Game machine
Patent Information
- Application Number
- JP2021191353
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2021-11-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional pachinko game machines lack variety in transition effects, leading to reduced player interest as they can only execute low-expectation and high-expectation transitions without sufficient differentiation.
The gaming machine incorporates game control means to determine whether to transition to a special game state based on predetermined conditions, using production control means to execute judgment results that suggest varying degrees of expectation, including low-expectation and high-expectation transition effects.
This enhances player engagement by providing diverse and dynamic game experiences, increasing amusement through varied transition effects.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[Technical Field]
[0001] The present invention relates to a gaming machine such as a pachinko gaming machine. [Background technology]
[0002] Among conventional pachinko gaming machines, there is known a gaming machine that performs a hit determination to determine whether or not a hit has occurred on the condition that a gaming ball enters a starting hole, displays a special symbol in a variable manner, and executes a winning game (special game state) when the winning symbol is displayed stationary.
[0003] For example, the pachinko gaming machine described in Patent Document 1 below is provided with a presentation control means that can control the presentation, and it is possible to execute a weak SP reach, which indicates that the probability of a winning game being executed (the probability controlled in a special game state) is low, and a strong SP reach, which indicates that the probability of a winning game being executed is high. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Laid-Open No. 2005-058457 Summary of the Invention [Problem to be solved by the invention]
[0005] However, in recent years, there are many gaming machines that can execute both low-expectation transition effects and high-expectation transition effects that suggest a higher expectation of being controlled to a special game state than a low-expectation transition effect, so simply being able to execute low-expectation transition effects and high-expectation transition effects can sometimes lack interest, and there is room for improvement in this regard. [Means for solving the problem]
[0006] The gaming machine of the present invention comprises: a game control means for determining whether or not to control the game into a special game state advantageous to a player based on the establishment of a predetermined condition; and a performance control means capable of executing a performance of a judgment result that suggests the result of the judgment, The performance control means In the determination result presentation, it is possible to transition to an expectation transition presentation that suggests the degree of expectation controlled to the special game state, In the determination result presentation, an expectation suggestion presentation that suggests a transition to the expectation transition presentation can be executed, The expected transition effects include a low expectation transition effect and a high expectation transition effect that suggests that the expectation of being controlled to the special game state is higher than that of the low expectation transition effect, The expectation suggestion effect includes a low expectation suggestion effect that suggests a transition to the low expectation transition effect, and a high expectation suggestion effect that suggests a transition to the high expectation transition effect. This is a gaming machine characterized by the above. [Effects of the Invention]
[0007] According to the present invention, it is possible to increase interest in games. [Brief explanation of the drawings]
[0008] [Figure 1] FIG. [Figure 2] FIG. [Figure 3] A front view showing the second large prize device and other details. [Figure 4] FIG. [Figure 5] (A) is a front view of the performance unit when the above-board movable device and the below-board movable device are in standby state, and (B) is a front view of the performance unit when the above-board movable device and the below-board movable device are activated. [Figure 6] FIG. 2 is a block diagram showing the electrical configuration of the main control board. [Figure 7] FIG. 2 is a block diagram showing the electrical configuration of the sub-control board. [Figure 8](A) is a table showing random numbers related to the general map, and (B) is a table showing random numbers related to the special map. [Figure 9] (A) is a winning determination table, (B) is a normal game fluctuation pattern determination table, and (C) is an auxiliary game control table. [Figure 10] (A) is a jackpot determination table, (B) is a jackpot symbol type determination table, and (C) is a reach determination table. [Figure 11] This is a table for determining the variation pattern of Special Chart 1. [Figure 12] This is a table for determining the variation pattern of Special Chart 2. [Figure 13] This is a look-ahead determination table. [Figure 14] This is a jackpot game control table. [Figure 15] FIG. [Figure 16] FIG. 10 is an explanatory diagram showing a specific example of a presentation mode. [Figure 17] An explanatory diagram showing a specific example of normal fluctuations in special chart fluctuation effects. [Figure 18] This is an explanatory diagram showing a specific example of N reach in the special chart change performance. [Figure 19] This is an explanatory diagram showing a specific example of SP reach in the special chart change performance. [Figure 20] An explanatory diagram showing a specific example of a hold effect. [Figure 21] An explanatory diagram showing a specific example of a movable object effect. [Figure 22] FIG. 10 is an explanatory diagram showing a specific example of an operation presentation. [Figure 23] 10 is a flowchart of a main control process. [Figure 24] 10 is a flowchart of a main-side timer interrupt process. [Figure 25] 10 is a flowchart of a sub-control main process. [Figure 26] 10 is a flowchart of a 1 ms timer interrupt process. [Figure 27] 10 is a flowchart of a 10 ms timer interrupt process. [Figure 28] This is a special diagram 1 fluctuation pattern determination table for the non-time-saving state in the first embodiment. [Figure 29] (A) A table showing the allocation rate of the special chart 1 variation pattern selected in the case of a non-time-saving state and a jackpot in the first embodiment, (B) a table showing the allocation rate of the special chart 1 variation pattern selected in the case of a non-time-saving state and a miss with a reach in the first embodiment, and (C) a table showing the allocation rate of the special chart 1 variation pattern selected in the case of a non-time-saving state and a miss without a reach in the first embodiment. [Figure 30] 10 is a first look-ahead determination table for a non-time-shortening state in the first embodiment. [Figure 31] An explanatory diagram showing the display modes of the icon and the types of display modes of the hold icon in the first embodiment. [Figure 32] An explanatory diagram showing the icon and the hold icon in the first embodiment. [Figure 33] An explanatory diagram showing the types of scenario patterns for displaying the hold icon in the first embodiment. [Figure 34] 10 is a scenario pattern selection table for the hold icon in the first embodiment. [Figure 35] FIG. 10 is an explanatory diagram showing types of scenario patterns for displaying the icon in the first embodiment. [Figure 36] 10 is a scenario pattern selection table for the hold icon in the first embodiment. [Figure 37] FIG. 2 is a front view of the on-board movable body of the first embodiment. [Figure 38] 10 is an execution lottery table for determining whether to execute a first icon change effect according to the first embodiment. [Figure 39] 10 is a presentation mode selection table for a first icon change presentation in the first embodiment. [Figure 40] FIG. 10 is an explanatory diagram showing the execution timing of the first icon change effect in the first effect mode. [Figure 41] FIG. 10 is an explanatory diagram showing the execution timing of the first icon change effect in the second effect mode. [Figure 42] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 43] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 44] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 45] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 46] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 47] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 48] FIG. 10 is an explanatory diagram showing a specific example of a first icon change effect in the first embodiment. [Figure 49] 10 is an execution lottery table for determining whether or not a second icon change effect is to be performed in the first embodiment. [Figure 50] 10 is an execution lottery table for determining whether or not a third icon change effect is to be performed in the first embodiment. [Figure 51] FIG. 10 is an explanatory diagram showing the execution timing of the second icon change effect and the execution timing of the third icon change effect. [Figure 52] FIG. 10 is an explanatory diagram showing a specific example of the second icon change effect in the first embodiment. [Figure 53] FIG. 10 is an explanatory diagram showing a specific example of the third icon change effect in the first embodiment. [Figure 54] FIG. 10 is an explanatory diagram showing a specific example of the third icon change effect in the first embodiment. [Figure 55] A diagram showing the presentation flow of the special chart change presentation in the first embodiment. [Figure 56] This is a sub-variation pattern selection table for SPSP reach. [Figure 57] (A) is an execution lottery table for the pre-battle suggestion cut-in effect of the first embodiment, and (B) is an execution lottery table for the pre-coalition suggestion cut-in effect of the first embodiment. [Figure 58] (A) is an execution lottery table for the development suggestion effect of the first embodiment, and (B) is an execution lottery table for the super hot suggestion effect of the first embodiment. [Figure 59] This is a table showing the expected probability of winning the jackpot with SPSP reach. [Figure 60] An explanatory diagram showing the timing of execution of the advance suggestion cut-in effect and the timing of execution of the development suggestion effect. [Figure 61] An explanatory diagram showing the timing of execution of the pre-suggestion cut-in effect and the timing of execution of the super hot suggestion effect. [Figure 62] An explanatory diagram showing the timing of execution of the advance suggestion cut-in effect and the timing of execution of the development suggestion effect. [Figure 63] An explanatory diagram showing the timing of execution of the pre-suggestion cut-in effect and the timing of execution of the super hot suggestion effect. [Figure 64] FIG. 2 is an explanatory diagram showing a specific example of branching effects in the first embodiment. [Figure 65] FIG. 2 is an explanatory diagram showing a specific example of branching effects in the first embodiment. [Figure 66] FIG. 2 is an explanatory diagram showing a specific example of branching effects in the first embodiment. [Figure 67] FIG. 2 is an explanatory diagram showing a specific example of a battle reach in the first embodiment. [Figure 68] An explanatory diagram showing a specific example of a cooperative battle reach in the first embodiment. [Figure 69] 10 is a flowchart of a received command analysis process according to the first embodiment. [Figure 70] This is a flowchart of the processing at the time of starting winning in the first embodiment. [Figure 71] 10 is a flowchart of the variable performance start processing of the first embodiment. [Figure 72] FIG. 10 is a block diagram showing the electrical configuration of the main control board according to the second embodiment. [Figure 73] FIG. 10 is a block diagram showing the electrical configuration of a sub-control board according to a second embodiment. [Figure 74] FIG. 2 is a perspective view showing the back side of the gaming machine. [Figure 75] FIG. 2 is a front view showing a 7-segment display. [Figure 76] A diagram showing the over-prize ball prevention function. [Figure 77] A diagram showing the resetting of the difference in the number of balls. [Figure 78] (A) A diagram showing the presentation mode when there is an excess ball abnormality, and (B) A diagram showing the presentation mode when there is a magnetic detection abnormality. [Figure 79] (A) is a diagram showing an image predicting an excess prize ball, and (B) is a diagram showing an image predicting a game stop. [Figure 80] (A) A figure showing a purple-bordered image when in a high-probability, high-base state, and (B) a figure showing a red-bordered image when in a high-probability, high-base state. [Figure 81] FIG. 10A is a diagram showing the state when the special reset switch is pressed, and FIG. 10B is a diagram showing the state when one hour has passed since the customer waiting state. [Figure 82] 10 is a flowchart of a main-side timer interrupt process according to the second embodiment. [Figure 83] 10 is a flowchart of an input process. [Figure 84] 10 is a flowchart of the difference ball number measurement process. [Figure 85] 10 is a flowchart of a special action process. [Figure 86] 10 is a flowchart of a special symbol waiting process. [Figure 87] 10 is a flowchart of a customer waiting measurement process. [Figure 88] 10 is a flowchart of a special symbol determination process. [Figure 89] 10 is a flowchart of a game status management process. [Figure 90] 10 is a flowchart of an output process. [Figure 91] 10 is a flowchart of an outer end signal output process. [Figure 92] A diagram showing the excess prize ball prevention function in a modified example of the second embodiment. [Figure 93] A diagram showing the resetting of the difference in the number of balls in a modified example of the second embodiment. [Figure 94] A figure showing a case where the difference in the number of balls is displayed on a 7-segment display in a modified example of the second embodiment. [Figure 95] 10 shows a big win determination table, a big win symbol type determination table, a small win symbol type determination table, a losing symbol type determination table, and a reach determination table according to the third embodiment. [Figure 96] 10 is a determination table of the big win symbol type and the small win symbol type according to the third embodiment, which is a table for explaining the types of big wins and small wins. [Figure 97] 10 is a determination table of the type of losing symbol according to the third embodiment, which is a table explaining the types of losing symbols. [Figure 98] This is a table showing the types of hit determination table, normal map change pattern determination table, and electric chute opening pattern table related to the third embodiment. [Figure 99] This is a special chart variation pattern determination table relating to the third embodiment. [Figure 100] 11 is a flowchart of a game status management process according to the third embodiment. [Figure 101] FIG. 10 is a diagram illustrating an outline of the game flow of the gaming machine according to the third embodiment. [Figure 102] 10A to 10C are diagrams showing display screens of each rendering mode according to the third embodiment. [Figure 103] FIG. 11 is a diagram showing a specific example of a RUSH entry effect according to the third embodiment. DETAILED DESCRIPTION OF THE INVENTION
[0009] A first embodiment of the gaming machine of the present invention will be described in detail below with reference to the drawings. In each of the drawings, identical parts are designated by the same reference numerals, and redundant descriptions of identical parts will generally be omitted. For the sake of simplicity, this specification may use symbols or signs referring to information, signals, physical quantities, components, etc., and omit or abbreviate the names of the information, signals, physical quantities, components, etc. corresponding to the symbols or signs. In addition, in any of the flowcharts described below, the execution order of multiple processes in any of the steps can be arbitrarily changed or executed in parallel, as long as no inconsistency occurs in the process content.
[0010] 1. Structure of the gaming machine A pachinko gaming machine PY1, which is a first embodiment of the gaming machine of the present invention, will be described below. First, the structure of the pachinko gaming machine PY1 will be described using Figures 1 to 5. In the following description, the left, right, up, and down directions of each part of the pachinko gaming machine PY1 refer to the left, right, up, and down directions (as viewed from the front) of a player facing the pachinko gaming machine PY1. Furthermore, "forward" refers to the direction from the pachinko gaming machine PY1 approaching the player facing the pachinko gaming machine PY1, and "rearward" refers to the direction from the player facing the pachinko gaming machine PY1 approaching the pachinko gaming machine PY1.
[0011] As shown in FIG. 1, the pachinko gaming machine PY1 includes a gaming machine frame 2. The gaming machine frame 2 includes an outer frame 22 and a front door 23 that can be opened and closed relative to the outer frame 22. The front door 23 further includes a gaming board mounting frame 2A to which a gaming board unit YU (described later) is attached, and a front frame 23m that is rotatably supported on the gaming board mounting frame 2A via hinges 2B. The front frame 23m can be opened and closed relative to the gaming board mounting frame 2A. A transparent plate 23t is attached to the front frame 23m. When the front frame 23m is closed, the gaming board 1 attached to the gaming board mounting frame 2A and the transparent plate 23t face each other. Therefore, when the pachinko gaming machine PY1 is installed in a gaming parlor, a player standing in front of the pachinko gaming machine PY1 can see the game area 6 formed on the gaming board 1 through the transparent plate 23t. The transparent plate 23t may be a transparent glass plate, a transparent synthetic resin plate, etc. It is sufficient that the playing area 6 can be seen from the front of the pachinko gaming machine PY1.
[0012] A handle 72k that can be rotated to launch game balls is provided at the lower right of the front of the front frame 23m. The amount by which the handle 72k is rotated (rotation angle) corresponds to the magnitude (launch strength) of the force applied to the game ball to launch it (the amount by which the launch device 72, described below, drives the launch solenoid). Therefore, the game balls are launched with a launch strength that corresponds to the rotation of the handle 72k. In addition, a lower decorative body 36 that protrudes significantly forward is provided at the lower center of the front of the front frame 23m. An upper tray 34 is formed on the top surface of the lower decorative body 36 to store game balls supplied to the handle 72k. In addition, a lower tray 35 is provided at the lower center of the front of the lower decorative body 36 to store surplus game balls that cannot be accommodated in the upper tray 34.
[0013] An operable first input device (hereinafter referred to as "normal button") 40 is provided on the upper surface of the lower decorative body 36, forward of the upper tray 34. The normal button 40 is composed of, for example, a button with a depression surface, a lever with a grip, etc. In addition, an operable second input device (hereinafter referred to as "special button") 41 is provided on the right decorative body 32, which is formed to protrude forward from the right edge of the surface of the front frame 23m. The special button 41 (operation means) is composed of, for example, a button with a depression surface, a lever with a grip, etc.
[0014] Additionally, a speaker 52 capable of outputting sound is provided on the bottom surface of the upper decorative body 31, which is formed by protruding forward from the top of the surface of the front frame 23m. The speaker 52 consists of a left speaker 52L located on the left side and a right speaker 52R located on the right side. Furthermore, illuminating frame lamps 53 are provided on the right edge of the front frame 23m and on the left and right sides of the lower tray 35 at the front of the lower decorative body 36. Furthermore, movable frame movable devices 58 are attached to the upper left and right edges of the front frame 23m as presentation devices intended to enhance the enjoyment of the game. The frame movable devices 58 consist of a left frame movable device 58L located on the left side and a right frame movable device 58R located on the right side.
[0015] The positions and number of components and devices provided in the gaming machine frame 2 can be changed as appropriate within the scope that does not interfere with the game.
[0016] Next, the game board unit YU will be described mainly with reference to Figures 2 to 5. The game board unit YU has a game board 1 and a presentation unit 1U attached to the back side of the game board 1. First, the game board 1 will be described. The game board 1 is made of a transparent synthetic resin plate. An opening 1A that is approximately circular when viewed from the front is formed in the approximate center of the game board 1. A substantially ring-shaped inner wall portion 1B is formed to protrude forward along the opening 1A to define a game area 6 into which game balls can flow. In addition, a substantially ring-shaped outer wall portion 1C is formed to protrude forward also on the outside of the inner wall portion 1B to define the game area 6.
[0017] A play area 6 surrounded by an inner wall 1B, an outer wall 1C, etc. is formed on the front surface of the game board 1. That is, the front surface of the game board 1 is divided into the play area 6 and other areas by the inner wall 1B and the outer wall 1C.
[0018] The play area 6 is an area where game balls released by operating the handle 72k can flow down, and is provided for playing games on the pachinko game machine PY1. Numerous game nails (not shown) protrude from the play area 6. The game nails form paths that appropriately guide game balls that enter the play area 6 and flow down the play area 6 to the first start opening 11, the second start opening 12, the general prize opening 10, the gate 13, the first big prize opening 14, and the second big prize opening 15, which will be described later.
[0019] The game area 6 is provided with a first start winning device 11D having a first start hole 11 through which a game ball can enter, and a second start winning device (a so-called "electric chute") 12D which enables or disables the ball from entering the second start hole 12.
[0020] The first start winning device 11D is stationary. Therefore, the ease with which the game ball enters the first start opening 11 remains constant (unchanging). The entry of a game ball into the first start opening 11 triggers a lottery for a first special symbol (hereinafter referred to as "Special Symbol 1") (obtaining and determining a random number related to Special Symbol 1, described below; hereinafter referred to as "Special Symbol 1 lottery") and the variable display of Special Symbol 1. In addition, when a game ball enters the first start opening 11, a predetermined number of game balls (for example, four) are paid out as prize balls.
[0021] The electric chute 12D is equipped with an operable electric chute opening / closing member 12k. The electric chute opening / closing member 12k is normally (in a normal state) in a closed position, making it impossible or extremely difficult for a gaming ball to enter the second starting hole 12. When a special state is entered, the electric chute opening / closing member 12k moves to an open position, making it possible for a gaming ball to enter the second starting hole 12. In this way, the movement of the electric chute opening / closing member 12k to the open position is also referred to as the "open state" of the second starting hole 12 or the electric chute 12D, and only when in the open state is a gaming ball able to enter the second starting hole 12. On the other hand, the electric chute opening / closing member 12k in the closed position is also referred to as the "closed state" of the second starting hole 12 or the electric chute 12D. In addition, when the second starting hole 12 or the electric chute 12D is in the "open state," it is also referred to as "the electric chute 12D is open," and when the electric chute 12D is in the "closed state," it is also referred to as "the electric chute 12D is closed."
[0022] The entry of a gaming ball into the second starting hole 12 triggers the lottery for the second special symbol (hereinafter referred to as "Special Symbol 2") (obtaining and determining the special symbol 2-related random number described below: hereinafter referred to as "Special Symbol 2 lottery") and the variable display of Special Symbol 2. In addition, when a gaming ball enters the second starting hole 12, a predetermined number of gaming balls (for example, four) are paid out as prize balls.
[0023] In addition, a general winning opening 10 into which game balls can enter is provided in the game area 6. When a game ball enters the general winning opening 10, a predetermined number of game balls (for example, three) are paid out as prize balls.
[0024] In addition, the gaming area 6 is provided with a gate 13 through which the gaming ball can pass. The passage of the gaming ball through the gate 13 triggers the drawing of a regular symbol (hereinafter referred to as "regular symbol") (i.e., the acquisition and determination of a regular symbol random number: hereinafter referred to as "regular symbol drawing") and the variable display of the regular symbol. The electric chute 12D is opened when the auxiliary game is executed. In other words, the auxiliary game is a game that involves the opening of the electric chute 12D.
[0025] In addition, the gaming area 6 is provided with a first special prize device 14D (hereinafter also referred to as "normal AT 14D") in which a first special prize opening 14 into which gaming balls can enter is formed.
[0026] The first large prize winning device 14D is equipped with a normal AT opening / closing member 14k that can be operated between an open state and a closed state. The first large prize winning opening 14 is opened and closed by operation of the normal AT opening / closing member 14k. The normal AT opening / closing member 14k is normally in a closed state that blocks the first large prize winning opening 14, making it impossible or extremely difficult for a gaming ball to enter the first large prize winning opening 14. When the normal AT opening / closing member 14k is operated to an open state, it becomes possible for a gaming ball to enter the first large prize winning opening 14. In this way, a gaming ball can enter the first large prize winning opening 14 only when the normal AT opening / closing member 14k is in the open state. When a gaming ball enters the first large prize winning opening 14, a predetermined number of gaming balls (e.g., 14) are paid out as prize balls.
[0027] In addition, the game area 6 is provided with a guide stage 12g that guides the game ball to the second starting port 12. The game ball rolling on the upper surface of the guide stage 12g can flow down toward the second starting port 12.
[0028] The gaming area 6 is also provided with a second large prize device 15D (hereinafter also referred to as "VAT 15D") having a second large prize opening 15 through which a gaming ball can enter. The second large prize device 15D is equipped with an operable VAT opening / closing member 15k. The VAT opening / closing member 15k normally blocks the second large prize opening 15, making it impossible or extremely difficult for a gaming ball to enter the second large prize opening 15. The VAT opening / closing member 15k can be in an open state. When the VAT opening / closing member 15k is in the open state, it becomes easy for a gaming ball to enter the second large prize opening 15. On the other hand, the state in which the VAT opening / closing member 15k blocks the second large prize opening 15 is also referred to as a "closed state." In this way, the second large prize opening 15 is opened and closed by the operation of the VAT opening / closing member 15k. When a gaming ball enters the second large winning hole 15, a predetermined number of gaming balls (for example, 14 balls) are paid out as prize balls.
[0029] Here, second large prize winning device 15D will be described in detail using Figure 3. Inside second large prize winning device 15D, there is provided gate-shaped second large prize winning opening sensor 15a that detects a gaming ball that has entered second large prize winning opening 15 and allows the gaming ball to pass downward.
[0030] A specific area 16 and a non-specific area 17 through which gaming balls can pass (enter) are provided downstream of the second large winning opening sensor 15a. Gaming balls that pass through the second large winning opening sensor 15a are sorted by a sorting device 16D into either the specific area 16 or the non-specific area 17. The sorting device 16D includes a sorting member 16k made of a substantially rectangular flat plate, and a sorting solenoid 16s that drives the sorting member 16k. The sorting member 16k is configured to be slidable left and right by the drive of the sorting solenoid 16s.
[0031] When the sorting solenoid 16s is not energized, the sorting member 16k is in a first state (passage-blocking state: in a front view of FIG. 3(A), the left end of the sorting member 16k is located slightly to the right of the left end of the specific area 16, and the sorting member 16k covers the specific area 16 directly above) in which it prevents the passage of game balls into the specific area 16. When the sorting member 16k is in the first state, after a game ball enters the second large prize opening 15 passes through the second large prize opening sensor 15a, it is impossible or extremely difficult for the game ball to pass through the specific area 16, and the game ball passes through the non-specific area 17. The route of the game ball flowing down from the second large prize opening 15 to the non-specific area 17 is called the first route.
[0032] On the other hand, when the distribution solenoid 16s is energized, the distribution member 16k is in a second state that allows the game ball to pass (enter) the specific area 16 (passage-permitting state: when viewed from the front in FIG. 3(B), the left end of the distribution member 16k is located slightly to the left of the right end of the specific area 16, and the distribution member 16k does not cover the specific area 16 directly above, leaving the area directly above the specific area 16 open). When the distribution member 16k is in the second state, a game ball that has entered the second large prize opening 15 can easily pass through the specific area 16 after passing through the second large prize opening sensor 15a. The route of the game ball flowing down from the second large prize opening 15 to the specific area 16 is called the second route.
[0033] Basically, the distributing member 16k is maintained in the first state. That is, the first state can be said to be the normal state of the distributing member 16k. Then, only in a predetermined round of play (for example, 10 rounds), the distributing solenoid 16s is energized and the distributing member 16k can be changed to the second state.
[0034] The specific area 16 and the non-specific area 17 are provided with a specific area sensor 16a and a non-specific area sensor 17a that detect a gaming ball that has passed through (entered) each area 16, 17 and allow the gaming ball to pass downward.
[0035] It is possible to provide only one of the first special prize winning device 14D and the second special prize winning device 15D, as long as it does not interfere with the game.
[0036] In addition, at approximately the bottom of the game area 6, two outlets 19 are provided for discharging game balls that have been shot into the game area 6 but have not won in any of the winning holes to the outside of the game area 6. In addition, the game board 1 is provided with an illuminating board lamp 54.
[0037] The play area 6 through which the game ball can flow can be divided into a left play area (first play area) on the left side of the center in the left-right direction, and a right play area (second play area) on the right side. The operation mode of the handle 72k that launches the game ball so that it flows down the left play area is called a "left hit." On the other hand, the operation mode of the handle 72k that launches the game ball so that it flows down the right play area is called a "right hit." In the pachinko game machine PY1, the flow path through which the game ball can flow when launched by a left hit is called the first flow path R1, and the flow path through which the game ball can flow when launched by a right hit is called the second flow path R2. The first flow path R1 and the second flow path R2 are also formed by a number of game nails, etc.
