Double-layer branching cable bridge

By designing a double-layer cable tray, using support rods and mounting rails to support the clamping frame in layers, and combining the cooperation of mounting plates and springs, the problems of cable stacking and inconvenient maintenance in cable trays are solved, and stable installation and quick disassembly of cables are achieved.

CN224110793UActive Publication Date: 2026-04-10JIANGSU BAOFENG ELECTRIC
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-24
Publication Date
2026-04-10

AI Technical Summary

Technical Problem

Existing cable trays are prone to cable stacking and heat accumulation during use, and are inconvenient to install and maintain, especially the straps are difficult to remove.

Method used

Design a double-layer cable tray, which is divided into upper and lower layers by a support rod and a mounting rail supporting the clamping frame. Combined with the cooperation of mounting plates, limit plates and mounting springs, it realizes the layered installation and quick disassembly of cables.

Benefits of technology

It effectively reduces cable stacking, improves maintenance efficiency, facilitates cable separation and installation, and simplifies the process of removing and installing cable ties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224110793U_ABST
    Figure CN224110793U_ABST
Patent Text Reader

Abstract

The utility model discloses a double-layer branching cable bridge which comprises a bridge body, an installation rail is fixedly installed on the inner side of the bridge body, an installation clamping seat is arranged on the outer side of the installation rail in a clamping mode, a supporting rod is fixedly installed on the upper side of the installation clamping seat, a clamping frame is fixedly installed at the upper end of the supporting rod, and the clamping frame is fixedly installed on the upper end of the supporting rod. A hoisting rod is arranged on one side of the bridge main body, a supporting seat is arranged on the lower side of the bridge main body, and one end of the supporting seat is fixed on the hoisting rod; through the designed mounting rail and the clamping frame, the clamping frame is mounted at a use position through the support rods and the mounting rail support during use, and the clamping frame is divided into an upper layer and a lower layer through the support rods with different lengths, so that the supporting cable is divided into two layers during mounting, and subsequent distinguishing and reasonable maintenance are facilitated while stacking is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to cable bridge technical field, concretely relates to a double -deck cable bridge of branch. BACKGROUND

[0002] Cable bridge has many types, including groove type bridge, tray type bridge, ladder type bridge and grid bridge etc. These bridges can be independently erected, can also be laid on various buildings and pipe gallery support,

[0003] In view of the related technology in the above, the existing cable bridge installs cable in the bridge when using, usually adopts the bandage to fix directly to multiple cables, but in the installation use, the cable stack heat storage phenomenon appears, and the bandage is not good to detach and the problem of the bandage is not good to detach, needs to design a double -deck cable bridge of branch to solve the above -mentioned problem. UTILITY MODEL CONTENTS

[0004] The utility model is provided with a double -deck cable bridge of branch to solve the problems in the above background.

[0005] In order to achieve the above object, the utility model provides the following technical scheme: a double -deck cable bridge of branch, including bridge main part, the inside fixed mounting of bridge main part has installation rail, the outside of installation rail is equipped with installation clamping seat, the upper side fixed mounting of installation clamping seat has support rod, the upper end fixed mounting of support rod has clamping frame, one side of bridge main part is provided with hoisting rod, the lower side of bridge main part is provided with support seat, one end of support seat is fixed on hoisting rod.

[0006] Preferably, the support rod is provided with two lengths, and the end of the support rod of the two lengths is provided with a clamping frame and an installation clamping seat.

[0007] Preferably, one end of the clamping frame is provided with a through hole, and the cross-sectional shape of the installation clamping seat and the installation rail is circular.

[0008] Preferably, the lower side of the installation rail is provided with a fixing seat, and the installation rail is fixed in the bridge main body through the fixing seat.

[0009] Preferably, the inner side of the hoisting rod is provided with an adjusting groove, the inner wall of the adjusting groove is fixedly installed with an installation bracket, one end of the support seat is provided with an installation clamping plate, the installation clamping plate is clamped in the inner side of the installation bracket, one end of the installation clamping plate is fixedly installed with a limiting plate, the limiting plate is tightly pressed on the hoisting rod and is fixed through a screw.

[0010] Preferably, the lower surface of the bridge main body is provided with an installation clamping groove, the upper side of the support seat is provided with an installation clamping head, and the installation clamping head is clamped in the installation clamping groove.

[0011] Preferably, the inner side of the support seat is provided with a guide sliding groove, one end of the guide sliding groove is provided with a mounting spring, one end of the mounting spring is fixedly provided with a guide sliding seat, and the guide sliding seat is slidingly installed in the guide sliding groove.

[0012] Compared with the prior art, the utility model has the advantages that:

[0013] 1. By designing the mounting rail and the clamping frame, the clamping frame is installed at the use position through the support rod and the mounting rail in use, and the clamping frame is divided into two layers through the support rods of different lengths, so that the cable installation is divided into two layers, and subsequent identification and reasonable maintenance are facilitated while reducing stacking.

