rods 5 is respectively screwed with one side of the four sliding blocks 6, one end of the two bidirectional screw rods 5 is fixedly connected with the connecting rod 7, one end of the two connecting rods 7 is rotatably connected with the rotating rod 8, the lower side of the one mounting bracket 14 is fixedly connected with the bottom plate 16, the outer surface of the bottom plate 16 is evenly provided with the anti-skid pattern 17, the two sides of the two second clamping blocks 24 is fixedly connected with the first reinforcing rib 23, the outer surface of the bottom plate 16 is fixedly connected with the second reinforcing rib 15.

[0035] In this embodiment, when clamping and fixing different sizes of steel pipes, the rotating rod 8 can drive the two bidirectional screw rods 5 to rotate, the rotating bidirectional screw rods 5 can drive the sliding blocks 6 to move, when the distance between the opposite sliding blocks 6 increases, it can be used to fix the larger diameter steel pipe, otherwise it can fix the smaller diameter steel pipe, then the second fastener 12 can be rotated to release the limiting of the telescopic rod 3, then the telescopic rod 3 can be pulled up and down to adjust its position to the appropriate height, through the above operation, the outer surface of the steel pipe is clamped with the four first clamping blocks 9, then the position of the movable rod 19 is used to clamp the steel pipe with the second clamping block 24, through this method, the device can be adapted to more types of steel pipes during fixing, greatly enhancing the practicability of the device, and the second clamping method also makes the device more stable and safe when fixing the steel pipe.

[0036] Working principle: when the fixed steel pipe needs to be taken off from the device, the first fastener 18 is first rotated to release the limit of the first slide rod 21, then the movable rods 19 on both sides are slid to separate the second clamping blocks 24 on both sides of the steel pipe, then the device is pulled to one end of the steel pipe, the first clamping blocks 9 around the steel pipe move to the end of the steel pipe and are taken off, and when the first clamping blocks 9 move, the rollers 10 can roll when the first clamping blocks 9 move, so that the transverse friction between the first clamping blocks 9 and the outer surface of the steel pipe is reduced, so that the movement is more convenient and labor-saving, when clamping and fixing steel pipes of different sizes, the rotating rod 8 is rotated to drive the bidirectional screw rods 5 on both sides to rotate, the rotating bidirectional screw rods 5 can drive the sliding blocks 6 to move, when the distance between the opposite sliding blocks 6 increases, it can be used to fix the steel pipe with larger diameter, otherwise it can fix the steel pipe with smaller diameter, then the second fastener 12 is rotated to release the limit of the telescopic rod 3, then the telescopic rod 3 is pulled to move up and down, and the position is adjusted to the appropriate height, after the outer surface of the steel pipe is clamped by the four first clamping blocks 9 through the above operation, the position of the movable rod 19 is used to clamp the steel pipe again.

[0037] Finally, it should be pointed out that: the above only for the preferred embodiments of the utility model, and does not limit the utility model, although the utility model is described in detail with reference to the foregoing embodiments, for the person skilled in the art, it still can modify the technical scheme recorded in the foregoing each embodiment, or equivalent replacement to part of technical features, any modification, equivalent replacement, improvement etc. within the spirit and principles of the utility model, should be contained in the protection scope of the utility model.

Claims

1. A construction steel pipe fixing device comprising a fixing frame (1), characterized in that: The upper side of the fixed frame (1) is provided with a fixed rod (4), one side of the fixed frame (1) and the fixed rod (4) is provided with a first sliding groove (20), both sides of the two first sliding grooves (20) are slidably connected with a sliding block (6), one end of the four sliding blocks (6) is fixedly connected with a first clamping block (9), one side of the four first clamping blocks (9) is rotatably connected with a roller (10), both sides of the fixed frame (1) are fixedly connected with a mounting rod (2), one side of the two mounting rods (2) is slidably connected with a movable rod (19), one end of the two movable rods (19) is fixedly connected with a second clamping block (24), both sides of the two second clamping blocks (24) are fixedly connected with a non-slip pad (25), the upper side of the two mounting rods (2) is fixedly connected with a first sliding rod (21), the middle part of the two movable rods (19) is provided with a second sliding groove (22), the outer surfaces of the two first sliding rods (21) are slidably connected with the interiors of the two second sliding grooves (22), and the outer surfaces of the two first sliding rods (21) are threadedly connected with a first fastener (18).

2. A construction steel pipe fixing device according to claim 1, characterized in that: Both sides of the lower end of the fixed rod (4) are fixedly connected with a telescopic rod (3), and the outer surfaces of the two telescopic rods (3) are slidably connected with both sides of the fixed frame (1).

3. A construction steel pipe fixing device according to claim 2, characterized in that: Both sides of the fixed frame (1) are provided with a third sliding groove (11), and one side of the two telescopic rods (3) is fixedly connected with a second sliding rod (13).

4. A device for securing a steel pipe for construction purposes according to claim 3, characterized in that: The outer surfaces of the two second sliding rods (13) are slidably connected with the interiors of the two third sliding grooves (11), and the outer surfaces of the two second sliding rods (13) are threadedly connected with a second fastener (12).

5. A device for securing a construction steel pipe according to claim 1, characterized in that: One side of the fixed frame (1) and the fixed rod (4) is fixedly connected with a mounting bracket (14), and one side of the two mounting brackets (14) is rotatably connected with a bidirectional screw rod (5).

6. A construction steel pipe fixing device according to claim 5, characterized in that: Both sides of the outer surfaces of the two bidirectional screw rods (5) are threadedly connected with one side of the four sliding blocks (6), one end of the two bidirectional screw rods (5) is fixedly connected with a connecting rod (7), and one end of the two connecting rods (7) is rotatably connected with a rotating rod (8).

7. A device for securing a steel pipe for construction purposes according to claim 6, characterized in that: The lower side of one of the mounting brackets (14) is fixedly connected with a bottom plate (16), and the outer surfaces of the bottom plate (16) are uniformly provided with anti-skid lines (17).

8. A construction steel pipe fixing device according to claim 7, characterized in that: Both sides of the two second clamping blocks (24) are fixedly connected with a first reinforcing rib (23), and the upper end of the bottom plate (16) is fixedly connected with a second reinforcing rib (15).

Citation Information

Patent Citations

  • Building construction steel pipe fixing device

    CN210650387U