Graphical user interface for water-bound confined space management and control platform for electronic equipment

CN309479775SActive Publication Date: 2025-09-05SICHUAN GUOLAN ZHONGTIAN ENVIRONMENTAL TECH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430500201.2
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2025-09-05
Estimated Expiration
2039-08-08

Smart Images

  • Figure 000004_ABST
    Figure 000004_ABST
Patent Text Reader

Abstract

1. Name of this design product: Graphical user interface for a water-related confined space management and control platform for electronic equipment. 2. Purpose of this design product: used to display and run programs. 3. The key design point of this design product lies in the graphical user interface on the screen. 4. The picture or photo that best illustrates the key points of the design: Design 1 changing state diagram 3. 5. Designate Design 1 as the base design. 6. Purpose of the graphical user interface: used for monitoring, management, data collection and analysis of river pollution. In the main view of Design 1, click "Login" to get the Design 1 change state diagram 1. In the Design 1 change state diagram 1, click "Smart Flood Control" to get the Design 1 change state diagram 2. In the Design 1 change state diagram 2, click "Water-related Limited Space" in the upper left corner to get the Design 1 change state diagram 3. In the Design 1 change state diagram 3, click any water-related limited space supervision object under "Water-related Limited Space Supervision Object" to get the Design 1 change state diagram 4. In the Design 1 change state diagram 4, click any water-related limited space supervision object in the "Water-related Limited Space Risk Point" window to get the Design 1 change state diagram 5. 1 Change State Diagram 5, click "Login" in the Design 2 main view to obtain the Design 2 Change State Diagram 1, click "Smart Flood Prevention" in the Design 2 Change State Diagram 1 to obtain the Design 2 Change State Diagram 2, click "Wade Limited Space" in the upper left corner in the Design 2 Change State Diagram 2 to obtain the Design 2 Change State Diagram 3, click the "View All" button to the right of "Inspection Hidden Danger Events" in the lower right corner in the Design 2 Change State Diagram 3 to obtain the Design 2 Change State Diagram 4, and click any event in the "Hazard Event List" window in the Design 2 Change State Diagram 4 to obtain the Design 2 Change State Diagram 5.
Need to check novelty before this filing date? Find Prior Art