Monitoring program, printing system, and monitoring apparatus

The system enhances troubleshooting efficiency by prioritizing recovery procedures based on historical data and probability, addressing multiple error causes in printing presses.

JP2024162662APending Publication Date: 2024-11-21KONICA MINOLTA INC

Patent Information

Application Number
JP2023078398
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-11
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

Existing printing press troubleshooting methods do not provide efficient procedures for operators to address multiple potential causes of errors, leading to inefficiencies in recovery work.

Method used

A system that acquires status information from a printing press, extracts relevant work information linked to the status, and calculates a priority order for displaying recovery procedures based on historical data and probability of success.

Benefits of technology

Improves labor efficiency by presenting troubleshooting steps in the most efficient order, ensuring operators can resolve printing press issues effectively.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162662000001_ABST
    Figure 2024162662000001_ABST
Patent Text Reader

Abstract

To present information regarding a related task for handling a problem of a printing machine in the most efficient order, thereby improving work efficiency in handling the problem.SOLUTION: A server 30 (monitoring program 31) executes the processes of: acquiring state information regarding a state of a printing machine 10; extracting related task information, which is associated with the acquired state information, from registered related task information corresponding to the state information; and calculating, in the case where multiple pieces of extracted related task information exist, a priority order for displaying the related task information.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a monitoring program, a printing system, and a monitoring device. [Background technology]

[0002] Conventionally, in the industrial printing industry, when a printing machine trouble occurs, it is common for the printing company to contact the printing machine manufacturer, and the printing machine manufacturer's service personnel go to the printing company (on-site) to resolve the printing machine trouble. However, when the printing machine trouble occurs outside the business hours of the printing machine manufacturer's service desk, that is, when the printing machine manufacturer cannot immediately accept the trouble, the printing company's operator has no choice but to deal with the trouble. However, the printing company's operator often does not know the procedure for recovery work to deal with the trouble, and it may be difficult to perform the recovery work. Therefore, a technology has been proposed for displaying a maintenance video of the printing machine, that is, a video showing the contents of the related work, on the display panel of the printing machine, such as the technology described in Patent Document 1.

[0003] Patent document 1 describes a printing device having a print processing means that performs print processing on a recording medium based on print data, a notification means that notifies a host device of status information of the printing device, a receiving means that receives video data of the operating procedures of the printing device corresponding to the status of the printing device supplied from the host device based on the notification, and a display means that displays the video data. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2009-96069 A Summary of the Invention [Problem to be solved by the invention]

[0005] As described above, in order to enable the operator of the printing company to perform recovery work in response to a printing machine problem, a technology has been proposed for displaying a video of the operation procedure on the display means of the printing device, as described in Patent Document 1. Incidentally, a notification of a problem is generally given by an error code, but the procedure for the problem to be performed may not be narrowed down to one using only the error code. For example, in the process of conveying a sheet of paper from a paper cassette of a printing machine to a secondary transfer roller, if the paper cannot be detected just before the secondary transfer process begins, an error code assigned to a problem of no paper is generated. However, the cause of the error code can be either a paper jam in the conveying process or a slip of the paper roller that takes out the paper from the paper storage, which prevents the paper from being conveyed in the conveying process. The recovery procedure for solving each of these two causes is different. However, the technology described in Patent Document 1 does not mention a method for outputting an appropriate recovery procedure when multiple recovery procedures are extracted based on a problem notification.

[0006] The present invention has been made in consideration of the above-mentioned situation, and an object of the present invention is to present information regarding related work to respond to printing press troubles in the most efficient order, thereby improving labor efficiency in responding to troubles. [Means for solving the problem]

[0007] The present invention executes a process of acquiring status information regarding the status of a printing press, a process of extracting related work information linked to the acquired status information from pre-registered related work information corresponding to the status information, and, if there are multiple pieces of extracted related work information, a process of calculating a priority order for displaying the related work information. Effect of the Invention

[0008] According to the present invention having the above configuration, information on related work to deal with a printing press problem can be presented in the most efficient order, thereby improving the labor efficiency of troubleshooting. Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0009] [Figure 1] 1 is a diagram illustrating an example of a schematic configuration of a printing system according to a first embodiment of the present invention. [Diagram 2] 5A and 5B are diagrams illustrating an example of data of an execution history of related tasks in the printing system according to the first embodiment of the present invention. [Diagram 3] 5 is a diagram showing the priority order of related tasks calculated by a first calculation method in the printing system according to the first embodiment of the present invention. FIG. [Figure 4] 10A and 10B are diagrams for explaining a second calculation method for the priority order of related operations in the printing system according to the first embodiment of the present invention. [Diagram 5] 11A and 11B are diagrams for explaining a specific example 1 of a second calculation method for the priority order of related operations in the printing system according to the first embodiment of the present invention. [Figure 6] 11A and 11B are diagrams for explaining a specific example 2 of a second calculation method for priorities of related tasks in the printing system according to the first embodiment of the present invention. [Figure 7] 5 is a flowchart showing the procedure of a monitoring process in the printing system according to the first embodiment of the present invention. [Figure 8] 1 is a block diagram showing an example of the hardware configuration of a monitoring device of a printing system according to a first embodiment of the present invention. [Figure 9] 10 is a flowchart showing the procedure of a monitoring process in a printing system according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings. In this specification and the drawings, components having substantially the same functions or configurations are designated by the same reference numerals, and redundant description will be omitted.

