Alert display device, alert display method, and alert display program

The alert display device automates the determination and display of provisional customs duty reduction eligibility for re-imported products, addressing manual judgment errors and ensuring timely application, thereby enhancing cost control and savings in the apparel and jewelry industries.

JP7572983B2Active Publication Date: 2024-10-24OBIC CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2022031371
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-03-02
Publication Date
2024-10-24
Estimated Expiration
2042-03-02

AI Technical Summary

Technical Problem

In the apparel and jewelry industries, manually judging the applicability of provisional customs duty reductions for re-imported products processed overseas from exported raw materials is labor-intensive and prone to errors, making it difficult to effectively apply for cost savings.

Method used

An alert display device and method that calculates and displays alerts for raw materials nearing their provisional application deadline, automatically determining eligibility for customs duty reductions and providing processing instructions to ensure timely re-import and application of these savings.

Benefits of technology

Automated alert systems enable accurate and efficient application of provisional customs duty reductions, reducing labor and errors, leading to strict cost control and enhanced cost savings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572983000001
    Figure 0007572983000001
  • Figure 0007572983000002
    Figure 0007572983000002
  • Figure 0007572983000003
    Figure 0007572983000003
Patent Text Reader

Abstract

To provide an alert display device, an alert display method, and an alert display program for displaying an alert for a raw material for which an application time limit of Article 8 of the Temporary Tariff Measures Law is approaching or has passed when the raw material is input and a processing instruction of a product is given to a foreign processing destination.SOLUTION: In an alert display apparatus 100, an application time limit acquisition unit 102a acquires an application time limit of Article 8 of the Temporary Tariff Measures Law associated with a processing destination code, a commodity code, and a lot NO that are input when a processing instruction is performed to a processing destination of a product from a material management master 106b including the processing destination code, the commodity code, the lot NO, and the application time limit of Article 8 of the Temporary Tariff Measures Law. A number-of-days calculation unit 102b calculates, for each combination of the processing destination code, the commodity code, and a lot NO, the number of days acquired by subtracting a scheduled date of reimport regarding the product input when the processing instruction is given from the acquired application time limit of Article 8 of the Temporary Tariff Measures Law. An alert display unit 102c displays an alert relative to a combination in which the calculated number of days is equal to or less than a predetermined number of days.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an alert display device, an alert display method, and an alert display program. [Background technology]

[0002] Patent Document 1 discloses a method for managing outsourced processing and assembly operations, and a method for managing processing and assembly re-import operations in which raw materials or parts are exported overseas, processed and assembled overseas, and then imported as products (see paragraph 0001 of Patent Document 1, etc.). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2003-281417 A Summary of the Invention [Problem to be solved by the invention]

[0004] As described in the above Patent Document 1, in the apparel and jewelry industries, for reasons of cost and quality, etc., products that are processed overseas using raw materials exported from within the country are sometimes re-imported into the country.

[0005] There is a system (Article 8 of the Tariff Temporary Measures Act, commonly known as Temporary 8) under which, if the period between the date of export permission for the raw materials and the date of re-import of the product is within one year, the tariff on the re-import of the product is reduced in proportion to the proportion of the raw materials in the product.

[0006] Here, in the past, in order to apply the provisional 8 exemption, at the stage of issuing instructions for processing the raw materials, a person in charge would manually determine whether or not the provisional 8 exemption was applicable to each raw material by comparing the planned re-import date with the provisional 8 exemption deadline.

[0007] For example, if the current planned re-import date allows the application of the provisional eight to raw material a1 that constitutes product A, but does not allow the application of the provisional eight to raw material a2, it would have been necessary to change raw material a2 to a different lot, or to move up the planned re-import date without changing the lot of raw material a2.

[0008] However, having a person in charge manually determine whether or not the provisional eight could be applied to each raw material required a great deal of effort and was prone to errors.

