Transport system

By segregating floor map and connection relationship information, the system reduces processing loads and information updates in multi-floor conveyance systems, ensuring efficient route control.

JP2024132609AActive Publication Date: 2024-10-01DAIFUKU CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023043451
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2024-10-01
Estimated Expiration
2043-03-17

AI Technical Summary

Technical Problem

Existing conveyance systems face increased processing loads and information updates when route layouts change, particularly in multi-floor environments, due to the distribution of comprehensive route information to control devices.

Method used

The system segregates floor map information and connection relationship information, allowing updates to be performed only on affected areas, reducing the amount of information processed by the control device.

Benefits of technology

This configuration minimizes the amount of updated information in the control device, maintaining efficient control over intra-floor and connection routes even with layout changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024132609000001_ABST
    Figure 2024132609000001_ABST
Patent Text Reader

Abstract

To provide a technology that can reduce the amount of information to be updated in a control device when the layout of a route is changed in a transport system that has a plurality of floors and the control device that controls transport vehicles.SOLUTION: The control device is configured to: hold floor map information M1 for a plurality of floors and connection relationship information M2, which is information indicating a connection relationship between different floors connected by a connection route; and a control transport vehicle on intra-floor routes and the connection routes based on the floor map information M1 and the connection relationship information M2. A management device 20 holds the floor map information M1 for the plurality of floors in a state of being separable for each floor, and holds the connection relationship information M2 in a state of being separable from the floor map information M1 for a plurality of floors, and performs an update process of the floor map information M1 and the connection relationship information M2 for the control device.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a transport system that transports articles by means of a transport vehicle. [Background technology]

[0002] An example of such a transport system is disclosed in Japanese Patent Laid-Open Publication No. 2004-227058 (Patent Document 1). In the following description of the background art, the reference numerals in Patent Document 1 are cited in parentheses. A transport vehicle system (1) as a transport system disclosed in Patent Document 1 includes a plurality of bays (3), transport vehicles (10) that transport articles within each bay (3) and between the bays (3), and an area controller (8) that is arranged for each bay (3) and manages the transport vehicles (10) in the bay (3). A travel path (2) on which the transport vehicles (10) travel is provided within each bay (3) and between the bays (3), and transport route information including map information related to all the travel paths (2) is stored in a storage means provided in each area controller (8). In this transport vehicle system (1), when the layout of the travel path (2) is changed, the updated transport route information is distributed to each area controller (8) to update the transport route information. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2004-227058 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the technology described in Patent Document 1, when the layout of the travel path is changed, updated transport path information including map information on all the travel paths is delivered to a control device (specifically, each of the multiple area controllers equipped in the control device) that controls the transport vehicle, and the transport path information is updated. Therefore, the amount of information updated in the control device is likely to be large, and the processing load of the update work (the processing amount and processing time of the calculation device, etc.) is likely to be large. Although not specified in Patent Document 1, there are cases where the transport system has multiple floors, and each of the multiple floors is provided with an in-floor route through which the transport vehicle can move, and a connection route connecting different floors is provided. In such a transport system, if the layout of the route (in-floor route, connection route, etc.) is changed, if the updated route information including information on all the routes is delivered to the control device, the amount of information updated in the control device is likely to be large, and the processing load of the update work is likely to be large, as in the transport system of Patent Document 1.

[0005] Therefore, it is desirable to realize technology that can reduce the amount of information updated in a control device when the layout of a route is changed in a transport system that has multiple floors and a control device that controls transport vehicles. [Means for solving the problem]

[0006] The conveying system according to the present disclosure is a conveying system for conveying items by a conveying vehicle, comprising a plurality of floors, an in-floor route provided on each of the plurality of floors along which the conveying vehicle can move, a control device for controlling the conveying vehicle, and a management device for managing data updates of the control device, wherein connection routes are provided connecting different floors, and the conveying vehicle moves across the plurality of floors through the connection routes, and the control device holds floor map information which is information about the in-floor route for each of the plurality of floors, and connection relationship information which is information indicating the connection relationships between the different floors via the connection routes, and is configured to control the conveying vehicle on the in-floor route and the connection routes based on the floor map information and the connection relationship information, and the management device holds the floor map information for the plurality of floors in a state in which it can be separated for each floor, and holds the connection relationship information in a state in which it can be separated from the floor map information for the plurality of floors, and performs an update process for the floor map information and the connection relationship information for the control device.

[0007] According to this configuration, the control device holds floor map information and connection relationship information for multiple floors, so that the transport vehicle can be appropriately controlled for both the intra-floor route and the connection route. According to this configuration, the management device that performs an update process of the floor map information and the connection relationship information for the control device holds floor map information for multiple floors in a state in which it can be separated for each floor, and holds the connection relationship information in a state in which it can be separated from the floor map information for multiple floors. Therefore, when the layout of the route such as the intra-floor route or the connection route is changed, the control device can update only the information of the route related to the change in the layout. Therefore, even when only a part of the layout is changed, it is easier to keep the amount of information updated in the control device small compared to when it is necessary to update the information of all routes (i.e., the floor map information and the connection relationship information for all floors) in the control device.

[0008] As described above, according to this configuration, when the layout of the routes is changed in a transport system having multiple floors and a control device that controls transport vehicles, the amount of information updated in the control device can be kept small.