[0011] First Embodiment [Example of a schematic configuration of a printing system] First, a schematic configuration of a printing system 1 according to a first embodiment of the present invention will be described. Fig. 1 is a diagram showing a schematic configuration example of a printing system according to a first embodiment of the present invention. As shown in Fig. 1, the printing system 1 includes a printing machine 10, a management terminal 20, a server 30, and a monitoring device 40.

[0012] The printing machine 10 is an example of an image forming device that forms an image on a recording medium by electrophotography. The printing machine 10 is configured as a multi-function peripheral (MFP) equipped with multiple functions such as a scanner function, a copy function, a facsimile function, a network function, a BOX function, and a post-processing function. When a problem (abnormality) occurs, the printing machine 10 outputs status information related to the status of the printing machine 10 to the management terminal 20. Note that while only one printing machine is shown in FIG. 1, the present invention is not limited to this, and the printing system 1 may include multiple printing machines.

[0013] Here, the state of the printing press 10 is a state in which printing stops during normal operation of the printing press and a predetermined operation is required to resume printing. The state of the printing press 10 includes an abnormal state in which the printing press goes into a breakdown state and an error code is output, and an abnormal state other than the breakdown state in which an error code is output. For example, a breakdown state in which a part of the printing press does not work is an abnormal state in which an error code is output. Also, for example, an abnormal state in which the recording medium (paper) runs out, the toner runs out, the waste toner bottle is full, the paper output tray is full, etc. are abnormal states in which an error code is not generated. These states of the printing press 10 are resolved by an operator's work such as refilling the recording medium (paper), refilling the toner, replacing the waste toner bottle, and collecting printed matter from the paper output tray. Also, for example, printing defects such as stains detected by a print inspection device attached to the printing press, and other abnormalities that cause printing to be interrupted, etc. may be included in the abnormal state in which an error code is not generated. Also, the state information regarding the state of the printing press 10 includes a message notifying an abnormal state in which an error code is not generated, and an error code for an abnormal state in which an error code is generated. Although it has not yet reached the level of an abnormality, information such as the recording medium (paper) being near empty, the toner being near empty, the waste toner bottle being near full, the output tray being near full, or the stains on the printed matter being worsening may be output as status information.

[0014] The management terminal 20 is an example of an information processing device, and is connected to the printing press 10 by wired or wireless means, and performs operations such as correcting image data before printing, specifying the size of the printed image and color / monochrome mode, and outputting print instructions to the printing press 10. Furthermore, if a problem occurs in the printing press 10, the management terminal 20 receives status information regarding the status of the printing press 10 from the printing press 10, and transmits the received status information to the server 30 via the network.

[0015] The server 30 is, for example, a cloud server, and executes a monitoring program 31 that acquires various information about the printing press 10 from the management terminal 20 and performs various analyses using the acquired information. The server 30 also stores a history of the execution of recovery work (related work) that can resolve a problem corresponding to status information about the state of the printing press 10 (see FIG. 2 described below), and pre-registered related work information (hereinafter referred to as "related work information"). Here, the related work information is information indicating the content of the related work (for example, video, audio explanation, procedure manual, etc.), or access information to a storage destination for the content of the related work. The access information to the storage destination is, for example, an access address to the storage destination, a read code from which the access address can be read, etc.

[0016] The monitoring program 31 on the server 30 also receives (acquires) status information on the status of the printing press 10 from the management terminal 20. The monitoring program 31 also extracts related work information linked to the acquired status information from related work information corresponding to the status information that is preregistered in the server 30. If there are multiple pieces of extracted related work information, the monitoring program 31 calculates a priority order for displaying the related work information. The monitoring program 31 also outputs at least one of the multiple pieces of related work information based on the calculated priority order. The monitoring program 31 will be described in detail with reference to FIG. 7 below. The execution results of the monitoring program 31, for example, related work information arranged in order of priority, are transmitted to the management terminal 20 or the monitoring device 40 and displayed.

[0017] The server 30 is not limited to a cloud server, and may be a dedicated server. The functions of the server 30 may be provided in an information processing device such as the management terminal 20 or the monitoring device 40.

