ARRANGEMENT AND PROCEDURE FOR BREWING BEER

DE502020009411D1Active Publication Date: 2024-10-31DENKE LARS +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE502020009411
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-07-09
Publication Date
2024-10-31
Estimated Expiration
2040-07-09

AI Technical Summary

Technical Problem

Existing beer brewing systems in limited spaces, such as hotels and pubs, face challenges in efficiently and precisely controlling the brewing process, particularly in terms of space constraints and the need for simultaneous performance of multiple brewing stages like mashing, lautering, and hop boiling.

Method used

A dual-container brewing system where each container is equipped with heatable outlets, pumps, and shut-off devices for fluid circulation and transfer, allowing for overlapping brewing processes like mashing and hop boiling, with temperature control and sediment management to enhance throughput and reduce filtration effort.

Benefits of technology

This setup enables efficient, precise, and repetitive control over the brewing process, increasing throughput in limited spaces by allowing simultaneous execution of brewing stages, reducing sediment and filtration effort, and maintaining consistent quality.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to an arrangement and a method for brewing beer.

[0002] State-of-the-art brewing systems are known that allow beer to be brewed in limited space, for example in hotels, restaurants, pubs, etc.

[0003] WO 2017 / 153818 A1 describes a compact two-vessel beer brewing system with vessels configured to perform mashing, lautering, and boiling brewing stages, particularly applicable to small-scale craft breweries, such as pub brewing. To provide a compact and cost-effective brewing system that can be used simply, precisely, and repeatably to control and improve all critical aspects of the brewing process associated with brewing, the system comprises a lower vessel having an inner tun configured to perform mashing and boiling stages, an upper vessel positioned above the lower vessel in fluid communication with the tun and configured to perform lautering stages, and a pump for draining liquid from the tun to the upper vessel.Preferably, at least the lower tub and / or the upper vessel is / are substantially cylindrical, the diameter of the upper vessel is smaller than the diameter of the lower tub and the lower vessel is placed eccentrically above the lower tub.

[0004] DE 10 2006 009612 A1 describes a microbrewing system and a process that enable the simple and precise heating and / or boiling of mash and / or wort, even for laypersons. The system essentially consists of a kettle for mash heating and wort boiling, a lauter tun, and one or more radiant heaters located beneath the kettle, ensuring precise temperature and timing control of the mash and wort. To prevent radiation losses, the underside of the kettle is also coated with a special coating. Furthermore, the microbrewing system includes a water inlet, a wort inlet, a wort outlet, an agitator, a siphon, and a hop dispenser.An integrated control system allows the individual functions of water supply, heating, hop addition, emptying the kettle, use of the agitator and / or pumping the wort into the kettle after the lautering process to be controlled programmatically or manually, with the progress of the individual process steps as well as the actual and target states of the controlled variables temperature, time and fill level of the kettle being displayed on a screen.

[0005] The invention is based on the object of providing an improved arrangement and an improved method for brewing beer.

[0006] The object is achieved according to the invention by an arrangement having the features of claim 1 and by a method having the features of claim 8.

[0007] Advantageous embodiments of the invention are the subject of the subclaims.

[0008] An arrangement according to the invention for brewing beer comprises at least a first container and a second container, each container having at least a first outlet below a seat for a removable lautering sieve and a second outlet above the seat for the lautering sieve, each container being designed to be heatable, the arrangement further comprising at least one pump which is or can be connected via corresponding suction lines and one or more shut-off devices selectively to the first outlet of the first container and / or the first outlet of the second container, the at least one pump being or can be connected via corresponding pressure lines and one or more shut-off devices selectively to the second outlet of the first container and / or to the second outlet of the second container, such thatthat by means of the at least one pump, liquid can be circulated in the first container and / or in the second container or pumped from one of the containers to the other of the containers.,

[0009] The shut-off devices can be designed as gate valves, butterfly valves, shut-off cocks or valves (e.g. three-way valves) and can be operated manually or automatically.

