COMMUNICATION CONTROL DEVICE, METHOD, PROGRAM, AND VEHICLE

The communication control device optimizes communication methods by predicting available networks along a scheduled route, addressing connectivity and bandwidth issues in mobile devices.

JP7556738B2Active Publication Date: 2024-09-26TOYOTA JIDOSHA KK +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2020168632
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-10-05
Publication Date
2024-09-26
Estimated Expiration
2040-10-05

AI Technical Summary

Technical Problem

Existing communication control systems for mobile devices fail to accurately predict and switch to the optimal communication method as the device moves, leading to potential network connection failures and inability to achieve desired communication bands.

Method used

A communication control device that acquires a scheduled route and stores communication possibility information associating locations with available methods, controlling communication methods based on this data and requested content to ensure connectivity and bandwidth.

Benefits of technology

The device optimally controls communication methods during movement, preventing connection failures and ensuring desired bandwidth by predicting and adapting to communication environments along the route.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007556738000005
    Figure 0007556738000005
  • Figure 0007556738000004
    Figure 0007556738000004
  • Figure 0007556738000006
    Figure 0007556738000006
Patent Text Reader

Abstract

To provide a communication control device that can suitably control a communication method while traveling.SOLUTION: A communication control device can be connected with an external apparatus by using a plurality of communication methods, and comprises: an acquisition unit that acquires a first route as a scheduled route on which the communication control device travels; a storage unit that stores communicability information in which at least a position at which the communication control device can be connected with the external apparatus and a communication method, of the plurality of communication methods, which is available at the position are associated with each other; a control unit that controls a communication method that an application mounted on the communication control device uses for the communication with the external apparatus while the communication control device travels based on the first route, the communicability information, and the details of communication requested by the application; and a communication unit that executes the communication between the application and the external apparatus by using the communication method controlled by the control unit.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a communication control device that can be connected to an external device using a plurality of communication methods. [Background technology]

[0002] In mobile devices that implement multiple communication methods (e.g., cellular (4G / 5G) and wireless LAN) as a means of communication to connect to networks such as the Internet, the most appropriate communication method is automatically or manually selected from the multiple communication methods according to the situation in which the mobile device is placed.

[0003] Patent Document 1 discloses a system that provides flexible and stable network communication for mobile terminals mounted on vehicles, etc. This system uses information indicating areas where communication is possible using each communication method to predict the area where the vehicle will be located a predetermined time later (several seconds later) based on the current vehicle position and speed, and performs control to determine the optimal communication method for mobile equipment in this predicted area. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2005-012563 A Summary of the Invention [Problem to be solved by the invention]

[0005] In the technology described in the above-mentioned Patent Document 1, the communication method of the mobile device after a certain time has actually passed since the predicted time is switched to the communication method predicted a certain time ago. However, there is a risk that the vehicle is not in the predicted area when the communication method is switched, and therefore it is not possible to connect to the network using the switched communication method, or the desired communication band cannot be obtained. Therefore, there is room for further improvement in the mechanism for controlling the communication method when a device such as a mobile device moves.

[0006] The present disclosure has been made in consideration of the above problems, and aims to provide a communication control device and the like that can suitably control a communication method when moving. [Means for solving the problem]

[0007] In order to solve the above problem, one aspect of the disclosed technology is a communication control device that can connect to an external device using multiple communication methods, and includes an acquisition unit that acquires a first route as a planned route along which the communication control device will move, a memory unit that stores communication possibility information that at least corresponds a location at which the communication control device can connect to an external device with a communication method among the multiple communication methods that can be used at that location, a control unit that controls the communication method that an application implemented in the communication control device uses to communicate with the external device while the communication control device is moving, based on the first route, the communication possibility information, and the communication content requested by the application, and a communication unit that performs communication between the application and the external device using the communication method controlled by the control unit.

[0008] Another aspect of the disclosed technology is a communication control method executed by a computer of a communication control device connectable to an external device using multiple communication methods, or a control program to be executed by the computer of the communication control device, the method including: an acquisition unit that acquires a first route as a planned route along which the communication control device will move; a memory unit that stores communication possibility information that at least corresponds a position at which the communication control device can connect to an external device with a communication method among multiple communication methods that can be used at that position; a control unit that controls a communication method that an application implemented in the communication control device uses to communicate with the external device while the communication control device is moving, based on the first route, the communication possibility information, and the communication content requested by the application; and a communication unit that executes communication between the application and the external device using a communication method controlled by the control unit. Effect of the Invention

[0009] According to the communication control device disclosed herein, the communication method used by an application to communicate with an external device while the communication control device is moving is controlled based on a planned route (first route), communication possibility information, and the communication content requested by the application, thereby making it possible to more appropriately control the communication method when moving. [Brief description of the drawings]

[0010] [Figure 1] A functional block diagram of a communication control device according to a first embodiment and its peripheral units. [Diagram 2] FIG. 1 is a diagram showing an example of communication possibility information stored in a communication possibility database; [Figure 3A] 1 is a flowchart showing a procedure of communication control executed by a communication control device according to a first embodiment; [Figure 3B] 1 is a flowchart showing a procedure of communication control executed by a communication control device according to a first embodiment; [Figure 4] A functional block diagram of a communication control device and its peripheral parts according to a second embodiment. [Diagram 5] A functional block diagram of a communication control device according to a third embodiment and its peripheral units. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] The communication control device disclosed herein controls the communication method that an application implemented in the communication control device uses to communicate with an external device while the communication control device is moving, based on the route along which the communication control device plans to move, communication possibility information that associates positions at which the communication control device can connect to an external device with communication methods available at those positions, and communication content defined by a data transmission / reception request generated by the application. This control prevents the communication control device from being unable to connect to an external device at a planned position, or from being unable to obtain a desired communication bandwidth even if the communication control device can connect to an external device, thereby making it possible to optimally control the communication method used when the communication control device moves.

[0012] The communication control device according to the present disclosure is a device that can be connected to an external device using a plurality of communication methods. Hereinafter, each embodiment of the present disclosure will be described in detail with reference to the drawings, taking an example in which the communication control device is mounted on a mobile device such as a vehicle.