[0038] A first start opening 11 and two general winning openings 10 are provided on the first flow path R1. Therefore, a player can aim to win a prize in the first start opening 11 or the general winning opening 10 by hitting the ball from the left so that the game ball flows down the first flow path R1. Meanwhile, a second start opening 12, a gate 13, a first large winning opening 14, and a second large winning opening 15 are provided on the second flow path R2. Therefore, a player can aim to win a prize in the second start opening 12, the first large winning opening 14, or the second large winning opening 15 by hitting the ball from the right so that the game ball flows down the second flow path R2.
[0039] In addition, game balls that do not enter any of the winning holes (first start hole 11, second start hole 12, general winning hole 10, first large winning hole 14, and second large winning hole 15) are guided and discharged to the outlet hole 19. In addition, the number of winning balls that enter each winning hole can be set appropriately.
[0040] In addition, displays 8 are arranged below and to the left of the play area 6 formed on the front of the game board 1 (in the area other than the play area 6). As shown in Figure 4, the displays 8 include a special chart 1 display 81a that variably displays special chart 1, a special chart 2 display 81b that variably displays special chart 2, and a general chart display 82 that variably displays general charts. In addition, the displays 8 include a special chart 1 reserve display 83a that displays the special chart 1 reserve number (U1: the number of reserved special chart 1 variable displays by the special chart 1 display 81a) described below, and a special chart 2 reserve display 83b that displays the special chart 2 reserve number (U2: the number of reserved special chart 2 variable displays by the special chart 2 display 81b) described below.
[0041] The variable display of special chart 1 is executed when a special chart 1 lottery is triggered by the entry of a gaming ball into the first starting gate 11. The variable display of special chart 2 is executed when a special chart 2 lottery is triggered by the entry of a gaming ball into the second starting gate 12. The entry of a gaming ball into the first starting gate 11 or the second starting gate 12 corresponds to the "fulfillment of a predetermined condition" in the present invention. In the following explanation, special charts 1 and 2 are collectively referred to as special charts, and the special chart 1 lottery and special chart 2 lottery are collectively referred to as special chart lottery. Furthermore, the special chart 1 display 81a and the special chart 2 display 81b are collectively referred to as special chart display 81. Furthermore, the special chart 1 reserve display 83a and the special chart 2 reserve display 83b are collectively referred to as special chart reserve display 83.
[0042] The variable display of the special symbol notifies the result of the special symbol lottery. In the variable display of the special symbol, the special symbol is displayed variably and then displayed stationary. The stationary special symbol (stationary special symbol, special symbol derived and displayed as a result of the display of the variable display) is one special symbol selected from multiple types of special symbols by the special symbol lottery. If the stationary special symbol is a predetermined specific special symbol (a special symbol with a specific stopping pattern, i.e., a jackpot symbol), a jackpot game (an example of a special game) is played in which the jackpot slots (first jackpot slot 14 and second jackpot slot 15) are opened.
[0043] The special symbol display 81 is composed of, for example, eight LEDs (Light Emitting Diodes) arranged horizontally, and displays a special symbol according to the result of the special symbol lottery depending on the lighting state of the LEDs. For example, if the result of the special symbol lottery is a jackpot (one of the multiple types of jackpots described below), the special symbol display 81 displays a jackpot symbol consisting of the first, second, fifth, and sixth LEDs from the left lit, such as "□□■■□□■■" (□: lit, ■: unlit). Also, if the result of the special symbol lottery is a loss, the special symbol display 81 displays a loss symbol consisting of only the rightmost LED lit, such as "■■■■■■■□." The lighting state of the LEDs corresponding to the result of the special symbol lottery is not limited and can be set as appropriate. Therefore, for example, all LEDs may be turned off to indicate a loss symbol.
[0044] Furthermore, in the variable display of the special symbol, the special symbol is displayed for a predetermined variable time before being displayed in a static manner. The variable display of the special symbol is, for example, a manner in which each LED lights up so that light flows repeatedly from left to right. The variable display of the special symbol is not particularly limited, and may be set appropriately, such as all LEDs flashing simultaneously, unless each LED is displayed in a static manner (illuminated in a specific manner).
[0045] In the pachinko gaming machine PY1, when a gaming ball enters the first starting hole 11 or the second starting hole 12, various random numbers (examples of numerical information and judgment information) for conducting special drawing lottery and the like may be acquired. These various random numbers are temporarily stored as special drawing reserves in the special drawing reserve memory unit 105 described below. Note that, hereinafter, the various random numbers acquired upon the entry of a gaming ball into the first starting hole 11 are referred to as "special drawing 1-related random numbers," and the various random numbers acquired upon the entry of a gaming ball into the second starting hole 12 are referred to as "special drawing 2-related random numbers." Here, the special drawing 1-related random numbers are stored as special drawing 1 reserves in the special drawing reserve memory unit 105a within the special drawing reserve memory unit 105. Meanwhile, the special drawing 2-related random numbers are stored as special drawing 2 reserves in the special drawing reserve memory unit 105b within the special drawing reserve memory unit 105. An upper limit (for example, 4) can be set for the number of special drawing 1 reservations (special drawing 1 reservation number) that can be stored in the special drawing 1 reservation memory unit 105a and the number of special drawing 2 reservations (special drawing 2 reservation number) that can be stored in the special drawing 2 reservation memory unit 105b. Note that, hereinafter, special drawing 1 reservations and special drawing 2 reservations are collectively referred to as "special drawing reservations," and the number of special drawing 1 reservations and the number of special drawing 2 reservations are collectively referred to as "special drawing reservation numbers." In addition, special drawing 1-related random numbers and special drawing 2-related random numbers are collectively referred to as "special drawing-related random numbers."
[0046] In the pachinko gaming machine PY1, if the variable display of the special symbol is not performed immediately after the gaming ball enters the first starting hole 11 or the second starting hole 12, specifically, if a prize is won while the variable display of the special symbol is being performed or during a jackpot game (special game state), the variable display of the special symbol (or the right to draw a special symbol) for that prize can be reserved. The reserved special symbol stored in the special symbol reservation memory unit 105 is consumed when the variable display of the special symbol based on that reserved special symbol becomes possible. In other words, the consumption of the reserved special symbol means determining the special symbol-related random number, etc. corresponding to that reserved special symbol and executing the variable display of the special symbol to show the determination result.
[0047] The number of reserved special drawings is displayed on the reserved special drawing display 83. Each of the reserved special drawing 1 display 83a and the reserved special drawing 2 display 83b is composed of, for example, four LEDs, and the number of reserved special drawings can be displayed by lighting up the LEDs corresponding to the number of reserved special drawings.
[0048] Furthermore, the variable display of the normal map notifies the result of the normal map lottery. In the variable display of the normal map, the normal map is displayed variably and then stopped. The stopped and displayed normal map (stop normal map, normal map derived and displayed as a display result of the variable display) is one normal map selected from multiple types of normal maps by the normal map lottery. If the stopped and displayed normal map is a specific normal map determined in advance (a normal map with a predetermined stopping pattern, i.e., a winning pattern), an auxiliary game is played in which the second starting hole 12 (electric chute 12D) is opened.
[0049] The normal map display 82 is composed of, for example, two LEDs, and displays a normal map according to the result of the normal map lottery depending on how they are lit. If the result of the normal map lottery is a win, the normal map display 82 displays a winning pattern consisting of both LEDs lit, such as "□□" (□: lit, ■: unlit). If the result of the normal map lottery is a loss, the normal map display 82 displays a losing pattern consisting of only the right LED lit, such as "■□". A mode in which all LEDs are unlit may also be adopted to indicate a losing pattern. The lighting mode of the LEDs corresponding to the result of the normal map lottery is not limited and can be set as appropriate.
[0050] In addition, before the normal map is displayed as stopped, the normal map is displayed as a variable display for a predetermined variable time. The variable display mode of the normal map is, for example, a mode in which both LEDs light up alternately. Note that the variable display mode of the normal map is not particularly limited, and if each LED is not displayed as stopped (lighted up in a specific mode), it may be set appropriately, such as all LEDs flashing at once.
[0051] In the pachinko gaming machine PY1, when a gaming ball passes through gate 13, a normal symbol random number (an example of numerical information or judgment information) for conducting a normal symbol lottery may be acquired. This random number is stored in the normal symbol reserve memory unit 106, which will be described later, on the condition that the normal symbol variable display or auxiliary game is not being executed. It is possible to set an upper limit (for example, four) on the number of normal symbol reserves (normal symbol reserve number) that can be stored in the normal symbol reserve memory unit 106. In the following, the normal symbol random number acquired when a gaming ball passes through gate 13 is also referred to as a "normal symbol-related random number."
[0052] Next, the presentation unit 1U attached to the back of the game board 1 will be explained using Figure 5. The presentation unit 1U is a unit made up of multiple devices that mainly perform presentations. The presentation unit 1U is equipped with an image display device 50, a first board movable device (hereinafter referred to as "above-board movable device") 55, and a second board movable device (hereinafter referred to as "below-board movable device") 56.
[0053] The image display device 50 is provided with a display unit 50a (display unit) that is configured with, for example, a 20-inch 3D liquid crystal display, a dot display, a 7-segment display, or the like, and is capable of displaying patterns and the like.
[0054] The above-board movable device 55 is disposed in front of the display unit 50a, is movable along the display unit 50a, and includes a decorated above-board movable body 55k (movable body). The below-board movable device 56 is disposed in front of the display unit 50a, is movable along the display unit 50a, and includes a decorated below-board movable body 56k.
[0055] 5(A) shows a schematic diagram of the state in which the above-board movable body 55k and the below-board movable body 56k are held in a normal standby state (initial position) in which they are not in operation. When the drive source of the above-board movable device 55 is driven, the above-board movable body 55k moves downward (descends), and when the drive source of the below-board movable device 56 is driven, the below-board movable body 56k moves upward (rises). At this time, the image display device 50 is covered by the lowered above-board movable body 55k or the raised below-board movable body 56k, making the image display device 50 difficult to see.
[0056] The positions and number of components and devices provided on the game board unit YU can be changed as appropriate within the scope that does not interfere with the game.
[0057] 2. Electrical configuration of gaming machine Next, the electrical configuration of the pachinko gaming machine PY1 will be described with reference to Figures 6 to 7. As shown in Figures 6 to 7, the pachinko gaming machine PY1 is provided with a game control board (hereinafter referred to as the "main control board") 100 that controls game profits (progress of the game) such as special symbol lottery, variable display of special symbols, jackpot game, setting of game states to be described later, regular symbol lottery, variable display of regular symbols, and supplementary games, a presentation control board (hereinafter referred to as the "sub-control board") 120 that controls presentations such as game presentations (special symbol variation presentations (judgment result suggestion presentations), hold presentations, jackpot game presentations) according to the progress of the game by the main control board 100, customer waiting presentations, and operation promotion presentations that prompt operation during a period (operation valid period) when operation of the normal button 40 or the special button 41 is valid, and a payout control board 170 that controls payout of game balls, etc., located further behind the image display device 50 on the gaming board 1. The main control board 100 can be positioned as a game control unit that controls the game. The sub-control board 120, together with the image control board 140, lamp control circuit 151, and audio control circuit 161 described below, can be positioned as a performance control unit that controls the performance. The performance control unit only needs to be equipped with at least the sub-control board 120 and be able to control game performance, customer waiting performance, and operation prompt performance using performance means (image display device 50, speaker 52 (output means), frame lamp 53, board lamp 54, movable devices 55, 56, etc.).
[0058] The pachinko gaming machine PY1 also includes a power supply board 190. The power supply board 190 supplies power to the main control board 100, the sub-control board 120, and the payout control board 170, and also supplies necessary power to other devices via these boards. The power supply board 190 is provided with a backup power circuit 192. When power is not supplied to the pachinko gaming machine PY1, the backup power circuit 192 supplies power to the game RAM 104 of the main control board 100 and the performance RAM 124 of the sub-control board 120, which will be described later. Therefore, information stored in the game RAM 104 of the main control board 100 and the performance RAM 124 of the sub-control board 120 is retained even when power to the pachinko gaming machine PY1 is interrupted. A power switch 191 is also connected to the power supply board 190. The power supply is turned on or off by turning the power switch 191 on or off. In addition, a backup power supply circuit for the game RAM 104 of the main control board 100 may be provided on the main control board 100, and a backup power supply circuit for the performance RAM 124 of the sub-control board 120 may be provided on the sub-control board 120.
[0059] 6, a game control one-chip microcomputer (hereinafter referred to as "game control microcomputer") 101 that controls the progress of a game on the pachinko game machine PY1 according to a program is mounted on the main control board 100. The game control microcomputer 101 includes a game ROM (Read Only Memory) 103 that stores programs, tables, etc. for controlling the progress of a game, a game RAM (Random Access Memory) 104 used as a work memory, and a game CPU (Central Processing Unit) 102 that executes the programs stored in the game ROM 103.
[0060] The gaming ROM 103 stores programs for performing the main control main processing and main timer interrupt processing, which will be described later. The gaming ROM 103 also stores a jackpot determination table, a jackpot symbol type determination table, a reach determination table, a special symbol variation pattern determination table, a look-ahead determination table, a jackpot game control table, a win determination table, a normal symbol variation pattern determination table, an auxiliary game control table, and the like, which will be described later. The gaming ROM 103 may be external. The gaming RAM 104 also includes the special symbol reservation memory unit 105 and the normal symbol reservation memory unit 106, which have been described above.
[0061] The main control board 100 also includes a gaming I / O (Input / Output) port section 118 for inputting and outputting data and signals, and a RAM clear switch 119 for causing the gaming CPU 102 to clear the information stored in the gaming RAM 104.
[0062] The main control board 100 is connected to various sensors MS and various actuators MA via predetermined relay boards (not shown). Therefore, signals output by the various sensors MS are input to the main control board 100. The main control board 100 also outputs signals to the various actuators MA.
[0063] The various sensors MS connected to the main control board 100 include a first start gate sensor that detects game balls that have entered the first start gate 11, a second start gate sensor that detects game balls that have entered the second start gate 12, a general prize gate sensor that detects game balls that have entered the general prize gate 10, a gate sensor that detects game balls that have passed through the gate 13, a first large prize gate sensor that detects game balls that have entered the first large prize gate 14, a second large prize gate sensor 15a that detects game balls that have entered the second large prize gate 15, a specific area sensor 16a that detects game balls that have passed through the specific area 16 (entered the specific area 16), and a non-specific area sensor 17a that detects game balls that have passed through the non-specific area 17 (entered the non-specific area 17). When each sensor detects a game ball, it outputs a signal to the main control board 100 according to the content of its detection. The type and number of sensors connected to the main control board 100 can be changed as appropriate as long as it does not interfere with gameplay.
[0064] Furthermore, the various actuators MA connected to the main control board 100 include an electric chute solenoid that drives electric chute opening / closing member 12k of electric chute 12D, a first large prize opening solenoid that drives normal AT opening / closing member 14k of first large prize device 14D, a second large prize opening solenoid that drives VAT opening / closing member 15k of second large prize device 15D, and a distribution solenoid 16s that drives distribution member 16k of distribution device 16D. Note that the type and number of actuators connected to the main control board 100 can be changed as appropriate as long as it does not interfere with gameplay.
[0065] Furthermore, displays 8 (special chart display 81, regular chart display 82, and special chart reserved display 83) are connected to the main control board 100. The display control of these displays 8 is performed by a game control microcomputer 101.
[0066] The main control board 100 also transmits various commands to the payout control board 170 and receives signals from the payout control board 170 to monitor payouts. The payout control board 170 is connected to a card unit CU (which is installed adjacent to the pachinko gaming machine PY1 and enables ball lending based on information such as an inserted prepaid card) and a prize ball payout device 73, as well as to a launching device 72 via a launching control circuit 175. The launching device 72 includes a handle 72k (see FIG. 1).
[0067] Based on signals from the game control microcomputer 101 and signals from the connected card unit CU, the payout control board 170 pays out prize balls or pays out loan balls using the prize ball payout device 73 or loan ball payout device 74. The number of game balls to be paid out is output to the payout control board 170.
[0068] The launching device 72 is also provided with a touch switch capable of detecting contact of a player or other person with the handle 72k (see FIG. 1). When the player operates the handle 72k, the touch switch detects the player's contact with the handle 72k and outputs a detection signal to the payout control board 170. A launch volume knob capable of detecting the rotation angle (operation amount) of the handle 72k is also connected to the launching device 72. The launching device 72 drives a launch solenoid so that gaming balls are launched with a strength corresponding to the rotation angle of the handle 72k detected by the launch volume knob. In the pachinko gaming machine PY1, when the rotation operation of the handle 72k is maintained, one gaming ball is launched approximately every 0.6 seconds.
[0069] Furthermore, the main control board 100 transmits various commands containing information related to the game to the sub-control board 120 as the game progresses. The sub-control board 120 can grasp the progress of the game (the content of game control) by the main control board 100 based on the various commands sent from the main control board 100. The connection between the main control board 100 and the sub-control board 120 is a unidirectional communication connection that only allows signals to be sent from the main control board 100 to the sub-control board 120. In other words, a unidirectional circuit (e.g., a circuit using a diode) (not shown) is interposed between the main control board 100 and the sub-control board 120 as a means for restricting the direction of communication.
[0070] 7, a performance control one-chip microcomputer (hereinafter referred to as "performance control microcomputer") 121 that controls the performance of the pachinko gaming machine PY1 according to a program is mounted on the sub-control board 120. The performance control microcomputer 121 (performance control means) includes a performance ROM 123 that stores programs and the like for controlling performance as the game progresses using the main control board 100, a performance RAM 124 used as a work memory, and a performance CPU 122 that executes the programs stored in the performance ROM 123.
[0071] The performance ROM 123 also stores programs for performing sub-control main processing, reception interrupt processing, sub-side timer interrupt processing, etc. The performance ROM 123 may be external.
[0072] The sub-control board 120 also includes a presentation I / O port 138 for inputting and outputting data and signals, and an RTC (Real Time Clock) 139. The RTC 139 measures the current date and time. The RTC 139 operates on power supplied from a predetermined island power supply device (not shown) when the pachinko gaming machine PY1 is supplied with power. When power is not supplied from the island power supply device, the RTC 139 operates on power supplied from a backup power circuit 192 provided on the power supply board 190. Therefore, the RTC 139 can measure the current date and time even when the pachinko gaming machine PY1 is not powered on. A backup power circuit for the RTC 139 may be provided on the sub-control board 120. The backup power circuit may include a circuit including a capacitor and an internal battery (such as a button battery).
[0073] An image control board 140 is connected to the sub-control board 120. The performance control microcomputer 121 of the sub-control board 120 causes the image CPU 141 of the image control board 140 to control the display of the image display device 50 based on commands received from the main control board 100, i.e., in accordance with the progress of the game by the main control board 100. The connection between the sub-control board 120 and the image control board 140 is a two-way communication connection that allows signals to be transmitted both from the sub-control board 120 to the image control board 140 and from the image control board 140 to the sub-control board 120.
[0074] The image control board 140 includes an image ROM 142 storing programs for image control, an image RAM 143 used as a work memory, and an image CPU 141 that executes the programs stored in the image ROM 142. The image control board 140 also includes a CGROM 145 storing image data to be displayed on the image display device 50, a VRAM 146 used for expanding the image data stored in the CGROM 145, and a VDP (Video Display Processor) 144. Of course, all or part of these electronic components may be configured on a single chip. The CGROM 145 stores, for example, image data for displaying images on the image display device 50 (still image data and video data, specifically, image data for characters, items, figures, letters, numbers, symbols, etc. (including effect designs), background images, etc.).
[0075] The VDP 144 reads image data from the CGROM 145 and displays it in a display area in the VRAM 146 in accordance with a display list created by the image CPU 141 based on instructions from the performance control microcomputer 121. The VDP 144 then appropriately combines the displayed image data and draws an image in a frame buffer in the VRAM 146. The image drawn in the frame buffer is then output as an RGB signal to the image display device 50. As a result, various performance images are displayed on the display unit 50a.
[0076] The display list is made up of commands for instructing the execution of drawing on a frame-by-frame basis, and includes various parameter information such as the type of image to be drawn, the position at which the image is drawn, the display priority, the display magnification, and the transparency of the image.
[0077] The performance control microcomputer 121 outputs voice, music, sound effects, etc. from the speaker 52 via the audio control circuit 161 based on commands received from the main control board 100, i.e., in accordance with the progress of the game by the main control board 100.
[0078] Audio data such as the sound output from the speaker 52 is stored in the performance ROM 123 of the sub-control board 120. The audio control circuit 161 may be a board on which a CPU is mounted. In this case, the CPU may be made to execute audio control. In this case, a ROM may be mounted on the board and audio data may be stored in the ROM. The speaker 52 may also be connected to the image control board 140, and the image CPU 141 of the image control board 140 may be made to execute audio control. In this case, the audio data may be stored in the image ROM 142 of the image control board 140.
[0079] The sub-control board 120 is also connected to various switches serving as input units, various actuators SA serving as drive sources, and various lamps SL via a predetermined relay board (not shown). Signals output by the various switches are input to the sub-control board 120. The sub-control board 120 also outputs signals to the various actuators SA. The sub-control board 120 also controls the lighting of the various lamps SL via a lamp control circuit 151 based on commands received from the main control board 100.
[0080] The various switches connected to the sub-control board 120 include a normal button detection switch 40a and a special button detection switch 41a. The normal button detection switch 40a detects when the normal button 40 is pressed. The special button detection switch 41a detects when the special button 41 is pressed. Each detection switch 40a, 41a outputs a signal to the sub-control board 120 according to the detection content. The type and number of switches connected to the sub-control board 120 can be changed as appropriate as long as it does not interfere with gameplay.
[0081] The various actuators SA connected to the sub-control board 120 include motors that drive the above-board movable device 55, the below-board movable device 56, the frame movable device 58, etc., and can drive the motors to cause each movable device to perform a predetermined operation. In detail, the performance control microcomputer 121 creates operation pattern data that determines the operation mode of each movable device, and controls the operation of each movable device via the lamp control circuit 151. The type and number of actuators connected to the sub-control board 120 can be changed as appropriate as long as it does not interfere with gameplay.
[0082] The various lamps SL connected to the sub-control board 120 include a frame lamp 53, a board lamp 54, etc., and cause each lamp to emit light. In detail, the performance control microcomputer 121 creates light emission pattern data (data that determines the on / off state, light color, etc., also called lamp data) that determines the light emission mode of each lamp, and controls the emission of each lamp according to the light emission pattern data. Note that data stored in the performance ROM 123 of the sub-control board 120 is used to create the light emission pattern data.
[0083] A CPU may be mounted on the lamp control circuit 151 as a circuit board. In this case, the CPU may be configured to control the lighting of each lamp and the operation of each movable device. In this case, a ROM may be mounted on the circuit board, and data related to lighting patterns and operation patterns may be stored in the ROM. The type and number of lamps connected to the sub-control board 120 may be changed as appropriate as long as it does not interfere with gameplay.
[0084] 3. Main games played on gaming machines Next, the main games played on the pachinko gaming machine PY1 will be described with reference to FIGS.
[0085] 3-1. Games related to regular maps First, we will explain the game related to the normal map. When a launched game ball passes through gate 13, pachinko game machine PY1 performs a normal map lottery. When the normal map lottery is performed, the normal map display 82 displays a variable normal map (a variable display followed by a static display). Here, the statically displayed normal map includes winning and losing patterns. Note that the losing normal map patterns are also called "losing normal maps" to distinguish them from the losing special map patterns described below. When a winning pattern is statically displayed, an auxiliary game is executed, and the game related to passing through gate 13 ends. On the other hand, when a losing normal map is statically displayed, no auxiliary game is played, and the game related to passing through gate 13 ends. In addition, hereinafter, when a game ball passes through gate 13 when the variable normal map display or auxiliary game is not being performed, it is referred to as "the establishment of the normal map variation start condition."
[0086] When the pachinko gaming machine PY1 performs this series of games (regular symbol lottery, variable display of regular symbols, auxiliary games), it acquires regular symbol-related random numbers when the regular symbol variation start conditions are met. The acquired regular symbol-related random numbers include regular symbol random numbers, as shown in Figure 8(A). Regular symbol random numbers are random numbers (determination information) used to determine whether a win has occurred. Each random number has an appropriate range.
[0087] 3-1-1. Hit detection The hit determination is a determination to determine whether or not a win has occurred (whether or not a supplementary game is executed) using one or more hit determination tables as shown in FIG. 9(A). The hit determination table can be associated with the game state, which will be described later. That is, the game state includes a non-time-saving state and a time-saving state, and it is possible to distinguish between a hit determination table used in the non-time-saving state (a hit determination table for non-time-saving) and a hit determination table used in the time-saving state (a hit determination table for time-saving). In each hit determination table, a determination value of the normal symbol random number (normal symbol random number value) is assigned to the hit determination result, which is a win or a miss. Therefore, the pachinko gaming machine PY1 compares the acquired normal symbol random number with the hit determination table to determine whether or not a win has occurred. Then, based on the hit determination result, a normal symbol variation pattern determination is performed to perform a variable display of the normal symbol. If the hit determination result is a win, the winning symbol is basically displayed stationary in the variable display of the normal symbol. On the other hand, if the result of the winning judgment is a loss, the loss normal map is basically displayed as a static image on the variable display of the normal map. Also, the probability of winning can be changed as appropriate.
[0088] 3-1-2. Normal map changes The map fluctuation pattern determination is a determination to determine the map fluctuation pattern using one or more map fluctuation pattern determination tables as shown in Figure 9 (B). The map fluctuation pattern is identification information regarding predetermined items related to the variable display of the map, such as the map fluctuation time.
[0089] The normal map fluctuation pattern determination table can be associated with the game state. That is, as the normal map fluctuation pattern determination table, it is possible to distinguish between a normal map fluctuation pattern determination table used in a non-time-saving state (non-time-saving normal map fluctuation pattern determination table) and a normal map fluctuation pattern determination table used in a time-saving state (time-saving normal map fluctuation pattern determination table).