[0009] Further features and advantages of the transport system will become apparent from the following description of the embodiments taken in conjunction with the drawings. [Brief description of the drawings]

[0010] [Figure 1] Schematic diagram of the transport system [Diagram 2] Floor route and connecting route diagram [Diagram 3] Block diagram showing part of the transport system [Figure 4] Diagram of creating update data [Diagram 5] Explanation of update process [Figure 6] Explanation of update process DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] An embodiment of the conveying system will be described with reference to the drawings. As shown in Fig. 1, the conveying system 100 is a system that conveys an article 2 (see Fig. 2) by a conveying vehicle 1. The article 2 is, for example, a FOUP (Front Opening Unified Pod) that accommodates a semiconductor wafer.

[0012] The transport vehicle 1 moves along a moving path to transport the item 2. The transport vehicle 1 is an unmanned transport vehicle. The moving path includes an intra-floor path 4 and a connection path 5, which will be described later. Although only one station 3 is shown in FIG. 2, multiple stations 3 are set along the moving path (here, the intra-floor path 4). In response to a transport command from a control device C (in this embodiment, a control unit 10), which will be described later, the transport vehicle 1 transports the item 2 from the source station 3 specified in the transport command to the destination station 3 specified in the transport command. Although not shown in the figure, the station 3 is provided with an item support unit that supports the item 2, and the item 2 is transferred between the transport vehicle 1 and the item support unit at the station 3. The item support unit is, for example, a load port of a processing device that processes the item 2 (or the contents contained in the item 2), an input / output port of a storage device that stores the item 2, a storage shelf that temporarily stores the item 2, or the like.

[0013] As shown in FIG. 1, the transport system 100 includes a plurality of floors F. The plurality of floors F of the transport system 100 may include, for example, a plurality of floors F arranged vertically, or a plurality of floors F spaced apart horizontally, or both. In the example shown in FIG. 1, the facility to which the transport system 100 is applied includes two buildings P, a first building P1 and a second building P2, each of which includes two floors F, a first floor F1 and a third floor F3. In each of the first building P1 and the second building P2, the first floor F1 and the third floor F3 are arranged vertically. In addition, the floor F of the first building P1 and the floor F of the second building P2 are spaced apart horizontally.

[0014] The transport system 100 includes an intra-floor path 4 that is provided on each of a plurality of floors F and along which the transport vehicle 1 can move, and a connection path 5 that connects different floors F. The transport vehicle 1 moves through the connection path 5 across the plurality of floors F. For example, when a station 3 from which an item 2 is to be transported and a station 3 to which the item 2 is to be transported are located on different floors F, the transport vehicle 1 moves through the connection path 5 across the plurality of floors F.

[0015] FIG. 2 shows an intra-floor path 4 provided on the first floor F1 of the first building P1, an intra-floor path 4 provided on the third floor F3 of the first building P1, and a connecting path 5 connecting the first floor F1 and the third floor F3. Note that FIG. 2 conceptually shows each path, such as showing two intra-floor paths 4 arranged in a plan view, which are actually formed to be aligned vertically, and does not necessarily accurately represent the actual path. The evacuation path 6 shown in FIG. 2 is a path for the transport vehicle 1 to evacuate at the destination floor F when the transport vehicle 1 moves to another floor F through the connecting path 5. The situation in which the transport vehicle 1 evacuates to the evacuation path 6 will be described later.

[0016] The movement paths such as the intra-floor path 4 and the connection path 5 may be formed physically or virtually. The intra-floor path 4 is formed physically by, for example, a rail. In this case, the rail is supported by being suspended from the ceiling. In addition, the movement paths such as the intra-floor path 4 and the connection path 5 may be a path along which the transport vehicle 1 moves by the travelling operation of the transport vehicle 1 (specifically, the operation of rotating the drive wheels) (hereinafter referred to as a "travelling path"), or a path along which the transport vehicle 1 moves by being transported by another device (hereinafter referred to as a "non-travelling path"). For example, the intra-floor path 4 and the connection path 5 connecting floors F spaced apart in the horizontal direction (for example, an inter-building path connecting floors F of different buildings P) are considered to be travelling paths. In addition, for example, the connection path 5 connecting floors F arranged vertically (for example, an inter-floor path connecting different floors F of the same building P) is considered to be a non-travelling path. In this case, the non-travelling path is, for example, a path along which the transport vehicle 1 moves by being raised and lowered by a lifting device.

[0017] The conveyance system 100 includes a control device C (see FIG. 3) that controls the conveyance vehicle 1. In this embodiment, the control device C includes a plurality of control units 10. The plurality of control units 10 are configured to be able to communicate with each other. The control device C (here, each of the plurality of control units 10) includes an arithmetic processing device such as a CPU (Central Processing Unit) and peripheral circuits such as a memory, and the functions of the control device C (here, each of the functions of the plurality of control units 10) are realized by cooperation between these hardware and a program (software) executed on the hardware such as the arithmetic processing device.

[0018] Each of the multiple floors F is subject to management by one or more of the multiple control units 10. Each of the multiple control units 10 manages the transport vehicle 1 (for example, controls the movement of the transport vehicle 1) on one or more floors F that are the management target of the respective control units. In this embodiment, the transport system 100 includes the same number of control units 10 as the number of floors F. Each of the multiple floors F is subject to management by one control unit 10, and each of the multiple control units 10 manages one floor F. FIG. 3 shows four control units 10 corresponding to the four floors F shown in FIG. 1. In FIG. 3, the reference numbers (F1, F3) of the floors F attached to the two-dot chain line rectangle represent the floors F that are the management target of the control units 10 surrounded by the rectangle. For example, the top control unit 10 in FIG. 3 is the control unit 10 that manages the third floor F3 of the first building P1.

[0019] The control unit 10 at least knows the current position of the transport vehicle 1 present on the floor F that is the object of management of the control unit 10. In this embodiment, the transport vehicle 1 is configured to recognize its own current position, and the control unit 10 knows the current position of the transport vehicle 1 by acquiring information on the current position of the transport vehicle 1 from the transport vehicle 1.