[0018] The monitoring device 40 is a display terminal connected to the server 30 via a network, and receives and displays related work information, etc., arranged in order of priority from the server 30. When displaying related work information, the monitoring device 40 displays at least one of a plurality of related work information in order of priority, for example, according to the size of the display screen or the number specified by the operator. The monitoring device 40 may also be an information processing device that has the functions of the server 30 and executes the monitoring program 31 instead of the server 30. The monitoring device 40 may also transmit the received related work information, etc., arranged in order of priority to a terminal device held by an operator who performs recovery work, or to the operator's contact information (for example, email address). In this case, it is assumed that the operator's contact information has been registered in advance in the monitoring device 40.

[0019] Next, an example of data on the performance history of related work in the printing system 1 will be described. The performance history of related work is registered in advance in the server 30 and is updated based on the result of whether or not the status (trouble) of the printing press has been resolved, which is sent by the operator after performing the related work corresponding to the status information. Furthermore, the performance history of related work is provided for each piece of status information. FIG. 2 is a diagram showing an example of data on the performance history of related work in the printing system 1 according to this embodiment. The performance history of related work is linked to the status information, and as shown in FIG. 2, has columns for "related work," "work time (minutes)," "number of occurrences," and "probability of occurrence."

[0020] The "Related Work" column stores identifiers such as names and IDs that can uniquely identify related works. For example, the "Related Work" column in Figure 2 stores the names of related works such as "A", "B", and "C".

[0021] "Work time (min)" stores the work time for the related work stored in the corresponding "related work" column, for example, in minutes. The work time for the related work is the actual work time that the operator performed the related work, or the estimated work time required to perform the related work that is predicted in advance based on the content of the related work. For example, in the "work time (min)" shown in FIG. 2, work times such as "5" (min), "30" (min), etc. are stored.

[0022] The "Number of times" field stores the number of times the printing machine condition (trouble) was resolved by performing the related work stored in the corresponding "Related work" field. For example, the "Number of times" field shown in Figure 2 stores "200," "300," and "500."

[0023] The "Probability of Correlation" column shows the probability of correlation of the related task calculated based on the data stored in the corresponding "Number of Correspondences" column, such as "0.2", "0.3", and "0.5" as shown in FIG. 2. The probability of correlation is the ratio of the number of correlations of each related task to the total number of correlations of multiple related tasks stored in the related task execution history. For example, the ratio of the number of correlations of related task "A" (200) to the total number of correlations of multiple related tasks (200 + 300 + 500 = 1000) is "0.2". The unit of "probability of correlation" may be a percentage.

[0024] Note that the execution history of the related tasks shown in FIG. 2 includes the “number of times that the related tasks have occurred” and the “probability of occurrence” of the related tasks, but the present invention is not limited to this, and may include either the “number of times that the related tasks have occurred” or the “probability of occurrence”.

[0025] Next, a first calculation method for the priority order of related tasks in the printing system 1 will be described. The first calculation method for the priority of related tasks is performed by the monitoring program 31 on the server 30, and calculates the priority of related tasks based on at least one of the number of times the related task has been hit and the actual work time or the estimated work time. When calculating the priority based only on the number of times the related task has been hit, the first calculation method determines the priority in descending order (ranking from highest to lowest) of the hit probability calculated using the number of times the related task has been hit. When calculating the priority based only on the actual work time or the estimated work time, the first calculation method determines the priority in ascending order (ranking from shortest to longest) of the actual work time or the estimated work time of the related tasks.

[0026] In addition, when the priority order is calculated based on the number of occurrences and the actual work time or estimated work time, the first calculation method determines the priority order based on the product of the inverse of the probability of occurrence calculated using the number of occurrences of the related work and the actual work time or estimated work time of the related work. As a specific example of this case, an example of calculating the priority order for each of the related work "A", "B", and "C" based on the execution history of the related work shown in FIG. 2 will be described. The first calculation method calculates the product of the inverse of the "probability of occurrence" and the "work time (minutes)" of the execution history of the related work as the priority index. For example, the priority index of the related work "A" shown in FIG. 2 is 5×(1 / 0.2)=25, and the priority indexes of the related work "B" and "C" are "60" and "100", respectively. The first calculation method determines the priority order in ascending order of the calculated priority index (from smallest to largest). By using this calculation method, it is possible to output and display multiple related work information in order of the shortest work time and the highest possibility of solving the state (trouble) of the printing press, that is, in the most efficient order.

[0027] Fig. 3 is a diagram showing the priority of related tasks calculated by the first calculation method in the printing system 1 according to this embodiment. Fig. 3 shows the "priority index" and "priority" of each of the related tasks "A", "B", and "C". As shown in Fig. 3, the priority index "25" of the related task "A" is the smallest, so the related task "A" is assigned the highest "priority" of "1". Also, as shown in Fig. 3, the priority index "100" of the related task "C" is the largest, so the related task "C" is assigned the lowest "priority" of "3".