[0010] In one embodiment, the arrangement comprises a first pump and a second pump, wherein the first pump is connected or connectable to the first outlet of the first container via a suction line and one or more shut-off devices, wherein the first pump is connected or connectable to the second outlet of the first container and / or to the second outlet of the second container via a pressure line and at least one shut-off device, such that liquid can be circulated in the first container or pumped from the second container into the first container by means of the first pump, wherein the second pump is connected or connectable to the first outlet of the second container via a suction line and one or more shut-off devices, wherein the second pump is connected or connectable to the second outlet of the second container and / or to the second outlet of the first container via a pressure line and at least one shut-off device, such thatthat by means of the second pump, liquid can be circulated in the second container or pumped from the first container into the second container.,

[0011] The beer brewing arrangement according to the invention allows each step of a brewing process, in particular mashing, lautering, and hop boiling, to be carried out in each of the two brewing vessels. This allows, in particular, two brewing processes to overlap. This allows for increased throughput of the beer brewing arrangement even when space is limited.

[0012] The two containers are preferably identically designed and / or equipped.

[0013] In one embodiment, the first outlet is arranged at a lowest point of the respective container.

[0014] In one embodiment, each container has a third outlet above the lowest point but below the seat for the lautering sieve, wherein the third outlet of the first container is connected or connectable to the first pump via a further suction line, and wherein the third outlet of the second container is connected or connectable to the second pump via a further suction line. In this way, when the hopped wort is pumped out of the container, any sediment can remain in the container and does not enter the fermentation vessel, thus reducing the filtration effort.

[0015] In one embodiment, at least one further shut-off device is provided for connecting the first pump and / or second pump to the third outlet of the respective container.

[0016] In one embodiment, a shut-off device is further provided, via which liquid can be pumped from the first container into a fermentation container using the at least one pump, for example the first pump, and / or via which liquid can be pumped from the second container into a fermentation container using the at least one pump, for example the second pump.

[0017] In one embodiment, the containers are each provided with a temperature sensor and can be heated by means of a heater.

[0018] In one embodiment, an electronic control and / or at least one thermostat is provided, which is designed to monitor the temperature by means of the temperature sensors and to control and / or regulate the heating and the pumps.

[0019] In one embodiment, a heat exchanger is provided for cooling liquid pumped to the fermentation tank.

[0020] A method for brewing beer according to the invention is carried out using the arrangement described above, wherein mashing takes place in the first container, while at the same time hop boiling takes place in the second container, wherein after hop boiling wort is pumped from the second container into a fermentation tank, the now empty second container is cleaned and a lautering sieve is inserted into the second container, wherein mash is then pumped from the first container into the second container and lautered there, wherein wort resulting from lautering is then pumped into the first container and hop boiling is carried out there, while the now empty second container is cleaned, the lautering sieve is removed and then mashing takes place in the second container.

[0021] Preferably, the process can be repeated one or more times, alternating between the first container and the second container. In this way, two brewing processes can be carried out in an overlapping manner.

[0022] In one embodiment, the mash is circulated during mashing using the pump assigned to the respective container.

[0023] Embodiments of the invention are explained in more detail below with reference to drawings.

[0024] Showing: Figure 1 is a schematic view of an arrangement for brewing beer, and Figure 2 is a schematic view of a further embodiment of an arrangement for brewing beer.

[0025] Corresponding parts are provided with the same reference numerals in all figures.

[0026] Figure 1shows a schematic view of an arrangement 1 for brewing beer, comprising a first container B1 and a second container B2.

[0027] A replaceable lautering sieve L is shown in the second container B2 in the illustration, but can be removed and inserted into the first container B1 instead. Alternatively, two lautering sieves L can be included in the scope of delivery of assembly 1.

[0028] Each of the containers B1, B2 has at least a first outlet A1 at a lowest point of the container B1, B2 below a seat for the lautering sieve L and a second outlet A2 above the seat for the lautering sieve L. A third outlet A3 can be provided above the lowest point but below the seat for the lautering sieve L.

[0029] Each of the containers B1, B2 is designed to be heatable and can therefore have connections for a heating circuit. Furthermore, a temperature sensor TF is provided in or on each of the containers B1, B2.

