Method for tracking containers formed with moulds by means of a search by alignment of mould identifier sequences

EP4747704A1Pending Publication Date: 2026-05-27TIAMA SOCIETE ANONYME
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
TIAMA SOCIETE ANONYME
Filing Date
2024-07-16
Publication Date
2026-05-27

AI Technical Summary

Technical Problem

Existing methods for monitoring containers formed using molds on conveyor routes are limited in accurately determining the manufacturing parameters and inspection results for individual containers, as they rely on mold identifiers that do not provide precise information about the manufacturing moment and can lead to delayed or incorrect interventions due to the mixing of containers and the lack of real-time data synchronization.

Method used

A process that involves obtaining sequences of inspection results from multiple containers using multiple inspection devices, aligning mold or forming cavity identifiers to identify the same containers across different inspection points, allowing for precise tracking and association of inspection results with manufacturing data, even when containers are mixed or rearranged on the conveyor route.

Benefits of technology

This approach enables real-time monitoring and identification of containers, facilitating timely corrective actions and improving the efficiency of mold maintenance and quality control by associating inspection results with specific manufacturing parameters, thus overcoming the limitations of previous methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FR2024050973_30012025_PF_FP_ABST
    Figure FR2024050973_30012025_PF_FP_ABST
Patent Text Reader

Abstract

The invention relates to a method for tracking containers transported on a conveyor (100) of containers (300), the containers having been formed by means of a set of moulds, the method comprising: - obtaining a first sequence of inspection results associated with information relating to the mould identifiers, - obtaining a second sequence of inspection results associated with information relating to the mould identifiers, - obtaining mould identifiers for the first sequence of results and for the second sequence of results, - searching by sequence alignment for the first sequence of results (SEQ1) in the second sequence of results (SEQ2) using the obtained mould identifiers, to identify containers that are the same.
Need to check novelty before this filing date? Find Prior Art