Control object selection device for remote ampere control, object selection method, and smart meter operation management device
The control target selection device uses power system data and consumer history to fairly select consumers for remote ampere control, ensuring necessary power reductions are met with minimal consumer impact.
Patent Information
- Application Number
- JP2023088169
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-29
- Publication Date
- 2024-12-11
AI Technical Summary
Existing technologies do not provide a mechanism for selecting consumers to be subjected to remote ampere control in a fair manner while ensuring the necessary reduction in power usage.
A control target selection device using an information processing device with a processor and storage, utilizing power system supply and demand prediction information, past implementation history, and customer information to select consumers for remote ampere control based on fairness and power reduction requirements.
Enables fair selection of consumers for remote ampere control, ensuring the required power reduction is achieved while minimizing impact on individual consumers.
Smart Images

Figure 2024171210000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a control target selection device, a target selection method, and a smart meter operation management device for remote ampere control. [Background technology]
[0002] Recently, the Working Group on the Use of Next-Generation Smart Meters has been considering so-called remote ampere control, which involves remotely controlling a consumer's smart meter and changing the upper limit of the current supplied to the consumer's load (the operating current of the breaker (distribution circuit breaker), hereafter referred to as the "limit value") to curb the consumer's use of electricity. Remote ampere control makes it easy to restrict the consumer's use of electricity through centralized control from a smart meter operation management device. Furthermore, the adoption of remote ampere control is expected to have effects such as avoiding planned power outages (avoiding complete power outages) in the event of a large-scale disaster, and strengthening the resilience of the power supply. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2012-60809 A Summary of the Invention [Problem to be solved by the invention]
[0004] When implementing remote ampere control, it is necessary to select consumers to be the targets of remote ampere control in a manner that is fair to consumers while ensuring the necessary amount of power usage reduction. The above-mentioned Patent Document 1 describes a planned power outage notification support system that is configured to reduce the burden of complicated administrative work involved in notifying consumers of the implementation date and time of planned power outages. However, the technology described in this document is not related to remote ampere control, and the document does not describe a mechanism for selecting consumers to be targets of remote ampere control.
[0005] The present invention has been made in consideration of the above background, and aims to provide a control target selection device, a target selection method, and a smart meter operation and management device for remote ampere control that are capable of selecting consumers to be subject to remote ampere control in a manner that is fair to consumers while ensuring the necessary amount of reduction in power usage. [Means for solving the problem]
[0006] One of the present inventions for achieving the above-mentioned object is a control target selection device for remote ampere control, which is configured using an information processing device having a processor and a storage device, and stores a required suppression amount which is a target value of the amount of power suppression in the power system to be achieved by remote ampere control, calculated based on supply and demand forecast information of the power system, stores a history of past implementation of remote ampere control for each of a plurality of consumers receiving power from the power system, stores each suppression amount when remote ampere control is implemented for each of the plurality of consumers, and sequentially selects, with priority given to consumers who have implemented remote ampere control fewer times in the past, until an integrated value of the suppression amount obtained by implementing the remote ampere control becomes equal to or greater than the required suppression amount, and generates information indicating the selected consumers.
[0007] Other problems and solutions disclosed in the present application will be made clear in the detailed description and drawings. Effect of the Invention
[0008] According to the present invention, it is possible to select consumers to be targets of remote ampere control in a manner that is fair to the consumers while ensuring the necessary amount of suppression of power usage. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of an electricity supply and demand management system. [Diagram 2] FIG. 2 is a diagram showing main functions of the power supply monitoring device. [Diagram 3]FIG. 2 is a diagram showing main functions of the SM operation management device. [Figure 4] 1 is an example of the hardware configuration of a smart meter (SM). [Diagram 5] FIG. 1 is a diagram showing main functions of a smart meter (SM). [Figure 6] FIG. 2 is a diagram showing main functions of a control object selection device. [Figure 7] 1 is an example of consumer information. [Figure 8] 13 is an example of a restriction target list. [Figure 9] 11 is a flowchart illustrating a control object selection process. [Figure 10] 1 is an example of an information processing device used in the configuration of an electricity supply and demand management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description, the letter "S" before each reference numeral denotes a processing step.
