COMMUNICATION CONTROL DEVICE, METHOD, PROGRAM, AND VEHICLE
The communication control device addresses connectivity issues by updating connection information in real-time based on predicted communication possibilities, ensuring optimal communication methods are used during movement, thus preventing connectivity failures and reducing costs.
Patent Information
- Application Number
- JP2020168633
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-10-05
- Publication Date
- 2024-09-26
- Estimated Expiration
- 2040-10-05
AI Technical Summary
Existing communication control devices in mobile devices face issues with incomplete or outdated connection information in their databases, leading to potential failures in switching communication methods, especially when moving, which can result in connectivity issues or increased costs.
A communication control device that updates connection information in real-time by acquiring a scheduled route, predicting communication possibilities, and adjusting communication methods based on location, weather, and device status to ensure optimal connectivity.
Ensures accurate and timely updates of connection information, preventing connectivity failures and reducing unnecessary communication costs by predicting and adapting to the optimal communication method during movement.
Smart Images

Figure 0007556739000001 
Figure 0007556739000003 
Figure 0007556739000002
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a communication control device that can be connected to an external device using a plurality of communication methods. [Background technology]
[0002] In mobile devices that implement multiple communication methods (e.g., cellular (4G / 5G) and wireless LAN) as a means of communication to connect to networks such as the Internet, the most appropriate communication method is automatically or manually selected from the multiple communication methods according to the situation in which the mobile device is placed.
[0003] One technique for automatically selecting an optimal communication method from among multiple communication methods is disclosed in Patent Document 1. In this technique, connection information indicating connection priority, location, movement speed, and connectable communication methods is stored in advance in a database provided in the mobile device. Then, in this technique, control is performed to automatically switch the optimal communication method as a means of connecting to the network based on the location information and movement speed information of the mobile device and the connection information stored in the database. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2001-309445 A Summary of the Invention [Problem to be solved by the invention]
[0005] When switching the communication method of a mobile device while moving using connection information stored in a database, as in the technology disclosed in the above-mentioned Patent Document 1, if there are missing parts in the connection information or the contents of the connection information are outdated, there is a risk that necessary information will be lacking when attempting to switch the communication method, or that connection to the network using the communication method to be switched to will not be possible. For this reason, in a mobile device that implements multiple communication methods, it is desirable to be able to appropriately update the connection information stored in the database even while the device is moving, and there is room for consideration regarding update control of the connection information.
[0006] The present disclosure has been made in consideration of the above problems, and aims to provide a communication control device and the like that can preferably update connection information stored in a database even while moving. [Means for solving the problem]
[0007] In order to solve the above problem, one aspect of the disclosed technology is a communication control device that can be connected to an external device using multiple communication methods, and includes: a memory unit that stores communication possibility information that at least corresponds a location at which the communication control device can connect to the external device with a communication method among the multiple communication methods that can be used at the location; an update control unit that controls updating of the communication possibility information based on a request from at least one of the communication control device and the external device; an acquisition unit that acquires a first route as a planned route along which the communication control device will move; a control unit that controls communication between the communication control device and the external device while the communication control device is moving in order for the update control unit to update the communication possibility information, based on the first route, the communication possibility information, and communication content requested by the communication control device and the external device; and a communication unit that performs communication between the communication control device and the external device based on the control of the control unit, wherein the update control unit collects data necessary for updating in communication between the communication control device and the external device, and controls updating of the communication possibility information based on the collected data.
[0008] Another aspect of the disclosed technology is a communication control method executed by a computer of a communication control device connectable to an external device using multiple communication methods, or a control program to be executed by the computer of the communication control device, the method including the steps of: requesting an update of the communication possibility information from at least one of the communication control device and the external device using communication possibility information stored in a memory unit, the communication possibility information correlating at least a position at which the communication control device can connect to an external device with a communication method among multiple communication methods that can be used at the position; acquiring a first route as a planned route along which the communication control device will move; controlling communication between the communication control device and the external device while the communication control device is moving in order to update the communication possibility information, based on the first route, the communication possibility information, and the communication content requested by the communication control device and the external device; executing communication between the communication control device and the external device and collecting data necessary for the update based on the control of the controlling step; and controlling the update of the communication possibility information based on the collected data. Effect of the Invention
[0009] According to the communication control device and the like of the present disclosure, the connection information stored in the database can be suitably updated even while moving. [Brief description of the drawings]
[0010] [Figure 1] A functional block diagram of a communication control device according to a first embodiment and its peripheral units. [Diagram 2] FIG. 1 is a diagram showing an example of communication possibility information stored in a communication possibility database; [Figure 3A] 1 is a flowchart showing a procedure of communication control executed by a communication control device according to a first embodiment; [Figure 3B] 1 is a flowchart showing a procedure of communication control executed by a communication control device according to a first embodiment; [Figure 4A] 10 is a flowchart showing a procedure of another communication control process executed by the communication control device according to the first embodiment; [Figure 4B]10 is a flowchart showing a procedure of another communication control process executed by the communication control device according to the first embodiment; [Diagram 5] A functional block diagram of a communication control device and its peripheral parts according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] The communication control device of the present disclosure updates communication possibility information, which associates a position where the device can connect to an external device with a communication method available at that position, based on a route along which the device plans to move and the update content required. This allows information on missing parts or parts with old creation dates in the communication possibility information to be updated appropriately even while the device is moving, so that the optimal communication method that an application will use to communicate with an external device while the device is moving can be accurately predicted in advance based on the planned route, communication possibility information, and communication content required by the communication needs generated by the application implemented in the device. This makes it possible to avoid situations where the device cannot connect to a center at a planned location, where the desired communication bandwidth cannot be obtained even if the device can connect to the center, or where communication costs for connecting to the center become unnecessarily high.
[0012] The communication control device according to the present disclosure is a device that can be connected to an external device using a plurality of communication methods. Hereinafter, each embodiment of the present disclosure will be described in detail with reference to the drawings, taking an example in which the communication control device is mounted on a mobile device such as a vehicle.
[0013] <First embodiment> [composition] Fig. 1 is a functional block diagram of a communication control device 100 and its peripheral units according to a first embodiment of the present disclosure. The functional block illustrated in Fig. 1 includes the communication control device 100 mounted on a vehicle, and a center 500 connected to the communication control device 100. The center 500 can be connected to one or more other communication control devices (not shown) other than the communication control device 100.
[0014] The center 500 is an external device other than a vehicle that receives services provided by the communication control device 100 and provides its own services to the communication control device 100 by communicating with the communication control device 100. The center 500 also manages communication possibility information (described later) provided in the communication control device 100, and can output a request for updating all or part of a database regarding this communication possibility information (hereinafter referred to as a "center DB update request") to the communication control device 100 as necessary. The center DB update request may be generated by the center 500 itself, or may be a request generated in one vehicle connected to the center 500 and mediated to another vehicle. The center 500 may be, for example, a fixed facility such as a server, or a mobile terminal such as a smartphone.