[0020] The control device C holds floor map information M1 for each of the multiple floors F (in other words, floor map information M1 for all floors F). In this embodiment, each of the multiple control units 10 holds at least floor map information M1 for the floor F that it manages, and the control device C equipped with these multiple control units 10 holds floor map information M1 for all floors F. The floor map information M1 is information on an intra-floor route 4 (e.g., map information such as the shape of a route). For example, the floor map information M1 for the first floor F1 of the first building P1 is information on an intra-floor route 4 provided on the first floor F1 of the first building P1. In this embodiment, the floor map information M1 includes information on the intra-floor route 4 as well as information on the stations 3 provided along the intra-floor route 4.

[0021] In this embodiment, each of the multiple control units 10 is configured to hold floor map information M1 of all floors F. In the example shown in FIG. 3, each of the four control units 10 holds floor map information M1 of the four floors F. In FIG. 3 and FIGS. 4 to 6 to be referred to later, "P1_1F" represents floor map information M1 of the first floor F1 of the first building P1, "P1_3F" represents floor map information M1 of the third floor F3 of the first building P1, "P2_1F" represents floor map information M1 of the first floor F1 of the second building P2, and "P2_3F" represents floor map information M1 of the third floor F3 of the second building P2. In addition, in FIGS. 3 to 6, "FL" represents connection relationship information M2 described below. In the following, floor map information M1 of the Nth floor FN (M is 1 or 2, N is 1 or 3) of the Mth building PM may be referred to as floor map information M1[PM_NF]. Also, connection relationship information M2 may be referred to as connection relationship information M2[FL].

[0022] The control device C holds the connection relationship information M2. In this embodiment, each of the multiple control units 10 holds the connection relationship information M2. The connection relationship information M2 is information indicating the connection relationship between different floors F by the connection path 5. While the floor map information M1 is information for each floor F, the connection relationship information M2 indicates information on the connection relationship between different floors F by the connection path 5 for all the connection paths 5. By referring only to the information on the connection path 5 (for example, map information such as the shape of the path), it is not possible to identify the two floors F connected by the connection path 5, but by referring to the connection relationship information M2, it is possible to identify the two floors F connected by the connection path 5. For example, when the transport vehicle 1 moves to another floor F through the connection path 5, the floor map information M1 used to control the transport vehicle 1 is switched to the floor map information M1 of the destination floor F, but by referring to the connection relationship information M2, it is possible to determine which floor F the floor map information M1 of the destination floor F is the floor map information M1 of.

[0023] In this embodiment, the information on the connection path 5 is included in the floor map information M1. Specifically, the floor map information M1 includes information on the intra-floor path 4 as well as information on the connection path 5 connected to the intra-floor path 4. For example, information on the connection path 5 connecting the first floor F1 and the third floor F3 of the first building P1 shown in FIG. 2 is included in the floor map information M1 of the first floor F1 and the floor map information M1 of the third floor F3. However, the floor map information M1 of the first floor F1 does not include information that the destination of the connection path 5 is the third floor F3, and the floor map information M1 of the third floor F3 does not include information that the destination of the connection path 5 is the first floor F1. Therefore, for example, when the transport vehicle 1 moves from the first floor F1 to the third floor F3 through the connection path 5, it can be determined that the floor map information M1 of the third floor F3, which is the destination of the connection path 5, is the floor map information M1 of the third floor F3, by referring to the connection relationship information M2.

[0024] In addition, when the transport vehicle 1 moves to another floor F through the connection path 5, a situation may occur in which the floor map information M1 used to control the transport vehicle 1 cannot be switched to the latest floor map information M1 of the destination floor F. For example, the above situation may occur when the update of the floor map information M1 for the control unit 10 that manages the destination floor F is delayed, or when the communication situation is poor and the transport vehicle 1 cannot obtain the latest floor map information M1 from the control unit 10 that manages the destination floor F. In this embodiment, when such a situation occurs, the transport vehicle 1 is configured to move to the evacuation path 6 included in the intra-floor path 4 of the destination floor F. In this embodiment, information necessary for moving from the connection path 5 to the evacuation path 6, such as information that associates the connection path 5 with the evacuation path 6, is included in the connection relationship information M2.

[0025] The control device C is configured to control the transport vehicle 1 on the intra-floor path 4 and the connection path 5 based on the floor map information M1 and the connection relationship information M2. In this embodiment, each of the multiple control units 10 is configured to control the transport vehicle 1 on the intra-floor path 4 of the floor F that is the object of management of each of them and the connection path 5 connected to the floor F based on the floor map information M1 and the connection relationship information M2. When the transport vehicle 1 moves through the connection path 5 between two floors F that are the object of management of different control units 10, the control unit 10 that controls the transport vehicle 1 is switched from the control unit 10 that manages the floor F before the movement to the control unit 10 that manages the floor F of the movement destination as the transport vehicle 1 moves.

[0026] In this embodiment, floor map information M1 and connection relationship information M2 are distributed from the control device C (specifically, the control unit 10, the same applies hereinafter in this paragraph) to the transport vehicle 1, and the transport vehicle 1 moves along the intra-floor route 4 and the connection route 5 based on its own current position, the floor map information M1 and the connection relationship information M2 in response to a command (e.g., a transport command) from the control device C. Note that, if the route along which the transport vehicle 1 moves includes a route along which the transport vehicle 1 moves as a result of being transported by another device (the non-travel route described above), the control of the transport vehicle 1 by the control device C also includes the control of the transport vehicle 1 via the other device.