[0013] <First embodiment> [composition] 1 is a functional block diagram of a communication control device 100 and its peripheral units according to the first embodiment of the present disclosure. The functional block illustrated in FIG. 1 includes the communication control device 100 and a center 500 mounted on a vehicle.

[0014] The center 500 is an external device other than a vehicle that receives services provided by the communication control device 100 and provides its own services to the communication control device 100 by communicating with the communication control device 100. The center 500 may be, for example, a fixed facility such as a server, or a mobile terminal such as a smartphone.

[0015] The communication control device 100 includes a power supply state detection unit 110, a communication control unit 120, an external communication application unit 130, an external communication unit 140, and a path determination unit 150.

[0016] The power supply state detection unit 110 can detect the current power supply state of the communication control device 100 and estimate the future power supply state of the communication control device 100 based on the planned route output by the route determination unit 150 described later. The power supply state of the communication control device 100 is the amount of stored power and the charge / discharge state of a battery (not shown) built into the communication control device 100. For example, when the communication control device 100 is mounted on a plug-in chargeable electric vehicle (PHV), the following can be set as the charge / discharge state of the vehicle: "IG state" in which the motor generator generates power and the on-board battery can be charged; "+B state" in which the motor generator does not generate power and the on-board battery is not charged; and "PlugIn state" in which the on-board battery is plugged in and charged from an external power supply facility. The power supply state detection unit 110 can also detect the power currently available for the communication control device 100 and estimate the power available for the communication control device 100 on the planned route. The power supply state detection unit 110 outputs information on the power supply state and available power of the communication control device 100 to the communication control unit 120.

[0017] The external communication application unit 130 includes an application implemented in the communication control device 100, and can implement a predetermined service by communicating with the center 500. In this embodiment, an example in which three applications, a first application 131, a second application 132, and a third application 133, are implemented as the external communication application unit 130 is shown, but the number of applications implemented in the communication control device 100 is not limited to this.

[0018] The external communication application unit 130 outputs a request for data transmission and / or a request for data reception (hereinafter referred to as "communication needs") generated from one or more of the first application 131, the second application 132, and the third application 133 to the communication control unit 120. The communication needs include, as the content required for communication (communication content), at least one of constraint information on the amount of data to be communicated (communication data amount), the time during which communication delay is allowed (allowable communication delay time), whether or not communication may be interrupted (communication interruption possibility), and the allowable cost for communication (allowable communication cost). In addition, the external communication application unit 130 receives a notification on the communication method and communication timing of the external communication unit 140 permitted to realize the communication needs from the communication control unit 120 (the communication policy decision notification unit 124 described later). Then, the external communication application unit 130 transmits data to the center 500 or receives data from the center 500 via the external communication unit 140 based on the notification received from the communication control unit 120.

[0019] Examples of applications implemented in the external communication application unit 130 include an application (Field of Test (FOT) application) that uploads predetermined data (field data) collected while the vehicle is traveling to the center 500 as needed. Another example is an application (hybrid navigation application) that downloads map data of a planned travel destination used for navigation that appropriately acquires map data required for route guidance, so-called hybrid navigation, from the center 500. Another example is an application (remote service application) that uploads data related to the vehicle state to the center 500 based on a request from the center 500. Another example is an application (Over The Air (OTA) application) that downloads an update program for updating software such as an ECU from the center 500.

[0020] The external communication unit 140 is a communication interface for connecting the communication control device 100 to the center 500 directly or via a network. In this embodiment, the external communication unit 140 includes, as communication means, a first communication unit 141 using a cellular 4G communication method, a second communication unit 142 using a cellular 5G communication method, a third communication unit 143 using a wireless LAN communication method, and a fourth communication unit 144 using a wired LAN communication method. The number of communication units included in the external communication unit 140 and the communication methods handled are not limited to those shown in the figure. The external communication unit 140 outputs operation information indicating whether each of the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 is operating normally to the communication control unit 120 (a communication policy decision notifying unit 124 described later).

[0021] The route determination unit 150 can determine a planned route along which the communication control device 100 moves (travels). The route determination unit 150 includes, for example, a navigation function that provides route guidance to a destination based on map data, an automatic driving function that performs all driving control by the vehicle, and a driving assistance function such as ACC (Adaptive Cruise Control) that assists the vehicle in controlling part of the driving. The route determination unit 150 outputs information about the planned route determined by these functions (passage positions, moving speed between passing positions, etc.) to the communication control unit 120 (communication possibility prediction unit 121 described later). In addition, when an alternative route is proposed by the communication control unit 120 (route review unit 123 described later), the route determination unit 150 can determine whether to change the current planned route to the alternative route based on predetermined conditions determined by safety and travel needs (arrival time, travel cost, comfort, etc.).

[0022] The communication control unit 120 controls communication performed between the communication control device 100 and the center 500. The communication control unit 120 includes a communication possibility prediction unit 121, a communication possibility database (DB) 122, a route planning unit 123, and a communication strategy decision notifying unit 124.

[0023] The communication possibility database 122 is a storage unit that stores communication possibility information that at least associates a position where the communication control device 100 can be connected to the center 500 with a communication method available at each position among a plurality of communication methods provided in the external communication unit 140. An example of communication possibility information stored in the communication possibility database 122 is shown in FIG.

[0024] In the communication possibility information shown in FIG. 2, the passing speed, the communication possible method, the communication possible band, the weather, the transmission and reception power, the disconnection rate, and the error rate are stored in association with each other for each time at each position. The position is, for example, a point indicated by latitude and longitude (a node in map data), a straight line connecting two points (a link), or an area surrounded by four points (a mesh). The time is basically information of hours and minutes, and may further include information such as the month, date, and day of the week. The passing speed is the speed when the communication control device 100 passes through the position. In addition, when the position is a straight line or an area, it may be an instantaneous value of the speed at a certain point, or may be an average value or maximum value of the speed. The communication possible method indicates a communication method that the communication control device 100 can use at the position under the conditions of each time and the passing speed. The communication possible band indicates a communication band that the communication control device 100 can use at the position under the conditions of each time, the passing speed, and the communication method. The weather is a meteorological condition such as sunny, rainy, and snowy, and indicates the weather when each passing speed, communication possible method, and communication possible band were obtained at the position and time. The transmission and reception power indicates the power that the communication control device 100 can transmit and receive under the conditions of each time, passing speed, communication method, and weather at the position. The disconnection rate indicates the rate at which communication between the communication control device 100 and the center 500 is disconnected under the conditions of each time, passing speed, communication method, communication possible band, weather, and transmission and reception power at the position. The error rate indicates the rate at which an error occurs in communication between the communication control device 100 and the center 500 under the conditions of each time, passing speed, communication method, communication possible band, weather, and transmission and reception power at the position. The above-mentioned information on the weather, transmission and reception power, disconnection rate, and error rate may be omitted. In addition, when the communication possibility information differs depending on the installation location of the communication antenna of the communication control device 100, the communication possibility information may be stored for each installation location of the communication antenna.

