Landscaping plant climbing frame

Through innovative design of support poles and fixing components, the problems of unstable structure and unstable fixation of climbing frames have been solved, achieving a stable connection and simplified installation of climbing frames, and improving the stability and safety of climbing frames.

CN223666896UActive Publication Date: 2025-12-16GUANGDONG YIMIAO CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422659799.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-12-16
Estimated Expiration
2034-10-31

AI Technical Summary

Technical Problem

Existing climbing frames cannot allow plants to climb stably on their upper parts. The unstable structure affects growth and safety, the unstable fixation leads to the risk of tipping over, and the installation is complicated and time-consuming.

Method used

A climbing frame for garden plants was designed, which adopts a combination structure of support rods, connecting rods, auxiliary rods, fixing rods and main beams. Combined with the fixing components of gripping foot plates, fixing sleeves and rotating rings, it achieves quick and stable connection and adjustment through the cooperation of injection pipes and springs.

Benefits of technology

It improves the stability and safety of the climbing frame, simplifies the installation process, enhances ease of operation, and extends the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223666896U_ABST
    Figure CN223666896U_ABST
Patent Text Reader

Abstract

The utility model discloses a landscaping plant climbing frame which comprises four supporting frame rods, a supporting assembly is arranged on the supporting frame, the supporting assembly comprises a connecting rod, an auxiliary rod, a fixing rod, a main beam and a top rod, the connecting rod is connected between the supporting frame rods, the auxiliary rod is arranged at the top of the connecting rod, and the fixing rod is arranged on the top of the connecting rod. The fixing rods are arranged at the tops of the two ends of the auxiliary rod, the main beam is arranged at the middle end of the connecting rod, the top rod is arranged on the main beam, a fixing assembly is arranged on the supporting frame rod and comprises a grabbing foot plate, a fixing sleeve and a rotating ring, the grabbing foot plate is installed on the supporting frame rod, and the fixing sleeve is sleeved with the rotating ring. The fixing sleeve is slidably connected to the grabbing foot plate, and the rotating ring is rotatably connected to the fixing sleeve, so that the technical problem that a plant cannot stably climb at the upper end of an existing climbing frame mentioned in the background art in the using process is solved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of climbing frame, more specifically, it relates to a garden greening plant climbing frame. BACKGROUND

[0002] In the prior art, the current climbing frame cannot make plants stably climb on its upper end during use, which seriously affects the growth effect and overall landscape presentation of plants. The unstable structure of the upper end of the climbing frame makes it difficult for plants to extend upward, affecting their natural growth. Plants cannot evenly cover the upper part of the climbing frame, resulting in poor landscape effect. The unstable upper end structure may cause the plant branches to break or be damaged.

[0003] The existing climbing frame technology has a significant limitation during use, which is the inability to conveniently fix the locking block. This problem not only affects the stability and safety of the climbing frame, but also brings many challenges to the daily operation and maintenance of horticultural workers, which may involve the adjustment and alignment of multiple components. This complex operation not only consumes time and effort, but also may require professional tools and skills, increasing the installation difficulty and operation threshold.

[0004] The current climbing frame cannot stably ensure fixation with the ground during use, which directly affects the safety and durability of the climbing frame. Unstable fixation may cause the climbing frame to tip over, causing safety accidents. Shaking of the climbing frame will affect the normal growth and climbing of plants. Unstable climbing frame affects the aesthetic and coordination of the overall landscape. Unstable fixation causes the climbing frame to be easily displaced or tipped over in strong wind weather. UTILITY MODEL CONTENTS

[0005] (I) Technical problem solved

[0006] In view of the problems existing in the prior art, the utility model provides a garden greening plant climbing frame to solve the technical problem that the current climbing frame cannot make plants stably climb on its upper end during use mentioned in the background art.

[0007] (II) Technical solution

[0008] To achieve the above object, the utility model provides following technical scheme: A kind of garden afforestation plant climbing frame, including support frame pole, the support frame pole is provided with four, support assembly is provided on the support frame, the support assembly includes connecting rod, auxiliary rod, fixed rod, main beam and top rod, the connecting rod is connected between support frame pole, the auxiliary rod is arranged at the top of connecting rod, the fixed rod is arranged at the top of both ends of auxiliary rod, the main beam is arranged at the middle end of connecting rod, the top rod is arranged on main beam, fixed component is provided on the support frame pole, the fixed component includes grab fixed footboard, fixed sleeve and rotating ring, the grab fixed footboard is installed on support frame pole, the fixed sleeve is slidably connected on grab fixed footboard, the rotating ring is rotatably connected on fixed sleeve.