[0090] Each normal map fluctuation pattern determination table stores one normal map fluctuation pattern, which is the result of the normal map fluctuation pattern determination, for each stopped normal map. In other words, the pachinko gaming machine PY1 can vary the normal map fluctuation time between the non-time-saving state and the time-saving state. For example, in the non-time-saving state, when a losing normal map (a losing normal map) is stopped and displayed, a normal map fluctuation pattern with a normal map fluctuation time of, for example, 30 seconds is determined for the variable display of the normal map, and when a winning pattern is stopped and displayed, a normal map fluctuation pattern with a normal map fluctuation time of, for example, 30 seconds is determined for the variable display of the normal map. Also, in the time-saving state, when a losing normal map is stopped and displayed, a normal map fluctuation pattern with a normal map fluctuation time of, for example, 5 seconds is determined for the variable display of the normal map, and when a winning pattern is stopped and displayed, a normal map fluctuation pattern with a normal map fluctuation time of, for example, 5 seconds is determined for the variable display of the normal map. The variable display of the normal map with the normal map fluctuation time corresponding to the normal map fluctuation pattern determined by this determination is performed by the normal map display 82. In addition, the time for these map fluctuations can be changed as appropriate. In this way, the hit determination and map fluctuation pattern determination are performed, and the map display 82 displays the map in a variable manner.
[0091] 3-1-3. Supplementary games The auxiliary game is executed when the winning symbol is displayed (derived) as a stop symbol in the variable display of the normal symbol (the result of the normal symbol lottery).
[0092] The auxiliary game includes various elements that make up the auxiliary game (auxiliary game components), such as the number of times the electric chute 12D opens and the opening time for each opening. Each of these elements is associated with a game state. The pachinko gaming machine PY1 controls the auxiliary game using one or more auxiliary game control tables, such as those shown in FIG. 9(C), based on the game state. The auxiliary game control tables are associated with the game state. Each auxiliary game control table stores auxiliary game components. The number of times the electric chute 12D opens and the opening time for each of these elements can be changed as appropriate.
[0093] The pachinko gaming machine PY1 can vary the opening time of the electric chute 12D between the auxiliary game in the non-time-shortened state and the auxiliary game in the time-shortened state. For example, in the auxiliary game in the non-time-shortened state, the electric chute 12D is opened for a first opening time (a time during which it is difficult to get the game ball to enter the electric chute 12D (e.g., 0.08 seconds)). Note that, hereinafter, the auxiliary game in the non-time-shortened state is also referred to as a "short-open auxiliary game." Also, in the auxiliary game in the time-shortened state, the electric chute 12D is opened for a second opening time (a time during which it is easy to get the game ball to enter the electric chute 12D (e.g., 3.00 seconds)) that is longer than the first opening time. Note that, hereinafter, the auxiliary game in the time-shortened state is also referred to as a "long-open auxiliary game."
[0094] 3-2. Games related to special charts Next, we will explain the game related to the special symbol. When a launched game ball enters the first starting hole 11, the pachinko game machine PY1 performs a special symbol 1 lottery. When the special symbol 1 lottery is performed, the special symbol 1 display 81a displays a variable special symbol 1 (a variable display followed by a static display) to notify the result of the special symbol 1 lottery. Here, the statically displayed special symbol 1 includes a jackpot symbol and a losing symbol. In other words, the results of the special symbol 1 lottery include a jackpot and a losing symbol. When a jackpot symbol is displayed statically, a jackpot game is executed, a new game state is set, and the game based on that winning is ended. On the other hand, when a losing symbol is displayed statically, the jackpot game is not performed, and the game based on that winning is ended.
[0095] Similarly, the pachinko gaming machine PY1 conducts a special drawing for the 2nd symbol when a launched game ball enters the second starting hole 12. When the special drawing for the 2nd symbol is conducted, the special drawing for the 2nd symbol is displayed variably (variably displayed and then statically displayed) on the special drawing for the 2nd symbol display 81b to notify the result of the special drawing for the 2nd symbol. Here, the statically displayed special drawing for the 2nd symbol includes a jackpot symbol and a losing symbol. In other words, the results of the special drawing for the 2nd symbol include a jackpot symbol and a losing symbol. When a jackpot symbol is displayed statically, a jackpot game is executed, a new game state is set, and the game based on the winning is ended. On the other hand, when a losing symbol is displayed statically, the jackpot game is not conducted, and the game based on the winning is ended.
[0096] In the following, the entry of a game ball into the first start hole 11 is referred to as "the fulfillment of the first start condition," and the entry of a game ball into the second start hole 12 is referred to as "the fulfillment of the second start condition." Furthermore, the "fulfillment of the first start condition" and the "fulfillment of the second start condition" are collectively referred to as "the fulfillment of the start condition." Furthermore, the losing special symbols are also referred to as "losing special symbols" to distinguish them from the losing regular symbols mentioned above.
[0097] When the pachinko gaming machine PY1 performs this series of games (special symbol lottery, variable display of special symbols, jackpot game, and game state setting), it acquires special symbol-related random numbers when the start conditions are met and makes various judgments about the random numbers. The acquired special symbol-related random numbers include special symbol random numbers (jackpot random numbers), jackpot symbol type random numbers, reach random numbers, and special symbol variation pattern random numbers, as shown in Figure 8(B). The special symbol random numbers are random numbers used to make jackpot judgments. The jackpot symbol type random numbers are random numbers used to make jackpot symbol type judgments. The reach random numbers are random numbers used to make reach judgments. The special symbol variation pattern random numbers are random numbers used to make special symbol variation pattern judgments. Each random number has an appropriate range. The random numbers are also sometimes called judgment information.
[0098] 3-2-1.Jackpot Judgment The jackpot determination is a determination to determine whether or not a jackpot has occurred (whether or not a jackpot game is executed) using one or more jackpot determination tables such as those shown in Fig. 10(A). The game state includes a normal probability state and a high probability state, and the jackpot determination table is associated with whether the state is the normal probability state or the high probability state. In other words, it is possible to distinguish between a jackpot determination table used in the normal probability state (normal probability jackpot determination table) and a jackpot determination table used in the high probability state (high probability jackpot determination table).
[0099] In each jackpot determination table, a special symbol random number determination value (special symbol random number value) is assigned to the jackpot and miss results of the jackpot determination. The pachinko gaming machine PY1 compares the acquired special symbol random number with the jackpot determination table to determine whether it is a jackpot or a miss. As shown in FIG. 10(A), the high-probability jackpot determination table has more special symbol random number determination values that determine a jackpot than the normal-probability jackpot determination table. In addition, the probability of winning a jackpot can be changed as needed.
[0100] 3-2-2.Jackpot symbol type determination The jackpot symbol type determination is a determination for determining the type of jackpot symbol (jackpot symbol type) using one or more jackpot symbol type determination tables as shown in Fig. 10(B) when the result of the jackpot determination is a jackpot. It is possible to associate each type of jackpot symbol with the content of the jackpot, in other words, the components of the jackpot that are made up of the gaming benefits given to the player.
[0101] The jackpot symbol type determination table can be associated with the type of special symbol that is variably displayed, in other words, the type of starting gate from which the winning that resulted from the jackpot symbol type determination (that generated the jackpot symbol type determination) occurred. In other words, as the jackpot symbol type determination table, it is possible to distinguish between a jackpot symbol type determination table (first jackpot symbol type determination table) used when performing the variable display of special symbol 1 and a jackpot symbol type determination table (second jackpot symbol type determination table) used when performing the variable display of special symbol 2.
[0102] There are multiple types of jackpot symbols, and in each jackpot symbol type determination table, a determination value of the jackpot symbol type random number (jackpot symbol type random number value) is assigned to the jackpot symbol type, which is the result of the jackpot symbol type determination. Therefore, the pachinko gaming machine PY1 checks the acquired jackpot symbol type random number against the jackpot symbol type determination table to determine the type of jackpot symbol. Then, in the first jackpot symbol type determination table and the second jackpot symbol type determination table, the jackpot symbol type random number value is assigned appropriately to various jackpot symbols. Also, the assignment rate of the jackpot symbol type can be changed as appropriate. Also, the types of jackpot symbols can be increased or decreased as appropriate.
[0103] For example, as shown in Figure 10(B), the allocation rate of the jackpot symbol type determined by the jackpot symbol type for special symbol 1 can be set to 50% for jackpot symbol X and 50% for jackpot symbol Y, and the allocation rate of the jackpot symbol type determined by the jackpot symbol type for special symbol 2 can be set to 100% for jackpot symbol Z. In this way, it is possible to make the allocation rate of the jackpot symbol type different between the special symbol 1 lottery, which is held when a gaming ball enters the first starting hole 11, and the special symbol 2 lottery, which is held when a gaming ball enters the second starting hole 12.
[0104] 3-2-3.Reach Judgment The reach judgment is a judgment to determine whether or not to generate a reach in the special chart change presentation described below when the result of the jackpot judgment is a miss, using one or more reach judgment tables such as those shown in Figure 10 (C).
[0105] The reach determination table can be associated with the game state. That is, it is possible to distinguish between a reach determination table used in a non-time-shortening state (a reach determination table for non-time-shortening) and a reach determination table used in a time-shortening state (a reach determination table for time-shortening).
[0106] In each reach determination table, reach random number determination values (reach random number values) are assigned to the reach determination results of "reach (reach occurs)" and "not reach (reach does not occur)." Therefore, the pachinko gaming machine PY1 checks the acquired reach random number against the reach determination table to determine whether or not there is a reach (whether or not there is a reach). As shown in FIG. 10(C), it is possible to set different reach random number values for determining "reach (reach occurs)" between the non-time-saving reach determination table and the time-saving reach determination table. Note that, hereinafter, "reach (reach occurs)" which is performed on the assumption that the result of the jackpot determination is a "miss" is referred to as "reach with miss," and "not reach (reach does not occur)" is sometimes referred to as "no reach with miss."
[0107] 3-2-4. Special chart changes The special symbol variation pattern determination is a determination to determine the variation pattern of the variable display of the special symbol (special symbol variation pattern) using one or more special symbol variation pattern determination tables (special symbol variation pattern determination tables) as shown in Figures 11 and 12, and is performed whether the result of the jackpot determination is a jackpot or a miss. The special symbol variation pattern is identification information for identifying predetermined items such as the special symbol variation time and the presentation flow (presentation content) of the special symbol variation presentation described below. Note that the special symbol variation pattern can include identification information regarding the results of the jackpot determination and the reach determination, in addition to the special symbol variation time and the presentation flow (presentation content) of the special symbol variation presentation. It is possible to use multiple types of special symbol variation patterns, each with different identification information, as the special symbol variation pattern, and the number of such patterns can be changed as appropriate.
[0108] The special symbol variation pattern determination table can be associated with the type of special symbol that performs the variable display to be determined, in other words, the type of starting gate where the winning that resulted from the special symbol variation pattern determination was made. In other words, as the special symbol variation pattern determination table, it is possible to distinguish between the special symbol variation pattern determination table used when performing the variable display of special symbol 1 (special symbol 1 variation pattern determination table: Figure 11) and the special symbol variation pattern determination table used when performing the variable display of special symbol 2 (special symbol 2 variation pattern determination table: Figure 12).
[0109] Each special chart fluctuation pattern determination table can also be associated with a game state. That is, as the special chart 1 fluctuation pattern determination table, it is possible to distinguish between a special chart 1 fluctuation pattern determination table used in a non-time-saving state (special chart 1 fluctuation pattern determination table for non-time-saving) and a special chart 1 fluctuation pattern determination table used in a time-saving state (special chart 1 fluctuation pattern determination table for time-saving). On the other hand, for the special chart 2 fluctuation pattern determination table, it is similarly possible to distinguish between a special chart 2 fluctuation pattern determination table used in a non-time-saving state (special chart 2 fluctuation pattern determination table for non-time-saving) and a special chart 2 fluctuation pattern determination table used in a time-saving state (special chart 2 fluctuation pattern determination table for time-saving). It is not necessary to separate the special chart fluctuation pattern determination tables for each game state.
[0110] In addition, each special symbol variation pattern determination table associated with a game state can also be associated with a jackpot determination result, a jackpot symbol type determination result, or a reach determination result. That is, the non-time-saving special symbol 1 variation pattern determination table and the non-time-saving special symbol 2 variation pattern determination table each have a jackpot (for each jackpot symbol type), a reach-with-miss, and a reach-without-miss, etc. Similarly, the time-saving special symbol 1 variation pattern determination table and the time-saving special symbol 2 variation pattern determination table each have a jackpot (for each jackpot symbol type), a reach-with-miss, and a reach-without-miss, etc.
[0111] Furthermore, the special chart 1 variation pattern determination table for each no-reach miss can also be associated with the number of reserved special charts. For example, it is possible to distinguish between a special chart 1 variation pattern determination table for no-reach misses used when the number of reserved special charts (U1) is 0 to 2 and a special chart 1 variation pattern determination table for no-reach misses used when the number of reserved special charts (U1) is 3 to 4. Furthermore, the special chart 2 variation pattern determination table for each no-reach miss can also be associated with the number of reserved special charts. For example, it is possible to distinguish between a special chart 2 variation pattern determination table for no-reach misses used when the number of reserved special charts (U2) is 0 to 2 and a special chart 2 variation pattern determination table for no-reach misses used when the number of reserved special charts (U2) is 3 to 4.
[0112] Then, the special symbol display device 81 performs variable display of the special symbol for the special symbol variation time according to the special symbol variation pattern determined by each special symbol variation pattern determination. Then, when the jackpot symbol is stopped and displayed as the display result (the result of the special symbol lottery) in the variable display of the special symbol, the next variable display of the special symbol is not immediately performed, and the jackpot game is subsequently executed.
[0113] In addition, each special chart change pattern can be associated with a special chart change performance flow as shown in the second column from the right in the table of Figures 11 to 12.
[0114] As shown in the rightmost columns of the tables in Figures 11 and 12, special chart variation patterns are sometimes named in association with the special chart (jackpot determination result) and the content of the special chart variation effect. For example, a special chart variation pattern related to a jackpot is called a "jackpot variation." On the other hand, a special chart variation pattern in which an SP reach, a type of reach, occurs among reach-and-misses is called an "SP miss variation." A special chart variation pattern in which an L reach, a type of reach, occurs among reach-and-misses is called an "L miss variation." A special chart variation pattern in which the special chart variation effect ends with an N reach (normal reach effect), a type of reach, among reach-and-misses is called an "N miss variation." A special chart variation pattern related to a no-reach miss is called a "normal miss variation." Note that an N reach corresponds to the "specific reach effect" of the present invention.
[0115] 3-2-5. Prediction The pachinko gaming machine PY1 performs a look-ahead determination using one or more look-ahead determination tables as shown in FIG. 13 based on the acquired special symbol-related random numbers. Look-ahead determinations include, for example, determining whether a special symbol random number is determined to be a jackpot in a jackpot determination, determining which jackpot symbol type a jackpot symbol type a jackpot symbol type random number is determined to be, and determining which special symbol variation pattern a special symbol variation pattern random number is determined to be in a special symbol variation pattern determination. The look-ahead determination table can be associated with the type of start gate associated with the start winning. In other words, the look-ahead determination table can be distinguished between a look-ahead determination table (first look-ahead determination table) for when a winning ball enters the first start gate 11 and a look-ahead determination table (second look-ahead determination table) for when a winning ball enters the second start gate 12.
[0116] The look-ahead determination table can also be associated with the game state. That is, it is possible to distinguish between a look-ahead determination table used in a non-time-saving state (non-time-saving look-ahead determination table) and a look-ahead determination table used in a time-saving state (time-saving look-ahead determination table).
[0117] That is, the look-ahead judgment table can be distinguished between a first look-ahead judgment table used in a non-time-saving state, a first look-ahead judgment table used in a time-saving state, a second look-ahead judgment table used in a non-time-saving state, and a second look-ahead judgment table used in a time-saving state. Note that it is possible to change as appropriate what judgments are included in the look-ahead judgment.
[0118] 3-3. Jackpot games Next, we will explain the jackpot game. The jackpot game includes multiple rounds of play accompanied by the opening and closing of the jackpot opening (first jackpot opening 14 or second jackpot opening 15), an opening (also referred to as OP) from the start of the jackpot game until the start of the first round of play, and an ending (also referred to as ED) from the end of the final round of play until the end of the jackpot game. Each round of play begins with the end of the opening or the end of the previous round of play, and ends with the start of the next round of play or the start of the ending. It is also possible to have no OP or ED. Note that, hereinafter, a predetermined number of rounds of play (in a predetermined order) will simply be referred to as a "round." For example, the first round of play will be referred to as "1st round (1R)," and the tenth round of play will be referred to as "10th round (10R)."
[0119] The elements that make up such a jackpot game (jackpot game components) include the number of rounds of play, the number of times the jackpot opening port (first jackpot opening port 14 or second jackpot opening port 15) opens during each round of play, the type of jackpot opening port and its opening time (opening pattern), the time it remains closed until the next opening (closing time), the opening time (opening time), and the ending time (ending time). After the special symbol is displayed, the pachinko game machine PY1 controls the jackpot game using one or more jackpot game control tables such as those shown in FIG. 14. The jackpot game control table stores jackpot game components for each jackpot game. It is possible to control one or more types of jackpot games as jackpot games.
[0120] 14, from the first round to the tenth round, a round game is played in which the first major prize opening 14 is open for a maximum of 29.5 seconds, or a round game in which the first major prize opening 14 is open for a maximum of 0.1 seconds. Then, in the tenth round (final round), a round game is played in which the second major prize opening 15 is open for a maximum of 29.5 seconds, or a round game in which the second major prize opening 15 is open for a maximum of 0.1 seconds. In each round game, when a predetermined number of game balls (for example, 10 balls) are detected by the major prize opening sensor, the round game is ended even before the maximum opening time of the major prize openings 14, 15 has elapsed.
[0121] The number of times and duration of each element can be changed as appropriate. The jackpot game can be played using both the first jackpot slot 14 and the second jackpot slot 15, or using only one of them.
[0122] Here, the specific area 16 will be described in detail. The specific area 16 is controlled by the distribution member 16k to assume a closed state in which a prize cannot be won and an open state in which a prize can be won. Therefore, the operating mode of the distribution member 16k can be referred to as the opening / closing mode of the specific area 16. Hereinafter, the operating mode of the distribution member 16k will also be referred to as the "opening / closing mode of the specific area 16." In this way, the distribution member 16k is controlled in a certain operating mode (the specific area 16 is in a certain opening / closing mode). The difficulty (ease) of allowing a gaming ball to enter the specific area 16 in a jackpot game is set by combining the certain operating mode of the distribution member 16k (the certain opening / closing mode of the specific area 16) with the opening / closing mode of the second large prize opening 15 in a jackpot game. Hereinafter, the open state of the specific area 16 will also be referred to as the "V-open state."
[0123] For 15 seconds after the second large prize opening begins to open, the distribution solenoid 16s is energized and the distribution member 16k is controlled to the second state (FIG. 3(B)). Therefore, in a round game in which the second large prize opening 15 is open for a maximum of 29.5 seconds, it is easy for the gaming ball to pass through the specific area 16 (to enter the specific area 16) due to the relationship between the opening time and timing of the second large prize opening 15 and the time and timing for which the distribution member 16k is controlled to the second state. On the other hand, in a round game in which the second large prize opening 15 is open for a maximum of 0.1 seconds, it is nearly impossible (difficult) for the gaming ball to pass through the specific area 16 (to enter the specific area 16) due to the relationship between the opening time and timing of the second large prize opening 15 and the time and timing for which the distribution member 16k is controlled to the second state. In this way, it is possible to execute two types of jackpot games: one in which the VAT opening / closing member 15k and the distributing member 16k operate in a first opening pattern (V-long opening pattern) that makes it easy for the gaming ball to pass through the specific area 16 (hereinafter also referred to as "V passage"), and another in which the VAT opening / closing member 15k and the distributing member 16k operate in a second opening pattern (V-short opening pattern) that makes it difficult or impossible for the gaming ball to pass through the specific area 16. In this way, a jackpot game in which the VAT opening / closing member 15k and the distributing member 16k operate in the V-long opening pattern is called a "V-long jackpot." On the other hand, a jackpot game in which the VAT opening / closing member 15k and the distributing member 16k operate in the V-short opening pattern is called a "V-short jackpot."
[0124] 3-4. Game status Next, the game states will be explained. As shown in FIG. 15, the pachinko game machine PY1 can be set to any one of the game states of a "low-probability low base game state," a "low-probability high base game state," a "high-probability low base game state," a "high-probability high base game state," and a "jackpot game state." The "low-probability low base game state" can be abbreviated as a "low-probability low base state," the "low-probability high base game state" as a "low-probability high base state," the "high-probability low base game state" as a "high-probability low base state," and the "high-probability high base game state" as a "high-probability high base state." The game states include a state related to the probability of determining a "jackpot" in the jackpot determination and a state related to the ease of opening the electric chute 12D. The former includes a normal probability state and a high probability state. The latter includes a non-time-saving state and a time-saving state.
[0125] The normal probability state is set in a "low probability, low base game state" or a "low probability, high base game state," in which the probability of a jackpot being determined in a jackpot determination is normal. The high probability state is set in a "high probability, low base game state" or a "high probability, high base game state," in which the probability of a jackpot being determined in a jackpot determination is higher than the normal probability. Therefore, the high probability state can be said to be a state that is more advantageous to the player than the normal probability state. When the pachinko gaming machine PY1 is first turned on, the normal probability state is set. Then, by winning a jackpot, it is possible to switch from the normal probability state to the high probability state. For example, during a jackpot game, it is possible to switch to the high probability state by the game ball passing through the specific area 16. It is also possible to switch to the high probability state depending on the type of jackpot symbol. The high probability state can be switched from the high probability state to the normal probability state by a predetermined number of jackpot determinations being made without winning a jackpot, or by winning the next jackpot.
[0126] The non-time-saving state is set in a "low-probability, low-base game state," a "high-probability, low-base game state," or a "jackpot game state." The time-saving state is set in a "low-probability, high-base game state" or a "high-probability, high-base game state," and is a game state in which the opening time of the electric chute 12D during one supplementary game is more likely to be longer than in a non-time-saving state. For example, in the time-saving state, the opening time of the electric chute 12D is longer (e.g., 3.00 seconds) than in a non-time-saving state (e.g., 0.08 seconds). In addition, in the time-saving state, a special symbol variation pattern determination table can be used to determine the special symbol variation pattern, which is determined so that a special symbol variation pattern with a shorter special symbol variation time is selected more frequently than in a non-time-saving state (see Figures 11 and 12). As a result, in the time-saving state, the pace of consumption of reserved special symbols increases, making it easier for a valid win (a win that can be stored as reserved special symbols) to occur in the starting slot. This allows for smooth gameplay and the aim of winning a jackpot.
[0127] In addition, the time-saving state can make it easier for the normal map variation time to be shorter than the non-time-saving state. For example, in the time-saving state, the normal map variation time (5 seconds) is determined, which is shorter than the normal map variation time (30 seconds) determined in the non-time-saving state. Therefore, the time-saving state has more normal map lottery executions per unit time.
[0128] In addition, the time-saving state can be more likely to be determined as a hit in the hit determination than the non-time-saving state. For example, in the time-saving state, a hit is determined with a higher probability (e.g., 59936 / 65536) than the probability of a hit being determined in the non-time-saving state (e.g., 6600 / 65536). Therefore, the time-saving state has a higher number of hits determined in the hit determination per unit time.
[0129] In this way, in the time-saving mode, the electric chute 12D is open for a longer period of time per unit of time than in the non-time-saving mode, making it easier for game balls to enter the second starting slot 12 more frequently. As a result, the base, which is the ratio of the number of winning balls to the number of shot balls, becomes higher. Therefore, in the time-saving mode with a high base, players can aim for a jackpot without significantly reducing the number of game balls they have. Therefore, it can be said that the time-saving mode is more advantageous to players than the non-time-saving mode.
[0130] When the pachinko gaming machine PY1 is first powered on, it is set to the non-time-shortening state. Then, for example, the time-shortening state can be set by winning a jackpot. The time-shortening state can be changed from the time-shortening state to the non-time-shortening state by performing a predetermined number of jackpot determinations without winning a jackpot, or by winning the next jackpot.
[0131] In addition, in the time-saving state, compared to the non-time-saving state, it is easier to win, the normal map fluctuation time is more likely to be shorter, and the opening time of the electric chute 12D in one supplementary game is more likely to be longer. There are three points about the game related to the normal map that are set to be advantageous to the player. However, these points that are set to be advantageous to the player may be only a part of them.
[0132] The gaming state after the pachinko gaming machine PY1 is first turned on is a "low probability, low base gaming state" in which a normal probability state and a non-time-saving state are set. This gaming state is also called the "normal gaming state." In the "jackpot gaming state," a win determination is performed but a jackpot determination is not performed, so a non-time-saving state is set with the start of a jackpot game. In addition, it is possible to use all or only some of the gaming states described above.
[0133] 4. Main effects of gaming machines Next, the main effects performed by the pachinko gaming machine PY1 will be described with reference to FIGS.
[0134] 4-1.Performance mode First, we will explain the presentation mode. The presentation mode is a classification of presentation (or a higher-level conceptual attribute). The pachinko gaming machine PY1 can set the following presentation modes: a customer waiting presentation mode, a normal presentation mode, a probability variation presentation mode, a time-saving presentation mode, and a big win presentation mode.
[0135] The customer waiting mode can be set when the special symbol variation effect is not being performed in the "low probability low base game state," "low probability high base game state," "high probability low base game state," and "high probability high base game state," and is a mode indicating a standby state in which the special symbol variation effect is not being performed. The customer waiting effect is performed when the customer waiting mode is set. In the customer waiting effect, for example, as shown in FIG. 16(A-1), a customer waiting demo video G100 introducing the pachinko gaming machine PY1 is displayed on the display unit 50a. Furthermore, when the normal button 40 is operated while the customer waiting demo video G100 is being displayed, a setting screen G101 for setting the effects of the pachinko gaming machine PY1 is displayed, as shown in FIG. 16(A-2). The effect settings include the volume setting for the sound output from the speaker 52, the brightness setting for the display unit 50a ("light intensity setting"), and the frequency setting for the effects to be executed ("effect setting").
