A prefabricated bridge connecting structure

By introducing correction units and protective mechanisms into the bridge connection structure, the positional deviation of the reinforcing bars is automatically corrected, solving the problem of aligning bent reinforcing bars, improving the bridge installation efficiency, and reducing frictional damage between the reinforcing bars and the trench wall.

CN224378684UActive Publication Date: 2026-06-19KUNSHAN FU AVENUE CAPITAL CONSTR TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
KUNSHAN FU AVENUE CAPITAL CONSTR TECH CO LTD
Filing Date
2025-06-19
Publication Date
2026-06-19

Smart Images

  • Figure CN224378684U_ABST
    Figure CN224378684U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembled bridge connecting structure relates to bridge connecting technical field, include: the bridge pier, the top fixed connection of bridge pier has a plurality of reinforcing bars, the top of bridge pier is provided with butt joint bridge, just the butt joint bridge's bottom is provided with the butt joint groove that matches with reinforcing bar, the bottom of butt joint bridge is provided with correction unit and protection mechanism respectively, the correction unit includes: the connecting channel, the connecting channel sets up in the bottom of butt joint bridge, just the connecting channel is provided with two groups, the bottom of connecting channel is provided with the abutment ring. The utility model discloses through setting correction unit, butt joint bridge dead weight and the pressure of having aligned reinforcing bar can form horizontal component, force reinforcing bar to slide along the inclined plane and move to butt joint groove center, need not manual adjustment bent reinforcing bar one by one, and the position deviation of reinforcing bar is corrected automatically through mechanical force, reduces the time of on -the -spot adjustment, thereby has improved the installation efficiency of bridge pier and butt joint bridge greatly.