[0015] The communication control device 100 includes a power supply state detection unit 110, a communication control unit 120, an external communication application unit 130, an external communication unit 140, a path determination unit 150, and a database (DB) update control unit 160.
[0016] The power supply state detection unit 110 can detect the current power supply state of the communication control device 100 and estimate the future power supply state of the communication control device 100 based on the planned route output by the route determination unit 150 described later. The power supply state of the communication control device 100 is the amount of stored power and the charge / discharge state of a battery (not shown) built into the communication control device 100. For example, when the communication control device 100 is mounted on a plug-in chargeable electric vehicle (PHV), the following can be set as the charge / discharge state of the vehicle: "IG state" in which the motor generator generates power and the on-board battery can be charged; "+B state" in which the motor generator does not generate power and the on-board battery is not charged; and "PlugIn state" in which the on-board battery is plugged in and charged from an external power supply facility. The power supply state detection unit 110 can also detect the power currently available for the communication control device 100 and estimate the power available for the communication control device 100 on the planned route. The power supply state detection unit 110 outputs information on the power supply state and available power of the communication control device 100 to the communication control unit 120.
[0017] The external communication application unit 130 includes an application implemented in the communication control device 100, and can implement a predetermined service by communicating with the center 500. In this embodiment, an example in which three applications, a first application 131, a second application 132, and a third application 133, are implemented as the external communication application unit 130 is shown, but the number of applications implemented in the communication control device 100 is not limited to this.
[0018] The external communication application unit 130 outputs a request for data transmission and / or a request for data reception (hereinafter referred to as "communication needs") generated from one or more of the first application 131, the second application 132, and the third application 133 to the communication control unit 120. The communication needs include, as the content required for communication (communication content), constraint information on at least one of the amount of data to be communicated (communication data amount), the time during which communication delay is allowed (allowable communication delay time), whether or not communication may be interrupted (communication interruption possibility), and the allowable cost for communication (allowable communication cost). In addition, the external communication application unit 130 receives a notification from the communication control unit 120 regarding the communication method and communication timing of the external communication unit 140 permitted to realize the communication needs. Then, the external communication application unit 130 transmits data to the center 500 or receives data from the center 500 via the external communication unit 140 based on the notification received from the communication control unit 120.
[0019] An example of the application implemented in the external communication application unit 130 is an application (FOT (Field of Test) application) that uploads predetermined data (field data) collected during the traveling of the vehicle to the center 500 as needed. Also, an example of the application implemented in the external communication application unit 130 is a navigation application that appropriately acquires map data required for route guidance, and an application (hybrid navigation application) that downloads map data of a planned traveling destination used for so-called hybrid navigation from the center 500. Also, an example of the application implemented in the external communication application unit 130 is an application (remote service application) that uploads data related to the state of the vehicle to the center 500 based on a request from the center 500. Also, an example of the application implemented in the external communication application unit 130 is an application (OTA (Over The Air) application) that downloads an update program for updating software such as an ECU from the center 500.
[0020] The external communication unit 140 is a communication interface for connecting the communication control device 100 to the center 500 directly or via a network. The external communication unit 140 executes communication between the communication control device 100 and the center 500 based on the control of the communication control unit 120. The external communication unit 140 of this embodiment is provided with a first communication unit 141 using a cellular 4G communication method, a second communication unit 142 using a cellular 5G communication method, a third communication unit 143 using a wireless LAN communication method, and a fourth communication unit 144 using a wired LAN communication method as communication means. The number of communication units provided in the external communication unit 140 and the communication method handled are not limited to those shown in the figure. The external communication unit 140 may output operation information indicating whether each of the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 is operating normally to the communication control unit 120 or the database update control unit 160.
[0021] The route determination unit 150 can determine a planned route along which the communication control device 100 moves (travels). The route determination unit 150 includes, for example, a navigation function that provides route guidance to a destination based on map data, an automatic driving function that performs all driving control by the vehicle, and a driving assistance function such as ACC (Adaptive Cruise Control) that assists the vehicle in controlling part of the driving. The route determination unit 150 outputs information about the planned route determined by these functions (passage positions, moving speed between passing positions, etc.) to the communication control unit 120. In addition, when an alternative route is proposed by the communication control unit 120, the route determination unit 150 can determine whether to change the current planned route to the alternative route based on predetermined conditions determined by safety and travel needs (arrival time, travel cost, comfort, etc.).
[0022] The communication control unit 120 controls communication between the communication control device 100 and the center 500 so that an application implemented in the external communication application unit 130 performs a predetermined service or so that the database update control unit 160 updates communication possibility information (described later). The communication control unit 120 includes a communication possibility prediction unit 121, a communication possibility database (DB) 122, a route consideration unit 123, and a communication strategy decision notification unit 124.
[0023] The communication possibility database 122 is a storage unit that stores communication possibility information that at least associates a position where the communication control device 100 can be connected to the center 500 with a communication method available at each position among a plurality of communication methods provided in the external communication unit 140. An example of communication possibility information stored in the communication possibility database 122 is shown in FIG.
[0024] In the communication possibility information shown in FIG. 2, the passing speed, the communication possible method, the communication possible band, the weather, the transmission and reception power, the disconnection rate, and the error rate are stored in association with each other for each time at each position. The position is, for example, a point indicated by latitude and longitude (a node in map data), a straight line connecting two points (a link), or an area surrounded by four points (a mesh). The time is basically information of hours and minutes, and may further include information such as the month, date, and day of the week. The passing speed is the speed when the communication control device 100 passes through the position. In addition, when the position is a straight line or an area, it may be an instantaneous value of the speed at a certain point, or may be an average value or maximum value of the speed. The communication possible method indicates a communication method that the communication control device 100 can use at the position under the conditions of each time and the passing speed. The communication possible band indicates a communication band that the communication control device 100 can use at the position under the conditions of each time, the passing speed, and the communication method. The weather is a meteorological condition such as sunny, rainy, and snowy, and indicates the weather when each passing speed, communication possible method, and communication possible band were obtained at the position and time. The transmission and reception power indicates the power that the communication control device 100 can transmit and receive under the conditions of each time, passing speed, communication method, and weather at the position. The disconnection rate indicates the rate at which communication between the communication control device 100 and the center 500 is disconnected under the conditions of each time, passing speed, communication method, communication possible band, weather, and transmission and reception power at the position. The error rate indicates the rate at which an error occurs in communication between the communication control device 100 and the center 500 under the conditions of each time, passing speed, communication method, communication possible band, weather, and transmission and reception power at the position. The above-mentioned information on the weather, transmission and reception power, disconnection rate, and error rate may be omitted. In addition, when the communication possibility information differs depending on the installation location of the communication antenna of the communication control device 100, the communication possibility information may be stored for each installation location of the communication antenna.