[0011] Fig. 1 shows a schematic configuration of an electric power supply and demand management system 1 according to an embodiment of the present invention. As shown in Fig. 1, the electric power supply and demand management system 1 includes an electric power supply and demand information management device 400 that monitors and controls the supply and demand of electric power in an electric power system 3, a plurality of consumers 2 that receive electric power from the electric power system 3, a smart meter (hereinafter referred to as "SM 200") provided in each of the consumers 2, a smart meter operation management device (hereinafter referred to as "SM operation management device 300"), and a device (hereinafter referred to as "control target selection device 100") that selects a consumer 2 to be a target of remote ampere control. The electric power supply and demand information management device 400, the SM 200, the SM operation management device 300, and the control target selection device 100 are all configured using information processing devices (computers).
[0012] The power system 3 includes, for example, conventional power generation facilities such as thermal power generation facilities, and power generation facilities that utilize renewable energy such as wind power generation facilities and photovoltaic power generation facilities (PV: PhotoVoltaic). The power system 3 may function as, for example, a VPP (Virtual Power Plant).
[0013] The SM operation management device 300 is communicatively connected to the SM 200 provided in each of the consumers 2. The SM operation management device 300 is also communicatively connected to the power supply and demand information management device 400 and the SM operation management device 300. The power supply and demand information management device 400 is also communicatively connected to the control object selection device 100. The control object selection device 100 is communicatively connected to the power supply and demand information management device 400 and the SM operation management device 300. The communication system 5 that communicatively connects each device is a communication infrastructure that realizes communication by a wired or wireless method, such as a wide area network (WAN), a local area network (LAN), a wireless LAN, a head end system (HES), a concentrator, a 920 Hz band communication network, a power line communication (PLC), the Internet, various public communication networks, a dedicated line, etc.
[0014] The power supply and demand information management device 400 is an information processing device (computer) operated by an operator of the power system 3, such as a power transmission and distribution business operator (general power transmission and distribution business operator, aggregation business operator, etc.). The power supply and demand information management device 400 is communicably connected to various devices in the power system 3. The power supply and demand information management device 400 acquires the power supply amount of various power generation facilities connected to the power system 3 and the real-time power consumption amount of power based on the measurement values (voltage value, current value, active power, reactive power, power factor, temperature, etc.) of the SM 200 installed in each consumer 2 connected to the power system 3, and provides information used for adjusting the power supply and demand balance in the power system 3 (load leveling, absorbing excess supply of renewable energy, supplying required power during power shortage, etc.) to other devices based on the acquired power supply amount and power consumption amount. The above adjustment is performed, for example, by predicting the electricity supply and demand situation for each future time period (e.g., 00:00 to 6:00, 6:00 to 12:00, 12:00 to 18:00, 18:00 to 24:00) based on information accumulated in the past (supply and demand information, weather information, etc.).
[0015] The SM operation management device 300 is realized, for example, using a mechanism of HES or MDMS (Meter Data Management System), and acquires information from the SM 200 of each consumer 2 and sets and controls the functions of the SM 200 of each consumer 2. The SM operation management device 300 also includes a mechanism of remote ampere control that remotely controls the SM 200 of the consumer 2 and changes the upper limit of the current supplied to the load of the consumer 2 (the operating current (the value at which the breaker is tripped) of a breaker (discrete circuit breaker) provided in the consumer 2; hereinafter referred to as the "limit value"), thereby suppressing the use of power in the consumer 2.
[0016] The SM 200 transmits various measurement values of the power supplied from the power transmission and distribution system to the load of the consumer 2 to the SM operation management device 300. The SM operation management device 300 receives the measurement values transmitted from the SM 200 at regular intervals (e.g., every 5 minutes, every 30 minutes, etc.) and monitors the power supply and demand situation at the consumer 2 based on the received measurement values. The SM 200 also manages (stores) the limit value of the remote ampere control and updates the limit value in response to an instruction transmitted from the SM operation management device 300.
[0017] The control object selection device 100 selects consumers 2 to be subject to remote ampere control based on information provided by the power supply and demand information management device 400, and notifies information indicating the selected consumers 2 (a control object list, described later) to the SM operation management device 300. The function of the control object selection device 100 will be described in detail later.
[0018] <Electricity supply and demand information management device> 2 shows main functions of the power supply and demand information management device 400. As shown in the figure, the power supply and demand information management device 400 has the functions of a storage unit 410, a supply and demand information acquisition and management unit 420, a meteorological information acquisition and management unit 425, a supply and demand prediction unit 430, and a supply and demand prediction information transmission unit 435.
[0019] The storage unit 410 stores the following information (data): power supply and demand information 411, weather information 412, and supply and demand forecast information 413.