[0025] The communication possibility prediction unit 121 acquires the planned route determined by the route determination unit 150. Then, the communication possibility prediction unit 121 predicts the communication possibility on the planned route acquired from the route determination unit 150, based on information on the state of the communication control device 100 (position, speed, etc.), information on the state around the communication control device 100 (time, weather, etc.), and communication possibility information stored in the communication possibility database 122. The communication possibility in this embodiment refers to a communication possible method, a communication possible band, a transmission / reception power, a disconnection rate, and an error rate.

[0026] The communication policy decision notifying unit 124 determines the optimal communication method and communication timing for executing the communication needs received from the external communication application unit 130 based on at least the communication possibility on the planned route predicted by the communication possibility prediction unit 121 and the operation information output from the external communication unit 140. When there are multiple communication needs, the communication policy decision notifying unit 124 determines the communication method and communication timing for each communication need based on a priority given in advance to each communication need. The communication policy decision notifying unit 124 may further determine the optimal communication method and communication timing for executing the communication needs based on the power state of the communication control device 100 detected by the power state detection unit 110 and available power on the predicted planned route. Note that the communication method and communication timing may be determined for each application (first application 131, second application 132, and third application 133) implemented by the external communication application unit 130, rather than for each communication need. Then, the communication strategy determination notifying unit 124 notifies the external communication application unit 130 of the communication method for implementing the relevant communication needs, in accordance with the determined communication method and communication timing.

[0027] The route planning unit 123 considers whether or not there is an optimal route for executing the communication needs received from the external communication application unit 130 other than the current planned route already determined by the route determination unit 150. This consideration is performed based on the communication data volume, the allowable communication delay time, the possibility of communication interruption, and the allowable communication cost, which are communication contents required by the communication needs. Details of this consideration will be described later. Furthermore, the route planning unit 123 may consider whether or not power can be reduced based on the power state of the communication control device 100 detected by the power state detection unit 110 and the available power on the predicted planned route. If the route planning unit 123 finds an optimal alternative route other than the planned route as a result of the route consideration, it proposes to the route determination unit 150 to change to the alternative route.

[0028] Incidentally, a part or all of the above-mentioned communication control device 100 may be configured as an electronic control unit (ECU) that typically includes a processor such as a microcomputer, a memory, an input / output interface, etc. This electronic control unit can realize a part or all of the functions of the power supply state detection unit 110, the communication control unit 120, the external communication application unit 130, the external communication unit 140, and the path determination unit 150 by the processor reading and executing a program stored in the memory.

[0029] [control] Next, the control performed by the communication control device 100 of this embodiment will be described with further reference to Fig. 3A and Fig. 3B. Fig. 3A and Fig. 3B are flowcharts showing the procedure of the communication control process executed by the communication control device 100. Note that the process in Fig. 3A and the process in Fig. 3B are connected by connectors X, Y, and Z, respectively.

[0030] The communication control shown in FIG. 3 is started, for example, when the route determination unit 150 determines a planned route along which the communication control device 100 is to move.

[0031] (Step S301) The external communication application unit 130 judges whether or not one or more communication needs have newly arisen in the first application 131, the second application 132, and the third application 133. If new communication needs have arisen (S301, Yes), the process proceeds to step S302. The arisen communication needs are output to the communication control unit 120. On the other hand, if new communication needs have not arisen (S301, No), the process proceeds to step S312.

[0032] (Step S302) When the communication control unit 120 inputs (accepts) communication needs from the external communication application unit 130, the communication possibility prediction unit 121 acquires the planned route (first route) determined by the route determination unit 150 from the route determination unit 150. When the planned route (first route) is acquired, the process proceeds to step S303.

[0033] (Step S303) The communication possibility prediction unit 121 of the communication control unit 120 predicts the communication possibility (communication possible method, communication possible band, etc.) at each position on the planned route (first route) determined by the route determination unit 150, based on the communication possibility information stored in the communication possibility database 122. When the prediction of the communication possibility on the planned route (first route) is completed, the process proceeds to step S304.

[0034] (Step S304) The route planning unit 123 of the communication control unit 120 considers a change to the planned route (first route) based on the planned route (first route) determined by the route determination unit 150, the communication needs generated by the external communication application unit 130, and the communication possibility information stored in the communication possibility database 122. Specifically, the route planning unit 123 considers whether or not there is an alternative route (second route) that can satisfy the communication contents (communication data volume, allowable communication delay time, whether communication can be interrupted, allowable communication cost) required by the communication needs more than when moving along the current planned route (first route). Here, examples of cases that can satisfy the communication needs include cases where the planned route (first route) does not pass through a position where wireless LAN can be used, but the alternative route (second route) can pass through a position where wireless LAN can be used, thereby reducing communication costs, and cases where the planned route (first route) can satisfy the allowable communication delay time, but the alternative route (second route) can perform communication with less delay time, resulting in higher communication efficiency. Information such as map data required for considering a route change may be acquired from the route determination unit 150, may be stored in the route planning unit 123 itself, or may be acquired from another component. When the consideration of a change to the planned route (first route) is completed, the process proceeds to step S305.

[0035] (Step S305) As a result of considering changes to the planned route (first route), the route planning unit 123 of the communication control unit 120 judges whether or not there is an alternative route (second route) to which the planned route (first route) can be changed. There may be one alternative route (second route) or two or more alternative routes. If there is an alternative route (second route) (S305, Yes), the process proceeds to step S306. The alternative route (second route) is output to the route determination unit 150, which proposes a change to the planned route (first route). On the other hand, if there is no alternative route (second route) (S305, No), the process proceeds to step S308.