[0025] The communication possibility prediction unit 121 acquires the planned route determined by the route determination unit 150. Then, the communication possibility prediction unit 121 predicts the communication possibility on the planned route acquired from the route determination unit 150, based on information on the state of the communication control device 100 (position, speed, etc.), information on the state around the communication control device 100 (time, weather, etc.), and communication possibility information stored in the communication possibility database 122. The communication possibility in this embodiment refers to a communication possible method, a communication possible band, a transmission / reception power, a disconnection rate, and an error rate.
[0026] The communication policy determination notifying unit 124 determines the optimum communication method and communication timing for executing the communication needs received from the external communication application unit 130 and / or the communication needs for DB update received from the database update control unit 160, which will be described later, based on at least the communication possibility on the planned route predicted by the communication possibility prediction unit 121 (and further, the operation information output from the external communication unit 140). When there are a plurality of communication needs, the communication policy determination notifying unit 124 determines the communication method and communication timing for each communication need based on a priority given in advance to each communication need. The communication policy determination notifying unit 124 may further determine the optimum communication method and communication timing for executing the communication needs based on the power state of the communication control device 100 detected by the power state detection unit 110 and the available power on the predicted planned route. Note that the communication method and communication timing may be determined for each application (first application 131, second application 132, and third application 133) implemented by the external communication application unit 130, rather than for each communication need. Then, the communication strategy determination notification unit 124 notifies the external communication application unit 130 of the communication method for executing the corresponding communication needs in accordance with the determined communication method and communication timing, and notifies the database update control unit 160 of the communication method for executing the corresponding communication needs for DB update.
[0027] The route planning unit 123 considers whether or not there is an optimal route for executing the communication needs received from the external communication application unit 130 and / or the communication needs for DB update generated by the update request integration unit 161 described later, other than the current planned route already determined by the route determination unit 150. This consideration is performed based on communication data volume, allowable communication delay time, whether or not communication can be interrupted, allowable communication cost, etc., which are communication contents required by the communication needs, and communication position, passing speed, communication data volume, communication method, weather, etc., which are communication contents required by the communication needs for DB update. Details of this consideration will be described later. Furthermore, the route planning unit 123 may consider whether or not power can be reduced based on the power state of the communication control device 100 detected by the power state detection unit 110 and the available power on the predicted planned route. When an optimal alternative route other than the planned route exists as a result of the route consideration, the route planning unit 123 proposes a change to the alternative route to the route determination unit 150.
[0028] Furthermore, the route planning unit 123 can determine whether or not it is necessary to update the communication possibility information stored in the communication possibility database 122. The determination that an update is necessary can be made, for example, by extracting missing parts in the communication possibility information based on the communication needs received from the external communication application unit 130, or by extracting outdated parts for which a predetermined period of time has passed since the creation date and time. The route planning unit 123 outputs a request (hereinafter referred to as a "local DB update request") to update all or part of the database related to the parts of the communication possibility information determined to require updating, to the database update control unit 160.
[0029] The database update control unit 160 controls processing relating to updating of communication possibility information stored in the communication possibility database 122 of the communication control unit 120. The database update control unit 160 includes an update request integrating unit 161 and an update data acquiring unit 162.
[0030] The update request integration unit 161 inputs one or both of the local DB update request output from the route planning unit 123 and the center DB update request output from the center 500. If there are multiple DB update requests, the update request integration unit 161 integrates the DB update requests to generate communication needs for DB update. The communication needs for DB update include a communication position indicating a location to be updated among the communication possibility information, the time at that position, the passing speed, the communication data amount, the communication method, the communication band, the power supply state, and at least one of the weather constraint information. The generated communication needs for DB update are output to the communication control unit 120. The update request integration unit 161 also acquires DB update data generated based on the information acquired by the update data acquisition unit 162 through communication with the center 500 based on the communication needs for DB update. The update request integration unit 161 outputs the acquired DB update data to the request source that generated the DB update request. More specifically, the update request integration unit 161 outputs a local DB update request to the communication control unit 120, and outputs a center DB update request to the center 500.
[0031] The update data acquisition unit 162 receives a notification from the communication control unit 120 regarding the communication method and communication timing of the external communication unit 140 permitted to realize the communication needs for DB update. Then, based on the notification received from the communication control unit 120, the update data acquisition unit 162 transmits data to the center 500 or receives data from the center 500 via the external communication unit 140. In carrying out this communication, the update data acquisition unit 162 collects data necessary for updating information related to communication feasibility, such as a communication available band, a disconnection rate, and an error rate. Also, based on the collected data, the update data acquisition unit 162 generates DB update data for updating the communication feasibility information stored in the communication feasibility database 122. The generated DB update data is output to the update request integration unit 161.
[0032] Incidentally, a part or all of the above-mentioned communication control device 100 may be configured as an electronic control unit (ECU) that typically includes a processor such as a microcomputer, a memory, an input / output interface, etc. This electronic control unit can realize a part or all of the functions of the power supply state detection unit 110, the communication control unit 120, the external communication application unit 130, the external communication unit 140, the path determination unit 150, and the database update control unit 160 by the processor reading and executing a program stored in the memory.
[0033] [control] Next, with further reference to FIGS. 3A, 3B, 4A, and 4B, the control performed by the communication control device 100 of the present embodiment will be described.
[0034] 3A and 3B are flowcharts showing a procedure of communication control processing executed by the communication control device 100 when a request occurs to update the communication feasibility information stored in the communication feasibility database 122. The processing in Fig. 3A and the processing in Fig. 3B are connected by connectors V and W, respectively.
[0035] 3A and 3B is started, for example, when a planned route along which the communication control device 100 is to move is determined by the route determination unit 150. Note that this communication control may be repeatedly performed until the movement of the communication control device 100 along the planned route is completed.
[0036] (Step S301) The database update control unit 160 judges whether or not at least one DB update request has occurred regarding the local DB update request by the communication control unit 120 and the center DB update request by the center 500. If a DB update request has occurred (S301, Yes), the process proceeds to step S302, and if a DB update request has not occurred (S301, No), this communication control ends.
[0037] (Step S302) The update request integration unit 161 of the database update control unit 160 generates communication needs for DB update to update the communication possibility information stored in the communication possibility database 122, based on the generated DB update request. When multiple DB update requests are generated, one communication need for DB update is generated by integrating the multiple DB update requests. The generated communication need for DB update is output to the communication control unit 120. When the communication need for DB update is generated, the process proceeds to step S303.