[0020] The power supply and demand information 411 includes a time series of the amount of power supply in the power system 3 from a specified point in the past to the present (hereinafter referred to as "power supply history"), and a time series of the amount of power usage in the power system 3 from a specified point in the past to the present (hereinafter referred to as "power usage history").
[0021] The weather information 412 includes weather information (past and current weather information) for the area in which the power system 3 is deployed.
[0022] The supply and demand prediction information 413 includes information on the future supply and demand of power in the power system 3 for each predetermined time period predicted by the supply and demand prediction unit 430 .
[0023] Among the above functions, the supply-demand information acquisition and management unit 420 generates a power supply history and a power consumption history based on information obtained from various devices constituting the power system 3 and the SM operation management device 300, and manages the generated power supply history and power consumption information as power supply-demand information 411 in the storage unit 410.
[0024] The weather information acquisition and management unit 425 acquires weather information of the area where the power system 3 is located from a weather information providing organization (such as the Japan Meteorological Agency) via the Internet or the like, and manages the acquired weather information as weather information 412 in the storage unit 410.
[0025] The supply-demand prediction unit 430 predicts the power supply and demand for each predetermined time period in the future in the power system 3 based on the power supply-demand information 411 and the weather information 412, and manages the predicted result as supply-demand prediction information 413 in the storage unit 410.
[0026] The supply-demand prediction information transmission unit 435 transmits the supply-demand prediction information 413 to the control target selection device 100 at any time.
[0027] <SM operation management device> Fig. 3 shows the main functions of the SM operation management device 300. As shown in the figure, the SM operation management device 300 has functions of a storage unit 310, a measured value acquisition and management unit 320, a limit value management unit 325, a control target list reception unit 330, a remote ampere control unit 335, and an information providing unit 340.
[0028] Among the above functions, the storage unit 310 stores measured values 311, limit values 312, and a control target list 313. Among these, the measured values 311 include measured values (voltage value, current value, active power, reactive power, power factor, temperature, etc.) acquired by the measured value acquisition and management unit 320 from the SMs 200 of each consumer 2. The limit values 312 are limit values in the remote ampere control of the SMs 200 of each consumer 2 set by the limit value management unit 325. The control target list 313 includes a list of consumers 2 that are targets of remote ampere control.
[0029] Of the above functions, the measurement value acquisition management unit 320 acquires measurement values from the SM 200 of each consumer 2 , and manages the acquired measurement values as measurement values 311 in the storage unit 310 .
[0030] The limit value management unit 325 manages the limit value of the remote ampere control of each consumer 2 (SM 200) received from the control object selection device 100 as a limit value 312 in the storage unit 310. The limit value of each consumer 2 may be set as a fixed value in advance, or may be set arbitrarily by the user for each consumer 2 via a user interface.
[0031] The control object list receiving unit 330 manages the control object list received from the control object selecting device 100 as the control object list 313 in the storage unit 310 .
[0032] When the time arrives to perform remote ampere control, the remote ampere control unit 335 performs remote ampere control for the consumer 2 listed in the control target list 313 (sets the limit value of SM200 of the consumer 2 that is the target of remote ampere control to the value of limit value 312).
[0033] The information providing unit 340 provides (transmits) the contents of the measured value 311 and the limit value 312, and information related to the SM 200 of each consumer 2 to other devices communicatively connected thereto.
[0034] <sm200> 4 shows an example of a hardware configuration of the SM 200. As shown in the figure, the SM 200 includes a processor 21, a memory 22, a timing device 23, a measuring device 24, an input device 25, an output device 26, a communication device 27, a power supply device 28, and a breaker 29.
[0035] The processor 21 is configured using a CPU, MPU, a power calculation engine (PCE), etc., and realizes various functions provided by the SM 200 by reading and executing programs stored in the memory 22. The memory 22 is configured using a ROM, a RAM, a non-volatile memory, etc., and stores programs (including firmware) and data. The programs stored in the memory 22 can be updated as appropriate, for example, by updating the firmware.
[0036] The clock device 23 is configured using, for example, a temperature compensated RTC (Real Time Clock) or the like, and provides time information such as the current date and time. The time information provided by the clock device 23 is used as information indicating the measurement date and time of measurement information such as a voltage measurement value. The clock device 23 may have a function of acquiring date and time information via the communication system 5 using NTP (Network Time Protocol) or the like.