[0009] The utility model further provides that the auxiliary frame is connected between the support frame pole and the connecting rod, which facilitates the use of the climbing frame.

[0010] The utility model further provides that the connecting plate is connected at the connection between the auxiliary frame and the support frame pole and the connecting rod, which facilitates the stability of the climbing frame.

[0011] The utility model further provides that the rotating ring is uniformly connected with rotating blocks, the fixed sleeve is slidably connected with a moving sleeve, the moving sleeve is provided with a moving groove, the moving groove is matched with the rotating blocks, a first spring is connected between the moving sleeve and the fixed sleeve, and the compression of the first spring is completed through the cooperation of the components.

[0012] The utility model further provides that the bottom of the fixed sleeve is provided with a pointed end, a pouring pipe is slidably connected in the fixed sleeve, and a pouring port is formed in the pouring pipe, so that the pouring of concrete is completed through the cooperation of the components.

[0013] The utility model further provides that the fixed sleeve is provided with a stabilizing assembly, the stabilizing assembly includes a rotating rod, a second spring and a driving rod, the rotating rod is rotatably connected to the fixed sleeve, the second spring is connected between the rotating rod and the fixed sleeve, the driving rod is slidably connected to the fixed sleeve, one end of the driving rod is in close contact with the rotating rod, and the compression of the second spring is completed through the cooperation of the components.

[0014] The utility model further provides that a limiting groove is formed in the fixed sleeve, a third spring is sleeved on the driving rod, the third spring is arranged at the limiting groove, one end of the driving rod is connected with a moving plate, the moving plate is in close contact with the pouring pipe, and the compression of the third spring is completed through the cooperation of the components.

[0015] The utility model further sets up, the mobile sleeve is equipped with locking piece on the sliding connection, the injection pipe is equipped with locking groove, the locking piece is matched with locking groove, the locking piece is equipped with fixed sleeve sliding connection, the injection pipe top connection is equipped with roof, the roof is close -fitted with fixed sleeve, through the cooperation of each component makes the locking process of locking piece is completed.

[0016] (Three) beneficial effect

[0017] Compared with the prior art, the utility model provides a garden greening plant climbing frame has the following beneficial effects:

[0018] 1, the support assembly clever design, through the reasonable configuration of support frame pole, connecting rod, auxiliary rod, fixed rod, main beam and top rod, formed a stable frame structure, the addition of auxiliary frame and connecting plate further enhances the overall stability, this design not only provides strong support, also has good adaptability, can satisfy different plant climbing demand, simultaneously, its modular design facilitates assembly and adjustment, improves use flexibility and efficiency.

[0019] 2, the design innovation of fixed component, adopts the combination of grab fixed footboard, fixed sleeve and rotating ring, realizes the quick, stable connection of climbing frame and ground, the cooperation design of rotating block and mobile sleeve, cooperation the use of first spring, provides flexible adjustment ability, the design of pointed foot end enhances the ground fixing effect, and the setting of injection pipe and injection port provides the possibility of further reinforcement, this design not only simplifies the installation process, also greatly improves the stability and safety of climbing frame.

[0020] 3, the design of stable component is unique, through the ingenious cooperation of rotating rod, second spring and jacking rod, in combination with the use of limiting groove and third spring, realize the accurate control to the fixed process, the close design of moving plate and injection pipe further enhances the fixed effect, and the cooperation of locking piece and locking groove ensures the stability of injection pipe, this design not only improves the stability of the whole climbing frame, also simplifies the adjustment process, improves the convenience and safety of operation, simultaneously, the design of roof effectively prevents impurities from entering, prolongs the service life of equipment. ACCURACY OF DRAWINGS

[0021] Figure 1 It is the overall structure schematic drawing of a garden greening plant climbing frame in the utility model;

[0022] Figure 2 It is the side view structure schematic drawing in the utility model;

[0023] Figure 3 It is the structure schematic drawing of fixed component in the utility model;

[0024] Figure 4It is the sectional view structure schematic diagram of fixed assembly in the utility model;

[0025] Figure 5 It is the side view sectional view structure schematic diagram of fixed assembly in the utility model;

[0026] Figure 6 It is the enlarged structure schematic diagram of A in the utility model.

