Embedded part for civil engineering construction
By designing embedded parts for civil engineering construction and utilizing external threads and auxiliary mechanisms, the problem of inconvenient adjustment of embedded bolts before concrete pouring was solved, enabling rapid and accurate adjustment of the verticality and horizontality of embedded workpieces.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SHANDONG NORTH ENERGY PROJECT MANAGEMENT CO LTD
- Filing Date
- 2025-05-12
- Publication Date
- 2026-04-10
AI Technical Summary
In existing technologies, it is difficult to quickly and accurately adjust the height and verticality of pre-embedded bolts before concrete pouring, especially since the top area is small, making it inconvenient to judge the verticality.
An embedded part for civil engineering construction has been designed, comprising an embedded workpiece, an adjusting nut, and an auxiliary mechanism. Through external thread connection and insertion hole, combined with a bubble level, the embedded workpiece can be precisely adjusted.
By setting up auxiliary mechanisms, the top area of the embedded workpiece can be significantly increased, making it easier to measure with a bubble level and achieve efficient and rapid adjustment of the verticality and horizontality of the embedded workpiece.
Smart Images

Figure CN224106614U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of concrete embedded part, and specifically relates to a embedded part for civil engineering construction. BACKGROUND
[0002] In civil engineering, when other devices need to be additionally installed at the corresponding position, the embedded part, such as a embedded bolt, needs to be embedded before concrete pouring.
[0003] In the prior art, the embedded bolt needs to be continuously adjusted before concrete pouring to ensure that each embedded bolt is in the correct position, and the adjustment includes but is not limited to height and verticality. In the prior art, it is not convenient to quickly judge the verticality because the top area of the embedded bolt is small. SUMMARY
[0004] The utility model discloses a embedded part for civil engineering construction.
[0005] To achieve the above object, the utility model provides the following technical scheme: a embedded part for civil engineering construction, including embedded part, the bottom end of embedded part is shaped with the bight, the top end outer wall of embedded part is turned on the outer thread, embedded part is connected with the adjusting nut through the outer thread screw thread, the top of embedded part is provided with the dowel hole that recesses downward, the inner wall of dowel hole is inserted with the auxiliary mechanism that extends to the top of embedded part.
[0006] As a further scheme of the utility model: the auxiliary mechanism includes the dowel post that is inserted in the inner wall of the dowel hole, and the top of the dowel post in the inner wall of the dowel hole is flush with the top end of the dowel hole, and the top end of the dowel post is welded with a horizontal plate.
[0007] As a further scheme of the utility model: the inner diameter of the dowel hole is equal to the outer diameter of the dowel post, and the length of the dowel post is shorter than the length of the dowel hole.
[0008] As a further scheme of the utility model: the inner wall of the adjusting nut is shaped with the internal thread that engages with the outer thread.
[0009] As a further scheme of the utility model: the dowel post is welded at the bottom center of the horizontal plate, and the central axis of the dowel post is perpendicular to the bottom surface of the horizontal plate.
[0010] Compared with the prior art, the utility model has the beneficial effects that:
[0011] 1、 through setting the auxiliary mechanism, the setting of the auxiliary mechanism can realize the effect of increasing the top area of the embedded workpiece, therefore, the bubble level can be used for measurement, and then the relatively efficient judgment effect is realized. BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of the utility model;
[0013] Figure 2 It is an internal structure schematic diagram of the utility model;
[0014] Figure 3 It is a Figure 2 The local enlarged view of A in the middle.
[0015] In the drawing: 1, embedded workpiece; 2, bending part; 3, external thread; 4, adjusting nut; 5, horizontal plate; 6, plug-in hole; 7, plug-in column. DETAILED DESCRIPTION
[0016] The technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model, obviously, the described embodiments are only a part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without making creative labor belong to the scope of protection of the utility model.
[0017] Please refer to Figures 1-3 In the embodiments of the utility model, a preformed part for civil engineering construction includes embedded workpiece 1, the bottom end of embedded workpiece 1 is shaped with bending part 2, the top end outer wall of embedded workpiece 1 is turned with external thread 3, embedded workpiece 1 is connected with adjusting nut 4 through external thread 3, the top of embedded workpiece 1 is provided with downward recessed plug-in hole 6, the inner wall of plug-in hole 6 is inserted with auxiliary mechanism extending above embedded workpiece 1.
[0018] In the embodiment: first, when the angle of embedded workpiece 1 is adjusted, first, the horizontal steel plate is padded, then the horizontal steel plate is adjusted to the horizontal position, and the adjustment is confirmed by bubble level, then bending part 2 passes through the round hole on the horizontal steel plate, until the part below external thread 3 of embedded workpiece 1 passes through below the horizontal steel plate, the bottom end of adjusting nut 4 contacts with the top of horizontal steel plate at this time, the verticality and horizontal height of embedded workpiece 1 need to be adjusted, the auxiliary mechanism is inserted into plug-in hole 6 before adjustment to assist adjustment;
[0019] It should be noted that: the diameter of the round hole on the horizontal steel plate is generally slightly larger than the diameter of embedded workpiece 1, so that subsequent adjustment can be facilitated.