[0037] The measuring device 24 is equipped with various sensors (voltage sensors, current sensors, temperature sensors, etc.), a ΔΣ type A / D converter, a gain amplifier, etc., and acquires various measurement values measured at the consumer 2 in which the SM200 is installed and stores them in the memory 22.
[0038] The input device 25 and the output device 206 provide a user interface for a person to directly operate the SM 200 at the site where the SM 200 is installed. The input device 25 is, for example, a keyboard, a touch panel, an operation button, etc. The output device 206 is, for example, various display devices such as an LCD, an organic EL panel (Organic Electro-Luminescence panel), an LED (Light Emitting Diode), etc.
[0039] The communication device 27 realizes communication with the SM operation management device 300 via the communication system 5. The communication device 27 includes, for example, a wireless communication module (such as a 920 MHz band wireless module or a 1:N wireless module) and a wired communication module (such as a PLC module (PLC: Power Line Communication)).
[0040] Power supply device 28 is a device that supplies driving power to each component of SM200, and includes, for example, an A / D converter that converts AC power from the power distribution line into DC power, a battery that enables SM200 to operate independently when the power supply from the power distribution line is stopped, and a charging circuit for the battery.
[0041] Breaker 29 (molded-case circuit breaker) cuts off (closes) the supply of power to the load when the current supplied to the load of consumer 2 exceeds a limit value.
[0042] 5 shows main functions of the SM 200. As shown in the figure, the SM 200 has the following functions: a storage unit 210, a measurement unit 220, a measurement value transmission unit 230, a limit value management unit 240, and a remote ampere control processing unit 250.
[0043] Of the above functions, the storage unit 210 stores a measurement value 211 and a limit value 212. Of these, the measurement value 211 is a measurement value measured by a measurement unit 220. The limit value 212 is a limit value of remote ampere control set for the SM 200.
[0044] Of the above functions, the measurement unit 220 manages the measurement values measured by the measurement device 24 as measurement values 211 in the storage unit 210 .
[0045] The measurement value transmission unit 230 transmits the measurement value 211 to the SM operation management device 300 .
[0046] The limit value management unit 240 manages the limit value received from the SM operation management device 300 as the limit value 212 in the storage unit 210 .
[0047] When the current value measured by the measurement unit 220 exceeds the limit value 212, the remote ampere control processing unit 250 operates the breaker 29 to stop (cut off) the power supply to the load of the customer 2.
[0048] <Control object selection device> 6 shows main functions of the control object selection device 100. As shown in the figure, the control object selection device 100 has the following functions: a storage unit 110, a consumer information management unit 120, a supply and demand prediction information receiving unit 125, a required suppression amount calculation unit 130, a limit value setting unit 135, a control object selection unit 140, and a control object list transmission unit 145.
[0049] Of the above functions, the storage unit 110 stores consumer information 111, supply and demand forecast information 112, required suppression amount 113, and control target list 114. Of these, the consumer information 111 includes information such as contract information of the consumer 2, a limit value set for the consumer 2 (SM 200), and past implementation history of remote ampere control of the consumer 2.
[0050] 7 shows an example of the consumer information 111. As shown in the figure, the consumer information 111 shown in the example is composed of a plurality of records including the following items: consumer ID 1111, SM ID 1112, contract information 1113, limit value 1114, suppression amount 1115, remote ampere control implementation count 1116, and remote ampere control implementation history 1117. One record of the consumer information 111 corresponds to one consumer 2 (SM 200).
[0051] Of the above items, the consumer ID 1111 stores an identifier of the consumer (hereinafter referred to as a "consumer ID"), and the SMID 1112 stores an identifier of the SM 200 (hereinafter referred to as a "SMID").
[0052] The contract information 1113 stores information relating to the power supply contract of the customer 2 (contract value, installation section, connected power distribution line, installation date and time, etc.).
[0053] The limit value 1114 stores the limit value currently set for the consumer 2.
[0054] In the suppression amount 1115, a value obtained by subtracting the limit value 1114 from the contract value in the contract information 1113 (hereinafter, referred to as the "suppression amount") is stored.
[0055] The remote ampere control implementation count 1116 stores information indicating the number of times remote ampere control has been implemented in the past for the consumer 2. The implementation count stored in the remote ampere control implementation count 1116 may be a value excluding old implementation histories (e.g., those from 10 years ago or more).