[0028] In addition, when there are multiple pieces of related work information linked to the status information, when performing recovery work, if a certain related work fails to resolve the status (trouble) of the printing press, generally, other related works are tried one by one until the trouble can be resolved. In this case, the work time required to find a related work that can resolve the trouble differs depending on the order in which the related works are performed. Therefore, it is difficult to select an order in which related works are performed that has a short work time and a high probability of being relevant. The second calculation method of the priority order of related works in the printing system 1 was made in consideration of the above situation. The second calculation method of the priority order of related works is performed by the monitoring program 31 on the server 30, similar to the first calculation method. The second calculation method calculates an expected value of the work time corresponding to a possible order pattern when performing multiple related works in order, based on the probability of the related works being relevant and the actual work time or expected work time, and determines the priority order based on the expected value of the work time.

[0029] FIG. 4 is a diagram for explaining a second calculation method of the priority order of related tasks in the printing system 1 according to the present embodiment. FIG. 4 shows the execution history of related tasks linked to certain status information. The execution history of related tasks shown in FIG. 4 does not include the "number of hits" explained in FIG. 2, and the columns for "related tasks," "task time (min)," and "hit probability" are the same as those shown in FIG. 2, and redundant explanations will be omitted. Also, in FIG. 4, there are "task_1" to "task_n" as multiple related tasks linked to certain status information. The "task time (min)" corresponding to "task_1" to "task_n" are "T1" to "Tn," and the "hit probability" are "P1" to "Pn," respectively.

[0030] The second calculation method for the priority order of related tasks uses the following formulas (1) to (4) to calculate the expected value of the task time required to perform "task_1" to "task_n" in the execution history of the related tasks in that order. The second calculation method determines the order of priority in ascending order of the calculated expected values ​​of the task time (ranking from smallest to largest). "T1" to "Tn" and "P1" to "Pn" in formulas (1) to (4) are the "task time (minutes)" and "applicable probability" shown in Figure 4.

[0031] TP1 = T1 × P1 … (1)

[0032] Equation (1) is used to calculate "TP1", which is the expected value of the individual task time corresponding to "task_1".

[0033] TP2 = T1 × P1 + (T1 + T2) × P2 … (2)

[0034] In formula (2), (T1+T2)×P2 is the expected value of the individual task time corresponding to "task_2." The expected value of the task time when performing related tasks in the order of "task_1" to "task_2," "TP2," is the sum of the expected values ​​of the individual task times of "task_1" and "task_2."

[0035] TP3=T1×P1+(T1+T2)×P2+(T1+T2+T3)×P3…(3)

[0036] In formula (3), (T1+T2+T3)×P3 is the expected value of the individual task time corresponding to "task_3." The expected value of the task time "TP3" when performing related tasks in the order of "task_1" to "task_3" is the sum of the expected values ​​of the individual task times of "task_1," "task_2," and "task_3."

[0037] TPn=T1×P1+(T1+T2)×P2+(T1+T2+T3)×P3+… +(T1+…+Tn)×Pn …(4)

[0038] In formula (4), (T1+...+Tn) x Pn is the expected value of the individual task time corresponding to "task_n." The expected value of the task time "TPn" when performing related tasks in the order of "task_1" to "task_n" is the sum of the expected values ​​of the individual task times of "task_1" to "task_n."

[0039] Fig. 5 is a diagram for explaining a specific example 1 of the second calculation method for the priority order of related tasks. Fig. 5A is a diagram showing the performance history of related tasks linked to certain state information. Fig. 5B is a diagram showing an expected value of the task time calculated by the second calculation method based on the performance history of the related tasks shown in Fig. 5A. Note that the performance history of the related tasks shown in Fig. 5A has the same configuration as the performance history of the related tasks shown in Fig. 4, and a duplicated description will be omitted.

[0040] In the related work execution history shown in Figure 5A, there are two related works, "A" and "B", so there are two possible ordering patterns when performing the related works in sequence, as shown in Figure 5B: an ordering pattern from related work "A" to "B", and an ordering pattern from related work "B" to "A".

[0041] In the sequence pattern from related tasks "A" to "B", the "task time (minutes)" and "applicable probability" of related task "A" are "T1" and "P1" in formula (2), and the "task time (minutes)" and "applicable probability" of related task "B" are "T2" and "P2" in formula (2). Therefore, the expected value of the task time for this sequence pattern is 60 x 0.7 + (60 + 20) x 0.3 = 66 (minutes), according to formula (2).

[0042] Also, in the sequence pattern from related tasks "B" to "A," the "task time (minutes)" and "applicable probability" of related task "B" are "T1" and "P1" in formula (2), and the "task time (minutes)" and "applicable probability" of related task "A" are "T2" and "P2" in formula (2). Therefore, the expected value of the task time for this sequence pattern is 20 x 0.3 + (20 + 60) x 0.7 = 62 (minutes), according to formula (2).