[0030] The arrangement 1 further comprises a first pump P1, which is or can be connected via corresponding suction lines S1, S2 and shut-off devices DKH1, DKH2, DKH4, DKH5, DKH8, for example gate valves or three-way valves, optionally to the first outlet A1 of the first container B1 and the first outlet A1 of the second container B2, and which is or can be connected via a pressure line D1 and a shut-off device DKH3 optionally to the second outlet A2 of the first container B1, such that by means of the first pump P1, liquid can be circulated in the first container B1 or pumped from the second container B2 into the first container B1. Furthermore, a shut-off device DKH9 is provided, via which by means of the first pump P1, liquid can be pumped from the first container B1 into a fermentation container G.For this purpose, the first pump P1 can draw the liquid via the suction line S1 from the first outlet A1 or via a suction line S3 from the third outlet A3 of the first tank B1, for which additional shut-off devices DKH7 and DKH4 as well as a shut-off device KH1 can be provided.

[0031] The arrangement 1 further comprises a second pump P2, which is or can be connected via corresponding suction lines S1, S2 and shut-off devices DKH1, DKH2, DKH4, DKH5, DKH8 optionally to the first outlet A1 of the first container B1 and the first outlet A1 of the second container B2, and which is or can be connected via a pressure line D2 and a shut-off device DKH6 optionally to the second outlet A2 of the second container B2, such that by means of the second pump P2, liquid can be circulated in the second container B2 or pumped from the first container B1 into the second container B2. Furthermore, by means of the shut-off device DKH9, the second pump P2 can pump liquid from the second container B2 into a fermentation container G.For this purpose, the second pump P2 can draw the liquid via the suction line S2 from the first outlet A1 or via a suction line S4 from the third outlet A3 of the second tank B2, for which the additional shut-off devices DKH7 and DKH4 as well as a shut-off device KH2 can be used.

[0032] The arrangement 1 can be used to carry out the beer brewing process described below.

[0033] Mashing takes place in the first tank B1, as is known from the prior art. Water is added, heated, and malt is added. Different resting times and temperatures must be maintained during mashing. In between and during the heating phases, the mash is circulated by the first pump P1 via the suction line S1 and the pressure line D1. For this purpose, the shut-off valves DKH1, DKH2, and DKH3 are set accordingly; in this example, they are set to a straight flow.

[0034] The second container B2 is empty during this time. The replaceable lautering sieve L can already be inserted into the second container B2.

[0035] After the mashing rest period, the entire contents of the first container B1 are pumped by the second pump P2 via the suction line S1 and the pressure line D2 into the second container B2, in which the lautering sieve L is or will be inserted. For this purpose, the shut-off devices DKH1, DKH2, DKH4, DKH5, and DKH6 are set accordingly. In the example shown, the shut-off devices DKH1, DKH4, and DKH6 are set to a straight passage, and the shut-off devices DKH2 and DKH5 are set to a corner passage.

[0036] The first container B 1 can be rinsed during and / or afterward with some water, in particular preheated water.

[0037] The first tank B1 is now empty. The lautering process begins in the second tank B2. The liquid is separated into wort and spent grain through the lautering sieve L, and the wort is pumped back into the first tank B1. Preheated sparge water is poured over the remaining spent grain and then pumped into the first tank B1 like the wort. Pumping is done with the first pump P1 via the suction line S2 and the pressure line D1. For this purpose, the shut-off devices DKH2, DKH3, DKH4, DKH5, and DKH8 are set accordingly. In the example shown, the shut-off devices DKH3, DKH4, and DKH8 are set to a straight passage, and the shut-off devices DKH2 and DKH5 are set to a corner passage.

[0038] The wort is then brought to a boil in the first tank B1 and hops are added. This step is also known as hop boiling. Remaining waste products (spent grain) are removed from the now empty second tank B2, and the second tank B2 is cleaned. For this purpose, the lautering sieve L can be removed. The wastewater generated during cleaning can be diverted to a drain A via the shut-off valve DKH8.

[0039] The wort is now boiling in the first tank B1, and mashing can begin for the next batch in the cleaned second tank B2. The process thus begins again. Water is added, heated, and malt is added. Different resting times and temperatures must be maintained during mashing. In between and during the heating phases, the mash is circulated by the second pump P2 via the suction line S2 and the pressure line D2. For this purpose, the shut-off valves DKH5, DKH6, and DKH8 are set accordingly; in this example, they are positioned straight through.