[0136] The normal presentation mode can be set when a special symbol variation presentation is being performed in a "low probability low base game state" or a "high probability low base game state," and is a presentation mode that indicates a non-time-saving state. The normal presentation mode includes, for example, a first normal presentation mode in which a background image (daytime normal background image G102) showing a daytime mountain scene is displayed on the display unit 50a as shown in Fig. 16 (B-1), a second normal presentation mode in which a background image (evening normal background image G103) showing an evening mountain scene is displayed on the display unit 50a as shown in Fig. 16 (B-2), and a third normal presentation mode in which a background image (nighttime normal background image G104) showing a nighttime mountain scene is displayed on the display unit 50a as shown in Fig. 16 (B-3), and can be switched based on one condition: the special symbol variation presentation is performed once or multiple times without winning a jackpot. Furthermore, each of the first to third normal presentation modes has a normal early presentation mode before the reach is established in the special chart variation presentation, and a normal late presentation mode after the reach is established. In the normal early presentation mode, one of the daytime normal background image G102, the evening normal background image G103, and the nighttime normal background image G104 is displayed on the display unit 50a, while in the normal late presentation mode, a dedicated background image according to the type of reach is displayed. In addition, a special presentation mode that is set only in the "high probability low base game state" may be provided.
[0137] The probability variable presentation mode is a presentation mode that can be set when a special symbol variation presentation is being performed in a "high probability, high base game state," and is a presentation mode that indicates a high probability state and a time-saving state. In the probability variable presentation mode, for example, as shown in FIG. 16 (B-4), a background image representing space (probability variable background image G105) is displayed on the display unit 50a. Furthermore, the probability variable presentation mode includes a probability variable pre-stage presentation mode before a reach is achieved in the special symbol variation presentation, and a probability variable post-stage presentation mode after the reach is achieved. In the probability variable pre-stage presentation mode, the probability variable background image G105 is displayed on the display unit 50a, while in the probability variable post-stage presentation mode, a dedicated background image according to the type of reach is displayed.
[0138] The time-saving presentation mode is a presentation mode that can be set when a special symbol variation presentation is being performed in a "low-probability, high-base game state," and is a presentation mode that indicates that the game is in a normal probability state and a time-saving state. In the time-saving presentation mode, for example, as shown in FIG. 16 (B-5), a background image representing the sky (time-saving background image G106) is displayed on the display unit 50a. Furthermore, the time-saving presentation mode includes a first stage of time-saving presentation mode before a reach is achieved in the special symbol variation presentation, and a second stage of time-saving presentation mode after the reach is achieved. In the first stage of time-saving presentation mode, the time-saving background image G106 is displayed on the display unit 50a, while in the second stage of time-saving presentation mode, a dedicated background image corresponding to the type of reach is displayed.
[0139] The jackpot presentation mode is a presentation mode that can be set when a jackpot game is being played in the "jackpot game state" and indicates that a jackpot game is being played. In the jackpot presentation mode, for example, during the opening of a jackpot game, as shown in FIG. 16(C-1), the display unit 50a displays an opening image G107 suggesting the start of the jackpot game and a right-hit image G108 encouraging a "right hit." During a round of a jackpot game, as shown in FIG. 16(C-2), the display unit 50a displays a round presentation in which a round image G109 indicating the number of rounds and a prize ball number image G110 indicating the number of prize balls paid out are displayed. During the ending of a jackpot game, as shown in FIG. 16(C-3), the display unit 50a displays a jackpot ending presentation in which an ending image G111 suggesting the presentation mode to be set after the jackpot game and a total prize ball number image G112 indicating the total number of prize balls paid out are displayed.
[0140] The types of presentation modes can be changed or added as appropriate.
[0141] 4-2. Special chart change performance Next, the special symbol variation effect (also simply referred to as "variation effect") will be explained. When the variable display of the special symbol begins, the pachinko gaming machine PY1 executes the special symbol variation effect based on the special symbol variation pattern related to the variable display of the special symbol and the special symbol lottery results (jackpot determination result, jackpot symbol type determination result, reach determination result, and special symbol variation pattern determination result). In the special symbol variation effect, the display unit 50a displays a variation of the effect symbol superimposed on a predetermined background image. The effect symbol is composed of, for example, numeral symbols 1 to 9, and in the variable display of the effect symbol, the effect symbol varies with the start of the variable display of the special symbol and stops with the end of the variable display of the special symbol. In other words, after the variable display of the effect symbol is performed for the special symbol variation time, the variation stops and the effect symbol is displayed as a still image. The result of the special symbol lottery is then announced by the still image of the effect symbol.
[0142] In addition, in the special chart variation performance, in addition to the display of the variation of the performance pattern, it is possible to perform other performances using various performance devices such as the image display device 50, speaker 52, frame lamp 53, board lamp 54, movable devices 55, 56, 58, normal button 40, and special button 41. In this case, it is possible to continue performing other performances even after the display of the performance pattern has stopped.
[0143] 4-2-1.Performance pattern display area As shown in Figure 17(A), the display unit 50a of the image display device 50 can be divided horizontally into three approximately equal sections: left, center, and right. The left display area 50b1 is an area that displays the left display area EZ1 when the display area is stopped during the special display variation. Similarly, the center display area 50b2 and the right display area 50b3 are areas that display the center display area EZ2 and the right display area EZ3.
[0144] 17(A), a small symbol area 50c can be provided in a section at the left end (upper left corner) of the upper end of the display unit 50a. The small symbol area 50c is an area that variably displays small symbols KZ1, KZ2, and KZ3 when variable display of special symbols is performed. The small symbols KZ1, KZ2, and KZ3 are, for example, composed of number symbols 1 to 9.
[0145] In Figure 17(A), the left performance pattern area 50b1, the middle performance pattern area 50b2, the right performance pattern area 50b3, and the small pattern area 50c are clearly shown with dotted lines, but this is written to indicate the range of the left performance pattern area 50b1, the middle performance pattern area 50b2, the right performance pattern area 50b3, and the small pattern area 50c, and is not actually displayed.
[0146] 4-2-2.Normal fluctuations The pachinko gaming machine PY1 can first perform a normal variation in the special chart variation effect. The normal variation functions as an effect that indicates that the variable display of the special chart has begun.
[0147] When the variable display of the special symbol starts, for example, as shown in Fig. 17(A), on the display unit 50a, the left effect symbol EZ1, the middle effect symbol EZ2, and the right effect symbol EZ3 are displayed in a static state, and the left small symbol KZ1, the middle small symbol KZ2, and the right small symbol KZ3 are displayed in a static state, and the variable display of the special symbol is not performed, and from a state in which the variable display of the special symbol is waiting, as shown in Fig. 17(B), with the start, the variable display of the effect symbols EZ1, EZ2, and EZ3 begins, and the variable display of the small symbols KZ1, KZ2, and KZ3 begins. Note that "↓" in Fig. 17 indicates that the variable display of the symbol is in progress. Then, when the special symbol variation pattern of the variable display of this special symbol is, for example, "normal miss variation," as shown in Figure 17(C-1), the left effect symbol EZ1 and the right effect symbol EZ3 temporarily stop in different stopping patterns, and then, as shown in Figure 17(D), the effect symbols EZ1, EZ2, and EZ3 stop and display in a stopping pattern suggesting a miss (so-called barakeme). At this time, the small symbols KZ1, KZ2, and KZ3 also stop and display all at once in a stopping pattern suggesting a miss. There are several types of stopping patterns suggesting a miss, such as "1·1·2" and "2·4·6," in which the left and right symbols are not the same. On the other hand, when the special symbol variation pattern of the variable display of the special symbol is a special symbol variation pattern with a reach, such as "N miss variation," as shown in Figure 17 (C-2), the left effect symbol EZ1 and the right effect symbol EZ3 temporarily stop in the same stopping mode (so-called reach eyes), and a reach is established. At this time, the variable display of the small symbols KZ1, KZ2, and KZ3 continues, and a reach effect is performed according to the special symbol variation pattern. Note that the stopping order and stopping mode of the effect symbols EZ1, EZ2, and EZ3 can be changed as appropriate.
[0148] 4-2-3.N Reach The pachinko gaming machine PY1 can perform an N-reach when a reach is achieved during normal variation. The N-reach is a presentation that suggests that the result of the jackpot determination may be a "jackpot," and functions as a presentation to make players look forward to a jackpot.
[0149] In the case of an N reach, as shown in FIG. 18(A), the reach-established state is maintained for a predetermined time (e.g., 10 seconds), and as shown in FIG. 18(B), the fluctuation speed of the center effect symbol EZ2 gradually slows down. When the special symbol fluctuation pattern of the variable display of the special symbol is, for example, "N miss fluctuation," the effect symbols EZ1, EZ2, and EZ3 are displayed stopped in a stopping mode suggesting a reach miss (a so-called reach miss), as shown in FIG. 18(C-1). At this time, the small symbols KZ1, KZ2, and KZ3 are also displayed stopped all at once in a stopping mode suggesting a reach miss. There are several types of stopping modes suggesting a reach miss, such as "7·6·7" and "5·3·5," in which the left and right symbols are the same but the center symbol is different from the left and right symbols. On the other hand, when the special symbol variation pattern of the variable display of the special symbol is, for example, "N jackpot variation," the symbol is displayed in a stop mode (so-called double numbers) that suggests a jackpot, as shown in Figure 18 (C-2). There are several types of stop modes that suggest a jackpot, such as "7·7·7" and "2·2·2," in which the left, right, and center symbols are the same. At this time, the small symbols KZ1, KZ2, and KZ3 are also displayed in a stop mode that suggests a jackpot. Note that the effects of the N reach are not limited to the gradual deceleration of the center effect symbol EZ2, and can be changed or added as appropriate.
[0150] 4-2-4. SP Reach The pachinko gaming machine PY1 can perform an SP reach after an N reach. The SP reach is a presentation that suggests that the result of the jackpot determination is more likely to be a "jackpot" than an N reach, and functions as a presentation to make the player expect a jackpot.
[0151] In the SP reach, after the N reach, for example, as shown in FIG. 19(A), a background image dedicated to the SP reach (SP reach background image G113) is displayed on the display unit 50a, and an image indicating the start of the SP reach (SP reach start title image) G1 is displayed in the center of the display unit 50a. After that, as shown in FIG. 19(B), a special SP reach effect (e.g., a battle effect) is performed. Then, when the final stage of the special reach effect is reached, if the special symbol variation pattern of the variable display of the special symbol is, for example, "SP jackpot variation," as shown in FIG. 19(C-1), an effect suggesting a jackpot (e.g., a display showing the main character rejoicing after winning the battle) is performed on the display unit 50a, and the effect symbols EZ1, EZ2, and EZ3 are displayed in a stop mode suggesting a jackpot (so-called double numbers). At this time, the small symbols KZ1, KZ2, and KZ3 are also displayed in a stop mode suggesting a jackpot. On the other hand, when the special chart variation pattern of the variable display of the special chart is, for example, "SP Miss Variation," as shown in FIG. 19 (C-2), an effect suggesting a miss (for example, a display in which the enemy character is happy about winning the battle) is performed, and the effect symbols EZ1, EZ2, and EZ3 are displayed stopped in a manner suggesting a reach miss. At this time, the small symbols KZ1, KZ2, and KZ3 are also displayed stopped all at once in a manner suggesting a miss. The effect content of the SP reach can be changed or added as appropriate.
[0152] Here, we will explain in detail the possibility (jackpot expectation) of the effect symbols EZ1, EZ2, and EZ3 for each reach stopping in a manner indicating a jackpot. The jackpot expectation for each reach is determined by the execution probability based on the result of the jackpot determination. For example, if the execution probability of an N reach is set to 10% when the result of the jackpot determination is a "miss" and 100% when the result of the jackpot determination is a "jackpot," and the execution probability of an SP reach is set to 4% when the result of the jackpot determination is a "miss" and 100% when the result of the jackpot determination is a "jackpot," it is possible to set the jackpot expectation for an SP reach higher than the jackpot expectation for an N reach. Furthermore, if SP Reach A and SP Reach B are executable as SP reaches, and the execution probability of SP Reach A is set to 2% when the result of the jackpot determination is a "miss" and 20% when the result of the jackpot determination is a "jackpot," and the execution probability of SP Reach B is set to 2% when the result of the jackpot determination is a "miss" and 30% when the result of the jackpot determination is a "jackpot," then it is possible to set the jackpot expectation rate of SP Reach B higher than that of SP Reach A. In this way, it is possible to set the jackpot expectation rate by appropriately setting the execution probability according to the result of the jackpot determination.
[0153] 4-3. Hold icon display area As shown in Figure 20(A), the display unit 50a of the image display device 50 can be provided with a hold icon display area 50d consisting of four display areas. The hold icon display area 50d is composed of a first display area 50d1, a second display area 50d2, a third display area 50d3, and a fourth display area 50d4. A hold icon HA (hold display) can be displayed in each display area 50d1, 50d2, 50d3, and 50d4 depending on the number of reserved special drawings 1 or 2. For example, if the number of reserved special drawings 1 is "1," the hold icon HA is displayed in the first display area 50d1, and if the number of reserved special drawings 1 is "2," the hold icon HA is displayed in both the first display area 50d1 and the second display area 50d2.
[0154] In addition, near the reserved icon display area 50d, as shown in Figure 20 (A), it is possible to provide the icon display area 50e (predetermined display position) consisting of one display area. The icon display area 50e can display the icon TA that is the same as or different from the reserved icon HA in response to the start of the special chart change performance. The reserved icon HA and the icon TA correspond to the "predetermined icon" of the present invention.
[0155] The number of display areas constituting the reserved icon display area 50d can be changed as appropriate. Also, the reserved icon display area 50d can be a display area that displays both the reserved number of special chart 1 and the reserved number of special chart 2, or a display area that displays only one of them.
[0156] 4-3-1.Hold performance The pachinko game machine PY1 can perform a hold effect in response to a game ball entering the first start hole 11 or the second start hole 12. The hold effect can notify the player of the number of special chart 1 holds or special chart 2 holds.
[0157] In the reserved performance, when the number of reserved special charts 1 is "0", if a game ball enters the first starting hole 11, the special chart change performance starts, and for example, as shown in Fig. 20 (B), the icon TA is displayed in the icon display area 50e. Then, if two more game balls enter the first starting hole 11 during the special chart change performance, as shown in Fig. 20 (C), the reserved icon HA is displayed in the first display area 50d1 and the second display area 50d2 of the reserved icon display area 50d, and the player is notified that the number of reserved special charts 1 is "2". After that, when the special chart change presentation ends and a new special chart change presentation begins, as shown in Figure 20 (D), the reserve icon HA that was displayed in the first display area 50d1 of the reserve icon display area 50d moves to the icon display area 50e and is displayed as the icon TA, and the reserve icon HA that was displayed in the second display area 50d2 of the reserve icon display area 50d moves to the first display area 50d1 and is displayed, and the player is notified that the number of reserved special charts 1 is "1".
[0158] 4-4. Preview performance The pachinko gaming machine PY1 can perform a notice performance at any timing during the special chart variation performance. The notice performance is a performance using the image display device 50, speaker 52, frame lamp 53, board lamp 54, movable devices 55, 56, 58, input devices 40, 41, etc., and can suggest the results of the jackpot determination and the special chart variation pattern determination.
[0159] 4-4-1. Movable object production The pachinko gaming machine PY1 can perform a movable body effect as a preview effect using the movable devices 55, 56, and 58. The movable body effect is an effect in which the movable devices 55, 56, and 58 are activated, and functions as an effect to make the player expect a big win.
[0160] In the movable body effect, for example, when an N reach progresses to an SP reach, as shown in FIG. 21(A), the on-board movable device 55 and the under-board movable device 56 are activated, and the on-board movable body 55k and the under-board movable body 56k move so that they overlap on the display unit 50a as seen by the player, suggesting the progression to an SP reach. At this time, an effect image is displayed in the space on the display unit 50a that does not overlap with the on-board movable body 55k and the under-board movable body 56k. Then, as shown in FIG. 21(B), the on-board movable body 55k and the under-board movable body 56k return to their normal standby state (initial position), progressing to an SP reach. Note that the movable body effect is not limited to suggesting progression to an SP reach, and can be modified or added as appropriate. Furthermore, the operation of the movable device in the movable body effect can be modified or added as appropriate.
[0161] 4-4-2. Operation direction The pachinko gaming machine PY1 can perform, as a preview effect, an operation effect using the normal button 40 or the special button 41. The operation effect is an effect in which the player operates the normal button 40 or the special button 41, and functions as an effect to make the player expect a jackpot.
[0162] In the operation presentation, for example, in the case of an SP reach, a period (a button operation valid period) occurs during which pressing the special button 41 is valid, and with the occurrence of this button operation valid period, a presentation (a button operation prompt presentation) is performed to prompt the player to operate the special button 41, as shown in FIG. 22(A). In the button operation prompt presentation, a button operation prompt image G3 is displayed on the display unit 50a. The button operation prompt image G3 includes an image (a button image G31) that resembles the special button 41, an image (a button press operation image G32) that shows the operation mode of the special button 41 (i.e., the pressing operation), and an image (a remaining valid operation period image G33) that shows the remaining time of the button operation valid period. The remaining valid operation period image G33 is composed of a generally curved progress bar, and changes over time so that the player can easily understand the remaining time of the valid operation period. Thereafter, in response to the special button 41 being pressed during the button operation valid period, or after the button operation valid period has elapsed without the special button 41 being operated, the on-board movable device 55 is activated as shown in Fig. 22(B), and the on-board movable body 55k moves to overlap the display unit 50a as seen by the player, indicating the likelihood of a jackpot. Note that the operation effects are not limited to the activation of the on-board movable device 55, and can be changed or added as appropriate.
[0163] 4-4-3. Predictive performance The pachinko gaming machine PY1 can perform a pre-reading effect for the special chart 1 reserve or special chart 2 reserve for which the special chart lottery has not yet been held as a notice effect. The pre-reading effect functions as an effect to suggest in advance the result of the special chart lottery for the special chart 1 reserve or special chart 2 reserve.
[0164] In the pre-reading effect, for example, if the result of the pre-reading judgment for the special chart 1 reserve is a "jackpot," the reserve icon HA, which is normally displayed as a "circle," may be displayed as a "☆" in the reserve icon display area 50d, as shown in FIG. 20(C). Also, if the result of the pre-reading judgment is a "miss," the reserve icon HA may be displayed as a "☆" as a so-called false effect. The pre-reading effect can be performed on both or either the special chart 1 reserve and the special chart 2 reserve. Furthermore, it is not limited to changing the display mode of the reserve icon HA; it can also be changed or added as appropriate. For example, it is also possible to change the stop mode of the effect symbols EZ1, EZ2, and EZ3 in the special chart variation effect.
[0165] 5. Game control by game control microcomputer 101 Next, the control of the game by the game control microcomputer 101 (game control means) will be described with reference to Figures 23 and 24. Note that counters, timers, buffers, etc. that appear in the control of the game by the game control microcomputer 101 described below are provided in the game RAM 104.
[0166] [1. Main control main processing] When the pachinko gaming machine PY1 is powered on, the gaming control microcomputer 101 provided on the main control board 100 reads out and executes the main control main processing program shown in Fig. 23 from the gaming ROM 103. As shown in the figure, the main control main processing first performs power-on processing (S001). The power-on processing performs settings such as permission to access the gaming RAM 104, settings for the gaming CPU 102, and settings for the SIO, PIO, and CTC (circuit for managing interrupt time).
[0167] Following the power-on process, interrupts are disabled (S002), and a normal / special symbol main random number update process (S003) is executed. In this normal / special symbol main random number update process (S003), the counter values of the various random numbers shown in Figures 8(A) and 8(B) are updated by incrementing them by 1. When the counter value of each random number reaches its upper limit, it returns to "0" and is incremented again. Note that the initial value of each random number counter may be a value other than "0" and may be changed randomly. Furthermore, at least some of the random numbers may be so-called hardware random numbers generated using a known random number generation circuit consisting of a counter IC or the like.
[0168] When the normal / special symbol main random number update process (S003) is completed, an interrupt is permitted (S004). While the interrupt is permitted, the main timer interrupt process (S005) can be executed. The main timer interrupt process (S005) is executed based on an interrupt pulse repeatedly input to the gaming CPU 102, for example, at a 4 msec cycle. That is, the main timer interrupt process (S005) is executed at a 4 msec cycle. Then, between the end of the main timer interrupt process (S005) and the start of the next main timer interrupt process (S005), the update process of the counter values of various random numbers by the normal / special symbol main random number update process (S003) is repeatedly executed. Note that if an interrupt pulse is input to the gaming CPU 102 while the interrupt is prohibited, the main timer interrupt process (S005) does not start immediately, but starts after the interrupt is permitted (S004).
[0169] [2. Main timer interrupt processing] Next, the main timer interrupt process (S005) will be described. As shown in Fig. 24, in the main timer interrupt process (S005), first, the output process (S101) is executed. In the output process (S101), commands etc. set in the output buffer provided in the gaming RAM 104 of the main control board 100 in each process described below are output to the sub-control board 120, the payout control board 170, etc.
[0170] In the input processing (S102) that follows the output processing (S101), the game control microcomputer 101, for example, takes in a detection signal from a lower tray full switch that detects whether the lower tray 35 is full, and stores it in the output buffer of the game RAM 104 as lower tray full data.
[0171] The normal symbol / special symbol main random number update process (S103) that is carried out next is the same as the normal symbol / special symbol main random number update process (S003) that is carried out in the main control main process of Fig. 23. That is, the update process of the counter values of various random numbers shown in Fig. 8(A) and Fig. 8(B) is carried out both during the execution period of the main side timer interrupt process (S005) and during other periods (the period from the end of the main side timer interrupt process (S005) to the start of the next main side timer interrupt process (S005)).
[0172] Following the normal symbol / special symbol main random number update process (S103), the game control microcomputer 101 performs a sensor detection process (S104), then a normal action process (S105), and then a special action process (S106). The sensor detection process, normal action process, and special action process will be described later.
[0173] Following the special operation process (S106), a sorting device control process for controlling the sorting device 16D is performed (S107).
[0174] Next, the game control microcomputer 101 executes other processing (S108) and ends the main timer interrupt processing (S005). Other processing (S108) includes power-off monitoring processing when the power is turned off, updating of the timer provided in the game RAM 104, and the like. Also included in other processing (S108) is payout control processing for paying out prize balls to the player. In the payout control processing, a prize ball request signal is sent to the payout control board 170 in response to the entry of game balls into each winning slot. That is, the payout control board 170 pays out prize balls based on the prize ball request signal.
[0175] The game control microcomputer 101 then repeatedly executes steps S002 to S004 of the main control process (see FIG. 23) until the next interrupt pulse is input to the game CPU 102, and when the interrupt pulse is input (approximately 4 msec later), it again executes the main timer interrupt process (S005). In the output process (S101) of the main timer interrupt process (S005) that has been executed again, the game control microcomputer 101 outputs the commands and the like that were set in the output buffer of the game RAM 104 in the previous main timer interrupt process (S005).
[0176] [2-1. Sensor detection process] In the sensor detection process (S104), the general winning slot sensor process, the gate sensor process, the second starting slot sensor process, the first starting slot sensor process, the first large winning slot sensor process, the second large winning slot sensor process, and the specific area sensor process are sequentially performed. Then, the commands generated in each process are set in the output buffer of the gaming RAM 104.
[0177] In the general prize opening sensor process, it is determined whether or not a gaming ball has been detected by the general prize opening sensor, and a command for the general prize opening sensor is generated according to the result of the process.
[0178] In the gate sensor processing, it is determined whether or not a gaming ball has been detected by the gate sensor. If it is determined that a gaming ball has been detected, the normal symbol random number indicated by the counter value of the normal symbol random number counter is acquired, and the acquired normal symbol random number is stored in the normal symbol reserve memory unit 106 provided in the gaming RAM 104. Note that if a predetermined number of normal symbol random numbers (for example, four) have been stored in the normal symbol reserve memory unit 106, the newly acquired normal symbol random number is not stored. Furthermore, a command for the gate sensor is generated according to the result of this processing.
[0179] In the second start hole sensor process, it is determined whether or not a gaming ball has been detected by the second start hole sensor. If it is determined that a gaming ball has been detected, a special symbol 2-related random number consisting of a special symbol random number counter, a jackpot symbol type random number counter, a reach random number counter, and a special symbol variation pattern random number counter is acquired, and the acquired special symbol 2-related random number is stored in the special symbol 2 reserve memory unit 105b provided in the gaming RAM 104. The special symbol 2 reserve memory unit 105b has multiple storage areas from area 1 to area n (n is an integer of 2 or more), and the acquired special symbol 2-related random numbers are stored in order from area 1. Note that if special symbol 2-related random numbers have been stored up to area n, the newly acquired special symbol 2-related random number is not stored. In addition, a second look-ahead determination is performed using the acquired special symbol 2-related random number and a second look-ahead determination table. In addition, depending on the result of the processing, a command for the second start port sensor is generated, which includes a special chart 2 reserve number command representing the number of special chart 2 related random numbers (special chart 2 reserve number) stored in the special chart 2 reserve memory unit 105b and a second start winning command representing the result of the second pre-reading judgment.
[0180] In the first start gate sensor process, it is determined whether or not a gaming ball has been detected by the first start gate sensor. If it is determined that a gaming ball has been detected, a special symbol 1-related random number consisting of a special symbol random number counter, a jackpot symbol type random number counter, a reach random number counter, and a special symbol variation pattern random number counter is acquired, and the acquired special symbol 1-related random number is stored in the special symbol 1 reserve memory unit 105a provided in the gaming RAM 104. The special symbol 1 reserve memory unit 105a has multiple storage areas from area 1 to area n (n is an integer of 2 or more), and the acquired special symbol 1-related random numbers are stored in order from area 1. Note that if special symbol 1-related random numbers have been stored up to area n, newly acquired special symbol 1-related random numbers are not stored. In addition, a first pre-reading judgment is performed using the acquired special symbol 1-related random number and a first pre-reading judgment table. In addition, depending on the result of the processing, a command for the first start port sensor is generated, which includes a special chart 1 hold number command representing the number of special chart 1 related random numbers (special chart 1 hold number) stored in the special chart 1 hold memory unit 105a and a first start winning command representing the result of the first pre-reading judgment.
[0181] In the first major prize opening sensor process, it is determined whether or not a gaming ball has been detected by the first major prize opening sensor, and a command for the first major prize opening sensor is generated according to the result of the process.