[0036] (Step S306) The route determination unit 150 judges whether the alternative route (second route) proposed by the communication control unit 120 satisfies the predetermined conditions required for the currently planned route (first route). Examples of the predetermined conditions include the desired arrival time at the destination, the travel cost to the destination (fuel cost, toll road fee, etc.), and the comfort (presence or absence of traffic jam, presence or absence of mountain road, etc.). If the alternative route (second route) satisfies the predetermined conditions (S306, Yes), the process proceeds to step S307, and if the alternative route (second route) does not satisfy the predetermined conditions (S306, No), the process proceeds to step S308.

[0037] (Step S307) The route determination unit 150 changes the planned route of the communication control device 100 from the currently determined planned route (first route) to an alternative route (second route). When the planned route is changed, the process proceeds to step S308.

[0038] (Step S308) The communication possibility prediction unit 121 of the communication control unit 120 again acquires the changed planned route (second route) from the route determination unit 150. When the planned route (second route) is acquired again, the process proceeds to step S309.

[0039] (Step S309) The communication possibility prediction unit 121 of the communication control unit 120 re-predicts the communication possibility at each position on the planned route (second route) based on the communication possibility information stored in the communication possibility database 122. When the re-prediction of the communication possibility on the planned route (second route) is completed, the process proceeds to step S310.

[0040] (Step S310) The communication policy decision notifying unit 124 of the communication control unit 120 acquires the state of the external communication unit 140. The state of the external communication unit 140 is information indicating whether each of the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 is in a usable state. Examples of an unusable state include a failure of the communication unit and no power supply to the communication unit. When the state of the external communication unit 140 is acquired, the process proceeds to step S311.

[0041] (Step S311) The communication strategy determination notifying unit 124 of the communication control unit 120 determines a communication strategy indicating a communication method and a communication timing for the communication needs generated in the external communication application unit 130 based on the communication possibility on the planned route (first route or second route) predicted by the communication possibility prediction unit 121 and the state of the external communication unit 140. As an example of this communication strategy, for the communication needs N, the communication method of wireless LAN via the third communication unit 143 is used at the timing of passing through the position P1, and the communication method of cellular 5G via the first communication unit 141 is used at the timing of passing through the position P2. When the communication strategy is determined, the process proceeds to step S312.

[0042] (Step S312) The communication strategy determination notifying unit 124 of the communication control unit 120 judges whether or not the communication timing indicated by the determined communication strategy has arrived. If the communication timing has arrived (S312, Yes), the process proceeds to step S313, and if the communication timing has not arrived (S312, No), the process proceeds to step S315.

[0043] (Step S313) The communication strategy determination notifying unit 124 of the communication control unit 120 notifies the target application (hereinafter referred to as the "target application") in the external communication application unit 130 of the communication method to be implemented at the communication timing determined in step S312. When the communication method is notified to the target application, the process proceeds to step S314.

[0044] (Step S314) The target application of the external communication application unit 130 communicates with the center 500 using the communication method notified by the communication control unit 120. Specifically, the target application requests the external communication unit 140 to communicate with the center 500 using the communication method notified by the communication control unit 120, and in response to this request, the external communication unit 140 realizes communication between the target application and the center 500. When communication between the target application and the center 500 is established, the process proceeds to step S315.

[0045] (Step S315) The route determination unit 150 judges whether or not movement along the planned route (first route or second route) by the communication control device 100 has ended. End of movement includes a case where the communication control device 100 stops movement along the planned route, a case where the communication control device 100 arrives at the destination point of the planned route, etc. If movement along the planned route has not ended (S315, No), the process proceeds to step S301, and if movement along the planned route has ended (S315, Yes), the process of this communication control ends.

[0046] As described above, by using the planned route along which the communication control device 100 will move, it is possible to predict with high accuracy in advance the communication method that the communication control device 100 can use for communication with the center 500. This makes it possible to prevent problems such as not being able to use (connect) a future communication method predicted based on the current situation or not being able to obtain a predicted future communication band.

[0047] [Specific example] Next, the communication control executed by the above-mentioned communication control device 100 will be described with some concrete examples.

[0048] (1) Example of data transmission using Wi-Fi (registered trademark) communication whenever possible using the FOT app When test data accumulates in the FOT application, a communication need occurs that requests the FOT application to transmit data to center 500. This communication need includes, as the requested communication content, constraint information such as the communication data volume (e.g., 1 GB) calculated from the accumulated data, the allowable communication delay time (e.g., 12 hours) calculated from the importance of the remaining test data and the remaining recording capacity, and whether or not communication can be interrupted (e.g., interruption is possible) derived from the characteristics of the application, and the allowable communication cost (e.g., the minimum cost limited to WiFi communication).

[0049] Based on the communication possibility information stored in the communication possibility database 122, the communication possibility prediction unit 121 predicts that cellular 4G communication will be available at some locations (passing points) on the current planned route, and that wireless LAN communication will be available at some other locations (intersections, parking lots).

[0050] Based on the communication possibility information stored in the communication possibility database 122, the route consideration unit 123 considers a route that satisfies the communication content required by the communication needs more than the planned route, and derives an alternative route that includes two intersections where the vehicle can stop at a red light and perform wireless LAN communication, and a parking lot where wireless LAN communication can be performed.

[0051] The route determination unit 150 checks whether the alternative route derived by the route planning unit 123 satisfies the predetermined conditions (safety, desired arrival time at the destination, etc.) required for the current planned route. In this example, since the predetermined conditions are satisfied, the route determination unit 150 changes the planned route to the alternative route.

[0052] The communication policy determination notifying unit 124 determines a communication policy with the communication timing set to the time when the vehicle stops at red lights at two intersections and the communication method set to wireless LAN based on the changed planned route (alternative route) and the communication content required by the communication needs. Then, the communication policy determination notifying unit 124 notifies the FOT application to transmit data to the center 500 by connecting via wireless LAN according to the determined communication policy at the timing when the communication control device 100 moves along the planned route and stops at an intersection.