[0040] After boiling the hops in the first tank B1, the wort is pumped via the suction line S3 by the first pump P1 through the heat exchanger W to cool it into a fermentation tank G for primary fermentation. For this purpose, the shut-off valves DKH7, DKH4, DKH2, DKH3, DKH9, and the shut-off valve KH1 are set accordingly. In the example, the shut-off valve KH1 is opened, and the shut-off valves DKH7, DKH4, DKH2, DKH3, and DKH9 are set to pass through the corner.

[0041] Once the first container B1 is empty, it can be cleaned if necessary and the lautering sieve L can be inserted. Any dirty water generated during cleaning can be directed to a drain A via the shut-off device DKH1.

[0042] After the end of the mashing rest in the second tank B2, the entire contents of the second tank B2 are pumped by the first pump P1 via the suction line S2 and the pressure line D1 into the first tank B1, in which the lautering sieve L is or will be inserted. For this purpose, the shut-off devices DKH2, DKH3, DKH4, DKH5, DKH8 are set accordingly; in the example shown, the shut-off devices DKH3, DKH4, and DKH8 are set to a straight passage, and the shut-off devices DKH2 and DKH5 are set to a corner passage.

[0043] The second tank B2 is now empty. The lautering process begins in the first tank B1. The liquid is separated into wort and spent grain through the lautering sieve L, with the wort being pumped back into the second tank B2. Preheated sparge water is poured over the remaining spent grain and then pumped into the second tank B2 along with the wort. Pumping is done with the second pump P2 via the suction line S1 and the pressure line D2. For this purpose, the shut-off devices DKH1, DKH2, DKH4, DKH5, and DKH6 are set accordingly. In the example shown, the shut-off devices DKH1, DKH4, and DKH6 are set to a straight flow, and the shut-off devices DKH2 and DKH5 are set to a corner flow.

[0044] The wort is then brought to a boil in the second tank B2, and hops are added. This step is also known as hop boiling. Remaining waste products (spent grain) are removed from the now empty first tank B1, and the first tank B1 is cleaned. The lautering sieve L can be removed for this purpose.

[0045] The wort now boils in the second container B2 and the next brew can be started with mashing in the cleaned first container B1 as described above.

[0046] After boiling the hops in the second tank B2, the wort is pumped via the suction line S4 by the second pump P2 through the heat exchanger W to cool it into a fermentation tank G for the primary fermentation. For this purpose, the shut-off valves DKH7, DKH4, DKH5, DKH6, DKH9, and the shut-off valve KH2 are set accordingly. In the example, the shut-off valve KH1 is opened, and the shut-off valves DKH7, DKH4, DKH5, DKH6, and DKH9 are set to the angled flow.

[0047] Once the second container B2 is empty, it can be cleaned if necessary and the lautering sieve L can be inserted.

[0048] In a preferred embodiment, both containers B1, B2 are identically designed and / or equipped.

[0049] Vessels B1, B2 can be heated with hot oil or another medium, which is heated, for example, in a heater H and circulated by a heating pump HP. An electronic control system ES can be provided, which controls the heater H, the heating pump HP, and the pumps P1, P2 via control lines SL and monitors the temperature of the vessels B1, B2 via temperature sensors TF. Furthermore, thermostats T can be provided to maintain the required temperatures during brewing.

[0050] The refill water, for example tap water, can be heated to the appropriate temperature via a heat exchanger that is heated with the hot oil or medium (instantaneous water heater principle) or there is a hot water connection whose warm water can be used directly for the refill.

[0051] Figure 2 shows a schematic view of another embodiment of an arrangement 1 for brewing beer, comprising a first container B1 and a second container B2.

[0052] A replaceable lautering sieve L is shown in the second container B2 in the illustration, but can be removed and inserted into the first container B1 instead. Alternatively, two lautering sieves L can be included in the scope of delivery of assembly 1.

[0053] Each of the containers B1, B2 has at least a first outlet A1 at a lowest point of the container B1, B2 below a seat for the lautering sieve L and a second outlet A2 above the seat for the lautering sieve L. A third outlet can be provided above the lowest point but below the seat for the lautering sieve L.