[0038] (Step S303) When the communication control unit 120 receives communication needs for DB update from the database update control unit 160, the communication possibility prediction unit 121 acquires the planned route (first route) determined by the route determination unit 150 from the route determination unit 150. When the planned route (first route) is acquired, the process proceeds to step S304.
[0039] (Step S304) The communication possibility prediction unit 121 of the communication control unit 120 predicts the communication possibility (communication possible method, communication possible band, etc.) at each position on the planned route (first route) determined by the route determination unit 150, based on the communication possibility information stored in the communication possibility database 122. When the prediction of the communication possibility on the planned route (first route) is completed, the process proceeds to step S305.
[0040] (Step S305) The communication possibility prediction unit 121 of the communication control unit 120 judges, based on the predicted communication possibility on the planned route (first route), whether or not all communication needs for DB update received from the database update control unit 160 can be satisfied when the communication control device 100 moves along the planned route (first route). If all communication needs for DB update are satisfied (S305, Yes), the process proceeds to step S311, and if all communication needs for DB update are not satisfied (S305, No), the process proceeds to step S306.
[0041] (Step S306) The route planning unit 123 of the communication control unit 120 considers a change to the planned route (first route) based on the planned route (first route) determined by the route determination unit 150, the communication needs for DB update received from the database update control unit 160, and the communication possibility information stored in the communication possibility database 122. Specifically, the route planning unit 123 considers whether there is an alternative route (second route) that can satisfy the communication contents (communication position, passing speed, communication data amount, communication method, weather, etc.) required by the communication needs for DB update more than when moving along the current planned route (first route). Here, an example of a case where the request for the communication needs for DB update is more satisfied is a case where the planned route (first route) is unlikely to pass at the required speed, but an alternative route (second route) in the same mesh is likely to pass at the required speed, and thus the update efficiency is high. Note that information such as map data required for considering a route change may be acquired from the route determination unit 150, may be possessed by the route planning unit 123 itself, or may be acquired from another configuration. When the consideration of changes to the planned route (first route) is completed, the process proceeds to step S307.
[0042] (Step S307) As a result of considering changes to the planned route (first route), the route planning unit 123 of the communication control unit 120 judges whether or not there is an alternative route (second route) to which the planned route can be changed. There may be one alternative route (second route) or two or more alternative routes. If there is an alternative route (second route) (S307, Yes), the process proceeds to step S308. The alternative route (second route) is output to the route determination unit 150, which proposes a change to the planned route (first route). On the other hand, if there is no alternative route (second route) (S307, No), the process proceeds to step S311.
[0043] (Step S308) The route determination unit 150 judges whether the alternative route (second route) proposed by the communication control unit 120 satisfies the predetermined conditions required for the currently planned route (first route). Examples of the predetermined conditions include the desired arrival time at the destination, the travel cost to the destination (fuel cost, toll road fee, etc.), and the comfort (presence or absence of traffic jam, presence or absence of mountain road, etc.). If the alternative route (second route) satisfies the predetermined conditions (S308, Yes), the process proceeds to step S309, and if the alternative route (second route) does not satisfy the predetermined conditions (S308, No), the process proceeds to step S311.
[0044] (Step S309) The route determination unit 150 changes the planned route of the communication control device 100 from the currently determined planned route (first route) to an alternative route (second route). When the planned route is changed, the process proceeds to step S310.
[0045] (Step S310) The communication possibility prediction unit 121 of the communication control unit 120 again acquires the changed planned route (second route) from the route determination unit 150. Then, the communication possibility prediction unit 121 again predicts the communication possibility at each position on the planned route (second route) based on the communication possibility information stored in the communication possibility database 122. When the re-prediction of the communication possibility on the planned route (second route) is completed, the process proceeds to step S311.
[0046] (Step S311) The communication policy decision notifying unit 124 of the communication control unit 120 acquires the state of the external communication unit 140. The state of the external communication unit 140 is information indicating whether each of the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 is in a usable state. Examples of an unusable state include a failure of the communication unit and no power supply to the communication unit. When the state of the external communication unit 140 is acquired, the process proceeds to step S311.
[0047] (Step S312) The communication strategy determination notifying unit 124 of the communication control unit 120 determines a communication strategy indicating a communication method and a communication timing for the communication needs for DB update received from the database update control unit 160, based on the communication possibility on the planned route (first route or second route) predicted by the communication possibility prediction unit 121 and the state of the external communication unit 140. An example of this communication strategy is that, for communication needs N, the wireless LAN communication method via the third communication unit 143 is used at the timing of passing through position P1, and the cellular 5G communication method via the first communication unit 141 is used at the timing of passing through position P2. When the communication strategy is determined, the process proceeds to step S313.
[0048] (Step S313) The communication possibility prediction unit 121 of the communication control unit 120 judges, based on the communication possibility on the predicted planned route (first route or second route), whether or not all of the communication needs for DB update received from the database update control unit 160 can be satisfied when the communication control device 100 moves along the planned route (first route). If all of the communication needs for DB update are satisfied (S313, Yes), the process proceeds to step S316, and if all of the communication needs for DB update are not satisfied (S313, No), the process proceeds to step S314.
[0049] (Step S314) The communication possibility prediction unit 121 of the communication control unit 120 requests DB update data for the portion that is lacking due to the inability to satisfy the communication needs for DB update from the center 500 via the database update control unit 160 and the external communication unit 140. Upon receiving this request, the center 500 performs, for example, collecting DB update data for the portion that is lacking using a communication control device mounted on another vehicle. After requesting the DB update data for the portion that is lacking from the center 500, the process proceeds to step S315.
[0050] (Step S315) The update data acquisition unit 162 of the database update control unit 160 acquires the missing DB update data from the center 500 via the external communication unit 140. When the missing DB update data has been acquired from the center 500, the process proceeds to step S316.
[0051] (Step S316) The communication strategy determination notifying unit 124 of the communication control unit 120 notifies the update data acquisition unit 162 of the database update control unit 160 of the communication method to be implemented at the communication timing indicated by the determined communication strategy. When the update data acquisition unit 162 is notified of the communication method, the process proceeds to step S317.
[0052] (Step S317) The update data acquisition unit 162 of the database update control unit 160 communicates with the center 500 using the communication method notified by the communication control unit 120. Specifically, the update data acquisition unit 162 requests the external communication unit 140 to communicate with the center 500 using the communication method notified by the communication control unit 120, and in response to this request, the external communication unit 140 realizes communication between the update data acquisition unit 162 and the center 500. Once communication between the update data acquisition unit 162 and the center 500 has been established, the process proceeds to step S318.