[0027] In the drawing: 1, support frame rod, 2, connecting rod, 3, auxiliary rod, 4, fixed rod, 5, main beam, 6, top rod, 7, grab foot plate, 8, fixed sleeve, 9, rotating ring, 10, auxiliary frame, 11, connecting plate, 12, rotating block, 13, moving sleeve, 14, moving groove, 15, first spring, 16, pointed foot end, 17, injection pipe, 18, injection port, 19, rotating rod, 20, second spring, 21, jacking rod, 22, limiting groove, 23, third spring, 24, moving plate, 25, locking block, 26, locking groove, 27, top plate. DETAILED DESCRIPTION

[0028] It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict. The present application will be described in detail below with reference to the drawings and in combination with the embodiments.

[0029] It should be noted that, unless otherwise specified, all technical and scientific terms used in the present application have the same meaning as generally understood by those skilled in the art to which the present application belongs.

[0030] In the present application, unless otherwise stated, the orientation such as "up, down" is generally with respect to the direction shown in the drawings, or with respect to the vertical, perpendicular or gravity direction; similarly, for the convenience of understanding and description, "left, right" is generally with respect to the left and right shown in the drawings; "inner, outer" refers to the inner and outer of the contour of each component itself, but the above orientation words are not used to limit the present application.

[0031] Please refer to Figures 1-6 A garden greening plant climbing frame, including support frame rod 1, support frame rod 1 is provided with four, support assembly is provided on the support frame, and the support assembly includes connecting rod 2, auxiliary rod 3, fixed rod 4, main beam 5 and top rod 6, connecting rod 2 is connected between support frame rod 1, auxiliary rod 3 is arranged at the top of connecting rod 2, fixed rod 4 is arranged at the top of both ends of auxiliary rod 3, main beam 5 is arranged at the middle end of connecting rod 2, top rod 6 is arranged on main beam 5, fixed assembly is arranged on support frame rod 1, and the fixed assembly includes grab foot plate 7, fixed sleeve 8 and rotating ring 9, grab foot plate 7 is installed on support frame rod 1, fixed sleeve 8 is slidably connected on grab foot plate 7, and rotating ring 9 is rotatably connected on fixed sleeve 8.

[0032] The auxiliary frame 10 is arranged between the support frame rod 1 and the connecting rod 2.

[0033] The connecting plate 11 is arranged at the connecting position of the auxiliary frame 10 and the support frame rod 1 and the connecting rod 2.

[0034] The rotating block 12 is uniformly arranged on the rotating ring 9, the moving sleeve 13 is slidingly arranged on the fixed sleeve 8, the moving groove 14 is arranged on the moving sleeve 13, the moving groove 14 is matched with the rotating block 12, and the first spring 15 is arranged between the moving sleeve 13 and the fixed sleeve 8.

[0035] The sharp end 16 is arranged at the bottom of the fixed sleeve 8, and the injection pipe 17 is slidingly arranged in the fixed sleeve 8.

[0036] In the embodiment, in use, the support frame rod 1 is placed at a suitable position by artificial, and the connecting rod 2 is sequentially arranged between the top of the support frame rod 1, then the auxiliary rod 3 is arranged on the top of the support frame rod 1 to assist the fixation of the top, then the end of the auxiliary rod 3 is fixed by the fixed rod 4 to assist the fixation of the auxiliary rod 3, and the main beam 5 is arranged to fix the top, and the connecting rod 2 is arranged between the main beam 5 and the fixed rod 4 to fix the support frame rod 1, and the auxiliary frame 10 and the connecting plate 11 are arranged between the connecting rod 2 and the support frame rod 1 to fix the support frame rod 1, and when the bottom of the support frame rod 1 needs to be fixed, the fixed sleeve 8 is inserted along the fixed foot plate 7, so that the sharp end 16 of the fixed sleeve 8 penetrates the fixed foot plate 7 and extends below the ground, then the rotating ring 9 is rotated to drive the rotating block 12 on the rotating ring 9 to rotate, so that the rotating block 12 is rotated to the moving groove 14 on the moving sleeve 13, so that the fixation of the moving sleeve 13 is released, and the moving sleeve 13 is slidingly moved along the outside of the fixed sleeve 8 under the elastic potential energy of the first spring 15, and the locking block 25 is slidingly moved along the moving groove 14 on the moving sleeve 13 during the movement of the moving sleeve 13, so that the moving sleeve 13 is moved to the position close to one end of the fixed sleeve 8, then the injection pipe 17 is slidingly inserted along the fixed sleeve 8, and the top plate on the injection pipe 17 is close to the top of the fixed sleeve 8.

