Intelligent pipe network data graphical user interface for computers

CN309983516SActive Publication Date: 2026-05-15ZHONGKE XINGTU YIMA (WUXI) TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
ZHONGKE XINGTU YIMA (WUXI) TECHNOLOGY CO LTD
Filing Date
2025-04-16
Publication Date
2026-05-15

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for Computers with Intelligent Network Data. 2. Purpose of this design: This design is used to run a smart pipeline processing program and display data information. The display screen panel is used with a computer. 3. The key design points of this product are: the design of the main view. 4. The picture or photo that best illustrates the key design points: Design 1 front view. 5. The computer-generated design is conventional, and the rear view, left view, right view, top view, bottom view, and 3D view of each design are omitted. 6. Design 1 is designated as the basic design. 7. Uses of the graphical user interface: for data display, query statistics, comprehensive analysis, pipeline monitoring and risk assessment in intelligent network management programs. 8. The area of ​​the graphical user interface in the product: the entire area of ​​the computer screen. 9. Human-computer interaction method of graphical user interface: Users can perform different functions by clicking different areas or icons displayed on the interface with the mouse. 10. Description of the changing states of the graphical user interface: Design 1's main view is the initial interface of the system. Based on the main view, clicking "Query Statistics" at the bottom will bring up the corresponding application pop-up window, which will display the design 1 change status diagram 1. Click "Spatial Query" and "Polygon Query" in sequence in the pop-up window and draw a polygon on the map to retrieve the corresponding results, which will be displayed as the design 1 change status diagram 2. The main view of Design 2 is the same as the main view of Design 1. Based on the main view of Design 2, click "Comprehensive Analysis" below to display the Design 2 change status diagram 1. Then click "Buffer Analysis", "Select Pipe", and click the target pipe segment on the map to display the Design 2 change status diagram 2. The main view of Design 3 is the same as the main view of Design 1. Based on the main view of Design 3, clicking "Pipeline Monitoring" below displays the Design 3 change status diagram 1, and clicking "Overdue Warning" and "Full Warehouse Warning" in sequence displays the Design 3 change status diagram 2.
Need to check novelty before this filing date? Find Prior Art