[0053] (Step S318) The update data acquisition unit 162 of the database update control unit 160 generates DB update data that is a part or all of the communication possibility information to be updated, based on the results (communication possible band, disconnection rate, error rate, etc.) collected by communication with the center 500. When the DB update data is generated, the process proceeds to step S319.
[0054] (Step S319) The update request integrator 161 of the database update control unit 160 outputs the DB update data generated by the update data acquisition unit 162 to the request source that generated the DB update request. Specifically, if the DB update request is a local DB update request generated by the communication control unit 120 of the host vehicle, the update request integrator 161 outputs the DB update data to the communication control unit 120, and if the DB update request is a center DB update request generated by the center 500, the update request integrator 161 outputs (transmits) the DB update data to the center 500. When the DB update data is output to the request source of the DB update request, the process proceeds to step S320.
[0055] (Step S320) The request source that has issued the DB update request updates the communication possibility information stored in the communication possibility database 122 based on the DB update data acquired from the database update control unit 160. Specifically, if the DB update request is a local DB update request, the communication control unit 120 updates the communication possibility information stored in the communication possibility database 122 held by the communication control unit 120 based on the DB update data acquired from the database update control unit 160. On the other hand, if the DB update request is a center DB update request, the center 500 outputs the DB update data acquired from the database update control unit 160 to a specific vehicle (a vehicle different from the vehicle that generated the DB update data) that is the request source of the database update, and the communication control device 100 of this specific vehicle updates its own communication possibility information based on the DB update data acquired from the center 500. Note that the center 500 may output the DB update data acquired from the database update control unit 160 to all connectable vehicles, in which case the communication control device 100 of each vehicle updates its own communication possibility information based on the DB update data acquired from the center 500. This ends the communication control process.
[0056] 4A and 4B are flowcharts showing a procedure of communication control executed by the communication control device 100 when a request is made by the external communication application unit 130 to communicate with the center 500. The process in FIG. 4A and the process in FIG. 4B are connected by connectors X, Y, and Z, respectively.
[0057] The communication control shown in Figures 4A and 4B is started, for example, when a planned route along which the communication control device 100 is to move is determined in the route determination unit 150. The communication control shown in Figures 4A and 4B is, in principle, performed independently of the communication control shown in Figures 3A and 3B.
[0058] (Step S401) The external communication application unit 130 determines whether or not one or more communication needs have newly arisen in the first application 131, the second application 132, and the third application 133. If new communication needs have arisen (S401, Yes), the process proceeds to step S402. The arisen communication needs are output to the communication control unit 120. On the other hand, if new communication needs have not arisen (S401, No), the process proceeds to step S412.
[0059] (Step S402) When the communication control unit 120 inputs (accepts) communication needs from the external communication application unit 130, the communication possibility prediction unit 121 acquires the planned route (first route) determined by the route determination unit 150 from the route determination unit 150. When the planned route (first route) is acquired, the process proceeds to step S403.
[0060] (Step S403) The communication possibility prediction unit 121 of the communication control unit 120 predicts the communication possibility (communication possible method, communication possible band, etc.) at each position on the planned route (first route) determined by the route determination unit 150, based on the communication possibility information stored in the communication possibility database 122. When the prediction of the communication possibility on the planned route (first route) is completed, the process proceeds to step S404.
[0061] (Step S404) The route planning unit 123 of the communication control unit 120 considers a change to the planned route (first route) based on the planned route (first route) determined by the route determination unit 150, the communication needs generated by the external communication application unit 130, and the communication possibility information stored in the communication possibility database 122. Specifically, the route planning unit 123 considers whether or not there is an alternative route (second route) that can satisfy the communication contents (communication data volume, allowable communication delay time, whether communication can be interrupted, allowable communication cost) required by the communication needs more than when moving along the current planned route (first route). Here, examples of cases that can satisfy the communication needs include cases where the planned route (first route) does not pass through a position where wireless LAN can be used, but the alternative route (second route) can pass through a position where wireless LAN can be used, thereby reducing communication costs, and cases where the planned route (first route) can satisfy the allowable communication delay time, but the alternative route (second route) can perform communication with less delay time, resulting in higher communication efficiency. Information such as map data required for considering a route change may be acquired from the route determination unit 150, may be stored in the route planning unit 123 itself, or may be acquired from another component. When the consideration of a change to the planned route (first route) is completed, the process proceeds to step S405.
[0062] (Step S405) As a result of considering changes to the planned route (first route), the route planning unit 123 of the communication control unit 120 judges whether or not there is an alternative route (second route) to which the planned route (first route) can be changed. There may be one alternative route (second route) or two or more alternative routes. If there is an alternative route (second route) (S405, Yes), the process proceeds to step S406. The alternative route (second route) is output to the route determination unit 150, which proposes a change to the planned route (first route). On the other hand, if there is no alternative route (second route) (S405, No), the process proceeds to step S408.
[0063] (Step S406) The route determination unit 150 judges whether the alternative route (second route) proposed by the communication control unit 120 satisfies the predetermined conditions required for the currently planned route (first route). Examples of the predetermined conditions include the desired arrival time at the destination, the travel cost to the destination (fuel cost, toll road fee, etc.), and the comfort (presence or absence of traffic jam, presence or absence of mountain road, etc.). If the alternative route (second route) satisfies the predetermined conditions (S406, Yes), the process proceeds to step S407, and if the alternative route (second route) does not satisfy the predetermined conditions (S406, No), the process proceeds to step S408.
[0064] (Step S407) The route determination unit 150 changes the planned route of the communication control device 100 from the currently determined planned route (first route) to an alternative route (second route). When the planned route is changed, the process proceeds to step S408.
[0065] (Step S408) The communication possibility prediction unit 121 of the communication control unit 120 again acquires the changed planned route (second route) from the route determination unit 150. When the planned route (second route) is acquired again, the process proceeds to step S409.
[0066] (Step S409) The communication possibility prediction unit 121 of the communication control unit 120 re-predicts the communication possibility at each position on the planned route (second route) based on the communication possibility information stored in the communication possibility database 122. When the re-prediction of the communication possibility on the planned route (second route) is completed, the process proceeds to step S410.
[0067] (Step S410) The communication policy decision notifying unit 124 of the communication control unit 120 acquires the state of the external communication unit 140. The state of the external communication unit 140 is information indicating whether each of the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 is in a usable state. Examples of an unusable state include a failure of the communication unit and no power supply to the communication unit. When the state of the external communication unit 140 is acquired, the process proceeds to step S411.
[0068] (Step S411) The communication strategy determination notifying unit 124 of the communication control unit 120 determines a communication strategy indicating a communication method and a communication timing for the communication needs generated in the external communication application unit 130 based on the communication possibility on the planned route (first route or second route) predicted by the communication possibility prediction unit 121 and the state of the external communication unit 140. As an example of this communication strategy, for the communication needs N, the wireless LAN communication method via the third communication unit 143 is used at the timing of passing through the position P1, and the cellular 5G communication method via the first communication unit 141 is used at the timing of passing through the position P2. When the communication strategy is determined, the process proceeds to step S412.