[0182] In the second large prize opening sensor process, it is determined whether or not a gaming ball has been detected by the second large prize opening sensor, and a command for the second large prize opening sensor is generated according to the result of the process.
[0183] In the specific area sensor process, it is determined whether or not a gaming ball has been detected by the specific area sensor, and a command for the specific area sensor is generated according to the result of the process.
[0184] [2-2. Normal operation processing] In the normal operation process (S105), normal symbol standby process, normal symbol variation process, normal symbol determination process, and auxiliary game control process are performed in sequence. Then, the commands generated in each process are set in the output buffer of the gaming RAM 104.
[0185] The normal symbol standby process is a process that is performed during standby when the variable display of the normal symbol and auxiliary play are not being performed. In the normal symbol standby process, a win determination is made based on the normal symbol random number stored in the normal symbol reserve memory unit 106. In addition, a normal symbol variation pattern determination is made based on the current game state to determine the normal symbol variation pattern. Then, a normal symbol variation start command is generated that includes information regarding the results of the win determination and the normal symbol variation pattern. Then, the normal symbol display device 82 is caused to start variable display of the normal symbol based on the normal symbol variation time associated with the determined normal symbol variation pattern.
[0186] The normal pattern change process is a process performed during the variable display of the normal map. In the normal pattern change process, the normal map is stopped based on the result of the hit determination as the normal map change time elapses since the variable display of the normal map started. Then, a normal map change stop command is generated to indicate the end of the variable display of the normal map.
[0187] The normal symbol determination process is a process that is performed when a normal symbol is displayed. In the normal symbol determination process, it is determined whether the normal symbol displayed is a winning symbol or not depending on whether a predetermined stop time (for example, 0.8 seconds) has passed since the normal symbol display started. If a winning symbol is displayed, an auxiliary game is started based on the current game state and the auxiliary game control table, and an auxiliary game start command indicating the start of the auxiliary game is generated.
[0188] The auxiliary game control process is performed when an auxiliary game is being played. The auxiliary game control process controls the auxiliary game based on the current game state and the auxiliary game control table. Furthermore, an auxiliary game control command is generated according to the result of the process.
[0189] [2-3. Special Action Processing] In the special operation process (S106), the following processes are sequentially performed: special symbol standby process, special symbol variation process, special symbol determination process, jackpot game control process, and game state setting process. Then, the commands generated in each process are set in the output buffer of the gaming RAM 104.
[0190] [2-3-1. Special pattern standby process] The special symbol standby process is a process that is performed not in a jackpot game state but during standby when the variable display of the special symbol is not being performed. In the special symbol standby process, based on the special symbol 2 related random number stored in the special symbol 2 reserve memory unit 105b, a special symbol 2 determination process and a special symbol 2 variation pattern determination process are performed, and a special symbol 2 reserve memory unit shift process is also performed. Also, based on the special symbol 1 related random number stored in the special symbol 1 reserve memory unit 105a, a special symbol 1 determination process and a special symbol 1 variation pattern determination process are performed, and a special symbol 1 reserve memory unit shift process is also performed.
[0191] In the special symbol 2 determination process, a jackpot determination is performed to determine whether there is a jackpot or a miss using the special symbol random number among the special symbol 2 related random numbers stored in the first area of the special symbol 2 reserved memory unit 105b and a jackpot determination table according to the current game state. If the result of the jackpot determination is a jackpot, a jackpot symbol type determination is performed to determine the type of jackpot symbol using the jackpot symbol type random number among the special symbol 2 related random numbers and the special symbol 2 jackpot symbol type determination table. Then, a symbol designation command representing the determined jackpot symbol type is generated. Furthermore, if the result of the jackpot determination is a miss, a symbol designation command representing a miss is generated.
[0192] The special chart 2 variation pattern determination process is a process performed after the special chart 2 determination process. In the special chart 2 variation pattern determination process, the special chart 2 variation pattern is determined using the special chart variation pattern random numbers among the special chart 2 related random numbers stored in the first area of the special chart 2 reserve memory unit 105b and a special chart 2 variation pattern table corresponding to the current game state. The determination of the special chart 2 variation pattern is also associated with the number of special chart 2 related random numbers (special chart 2 reserved number) stored in the special chart 2 reserve memory unit 105b. Then, a special chart 2 variation start command representing the determined special chart 2 variation pattern is generated. The special chart 2 variation start command includes information regarding the special chart 2, information regarding the result of the jackpot determination, information regarding the result of the reach determination, information regarding the special chart variation time associated with the special chart 2 variation pattern, etc. Then, the special chart 2 display 81b starts variable display of the special chart 2 based on the special chart variation time associated with the determined special chart 2 variation pattern.
[0193] The special chart 2 reserved memory unit shift process is a process that is performed when the special chart 2 determination process and the special chart 2 variation pattern determination process are performed. In the special chart 2 reserved memory unit shift process, the special chart 2 related random numbers stored in the special chart 2 reserved memory unit 105b are shifted one to the first area side, and the special chart 2 related random numbers in the first area are cleared from the special chart 2 reserved memory unit 105b. In this way, the special chart 2 related random numbers are consumed in the order in which they were acquired. Then, a special chart 2 reserved number command is generated that represents the special chart 2 reserved number after the process.
[0194] In the special symbol 1 determination process, a jackpot determination is performed to determine whether the result is a jackpot or a miss using the special symbol random number among the special symbol 1 related random numbers stored in the first area of the special symbol 1 reserved memory unit 105a and a jackpot determination table according to the current game state. If the result of the jackpot determination is a jackpot, a jackpot symbol type determination is performed to determine the type of jackpot symbol using the jackpot symbol type random number among the special symbol 1 related random numbers and the special symbol 1 jackpot symbol type determination table. Then, a symbol designation command representing the determined jackpot symbol type is generated. If the result of the jackpot determination is a miss, a symbol designation command representing a miss is generated.
[0195] The special chart 1 variation pattern determination process is a process performed after the special chart 1 determination process. In the special chart 1 variation pattern determination process, the special chart 1 variation pattern is determined using the special chart variation pattern random numbers among the special chart 1 related random numbers stored in the first area of the special chart 1 reserve memory unit 105a and a special chart 1 variation pattern table corresponding to the current game state. The determination of the special chart 1 variation pattern is also associated with the number of special chart 1 related random numbers (special chart 1 reserved number) stored in the special chart 1 reserve memory unit 105a. Then, a special chart 1 variation start command representing the determined special chart 1 variation pattern is generated. The special chart 1 variation start command includes information regarding the special chart 1, information regarding the result of the jackpot determination, information regarding the result of the reach determination, information regarding the result of the jackpot type determination, information regarding the special chart variation time associated with the special chart 1 variation pattern, etc. Then, the special chart 1 display 81a starts variable display of the special chart 1 based on the special chart variation time associated with the determined special chart 1 variation pattern.
[0196] The special chart 1 reserved memory unit shift process is a process that is performed when the special chart 1 determination process and the special chart 1 variation pattern determination process are performed. In the special chart 1 reserved memory unit shift process, the special chart 1 related random numbers stored in the special chart 1 reserved memory unit 105a are shifted one to the first area side, and the special chart 1 related random numbers in the first area are cleared from the special chart 1 reserved memory unit 105a. In this way, the special chart 1 related random numbers are consumed in the order in which they were acquired. Then, a special chart 1 reserved number command is generated that represents the special chart 1 reserved number after the process.
[0197] In this embodiment, if both the special chart 2 reserved number and the special chart 1 reserved number exist, the special chart 2 determination process is performed with priority, and the variable display of special chart 2 and the variable display of special chart 1 are not performed in parallel.
[0198] [2-3-2. Special pattern change processing] The special symbol variation process is a process performed during the variable display of the special symbol. In the special symbol variation process, as the special symbol variation time elapses, the special symbol display device 81 ends the variable display of the special symbol and stops displaying the special symbol according to the result of the jackpot determination. If the result of the jackpot determination is a jackpot, the jackpot symbol indicating a jackpot is stopped and displayed, and if the result of the jackpot determination is a miss, the miss symbol indicating a miss is stopped and displayed. Then, a special symbol variation stop command is generated which indicates the end of the variable display of the special symbol.
[0199] [2-3-3. Special design confirmation process] The special symbol determination process is a process performed when a special symbol is displayed. In the special symbol determination process, if the currently displayed special symbol is a jackpot symbol, the game transitions to a jackpot game state. An opening command indicating the start of a jackpot game is then generated. The opening command includes information regarding the result of the jackpot type determination. If the currently displayed special symbol is a losing symbol and the high probability state is to be ended, a normal probability state is set. A high probability end command indicating a transition to a normal probability state is then generated. If the currently displayed special symbol is a losing symbol and the time-saving state is to be ended, a non-time-saving state is set. A time-saving end command indicating a transition to a non-time-saving state is then generated. If the currently displayed special symbol is a losing symbol and the number of reserved special symbols 2 and 1 is "0", a customer waiting command indicating that the pachinko game machine PY1 is in a standby state is then generated.
[0200] [2-3-4. Jackpot game control processing] The jackpot game control process is a process performed in the jackpot game state. In the jackpot game control process, a jackpot game is played using a jackpot game control table. After transitioning to the jackpot game state, each round of play is started according to the passage of the opening time or closing time. Then, a round game command indicating the start of the round of play is generated. Furthermore, an ending is started according to the end of the final round of play. Then, an ending command indicating the end of the jackpot game is generated. The ending command includes information regarding the result of the jackpot type determination.
[0201] [2-3-5. Game status setting process] The gaming state setting process is a process that is performed when the jackpot gaming state ends. In the gaming state setting process, when changing from a normal probability state to a high probability state, the high probability state is set when the jackpot gaming state ends. When limiting the duration of the high probability state, the duration of the high probability state (for example, the number of times the special symbol is variable displayed that the high probability state can continue without winning a jackpot) is also set. Then, a high probability setting command is generated that indicates the setting of the high probability state. Also, when changing from a non-time-saving state to a time-saving state, the time-saving state is set when the jackpot gaming state ends. When limiting the duration of the time-saving state, the duration of the time-saving state (for example, the number of times the special symbol is variable displayed that the time-saving state can continue without winning a jackpot) is also set. Then, a time-saving setting command is generated that indicates the setting of the time-saving state.
[0202] In addition, the commands generated by the game control microcomputer 101 in each process can be added or changed as appropriate.
[0203] 6. Control of performance by performance control microcomputer 121 Next, the control of the performance by the performance control microcomputer 121 will be described with reference to Figures 25 and 26. Note that counters, timers, flags, buffers, etc. that appear in the following description of the control of the performance by the performance control microcomputer 121 are provided in the performance RAM 124.
[0204] [1. Sub-control main processing] When the pachinko gaming machine PY1 is powered on, the performance control microcomputer 121 provided on the sub-control board 120 reads out the program for the sub-control main processing shown in Fig. 25 from the performance ROM 123 and executes it. As shown in the figure, the sub-control main processing first performs power-on processing in response to power-on (S4001). The power-on processing performs, for example, setting of the performance CPU 122, setting of the SIO, PIO, CTC (circuit for managing interrupt time), etc.
[0205] Next, interrupts are prohibited (S4002), and random number seed update processing is executed (S4003). In the random number seed update processing (S4003), the values of various effect determination random number counters for making determinations regarding various effects are updated. As an example, the method of updating the effect determination random number counters for various effects can be the same as the normal symbol / special symbol main random number update processing performed by the main control board 100 described above. When updating, the random number value may be incremented by 2 instead of incremented by 1. This is also the same as in the normal symbol / special symbol main random number update processing performed by the main control board 100 described above.
[0206] When the random number seed update process is completed, a command transmission process is executed (S4004). In the command transmission process, various commands stored in the output buffer of the performance RAM 124 of the sub-control board 120 are transmitted to the image control board 140. Upon receiving the commands, the image control board 140 displays an image on the display unit 50a in accordance with the received commands (executing various image-based performances). In addition to the various performances performed by the image control board 140, the sub-control board 120 also outputs audio from the speaker 52 via the audio control circuit 161 (executing various audio performances), causes the frame lamp 53 and the board lamp 54 to emit light via the lamp control circuit 151 (executing various light-emitting performances), and activates the movable devices 55, 56, and 58 (executing various movable body performances). The performance RAM 124 is provided with a start winning command reservation memory unit that stores start winning commands including reserved lottery information. The reserved lottery information includes information based on each random number stored in the special symbol reserved memory unit 105 of the main control board 100. The start winning command reserved memory unit further includes a first start winning command reserved memory unit that stores a first start winning command based on the first special symbol reserved, and a second start winning command reserved memory unit that stores a second start winning command based on the second special symbol reserved. In addition, the performance RAM 124 may be provided with a memory unit that stores commands including information on the regular symbol reserved. In detail, the first start winning command reserved memory unit and the second start winning command reserved memory unit each have a memory area corresponding to the upper limit number of special symbol reserved. In the pachinko gaming machine PY1, the first start winning command reserved memory unit has four memory areas, and the second start winning command reserved memory unit also has four memory areas, in accordance with the upper limit number of special symbol reserved. Furthermore, each memory area has multiple sub-areas. Specifically, in the pachinko game machine PY1, a start winning command specified based on the winning of the start slot and data indicating the display mode of the hold icon HA are stored in each small area. The reception counter is used to manage the order of winning.
[0207] The performance control microcomputer 121 then enables interrupts (S4005). Thereafter, steps S4002 to S4005 are looped. While interrupts are enabled, reception interrupt processing (S4010) and sub-side timer interrupt processing (S4011) can be executed.
[0208] The reception interrupt process (S4010) is executed each time various commands sent from the main control board 100 are input to the performance control microcomputer 121. In the reception interrupt process (S4010), the performance control microcomputer 121 stores the various commands sent and received by the output process (S101) of the main control board 100 in a reception buffer of the performance RAM 124. This reception interrupt process is executed with priority over other interrupt processes (S4011).
[0209] [2. Sub-side timer interrupt processing] The 1 ms timer interrupt process (S4011) is executed each time an interrupt pulse having a predetermined period (for example, 1 msec period) is input to the sub-control board 120. In the 1 ms timer interrupt process (S4011), as shown in Fig. 26, input process (S4101), light emission data output process (S4102), movable device control process (S4103), and watchdog timer process (S4104) are performed in this order.
[0210] The input process detects operation of player-operable operating elements such as the normal button detection switch 40a and the special button detection switch 41a. The light-emission data output process outputs light-emission data to the lamp control circuit 151 to illuminate lamps such as the frame lamp 53 and the board lamp 54 at timings appropriate for image effects, based on the performance data created in the performance data creation process (described later). In other words, the performance control microcomputer 121 illuminates the frame lamp 53, the board lamp 54, and other lamps in a predetermined lighting pattern in accordance with the light-emission data. The movable device control process outputs drive data to perform a movable object effect by operating movable devices such as the movable devices 55, 56, and 58 at a predetermined timing, based on the performance data created in the performance data creation process. In other words, the performance control microcomputer 121 performs a movable object effect by operating the movable devices 55, 56, and 58 in a predetermined operating pattern in accordance with the drive data. The watchdog timer process resets the watchdog timer. In the switch processing, the display contents of the display unit 50a are set based on the data of the operation of the operation unit that can be operated by the player, such as the normal button detection switch 40a and the special button detection switch 41a, detected in the input processing. In the button valid period processing, the button operation valid period of various buttons (normal button 40, special button 41, etc.) is set. As a result, for example, an operation effect is performed during the execution of a special chart variation effect, and a button operation valid period occurs.
[0211] [10 ms timer interrupt processing] The 10 ms timer interrupt processing (S4012) is executed each time an interrupt pulse with a 10 ms period is input to the sub-control board 120. As shown in Figure 27, the 10 ms timer interrupt processing (S4012) sequentially performs received command analysis processing (S4201), performance timer update processing (S4202), audio control processing (S4203), and performance data creation processing (S4204).
[0212] In the received command analysis process, the command stored in the receive buffer of the performance RAM 124 by the receive interrupt process (S4010) is analyzed, and processing according to the command (for example, selecting a performance, setting a performance mode, setting a command, etc.) is performed. In the performance timer update process, a timer for measuring the time related to each performance is updated. For example, in the performance timer update process, the start timing and end timing of the effective operation period of an operation unit such as the normal button 40 or the special button 41 are measured. In the audio control process, audio data (data that controls the audio output from the speaker 52) is created and output to the audio control circuit 161 based on the processing result of the received command analysis process. In the performance data creation process, performance data is created based on the processing result of the received command analysis process.
[0213] In the switch processing (S4106), the performance control microcomputer 121 may analyze the switch data acquired by the input processing (S4104) and determine whether the normal button 40 has been pressed within the valid button operation period. For example, if the performance control microcomputer 121 analyzes the switch data acquired by the input processing (S4104) and determines that the normal button 40 has been pressed within the valid button operation period, the performance control microcomputer 121 executes the normal button processing. Here, the normal button processing refers to, for example, displaying a preview image on the display unit 50a or performing a movable object performance using the on-board movable object 55k. In addition, the performance control microcomputer 121 may analyze the switch data acquired by the input processing (S4104) and determine whether the special button 41 has been pressed within the valid button operation period. For example, if the performance control microcomputer 121 determines that the special button 41 has been pressed within the valid button operation period, the performance control microcomputer 121 executes the special button processing. Here, the special button process refers to, for example, displaying a preview image on the display unit 50a, or performing a movable object effect using the on-board movable object 55k.
[0214] Here, an example of processing when the performance control microcomputer 121 receives a command from the game control microcomputer 101 will be described. The command received by the performance control microcomputer 121 is a fluctuation start command (special chart 1 fluctuation start command or special chart 2 fluctuation start command). When the performance control microcomputer 121 determines in the received command analysis process (S4201) that it has received a fluctuation start command, it selects a fluctuation performance pattern (sub-fluctuation pattern) based on the special chart fluctuation pattern indicated by the command, sets information about the sub-fluctuation pattern, and sets a fluctuation performance start command including information about the sub-fluctuation pattern in the output buffer, as processing when the fluctuation start command is received. For example, if the special chart fluctuation pattern indicated by the fluctuation start command is an SP fluctuation (a fluctuation pattern associated with an SP reach), it selects a sub-fluctuation pattern that performs an SP reach, and sets a fluctuation performance start command corresponding to the sub-fluctuation pattern in the output buffer. Thereafter, various processes (such as command transmission process (S4004), light emission data output process (S4102), movable body control process (S4103), and sound control process (S4203)) are executed to realize a variation effect corresponding to the selected sub-variation pattern. Note that the flow of processing related to the realization of such effects is basically the same for other effects such as effects associated with special games, customer waiting effects, pre-reading effects, so-called advance notice effects associated with the relevant variations, and control of the effect mode.
[0215] 7. Description of Features of the Pachinko Game Machine PY1 of the First Embodiment The features of the pachinko gaming machine PY1 will be described in detail below. The first embodiment will be described below. Unless otherwise stated, the pachinko gaming machine PY1 of the basic embodiment described above is also applied to the first embodiment.
[0216] First, we will explain the special symbol variation pattern determined by the game control microcomputer 101 of the first embodiment. In the special symbol variation pattern determination process when the game control microcomputer 101 is set to the non-time-saving mode, the special symbol variation pattern is determined based on the results of the jackpot determination, the reach determination, and the special symbol variation pattern random number performed in the special symbol variation pattern determination process. More specifically, as shown in FIG. 28, when a jackpot is determined to have been won in the jackpot determination process, the game control microcomputer 101 can determine one of the special symbol variation patterns "P01," "P02," "P03," "P21," or "P22" as the special symbol variation pattern. The allocation ratio is as shown in FIG. 29(A). The allocation ratio (selection ratio) of the special symbol variation pattern shown in FIG. 29(A) can be changed as appropriate within the range that does not interfere with gameplay.
[0217] Furthermore, when the game control microcomputer 101 determines that the jackpot has been lost and the reach determination result is "reach," it can determine the special chart 1 variation pattern from among "P04," "P05," "P06," "P23," or "P24." The special chart 1 variation pattern to be determined is determined by a special chart variation pattern random number. The distribution rate is as shown in Figure 29(B). The distribution rate (selection rate) of the special chart 1 variation pattern shown in Figure 29(B) can be changed as appropriate within the range that does not interfere with gameplay.
[0218] Furthermore, if the game control microcomputer 101 determines a miss in the jackpot determination and the reach determination result is "no reach," it can determine "P07" or "P08" as the special chart 1 variation pattern. The two types of special chart 1 variation patterns to be selected are determined based on the number of reserved special charts 1. When the number of reserved special charts 1 is 0 to 2, a special chart variation pattern with a relatively long special chart variation time is likely to be selected. When the number of reserved special charts 1 is 3 to 4, a special chart variation pattern with a relatively short special chart variation time is likely to be selected. The allocation rate is as shown in Figure 29(C). The allocation rate (selection rate) of the special chart 1 variation patterns shown in Figure 29(C) can be changed as appropriate within the range that does not interfere with gameplay.
[0219] Here, the special chart 1 variation pattern "P21" is a cooperative jackpot variation in which normal variation → reach → N reach → development effect → SP reach → branching effect → cooperative reach, and the special chart 1 variation pattern "P23" is a cooperative loss variation in which normal variation → reach → N reach → development effect → SP reach → branching effect → cooperative reach. Here, the branching effect is an effect that is executed at the branching point (predetermined branching point) where the special chart variation effect branches into either the cooperative reach or the battle reach.
[0220] Here, the term "team fighting reach" refers to an effect in which a main character and his ally character cooperate to battle an enemy character, ultimately branching into either a victory effect (an example of a success effect) in which the main character wins, or a defeat effect (an example of a failure effect) in which the main character is defeated (see Figure 68). The team fighting reach is a reach effect that suggests that the result of the jackpot determination is more likely to be a "jackpot" than the SP reach, L reach, and N reach, and functions as an effect to make the player expect a jackpot. The team fighting reach and the battle reach (low expectation transition effect) described below are SPSP reaches (suggestion effects, expectation transition effects). The team fighting reach (high expectation transition effect) is a reach effect that suggests that the result of the jackpot determination is more likely to be a "jackpot" than the battle reach described below. In the team fighting reach, the success effect is an effect that suggests a jackpot win, and the failure effect is an effect that suggests a miss.
[0221] Here, special chart 1 variation pattern "P22" is a battle jackpot variation in which normal variation → reach → N reach → development effect → SP reach → branching effect → battle reach takes place, and special chart 1 variation pattern "P24" is a battle miss variation in which normal variation → reach → N reach → development effect → SP reach → branching effect → battle reach takes place.
[0222] Here, a battle reach is a presentation in which a main character and an enemy character battle each other, ultimately branching into a victory presentation in which the main character wins (an example of a success presentation), or a defeat presentation in which the main character is defeated (an example of a failure presentation) (see Figure 67). Also, a battle reach is a reach presentation that suggests that the result of the jackpot determination is more likely to be a "jackpot" than an SP reach, an L reach, or an N reach, and functions as a presentation to make the player look forward to a jackpot. However, a battle reach is a reach presentation that suggests that the result of the jackpot determination is less likely to be a "jackpot" than a joint battle reach. In a battle reach, a success presentation is a presentation that suggests a jackpot win, and a failure presentation is a presentation that suggests a miss.
[0223] Here, the special chart 1 variation pattern "P01" is an SP jackpot variation in which normal variation → reach → N reach → development effect → SP reach takes place, and the special chart 1 variation pattern "P04" is an SP miss variation in which normal variation → reach → N reach → development effect → SP reach takes place.
[0224] In addition, special chart 1 variation pattern "P02" is an L jackpot variation in which normal variation → reach → N reach → development effect → L reach occurs, and special chart 1 variation pattern "P05" is an L miss variation in which normal variation → reach → N reach → development effect → L reach occurs.
[0225] In addition, the special chart 1 variation pattern "P03" is an N jackpot variation in which the performance symbols EZ1, EZ2, and EZ3 become reaches, such as normal variation → reach → N reach, but none of the reach effects are performed among the L reach, SP reach, or SPSP reach (cooperative reach, battle reach).In addition, the special chart 1 variation pattern "P06" is an N miss variation in which the performance symbols EZ1, EZ2, and EZ3 become reaches, such as normal variation → reach → N reach, but none of the reach effects are performed among the L reach, SP reach, or SPSP reach (cooperative reach, battle reach).
[0226] In addition, the special chart 1 variation pattern "P07" is a normal miss variation in which the variation effect ends in 13 seconds without the performance symbols EZ1, EZ2, and EZ3 becoming reach. Also, the special chart 1 variation pattern "P08" shown in Figure 27 is a normal miss variation in which the variation effect ends in 4 seconds without the performance symbols EZ1, EZ2, and EZ3 becoming reach.
[0227] Next, among the main effects (normal variation, N reach, L reach, SP reach, SPSP reach (cooperative reach, battle reach)) that make up the special chart variation effects in the above-mentioned special chart variation patterns, the cooperative reach and battle reach, which are SPSP reaches, will be explained in detail. Note that the effect control microcomputer 121 displays an effect image on the display unit 50a in each effect that makes up the special chart variation effect, and, in accordance with the display of the effect image, can execute light-emitting effects using the frame lamp 53 and the board lamp 54, sound effects using the speaker 52, movable body effects using the movable devices 55, 56, 58 (movable body effects of the first effect mode, movable body effects of the second effect mode, etc.), operation effects using the input device (normal button 40, special button 41), etc.
[0228] <Joint Reach> A cooperative reach is a reach effect in which a main character cooperates with an ally character to battle an enemy character. A cooperative reach has a win / loss branch, and branches into a success effect (victory effect) in which the main character defeats the enemy character, or a failure effect (defeat effect) in which the main character is defeated by the enemy character (see Figure 68). A success effect, like the success effect in a battle reach, functions as an effect that suggests to the player that they have won the jackpot. A failure effect, like the failure effect in a battle reach, functions as an effect that suggests to the player that they have not won the jackpot.
[0229] <Battle Reach> A battle reach is a reach effect in which a battle takes place between a main character and an enemy character. A battle reach has a win / loss branch, and branches into a success effect (victory effect) in which the main character defeats the enemy character, or a failure effect (defeat effect) in which the main character is defeated by the enemy character (see Figure 67). A success effect, like the success effect in a joint battle reach, functions as an effect that suggests to the player that they have won the jackpot. A failure effect, like the failure effect in a joint battle reach, functions as an effect that suggests to the player that they have not won the jackpot.