[0014] 2. By designing the mounting bracket and the mounting clamping plate, the mounting clamping plate is clamped to the support seat through the mounting bracket in use, and is limited and fixed through the limiting plate, and two layers of bridge main bodies can be installed on the same side of the hoisting rod or two layers of bridge main bodies can be installed on the left and right sides of the hoisting rod according to the need, so that the use is more convenient, and the bridge main body can be quickly installed through the mounting clamping head and the mounting spring. BRIEF DESCRIPTION OF DRAWINGS

[0015] Figure 1 It is a structural schematic view of the utility model;

[0016] Figure 2 It is a sectional structure schematic view of the utility model;

[0017] Figure 3 It is a support rod mounting structure schematic view of the utility model;

[0018] Figure 4 It is a support seat structure schematic view of the utility model;

[0019] Figure 5 It is a hoisting rod structure schematic view of the utility model;

[0020] In the drawing: 1, bridge main body; 2, mounting rail; 3, support rod; 4, clamping frame; 5, hoisting rod; 6, support seat; 7, mounting clamping plate; 8, limiting plate; 9, mounting bracket; 10, mounting clamping head; 11, mounting spring; 12, guide sliding seat; 13, guide sliding groove; 14, mounting clamping seat; 15, fixed seat; 16, adjusting groove; 17, mounting clamping groove. DETAILED DESCRIPTION

[0021] With reference to the drawings of the embodiments of the present application, the technical solutions in the embodiments of the present application will be described clearly and completely. Obviously, the described embodiments are only some of the embodiments of the present application, but not all the embodiments. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without creative efforts belong to the scope of the present application.

[0022] Embodiment one: please refer to Figures 1 to 5 The utility model provides a technical scheme: a kind of double-layer cable distribution frame, including bridge main body 1, the inner side of bridge main body 1 is fixedly installed with installation rail 2, the outer side of installation rail 2 is equipped with installation clamping seat 14, the upper side of installation clamping seat 14 is fixedly installed with support rod 3, the upper end of support rod 3 is fixedly installed with clamping frame 4, one side of bridge main body 1 is provided with hoisting rod 5, the lower side of bridge main body 1 is provided with support seat 6, one end of support seat 6 is fixed on hoisting rod 5, in use, the clamping frame 4 of bottom can assist the support longer support rod 3, guarantee clamping frame 4 installation use more stable, bridge main body 1 is supported and installed by support seat 6;Support rod 3 is provided with two kinds of length, and the end of two kinds of length support rod 3 is equipped with clamping frame 4 and installation clamping seat 14, in use, according to the needs of the two kinds of length support rod 3 staggered installation in bridge main body 1, guarantee clamping frame 4 installation use more stable;One end of clamping frame 4 is provided with through hole, the cross-sectional shape of installation clamping seat 14 and installation rail 2 is all set circular, in use, installation clamping seat 14 is conveniently and quickly clamped on installation rail 2;The lower side of installation rail 2 is provided with fixed seat 15, and installation rail 2 is fixed in bridge main body 1 by fixed seat 15, in use, it is convenient to fixedly install installation rail 2 and use.

[0023] From the above description, the utility model has the following beneficial effects: in use, clamping frame 4 is installed in use position by support rod 3 and installation rail 2 support, and clamping frame 4 is divided into two layers by different length support rod 3, so that it is divided into two layers when supporting cable installation, and subsequent identification and reasonable maintenance are facilitated while reducing stacking.

[0024] Embodiment two: please refer to Figures 1 to 5As shown, on the basis of the embodiment one, the utility model provides a technical scheme: the inside of hoisting rod 5 is provided with adjusting groove 16, the inner wall of adjusting groove 16 is fixedly installed with installation bracket 9, one end of support base 6 is provided with installation clamping plate 7, installation clamping plate 7 is clamped in the inside of installation bracket 9, one end of installation clamping plate 7 is fixedly installed with limiting plate 8, limiting plate 8 is tightly pressed on hoisting rod 5 and is fixed through screw, installation clamping plate 7 is inserted into adjusting groove 16 and the height is adjusted and slides, installation clamping plate 7 is clamped in installation bracket 9 after adjusting height, limiting plate 8 is fixed in the one end of installation clamping plate 7 and is fixed on hoisting rod 5;The lower surface of bridge main body 1 is provided with installation clamping groove 17, the upside of support base 6 is provided with installation clamping head 10, installation clamping head 10 is clamped in installation clamping groove 17, the inside of support base 6 is provided with guide sliding slot 13, one end of guide sliding slot 13 is installed with installation spring 11, one end of installation spring 11 is fixedly installed with guide sliding base 12, and guide sliding base 12 is slidably installed in guide sliding slot 13, the lower end of installation clamping head 10 is fixed on the upside of guide sliding base 12, and bridge main body 1 is installed on support base 6 by pushing installation clamping head 10 to slide down and by installation spring 11 elastic force to push installation clamping head 10 to be clamped in installation clamping groove 17.