[0020] Please refer toFigure 1 、 Figure 2 With Figure 3 , the auxiliary mechanism comprises a plug-in column 7 plugged into the inner wall of the plug-in hole 6, the top of the plug-in column 7 plugged into the inner wall of the plug-in hole 6 is flush with the top end of the plug-in hole 6, and the top end of the plug-in column 7 is welded with a horizontal plate 5.
[0021] In the embodiment, before adjusting the verticality and the horizontal height of the embedded workpiece 1, the plug-in column 7 is completely inserted into the inner wall of the plug-in hole 6, at this time, the top of the horizontal plate 5 is flush with the top of the plug-in column 7, at this time, the two ends of the bubble level are respectively overlapped on the top of the two horizontal plates 5, so that whether the top of the embedded workpiece 1 is flush can be judged, and adjustment can be made, after the height adjustment is completed, when the verticality of the embedded workpiece 1 is adjusted, the bottom center of the horizontal bubble instrument is placed at the center position of the horizontal plate 5, so that whether the embedded workpiece 1 is in a vertical state or in which direction the embedded workpiece 1 is inclined can be judged through the position of the bubble, and thus more accurate adjustment can be made.
[0022] Please refer to Figure 2 With Figure 3 , the inner diameter of the plug-in hole 6 is equal to the outer diameter of the plug-in column 7, and the length of the plug-in column 7 is shorter than the length of the plug-in hole 6.
[0023] In the embodiment, because the length of the plug-in column 7 is shorter than the depth of the plug-in hole 6, it can be ensured that the bottom of all the horizontal plates 5 is in contact with the top end of the corresponding embedded workpiece 1, and the initial conditions will not be inconsistent due to human insertion errors (that is, the distance between the bottom end of the horizontal plate 5 and the top of the embedded workpiece 1 is inconsistent).
[0024] Please refer to Figure 1 , the inner wall of the adjusting nut 4 is shaped with an internal thread engaged with the external thread 3.
[0025] In the embodiment, when adjusting the vertical height of the embedded workpiece 1, the adjusting nut 4 is rotated, at this time, the embedded workpiece 1 is restricted from rotating by the other hand, and at this time, the embedded workpiece 1 can move in the up-down direction.
[0026] Please refer to Figure 1 、 Figure 2 With Figure 3 , the plug-in column 7 is welded at the bottom center of the horizontal plate 5, and the central axis of the plug-in column 7 is perpendicular to the bottom surface of the horizontal plate 5.
[0027] In the embodiment, through the design, the verticality of the embedded workpiece 1 can be judged by measuring the levelness of the top surface of the horizontal plate 5.
[0028] The above merely describes a preferred embodiment of the present application, and the protection scope of the present application is not limited thereto, and any skilled person in the art, according to the technical scheme and the inventive concept of the present application, makes equivalent replacement or change within the technical range disclosed by the present application, which should be covered within the protection scope of the present application.
Claims
1. A civil engineering construction embedded part comprising an embedded work piece (1), characterized in that, The bottom end of the embedded workpiece (1) is shaped with a bending part (2), the outer wall of the top end of the embedded workpiece (1) is turned with external threads (3), the embedded workpiece (1) is threadedly connected with an adjusting nut (4) through the external threads (3), the top of the embedded workpiece (1) is provided with a downwardly recessed inserting hole (6), and the inner wall of the inserting hole (6) is inserted with an auxiliary mechanism extending above the embedded workpiece (1).
2. A preformed embedded part for civil engineering construction according to claim 1, characterized in that The auxiliary mechanism comprises an inserting column (7) inserted into the inner wall of the inserting hole (6), the top of the inserting column (7) inserted into the inner wall of the inserting hole (6) is flush with the top end of the inserting hole (6), and the top end of the inserting column (7) is welded with a horizontal plate (5).
3. A preformed embedded part for civil engineering construction according to claim 2, characterized in that The inner diameter of the inserting hole (6) is equal to the outer diameter of the inserting column (7), and the length of the inserting column (7) is shorter than the length of the inserting hole (6).
4. A preformed embedded part for civil engineering construction according to claim 3, characterized in that The inner wall of the adjusting nut (4) is shaped with internal threads engaged with the external threads (3).
5. A pre-embedded part for civil engineering construction according to claim 3, characterized in that, The inserting column (7) is welded at the bottom end center of the horizontal plate (5), and the central axis of the inserting column (7) is perpendicular to the bottom end surface of the horizontal plate (5).