[0054] Each of the containers B1, B2 is designed to be heatable and can have connections for a heating circuit. Furthermore, a temperature sensor (not shown) can be provided in or on each of the containers B1, B2.

[0055] The arrangement 1 further comprises a first pump P1, which is selectively connected or connectable to the first outlet A1 of the first container B1 via a suction line S1 and a shut-off device AO1, for example a gate valve or three-way valve, and which is selectively connected or connectable to the second outlet A2 of the first container B1 via a pressure line D1 and at least one shut-off device AO2, AO3, such that liquid can be circulated in the first container B1 by means of the first pump P1. Furthermore, a shut-off device AO5 is provided, via which liquid can be pumped from the first container B1 into a fermentation tank (not shown) by means of the first pump P1.

[0056] The arrangement 1 further comprises a second pump P2, which is optionally connected or connectable to the first outlet A1 of the second container B2 via a suction line S2 and a shut-off device AO6, and which is optionally connected or connectable to the second outlet A2 of the second container B2 via a pressure line D2 and at least one shut-off device AO7, such that liquid can be circulated in the second container B2 by means of the second pump P2. The pressure lines D1, D2 are connected to one another via the shut-off devices AO2, AO7 and, if appropriate, further shut-off devices AO4, AO9, so that, with the shut-off devices AO1 to AO9 in the appropriate position, the first pump P1 can pump liquid from the first container B1 into the second container B2 or the second pump P2 can pump liquid from the second container B2 into the first container B1. Furthermore, liquid can be pumped from the second container B2 into a fermentation tank G via the shut-off device AO5 using the second pump P2.

[0057] The shut-off devices AO2, AO3, and AO4 can alternatively be combined to form a three-way valve. The shut-off devices AO7, AO8, and AO9 can alternatively be combined to form a three-way valve.

[0058] The arrangement 1 can be used to carry out the beer brewing process described below.

[0059] Mashing takes place in the first tank B1, as is known from the state of the art. Water is added, heated, and malt is added. During mashing, different resting times and temperatures must be maintained. In between and during the heating phases, the mash is circulated by the first pump P1 via the suction line S1 and the pressure line D1. For this purpose, the shut-off valves AO1, AO2, and AO3 are opened, and the shut-off valve AO4 is closed or remains closed.

[0060] The second container B2 is empty during this time. The replaceable lautering sieve L can already be inserted into the second container B2.

[0061] After the mashing rest period, the entire contents of the first tank B1 are pumped by the first pump P1 via the suction line S1 and the pressure line D1 into the second tank B2, in which the lautering sieve L is or will be inserted. For this purpose, the shut-off valves AO1, AO2, AO4, AO9, AO8 are or will remain open, and the shut-off valves AO3, AO5, AO7 are or will remain closed.

[0062] The first container B1 can be rinsed during and / or afterward with some water, in particular preheated water.

[0063] The first tank B1 is now empty. The lautering process begins in the second tank B2. The liquid is separated into wort and spent grain through the lautering sieve L, with the wort being pumped back into the first tank B1. Preheated sparge water is poured over the remaining spent grain and then pumped into the first tank B1 along with the wort. The pumping is performed by the second pump P2 via the suction line S2 and the pressure line D2. For this purpose, the shut-off valves AO6, AO7, AO9, ACH, and AO3 are opened or remain open, and the shut-off valves AO8, AO5, and AO2 are closed or remain closed.

[0064] The wort is then brought to a boil in the first tank B1, and hops are added. This step is also known as hop boiling. Remaining waste products (spent grain) are removed from the now empty second tank B2, and the second tank B2 is cleaned. For this purpose, the lautering sieve L can be removed. The wastewater generated during cleaning can be directed to a drain (not shown), for example, via a low point in the pump housing of the second pump P2.

[0065] The wort is now boiling in the first tank B1, and mashing can begin for the next batch in the cleaned second tank B2. The process thus begins again. Water is added, heated, and malt is added. Different resting times and temperatures must be maintained during mashing. In between and during the heating phases, the mash is circulated by the second pump P2 via the suction line S2 and the pressure line D2. For this purpose, the shut-off valves AO6, AO7, and AO8 are opened or remain open, and the shut-off valve AO9 is closed or remains closed.