[0043] As shown in Figure 5B, the expected value of the work time for the order pattern from related tasks "B" to "A" is smaller than the expected value of the work time for the order pattern from related tasks "A" to "B." Therefore, the second calculation method assigns a high priority to the order pattern from related tasks "B" to "A."

[0044] Fig. 6 is a diagram for explaining a specific example 2 of the second calculation method for the priority order of related tasks. Fig. 6A is a diagram showing the performance history of related tasks linked to certain state information. Fig. 6B is a diagram showing an expected value of the task time calculated by the second calculation method based on the performance history of the related tasks shown in Fig. 6A. Note that the performance history of the related tasks shown in Fig. 6A has the same configuration as the performance history of the related tasks shown in Fig. 4, and a duplicated description will be omitted.

[0045] In the related work execution history shown in FIG. 6A, there are three related works, "A," "B," and "C," and therefore there are six possible order patterns ("Pattern_1" to "Pattern_6") shown in FIG. 6B when performing the related works in order. In each of the six order patterns, the related works stored in "ORDER_1" to "ORDER_3" shown in FIG. 6B are performed in order. For example, in "Pattern_1," the related works "A," "B," and "C" are performed in order according to "ORDER_1" to "ORDER_3." Also, for example, in "Pattern 5," the related works "C," "A," and "B" are performed in order according to "ORDER_1" to "ORDER_3."

[0046] FIG. 6B also shows the "expected value of individual work time (minutes)" for each of "ORDER_1" to "ORDER_3". The "expected value of individual work time (minutes)" for "ORDER_1" is the calculation result of the T1×P1 part of formula (3). The "expected value of individual work time (minutes)" for "ORDER_2" is the calculation result of the (T1+T2)×P2 part of formula (3). The "expected value of individual work time (minutes)" for "ORDER_3" is the calculation result of the (T1+T2+T3)×P3 part of formula (3). And the "expected value of work time (minutes)" for each order pattern is the sum of the "expected value of individual work time (minutes)" for each of "ORDER_1" to "ORDER_3".

[0047] In the following, the calculation of the "expected value of work time (min)" of "pattern_5" will be explained as a specific example of the second calculation method. In "pattern_5", the related tasks "C", "A", and "B" are performed in order according to "order_1" to "order_3", so the "work time (min)" and "applicable probability" of the related task "C" shown in FIG. 6A are "T1" and "P1" in formula (3). Also, the "work time (min)" and "applicable probability" of the related task "A" shown in FIG. 6A are "T2" and "P2" in formula (3), and the "work time (min)" and "applicable probability" of the related task "B" are "T3" and "P3" in formula (3). Therefore, the "expected value of individual work time (min)" of "order_1" (related task "C") in "pattern_5" is 40×0.2=8. The "expected individual work time (minutes)" for "Order_2" (related task "A") is (40+20) x 0.3 = 18. The "expected individual work time (minutes)" for "Order_3" (related task "B") is (40+20+30) x 0.5 = 45. The "expected work time (minutes)" for "Pattern_5" is 8+18+45 = 71.

[0048] The second calculation method determines the priorities in ascending order of the “expected value of work time (minutes)” shown in FIG. 6B (from smallest to largest), that is, in the order of “Pattern_3”, “Pattern_1”, “Pattern_4”, “Pattern_2”, “Pattern_6”, and “Pattern_5”.

[0049] As described above, the second calculation method calculates the expected value of the work time for each possible sequence pattern when performing multiple related tasks in sequence, based on the probability of occurrence of multiple related tasks and the actual work time or estimated work time. Therefore, according to the second calculation method, it is possible to output and display related task information in order from the shortest expected value of work time to the longest expected value, that is, in order of most efficient.

[0050] [Monitoring process procedure] Next, a description will be given of the procedure of the monitoring process in the printing system 1. Fig. 7 is a flowchart showing the procedure of the monitoring process in the printing system 1 according to this embodiment. The process described below starts when the management terminal 20 transmits status information on the status of the printing press 10 to the server 30.

[0051] First, the server 30 (monitoring program 31) receives status information on the status of the printing press 10 from the management terminal 20 (step S11).

[0052] Next, the server 30 extracts related task information associated with the received status information from pre-registered related task information corresponding to the status information (step S12).

[0053] Next, the server 30 determines whether or not there are multiple pieces of extracted related work information (step S13).

[0054] In the processing of step S13, if the server 30 determines that the extracted related work information is not multiple (if the judgment in step S13 is No), it transmits the extracted related work information to the monitoring device 40, and the monitoring device 40 displays the received related work information (step S14).