[0027] In this way, the floor map information M1 and the connection relationship information M2 held by the control device C (specifically, the control unit 10) are used to control the transport vehicle 1, but when the layout of the movement path of the transport vehicle 1, such as the intra-floor path 4 and the connection path 5, is changed, it is necessary to update the floor map information M1 and the connection relationship information M2. The update of the floor map information M1 and the connection relationship information M2 will be described below.

[0028] The conveyance system 100 includes a management device 20 (see FIG. 4) that manages data updates of the control device C (a plurality of control units 10 in this embodiment). The management device 20 holds floor map information M1 of a plurality of floors F in a state in which the information can be separated for each floor F, and holds connection relationship information M2 in a state in which the information can be separated from the floor map information M1 of a plurality of floors F. In the example shown in FIG. 4, the management device 20 holds floor map information M1 of the first floor F1 of the first building P1, floor map information M1 of the third floor F3 of the first building P1, floor map information M1 of the first floor F1 of the second building P2, floor map information M1 of the third floor F3 of the second building P2, and connection relationship information M2 in a state in which the information can be separated from each other.

[0029] The management device 20 performs an update process of the floor map information M1 and the connection relationship information M2 for the control device C (in this embodiment, a plurality of control units 10). The update process of the information such as the floor map information M1 and the connection relationship information M2 for the control device C (specifically, the control unit 10, the same applies hereinafter in this paragraph) is performed by installing new information reflecting the change in the layout (specifically, information included in update data D, which will be described later) in the control device C. By installing the new information in the control device C, the information stored in the control device C is rewritten with the new information.

[0030] When an intra-floor route 4 is changed, the management device 20 performs an update process of only the floor map information M1 of the floor F on which the changed intra-floor route 4 is located. The update process of the floor map information M1 is performed for at least the control unit 10 that manages the floor F on which the changed intra-floor route 4 is located. In this embodiment, each of the multiple control units 10 holds floor map information M1 for all floors F. Therefore, the update process of the floor map information M1 is performed for all control units 10.

[0031] When a change is made to the connection path 5 (such as the addition or deletion of the connection path 5), not only the connection relationship information M2 but also the floor map information M1 of the floor F connected to the connection path 5 is updated. For example, when a connection path 5 is added, information on the connection points between the intra-floor path 4 and the connection path 5 is added to the floor map information M1 of the floor F connected to the connection path 5, and when a connection path 5 is deleted, information on the connection points between the intra-floor path 4 and the connection path 5 is deleted from the floor map information M1 of the floor F connected to the connection path 5. In this embodiment, information on the connection path 5 is included in the floor map information M1. Therefore, when a connection path 5 is added, information on the connection path 5 is added to the floor map information M1 of the floor F connected to the connection path 5 in addition to information on the connection points between the intra-floor path 4 and the connection path 5. Also, when a connection path 5 is deleted, information on the connection path 5 is deleted from the floor map information M1 of the floor F connected to the connection path 5 in addition to information on the connection points between the intra-floor path 4 and the connection path 5.

[0032] In view of the above, when the connection path 5 is changed, the management device 20 performs an update process of the connection relationship information M2 and the floor map information M1 of the floor F connected to the changed connection path 5. For example, when the connection path 5 shown in FIG. 2 is changed, the floors F connected to the changed connection path 5 are the first floor F1 of the first building P1 and the third floor F3 of the first building P1. Therefore, the management device 20 performs an update process of the connection relationship information M2, the floor map information M1 of the first floor F1 of the first building P1, and the floor map information M1 of the third floor F3 of the first building P1. The update process of the connection relationship information M2 is performed for all the control units 10. On the other hand, the update process of the floor map information M1 is performed for at least the control unit 10 that manages the floor F connected to the changed connection path 5. In this embodiment, each of the multiple control units 10 holds the floor map information M1 of all the floors F. Therefore, the update process of the floor map information M1 is performed for all the control units 10.

[0033] As shown in Fig. 4, in this embodiment, the management device 20 includes a database 21 in which the latest floor map information M1 and the latest connection relationship information M2 are stored, and an update data creation unit 22 that creates update data D to be distributed to the control device C (in this embodiment, the control unit 10). In this embodiment, the management device 20 manages the floor map information M1 and the connection relationship information M2 stored in the database 21 using a version control system. The functions of the update data creation unit 22 and the update processing unit 24 described below are realized by cooperation between hardware such as a calculation processing device and a program (software) executed on the hardware.

[0034] In this embodiment, the management device 20 includes an update processing unit 24 (see FIG. 3 and FIG. 5) that installs information included in the update data D in the control device C (specifically, the control unit 10). Here, the update processing unit 24 is provided for each of the control units 10, and each of the update processing units 24 is configured to be able to communicate with the corresponding control unit 10. Each of the update processing units 24 holds the latest floor map information M1 and the latest connection relationship information M2 of the floor F that is the object of management of the corresponding control unit 10. In FIG. 3 and FIG. 5, in order to easily grasp the correspondence between the control unit 10 and the update processing unit 24, the control unit 10, together with the update processing unit 24 provided for the control unit 10, is surrounded by a two-dot chain line rectangle representing the floor F that is the object of management. Note that the control unit 10 may be configured to have the function of the update processing unit 24.

[0035] Although details are omitted, in this embodiment, the update processing unit 24 is configured to be able to reflect the change in station information in the floor map information M1 when the station information is changed (for example, when station 3 is added) on the floor F managed by the corresponding control unit 10. The floor map information M1 reflecting the change in station information is installed in the corresponding control unit 10 by the update processing unit 24, and then distributed from the control unit 10 to other control units 10.