[0066] After boiling the hops in the first tank B1, the wort is pumped via the suction line S1 by the first pump P1 through the heat exchanger (not shown) to cool it down and enter a fermentation tank (not shown) for primary fermentation. For this purpose, the shut-off valves AO1, AO2, AO4, and AO5 are opened or remain open, and the shut-off valves AO3 and AO9 are closed or remain closed.

[0067] Once the first container B1 is empty, it can be cleaned if necessary and the lautering sieve L can be inserted. Any dirty water generated during cleaning can be directed to a drain (not shown), for example, via a lowest point in the pump housing of the first pump P1.

[0068] After the mashing rest period in the second tank B2 has ended, the entire contents of the second tank B2 are pumped by the second pump P2 via the suction line S2 and the pressure line D2 into the first tank B1, in which the lautering sieve L is or will be inserted. For this purpose, the shut-off valves AO1, AO7, AO9, ACH, AO3 are or will remain open, and the shut-off valves AO8, AO5, AO2 are or will remain closed.

[0069] The second tank B2 is now empty. The lautering process begins in the first tank B1. The liquid is separated into wort and spent grain through the lautering sieve L, with the wort being pumped back into the second tank B2. Preheated sparge water is poured over the remaining spent grain and then pumped into the second tank B2 along with the wort. Pumping is performed by the first pump P1 via the suction line S1 and the pressure line D1. For this purpose, the shut-off valves AO1, AO2, ACH, AO9, AO8 are opened or remain open, and the shut-off valves AO3, AO5, AO7 are closed or remain closed.

[0070] The wort is then brought to a boil in the second tank B2, and hops are added. This step is also known as hop boiling. Remaining waste products (spent grain) are removed from the now empty first tank B1, and the first tank B1 is cleaned. The lautering sieve L can be removed for this purpose.

[0071] The wort now boils in the second container B2 and the next brew can be started with mashing in the cleaned first container B1 as described above.

[0072] After boiling the hops in the second tank B2, the wort is pumped via the suction line S2 by the second pump P2 through the heat exchanger (not shown) to cool it down and enter a fermentation tank (not shown) for primary fermentation. For this purpose, the shut-off valves AO6, AO7, AO9, and AO5 are opened or remain open, and the shut-off valves AO8 and AO4 are closed or remain closed.

[0073] Once the second container B2 is empty, it can be cleaned if necessary and the lautering sieve L can be inserted.

[0074] In a preferred embodiment, both containers B1, B2 are identically designed and / or equipped.

[0075] In a similar way as in the embodiment according to Figure 1The containers B1, B2 can be heated with hot oil or another medium, which is heated, for example, in a heater and circulated by a heating pump. An electronic control system can be provided that controls the heater, the heating pump, and the pumps P1, P2 via control lines and monitors the temperature of the containers B1, B2 via temperature sensors. Furthermore, thermostats can be provided to maintain the required temperatures during brewing.

[0076] The refill water, for example tap water, can be heated to the appropriate temperature via a heat exchanger that is heated with the hot oil or medium (instantaneous water heater principle) or there is a hot water connection whose warm water can be used directly for the refill. LIST OF REFERENCE SYMBOLS

[0077] 1Arrangement for brewing beer A Drain A1 First outlet A2 Second outlet A3 Third outlet AO1 to AO9 Shut-off device B1 First tank B2 Second tank DKH1 to DKH9 Shut-off device D1, D2 Pressure line ES Electronic control GG Fermentation tank HHeater HP Heating pump KH1, KH2 Shut-off device L Lautering sieve P1 First pump P2 Second pump SL Control line S1, S2, S3, S4 Suction line T Thermostat TFT Temperature sensor W Heat exchanger