[0055] On the other hand, in the process of step S13, if the server 30 determines that there is a plurality of pieces of extracted related task information (if the determination is Yes in step S13), it calculates and sets the priority of the extracted plurality of related tasks (step S15). Note that the priority is calculated by the first calculation method described in Figs. 2 and 3, or the second calculation method described in Figs. 4 to 6.

[0056] Next, the server 30 transmits the prioritized related work information to the monitoring device 40, and the monitoring device 40 displays the related work information in order of priority (step S16). In this process, the monitoring device 40 displays, for example, the extracted multiple pieces of related work information in a list, and displays the related work information in order of priority from the top of the list.

[0057] After the processing of step S14 or step S16, the monitoring processing ends.

[0058] In addition, the operator who performs the recovery work can improve the labor efficiency by clicking the related work information from the top of the list of related work information displayed on the monitoring device 40 (starting from the most efficient one) and performing the related work while watching the video or procedure manual of the related work. After performing the related work, the operator inputs the implementation result of the related work, for example, the result that the printing press condition was resolved or the result that the printing press condition could not be resolved, and the work time required for the implementation, into the monitoring device 40, and the monitoring device 40 transmits the implementation result of the related work to the server 30. The server 30 updates the implementation history of the related work (see FIG. 2) based on the implementation result of the related work received from the monitoring device 40. For example, if the implementation result of the related work is the result that the printing press condition was resolved, the server 30 adds "1" to the "application count" of the related work and also updates the "application probability".

[0059] In addition, for example, if the result of carrying out the related work input by the operator indicates that the condition of the printing press could not be resolved, the monitoring device 40 deletes the related work information from the list, and sequentially prompts the operator to view other related work information or automatically displays it until a result is input indicating that the condition of the printing press has been resolved.

[0060] [Hardware configuration of monitoring device] Next, a description will be given of an example of the hardware configuration of the monitoring device 40. Fig. 8 is a block diagram showing an example of the hardware configuration of the monitoring device 40 of the printing system 1 according to this embodiment.

[0061] The monitoring device 40 is an example of an information processing device, and includes a CPU (Central Processing Unit) 41, a ROM (Read Only Memory) 42, and a RAM (Random Access Memory) 43, as shown in Fig. 8. The monitoring device 40 further includes a display device 44, an input device 45, a storage device 46, and a communication interface 47. The CPU 41, the ROM 42, the RAM 43, the display device 44, the input device 45, the storage device 46, and the communication interface 47 are connected by a bus 48 so as to be able to transmit and receive information data to and from each other.

[0062] The CPU 41 reads out from the ROM 42, loads into the RAM 43, and executes software programs for implementing the various functions of the monitoring device 40. For example, when the monitoring device 40 has the functions of the server 30 and performs the monitoring process shown in Fig. 7 instead of the server 30, the CPU 41 executes the monitoring program 31 for performing the monitoring process. Note that a GPU (Graphics Processing Unit) may be used instead of the CPU 41, or the CPU 41 may be used in combination with a GPU (Graphics Processing Unit).

[0063] The ROM 42 is configured by a storage medium such as a non-volatile memory, and stores programs and data executed and referenced by the CPU 41.

[0064] The RAM 43 is configured with a storage medium such as a volatile memory, and temporarily stores information (data) necessary for each process performed by the CPU 41.

[0065] The display device 44 is, for example, a display device such as an LCD (Liquid Crystal Display) or an organic EL (Electro-luminescence) display, and displays the results of processing performed by the monitoring device 40. The display device 44 also displays related work information received from the server 30 in order of priority. The input device 45 is, for example, composed of a keyboard, a mouse, etc. The input device 45 generates an operation signal representing the input operation content, and supplies the operation signal to the CPU 41. The display device 44 also displays the operation content, setting information, etc. based on the display signal supplied from the CPU 41. The display device 44 and the input device 45 can also be integrally formed as, for example, a touch panel.

[0066] The storage device 46 is configured with a computer-readable non-transitory recording medium, for example, a storage device such as an HDD (Hard Disk Drive). The storage device 46 stores programs and data, such as programs executed by the CPU 41, an OS (Operating System), and a controller. In addition, when the monitoring device 40 has the functions of the server 30 and performs the monitoring process shown in Fig. 7 instead of the server 30, the storage device 46 stores pre-registered related work information corresponding to status information of the printing press 10.

[0067] Note that some of the programs and data stored in the storage device 46 may be stored in the ROM 42. The computer-readable non-transitory recording medium storing the programs executed by the CPU 41 is not limited to an HDD, and may be, for example, a recording medium such as an SSD (Solid State Drive), a CD (Compact Disc)-ROM, or a DVD (Digital Versatile Disc)-ROM.

[0068] The communication interface 47 may be, for example, a NIC (Network Interface Card), and various data can be sent and received between the communication interface 47 and an external server via a LAN (Local Area Network), a dedicated line, etc., connected to the terminal of the NIC.