[0036] When there is a change in the intra-floor route 4, the update data creation unit 22 reads out from the database 21 the latest floor map information M1 of the floor F on which the changed intra-floor route 4 is located, and reflects the change in the intra-floor route 4 in the floor map information M1 to obtain new floor map information M1. The update data creation unit 22 then creates update data D including the new floor map information M1. By installing this update data D in the control device C (specifically, the control unit 10) (in this embodiment, installing via the corresponding update processing unit 24), the floor map information M1 for the control device C (specifically, the control unit 10) is updated.

[0037] When the connection path 5 is changed, the update data creation unit 22 reads out the latest floor map information M1 and the latest connection relationship information M2 of the floor F connected to the changed connection path 5 from the database 21, and reflects the change in the connection path 5 in the floor map information M1 and the connection relationship information M2 to obtain new floor map information M1 and new connection relationship information M2. Then, the update data creation unit 22 creates update data D combining the new floor map information M1 and the new connection relationship information M2 (in other words, update data D including the new floor map information M1 and the new connection relationship information M2). By installing this update data D in the control device C (specifically, the control unit 10) (in this embodiment, installing via the corresponding update processing unit 24), the floor map information M1 and the connection relationship information M2 for the control device C (specifically, the control unit 10) are updated.

[0038] The creation of the update data D will be specifically described with reference to Fig. 4. In Figs. 4 to 6, "PM_NF'" (M is 1 or 2, N is 1 or 3) represents new floor map information M1 (hereinafter may be referred to as floor map information M1[PM_NF']) obtained by reflecting a change in the layout in floor map information M1[PM_NF]. Also, "FL'" represents new connection relationship information M2 (hereinafter may be referred to as connection relationship information M2[FL']) obtained by reflecting a change in the layout in connection relationship information M2[FL].

[0039] 4 assumes that there is a change in the connection path 5 connecting the first floor F1 of the first building P1 and the third floor F3 of the first building P1. In this case, the update data creation unit 22 reads out the latest floor map information M1[P1_1F] and the latest floor map information M1[P1_3F] from the database 21 to the workspace 23 as the floor map information M1 of the floor F connected to the changed connection path 5. Then, the update data creation unit 22 reflects the change in the connection path 5 in the floor map information M1[P1_1F] and the floor map information M1[P1_3F] read out to the workspace 23 to obtain the floor map information M1[P1_1F'] and the floor map information M1[P1_3F']. The update data creation unit 22 stores the floor map information M1[P1_1F'] and the floor map information M1[P1_3F'] in the database 21. As a result, the change in the floor map information M1 is reflected in the database 21.

[0040] Furthermore, the update data creation unit 22 reads out the latest connection relationship information M2[FL] from the database 21. Then, the update data creation unit 22 reflects the change in the connection path 5 in the connection relationship information M2[FL] to obtain the connection relationship information M2[FL']. The update data creation unit 22 stores the connection relationship information M2[FL'] in the database 21. As a result, the change in the connection relationship information M2 is reflected in the database 21.

[0041] Then, the update data creation unit 22 creates update data D that combines the floor map information M1[P1_1F'] in the workspace 23 and the connection relationship information M2[FL'] stored in the database 21, and also creates update data D that combines the floor map information M1[P1_3F'] in the workspace 23 and the connection relationship information M2[FL'] stored in the database 21. In this embodiment, the update data creation unit 22 further creates update data D that includes only the connection relationship information M2[FL'].

[0042] Here, when the intra-floor path 4 is changed, the floor F on which the changed intra-floor path 4 is provided is set as the "first target floor", and when the connection path 5 is changed, the floor F connected to the changed connection path 5 is set as the "second target floor". In this embodiment, when the intra-floor path 4 is changed, the management device 20 performs an update process of the floor map information M1 of the first target floor for the control unit 10 that manages the first target floor, with priority over other control units 10. Also, in this embodiment, when the connection path 5 is changed, the management device 20 performs an update process of the floor map information M1 of the second target floor for the control unit 10 that manages the second target floor, with priority over other control units 10. Note that when the connection path 5 is changed, the management device 20 also performs an update process of the connection relationship information M2 for the control unit 10 that manages the second target floor, with priority over other control units 10.

[0043] In this embodiment, the management device 20 performs an update process of the floor map information M1 of the target floor (first target floor or second target floor, the same applies hereinafter in this paragraph) for the control unit 10 that manages the target floor (if there is a change in the connection path 5, the floor map information M1 and the connection relationship information M2, the same applies hereinafter), and then performs an update process of the floor map information M1 of the target floor for the other control units 10, thereby performing an update process of the floor map information M1 according to the above priority order. Specifically, when there is a change in the floor path 4, the management device 20 performs an update process of the floor map information M1 for the first target control unit, which is the control unit 10 that manages the first target floor, and then distributes the updated floor map information M1 from the first target control unit to the first non-target control unit, which is the other control unit 10, and performs an update process of the floor map information M1 for the first non-target control unit. Furthermore, when there is a change in the connection path 5, the management device 20 performs an update process of the floor map information M1 for the second target control unit, which is the control unit 10 that manages the second target floor, and then distributes the updated floor map information M1 from the second target control unit to the second non-target control unit, which is the other control unit 10, thereby performing an update process of the floor map information M1 for the second non-target control unit. Note that, under the control of the management device 20, the first target control unit and the second target control unit distribute the updated floor map information M1 to the other control units 10.