Claims

1. Beer brewing arrangement (1) comprising at least a first vessel (B1) and a second vessel (B2), each vessel (B1, B2) having at least a first outlet (A1) underneath a seat for a removable lauter tun (L) and a second outlet (A2) above the seat for the lauter tun (L), each vessel (B1, B2) being heatable, the arrangement (1) also comprising at least one pump (P1, P2), which is connected or connectable selectively to the first outlet (A1) of the first vessel (B1) and / or to the first outlet (A1) of the second vessel (B2) via corresponding suction lines (S1, S2) and one or more shut-off members (DKH1, DKH2, DKH4, DKH5, DKH8, AO1, AO6), the at least one pump (P1, P2) being connected or connectable selectively to the second outlet (A2) of the first vessel (B1) and / or to the second outlet (A2) of the second vessel (B2) via corresponding pressure lines (D1, D2) and one or more shut-off members (DKH3, AO2, AO3, AO4, AO7, AO8, AO9), such that by means of the at least one pump (P1, P2) liquid is circulatable in the first vessel (B1) and / or in the second vessel (B2) or pumpable from one of the vessels (B1, B2) into the other of the vessels (B2, B1).

2. Arrangement (1) according to Claim 1, comprising a first pump (P1) and a second pump (P2), the first pump (P1) being connected or connectable to the first outlet (A1) of the first vessel (B1) via a suction line (S1) and one or more shut-off members (DKH1, DKH2, A01), the first pump (P1) being connected or connectable selectively to the second outlet (A2) of the first vessel (B 1) and / or to the second outlet (A2) of the second vessel (B2) via a pressure line (D1) and one or more shut-off members (DKH3, AO2, AO3, AO4, AO7, AO8, AO9), such that by means of the first pump (P1) liquid is circulatable in the first vessel (B1) or pumpable from the first vessel (B1) into the second vessel (B2), the second pump (P2) being connected or connectable to the first outlet (A1) of the second vessel (B2) via a suction line (S2) and one or more shut-off members (DKH5, DKH8, AO6), the second pump (P2) being connected or connectable selectively to the second outlet (A2) of the second vessel (B2) and / or to the second outlet (A2) of the first vessel (B1) via a pressure line (D2) and one or more shut-off members (DKH6, AO7, AO8, AO9, AO3, AO4), such that by means of the second pump (P2) liquid is circulatable in the second vessel (B2) or pumpable from the second vessel (B2) into the first vessel (B1).

3. Arrangement (1) according to either of Claims 1 and 2, the first outlet (A1) being arranged at the deepest point of the respective vessel (B 1, B2).

4. Arrangement (1) according to one of the preceding claims, a shut-off member (DKH9, AO5) also being provided, via which liquid is pumpable from the first vessel (B1) into a fermentation tank (G) and / or liquid is pumpable from the second vessel (B2) into a fermentation tank (G) by means of the at least one pump (P1, P2).

5. Arrangement (1) according to one of the preceding claims, the vessels (B1, B2) each being provided with a temperature sensor (TF) and heatable by means of a heater (H).

6. Arrangement (1) according to one of the preceding claims, an electronic controller (ES) and / or at least one thermostat (T) being provided, which is designed to monitor the temperature by means of the temperature sensor (TF) and to open-loop and / or closed-loop control the heater (H) and the pumps (P1, P2).

7. Arrangement (1) according to one of Claims 4 to 6, a heat exchanger (W) for cooling liquid pumped to the fermentation tank (G) being provided.

8. Method for brewing beer using the arrangement according to one of the preceding claims, mashing being carried out in the first vessel (B1, B2), while at the same time hops are boiled in the second vessel (B2, B1), and, after the hops have been boiled, wort is pumped from the second vessel (B2, B1) into a fermentation tank (G), the now empty second vessel (B2, B1) is cleaned and a lauter tun (L) is inserted into the second vessel (B2, B 1), mash then being pumped from the first vessel (B1, B2) into the second vessel (B2, B1) and lautered there, and wort produced during the lautering operation then being pumped into the first vessel (B1, B2) and the hops being boiled there, while the now empty second vessel (B2, B1) is cleaned, the lauter tun (L) is removed and then mashing is carried out in the second vessel (B2, B1).

9. Method according to Claim 8, the method being repeated once or multiple times alternately between the first vessel (B 1) and the second vessel (B2).

10. Method according to Claim 8 or 9, the mash being circulated during the mashing operation by means of a pump (P1, P2) assigned to the respective vessel (B1, B2).