[0069] (Step S412) The communication strategy determination notifying unit 124 of the communication control unit 120 judges whether or not the communication timing indicated by the determined communication strategy has arrived. If the communication timing has arrived (S412, Yes), the process proceeds to step S413, and if the communication timing has not arrived (S412, No), the process proceeds to step S415.
[0070] (Step S413) The communication strategy determination notifying unit 124 of the communication control unit 120 notifies the target application (hereinafter referred to as the "target application") in the external communication application unit 130 of the communication method to be implemented at the communication timing determined in step S412. When the communication method is notified to the target application, the process proceeds to step S414.
[0071] (Step S414) The target application of the external communication application unit 130 communicates with the center 500 using the communication method notified by the communication control unit 120. Specifically, the target application requests the external communication unit 140 to communicate with the center 500 using the communication method notified by the communication control unit 120, and in response to this request, the external communication unit 140 realizes communication between the target application and the center 500. When communication between the target application and the center 500 is established, the process proceeds to step S415.
[0072] (Step S415) The route determination unit 150 judges whether or not movement along the planned route (first route or second route) by the communication control device 100 has ended. End of movement includes a case where the communication control device 100 stops movement along the planned route, a case where the communication control device 100 arrives at the destination point of the planned route, etc. If movement along the planned route has not ended (S415, No), the process proceeds to step S401, and if movement along the planned route has ended (S415, Yes), the process of this communication control ends.
[0073] Here, a request to update the communication possibility information stored in the communication possibility database 122 (FIG. 3A, S301) and a request for the external communication application unit 130 to communicate with the center 500 (FIG. 4A, S401) may occur at the same time. When the requests overlap in this way, it is desirable that the route planning unit 123 considers changing an alternative route that prioritizes communication needs based on the request from the external communication application unit 130 (step S306 in FIG. 3A, step S404 in FIG. 4A), and the communication policy decision notifying unit 124 decides a communication policy indicating a communication method and communication timing that prioritizes communication needs based on the request from the external communication application unit 130 (step S312 in FIG. 3B, step S411 in FIG. 4B).
[0074] As described above, by using the planned route along which the communication control device 100 will move, it is possible to predict with high accuracy in advance the communication method that the communication control device 100 can use to communicate with the center 500 in order to execute a service by an application or to update information in a database. This makes it possible to prevent problems such as not being able to use (connect) a future communication method predicted based on the current situation or not being able to obtain a predicted future communication bandwidth.
[0075] [Specific example] Next, the communication control executed by the above-mentioned communication control device 100 when a request for updating the communication possibility information stored in the communication possibility database 122 occurs will be described with some concrete examples.
[0076] (1) Example of a periodic local DB update request When the communication control device 100 is powered on, the communication control unit 120 searches for communication possibility information (such as communication possible bands according to time and passing speed, disconnection rates, error rates, and weather) stored in the communication possibility database 122, and extracts areas that need to be updated. Areas that need to be updated include areas where information is insufficient due to non-collection or areas where the information expiration date (for example, six months) has passed. The communication control unit 120 outputs a local DB update request for the extracted areas that need to be updated to the database update control unit 160.
[0077] The database update control unit 160 generates communication needs for DB update based on a local DB update request. The communication needs for DB update include, as requested communication content, constraint information such as the amount of data to be transmitted to the center 500 (e.g., 1 MB), the amount of data to be received from the center 500 (e.g., 1 MB), a specific position on a map (e.g., an intersection), the passing speed at that position (e.g., less than 10 km / h), the communication device to be used at that position (e.g., wireless LAN), and the weather at that position (e.g., rain). The generated communication needs for DB update are output to the communication control unit 120.
[0078] Based on the communication possibility information stored in the communication possibility database 122, the communication possibility prediction unit 121 predicts, with regard to the communication needs for DB update received from the database update control unit 160, that on the currently planned route, the weather at a specific location is likely to be rainy, but the possibility of passing that location at less than 10 km / h is low.
[0079] The route planning unit 123 considers a route that satisfies the communication content required by the communication needs for DB update more than the planned route based on the communication possibility information stored in the communication possibility database 122, and derives an alternative route that is likely to pass a specific position in the rain and at a speed of less than 10 km / h. As an example, the planned route is a route that travels on a priority road of a major trunk and passes a specific intersection, whereas the alternative route is a route that stops temporarily on a non-priority road and passes a specific intersection.
[0080] The route determination unit 150 checks whether the alternative route derived by the route planning unit 123 satisfies the predetermined conditions (safety, desired arrival time at the destination, etc.) required for the current planned route. In this example, since the predetermined conditions are satisfied, the route determination unit 150 changes the planned route to the alternative route.
[0081] The communication policy determination notifying unit 124 determines a communication policy with a communication timing of approaching an intersection and a wireless LAN as a communication method based on the changed planned route (alternative route) and the communication content required by the communication needs for DB update. Then, in accordance with the determined communication policy, the communication policy determination notifying unit 124 notifies the database update control unit 160 to transmit and receive data to and from the center 500 by connecting via the wireless LAN at the timing when the communication control device 100 moves along the planned route and stops at an intersection (or the vehicle speed in the intersection becomes less than 10 km / h).
[0082] In response to the notification, the database update control unit 160, which has received a notification from the communication strategy decision notifying unit 124 at the intersection, requests the third communication unit 143 to transmit data to the center 500 and receive data from the center 500 via wireless LAN communication. Then, the database update control unit 160 collects the available communication band, disconnection rate, error rate, and the like during this data communication.
[0083] The update data acquisition unit 162 of the database update control unit 160 generates DB update data based on communication results collected through wireless LAN communication with the center 500, and outputs the data to the update request integrating unit 161 of the database update control unit 160. The update request integrating unit 161 outputs the DB update data input from the update data acquisition unit 162 to the communication control unit 120 that generated the local DB update request. The communication control unit 120 updates the communication possibility information stored in the communication possibility database 122 based on the DB update data.
[0084] (2) Example of a case where the vehicle receives a request from the center to update the center DB for the hybrid navigation system of another vehicle When the communication control device 100 of the vehicle α needs map data for an area where the vehicle is scheduled to travel in the future while using the hybrid navigation system, a communication need arises to request the hybrid navigation application to receive data from the center 500. The communication need includes, as requested communication content, constraint information such as the amount of map data for the area where the vehicle is scheduled to travel (e.g., 100 MB), the allowable communication delay time calculated from the planned arrival time at the area where the vehicle is scheduled to travel (e.g., 30 minutes), whether communication can be interrupted (e.g., interruption is possible) derived from the characteristics of the application, and the allowable communication cost (e.g., the standard cost for using cellular and WiFi communication).