[0044] The update process performed by the management device 20 will be specifically described with reference to Figures 5 and 6. In Figures 5 and 6, it is assumed that the connection path 5 connecting the first floor F1 of the first building P1 and the third floor F3 of the first building P1 is changed, and the update process is performed using the update data D shown in Figure 4. Therefore, here, the first floor F1 of the first building P1 and the third floor F3 of the first building P1 are the above-mentioned "second target floors", and the update process of the floor map information M1 and the connection relationship information M2 for the control unit 10 that manages the first floor F1 of the first building P1 and the control unit 10 that manages the third floor F3 of the first building P1 is performed with priority over the control unit 10 that manages the first floor F1 of the second building P2 and the control unit 10 that manages the third floor F3 of the second building P2.

[0045] Specifically, as shown in Fig. 5, the update processing unit 24 provided for the control unit 10 that manages the first floor F1 of the first building P1 acquires update data D combining the floor map information M1[P1_1F'] and the connection relationship information M2[FL'], and updates the floor map information M1 and the connection relationship information M2 held by the update processing unit 24. Then, the update processing unit 24 installs the updated floor map information M1[P1_1F'] and the updated connection relationship information M2[FL'] in the control unit 10 that manages the first floor F1 of the first building P1. This completes the update process for the floor map information M1 and the connection relationship information M2 for the control unit 10 that manages the first floor F1 of the first building P1.

[0046] 5, the update processing unit 24 provided for the control unit 10 that manages the third floor F3 of the first building P1 acquires update data D combining the floor map information M1[P1_3F'] and the connection relationship information M2[FL'], and updates the floor map information M1 and the connection relationship information M2 held by the update processing unit 24. The update processing unit 24 then installs the updated floor map information M1[P1_3F'] and the updated connection relationship information M2[FL'] in the control unit 10 that manages the third floor F3 of the first building P1. This completes the update process for the floor map information M1 and the connection relationship information M2 for the control unit 10 that manages the third floor F3 of the first building P1.

[0047] As described above, in this embodiment, each of the update processing units 24 holds the latest floor map information M1 and the latest connection relationship information M2 of the floor F that is the object of management of the corresponding control unit 10. Therefore, as shown in Fig. 5, the update processing unit 24 provided for the second non-target control unit (here, the update processing unit 24 provided for the control unit 10 that manages the first floor F1 of the second building P2, and the update processing unit 24 provided for the control unit 10 that manages the third floor F3 of the second building P2) acquires update data D including the connection relationship information M2[FL'] (here, the update data D including only the connection relationship information M2[FL']) and updates the connection relationship information M2 held by the update processing unit 24.

[0048] After an update process is performed on the floor map information M1 and the connection relationship information M2 for the control unit 10 that manages the first floor F1 of the first building P1 and the control unit 10 that manages the third floor F3 of the first building P1, an update process is performed on the floor map information M1 and the connection relationship information M2 for the control unit 10 that manages the first floor F1 of the second building P2 and the control unit 10 that manages the third floor F3 of the second building P2.

[0049] Specifically, as shown in Fig. 6, the control unit 10 that manages the first floor F1 of the first building P1 distributes update data D including floor map information M1[P1_1F'] to the control unit 10 that manages the third floor F3 of the first building P1, the control unit 10 that manages the first floor F1 of the second building P2, and the control unit 10 that manages the third floor F3 of the second building P2, which are second non-target control units when the first floor F1 of the first building P1 is the "second target floor". This causes the update process of the floor map information M1 of the first floor F1 of the first building P1 for the second non-target control units to be performed. Furthermore, the control unit 10 that manages the third floor F3 of the first building P1 distributes update data D including floor map information M1[P1_3F'] to the control unit 10 that manages the first floor F1 of the first building P1, the control unit 10 that manages the first floor F1 of the second building P2, and the control unit 10 that manages the third floor F3 of the second building P2, which are second non-target control units when the third floor F3 of the first building P1 is the "second target floor". This causes the update process of the floor map information M1 for the third floor F3 of the first building P1 to be performed for the second non-target control units.

[0050] In this embodiment, the updated connection relationship information M2[FL'] is also distributed from the control unit 10 that manages the second target floor to the other control units 10, and the connection relationship information M2 for the other control units 10 is updated, but it is not necessary to distribute the same version of the connection relationship information M2[FL'] from multiple control units 10. Therefore, in the example shown in Fig. 6, the updated connection relationship information M2[FL'] is included in the update data D distributed from the control unit 10 that manages the third floor F3 of the first building P1, whereas the updated connection relationship information M2[FL'] is not included in the update data D distributed from the control unit 10 that manages the first floor F1 of the first building P1. Also, although not shown in the figure, the updated connection relationship information M2[FL'] is installed from the corresponding update processing unit 24 for the control unit 10 that manages the first floor F1 of the first building P1, so the updated connection relationship information M2[FL'] does not need to be included in the update data D distributed from the control unit 10 that manages the third floor F3 of the first building P1 to the control unit 10 that manages the first floor F1 of the first building P1.

[0051] Depending on the configuration of the transport system 100, when performing update processing on the control unit 10 through installation processing by the update processing unit 24, the control of the transport vehicle 1 by the control unit 10 may be interrupted. In this regard, in this embodiment, the control units 10 that are the targets of update processing by the update processing unit 24 can be limited to the control units 10 that manage the target floor (two control units 10 in the example shown in FIG. 5). Therefore, even if the above-mentioned interruption occurs, it is possible to minimize the impact on the transport efficiency of the article 2 in the entire system.