[0230] Next, the allocation rate of the special chart 1 variation pattern in the non-time-saving state will be explained using Figure 29. As shown in Figure 29 (A), the allocation rate of the special chart 1 variation pattern selected in the case of the "non-time-saving state" and "jackpot" in the pachinko game machine PY1 of the first embodiment is the allocation rate of the special chart 1 variation pattern "P03" (1%) ⇒ the allocation rate of the special chart 1 variation pattern "P02" (9%) ⇒ the allocation rate of the special chart 1 variation pattern "P01" (20%) ⇒ the allocation rate of the special chart 1 variation pattern "P22" (30%) ⇒ the allocation rate of the special chart 1 variation pattern "P21" (40%).
[0231] On the other hand, as shown in Figure 29 (B), the allocation rate of the special chart 1 variation pattern selected in the case of the "non-time-saving state" and "miss with reach" in the pachinko game machine PY1 of this embodiment increases in the following order: allocation rate of special chart 1 variation pattern "P23" (10%) ⇒ allocation rate of special chart 1 variation pattern "P24" (20%) ⇒ allocation rate of special chart 1 variation pattern "P04" (22%) ⇒ allocation rate of special chart 1 variation pattern "P05" (23%) ⇒ allocation rate of special chart 1 variation pattern "P06" (25%).
[0232] Also, as shown in Figure 29 (C), in the pachinko game machine PY1 of the first embodiment, when the "non-time-shortened state", the number of reserved special charts 1 is "0 to 2", and there is a "miss without a reach", the allocation rate of the special chart 1 variation pattern selected increases in the order of the allocation rate of the special chart 1 variation pattern "P08" (20%) ⇒ the allocation rate of the special chart 1 variation pattern "P07" (80%).
[0233] In addition, as shown in Figure 29 (C), in the pachinko game machine PY1 of this embodiment, when the "non-time-saving state", the number of reserved special charts 1 is "3 to 4", and there is a "miss without a reach", the allocation rate of the special chart 1 variation pattern selected increases in the order of the allocation rate of the special chart 1 variation pattern "P07" (20%) ⇒ the allocation rate of the special chart 1 variation pattern "P08" (80%).
[0234] In this embodiment, as shown in FIG. 29, when a jackpot is won (in the case of a jackpot fluctuation), a joint battle reach is more likely to be executed than a battle reach. On the other hand, when a miss occurs (in the case of a miss fluctuation), a battle reach is more likely to be executed than a joint battle reach. In other words, in this embodiment, a joint battle reach is a reach effect that has a higher chance of winning than a battle reach. In addition, when branching into wins and losses in various SPSP reaches (joint battle reaches, battle reaches), an operation effect may be configured to be performed in which the operation unit (normal button 40 or special button 41) is operated.
[0235] Next, in the first embodiment, when the game control microcomputer 101 is in the non-time-saving state, it performs a look-ahead determination using the first look-ahead determination table shown in FIG. 30 based on the acquired special symbol-related random number. This look-ahead determination includes a jackpot look-ahead determination as to whether the acquired special symbol pattern random number will be determined to be a "jackpot" in the jackpot determination, and a variation pattern look-ahead determination as to which special symbol variation pattern the acquired special symbol variation pattern random number will be determined to be in the special symbol variation pattern determination. The game control microcomputer 101 determines a start winning command based on the look-ahead determination result. In the first embodiment, the first look-ahead determination table shown in FIG. 28 is used, but it is also possible to use the look-ahead determination table shown in FIG. 13 in combination.
[0236] The game control microcomputer 101 determines the start winning command based on the result of the big win prediction judgment or the result of the fluctuation pattern prediction judgment in the first start opening sensor processing when the non-time-shortening state is set. As shown in Fig. 30, 11 types of start winning commands, "Command 01" to "Command 07" and "Command 21" to "Command 24", can be determined as the start winning command. In the first embodiment, the fluctuation pattern prediction judgment is performed based on the special chart 1 fluctuation pattern determined by the special chart 1 fluctuation pattern judgment table shown in Fig. 28.
[0237] If the result of the jackpot pre-reading determination is "jackpot" and the result of the variation pattern pre-reading determination is "cooperative jackpot variation," "Command 21" is determined. Also, if the result of the jackpot pre-reading determination is "jackpot" and the result of the variation pattern pre-reading determination is "battle jackpot variation," "Command 22" is determined. If the result of the jackpot pre-reading determination is "jackpot" and the result of the variation pattern pre-reading determination is "SP jackpot variation," "Command 01" is determined. If the result of the jackpot pre-reading determination is "jackpot" and the result of the variation pattern pre-reading determination is "L jackpot variation," "Command 02" is determined. If the result of the jackpot pre-reading determination is "jackpot" and the result of the variation pattern pre-reading determination is "N jackpot variation," "Command 03" is determined.
[0238] Furthermore, if the result of the jackpot pre-reading determination is a "miss" and the result of the variation pattern pre-reading determination is a "cooperative miss variation," "Command 23" is determined. If the result of the jackpot pre-reading determination is a "miss" and the result of the variation pattern pre-reading determination is a "battle miss variation," "Command 24" is determined. If the result of the jackpot pre-reading determination is a "miss" and the result of the variation pattern pre-reading determination is an "SP miss variation," "Command 04" is determined. If the result of the jackpot pre-reading determination is a "miss" and the result of the variation pattern pre-reading determination is an "L miss variation," "Command 05" is determined. If the result of the jackpot pre-reading determination is a "miss" and the result of the variation pattern pre-reading determination is an "N miss variation," "Command 06" is determined. If the result of the jackpot pre-reading determination is a "miss" and the result of the variation pattern pre-reading determination is a "normal miss variation," "Command 07" is determined.
[0239] Next, we will explain the hold icon HA and the icon TA that can be displayed by the performance control microcomputer 121 of this embodiment. In the hold performance, the performance control microcomputer 121 can display the hold icon HA corresponding to the special chart 1 hold in the hold icon display area 50d, and the icon TA corresponding to the special chart 1 hold in the icon display area 50e (see FIG. 32).
[0240] The hold icon HA of the first embodiment includes a hold icon HA1 (white circle) in the normal display mode shown in Fig. 31(A) and a hold icon HA2 (white triangle including a text image of "preparing") in the change suggestion display mode (specific display mode) shown in Fig. 31(E). Also, the icon TA of the first embodiment includes an icon TA1 (white circle) in the normal display mode shown in Fig. 31(A), icons TA2 to TA4 in the expectation display mode shown in Fig. 31(B) to Fig. 31(D), an icon TA5 (white triangle including a text image of "preparing") in the change suggestion display mode shown in Fig. 31(E), and icons TA6 to TA7 in the development suggestion display mode shown in Fig. 31(F) to Fig. 31(G).
[0241] The icons of various display modes will be explained below. First, the icons (reserved icon HA1, icon TA1) in the normal display mode (predetermined display mode) are the icons that are most frequently selected in the event of a loss. Next, the icons in the expectation display mode (icons TA2 to TA4) are the icons that are less frequently selected in the event of a loss than the icon TA1 in the normal display mode. Note that the shapes of the icons in the expectation display mode (icons TA2 to TA4) and the icon TA1 in the normal display mode are both round, but the colors of the icons in the expectation display mode (expectation display mode, special display mode) (icons TA2 to TA4) and the icon TA1 in the normal display mode are different.
[0242] The icons of the expectation level display modes (icons TA2 to TA4) include the icon TA2 (blue circle, see FIG. 31(B)) of the first expectation level display mode (first special display mode), the icon TA3 (green circle, see FIG. 31(C)) of the second expectation level display mode (first expectation display mode, second special display mode), and the icon TA4 (red circle, see FIG. 31(D)) of the third expectation level display mode (second expectation display mode). The shape of the icon TA2 of the first expectation level display mode, the shape of the icon TA3 of the second expectation level display mode, and the shape of the icon TA4 of the third expectation level display mode are all the same circle, but the color of the icon TA2 of the first expectation level display mode, the color of the icon TA3 of the second expectation level display mode, and the color of the icon TA4 of the third expectation level display mode are all different. In this embodiment, the probability of winning increases in the following order: icon TA1 (white circle) in the normal display mode ⇒ icon TA2 (blue circle) in the first expectation level display mode ⇒ icon TA3 (green circle) in the second expectation level display mode ⇒ icon TA4 (red circle) in the third expectation level display mode.
[0243] Next, the icons in the change suggestion display mode (reserved icon HA5, the icon TA5, a white triangle containing a text image of "preparing," see Figure 31(E)) are icons that are selected less frequently in the event of a miss than the icons in the normal display mode (reserved icon HA1, the icon TA1). The icons in the change suggestion display mode include the reserved icon HA5 in the change suggestion display mode and the icon TA5 in the change suggestion display mode. The icons in the change suggestion display mode (reserved icon HA5, the icon TA5) are icons that indicate that the icon TA5 in the change suggestion display mode will be changed to either the icon TA6 in the cooperative development suggestion display mode described below, or the icon TA7 in the battle development suggestion display mode described below, in the second icon change performance that can be performed during the execution of the special chart change performance. The cooperative development suggestion display mode and the battle development suggestion display mode correspond to the "special display mode" of the present invention.
[0244] The icons in the development suggestion display mode (icon TA6 consisting of the "battle" text image and a white triangle image shown in Figure 31(F), and icon TA7 consisting of the "co-op" text image and a white triangle image shown in Figure 31(G)) are icons that are selected less frequently in the event of a miss than the icons in the normal display mode. The icons in the development suggestion display mode include icon TA6 in the battle development suggestion display mode (a white triangle containing the "battle" text image shown in Figure 31(F)) and icon TA7 in the co-op development suggestion display mode (a white triangle containing the "co-op" text image shown in Figure 31(G)). Here, icon TA6 in the battle development suggestion display mode is the icon that indicates that the game will develop into a battle reach during the execution of the special chart change performance. Also, icon TA7 in the co-op development suggestion display mode is the icon that indicates that the game will develop into a co-op reach during the execution of the special chart change performance. In this embodiment, the probability of winning increases in the order of the icons: icon TA1 in the normal display mode ⇒ icon TA6 in the battle development suggestion display mode ⇒ icon TA7 in the cooperative development suggestion display mode.
[0245] Next, the icon TA and the reserved icon HA displayed on the display unit 50a will be further explained based on Fig. 32. In this embodiment, the display of the icon TA on the display unit 50a notifies the player that the special symbols (special symbol 1, special symbol 2) are being variably displayed (or are being stopped). In addition, the display of the reserved icon HA on the display unit 50a notifies the player of the reserved number of special symbol 1 or the reserved number of special symbol 2.
[0246] In this embodiment, the icon TA can be continuously displayed in the icon display area 50e during the period from the variable display of the special chart 1 on the special chart 1 display device 81a to the stop display, and during the period from the variable display of the special chart 2 on the special chart 2 display device 81b to the stop display. Also, for example, when the icon TA1 in the normal display mode is displayed in the icon display area 50e, as shown in Figures 32(A) and 32(D), the icon TA1 in the normal display mode can be continuously displayed in the icon display area 50e.
[0247] In addition, the hold icon HA of this embodiment can be displayed in the hold icon display area 50d in a number corresponding to the number displayed in the special chart 1 hold display 83a or the number displayed in the special chart 2 hold display 83b. Specifically, when the number displayed in the special chart 1 hold display 83a is "1", the hold icon HA1 in the normal display mode is displayed only in the first display area 50d1 of the hold icon display area 50d (see FIG. 32(A)). In other words, in that case, one hold icon HA is displayed in the hold icon display area 50d.
[0248] Also, when the display number in the special diagram 1 hold display 83a is "2", the hold icon HA1 in the normal display mode is displayed in the first display area 50d1 and the second display area 50d2 of the hold icon display area 50d (see FIG. 20(C)). In other words, in that case, two hold icons HA1 in the normal display mode are displayed in the hold icon display area 50d.
[0249] Also, when the display number in the special diagram 1 hold display 83a is "3", the hold icon HA1 in the normal display mode is displayed in the first display area 50d1, the second display area 50d2, and the third display area 50d3 of the hold icon display area 50d. In other words, in that case, three hold icons HA in the normal display mode are displayed in the hold icon display area 50d.
[0250] Also, when the display number in the special diagram 1 hold display 83a is "4", the hold icon HA1 in the normal display mode is displayed in the first display area 50d1, the second display area 50d2, the third display area 50d3, and the fourth display area 50d4 of the hold icon display area 50d. In other words, in that case, four hold icons HA1 in the normal display mode are displayed in the hold icon display area 50d.
[0251] As described above, the special chart 1 reserve indicator 83a displays the number of reserved special charts 1 (the number of reserved variable displays of special chart 1 by the special chart 1 indicator 81a), so the display of the reserve icon HA in the reserve icon display area 50d allows the player to grasp the current number of reserved special charts 1. Also, the special chart 2 reserve indicator 83b displays the number of reserved special charts 2 (the number of reserved variable displays of special chart 2 by the special chart 2 indicator 81b), so the display of the reserve icon HA in the reserve icon display area 50d allows the player to grasp the current number of reserved special charts 2.
[0252] In addition, the hold icon HA can be displayed together with the icon TA during the variable display of the special chart (variable display of special chart 1, variable display of special chart 2). In other words, when the icon TA is displayed in the icon display area 50e during the variable display of the special chart (variable display of special chart 1, variable display of special chart 2), the hold icons HA in the number corresponding to the number displayed on the special chart 1 hold indicator 83a or the number displayed on the special chart 2 hold indicator 83b are also displayed in the hold icon display area 50d.
[0253] In this embodiment, during the stop display of the special chart (stop display of special chart 1, stop display of special chart 2), the display of the icon TA displayed in the icon display area 50e is terminated. In other words, during the stop display of the special chart (stop display of special chart 1, stop display of special chart 2), the icon TA displayed in the icon display area 50e disappears from the icon display area 50e.
[0254] Specifically, if the hold icon HA is not displayed and the icon TA is displayed during the variable display of the special chart 1, the execution of the icon TA will end during the stopped display of the special chart 1 and disappear from the icon display area 50e (see Figure 32 (C)).
[0255] When the icon TA disappears from the icon display area 50e, the start of the variable display of the next special symbol (variable display of special symbol 1, variable display of special symbol 2) causes the reserved icon HA displayed in the first display area 50d1 to move (shift) from the first display area 50d1 to the icon display area 50e, and becomes the icon TA1 in the normal display mode (see Figures 32(C) and 32(D)). By displaying the icon TA in this way, the player can understand that the variable display of the next special symbol (variable display of special symbol 1, variable display of special symbol 2) has started.
[0256] In the first embodiment, the display patterns from when the display of the hold icon HA starts to when the display of the hold icon HA ends are selected collectively as a scenario. As shown in FIG. 33, there are two types of scenario patterns for displaying the hold icon HA: look-ahead scenario pattern 1 and look-ahead scenario pattern 2. Look-ahead scenario pattern 1 is a scenario in which the hold icon HA1 in the normal display mode, which is the initial mode of the hold icon HA, continues to be displayed without change. Also, look-ahead scenario pattern 2 is a scenario in which the hold icon HA2 in the change suggestion display mode of the hold icon HA continues to be displayed without change.
[0257] The performance control microcomputer 121 can select the type of reserved icon HA to be displayed in the reserved icon display area 50d using the look-ahead scenario pattern selection table shown in FIG. 34. In the start winning processing (S4302), the performance control microcomputer 121 selects look-ahead scenario pattern 1 or look-ahead scenario pattern 2 by referring to the start winning command. Specifically, regardless of which command the start winning command is, "Command 01" to "Command 07," look-ahead scenario pattern 1 is selected 100% of the time, and look-ahead scenario pattern 2 is never selected. When the start winning command is "Command 21," look-ahead scenario pattern 1 is selected 90% of the time, and look-ahead scenario pattern 2 is selected 10% of the time. On the other hand, when the start winning command is "Command 22," look-ahead scenario pattern 1 is selected 95% of the time, and look-ahead scenario pattern 2 is selected 5% of the time. Furthermore, when the start winning command is "Command 23," pre-reading scenario pattern 1 is selected 90% of the time, and pre-reading scenario pattern 2 is selected 10% of the time. On the other hand, when the start winning command is "Command 24," pre-reading scenario pattern 1 is selected 95% of the time, and pre-reading scenario pattern 2 is selected 5% of the time. The allocation rate (selection rate) of the scenario pattern selection table for the reserved icon shown in Figure 34 can be changed as appropriate within the range that does not interfere with gameplay.
[0258] In the first embodiment, the display pattern from the start of displaying the icon TA to the end of displaying the icon TA is selected collectively as a scenario. There are eight scenario patterns for displaying the icon TA, from scenario pattern 1 to scenario pattern 8, as shown in FIG. 35 . Scenario pattern 1 is a scenario in which the icon TA1 in the normal display mode, which is the initial mode of the icon TA, continues to be displayed without change. Scenario pattern 2 is a scenario in which the icon TA1 in the normal display mode is displayed, and the icon TA1 in the normal display mode is changed to the icon TA2 in the first expectation level display mode by executing a first icon change effect, and the icon TA2 in the first expectation level display mode continues to be displayed. Scenario pattern 3 is a scenario in which the icon TA1 in the normal display mode is displayed, and the icon TA1 in the normal display mode is changed to the icon TA3 in the second expectation level display mode by executing a first icon change effect, and the icon TA3 in the second expectation level display mode continues to be displayed. In addition, scenario pattern 3 is a scenario in which the icon TA1 is displayed in a normal display mode, and by executing the first icon change performance, the icon TA1 in the normal display mode is changed to the icon TA4 in the third expectation level display mode, and the icon TA4 in the third expectation level display mode continues to be displayed.
[0259] Scenario pattern 5 is a scenario in which the icon TA5 in a change suggestion display mode is displayed, the second icon change effect is executed to change the icon TA5 in the change suggestion display mode to the icon TA6 in the battle development suggestion display mode, and then the third icon change effect is executed to change the icon TA6 in the battle development suggestion display mode to the icon TA3 in the second expectation level display mode, and the icon TA3 in the second expectation level display mode continues to be displayed. Scenario pattern 6 is a scenario in which the icon TA5 in a change suggestion display mode is displayed, the second icon change effect is executed to change the icon TA5 in the change suggestion display mode to the icon TA6 in the battle development suggestion display mode, and then the third icon change effect is executed to change the icon TA6 in the battle development suggestion display mode to the icon TA4 in the third expectation level display mode, and the icon TA4 in the third expectation level display mode continues to be displayed. Scenario pattern 7 is a scenario in which the icon TA5 is displayed in a change suggestion display mode, and by executing a second icon change effect, the icon TA5 in the change suggestion display mode is changed to the icon TA7 in the cooperative development suggestion display mode, and then by executing a third icon change effect, the icon TA7 in the cooperative development suggestion display mode is changed to the icon TA3 in the second expectation level display mode, and the icon TA3 in the second expectation level display mode continues to be displayed. Scenario pattern 8 is a scenario in which the icon TA5 is displayed in a change suggestion display mode, and by executing a second icon change effect, the icon TA5 in the change suggestion display mode is changed to the icon TA7 in the cooperative development suggestion display mode, and then by executing a third icon change effect, the icon TA7 in the cooperative development suggestion display mode is changed to the icon TA4 in the third expectation level display mode, and the icon TA4 in the third expectation level display mode continues to be displayed.
[0260] In the scenario pattern selection process (S4504), the performance control microcomputer 121 can select the type of icon TA to be displayed in the icon display area 50e using the scenario pattern selection table shown in FIG. 36. In the scenario pattern selection process (S4504), the performance control microcomputer 121 refers to the type of special chart variation pattern and the selected pre-reading scenario pattern and selects one of the scenario patterns from scenario pattern 1 to scenario pattern 8. Specifically, when the special chart 1 variation pattern is "P01" and pre-reading scenario pattern 1 is selected, scenario pattern 3 is selected 20% of the time, and scenario pattern 4 is selected 80% of the time. When the special chart 1 variation pattern is "P02" and pre-reading scenario pattern 1 is selected, scenario pattern 2 is selected 20% of the time, and scenario pattern 3 is selected 80% of the time. If the special chart 1 variation pattern is "P03" and pre-reading scenario pattern 1 is selected, then scenario pattern 1 is selected 20% of the time, and scenario pattern 2 is selected 80% of the time. If the special chart 1 variation pattern is "P04" and pre-reading scenario pattern 1 is selected, then scenario pattern 3 is selected 80% of the time, and scenario pattern 4 is selected 20% of the time. If the special chart 1 variation pattern is "P05" and pre-reading scenario pattern 1 is selected, then scenario pattern 2 is selected 80% of the time, and scenario pattern 3 is selected 20% of the time. Regardless of which special chart 1 variation pattern is "P06" to "P08," if pre-reading scenario pattern 1 is selected, then scenario pattern 1 is selected 100% of the time.
[0261] Furthermore, when the special chart 1 variation pattern is "P21" to "P24," the selection rate of the scenario pattern differs depending on the selected pre-reading scenario pattern 1 or pre-reading scenario pattern 2. Specifically, when the special chart 1 variation pattern is "P21" and pre-reading scenario pattern 1 is selected, scenario pattern 4 is selected 100% of the time. On the other hand, when the special chart variation pattern is "P21" and pre-reading scenario pattern 2 is selected, scenario pattern 7 is selected 20% of the time, and scenario pattern 4 is selected 80% of the time. When the special chart 1 variation pattern is "P22" and pre-reading scenario pattern 1 is selected, scenario pattern 3 is selected 20% of the time, and scenario pattern 4 is selected 80% of the time. On the other hand, when the special chart variation pattern is "P22" and pre-reading scenario pattern 2 is selected, scenario pattern 5 is selected 40% of the time, and scenario pattern 6 is selected 60% of the time. When the special chart variation pattern is "P23" and pre-reading scenario pattern 1 is selected, scenario pattern 3 is selected 80% of the time, and scenario pattern 4 is selected 20% of the time. On the other hand, when the special chart variation pattern is "P23" and pre-reading scenario pattern 2 is selected, scenario pattern 7 is selected 80% of the time, and scenario pattern 8 is selected 20% of the time. When the special chart variation pattern is "P24" and pre-reading scenario pattern 1 is selected, scenario pattern 3 is selected 60% of the time, and scenario pattern 4 is selected 40% of the time. On the other hand, when the special chart variation pattern is "P24" and pre-reading scenario pattern 2 is selected, scenario pattern 5 is selected 60% of the time, and scenario pattern 6 is selected 40% of the time. The allocation rate (selection rate) of the scenario selection table for the icon shown in Figure 36 can be changed as appropriate as long as it does not interfere with gameplay.
[0262] Next, we will explain the icon change effect in which the display mode of the icon changes during the execution of the special chart change effect. The icon change effect of the first embodiment includes a first icon change effect, a second icon change effect, and a third icon change effect. Here, the first icon change effect is an effect in which the icon TA1 in the normal display mode displayed on the display unit 50a changes to the icon TA in the expectation display mode (first expectation display mode, second expectation display mode, third expectation display mode) during the execution of the special chart change effect. Furthermore, the second icon change effect is an effect in which the icon TA5 in the change suggestion display mode displayed on the display unit 50a changes to the icon TA6 in the cooperative development suggestion display mode or the icon TA7 in the battle development suggestion display mode during the execution of the special chart change effect. In addition, the third icon change effect is an effect in which, during execution of the special chart change effect, the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode displayed on the display unit 50a is changed to the icon TA in the expectation level display mode (first expectation level display mode, second expectation level display mode, third expectation level display mode).
[0263] First, the first icon change effect will be described in detail. When the execution of the first icon change effect starts, first, a movable body effect is executed to operate the on-board movable device 55. Thereafter, when the execution of the movable body effect ends during the execution of the first icon change effect, an on-board movable body image KG (movable body image) simulating the on-board movable body 55k is displayed on the display unit 50a. When the on-board movable body image KG is displayed on the display unit 50a, the icon TA1 in the normal display mode is moved from the icon display area 50e to the icon change area 50h (specific display position). Then, the icon TA1 in the normal display mode moved to the icon change area 50h is changed to the icon TA in an expectation level display mode (first expectation level display mode, second expectation level display mode, third expectation level display mode).
[0264] The first icon change effect includes a first icon change effect in a first effect mode and a first icon change effect in a second effect mode. The first icon change effect in the first effect mode is an icon change effect in which the icon TA1 in the normal display mode changes to one of the icon TA2 in the first expectation level display mode, the icon TA3 in the second expectation level display mode, or the icon TA4 in the third expectation level display mode. In other words, the first icon change effect in the first effect mode is an icon change effect in which the icon TA1 in the normal display mode changes to the icon TA in an expectation level display mode that indicates a jackpot expectation level equal to or higher than the icon TA2 in the first expectation level display mode. On the other hand, the first icon change effect in the second effect mode is an icon change effect in which the icon TA1 in the normal display mode changes to the icon TA3 in the second expectation level display mode or the icon TA3 in the third expectation level display mode. From the above explanation, the first icon change effect of the first effect mode is an icon change effect in which the icon TA1 in the normal display mode is changed to the icon in any of the expectation level display modes, among the icon TA2 in the first expectation level display mode, the icon TA3 in the second expectation level display mode, and the icon TA4 in the third expectation level display mode. On the other hand, since the first icon change effect of the second effect mode does not change the icon TA1 in the normal display mode to the icon TA2 in the first expectation level display mode, the first icon change effect of the second effect mode is an icon change effect in which the icon TA1 is changed to the icon TA in the expectation level display mode indicating a jackpot expectation level equal to or higher than the icon TA3 in the second expectation level display mode.
[0265] Here, the on-board movable body 55k provided on the gaming board 1 will be described with reference to FIG. 37. The on-board movable body 55k is equipped with a movable body LED 55L that can emit light, as shown in FIG. 37(A). By driving the motor to cause the on-board movable device 55 to perform a predetermined operation, the on-board movable body 55k can be moved to any position. Specifically, as shown in FIG. 37(A), until the execution of the first icon change effect is started, the on-board movable body 55k and the below-board movable body 56k are held in a normal standby state (initial position) in which they are not operating. Note that, as shown in FIG. 37(A), the movable body LED 55L equipped on the on-board movable body 55k is not emitting light.