[0053] In response to the notification, the FOT application receives a notification from the communication strategy decision notifying unit 124 at the intersection and requests the third communication unit 143 to transmit test data to the center 500 via wireless LAN communication.

[0054] If all the test data has not yet been transmitted to the center 500 at the time of arrival at the parking lot, the communication policy decision notifying unit 124 notifies the FOT application to transmit data to the center 500 by connecting via wireless LAN. At this time, if there are limited places in the parking lot where wireless LAN can be connected, the route planning unit 123 will reconsider a route change to move to a parking spot where wireless LAN can be connected. Then, at the timing when the communication control device 100 moves to a parking spot where wireless LAN can be connected, the communication policy decision notifying unit 124 notifies the FOT application to transmit data to the center 500 by connecting via wireless LAN.

[0055] In response to the notification received from the communication policy decision notifying unit 124 in the parking lot, the FOT application requests the third communication unit 143 to transmit test data to the center 500 via wireless LAN communication.

[0056] (2) Example of data reception using cellular and WiFi communications by a hybrid navigation app When the hybrid navigation system requires map data for an area where the vehicle is scheduled to travel in the future, a communication need occurs to request data reception from the center 500 to the hybrid navigation system application. This communication need includes, as requested communication content, constraint information such as the amount of map data for the area where the vehicle is scheduled to travel (e.g., 100 MB), the allowable communication delay time calculated from the planned arrival time at the area where the vehicle is scheduled to travel (e.g., 30 minutes), whether communication can be interrupted (e.g., interruption is possible) derived from the characteristics of the application, and the allowable communication cost (e.g., the standard cost for using cellular and WiFi communication).

[0057] Based on the communication possibility information stored in the communication possibility database 122, the communication possibility prediction unit 121 predicts that cellular 4G and 5G communication will be available at some locations (passing points) on the current planned route, and that wireless LAN communication will be available at some other locations (intersections).

[0058] Based on the planned route and the communication content required by the communication needs, the communication policy determination notifying unit 124 determines the communication policy in which the communication timing is the time when the vehicle stops at red lights at two intersections and the communication method is wireless LAN in order to prioritize communication cost within 20 minutes, and the communication delay time is prioritized after 20 minutes, so the communication timing is the time when connection is possible and the communication method is cellular 4G and 5G communication. Then, in accordance with the determined communication policy, the communication policy determination notifying unit 124 notifies the hybrid navigation application to receive map data from the center 500 by connecting via wireless LAN when the communication control device 100 moves along the planned route and stops at an intersection.

[0059] In response to the notification at the intersection from the communication strategy determination notifying unit 124, the hybrid navigation application requests the third communication unit 143 to receive map data from the center 500 via wireless LAN communication.

[0060] When 20 minutes have passed since the communication need occurred (regardless of whether an intersection has been passed), the communication strategy decision notification unit 124 notifies the hybrid navigation app to receive map data from the center 500 by connecting via cellular 4G or 5G when the communication control device 100 is capable of cellular communication.

[0061] In response to the notification, the hybrid navigation application receives a notification from the communication strategy decision notification unit 124 and requests the first communication unit 141 or the second communication unit 142 to receive map data from the center 500 via cellular 4G or 5G communication.

[0062] (3) Example of data transmission using cellular communications in response to a request from a center for remote services When a remote service located in the center 500 requires current state data held by a remote service application implemented in the communication control device 100 for a parked communication control device 100, a communication need occurs to request data transmission from the remote service application to the center 500. This communication need includes, as requested communication content, information such as the amount of current state data (e.g., 100 KB), an allowable communication delay time derived from the characteristics of the application (e.g., immediate), whether communication can be interrupted (e.g., interruption is not possible), and an allowable communication cost (e.g., the maximum cost for using only cellular communication).

[0063] The communication possibility prediction unit 121 predicts, based on the communication possibility information stored in the communication possibility database 122, that cellular 4G and 5G communication, and wireless LAN communication will be available at the location where the vehicle is stopped.

[0064] The communication policy determination notifying unit 124 determines a communication policy in which cellular 5G communication is used as the communication method according to the communication content required by the communication needs. Then, the communication policy determination notifying unit 124 notifies the remote service app to immediately transmit status data to the center 500 by connecting via cellular 5G communication according to the determined communication policy.

[0065] In response to the notification, the remote service app that has received the notification from the communication policy decision notifying unit 124 requests the second communication unit 142 to transmit status data to the center 500 via cellular 5G communication.

[0066] (4) An example where a FOT app and an OTA app generate communication needs at the same time When test data accumulates in the FOT application, a communication need occurs that requests data transmission from the FOT application to center 500. This communication need includes information such as the requested communication content, such as the communication data volume (e.g., 1 GB) calculated from the accumulated data, the allowable communication delay time (e.g., 12 hours) calculated from the importance of the remaining test data and the remaining recording capacity, whether communication can be interrupted (e.g., whether interruption is possible) derived from the characteristics of the application, and the allowable communication cost (e.g., the minimum cost limited to WiFi communication).

[0067] When a user such as a driver requests the OTA app to receive update data, a communication need arises to request the OTA app to receive data from center 500. This communication need includes information such as the requested communication content, such as the amount of update data (e.g., 200 MB), the allowable communication delay time (e.g., 1 hour) calculated based on the fact that it is a user request, whether communication can be interrupted (e.g., whether interruption is possible) derived from the characteristics of the app, and the allowable communication cost (e.g., the minimum cost limited to WiFi communication).

[0068] Based on the communication possibility information stored in the communication possibility database 122, the communication possibility prediction unit 121 predicts that cellular 4G will be available at some locations (passing points) on the current planned route, and that wireless LAN communication will be available at some other locations (intersections, parking lots).

[0069] Based on the communication possibility information stored in the communication possibility database 122, the route planning unit 123 plans a route that satisfies the communication content required by at least one of the communication needs more than the planned route, and derives an alternative route that includes two intersections where the vehicle can stop at a red light to perform wireless LAN communication, and a parking lot where wireless LAN communication can be performed.

[0070] The route determination unit 150 checks whether the alternative route derived by the route planning unit 123 satisfies the predetermined conditions (safety, desired arrival time at the destination, etc.) required for the current planned route. In this example, since the predetermined conditions are satisfied, the route determination unit 150 changes the planned route to the alternative route.

