Online commissioning graphical user interface for electronic devices
CN309746056SActive Publication Date: 2026-01-23INSPUR SUZHOU INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202530689374.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-21
- Publication Date
- 2026-01-23
- Estimated Expiration
- 2040-11-21
Smart Images

Figure 000001_ABST
Abstract
1. The name of the design product: online debugging graphical user interface of electronic equipment. 2. The use of the design product: for an electronic device. 3. The design points of the design product: the graphical user interface displayed on the electronic device. 4. The picture or photo that best shows the design points: design 1 front view. 5. Design 1 is designated as the basic design. 6. The use of the graphical user interface: the graphical user interface is used for reasoning service online debugging; design 1 front view is the homepage of online debugging, the user inputs the request command in the input box below "request command" and clicks the "send request" button to enter design 1 interface change state diagram 1, clicks the "format JSON" button in design 1 interface change state diagram 1 to enter design 1 interface change state diagram 2, and the user can perform relevant operations according to the interface prompt, such as clicking "restore format"; design 2 front view is the homepage of online debugging, the user clicks the "insert file" to insert the instruction file, clicks the "send request" button to enter design 2 interface change state diagram 1, clicks the "format JSON" button in design 2 interface change state diagram 1 to enter design 2 interface change state diagram 2, and the user can perform relevant operations according to the interface prompt, such as clicking "restore format". 7. Other circumstances that need to be explained: "X" in each interface represents replaceable text and / or numbers and / or letters and / or symbols; the cross on the right side of "Request.json" in design 2 interface change state diagram 1 and design 2 interface change state diagram 2 represents removing the inserted instruction file.
Need to check novelty before this filing date? Find Prior Art