A new dry dedusting ash conveying system pipe equipment
By adopting ash conveying bends and nitrogen-assisted blowing technology in blast furnace smelting, the problem of easy clogging of dry dust at low temperatures was solved, realizing smooth conveying of dust and safe and efficient ash cleaning operation, and reducing labor and material costs.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- ZHONGTIAN IRON & STEEL GRP (NANTONG) CO LTD
- Filing Date
- 2025-05-19
- Publication Date
- 2026-07-17
AI Technical Summary
During blast furnace smelting, dry dust removal ash is prone to clogging intermediate tanks and silo pumps under low temperature conditions, resulting in frequent dust removal work, increasing labor costs and workload, which is difficult to solve effectively with existing technologies.
A novel dry dust removal and ash conveying system pipeline equipment is designed, which adopts ash conveying bends, hydraulic ball valves and nitrogen-assisted blowing technology. The 90° bends in the ash conveying bends and the 0.7 MPa nitrogen pressurization and blowing ensure smooth flow of dust and reduce blockage.
It simplifies the disassembly and installation process, reduces the probability of blockage, improves operational safety, reduces manpower and material consumption, and lowers the difficulty and cost of dust removal work.
Smart Images

Figure CN224513533U_ABST
Abstract
Claims
1. A ducting equipment for a new dry dedusting ash conveying system, characterized in that: The system includes a dry dust collection chamber (1) and a main ash conveying pipe (8). A manual ball valve (2) is installed at the ash outlet of the dry dust collection chamber (1). A hydraulic upper ball valve (3) is connected below the manual ball valve (2). A hydraulic lower ball valve (7) is installed on the side of the hydraulic upper ball valve (3) away from the manual ball valve (2). The hydraulic lower ball valve (7) is connected to the main ash conveying pipe (8). An ash conveying bend (6) is installed between the hydraulic upper ball valve (3) and the hydraulic lower ball valve (7). A nitrogen-assisted blowing pipe (5) is connected to the side wall of the ash conveying bend (6).
2. A ducting equipment for a novel dry dedusting ash conveying system according to claim 1, characterized in that: The ash conveying bend (6) is bent at 90°.
3. A ducting equipment for a novel dry dedusting ash conveying system according to claim 1, characterized in that: The nitrogen blowing tube (5) has a size of φ40.
4. A ducting equipment for a novel dry dust removal ash conveying system according to claim 1, characterized in that: The hydraulic upper ball valve (3) has a size of 200mm, and the hydraulic lower ball valve (7) has a size of 150mm.
5. A ducting equipment for a novel dry dust extraction ash conveying system according to claim 1 characterized in that: A nitrogen-assisted blowing valve (10) is installed on the main ash conveying pipe (8).
6. A ducting equipment for a novel dry dust extraction ash conveying system according to claim 1 characterized in that: The main ash conveying pipe (8) is equipped with an ash conveying tee pipe (9), which is connected to the hydraulic lower ball valve (7).
7. A ducting equipment for a novel dry dust removal ash conveying system according to claim 1 characterized in that: The ash conveying bend (6) is connected to the hydraulic upper ball valve (3) and the hydraulic lower ball valve (7) via a flange (4).
8. A ducting equipment for a novel dry dust removal ash conveying system according to claim 1 characterized in that: The opening of the ash conveying bend (6) near the hydraulic upper ball valve (3) is flared.