[0056] The remote ampere control implementation history 1117 stores information indicating the implementation history of each implementation opportunity of the remote ampere of the consumer 2. For example, the remote ampere control implementation history 1117 stores one or more implementation histories including information indicating the period during which the remote ampere was implemented and the limit value at the time of implementation, such as the implementation period "May 11, 2019 00:00-12:00" and the limit value "10A", in the order (chronological order) of implementation time (implementation date and time, implementation period). Note that the implementation history stored in the remote ampere control implementation history 1117 may only exclude old ones (e.g., those from 10 years ago or more).
[0057] Returning to FIG. 6, the supply and demand forecast information 112 is the supply and demand forecast information sent from the power supply and demand information management device 400 .
[0058] The required suppression amount 113 is a target value of the suppression amount of power in the power system 3 (hereinafter referred to as the "required suppression amount") that is calculated by the required suppression amount calculation unit 130 and that should be achieved by remote ampere control.
[0059] The control target list 114 includes a list of consumers 2 (SMs 200) selected by the control target selection unit 140 as targets for which remote ampere control is to be performed.
[0060] Of the above functions, the consumer information management unit 120 manages information about the consumer 2 managed by the operator of the power system 3 or the like in the storage unit 110 as consumer information 111 .
[0061] The supply and demand prediction information receiving unit 125 receives the supply and demand prediction information sent from the power supply and demand information management device 400 , and manages the received supply and demand prediction information in the storage unit 110 as supply and demand prediction information 112 .
[0062] The required suppression amount calculation unit 130 calculates the required suppression amount based on the supply and demand prediction information 112. The required suppression amount calculation unit 130 obtains, for example, all or a part (a predetermined ratio) of the power supply shortage grasped from the supply and demand prediction information 112 as the required suppression amount to be achieved by remote ampere control. Note that the required suppression amount calculation unit 130 may calculate the required suppression amount to be larger than the power supply shortage grasped from the supply and demand prediction information 112 so that the required amount of suppression in the power system is reliably achieved.
[0063] The limit value setting unit 135 sets a limit value for each consumer 2. For example, the limit value setting unit 135 sets the limit value for each consumer 2 as a preset fixed value. Also, the limit value setting unit 135 receives the limit value to be set for each consumer 2 via, for example, a user interface.
[0064] The control target selection unit 140 selects consumers 2 to be targets of remote ampere control until the integrated value of the suppression amount of the selected consumers 2 becomes equal to or greater than the required suppression amount, and manages the selection results in the control target list 114. For example, the control target selection unit 140 prioritizes the consumer 2 that has recently undergone remote ampere control the fewest number of times ascertained from the remote ampere control implementation history 1117 (hereinafter referred to as the "first selection method") and selects it as the target of remote ampere control.
[0065] In addition, for example, when the first selection method cannot narrow down the consumer 2 to one (when there are multiple consumers 2 with the fewest implementation times), the control target selection unit 140 prioritizes the consumer 2 with the oldest implementation history (oldest most recent implementation date and time, oldest most recent implementation time) and selects it as the target for remote ampere control (hereinafter referred to as the "second selection method").
[0066] In addition, when the control target selection unit 140 is unable to narrow down the consumer 2 to one even after applying the first selection method and the second selection method in order (when there are multiple consumers 2 with the oldest recent implementation history), it prioritizes the consumer 2 with the currently set maximum limit value (the smallest amount of suppression) (the consumer 2 that is least affected by suppression) as the target for remote ampere control (hereinafter referred to as the "third selection method").
[0067] In addition, when the control target selection unit 140 is unable to narrow down the consumer 2 to one even after applying the first selection method, the second selection method, and the third selection method in order (when there are multiple consumers 2 with the maximum currently set limit value (minimum suppression amount)), the control target selection unit 140 selects the consumer 2 as a target for remote ampere control based on other attributes of the consumer 2.
[0068] 8 shows an example of the control object list 114. As shown in the figure, the illustrated control object list 114 is composed of one or more records each consisting of the items of a consumer ID 1141, an SM ID 1142, and a limit value 1443. One record in the control object list 114 corresponds to one consumer 2 (SM 200) that is subject to remote ampere control.
[0069] Of the above items, a consumer ID is stored in the consumer ID 1141. The SMID 1142 stores the SMID of the SM 200 installed in the consumer 2. The limit value 1143 stores the limit value set in the consumer 2.
[0070] Returning to FIG. 6, the control object list transmission unit 145 transmits the contents of the control object list 114 to the SM operation management device 300 .