[0071] The communication policy determination notifying unit 124 determines to prioritize the communication needs of the OTA application over the communication needs of the FOT application based on the allowable communication delay time of both communication needs. Note that the communication contents required by the communication needs may be assigned a priority in advance for each communication need. Then, based on the changed planned route (alternative route) and the communication contents required by both communication needs, the communication policy determination notifying unit 124 determines a communication policy in which the communication timing is the time when the vehicle stops at red lights at two intersections, the communication method is wireless LAN, and the communication needs of the OTA application are given first priority and the communication needs of the FOT application are given second priority.

[0072] The communication policy determination notifying unit 124 notifies the OTA application to receive update data from the center 500 by connecting via wireless LAN according to the determined communication policy when the communication control device 100 moves along the planned route and stops at an intersection.

[0073] In response to the notification, the OTA application receives a notification from the communication policy decision notifying unit 124 at the intersection and requests the third communication unit 143 to receive update data from the center 500 via wireless LAN communication.

[0074] When the OTA app has finished receiving all update data, the communication strategy determination notification unit 124 notifies the FOT app to transmit data to the center 500 by connecting via wireless LAN according to the determined communication strategy when the communication control device 100 moves along the planned route and stops at an intersection.

[0075] In response to the notification, the FOT application receives a notification from the communication strategy decision notifying unit 124 at the intersection and requests the third communication unit 143 to transmit test data to the center 500 via wireless LAN communication.

[0076] As can be seen from the above-mentioned specific example, the communication control device according to this embodiment can suitably determine the communication method.

[0077] <Second embodiment> 4 is a functional block diagram of a communication control device 200 and its peripheral units according to the second embodiment of the present disclosure. The functional block illustrated in FIG. 4 includes the communication control device 200 and a center 500 mounted on a vehicle.

[0078] A communication control device 200 according to the second embodiment shown in Fig. 4 differs from the communication control device 100 according to the first embodiment shown in Fig. 1 in the configurations of a route determination unit 250 and a human machine interface device (HMI) 210. The communication control device 200 according to the second embodiment will be described below, focusing on this different configuration.

[0079] The human-machine interface device 210 is a functional unit that is responsible for transmitting information between the communication control device 100 and a user such as a driver, and can provide the user with information for inquiring whether or not it is acceptable to change the planned route to an alternative route. The inquiry is made, for example, by displaying on a multi-information display or a meter, or by voice through a speaker, etc.

[0080] The route determination unit 250 can determine a planned route along which the communication control device 200 moves (travels). The route determination unit 250 includes, for example, a navigation function that provides route guidance to a destination based on map data, an automatic driving function that performs all driving control by the vehicle, and a driving assistance function such as ACC that assists the vehicle in controlling part of the driving. The route determination unit 250 outputs information about the planned route determined by these functions (passing positions, moving speed between passing positions, etc.) to the communication control unit 120 (communication possibility prediction unit 121). In addition, the route determination unit 250 changes the current planned route to the alternative route only when permission is obtained from the user if an alternative route proposed by the communication control unit 120 (route review unit 123) satisfies predetermined conditions determined by safety and travel needs (arrival time, travel cost, comfort, etc.).

[0081] In the communication control device 100 according to the first embodiment, the route determination unit 150 automatically determines whether or not to change the current planned route (first route) to the alternative route (second route) considered by the route consideration unit 123 of the communication control unit 120 based on a predetermined condition. In contrast, the communication control device 200 according to the second embodiment inquires of a user such as a driver via the human-machine interface device 210 whether or not it is acceptable to change the current planned route (first route) to the alternative route (second route) considered by the route consideration unit 123 of the communication control unit 120, and changes the current planned route (first route) to the alternative route (second route) only when permission is obtained from the user. In this way, the user can understand that the planned route along which the communication control device 200 travels will be changed or has already been changed, and the user does not feel distrust or discomfort.

[0082] <Third embodiment> [composition] 5 is a functional block diagram of a communication control device 100 and its peripheral units according to the third embodiment of the present disclosure. The functional block illustrated in FIG. 5 includes a communication control device 300 and a center 500 mounted on a vehicle.

[0083] A communication control device 300 according to the third embodiment shown in Fig. 5 differs from the communication control device 100 according to the first embodiment shown in Fig. 1 in the configurations of a communication control unit 320, an external communication application unit 330, and an external communication unit 340. The communication control device 300 according to the third embodiment will be described below, focusing on this different configuration.

[0084] The external communication application unit 330 includes an application implemented in the communication control device 300, and can implement a predetermined service by communicating with the center 500. In this embodiment, an example is shown in which three applications, a first application 131, a second application 132, and a third application 133, are implemented as the external communication application unit 330. Note that the first application 131, the second application 132, and the third application 133 are as described above.

[0085] The external communication application unit 330 outputs communication needs, which are requests for data transmission and / or requests for data reception generated from one or more of the first application 131, the second application 132, and the third application 133, to the communication control unit 320. The communication needs are as described above. Furthermore, when the communication needs are requests for data transmission, the external communication application unit 330 outputs data to be transmitted to the communication control unit 320 (communication data temporary storage unit 326 described later) in advance.

[0086] The external communication unit 340 is a communication interface for connecting the communication control device 300 to the center 500 directly or via a network. The external communication unit 340 of this embodiment is an example including a first communication unit 141, a second communication unit 142, a third communication unit 143, and a fourth communication unit 144 as communication means. The first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 are as described above. The external communication unit 340 outputs operation information indicating whether the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 are operating normally to the communication control unit 320 (the communication policy decision notifying unit 124 of the communication control unit 320). When the communication need is a request for data reception, the external communication unit 340 outputs data received from the center 500 to the communication data temporary storage unit 326 of the communication control unit 320 in advance.

[0087] The communication control unit 320 controls communication between the communication control device 300 and the center 500. The communication control unit 320 includes a communication possibility prediction unit 121, a communication possibility database (DB) 122, a route planning unit 123, a communication strategy decision notifying unit 324, a communication strategy execution unit 325, and a communication data temporary storage unit 326. The communication control unit 320 of the third embodiment is different from the communication control unit 120 of the first embodiment in the configurations of the communication strategy decision notifying unit 324, the communication strategy execution unit 325, and the communication data temporary storage unit 326.