[0085] The communication possibility prediction unit 121 of vehicle α predicts the possibility of communication along the current planned route based on the communication possibility information stored in the communication possibility database 122. However, since the communication possibility information lacks information on some locations necessary for the prediction, the communication control unit 120 of vehicle α requests the center 500 to transmit update data for the locations where information is lacking.
[0086] In response to a request from the communication control device 100 of vehicle α, the center 500 transmits a center DB update request to at least one vehicle β different from vehicle α, requesting update data for a portion of information that is lacking. Vehicle β is appropriately selected from among a plurality of vehicles communicatively connected to the center 500, based on various conditions, such as whether vehicle β can use the same communication method as vehicle α, whether vehicle β has the same antenna configuration as vehicle α, whether vehicle β already has information on the portion that is lacking, and whether vehicle β is located in a position where information on the portion that is lacking can be easily obtained.
[0087] The database update control unit 160 of the vehicle β that has received the center DB update request from the center 500 generates communication needs for DB update based on the center DB update request. The communication needs for DB update include, as requested communication content, constraint information such as the amount of data to be transmitted to the center 500 (e.g., 1 MB), the amount of data to be received from the center 500 (e.g., 1 MB), a specific position on the map (e.g., alleys B and C in city area A), the passing speed at that position (e.g., less than 40 km / h), the communication device to be used at that position (e.g., cellular 5G), and the weather at that position (e.g., sunny). The generated communication needs for DB update are output to the communication control unit 120 of the vehicle β.
[0088] Based on the communication possibility information stored in the communication possibility database 122, the communication possibility prediction unit 121 of vehicle β predicts that cellular 5G communication is possible in alley B in urban area A for the communication needs for DB update received from the database update control unit 160 of vehicle β.
[0089] Based on the communication possibility information stored in the communication possibility database 122, the route planning unit 123 of vehicle β plans a route that better satisfies the communication content required by the communication needs for DB update than the planned route, but determines that there is no alternative route that is better than the planned route.
[0090] Based on the planned route and the communication content required by the communication needs for DB update, the communication policy determination notifying unit 124 of vehicle β determines a communication policy with cellular 5G as the communication method and with the communication timing set at the time when the vehicle approaches alley B in urban area A. Then, in accordance with the determined communication policy, the communication policy determination notifying unit 124 of vehicle β notifies the database update control unit 160 to transmit and receive data to and from the center 500 by connecting via cellular 5G at the time when the communication control device 100 of vehicle β moves along the planned route and reaches alley B in urban area A.
[0091] In response to the notification, the database update control unit 160 of vehicle β, which has received a notification from the communication policy decision notifying unit 124 of vehicle β in alley B of urban area A, requests the second communication unit 142 of vehicle β to transmit data to the center 500 and receive data from the center 500 by cellular 5G communication. Then, the database update control unit 160 of vehicle β collects the communication available band, disconnection rate, error rate, and the like during this data communication.
[0092] The update data acquisition unit 162 of the database update control unit 160 of vehicle β generates DB update data based on communication results collected by cellular 5G communication with the center 500, and outputs the DB update data to the update request integrator 161 of the database update control unit 160 of vehicle β. The update request integrator 161 of vehicle β outputs the DB update data input from the update data acquisition unit 162 to the center 500 that generated the center DB update request.
[0093] The center 500 transmits the DB update data received from the communication control device 100 of the vehicle β to the communication control device 100 of the vehicle α that has requested transmission of update data for the portion of information that is lacking.
[0094] The communication control unit 120 of vehicle α updates the communication possibility information stored in the communication possibility database 122 of vehicle α based on the DB update data received from the center 500. This enables the communication possibility prediction unit 121 of vehicle α to predict the communication possibility on the current planned route based on the communication possibility information stored in the communication possibility database 122.
[0095] As can be seen from the above-mentioned specific example, the communication control device according to this embodiment can suitably update the communication possibility information stored in the database even while moving.
[0096] <Second embodiment> 5 is a functional block diagram of a communication control device 200 and its peripheral units according to the second embodiment of the present disclosure. The functional block illustrated in FIG. 5 includes the communication control device 200 and a center 500 mounted on a vehicle.
[0097] The communication control device 200 according to the second embodiment shown in Fig. 5 differs from the communication control device 100 according to the first embodiment shown in Fig. 1 in the configurations of an external communication unit 240 and a database update control unit 260. The communication control device 200 according to the second embodiment will be described below, focusing on this different configuration.
[0098] The external communication unit 240 is a communication interface for connecting the communication control device 200 to the center 500 directly or via a network. In this embodiment, the external communication unit 240 includes a first communication unit 141, a second communication unit 142, a third communication unit 143, and a fourth communication unit 144 as communication means. The first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 are as described above. The external communication unit 240 outputs operation information indicating whether or not each of the first communication unit 141, the second communication unit 142, the third communication unit 143, and the fourth communication unit 144 is operating normally to the database update control unit 260 (the communication policy decision notifying unit 124 thereof).
[0099] The database update control unit 260 controls processing relating to updating of communication possibility information stored in the communication possibility database 122 of the communication control unit 120. The database update control unit 260 includes an update request integrating unit 161 and an update data acquiring unit 262.
[0100] The update data acquisition unit 262 collects information related to communication possibility, such as a communication available band, a disconnection rate, and an error rate, via the external communication unit 240 in communication between the application of the external communication application unit 130 and the center 500. Furthermore, the update data acquisition unit 262 generates DB update data for updating the communication possibility information stored in the communication possibility database 122 based on the collected information. The generated DB update data is output to the update request integration unit 161.
[0101] In the communication control device 100 according to the first embodiment, the update data acquisition unit 162 transmits data to the center 500 and / or receives data from the center 500 via the external communication unit 140 based on a notification regarding the communication method and communication timing received from the communication control unit 120, and collects information required for creating DB update data. In contrast, in the communication control device 200 according to the second embodiment, the update data acquisition unit 262 does not communicate with the center 500 to create DB update data, but accumulates information that can be collected in communication between the application of the external communication application unit 130 and the center 500 to create DB update data. In this way, data communication between the database update control unit 260 and the center 500 can be substituted by data communication between the external communication application unit 130 and the center 500, and the amount of data communicated by the communication control device 200 with the center 500 can be reduced.
[0102] The route determination unit 150 may inquire of a user such as a driver via a human-machine interface device (not shown) whether or not it is OK to change the current planned route (first route) to an alternative route (second route) considered by the route consideration unit 123 of the communication control unit 120, and may change the current planned route (first route) to the alternative route (second route) only when permission is obtained from the user. In this way, the user can understand that the planned route along which the communication control device 100 will travel will be changed or has already been changed, and thus the user does not feel distrust or discomfort.