[0071] <Control target selection process> 9 is a flowchart for explaining the process (hereinafter referred to as "controlled object selection process S900") performed by the controlled object selection device 100. The controlled object selection process S900 will be explained below with reference to the same figure.
[0072] First, the control object selection device 100 selects an unselected time period (in the following process) during which remote ampere control is to be performed (S911). The selection (designation) of the time period may be performed by the user via a user interface, or may be a time period designated by the power supply and demand information management device 400, for example.
[0073] Next, the control object selection device 100 acquires supply and demand forecast information for the selected time period from the supply and demand forecast information 112 (S912).
[0074] Next, the control object selection device 100 calculates the required suppression amount for the selected time period (S913). For example, the control object selection device 100 obtains a shortage in power supply ascertained from the supply and demand forecast information 112, and obtains all or a part (a predetermined ratio) of the obtained shortage as the required suppression amount.
[0075] Next, the control object selection device 100 initializes (sets to 0) a "total suppression amount" that is used as a temporary variable for storing the integrated value of the suppression amount of each consumer 2 in the following processing (S914).
[0076] Next, the control target selection device 100 preferentially selects the consumer 2 with the fewest number of times that remote ampere control has been implemented in the past (the value of the remote ampere control implementation count 1116 in FIG. 7) from among the consumers 2 that have not yet been selected as targets of remote ampere control. If the consumer 2 with the fewest number of times that remote ampere control has been implemented in the past cannot be narrowed down to one, the control target selection device 100 further preferentially selects the consumer 2 with the oldest most recent implementation history. If the consumer 2 with the oldest most recent implementation history cannot be narrowed down to one, the control target selection device 100 further preferentially selects the consumer 2 with the largest currently set limit value (smallest suppression amount). If the consumer 2 with the largest limit value (smallest suppression amount) cannot be narrowed down to one, the control target selection device 100 further selects a consumer 2 based on other attributes of each consumer 2 (S915).
[0077] Next, the control object selection device 100 adds the suppression amount of the currently selected consumer 2 to the total suppression amount (S916).
[0078] Next, the control object selection device 100 judges whether the total suppression amount is equal to or greater than the necessary suppression amount calculated in S913 (S917). If the total suppression amount is equal to or greater than the necessary suppression amount calculated in S913 (S917: YES), the process proceeds to S918. On the other hand, if the total suppression amount is less than the necessary suppression amount calculated in S913 (S917: NO), the process returns to S915.
[0079] In S918, the control object selection device 100 generates a control object list 114 containing the consumer IDs of all consumers 2 selected in S915, and transmits the generated control object list 114 to the SM management device 600 together with information indicating the time period of the selected schedule.
[0080] When the SM management device 600 receives the control object list 114, it manages the received control object list 114 as the control object list 313. When the selected scheduled time period arrives, the SM management device 600 performs remote ampere control on the SMs 200 of each consumer 2 listed in the control object list 313 (updates the limit value 212 stored in each consumer 2).
[0081] In S919, the control object selecting device 100 updates the remote ampere control implementation history 1117 of the customer information 7 of the customer 2 (adds information on the remote ampere control implemented this time as the implementation history).
[0082] Next, the control object selection device 100 determines whether there are other time periods that have not been selected in S911 (S920). If there are other time periods that have not been selected, the process returns to S911 (S920: YES). If there are no other time periods that have not been selected (S920: NO), the control object selection process S900 ends.
[0083] <Effects> As described above, the control target selection device 100 of this embodiment prioritizes and sequentially selects the consumer 2 that has undergone remote ampere control the fewest number of times in the past until the accumulated value of the suppression amount becomes equal to or greater than the required suppression amount, thereby making it possible to select the consumer 2 to be the target of remote ampere control in a manner that is fair to the consumer 2 while ensuring the required suppression amount of power usage.
[0084] Furthermore, if the control target selection device 100 is unable to narrow down to one consumer 2 that has implemented remote ampere control the fewest times in the past, it will further prioritize the consumer 2 with the oldest recent implementation history, so that even in the above case, it is possible to select the consumer 2 to be the target of remote ampere control in a manner that feels fair to the consumer 2.
[0085] Furthermore, if the control target selection device 100 is unable to narrow down the consumer 2 with the oldest recent implementation history to one, it will further prioritize the consumer 2 with the smallest amount of suppression (the consumer 2 that will be least affected by the suppression), so that even in the above case, it is possible to select the consumer 2 to be the target of remote ampere control in a manner that feels fair to the consumer 2.