[0088] The communication policy decision notifying unit 324 determines the optimal communication method and communication timing for executing the communication needs received from the external communication application unit 330 based on at least the communication possibility on the planned route predicted by the communication possibility prediction unit 121 and the operation information output from the external communication unit 340. When there are multiple communication needs, the communication policy decision notifying unit 324 determines the communication method and communication timing for each communication need based on the priority given to each communication need in advance. The communication policy decision notifying unit 324 may further determine the optimal communication method and communication timing for executing the communication needs based on the power state of the communication control device 300 detected by the power state detection unit 110 and the available power on the predicted planned route. The communication method and communication timing may be determined for each application implemented by the external communication application unit 330, not for each communication need. Then, the communication policy decision notifying unit 324 notifies the communication policy execution unit 325 of the determined communication method and communication timing.

[0089] The communication policy execution unit 325 issues instructions to the communication data temporary storage unit 326 and the external communication unit 340 at the communication timing according to the communication method and communication timing for each communication need notified by the communication policy determination notifying unit 324, and executes communication with the center 500. Specifically, when the communication needs are data transmission, when the communication timing comes, the communication policy execution unit 325 instructs the communication data temporary storage unit 326 to send the transmission data stored in advance to the external communication unit 340, and instructs the external communication unit 340 to transmit the transmission data sent from the communication data temporary storage unit 326 to the center 500 according to the determined communication method. When the communication needs are data reception, when the communication timing comes, the communication policy execution unit 325 instructs the external communication unit 340 to receive data from the center 500 according to the determined communication method, and instructs the communication data temporary storage unit 326 to acquire the data received by the external communication unit 340 and output it to the external communication application unit 330.

[0090] The communication data temporary storage unit 326 is a memory that can temporarily store communication data, and can input and store transmission data and / or reception data based on instructions from the external communication application unit 330 and / or the communication policy execution unit 325, and can also output the stored transmission data and / or reception data.

[0091] In the communication control device 100 according to the first embodiment, an application in which a communication need has occurred in the external communication application unit 130 needs to transmit data to the external communication unit 140 or receive data from the external communication unit 140 every time the communication policy decision notifying unit 124 notifies the application according to the communication timing. This increases the load on the application in relation to the data transmission and reception processing. In contrast, in the communication control device 300 according to the third embodiment, the communication control unit 320 centrally controls the transmission and reception of data between the external communication application unit 330 and the external communication unit 340. Therefore, an application in which a communication need has occurred can deposit all data in the communication data temporary storage unit 326 in advance or receive all data from the communication data temporary storage unit 326 in a lump without being bound by the communication method or communication timing, thereby reducing the load on the application in relation to the data transmission and reception processing.

[0092] <Actions and Effects> According to the communication control device according to each embodiment of the present disclosure described above, the communication method that an application uses to communicate with a center, which is an external device, while a vehicle equipped with the communication control device is moving is controlled based on the planned route, communication possibility information, and communication content required by communication needs generated by the application. This control prevents the communication control device from being unable to connect to the center at the planned position, or from being unable to obtain the desired communication bandwidth even if the communication control device is able to connect to the center, thereby making it possible to optimally control the communication method used when moving.

[0093] For example, in the case where there is a place on the planned route where the communication methods are limited, such as a tunnel, the method disclosed herein can accurately predict the optimal communication method when passing through the tunnel in advance, since the communication control device can know that the tunnel will be passed through. Therefore, by switching the communication method of the communication control device to the communication method predicted in advance just before passing through the tunnel, unnecessary communication method switching processing can be eliminated, and it is possible to prevent deterioration of power efficiency and temporary interruption or delay of communication. Furthermore, even if there is a route in the vicinity that does not pass through a tunnel different from the planned route, the method disclosed herein controls the communication method based on the planned route, so there is no need to stand by with a communication method that can reliably connect but has a high communication cost because it is not possible to determine whether the tunnel will be passed through or not, and therefore communication costs can be reduced.

[0094] In addition, in the case where a need for communication arises when the power state of the communication control device is in IG state, if there is a position on the planned route where the power state will be in PlugIn state in the near future, the method disclosed herein makes it possible to control communication via wired LAN connection at a charging station instead of communication via wireless LAN connection at intersections along the route. This prevents wireless communication from wasting generated power, making it possible to reduce energy consumption and communication costs.

[0095] In addition, the method disclosed herein can predict with high accuracy, based on the planned route, how long the vehicle will stop at an intersection where a wireless LAN connection is available and how much data can be transmitted and received, making it possible to control communication to be completed without interruption of all data. This makes it possible to prevent deterioration of power efficiency due to data retransmission processing. In addition, by intentionally changing to an alternative route that stops at an intersection where a wireless LAN connection is available within the range permitted by communication needs (arrival time, travel cost, comfort, etc.), it is possible to further improve power efficiency and reduce communication costs.

[0096] Furthermore, in cases where the communication environment is unevenly distributed in a large parking lot, the method disclosed herein can change the planned route so that the vehicle equipped with the communication control device is parked in a location with a good communication environment (connection to wireless LAN, wide communication band, low disconnection rate, etc.). This allows communication to be completed in a short time while the vehicle is parked, thereby further improving power efficiency and reducing communication costs.