[0052] Other embodiments (1) In the above embodiment, the management device 20 performs an update process of the floor map information M1 for the target control unit (first target control unit or second target control unit, the same applies hereinafter in this paragraph), and then distributes the updated floor map information M1 (specifically, update data D including the updated floor map information M1) from the target control unit to the non-target control unit (first non-target control unit or second non-target control unit, the same applies hereinafter in this paragraph) to perform the update process of the floor map information M1 for the non-target control unit. However, the present disclosure is not limited to such a configuration, and the updated floor map information M1 can also be installed in the non-target control unit by a method different from the distribution from the target control unit (for example, an installation process by the corresponding update processing unit 24).

[0053] (2) In the above embodiment, a configuration has been described in which the management device 20 performs update processing of the floor map information M1 of a target floor (first target floor or second target floor, the same applies hereinafter in this paragraph) for the control unit 10 that manages the target floor, prior to other control units 10. However, the present disclosure is not limited to such a configuration, and for example, the management device 20 may perform update processing of the floor map information M1 for all control units 10 at the same time.

[0054] (3) In the above embodiment, an example has been described in which each of the multiple control units 10 holds floor map information M1 for all floors F. However, the present disclosure is not limited to such a configuration, and for example, each of the multiple control units 10 may hold only floor map information M1 for the floor F that it manages. In this case, the update process for the floor map information M1 is performed only for the control unit 10 that manages the floor F on which the changed intra-floor path 4 is located.

[0055] (4) In the above embodiment, a configuration in which each of the multiple floors F is the target of management by one control unit 10 has been described as an example. However, the present disclosure is not limited to such a configuration, and at least some of the multiple floors F may be the target of management by multiple control units 10. In this case, for example, a configuration in which multiple control units 10 that manage the same floor F manage different areas on the floor F may be used. Also, a priority order may be set among the multiple control units 10 that manage the same floor F, and a control unit 10 with a higher priority may basically manage the floor F, and a control unit 10 with a lower priority may manage the floor F when an abnormality such as a breakdown occurs in the control unit 10 with a higher priority.

[0056] (5) In the above embodiment, a configuration has been described as an example in which each of the multiple control units 10 manages one floor F. However, the present disclosure is not limited to such a configuration, and a configuration in which at least some of the multiple control units 10 manage multiple floors F may also be used.

[0057] (6) In the above embodiment, the control device C is described as having a plurality of control units 10. However, the present disclosure is not limited to such a configuration, and the control device C may be configured to have only one control unit 10. In this case, the control device C (specifically, the single control unit 10 included in the control device C) manages all floors F and manages the transport vehicles 1 on all floors F.

[0058] (7) Note that the configurations disclosed in the above-described embodiments can be applied in combination with configurations disclosed in other embodiments (including combinations of the embodiments described as other embodiments) as long as no contradiction occurs. Regarding other configurations, the embodiments disclosed in this specification are merely examples in all respects. Therefore, various modifications can be made as appropriate within the scope of the present disclosure.

[0059] [Summary of the above embodiment] The above-described transport system will now be outlined.

[0060] The transport system is a transport system that transports items by a transport vehicle, and comprises a plurality of floors, an in-floor route provided on each of the plurality of floors along which the transport vehicle can move, a control device that controls the transport vehicle, and a management device that manages data updates of the control device, wherein connection routes are provided connecting different floors, and the transport vehicle moves across the plurality of floors through the connection routes, and the control device holds floor map information, which is information about the in-floor route for each of the plurality of floors, and connection relationship information, which is information indicating the connection relationships between the different floors via the connection routes, and is configured to control the transport vehicle on the in-floor route and the connection routes based on the floor map information and the connection relationship information, and the management device holds the floor map information for the plurality of floors in a state that can be separated for each floor, and holds the connection relationship information in a state that can be separated from the floor map information for the plurality of floors, and performs an update process for the floor map information and the connection relationship information for the control device.

[0061] According to this configuration, the control device holds floor map information and connection relationship information for multiple floors, so that the transport vehicle can be appropriately controlled for both the intra-floor route and the connection route. According to this configuration, the management device that performs an update process of the floor map information and the connection relationship information for the control device holds floor map information for multiple floors in a state in which it can be separated for each floor, and holds the connection relationship information in a state in which it can be separated from the floor map information for multiple floors. Therefore, when the layout of the route such as the intra-floor route or the connection route is changed, the control device can update only the information of the route related to the change in the layout. Therefore, even when only a part of the layout is changed, it is easier to keep the amount of information updated in the control device small compared to when it is necessary to update the information of all routes (i.e., the floor map information and the connection relationship information for all floors) in the control device.

[0062] As described above, according to this configuration, when the layout of the routes is changed in a transport system having multiple floors and a control device that controls transport vehicles, the amount of information updated in the control device can be kept small.

[0063] Here, when there is a change in the intra-floor route, the management device preferably performs an update process of only the floor map information of the floor on which the changed intra-floor route is located, and when there is a change in the connection route, the management device preferably performs an update process of the connection relationship information and the floor map information of the floor connected to the changed connection route.

[0064] According to this configuration, when the layout of routes such as routes within a floor or connecting routes is changed, the information to be updated can be appropriately narrowed down according to the change in the layout. Therefore, the update process can be appropriately performed while keeping the amount of information updated in the control device small.

[0065] In the above configuration, the management device is provided with a database in which the latest floor map information and the latest connection relationship information are stored, and an update data creation unit that creates update data to be distributed to the control device, and when there is a change in the connection path, the update data creation unit preferably reads out the floor map information and the connection relationship information of the floor connected to the changed connection path from the database, and creates the update data combining the new floor map information and the new connection relationship information.

[0066] According to this configuration, when a connection path is changed, the latest floor map information and the latest connection relationship information are read from the database, and update data for updating the connection relationship information and the floor map information of the floor connected to the changed connection path can be appropriately created. Furthermore, according to this configuration, since the latest connection relationship information can be stored in the database in a state in which it can be separated from the latest floor map information, when a connection path is changed, it is also easy to create update data including only the new connection relationship information, in addition to the update data that combines the new floor map information and the new connection relationship information.