[0086] As described above, according to the power supply and demand management system 1 of this embodiment, it is possible to select consumers 2 to be subject to remote ampere control in a manner that is fair to consumers 2 while ensuring the necessary amount of reduction in power usage.
[0087] <Information processing device> FIG. 10 shows an example of a hardware configuration of an information processing device used to realize each device (power supply and demand information management device 400, SM 200, SM operation management device 300, and control object selection device 100) constituting the power supply and demand management system 1. The illustrated information processing device 10 includes a processor 11, a main memory device 12, an auxiliary memory device 13, an input device 14, an output device 15, and a communication device 16. Specific examples of the information processing device 10 include personal computers, office computers, various server devices, general-purpose machines, and the like. The information processing device 10 may be realized in whole or in part using virtual information processing resources provided using virtualization technology, process space separation technology, or the like, such as a virtual server provided by a cloud system. The power supply and demand information management device 400, SM 200, SM operation management device 300, and control object selection device 100 may be realized using a plurality of information processing devices 10 connected to each other so as to be able to communicate with each other.
[0088] In the figure, the processor 11 is configured using, for example, a CPU (Central Processing Unit), an MPU (Micro Processing Unit), a GPU (Graphics Processing Unit), an FPGA (Field Programmable Gate Array), an ASIC (Application Specific Integrated Circuit), an AI (Artificial Intelligence) chip, etc.
[0089] The main memory device 12 is a device that stores programs and data, and is, for example, a Read Only Memory (ROM), a Random Access Memory (RAM), or a non-volatile memory (Non Volatile RAM (NVRAM)).
[0090] The auxiliary storage device 13 is, for example, an SSD (Solid State Drive), a hard disk drive, an optical storage device (CD (Compact Disc), DVD (Digital Versatile Disc), etc.), a storage system, an IC card, a read / write device for a recording medium such as an SD card or an optical recording medium, a storage area of a cloud server, etc. Programs and data can be read into the auxiliary storage device 13 via a recording medium reader or a communication device 16. The programs and data stored (memorized) in the auxiliary storage device 13 are read into the main storage device 12 as needed.
[0091] The input device 14 is an interface that accepts input from the outside, and is, for example, a keyboard, a mouse, a touch panel, a card reader, a pen-input tablet, a voice input device, or the like.
[0092] The output device 15 is an interface that outputs various information such as the progress of processing and the results of processing. The output device 15 is, for example, a display device (LCD (Liquid Crystal Display), a graphic card, etc.) that visualizes the various information described above, a device that converts the various information described above into voice (voice output device (speaker, etc.)), or a device that converts the various information described above into text (printer, etc.). Note that, for example, the information processing device 10 may be configured to input and output information to and from other devices via the communication device 16.
[0093] The input device 14 and the output device 15 constitute a user interface for receiving information from the user and presenting information.
[0094] The communication device 16 is a device that realizes communication (wired communication or wireless communication) with other devices via a communication infrastructure such as the communication system 5, and is configured using, for example, a NIC (Network Interface Card), a wireless communication module, a USB module, etc. The communication device 16 communicates with the SM 200 installed in each consumer 2 via the communication system 5. The communication device 16 also communicates with other information processing systems that manage information related to the power transmission and distribution system and the SM 200 installed in each consumer 2, such as a power distribution control system and a customer management system that operate on the power supply and demand information management device 400, etc.
[0095] The information processing device 10 may be implemented with, for example, an operating system, a file system, a DBMS (DataBase Management System) (relational database, NoSQL, etc.), a KVS (Key-Value Store), etc.
[0096] The functions of the power supply and demand information management device 400, the SM 200, the SM operation management device 300, and the control object selecting device 100 are realized by the processor 11 of the information processing device 10 reading and executing a program stored in the main memory device 12, or by the functions of the hardware (FPGA, ASIC, AI chip, etc.) that constitutes them. The power supply and demand information management device 400, the SM 200, the SM operation management device 300, and the control object selecting device 100 store the various information (data) described above, for example, as a database table or a file managed by a file system.