[0266] In the first embodiment, the first icon change performance of the first performance mode and the first icon change performance of the second performance mode differ in the performance mode of the movable body performance using the on-board movable body 55k in the first icon change performance. Using Figures 37(B) to 37(D), the difference in the performance mode of the movable body performance using the on-board movable body 55k between the first icon change performance of the first performance mode and the first icon change performance of the second performance mode will be described.
[0267] First, the movable body effect of the first effect mode in the first icon change effect of the first effect mode will be described using Figures 37(B) to 37(C). When the execution of the first icon change effect of the first effect mode is started, the movable body effect using the on-board movable body 55k is executed, and the drive source of the on-board movable device 55 is driven, and the on-board movable body 55k held in the normal standby state (initial position) shown in Figure 37(B) moves downward (descends). Note that when the execution of the movable body effect is started during the execution of the first icon change effect of the first effect mode, the movable body LED 55L provided on the on-board movable body 55k lights up in blue. Thereafter, the on-board movable body 55k is held in the operating position shown in Figure 37(C). Note that even when the on-board movable body 55k is held in the operating position shown in Figure 37(C), the movable body LED 55L provided on the on-board movable body 55k lights up in blue. Thereafter, when the execution of the movable body performance ends during the execution of the first icon change performance of the first performance mode, the movable body LED 55L provided on the on-board movable body 55k goes out, and the on-board movable body 55k moves upward (rises) from the operating position shown in Fig. 37(C) to the normal standby state (initial position) shown in Fig. 37(B). Note that the operation of the on-board movable body 55k from the standby position shown in Fig. 37(B) to the operating position shown in Fig. 37(C) in the first icon change performance of the first performance mode corresponds to the "movable mode, first movable mode" of the present invention.
[0268] On the other hand, when the first icon change effect of the second effect mode is started and a movable body effect using the on-board movable body 55k is executed, the drive source of the on-board movable device 55 is driven, and the on-board movable body 55k, which is held in the normal standby state (initial position) shown in FIG. 37(B), moves downward (descends). Note that, when the movable body effect starts during the execution of the first icon change effect of the second effect mode, the movable body LED 55L provided on the on-board movable body 55k lights up in red. Thereafter, the on-board movable body 55k is held in the operating position shown in FIG. 37(D). Note that even when the on-board movable body 55k is held in the operating position shown in FIG. 37(D), the movable body LED 55L provided on the on-board movable body 55k lights up in red. Thereafter, when the execution of the movable body performance ends during the execution of the first icon change performance of the first performance mode, the movable body LED 55L provided on the on-board movable body 55k goes out, and the on-board movable body 55k moves upward (rises) from the operating position shown in Figure 37(D) to the normal standby state (initial position) shown in Figure 37(B). Note that in the first icon change performance of the second performance mode, the movement of the on-board movable body 55k from the standby position shown in Figure 37(B) to the operating position shown in Figure 37(D) corresponds to the "moving mode, second moving mode" of the present invention.
[0269] Next, a table showing the execution probability of the first icon change effect shown in Figure 38 will be described. In the first icon change effect selection process (S4507), if the information included in the received change start command is for the special chart 1 change pattern "P01" and the scenario pattern 3 or the scenario pattern 4 is selected, the effect control microcomputer 121 of the first embodiment determines the execution of the first icon change effect at a rate of 100% during the execution of the special chart change effect based on the special chart 1 change pattern based on the table shown in Figure 38. In the first icon change effect selection process (S4507), if the information included in the received change start command is for the special chart 1 change pattern "P02" and the scenario pattern 2 or the scenario pattern 3 is selected, the effect control microcomputer 121 of the first embodiment determines the execution of the first icon change effect at a rate of 100% during the execution of the special chart change effect based on the special chart 1 change pattern based on the table shown in Figure 38. In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P03" and the scenario pattern 1 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the first icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 38. On the other hand, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P03" and the scenario pattern 2 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the first icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 38.In the first icon change performance selection process (S4507), if the information included in the received variation start command is for the special chart 1 variation pattern "P04" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. In the first icon change performance selection process (S4507), if the information included in the received variation start command is for the special chart 1 variation pattern "P05" and the scenario pattern 2 or the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. In the first icon change performance selection process (S4507), when the information contained in the received change start command is any of the special chart 1 change patterns "P06" to "P08", and the corresponding scenario pattern 1 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 38, at a rate of 100% not to execute the first icon change performance during the execution of the special chart change performance based on the special chart 1 change pattern.
[0270] Also, in the first icon change performance selection process (S4507), if the information included in the received variation start command is for the special chart 1 variation pattern "P21" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. On the other hand, in the first icon change performance selection process (S4507), if the information included in the received variation start command is for the special chart 1 variation pattern "P21" and the scenario pattern 7 or the scenario pattern 8 is selected, the performance control microcomputer 121 of the first embodiment determines the non-execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. On the other hand, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 5 or the scenario pattern 6 is selected, the performance control microcomputer 121 of the first embodiment determines the non-execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38.
[0271] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. On the other hand, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 7 or the scenario pattern 8 is selected, the performance control microcomputer 121 of the first embodiment determines the non-execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. On the other hand, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 5 or the scenario pattern 6 is selected, the performance control microcomputer 121 of the first embodiment determines the non-execution of the first icon change performance at a rate of 100% during the execution of the special chart variation performance based on the special chart 1 variation pattern based on the table shown in Figure 38. The allocation rate (selection rate) of the execution lottery table for the first icon change effect shown in FIG. 38 can be changed as appropriate within the range that does not interfere with the game.
[0272] Next, a description will be given of the presentation mode selection table for the first icon change presentation shown in Fig. 39. In the first icon change presentation selection process (S4507), when the presentation control microcomputer 121 of the first embodiment determines to execute the first icon change presentation during execution of the special chart change presentation based on the special chart 1 change pattern, the presentation mode of the first icon change presentation is determined based on the presentation mode selection table for the first icon change presentation shown in Fig. 39.
[0273] First, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P01" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 40% and the second performance mode of the first icon change performance at a rate of 60% based on the performance mode selection table for the first icon change performance shown in Figure 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P01" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 20% and the second performance mode of the first icon change performance at a rate of 80% based on the performance mode selection table for the first icon change performance shown in Figure 39.
[0274] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P02" and the scenario pattern 2 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 100% based on the performance mode selection table for the first icon change performance shown in Fig. 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P02" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 40% and determines the second performance mode of the first icon change performance at a rate of 60% based on the performance mode selection table for the first icon change performance shown in Fig. 39.
[0275] In the first icon change performance selection process (S4507), if the information contained in the received change start command is for special chart 1 change pattern "P03" and the scenario pattern 2 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 100% based on the performance mode selection table for the first icon change performance shown in Figure 39.
[0276] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P04" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 60% and determines the second performance mode of the first icon change performance at a rate of 40% based on the performance mode selection table for the first icon change performance shown in Figure 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P04" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 80% and determines the second performance mode of the first icon change performance at a rate of 20% based on the performance mode selection table for the first icon change performance shown in Figure 39.
[0277] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P05" and the scenario pattern 2 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 100% based on the performance mode selection table for the first icon change performance shown in Fig. 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P05" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 60% and determines the second performance mode of the first icon change performance at a rate of 40% based on the performance mode selection table for the first icon change performance shown in Fig. 39.
[0278] In the first icon change performance selection process (S4507), if the information contained in the received change start command is for special chart 1 change pattern "P21" and scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 20% and determines the second performance mode of the first icon change performance at a rate of 80% based on the performance mode selection table for the first icon change performance shown in Figure 39.
[0279] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 40% and determines the second performance mode of the first icon change performance at a rate of 60% based on the performance mode selection table for the first icon change performance shown in Figure 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 20% and determines the second performance mode of the first icon change performance at a rate of 80% based on the performance mode selection table for the first icon change performance shown in Figure 39.
[0280] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 60% and determines the second performance mode of the first icon change performance at a rate of 40% based on the performance mode selection table for the first icon change performance shown in Figure 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 80% and determines the second performance mode of the first icon change performance at a rate of 20% based on the performance mode selection table for the first icon change performance shown in Figure 39.
[0281] In the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 60% and determines the second performance mode of the first icon change performance at a rate of 40% based on the performance mode selection table for the first icon change performance shown in Figure 39. Also, in the first icon change performance selection process (S4507), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines the first performance mode of the first icon change performance at a rate of 80% and determines the second performance mode of the first icon change performance at a rate of 20% based on the performance mode selection table for the first icon change performance shown in Figure 39. The allocation rate (selection rate) of the presentation mode selection table for the first icon change presentation shown in FIG. 39 can be changed as appropriate within the range that does not interfere with the game.
[0282] 39 above, in the pachinko gaming machine PY1 of the first embodiment, when the result of the jackpot determination is a jackpot, the second presentation mode is more likely to be selected as the presentation mode for the first icon change presentation than the first presentation mode when the result of the jackpot determination is a miss. As a result, it can be said that the likelihood of a jackpot is higher when the movable body presentation of the second presentation mode is executed in the first icon change presentation of the second presentation mode than when the movable body presentation of the first presentation mode is executed in the first icon change presentation of the first presentation mode. In other words, the movement of the on-board movable body 55k from the standby position shown in FIG. 37(B) to the operating position shown in FIG. 37(D) is the movement of the on-board movable body 55k with a higher likelihood of a jackpot than the movement of the on-board movable body 55k from the standby position shown in FIG. 37(B) to the operating position shown in FIG. 37(C). In addition, in the pachinko gaming machine PY1 of the first embodiment, the red light emitted by the movable body LED 55L in the movable body performance of the second performance mode can be said to have a higher expectation of a jackpot than the blue light emitted by the movable body LED 55L in the movable body performance of the first performance mode. This makes it possible for the player to have higher expectations of a jackpot when the movable body performance of the second performance mode is executed in the first icon change performance than when the movable body performance of the first performance mode is executed.
[0283] Next, the execution timing of the first icon change performance in the special chart change performance based on the special chart 1 change pattern will be explained using Figures 40 and 41. First, using Figure 40, the execution timing of the first icon change performance of the first performance mode in the special chart change performance based on the special chart 1 change pattern will be explained. Note that Figure 40 shows the execution timing of the first icon change performance of the first performance mode in the special chart change performance based on any of the special chart 1 change patterns from special chart 1 change patterns "P01" to "P05" and "P21" to "P24".
[0284] As shown in Fig. 40, the execution of the special chart change effect is started, and then the execution of the first icon change effect of the first effect mode is started. At the same time as the execution of the first icon change effect of the first effect mode is started, the execution of the movable body effect of the first effect mode is also started. When the execution of the movable body effect of the first effect mode is started, the drive source of the on-board movable device 55 is driven, and the on-board movable body 55k moves (descends) from the normal standby state (initial position) shown in Fig. 37(B) toward the operating position shown in Fig. 37(C), and is held in the operating position shown in Fig. 37(C).
[0285] Then, when the execution of the movable body effect of the first effect mode is completed in the first icon change effect of the first effect mode, the drive source of the on-board movable device 55 is driven, and the on-board movable body 55k moves (rises) from the operating position shown in FIG. 37(C) toward the normal standby state (initial position) shown in FIG. 37(B), and is held in the normal standby state (initial position) shown in FIG. 37(B). Simultaneously with the completion of the execution of the movable body effect of the first effect mode in the first icon change effect of the first effect mode, the display unit 50a starts displaying a first on-board movable body image KG1 that resembles the on-board movable body 55k having the movable body LED 55L lit in blue. Furthermore, simultaneously with the completion of the execution of the movable body effect of the first effect mode in the first icon change effect of the first effect mode, the icon TA1 of the normal display mode displayed in the icon display area 50e moves to the icon change area 50h.
[0286] Thereafter, the icon TA1 in the normal display mode displayed in the icon change area 50h is changed to the icon TA in one of the expectation degree display modes, the icon TA2 in the first expectation degree display mode, the icon TA3 in the second expectation degree display mode, or the icon TA4 in the third expectation degree display mode. The icon TA in the changed expectation degree display mode is displayed in the icon change area 50h.
[0287] After that, the display of the first on-board movable object image KG1 on the display unit 50a ends, and at the same time, the execution of the first icon change effect of the first effect mode also ends. Also, at the same time that the display of the first on-board movable object image KG1 on the display unit 50a ends, the icon TA of any of the expectation degree display modes, that is, the icon TA2 of the first expectation degree display mode, the icon TA3 of the second expectation degree display mode, or the icon TA4 of the third expectation degree display mode, displayed in the icon change area 50h, will move to the icon display area 50e (see FIG. 40).
[0288] Next, the execution timing of the first icon change performance of the second performance mode in the special chart change performance based on the special chart 1 change pattern will be explained using Figure 41. Note that Figure 41 shows the execution timing of the first icon change performance of the second performance mode in the special chart change performance based on any of the special chart 1 change patterns "P01" to "P05" and "P21" to "P24".
[0289] As shown in Fig. 41, the execution of the special chart change effect is started, and then the execution of the first icon change effect of the second effect mode is started. At the same time as the execution of the first icon change effect of the second effect mode is started, the execution of the movable body effect of the second effect mode is also started. When the execution of the movable body effect of the second effect mode is started, the drive source of the on-board movable device 55 is driven, and the on-board movable body 55k moves (descends) from the normal standby state (initial position) shown in Fig. 37(B) toward the operating position shown in Fig. 37(D), and is held in the operating position shown in Fig. 37(D).
[0290] Then, when the execution of the movable body effect of the second effect mode is completed in the first icon change effect of the second effect mode, the drive source of the on-board movable device 55 is driven, and the on-board movable body 55k moves (rises) from the operating position shown in FIG. 37(D) toward the normal standby state (initial position) shown in FIG. 37(B), and is held in the normal standby state (initial position) shown in FIG. 37(B). Simultaneously with the completion of the execution of the movable body effect of the second effect mode, the display unit 50a starts displaying a second on-board movable body image KG2 that resembles the on-board movable body 55k having the movable body LED 55L lit in red. Furthermore, simultaneously with the completion of the execution of the movable body effect of the second effect mode, the icon TA1 of the normal display mode displayed in the icon display area 50e moves to the icon change area 50h.
[0291] After that, the icon TA1 in the normal display mode displayed in the icon change area 50h is changed to the icon TA3 in the second expectation level display mode or the icon TA4 in the third expectation level display mode. The changed icon TA3 in the second expectation level display mode or the changed icon TA4 in the third expectation level display mode is displayed in the icon change area 50h.
[0292] After that, the display of the second on-board movable object image KG2 on the display unit 50a ends, and at the same time, the execution of the first icon change effect of the second effect mode also ends. Also, at the same time that the display of the second on-board movable object image KG2 on the display unit 50a ends, the icon TA3 of the second expectation level display mode or the icon TA4 of the third expectation level display mode displayed in the icon change area 50h moves to the icon display area 50e.
[0293] Next, using Figures 42 to 48, we will explain an example of a performance when the first icon change performance is executed during the execution of the special chart change performance. First, using Figures 42 to 45, we will explain an example of a performance when the first icon change performance of the first performance mode is executed during the execution of the special chart change performance. Note that Figures 42 to 45 are performance examples when the first icon change performance of the first performance mode is executed in the special chart change performance based on any of the special chart 1 change patterns "P01" to "P05" and "P21" to "P24".
[0294] When the normal presentation mode is set, when the execution of the special chart change presentation starts, as shown in Figure 42 (A), the display unit 50a starts to display the change of the presentation patterns EZ1 to EZ3, and also starts to display the change of the small patterns KZ1 to KZ3.
[0295] In addition, when the execution of the special chart variation effect starts, the icon TA1 in the normal display mode is displayed in the icon display area 50e as shown in Fig. 42 (A). As shown in Fig. 42 (A), the reserved icon HA is not displayed in the reserved icon display area 50d, so the player is notified that the number of reserved special charts 1 is "0".
[0296] 42(A), the icon change area 50h can be provided on the display unit 50a of the image display device 50. In the first embodiment, when the first icon change effect is executed, the icon TA1 in the normal display mode is moved to the icon change area 50h, and the icon TA1 in the normal display mode is changed to the icon in the expectation level display mode in the icon change area 50h.
[0297] When the first icon change effect of the first effect mode is executed during the execution of the special chart change effect, the movable body effect of the first effect mode is executed, and as shown in Fig. 42(B), the on-board movable body 55k covers the upper part of the display unit 50a of the image display device 50, making it difficult to see the upper part of the display unit 50a of the image display device 50. Note that, as shown in Fig. 42(B), the movable body LED 55L provided on the on-board movable body 55k lights up in blue light.
[0298] Thereafter, when the execution of the movable body effect of the first effect mode ends during the execution of the first icon change effect of the first effect mode, the movable body LED 55L provided on the on-board movable body 55k goes out, and the on-board movable body 55k moves (rises) to a predetermined standby position (initial position) as shown in FIG. 42(C) (see FIG. 37(B)). Also, when the execution of the movable body effect of the first effect mode ends during the execution of the first icon change effect of the first effect mode, a first on-board movable body image KG1 imitating the on-board movable body 55k with the movable body LED 55L lit in blue is displayed in the center of the display unit 50a. Also, after the execution of the movable body effect of the first effect mode ends, the first on-board movable body image KG1 is subsequently displayed on the display unit 50a, which can surprise the player and make an impact. Furthermore, as shown in Figure 42 (C), when the execution of the movable body performance is completed during the execution of the first icon change performance in the first performance mode, the icon TA1 in the normal display mode is moved from the icon display area 50e to the icon change area 50h.
[0299] Thereafter, during the execution of the first icon change effect of the first effect mode, a first change trigger image IH1 representing a lightning strike is displayed on the display unit 50a, as shown in Fig. 42(D). The display of the first change trigger image IH1 on the display unit 50a makes it appear to the player as if a lightning strike has struck from the first on-board movable object image KG1 toward the icon TA1 of the normal display mode displayed in the icon change area 50h. In the first icon change effect of the first effect mode of the first embodiment, the display of the first change trigger image IH1 on the display unit 50a changes the icon TA1 of the normal display mode displayed in the icon change area 50h to the icon TA of one of the expectation level display modes, among the icon TA2 of the first expectation level display mode, the icon TA3 of the second expectation level display mode, and the icon TA4 of the third expectation level display mode.
[0300] For example, when the scenario pattern 2 is selected by the performance control microcomputer 121 in the first icon change performance selection process (S4507) and the first icon change performance in the first performance mode is being executed, the performance example shown in Fig. 42(D) proceeds to the performance example shown in Fig. 43(A). As shown in Fig. 43(A), the icon TA2 in the first expectation level display mode is displayed in the icon change area 50h of the display unit 50a.
[0301] Thereafter, when the execution of the first icon change effect of the first effect mode is completed during the execution of the special chart change effect, the display of the first on-board movable body image KG1 on the display unit 50a is terminated, as shown in Fig. 43(B). Also, when the execution of the first icon change of the first effect mode is completed, as shown in Fig. 43(B), the icon TA2 of the first expectation degree display mode is moved from the icon change area 50h of the display unit 50a to the icon display area 50e. Then, as shown in Fig. 43(B), the icon TA2 of the first expectation degree display mode that has been moved to the icon display area 50e continues to be displayed.
[0302] For example, when the scenario pattern 3 is selected by the performance control microcomputer 121 in the first icon change performance selection process (S4507) and the first icon change performance in the first performance mode is executed, the performance example shown in Fig. 42(D) proceeds to the performance example shown in Fig. 44(A). As shown in Fig. 44(A), the icon TA3 in the second expectation level display mode is displayed in the icon change area 50h of the display unit 50a.
[0303] Thereafter, when the execution of the first icon change effect of the first effect mode is completed during the execution of the special chart change effect, the display of the first on-board movable body image KG1 on the display unit 50a is completed, as shown in Fig. 44(B). Also, when the execution of the first icon change effect of the first effect mode is completed, as shown in Fig. 44(B), the icon TA3 of the second expectation degree display mode is moved from the icon change area 50h of the display unit 50a to the icon display area 50e. Then, as shown in Fig. 44(B), the icon TA3 of the second expectation degree display mode continues to be displayed in the icon display area 50e.
[0304] For example, when the scenario pattern 4 is selected by the performance control microcomputer 121 in the first icon change performance selection process (S4507) and the first icon change performance in the first performance mode is being executed, the performance example shown in Fig. 42(D) proceeds to the performance example shown in Fig. 45(A). As shown in Fig. 45(A), the icon TA4 in the third expectation level display mode is displayed in the icon change area 50h of the display unit 50a.
[0305] Thereafter, when the execution of the first icon change effect of the first effect mode is completed during the execution of the special chart change effect, the display of the first on-board movable body image KG1 on the display unit 50a is terminated, as shown in Fig. 45(B). Also, when the execution of the first icon change effect of the first effect mode is completed, as shown in Fig. 45(B), the icon TA4 of the third expectation degree display mode is moved from the icon change area 50h of the display unit 50a to the icon display area 50e. Then, as shown in Fig. 45(B), the icon TA4 of the third expectation degree display mode continues to be displayed in the icon display area 50e.
[0306] Next, using Figures 46 to 48, we will explain an example of a performance when the first icon change performance of the second performance mode is executed during the execution of the special chart change performance. Figures 46 to 48 are performance examples when the first icon change performance of the second performance mode is executed in a special chart change performance based on one of the special chart 1 change patterns "P01" to "P05" and "P21" to "P24".
[0307] When the normal presentation mode is set, when the execution of the special chart change presentation starts, as shown in Figure 46 (A), the display unit 50a starts to display the change of the presentation patterns EZ1 to EZ3, and also starts to display the change of the small patterns KZ1 to KZ3.
[0308] In addition, when the execution of the special chart variation effect starts, the icon TA1 in the normal display mode is displayed in the icon display area 50e as shown in Fig. 46(A). As shown in Fig. 46(A), the reserved icon HA is not displayed in the reserved icon display area 50d, so the player is notified that the number of reserved special charts 1 is "0".
[0309] 46(A), the icon change area 50h can be provided on the display unit 50a of the image display device 50. In the first embodiment, when the first icon change effect is executed, the icon TA1 in the normal display mode is moved to the icon change area 50h, and the icon TA1 in the normal display mode is changed to the icon TA in the expectation level display mode in the icon change area 50h.
[0310] When the first icon change effect of the second effect mode is executed during the execution of the special chart change effect, the movable body effect of the second effect mode is executed, and as shown in Figure 46 (B), the on-board movable body 55k covers the central portion of the display unit 50a of the image display device 50, making it difficult to see the central portion of the display unit 50a of the image display device 50. In addition, as shown in Figure 46 (B), the movable body LED 55L provided on the on-board movable body 55k will light up in red.
[0311] Thereafter, when the execution of the movable body effect of the second effect mode ends during the execution of the first icon change effect of the second effect mode, as shown in FIG. 46(C), the movable body LED 55L provided on the on-board movable body 55k goes out, and the on-board movable body 55k moves (rises) to a predetermined standby position (initial position) (see FIG. 37(B)). Also, when the execution of the movable body effect of the first icon change effect of the second effect mode ends during the execution of the first icon change effect of the second effect mode, a second on-board movable body image KG2 imitating the on-board movable body 55k having the movable body LED 55L lit in red is displayed in the center of the display unit 50a. Furthermore, as shown in FIG. 46(C), when the execution of the movable body effect of the second effect mode ends during the execution of the first icon change effect of the second effect mode, the icon TA1 in the normal display mode is moved from the icon display area 50e to the icon change area 50h.
[0312] Thereafter, during the execution of the first icon change effect of the second effect mode, a second change trigger image IH2 showing two lightning strikes is displayed on the display unit 50a, as shown in Fig. 46(D). By displaying the second change trigger image IH2 on the display unit 50a, it is possible to make it appear to the player that lightning is striking from the second on-board movable object image KG2 toward the icon TA1 in the normal display mode displayed in the icon change area 50h. In the first icon change effect of the second effect mode of the first embodiment, by displaying the second change trigger image IH2 on the display unit 50a, the icon TA1 in the normal display mode displayed in the icon change area 50h is changed to the icon TA3 in the second expectation level display mode or the icon TA4 in the third expectation level display mode.
[0313] For example, when the scenario pattern 3 is selected by the performance control microcomputer 121 in the first icon change performance selection process (S4507) and the first icon change performance in the second performance mode is being executed, the performance example shown in Fig. 46(D) proceeds to the performance example shown in Fig. 47(A). As shown in Fig. 47(A), the icon TA3 in the second expectation level display mode is displayed in the icon change area 50h of the display unit 50a.
[0314] Thereafter, when the execution of the first icon change effect of the second effect mode is completed during the execution of the special chart change effect, the display of the second on-board movable body image KG2 on the display unit 50a is completed, as shown in Fig. 47(B). Also, when the execution of the first icon change effect of the second effect mode is completed, as shown in Fig. 47(B), the icon TA3 of the second expectation degree display mode is moved from the icon change area 50h of the display unit 50a to the icon display area 50e. Then, as shown in Fig. 47(B), the icon TA3 of the second expectation degree display mode is displayed in the icon display area 50e.
[0315] For example, when the scenario pattern 4 is selected by the performance control microcomputer 121 in the first icon change performance selection process (S4507) and the first icon change performance of the second performance mode is being executed, the performance example shown in Fig. 46(D) progresses to the performance example shown in Fig. 48(A). As shown in Fig. 48(A), the icon TA4 of the third expectation level display mode is displayed in the icon change area 50h of the display unit 50a.
[0316] Thereafter, when the execution of the first icon change effect of the second effect mode is completed during the execution of the special chart change effect, the display of the second on-board movable body image KG2 on the display unit 50a is completed, as shown in Fig. 48(B). Also, when the execution of the first icon change effect of the second effect mode is completed, as shown in Fig. 48(B), the icon TA4 of the third expectation degree display mode is moved from the icon change area 50h of the display unit 50a to the icon display area 50e. Then, as shown in Fig. 48(B), the icon TA4 of the third expectation degree display mode continues to be displayed in the icon display area 50e.