[0069] [effect] As described above, when the server 30 (monitoring program 31) of the printing system 1 according to this embodiment extracts multiple pieces of related work information linked to status information relating to the status of the printing press, it calculates the priority for outputting (displaying) each piece of related work information. Based on the work time (actual work time or estimated work time) and the probability of occurrence of each related work, the monitoring program 31 assigns a high priority to related work information with a short work time and a high probability of occurrence and outputs it. Therefore, according to the printing system of the present invention, information on related work that responds to a printing press trouble can be presented in the most efficient order, improving the labor efficiency of troubleshooting.

[0070] <Second embodiment> In the following, a printing system according to a second embodiment of the present invention will be described. The printing system according to the second embodiment has the same configuration as the printing system 1 shown in FIG. 1, and therefore a duplicated description will be omitted. In this embodiment, it is assumed that the actual work time and the estimated work time are stored separately in the "work time (minutes)" included in the execution history of the related work registered in advance (see FIG. 2). FIG. 9 is a flowchart showing the procedure of the monitoring process in the printing system according to the second embodiment of the present invention. As can be seen by comparing FIG. 9 with FIG. 7, the processes of steps S11 to S13 of the monitoring process in the printing system according to this embodiment are similar to those shown in FIG. 7, and therefore a duplicated description will be omitted.

[0071] In the process of step S13, if the server 30 determines that the extracted related work information is not multiple (if the determination is No in step S13), the server 30 performs the process of step S28 described below.

[0072] On the other hand, in the processing of step S13, if the server 30 determines that there are multiple extracted related tasks (if the judgment in step S13 is Yes), it obtains the corresponding number of times for each of the extracted related tasks from the performance history of the related tasks (step S24).

[0073] Next, the server 30 determines whether or not the estimated work time of the extracted related work is present in the execution history of the related work (step S25).

[0074] In the processing of step S25, if the server 30 determines that the estimated work time for the extracted related task does not exist (if the determination is No in step S25), it obtains the actual work time for the extracted related task from the performance history of the related task (step S26).

[0075] On the other hand, in the process of step S25, if the server 30 determines that the estimated work time for the extracted related task exists (Yes in step S25), it acquires the estimated work time for the extracted related task (step S27). Note that the processes of steps S25 to S27 are repeated the same number of times as the number of extracted related tasks. Also, the reason that the estimated work time for the related task is acquired preferentially in this step is that the actual work time differs even when the same task is performed by different operators, and therefore the priority order calculated based on the estimated work time is not affected by the difference in actual work time due to individual differences.

[0076] After the processing of step S26 or step S27, the server 30 transmits the corresponding number of times and the work time (estimated work time or actual work time) of the extracted related work to the monitoring device 40, and the monitoring device 40 displays the corresponding number of times and the work time of the received related work (step S28). After the processing of step S28, the monitoring process ends.

[0077] [effect] As described above, when the server 30 (monitoring program 31) of the printing system according to this embodiment extracts multiple pieces of related work information linked to status information on the status of the printing press, it outputs at least one of the number of times each related work is involved and the estimated work time or actual work time, and transmits it to the monitoring device 40. The monitoring device 40 also displays the number of times each related work is involved and the estimated work time or actual work time received. Operators can determine the priority order of related work that can improve their own labor efficiency based on the number of times each related work is involved and the estimated work time or actual work time displayed on the monitoring device 40. Therefore, according to the reference information (number of times involved, work time) for determining the priority order presented by the printing system according to this embodiment, when there are multiple operators who deal with problems with the printing press, when an operator is transferred, etc., each operator can determine the priority order of related work that can improve his or her own labor efficiency.

[0078] It should be noted that the present invention is not limited to the above-described embodiments, and various other applications and modifications are possible without departing from the gist of the present invention as set forth in the claims. For example, each of the above-mentioned embodiments describes the configuration of a printing system in detail and specifically in order to explain the present invention in an easily understandable manner, and is not necessarily limited to having all of the configurations described. In addition, it is possible to replace part of the configuration of the embodiment described here with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations. In addition, the control lines and information lines shown are those that are considered necessary for the explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it can be considered that almost all components are connected to each other.