[0097] Although the embodiment of the present invention has been described above in detail, the above description is for the purpose of facilitating understanding of the present invention and does not limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and the present invention naturally includes equivalents thereof. For example, the above embodiment has been described in detail to explain the present invention in an easily understandable manner, and is not necessarily limited to those having all of the configurations described. In addition, it is possible to add, delete, or replace part of the configuration of the above embodiment with other configurations. [Explanation of symbols]
[0098] 1 Power supply and demand management system, 2 Consumer, 3 Power system, 5 Communication system, 100 Control target selection device, 110 Memory unit, 111 Consumer information, 112 Supply and demand forecast information, 113 Required suppression amount, 114 Control target list, 120 Consumer information management unit, 125 Supply and demand forecast information receiving unit, 130 Required suppression amount calculation unit, 135 Limit value setting unit, 140 Control target selection unit, 145 Control target list transmitting unit, 200 SM, 300 SM operation management device, 310 Memory unit, 311 Measurement value, 312 Limit value, 313 Control target list, 320 Measurement value acquisition management unit, 325 Limit value management unit, 330 Control target list receiving unit, 335 Remote ampere control unit, 340 Information providing unit, 400 Power supply and demand information management device, 410 Memory unit, 411 Electric power supply and demand information, 412 meteorological information, 413 supply and demand forecast information, 420 supply and demand information acquisition and management unit, 425 meteorological information acquisition and management unit, 430 supply and demand forecast unit, 435 supply and demand forecast information transmission unit, S900 control target selection process
Claims
1. The information processing device includes a processor and a storage device. storing a required suppression amount, which is a target value of the suppression amount of power in the power system to be achieved by remote ampere control, the target value being calculated based on supply and demand forecast information of the power system; storing a history of remote ampere control performed on each of a plurality of consumers receiving power from the power system; storing a suppression amount for each of the plurality of consumers when remote ampere control is performed; Selecting, in order, the consumer that has had remote ampere control performed a minimum number of times in the past, with priority, until the integrated value of the suppression amount obtained by performing the remote ampere control becomes equal to or greater than the required suppression amount; Generate information indicating the selected consumer. A remote ampere controlled control selection device.
2. 2. The control target selection device for remote ampere control according to claim 1, If it is not possible to narrow down to one consumer who has performed the remote ampere control the least number of times in the past, the consumer who has the oldest most recent performance history is further selected with priority. A remote ampere controlled control selection device.
3. 3. The control target selection device for remote ampere control according to claim 2, If it is not possible to narrow down the consumer with the oldest most recent implementation history to one, the consumer with the smallest amount of suppression is further preferentially selected. A remote ampere controlled control selection device.
4. A smart meter operation management device that controls a smart meter using the information generated by the target selection device for remote ampere control according to any one of claims 1 to 3, A smart meter provided in the plurality of consumers is communicatively connected to the smart meter, updating a limit value, which is a current value at which power supply to a load of the consumer is cut off and which is stored in the smart meter installed in the consumer identified from the information, to a value lower than the currently stored limit value; Smart meter operation and management device.
5. An information processing device having a processor and a storage device, a step of storing a required suppression amount, which is a target value of the suppression amount of power in the power system to be achieved by remote ampere control, determined based on supply and demand forecast information of the power system; storing a history of past remote ampere control implementations for each of a plurality of consumers receiving power from the power system; storing a suppression amount for each of the plurality of consumers when remote ampere control is performed; a step of sequentially selecting, with priority, the consumer that has been subjected to the remote ampere control the least number of times in the past, until an integrated value of the suppression amount obtained by performing the remote ampere control becomes equal to or greater than the required suppression amount; and generating information indicating the selected consumer; A method for selecting targets for remote ampere control.
6. 6. A method for selecting a target for remote ampere control according to claim 5, comprising the steps of: When the information processing device cannot narrow down the number of times that remote ampere control has been implemented in the past to one consumer, the information processing device further selects the consumer with the oldest most recent implementation history by giving priority to the consumer; The method for selecting a target for remote ampere control further comprises:
7. 7. A method for selecting a target for remote ampere control according to claim 6, comprising the steps of: a step of, when the information processing device cannot narrow down the consumer with the oldest most recent implementation history to one consumer, further preferentially selecting the consumer with the smallest amount of suppression; The method for selecting a target for remote ampere control further comprises:
8. A method for selecting a target for remote ampere control according to any one of claims 5 to 7, comprising the steps of: a step of transmitting the information to a smart meter operation management device that controls smart meters provided at the plurality of consumers and is communicatively connected to the information processing device; a step of the smart meter operation management device updating a limit value, which is a current value at which power supply to a load is cut off and is stored in the smart meter provided in the consumer identified from the information, to a value lower than the currently stored limit value; The method for selecting a target for remote ampere control further comprises:
Citation Information
Patent Citations
Planned outage announcement support system
JP2012060809A