[0037] Please refer to Figures 3-6 , as a kind of garden afforestation plant climbing frame embodiment of stable assembly: fixed sleeve 8 is provided with stable assembly, stable assembly includes rotating rod 19, second spring 20 and jolt rod 21, rotating rod 19 is rotatably connected on fixed sleeve 8, second spring 20 is connected between rotating rod 19 and fixed sleeve 8, jolt rod 21 is slidingly connected on fixed sleeve 8, one end of jolt rod 21 is close to rotating rod 19.

[0038] The fixed sleeve 8 is provided with a limiting groove 22. The top rod 21 is sleeved with a third spring 23. The third spring 23 is arranged at the limiting groove 22. One end of the top rod 21 is connected with a moving plate 24. The moving plate 24 is tightly attached to the pouring pipe 17.

[0039] The moving sleeve 13 is slidably connected with a locking block 25. The pouring pipe 17 is provided with a locking groove 26. The locking block 25 is matched with the locking groove 26. The locking block 25 is slidably connected with the fixed sleeve 8. The pouring pipe 17 is connected with a top plate 27 at the top. The top plate is tightly attached to the fixed sleeve 8.

[0040] More specifically, during the sliding movement of the pouring pipe 17, the outer wall of the pouring pipe 17 is in contact with the moving plate 24 during the movement of the pouring pipe 17. The top rod 21 is slidably moved along the outside of the fixed sleeve 8. During the sliding movement, the third spring 23 on the top rod 21 is compressed by the moving plate 24. The pouring pipe 17 is fixed by the moving plate 24. Then the moving sleeve 13 is slidably moved along the fixed sleeve 8. During the movement, the first spring 15 is stretched. During the movement, the locking block 25 is slidably moved along the moving groove 14 on the moving sleeve 13. The locking block 25 is moved to the locking groove 26 on the pouring pipe 17. The pouring pipe 17 is fixed. The rotating ring 9 drives the rotating block 12 to rotate. The fixing of the moving sleeve 13 is completed. Then the concrete is poured into the fixed sleeve 8 through the pouring port 18 of the pouring pipe 17. After the concrete is dry, the fixing between the fixed sleeve 8 and the pouring pipe 17 is completed. The fixing is completed.

[0041] In summary, the overall device in use or operation: in the use process, by artificial support frame rod 1 placed in the appropriate position, and its top between the use of connecting rod 2 for connection, then in its top set auxiliary rod 3 to play a supporting role in the purpose of the top fixed, then its end with the fixed rod 4 to play a supporting role in the purpose of the auxiliary rod 3, but by using the main beam 5, to play the role of fixed top, and between the main beam 5 and the fixed rod 4 by setting the connecting rod 2 to connect, to stabilize the process of its fixed, and between the connecting rod 2 and the support frame rod 1 by setting the auxiliary frame 10 and connecting plate 11 to stabilize the process of its fixed, and in need to ensure the bottom of the support frame rod 1 fixed process, by the fixed sleeve 8 along the grab foot plate 7 inserted process, so that the fixed sleeve 8 on the sharp end 16 through the grab foot plate 7 into the ground below, then for the rotating ring 9 rotating process, make it driven rotating ring 9 on the rotating block 12 rotating process, so that the rotating block 12 rotating to the mobile sleeve 13 on the mobile slot 14, so that the removal of the fixed process of the mobile sleeve 13, make it in the first spring 15 elastic potential energy, driven mobile sleeve 13 along the outside of the fixed sleeve 8 sliding movement process, and in its movement process, mobilization of the lock block 25 along the mobile sleeve 13 on the mobile slot 14 sliding movement process, so that the mobile sleeve 13 moved to the fixed sleeve 8 with one end of the tight position, then the injection pipe 17 along the fixed sleeve 8 sliding insertion, and make the top plate on the injection pipe 17 and the top of the fixed sleeve 8 tight.