[0103] In the above embodiment, an application in which a communication need has occurred in the external communication application unit 130 needs to transmit data to the external communication unit 140 or receive data from the external communication unit 140 every time the communication strategy determination notifying unit 124 notifies the application according to the communication timing, but the communication control unit 120 may be newly provided with a configuration for temporarily storing communication data and centrally control transmission and reception of data between the external communication application unit 130 and the external communication unit 140. As a result, an application in which a communication need has occurred can temporarily deposit all data in the communication control unit 120 in advance or receive all temporarily deposited data from the communication control unit 120 all at once without being bound by the communication method or communication timing, thereby reducing the load on the application related to data transmission and reception processing.
[0104] <Actions and Effects> According to the communication control device according to each embodiment of the present disclosure described above, the communication possibility information stored in the communication possibility database, which at least associates a location where a center can be connected with a usable communication method, is updated based on the planned route along which the communication control device will move and the requested update content, so that information on missing parts or parts with old creation dates and times in the communication possibility information stored in the communication control device can be suitably updated even while the communication control device is moving.
[0105] This control makes it possible to accurately predict in advance the optimal communication method that the application will use to communicate with the center while the communication control device (the vehicle in which it is installed) is moving, based on the planned route, the latest communication possibility information updated as needed, and the communication content required by the communication needs generated by the application implemented in the communication control device. This makes it possible to avoid situations where the communication control device cannot connect to the center at the planned location, where the desired communication band cannot be obtained even if the communication control device can connect to the center, and where the communication costs required for connecting to the center become unnecessarily high.
[0106] The above describes one embodiment of the present disclosure, but the present disclosure can be understood as a vehicle equipped with a communication control device, a battery control method executed by a communication control device having a processor and a memory, a control program for executing the battery control method, a computer-readable non-transitory storage medium storing the control program, and a power supply system including the communication control device. [Industrial Applicability]
[0107] The present disclosure can be used in a communication control device that can be connected to an external device using a plurality of communication methods. [Explanation of symbols]
[0108] 100, 200 Communication control device 110 Power supply status detector 120 Communication control section 121 Communication Possibility Prediction Department 122 Communication Possibility Database (DB) 123 Route Planning Department 124 Communications Policy Decision and Notification Division 130 External communication application part 131 App 1 132 2nd App 133 Third App 140, 240 External communication department 141 First Communication Section (4G) 142 Second Communication Division (5G) 143 Third Communication Department (Wireless LAN) 144 4th Communication Section (Wired LAN) 150 Route Determination Unit 160, 260 Database update control section 161 Update request integration section 162, 262 Update data acquisition section 500 Center
Claims
1. A communication control device that can be connected to an external device using a plurality of communication methods, a storage unit configured to store communication possibility information that associates at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; an update control unit that controls updating of the communication possibility information based on at least one of a request generated within the communication control device and a request output from the external device; an acquisition unit that acquires a first route as a planned route for the communication control device; a control unit that controls communication between the communication control device and the external device while the communication control device is moving so that the update control unit controls the update of the communication possibility information, based on the first route, the communication possibility information, and communication content requested by the communication control device; a communication unit that executes communication between the communication control device and the external device based on control of the control unit, The update control unit, Collecting data necessary for updating in communication between the communication control device and the external device, and controlling updating of the communication possibility information based on the collected data; When a plurality of requests are generated, the plurality of requests are consolidated into one and the update of the communication possibility information is controlled. Communications control device.
2. The communication contents include at least one of a communication location, a passing speed, a communication data volume, a communication method, and weather, which indicate a portion of the communication possibility information that should be updated; The control unit controls communication between the communication control device and the external device so as to satisfy the communication content. The communication control device according to claim 1 .
3. When the request is a request output from the external device, the update control unit transmits update data of the communication possibility information generated based on the collected data to the external device. The communication control device according to claim 1 .
4. The external device distributes the update data received from the update control unit to another communication control device that has not generated the update data, in order to update the communication feasibility information held by the other communication control device. The communication control device according to claim 3.
5. A route planning unit that plans and proposes a second route different from the first route based on the first route, the communication possibility information, and the communication content, when it is determined that the second route satisfies a predetermined condition required for the planned route, the control unit changes the planned route along which the communication control device moves from the first route to the second route, and controls communication between the update control unit and the external device. The communication control device according to claim 1 .
6. The second route is a route in which the communication possibility information is updated more efficiently than the first route. The communication control device according to claim 5.
7. The conditions required for the planned route include at least one of an arrival time at a destination point of the planned route and a travel cost to the destination point. The communication control device according to claim 5.
8. The communication possibility information further includes at least one of a time, a weather, a passing speed, a communication band, a power required for communication, a communication disconnection rate, and a communication error rate, which are associated with the location in addition to the communication method. The communication control device according to claim 1 .
9. A communication control method executed by a computer of a communication control device that can be connected to an external device using a plurality of communication methods, comprising: using communication possibility information stored in a storage unit, the communication possibility information associating at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; controlling update of the communication possibility information based on at least one of a request generated inside the communication control device and a request output from the external device; acquiring a first route as a planned route for the communication control device; controlling communication between the communication control device and the external device while the communication control device is moving based on the first route, the communication availability information, and the requested communication content in order to control an update of the communication availability information; executing communication between the communication control device and the external device based on control of the controlling step, and collecting data required for updating; controlling an update of the communication capability information based on the collected data; and when a plurality of the requests are generated, aggregating the plurality of the requests into one and controlling update of the communication possibility information. Communications control method.
10. A communication control program to be executed by a computer of a communication control device that can be connected to an external device using a plurality of communication methods, using communication possibility information stored in a storage unit, the communication possibility information associating at least a position where the communication control device can be connected to the external device with a communication method available at the position among the plurality of communication methods; controlling update of the communication possibility information based on at least one of a request generated inside the communication control device and a request output from the external device; acquiring a first route as a planned route for the communication control device; controlling communication between the communication control device and the external device while the communication control device is moving based on the first route, the communication availability information, and the requested communication content in order to control an update of the communication availability information; executing communication between the communication control device and the external device based on control of the controlling step, and collecting data required for updating; controlling an update of the communication capability information based on the collected data; and when a plurality of the requests are generated, aggregating the plurality of the requests into one and controlling update of the communication possibility information. Communications control program.
11. A vehicle equipped with the communication control device according to any one of claims 1 to 8.
Citation Information
Patent Citations
Network connection automatic changeover system
JP2001309445A
Wireless communication control apparatus, and method for mobile objects
JP2009194823A
Vehicle network connectivity management system and method
JP2013186121A