[0079] In the above embodiments, the server 30 has been described as extracting related work information linked to the status information of one printing press 10 of the printing system 1, but the present invention is not limited to this. For example, when the printing system 1 has multiple printing presses, or when there are other printing presses connected to the server 30 via a network, the server 30 (monitoring program 31) may extract related work information linked to the status information of a printing press of the same model among the multiple printing presses. Also, for example, the server 30 may extract related work information linked to the status information of a printing press of the same model and the same lot among the multiple printing presses. Also, for example, the server 30 may extract related work information linked to the status information of a printing press that prints on the same type of recording medium among the multiple printing presses. Also, for example, the server 30 may extract related work information linked to the status information of a printing press in the same area among the multiple printing presses. As described above, when extracting related work information linked to the status information of a printing press, it is possible to extract related work information with a higher probability of being relevant by adding and extracting possible conditions that may cause the status information. [Explanation of symbols]

[0080] 1... printing system, 10... printing machine, 20... management terminal, 30... server, 31... monitoring program, 40... monitoring device

Claims

1. obtaining status information regarding the status of the printing press; A process of extracting related work information associated with the acquired status information from related work information corresponding to the status information that is registered in advance; and if there are a plurality of pieces of extracted related task information, a process of calculating a priority order for displaying the pieces of extracted related task information is executed by the computer. Surveillance program.

2. The process of calculating the priority order calculates the priority order based on at least one of the number of times the state of the printing machine was resolved by performing the related work, an actual work time included in a performance history of the related work registered in advance, or an estimated work time required to perform the related work that is estimated in advance. The monitoring program according to claim 1.

3. When the process of calculating the priority order calculates the priority order of the related work based on the number of occurrences and the actual work time or the estimated work time, a probability of occurrence is calculated, which is the ratio of the number of occurrences of the related work to the total number of occurrences of a plurality of the related works, and the priority order is determined based on the product of the inverse of the probability of occurrence and the actual work time or the estimated work time of the related work. The monitoring program according to claim 2.

4. The process of calculating the priority order calculates an expected value of a work time corresponding to a possible sequence pattern when the related tasks are performed in sequence, based on the probability of the related tasks being relevant and the actual work time or the estimated work time, and determines the priority order based on the expected value of the work time. The monitoring program according to claim 2.

5. The related work information is information indicating the content of the related work. The monitoring program according to claim 1.

6. The related work information is a video showing the content of the related work. The monitoring program according to claim 5.

7. The related work information is access information to a storage location of the contents of the related work. The monitoring program according to claim 1.

8. The process of calculating the priority order includes outputting at least one of the plurality of pieces of related work information based on the priority order. The monitoring program according to any one of claims 1 to 7.

9. When there are a plurality of printing presses, the process of acquiring the related work information includes extracting the related work information linked to the status information of the printing presses of the same model. The monitoring program according to any one of claims 1 to 7.

10. When there are a plurality of printing presses, the process of acquiring the related work information extracts the related work information linked to the status information of the printing presses of the same model and the same lot. The monitoring program according to any one of claims 1 to 7.

11. When there are a plurality of the printing presses, the process of acquiring the related work information extracts the related work information linked to the status information of the printing presses that print on the same type of recording medium. The monitoring program according to any one of claims 1 to 7.

12. When there are a plurality of printing presses, the process of acquiring the related work information includes extracting the related work information linked to the status information of the printing presses in the same region. The monitoring program according to any one of claims 1 to 7.

13. obtaining status information regarding the status of the printing press; A process of extracting related work information associated with the acquired status information from related work information corresponding to the status information that is registered in advance; and when there are a plurality of pieces of extracted related work information, outputting at least one of the number of times that the state of the printing press was resolved by performing the related work, the actual work time included in the execution history of the related work registered in advance, or the estimated work time required to perform the related work that is estimated in advance. Surveillance program.

14. a printing machine for forming an image on a recording medium; a server that acquires status information relating to a status of the printing press, extracts related work information associated with the acquired status information from pre-registered related work information corresponding to the status information, and, if there are a plurality of pieces of extracted related work information, calculates a priority order for displaying the related work information. Printing system.

15. a display terminal that receives the related work information arranged in the order of priority from the server and displays the related work information. The printing system of claim 14.

16. The display terminal displays at least one of the plurality of related work information in the order of priority. The printing system of claim 15.

17. a printing machine for forming an image on a recording medium; a server that acquires status information on the status of the printing press, extracts related work information linked to the acquired status information from pre-registered related work information corresponding to the status information, and, if there are multiple pieces of extracted related work information, outputs at least one of the corresponding number of times that the status of the printing press was resolved by performing the related work, the actual work time included in the pre-registered execution history of the related work, or the estimated work time required to perform the related work that is estimated in advance. Printing system.

18. Obtain status information regarding the condition of the press; Extracting the related work information associated with the acquired status information from pre-registered related work information corresponding to the status information; When there are a plurality of pieces of extracted related work information, a priority order for displaying the plurality of pieces of extracted related work information is calculated. monitoring equipment.

19. Obtain status information regarding the condition of the press; Extracting the related work information associated with the acquired status information from pre-registered related work information corresponding to the status information; When there are a plurality of pieces of extracted related work information, at least one of the number of times that the state of the printing press was resolved by performing the related work, the actual work time included in the execution history of the related work registered in advance, or the estimated work time required to perform the related work estimated in advance is output. monitoring equipment.