[0097] The above describes one embodiment of the present disclosure, but the present disclosure can be understood as a vehicle equipped with a communication control device, a battery control method executed by a communication control device having a processor and a memory, a control program for executing the battery control method, a computer-readable non-transitory storage medium storing the control program, and a power supply system including the communication control device. [Industrial Applicability]

[0098] The present disclosure can be used in a communication control device that can be connected to an external device using a plurality of communication methods. [Explanation of symbols]

[0099] 100, 200, 300 Communication control device 110 Power supply status detector 120, 320 Communication control unit 121 Communication Possibility Prediction Department 122 Communication Possibility Database (DB) 123 Route Planning Department 124, 324 Communications Policy Decision and Notification Division 130, 330 External communication application section 131 App 1 132 2nd App 133 Third App 140, 340 External Communications Department 141 First Communication Section (4G) 142 Second Communication Division (5G) 143 Third Communication Department (Wireless LAN) 144 4th Communication Section (Wired LAN) 150, 250 Route determination section 210 Human Machine Interface Devices (HMI) 325 Communications Policy Implementation Department 326 Temporary Storage of Communication Data 500 Center

Claims

1. A communication control device that can be connected to an external device using a plurality of communication methods, a storage unit configured to store communication possibility information that associates at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; an acquisition unit that acquires a first route as a planned route for the communication control device; a control unit that controls a communication method used by an application implemented in the communication control device to communicate with the external device while the communication control device is moving, based on the first route, the communication possibility information, and communication content requested by the application; a communication unit that executes communication between the application and the external device using a communication method controlled by the control unit; a detection unit that detects a power supply state of the communication control device, The communication contents include at least one of a communication data amount, an allowable delay time, whether or not communication can be interrupted, and an allowable communication cost; The control unit is Controlling a communication method used by the application to communicate with the external device so as to satisfy the communication content; controlling a communication method used by the application to communicate with the external device based on the predicted change in the power supply state in the first path so as to satisfy the communication content; Communications control device.

2. A communication control device capable of connecting to an external device using a plurality of communication methods, a storage unit configured to store communication possibility information that associates at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; an acquisition unit that acquires a first route as a planned route for the communication control device; a control unit that controls a communication method used by an application implemented in the communication control device to communicate with the external device while the communication control device is moving, based on the first route, the communication possibility information, and communication content requested by the application; a communication unit that executes communication between the application and the external device using a communication method controlled by the control unit; a route planning unit that plans and proposes a second route different from the first route based on the first route, the communication possibility information, and the communication content; When the control unit determines that the second route satisfies a predetermined condition required for the planned route, the control unit changes the planned route along which the communication control device moves from the first route to the second route, and controls the communication method used by the application to communicate with the external device. Communications control device.

3. The second route has a higher communication efficiency than the first route. The communication control device according to claim 2.

4. The conditions required for the planned route include at least one of an arrival time at a destination point of the planned route and a travel cost to the destination point. The communication control device according to claim 2.

5. The control unit changes the route from the first route to the second route based on permission from a user of the communication control device. The communication control device according to claim 2.

6. When a plurality of requests are generated from the application, the communication unit executes communication between the application and the external device based on the priority of each of the plurality of requests. The communication control device according to claim 1 or 2.

7. The communication possibility information further includes at least one of a time, a weather, a passing speed, a communication band, a power required for communication, a communication disconnection rate, and a communication error rate, which are associated with the location in addition to the communication method. The communication control device according to claim 1 or 2.

8. A communication control method executed by a computer of a communication control device that can be connected to an external device using a plurality of communication methods, comprising: using communication possibility information stored in a storage unit, the communication possibility information associating at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; acquiring a first route as a planned route for the communication control device; controlling a communication method used by an application implemented in the communication control device for communication with the external device while the communication control device is moving, based on the first route, the communication possibility information, and communication content including at least one of an amount of communication data requested by the application, an allowable delay time, whether or not communication can be interrupted, and an allowable communication cost; executing communication between the application and the external device using a communication method controlled in the controlling step; detecting a power state of the communication control device; controlling a communication method used by the application to communicate with the external device so as to satisfy the communication content; and controlling a communication method used by the application for communication with the external device based on the predicted change in the power supply state in the first path so as to satisfy the communication content. Communications control method.

9. A communication control method executed by a computer of a communication control device connectable to an external device using a plurality of communication methods, comprising: using communication possibility information stored in a storage unit, the communication possibility information associating at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; acquiring a first route as a planned route for the communication control device; controlling a communication method used by an application implemented in the communication control device for communication with the external device while the communication control device is moving, based on the first route, the communication possibility information, and communication content including at least one of an amount of communication data requested by the application, an allowable delay time, whether or not communication can be interrupted, and an allowable communication cost; executing communication between the application and the external device using a communication method controlled in the controlling step; considering and proposing a second route different from the first route based on the first route, the communication possibility information, and the communication content; and when it is determined that the second route satisfies a predetermined condition required for the planned route, changing the planned route along which the communication control device travels from the first route to the second route, and controlling a communication method used by the application to communicate with the external device. Communications control method.

10. A communication control program to be executed by a computer of a communication control device that can be connected to an external device using a plurality of communication methods, using communication possibility information stored in a storage unit, the communication possibility information associating at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; acquiring a first route as a planned route for the communication control device; controlling a communication method used by an application implemented in the communication control device for communication with the external device while the communication control device is moving, based on the first route, the communication possibility information, and communication content including at least one of an amount of communication data requested by the application, an allowable delay time, whether or not communication can be interrupted, and an allowable communication cost; executing communication between the application and the external device using a communication method controlled in the controlling step; detecting a power state of the communication control device; controlling a communication method used by the application to communicate with the external device so as to satisfy the communication content; and controlling a communication method used by the application for communication with the external device based on the predicted change in the power supply state in the first path so as to satisfy the communication content. Communications control program.

11. A communication control program to be executed by a computer of a communication control device capable of connecting to an external device using a plurality of communication methods, using communication possibility information stored in a storage unit, the communication possibility information associating at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; acquiring a first route as a planned route for the communication control device; controlling a communication method used by an application implemented in the communication control device for communication with the external device while the communication control device is moving, based on the first route, the communication possibility information, and communication content including at least one of an amount of communication data requested by the application, an allowable delay time, whether or not communication can be interrupted, and an allowable communication cost; executing communication between the application and the external device using a communication method controlled in the controlling step; considering and proposing a second route different from the first route based on the first route, the communication possibility information, and the communication content; and when it is determined that the second route satisfies a predetermined condition required for the planned route, changing the planned route along which the communication control device travels from the first route to the second route, and controlling a communication method used by the application to communicate with the external device. Communications control program.

12. A vehicle equipped with the communication control device according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Network connection system of mobile terminal

    JP2005012563A

  • Wireless communication control apparatus, and method for mobile objects

    JP2009194823A

  • Vehicle network connectivity management system and method

    JP2013186121A

  • Location-Aware Network Selection

    JP2016513934A