[0067] In addition, the control device is equipped with a plurality of control units, each of the plurality of floors is subject to management by one or more of the plurality of control units, each of the plurality of control units is configured to hold the floor map information of all of the floors and manages the transport vehicles for the one or more floors that it manages, and when there is a change in the intra-floor route, the management device sets the floor on which the changed intra-floor route is located as a first target floor, and performs an update process of the floor map information of the first target floor for the control unit that manages the first target floor with priority over the other control units, and when there is a change in the connection route, the floor connected to the changed connection route is set as a second target floor, and performs an update process of the floor map information of the second target floor for the control unit that manages the second target floor with priority over the other control units.

[0068] According to this configuration, when the control device has multiple control units, the updated floor map information can be quickly applied to the management of transport vehicles (e.g., control of moving transport vehicles) on the target floor (first target floor or second target floor, the same applies hereinafter in this paragraph). Note that on non-target floors, which are floors different from the target floor, there are no changes to the routes within the floor, and the urgency of the update process for the control unit that manages the non-target floor is not high. Therefore, there is no particular problem even if the update process for the control unit that manages the target floor is prioritized.

[0069] In the above configuration, when there is a change in the intra-floor route, the management device preferably performs an update process of the floor map information for the first target control unit, which is the control unit that manages the first target floor, and then distributes the updated floor map information from the first target control unit to the other control unit, which is the first non-target control unit, to perform an update process of the floor map information for the first non-target control unit; and when there is a change in the connection route, the management device preferably performs an update process of the floor map information for the second target control unit, which is the control unit that manages the second target floor, and then distributes the updated floor map information from the second target control unit to the other control unit, which is the second non-target control unit, to perform an update process of the floor map information for the second non-target control unit.

[0070] According to this configuration, the floor map information for all the control units can be updated using the communication between the control units. For example, when the floor map information for the control units is updated by an operator, the update process can be performed using the communication between the control units in this manner, thereby reducing the burden on the operator involved in the update work.

[0071] It is sufficient for the transport system according to the present disclosure to achieve at least one of the above-mentioned effects. [Explanation of symbols]

[0072] 1: Transport vehicle 2: Goods 4: Routes within the floor 5: Connection path 10: Control unit 20: Management device 21: Database 22: Update data creation department 100:Transportation system C: Control device D: Update data F: Floor M1:Floor map information M2: Connection information

Claims

1. A transport system for transporting an article by a transport vehicle, The system includes a plurality of floors, an in-floor route provided on each of the plurality of floors and along which the transport vehicle can move, a control device that controls the transport vehicle, and a management device that manages data updates of the control device, A connection path is provided to connect the different floors, the transport vehicle travels through the connecting path to the plurality of floors; the control device is configured to hold floor map information, which is information on the intra-floor routes for each of the plurality of floors, and connection relationship information, which is information indicating connection relationships between different floors by the connection routes, and to control the transport vehicles on the intra-floor routes and the connection routes based on the floor map information and the connection relationship information; A transportation system in which the management device holds floor map information for multiple floors in a state that can be separated for each floor, and holds the connection relationship information in a state that can be separated from the floor map information for multiple floors, and performs an update process for the floor map information and the connection relationship information for the control device.

2. The management device includes: When the route within the floor is changed, updating processing is performed only on the floor map information of the floor on which the route within the floor that has been changed is provided; The transportation system according to claim 1 , wherein, when the connection route is changed, an update process is performed on the connection relationship information and the floor map information of the floor connected to the changed connection route.

3. the management device includes a database in which the latest floor map information and the latest connection relationship information are stored, and an update data creation unit that creates update data to be distributed to the control device; The transportation system according to claim 2, wherein, when the connection route is changed, the update data creation unit reads out the floor map information and the connection relationship information of the floor connected to the changed connection route from the database, and creates the update data by combining the new floor map information and the new connection relationship information.

4. The control device includes a plurality of control units. each of the plurality of floors is subject to management by one or more of the plurality of control units; Each of the plurality of control units is configured to hold the floor map information of all of the floors, and each of the control units manages the transport vehicles in one or more of the floors that are the subject of management; The management device includes: When the intra-floor route is changed, the floor on which the changed intra-floor route is provided is designated as a first target floor, and the control unit that manages the first target floor performs a process of updating the floor map information of the first target floor, with priority over the other control units; A transportation system as described in claim 2 or 3, wherein when the connection path is changed, the floor connected to the changed connection path is designated as a second target floor, and the control unit that manages the second target floor updates the floor map information of the second target floor with priority over other control units.

5. The management device includes: When the route within the floor is changed, the floor map information is updated for the first target control unit, which is the control unit that manages the first target floor, and then the updated floor map information is distributed from the first target control unit to the other control unit, which is the first non-target control unit, and the floor map information is updated for the first non-target control unit; The transportation system of claim 4, wherein when the connection path is changed, an update process of the floor map information for the second target control unit, which is the control unit that manages the second target floor, is performed, and then the updated floor map information is distributed from the second target control unit to the other control unit, which is the second non-target control unit, thereby updating the floor map information for the second non-target control unit.

Citation Information

Patent Citations

  • Guided vehicle system

    JP2004227058A

  • Carriage system

    JP2006313462A

  • Map information distribution system and map information distribution method

    JP2021113917A

  • Mapping dynamic spaces and way finding related to the mapping

    US20170031925A1

  • Hybrid Modular Storage Fetching System

    US20180096299A1