[0025] The installation bracket 9 and the installation clamping plate 7 adopt the above technical scheme, and when in use, the installation clamping plate 7 is clamped to the installation bracket 9 to install the support base 6, and the limiting plate 8 is used for limiting and reinforcing fixation, and according to requirements, two layers of bridge main bodies 1 can be installed on the same side of the hoisting rod 5 or on the left and right sides of the hoisting rod 5, so that the installation is more convenient, and the installation clamping head 10 and the installation spring 11 are clamped in the installation clamping groove 17, so that the bridge main body 1 can be quickly installed.

[0026] The working principle and the use process of the utility model are as follows: when in use, two kinds of long and short support rods 3 are alternately installed in the bridge main body 1 according to requirements, the installation clamping seat 14 is clamped on the installation rail 2 to be fixed, the clamping frame 4 at the bottom can assist in supporting the longer support rod 3, then the cable is installed in the clamping frame 4, the cable can be installed and fixed by using a cable tie or a bandage through the through hole of the clamping frame 4, the installation clamping plate 7 is inserted into the adjusting groove 16 and the height is adjusted and slides according to the installation requirements, the installation clamping plate 7 is clamped in the installation bracket 9 after adjusting the height, the limiting plate 8 is fixed at one end of the installation clamping plate 7, and the limiting plate 8 is fixed on the hoisting rod 5, then the bridge main body 1 is installed on the support base 6 by pushing the installation clamping head 10 to slide down, and the installation clamping head 10 is clamped in the installation clamping groove 17 by the elastic force of the installation spring 11, so that the installation is completed.

[0027] It is to be noted that the relational terms herein, such as first and second, and the like, are used solely to distinguish one from another entity or action without necessarily requiring or implying any actual relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus. An element proceeded by "comprises... a" does not, without more constraints, exclude the existence of additional identical elements in the process, method, article, or apparatus that comprises the element.

[0028] The above description is merely intended to illustrate the technical solutions of the present application, but not to limit the present application. Other modifications or equivalent replacements to the technical solutions of the present application made by those skilled in the art shall be included in the scope of the claims of the present application, as long as these modifications or equivalent replacements do not depart from the spirit and scope of the technical solutions of the present application.

Claims

1. A double-layer branching cable bridge, comprising a bridge main body (1), characterized in that: The inner side of the bridge body (1) is fixedly installed with a mounting rail (2), the outer side of the mounting rail (2) is clamped with a mounting clamping seat (14), the upper side of the mounting clamping seat (14) is fixedly installed with a supporting rod (3), the upper end of the supporting rod (3) is fixedly installed with a clamping frame (4), one side of the bridge body (1) is provided with a lifting rod (5), the lower side of the bridge body (1) is provided with a supporting seat (6), one end of the supporting seat (6) is fixed on the lifting rod (5).

2. The cable tray according to claim 1, wherein: The supporting rod (3) is provided with two lengths, and the end of the supporting rod (3) is provided with a clamping frame (4) and a mounting clamping seat (14).

3. The cable tray according to claim 1, wherein: One end of the clamping frame (4) is provided with a through hole, and the cross-sectional shape of the mounting clamping seat (14) and the mounting rail (2) is circular.

4. The cable tray according to claim 1, wherein: The lower side of the mounting rail (2) is provided with a fixing seat (15), and the mounting rail (2) is fixed in the bridge body (1) through the fixing seat (15).

5. The cable tray according to claim 1, wherein: The inner side of the lifting rod (5) is provided with an adjusting groove (16), the inner wall of the adjusting groove (16) is fixedly installed with a mounting bracket (9), one end of the supporting seat (6) is provided with a mounting clamping plate (7), the mounting clamping plate (7) is clamped in the inner side of the mounting bracket (9), one end of the mounting clamping plate (7) is fixedly installed with a limiting plate (8), the limiting plate (8) is tightly pressed on the lifting rod (5) and is fixed by a screw.

6. The cable tray according to claim 1, wherein: The lower surface of the bridge body (1) is provided with a mounting clamping groove (17), the upper side of the supporting seat (6) is provided with a mounting clamping head (10), and the mounting clamping head (10) is clamped in the mounting clamping groove (17).

7. The cable tray according to claim 6, wherein: The inner side of the supporting seat (6) is provided with a guide sliding groove (13), one end of the guide sliding groove (13) is installed with a mounting spring (11), one end of the mounting spring (11) is fixedly installed with a guide sliding seat (12), and the guide sliding seat (12) is slidingly installed in the guide sliding groove (13), and the lower end of the mounting clamping head (10) is fixed on the upper side of the guide sliding seat (12).