[0042] In the sliding movement process of the injection pipe 17, the outer wall of the injection pipe 17 with its movement process, and the moving plate 24, and drive the ejector rod 21 along the outside of the fixed sleeve 8 sliding movement process, and in its sliding movement process, the use of moving plate 24 for the third spring 23 on the ejector rod 21 compression, so that the use of moving plate 24 for the injection pipe 17 fixed process, then the mobile sleeve 13 along the fixed sleeve 8 sliding movement, in its movement process, for the first spring 15 stretching, and in its movement process, drive the lock block 25 along the mobile sleeve 13 on the mobile slot 14 sliding movement, so that the lock block 25 moved to the injection pipe 17 on the lock slot 26, so as to ensure the fixed process of the injection pipe 17, and the use of rotating ring 9 drive rotating block 12 rotating, so that the completion of the fixed process of the mobile sleeve 13, then the concrete along the injection pipe 17 injection port 18 into the fixed sleeve 8 inside, make it after the concrete dry, complete the fixed process between the fixed sleeve 8 and the injection pipe 17, so as to complete the fixed process.

[0043] In all the above-mentioned solutions, the connection between the two components can be selected according to the actual situation, such as welding, bolt and nut connection, bolt or screw connection or other known connection mode, which will not be described here. In the above, whenever there is a fixed connection, welding is preferred. Although the embodiments of the utility model have been shown and described, those skilled in the art can understand that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A garden greening plant climbing frame, comprising support frame poles (1), the support frame poles (1) are provided with four, characterized in that: The support frame is provided with a support assembly, the support assembly comprises a connecting rod (2), an auxiliary rod (3), a fixed rod (4), a main beam (5) and a top rod (6), the connecting rod (2) is connected between the support frame rods (1), the auxiliary rod (3) is arranged at the top of the connecting rod (2), the fixed rod (4) is arranged at the top of both ends of the auxiliary rod (3), the main beam (5) is arranged at the middle end of the connecting rod (2), and the top rod (6) is arranged on the main beam (5); the support frame rod (1) is provided with a fixing assembly, the fixing assembly comprises a clamping foot plate (7), a fixing sleeve (8) and a rotating ring (9), the clamping foot plate (7) is installed on the support frame rod (1), the fixing sleeve (8) is slidably connected on the clamping foot plate (7), and the rotating ring (9) is rotatably connected on the fixing sleeve (8).

2. The garden greening plant climbing frame according to claim 1, characterized in that: The connecting rod (2) is connected between the support frame rods (1).

3. The garden greening plant climbing frame according to claim 2, characterized in that: The connecting rod (2) is connected between the support frame rods (1).

4. The garden greening plant climbing frame according to claim 3, characterized in that: The rotating ring (9) is uniformly connected with rotating blocks (12), the fixing sleeve (8) is slidably connected with a moving sleeve (13), the moving sleeve (13) is provided with a moving groove (14), the moving groove (14) is matched with the rotating blocks (12), and the first spring (15) is connected between the moving sleeve (13) and the fixing sleeve (8).

5. A garden plant climbing frame according to claim 4, characterised in that: The bottom of the fixing sleeve (8) is provided with a pointed end (16), the inside of the fixing sleeve (8) is slidably connected with a pouring pipe (17), and the pouring pipe (17) is provided with a pouring port (18).

6. A garden plant climbing frame according to claim 5, characterised in that: The fixing sleeve (8) is provided with a stabilizing assembly, the stabilizing assembly comprises a rotating rod (19), a second spring (20) and a jacking rod (21), the rotating rod (19) is rotatably connected on the fixing sleeve (8), the second spring (20) is connected between the rotating rod (19) and the fixing sleeve (8), the jacking rod (21) is slidably connected on the fixing sleeve (8), and one end of the jacking rod (21) is tightly attached to the rotating rod (19).

7. A garden plant climbing frame according to claim 6, characterised in that: The fixing sleeve (8) is provided with a limiting groove (22), the jacking rod (21) is sleeved with a third spring (23), the third spring (23) is arranged at the limiting groove (22), one end of the jacking rod (21) is connected with a moving plate (24), and the moving plate (24) is tightly attached to the pouring pipe (17).

8. A garden plant climbing frame according to claim 7, characterised in that: The moving sleeve (13) is slidably connected with a locking block (25), the pouring pipe (17) is provided with a locking groove (26), the locking block (25) is matched with the locking groove (26), the locking block (25) is slidably connected with the fixing sleeve (8), and the pouring pipe (17) is connected with a top plate (27) at the top, and the top plate (27) is tightly attached to the fixing sleeve (8). The moving sleeve (13) is slidably connected with a locking block (25), the pouring pipe (17) is provided with a locking groove (26), the locking block (25) is matched with the locking groove (26), the locking block (25) is slidably connected with the fixing sleeve (8), and the pouring pipe (17) is connected with a top plate (27) at the top, and the top plate (27) is tightly attached to the fixing sleeve (8).