[0317] Next, we will specifically explain the second icon change effect and the third icon change effect, which are types of preview effects executed during the execution of the special chart change effect. The second icon change effect is a preview effect that changes the icon TA5 in the change suggestion display mode displayed in the icon display area 50e to the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode. Furthermore, the third icon change effect is a preview effect that changes the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode displayed in the icon display area 50e after the execution of the second icon change effect has ended to the icon TA3 in the second expectation level display mode or the icon TA4 in the third expectation level display mode.
[0318] A table showing the execution probability of the second icon change effect shown in Figure 49 will be described. In the second icon change effect selection process (S4508), when the information included in the received change start command is for the special chart 1 change pattern "P01" and the scenario pattern 3 or the scenario pattern 4 is selected, the effect control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 49, at a rate of 100% not to execute the second icon change effect during the execution of the special chart change effect based on the special chart 1 change pattern. In the second icon change effect selection process (S4508), when the information included in the received change start command is for the special chart 1 change pattern "P02" and the scenario pattern 2 or the scenario pattern 3 is selected, the effect control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 49, at a rate of 100% not to execute the second icon change effect during the execution of the special chart change effect based on the special chart 1 change pattern. In the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P03" and the scenario pattern 1 or the scenario pattern 2 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 49, at a rate of 100%, not to perform the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern. In the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P04" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 49, at a rate of 100%, not to perform the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern.In the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P05" and the scenario pattern 2 or the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 49, at a rate of 100% not to perform the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, even if the information included in the received variation start command is for any of the special chart 1 variation patterns "P06", "P07", or "P08", when the scenario pattern 1 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 49, at a rate of 100% not to perform the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern.
[0319] Also, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P21" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines, at a rate of 100%, not to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49. On the other hand, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P21" and the scenario pattern 7 or the scenario pattern 8 is selected, the performance control microcomputer 121 of the first embodiment determines, at a rate of 100%, to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49.
[0320] Also, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49. On the other hand, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 5 or the scenario pattern 6 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49.
[0321] Also, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49. On the other hand, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 7 or the scenario pattern 8 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49.
[0322] Also, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49. On the other hand, in the second icon change performance selection process (S4508), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 5 or the scenario pattern 6 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the second icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 49. The allocation rate (selection rate) of the execution lottery table for the second icon change effect shown in FIG. 49 can be changed as appropriate within the range that does not interfere with the game.
[0323] Next, a table showing the execution probability of the third icon change effect shown in Figure 50 will be described. In the third icon change effect selection process (S4509), when the information included in the received change start command is for the special chart 1 change pattern "P01" and the scenario pattern 3 or the scenario pattern 4 is selected, the effect control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 50, at a rate of 100%, not to execute the third icon change effect during the execution of the special chart change effect based on the special chart 1 change pattern. In the third icon change effect selection process (S4509), when the information included in the received change start command is for the special chart 1 change pattern "P02" and the scenario pattern 2 or the scenario pattern 3 is selected, the effect control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 50, at a rate of 100%, not to execute the third icon change effect during the execution of the special chart change effect based on the special chart 1 change pattern. In the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P03" and the scenario pattern 1 or the scenario pattern 2 is selected, the performance control microcomputer 121 of the first embodiment determines, at a rate of 100%, not to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50. In the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P04" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines, at a rate of 100%, not to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50.In the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P05" and the scenario pattern 2 or the scenario pattern 3 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 50, at a rate of 100% not to perform the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, even if the information included in the received variation start command is for the special chart 1 variation pattern "P06," "P07," or "P08," when the scenario pattern 1 is selected, the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 50, at a rate of 100% not to perform the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern.
[0324] Also, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P21" and the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50. On the other hand, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P21" and the scenario pattern 7 or the scenario pattern 8 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50.
[0325] Also, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50. On the other hand, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P22" and the scenario pattern 5 or the scenario pattern 6 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50.
[0326] Also, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50. On the other hand, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P23" and the scenario pattern 7 or the scenario pattern 8 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50.
[0327] Also, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 3 or the scenario pattern 4 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% not to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50. On the other hand, in the third icon change performance selection process (S4509), when the information included in the received variation start command is for the special chart 1 variation pattern "P24" and the scenario pattern 5 or the scenario pattern 6 is selected, the performance control microcomputer 121 of the first embodiment determines at a rate of 100% to execute the third icon change performance during the execution of the special chart variation performance based on the special chart 1 variation pattern, based on the table shown in Figure 50.
[0328] Next, the execution timing of the second icon change performance and the execution timing of the third icon change performance in the special chart change performance based on the special chart 1 change pattern will be explained using Figure 51. Note that Figure 51 shows the execution timing of the second icon change performance and the execution timing of the third icon change performance in the special chart change performance based on any of the special chart 1 change patterns from "P21" to "P24".
[0329] As shown in FIG. 51, the execution of the special symbol change effect begins, and first, the execution of the second icon change effect begins. By executing the second icon change effect, the icon TA5 in the change suggestion display mode displayed in the icon display area 50e is changed to the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode. Then, the execution of the second icon change effect in the special symbol change effect ends. Thereafter, during the execution of the special symbol change effect, if a reach is established, the execution of an N reach is initiated, and a predetermined period (e.g., 1 second) has elapsed, the third icon change effect is executed. The start of the execution of an N reach and the elapse of a predetermined period (e.g., 1 second) corresponds to the "specific condition" of the present invention. By executing the third icon change effect, the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode displayed in the icon display area 50e is changed to the icon TA3 in the second expectation display mode or the icon TA4 in the third expectation display mode. Then, the execution of the third icon change effect in the special chart change effect ends.
[0330] Then, as shown in FIG. 51, after the N reach ends in the special chart variation presentation, it progresses through a development presentation to an SP reach. After the SP reach ends in the special chart variation presentation, it progresses through a branching presentation to an SPSP reach (battle reach, alliance reach). This allows the player to understand that they will progress to either the SPSP reach, the battle reach, or the alliance reach, by the icon TA6 in the battle development suggestion display mode or the icon TA7 in the alliance development suggestion display mode displayed on the display unit 50a in the special chart variation presentation. Then, by the icon TA3 in the changed second expectation display mode or the icon TA4 in the changed third expectation display mode, the player understands the possibility that the result of the jackpot determination will be a jackpot, allowing the player to enjoy the SPSP reach (battle reach, alliance reach).
[0331] Next, using Figures 52 to 54, we will explain an example of a performance when the second icon change performance and the third icon change performance are executed during the execution of a special chart change performance. Note that Figures 52(B) to 54 are performance examples when the second icon change performance and the third icon change performance are executed in a special chart change performance based on any of the special chart 1 change patterns "P21" to "P24". First, using Figure 52, we will explain an example of a performance when the second icon change performance is executed during the execution of a special chart change performance.
[0332] When the normal display mode is set, upon completion of the special symbol variation display, as shown in FIG. 52(A), the display unit 50a displays the symbols EZ1-EZ3 as fixed stops in a stop pattern ("5·4·3") indicating a miss, and the small symbols KZ1, KZ2, and KZ3 are also displayed simultaneously in a stop pattern ("5·4·3") indicating a miss. Also, as shown in FIG. 52(A), upon completion of the special symbol variation display, the icon TA disappears from the icon display area 50e. As shown in FIG. 52(A), the first display area 50d1 of the reserved icon display area 50d displays a reserved icon HA5 in a change suggestion display mode, consisting of a text image "Preparing" and a white triangular display image. Displaying the reserved icon HA5 in a change suggestion display mode in the first display area 50d1 allows the player to understand that the icon TA5 in the change suggestion display mode will change to the icon in the development suggestion display mode in the next special symbol variation display. Since the hold icon HA5 in a change suggestion display mode is displayed in the first display area 50d1, the player is notified that the number of reserved special chart 1 is "1".
[0333] When the special chart 1 variable display starts and the special chart change effect is executed, the pending icon HA5 in the change suggestion display mode that was displayed in the first display area 50d1 moves (shifts) from the first display area 50d1 to the icon display area 50e, and becomes the icon TA5 in the change suggestion display mode (see Figure 52(B)). By displaying the icon TA in this way, the player can understand that the next special chart 1 variable display has started. Furthermore, by displaying the icon TA5 in the change suggestion display mode in the icon display area 50e, the player can understand that the icon TA5 in the change suggestion display mode will change to the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode during the execution of the special chart change effect.
[0334] Also, when the execution of the special symbol variation effect is started, as shown in FIG. 52(B), the variation display of the effect symbols EZ1 to EZ3 is started, and the variation display of the small symbols KZ1 to KZ3 is also started.
[0335] Thereafter, when the timing for executing the second icon change effect is reached during execution of the special chart change effect (see FIG. 51), execution of the second icon change effect begins. When the second icon change effect is executed, the first icon change trigger image HE1 is displayed so as to obscure the icon TA5 in the change suggestion display mode displayed in the icon display area 50e with a cloud. By displaying the first icon change trigger image HE1 in the icon display area 50e, it becomes possible to understand that the icon TA5 in the change suggestion display mode will change to the icon TA6 in the battle development suggestion display mode or the icon TA7 in the cooperative development suggestion display mode.
[0336] For example, when the display of the first icon change trigger image HE1 ends, the icon TA5 in the change suggestion display mode displayed in the icon display area 50e changes to the icon TA6 in the battle development suggestion display mode, and the execution of the second icon change performance ends, the performance example shown in Figure 52(C) proceeds to the performance example shown in Figure 53(A).
[0337] When the display of the first icon change trigger image HE1 displayed on the display unit 50a ends, the icon TA5 in the change suggestion display mode displayed in the icon display area 50e changes to the icon TA6 in the battle development suggestion display mode. When the execution of the second icon change effect ends, the icon TA6 in the battle development suggestion display mode is displayed in the icon display area 50e of the display unit 50a, as shown in Fig. 53(A). By displaying the icon TA6 in the battle development suggestion display mode on the display unit 50a, it becomes possible for the player to understand that the special chart change effect will develop into a battle reach.
[0338] During the execution of the special chart variation effect, the left effect symbol EZ1 and the right effect symbol EZ3 temporarily stop in the same stopping pattern (a so-called reach eye), a reach is established, and the execution of the N reach begins. When a predetermined period (for example, 1 second) has elapsed since the execution of the N reach begins, as shown in FIG. 53(B), the left effect symbol EZ1 and the right effect symbol EZ3 temporarily stop in the same stopping pattern ("5·↓·5") on the display unit 50a, and while the N reach is being executed, a third icon change effect is executed. When the third icon change effect is executed, a second icon change trigger image HE2 is displayed, which is composed of a first cloud effect image that covers the icon TA6 in the battle development suggestion display mode displayed in the icon display area 50e, and a second cloud effect image that shows lightning striking the first cloud effect image. In the third icon change performance, when the display of the second icon change trigger image HE2 ends, the icon TA6 in the battle development suggestion display mode displayed in the icon display area 50e changes to the icon TA3 in the second expectation level display mode or the icon TA4 in the third expectation level display mode, and the execution of the third icon change performance ends.
[0339] When the display of the second icon change trigger image HE2 displayed on the display unit 50a ends, the icon TA6 in the battle development suggestion display mode displayed in the icon display area 50e changes to the icon TA3 in the second expectation level display mode, and the execution of the third icon change effect ends, the effect example shown in Figure 53(C) is displayed. As shown in Figure 53(C), the icon TA3 in the second expectation level display mode is displayed in the icon display area 50e. Displaying the icon TA3 in the second expectation level display mode on the display unit 50a makes it possible to have some degree of expectation for a jackpot.
[0340] On the other hand, when the display of the second icon change trigger image HE2 displayed on the display unit 50a ends, the icon TA6 in the battle development suggestion display mode displayed in the icon display area 50e changes to the icon TA4 in the third expectation level display mode, and the execution of the third icon change effect ends, the effect example shown in Figure 53(D) is displayed. As shown in Figure 53(D), the icon TA4 in the third expectation level display mode is displayed in the icon display area 50e. By displaying the icon TA7 in the third expectation level display mode on the display unit 50a, it is possible to create great expectations that the result of the jackpot determination will be a jackpot.
[0341] Next, for example, when the display of the first icon change trigger image HE1 ends, the icon TA5 in the change suggestion display mode displayed in the icon display area 50e changes to the icon TA7 in the cooperative development suggestion display mode, and the second icon change presentation ends, the presentation example shown in Figure 52(C) proceeds to the presentation example shown in Figure 54(A).
[0342] The display of the first icon change trigger image HE1 displayed on the display unit 50a ends, and the icon TA5 in the change suggestion display mode displayed in the icon display area 50e changes to the icon TA7 in the alliance development suggestion display mode, and the execution of the second icon change effect ends. Subsequently, the execution of the second icon change effect ends, and the icon TA7 in the alliance development suggestion display mode is displayed in the icon display area 50e of the display unit 50a, as shown in Figure 54 (A). By displaying the icon TA7 in the alliance development suggestion display mode on the display unit 50a, it becomes possible for the player to understand that the special chart change effect will develop into an alliance reach.
[0343] During the execution of the special chart variation effect, the left effect symbol EZ1 and the right effect symbol EZ3 temporarily stop in the same stopping pattern (a so-called reach eye), a reach is established, and the execution of the N reach begins. When a predetermined period (for example, 1 second) has elapsed since the execution of the N reach begins, as shown in FIG. 54(B), if the left effect symbol EZ1 and the right effect symbol EZ3 temporarily stop in the same stopping pattern ("5·↓·5") on the display unit 50a and are in a reach state, a third icon change effect is executed. When the third icon change effect is executed, the icon TA7 in the cooperative development suggestion display mode displayed in the icon display area 50e is covered with a cloud, and a second icon change trigger image HE2 is displayed in which a cloud is displayed that is casting lightning toward the cloud. In the third icon change performance, when the display of the second icon change trigger image HE2 ends, the icon TA7 in the cooperative development suggestion display mode displayed in the icon display area 50e will be changed to the icon TA3 in the second expectation level display mode or the icon TA4 in the third expectation level display mode.
[0344] When the display of the second icon change trigger image HE2 displayed on the display unit 50a ends, the icon TA7 in the cooperative development suggestion display mode displayed in the icon display area 50e changes to the icon TA3 in the second expectation level display mode, and when the execution of the third icon change effect ends, the effect example shown in Figure 54(C) is displayed. As shown in Figure 54(C), the icon TA3 in the second expectation level display mode is displayed in the icon display area 50e. By displaying the icon TA3 in the second expectation level display mode on the display unit 50a, it is possible to have some expectation of a jackpot.
[0345] On the other hand, when the display of the second icon change trigger image HE2 displayed on the display unit 50a ends, the icon TA7 in the cooperative development suggestion display mode displayed in the icon display area 50e changes to the icon TA4 in the third expectation level display mode, and when the execution of the third icon change effect ends, the effect example shown in Figure 54(D) is displayed. As shown in Figure 54(D), the icon TA4 in the third expectation level display mode is displayed in the icon display area 50e. By displaying the icon TA7 in the third expectation level display mode on the display unit 50a, it is possible to create great expectations that the result of the jackpot determination will be a jackpot.
[0346] Next, the presentation flow of the special chart variation presentation based on the special chart 1 variation pattern in the non-time-saving state in the pachinko gaming machine PY1 of the first embodiment will be explained using Figure 55. When the special chart variation presentation based on the special chart 1 variation pattern starts in the non-time-saving state, as shown in Figure 55, it first branches to "normal miss variation" or "reach → N reach." In the case of "normal miss variation," when the execution of the special chart variation presentation ends, the presentation patterns EZ1, EZ2, and EZ3 are displayed stopped in a stopping mode suggesting a miss (so-called spread). In this case, the special chart variation presentation based on the special chart 1 variation pattern "P07" or "P08" has been executed (see Figure 28). On the other hand, in the case of "reach → N reach," it branches to "when it ends with N reach" or "development presentation → L reach or SP reach" via N reach.
[0347] In the case of "ending with N reach," when the execution of the special chart variation effect is completed, or when a stop display indicating a jackpot (a so-called double number) is displayed, or when a stop display indicating a reach miss (a so-called reach miss number) is displayed, the effect patterns EZ1, EZ2, and EZ3 are displayed. In this case, the special chart variation effect based on the special chart 1 variation pattern "P03" or "P06" is being executed (see Figure 28). On the other hand, in the case of "development effect → L reach or SP reach" after passing through N reach, "when development effect → ends with L reach or SP reach," or after passing through SP reach, it branches to "branch effect."
[0348] In the "case where the development effect ends with an L reach," when the development effect → L reach ends and the execution of the special chart variation effect is completed, the effect symbols EZ1, EZ2, and EZ3 are displayed stopped in a manner suggesting a jackpot (a double number), or in a manner suggesting a reach miss (a reach miss). In this case, the special chart variation effect based on the special chart 1 variation pattern "P02" or "P05" has been executed (see Figure 28). On the other hand, in the "case where the development effect ends with an SP reach," when the development effect → SP reach ends and the execution of the special chart variation effect is completed, the effect symbols EZ1, EZ2, and EZ3 are displayed stopped in a manner suggesting a jackpot (a double number), or in a manner suggesting a reach miss (a reach miss). In this case, the special chart variation effect based on the special chart 1 variation pattern "P01" or "P04" is executed (see Figure 28). Also, in the case of a "branching effect" after an SP reach, it branches to a "battle reach" or a "cooperative reach."
[0349] During the execution of the branching effect, a pre-indication cut-in effect, which is a type of advance notice effect that indicates the progression to the SPSP reach before the execution of the development suggestion effect (expectation suggestion effect) described below, is executed. The pre-indication cut-in effect includes a battle pre-indication cut-in effect that indicates the progression to the battle reach during the execution of the branching effect, and a cooperative pre-indication cut-in effect that indicates the progression to the cooperative reach during the execution of the branching effect.
[0350] In the case of "branching effect → battle reach," a pre-battle suggestion cut-in effect (pre-transition suggestion effect) is executed, suggesting that the game will proceed to the battle reach before the execution of the development suggestion effect described below. Then, during the execution of the branching effect after the pre-battle suggestion cut-in effect is executed, a battle development suggestion effect is executed, suggesting that the game will proceed to the battle reach. After that, the game proceeds to the battle reach, and when the battle reach ends and the execution of the special chart variation effect is completed, the effect patterns EZ1, EZ2, and EZ3 are displayed stopped in a stopping pattern suggesting a jackpot (so-called double numbers), or in a stopping pattern suggesting a reach miss (so-called reach miss numbers). In this case, the special chart variation effect based on the special chart 1 variation pattern "P22" or "P24" is executed (see Figure 28).
[0351] On the other hand, in the case of "branching effect → alliance reach," a alliance advance suggestion cut-in effect is executed during the execution of the branching effect, suggesting that the alliance will progress to the alliance reach before the execution of the development suggestion effect described below. Then, during the execution of the branching effect after the alliance advance suggestion cut-in effect is executed, an alliance development suggestion effect is executed, suggesting that the alliance will progress to the alliance reach. After that, the alliance progresses to the alliance reach, and when the alliance reach ends and the execution of the special chart variation effect is completed, the effect patterns EZ1, EZ2, and EZ3 are displayed stopped in a stopping pattern suggesting a jackpot (so-called double numbers), or in a stopping pattern suggesting a reach miss (so-called reach miss numbers). In this case, the special chart variation effect based on the special chart 1 variation pattern "P21" or "P23" is executed (see Figure 28).
[0352] Here, the control when the performance control microcomputer 121 executes SPSP reach will be explained. In the following, when controlled in the non-time-saving state, the game control microcomputer 101 determines one of the special chart 1 variation patterns "P21" to "P24" by the special chart 1 variation pattern determination table in the non-time-saving state shown in Figure 28.
[0353] When a variation start command including information on any one of the special chart 1 variation patterns "P21" to "P24" is sent to the performance control microcomputer 121, the performance control microcomputer 121 of the first embodiment determines a sub-variation pattern based on information on any one of the special chart 1 variation patterns "P21" to "P24" in the sub-variation pattern selection process (S4504) of the variation performance start process (S4304). Specifically, the performance control microcomputer 121 determines whether to execute an SPSP reach (cooperative fight reach, battle reach), and when it is determined to execute an SPSP reach (cooperative fight reach, battle reach), it refers to the sub-variation pattern selection table for SPSP reach shown in FIG. 56 and determines a sub-variation pattern using a sub-variation pattern random number.
[0354] For example, if the information included in the transmitted fluctuation start command is a command containing information on the special chart 1 fluctuation pattern "P21," in the sub-fluctuation pattern selection process (S4504), the performance control microcomputer 121 determines the sub-fluctuation pattern Q1 at a rate of 100%. In this case, when a fluctuation performance start command containing information on the sub-fluctuation pattern Q1 is transmitted to the image control board 140, the display unit 50a executes a joint battle reach after a branching performance following an SP reach. Then, after a win / loss branching, the performance patterns EZ1, EZ2, and EZ3 are finally displayed stopped in a stopping mode (so-called doublets) that suggests a jackpot.
[0355] Also, if the information included in the transmitted fluctuation start command is a command including information on the special chart 1 fluctuation pattern "P22", in the sub-fluctuation pattern selection process (S4504), the performance control microcomputer 121 determines the sub-fluctuation pattern Q2 at a rate of 100%. In this case, when a fluctuation performance start command including information on the sub-fluctuation pattern Q2 is transmitted to the image control board 140, the display unit 50a executes a battle reach after a branching performance following an SP reach. Then, after a win / loss branching, the performance patterns EZ1, EZ2, and EZ3 are finally displayed stopped in a stopping mode (so-called doublets) that suggests a jackpot.
[0356] If the information included in the transmitted fluctuation start command is a command containing information on the special pattern 1 fluctuation pattern "P23", in the sub-fluctuation pattern selection process (S4504), the performance control microcomputer 121 determines the sub-fluctuation pattern Q3 at a rate of 100%. In this case, when the fluctuation performance start command containing information on the sub-fluctuation pattern Q3 is transmitted to the image control board 140, the display unit 50a executes a joint battle reach after a branching performance following the SP reach. Then, after a win / loss branching, the performance symbols EZ1, EZ2, and EZ3 are displayed stopped in a stopping mode suggesting a reach miss (a so-called reach miss).
[0357] If the information included in the transmitted fluctuation start command is a command including information on the special chart 1 fluctuation pattern "P24", in the sub-fluctuation pattern selection process (S4504), the performance control microcomputer 121 determines the sub-fluctuation pattern Q4 at a rate of 100%. In this case, when the fluctuation performance start command including information on the sub-fluctuation pattern Q4 is transmitted to the image control board 140, the display unit 50a executes a battle reach after a branching performance following the SP reach. Then, after a win / loss branching, the performance symbols EZ1, EZ2, and EZ3 are displayed stopped in a stopping mode suggesting a reach miss (a so-called reach miss).
[0358] Next, a table showing the execution probability of the battle pre-suggestion cut-in effect will be explained using Figure 57 (A). In the advance notice effect selection process (S4510), the effect control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 57 (A), whether the information included in the received variation start command is any of the special chart 1 variation patterns "P01" to "P08", and determines, at a rate of 100%, whether the battle pre-suggestion cut-in effect will be executed during the execution of the special chart variation effect based on the special chart 1 variation pattern.
[0359] Also, in the advance notice performance selection process (S4510), if the information included in the received variation start command is the special chart 1 variation pattern "P21", the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 57(A), at a rate of 100%, not to execute the battle pre-suggestion cut-in performance during the execution of the special chart variation performance based on the special chart 1 variation pattern. In the advance notice performance selection process (S4510), if the information included in the received variation start command is the special chart 1 variation pattern "P22", the performance control microcomputer 121 of the first embodiment determines, based on the table shown in Figure 57(A), at a rate of 100%, to execute the battle pre-suggestion cut-in performance during the execution of the special chart variation performance based on the special chart 1 variation pattern. In the preview effect selection process (S4510), if the information included in the received variation start command is the special chart 1 variation pattern "P23," the performance control microcomputer 121 of the first embodiment determines, based on the table shown in FIG. 57(A), that the battle pre-suggestion cut-in effect will not be executed at a rate of 100% during the execution of the special chart variation effect based on the special chart 1 variation pattern. In the preview effect selection process (S4510), if the information included in the received variation start command is the special chart 1 variation pattern "P24," the performance control microcomputer 121 of the first embodiment determines, based on the table shown in FIG. 57(A), that the battle pre-suggestion cut-in effect will be executed at...
Claims
[Claim 1] a game control means capable of determining whether or not to control a game into a special game state advantageous to a player based on the establishment of a predetermined condition; A performance control means capable of executing a performance of a judgment result suggesting a result of the judgment; A power supply operation unit is provided on the rear side of the gaming machine and is capable of turning on the power, The game control means includes: A specific measurement number based on the number of prize balls given to a player can be measured, When the special game state is controlled, if the specific measurement number is equal to or greater than a predetermined reference number and the special game state ends, the game can be controlled to be disabled; When information related to the game is not erased in accordance with an operation on the power supply operation unit after controlling the game to be unplayable, the control to make the game unplayable is maintained, whereas when information related to the game is erased in accordance with an operation on the power supply operation unit after controlling the game to be unplayable, the control to make the game unplayable is released; The performance control means includes: In the determination result presentation, a transition to an expectation transition presentation suggesting an expectation level controlled in the special game state is possible; In the determination result presentation, an expectation suggestion presentation that suggests a transition to the expectation transition presentation can be executed, In the determination result performance, before executing the expectation suggestion performance, a pre-transition suggestion performance that suggests a transition to the expectation transition performance can be executed; The expectation transition effect includes a low expectation transition effect and a high expectation transition effect which indicates that the expectation of being controlled to the special game state is higher than that of the low expectation transition effect. The expectation suggestion performance includes a low expectation suggestion performance that suggests a transition to the low expectation transition performance, and a high expectation suggestion performance that suggests a transition to the high expectation transition performance, This gaming machine is characterized in that, at a predetermined branching point in the judgment result presentation, if the low expectation suggestion presentation is executed, a transition is made to the low expectation transition presentation, and, on the other hand, at the predetermined branching point, if the high expectation suggestion presentation is executed, a transition is made to the high expectation transition presentation.