[0009] The present invention has been made in consideration of the above problems, and has an object to provide an alert display device, an alert display method, and an alert display program that are capable of displaying an alert for raw materials whose provisional application deadline is approaching or has passed when raw materials are input and product processing instructions are given to an overseas processing partner. [Means for solving the problem]

[0010] In order to solve the above-mentioned problems and achieve the object, the alert display device according to the present invention is an alert display device having a control unit and a memory unit, which is capable of displaying a reduction application alert, which is an alert to inform the user that there is not much time between the scheduled re-import date of the product and the application deadline, which is the deadline for applying the reduction, when a product that has been processed overseas using raw materials exported from within the country is re-imported into the country and the period from the export permission date for the raw materials to the re-import date of the product is within a predetermined period, and the reduction application alert is an alert to inform the user that there is not much time between the scheduled re-import date of the product and the application deadline, which is the deadline for applying the reduction, and the like. The memory unit includes processing destination identification data for identifying a destination where the product will be processed, raw material identification data for identifying the raw materials, and The control unit is characterized in that a raw material management master including lot identification data for identifying a lot of raw materials and the application deadline is stored, and the control unit is equipped with an application deadline acquisition means for acquiring from the raw material management master an application deadline linked to the processing destination identification data, raw material identification data, and lot identification data input when giving a processing instruction to the processing destination of the product, a number of days calculation means for calculating the number of days obtained by subtracting the planned re-import date for the product input when giving the processing instruction from the application deadline acquired by the application deadline acquisition means for each combination of the processing destination identification data, the raw material identification data, and the lot identification data, and an alert display means for displaying the reduction application alert for the combination for which the number of days calculated by the number of days calculation means is equal to or less than a predetermined number of days.

[0011] In addition, in the alert display device of the present invention, the alert display means is characterized in that when the number of days calculated by the number of days calculation means is less than the specified number of days and greater than or equal to 0 days, it displays a number of days for alert corresponding to the number of days calculated by the number of days calculation means as the reduction application alert, and when the number of days calculated by the number of days calculation means is less than 0 days, it displays as the reduction application alert a message to the effect that the reduction is not applied.

[0012] In addition, in the alert display device of the present invention, the memory unit further stores processing instruction receiving data for managing receiving information about the product, including processing instruction identification data for identifying the processing instruction and product identification data for identifying the product, and processing instruction delivery data for managing delivery information about the raw materials, including the processing instruction identification data, the combination of the processing destination identification data, the raw material identification data, and the lot identification data, and the delivery quantity of the raw materials, and the control unit further includes an application flag adding means for updating the processing instruction delivery data by adding a flag indicating that the reduction is applied to the combination of the processing destination identification data, the raw material identification data, and the lot identification data for which the number of days calculated by the day number calculation means is 0 or more.

[0013] Further, in the alert display device according to the present invention, the control unit includes a pre-reduction application_product tariff calculation means for multiplying a tariff rate by an amount of a product specified by the product identification data in the processing instruction acceptance data to calculate a tariff for the product before the reduction is applied for each product, a pre-reduction application_combined tariff calculation means for calculating a tariff for each combination before the reduction is applied by apportioning the tariff for each product calculated by the pre-reduction application_product tariff calculation means in accordance with the payout quantity for each combination in the processing instruction payout data associated with the same processing instruction identification data in the processing instruction acceptance data, and a pre-reduction application_combined tariff calculation means for calculating a tariff for each combination before the reduction is applied for a combination to which a flag indicating that the reduction is applied is not added in the processing instruction payout data, the tariff for each combination before the reduction is applied calculated by the pre-reduction application_combined tariff calculation means is used as it is as the tariff for each combination after the reduction is applied, and For the combination to which a flag indicating that the reduction is applied is added in the instruction delivery data, the system further comprises: after-reduction application_combined tariff calculation means for calculating a tariff for each combination after the reduction is applied, using the tariff for each combination before the reduction is applied calculated by the before-reduction application_combined tariff calculation means and a default reduction rate; after-reduction application_product tariff calculation means for calculating a tariff for the product after the reduction is applied, for each product, by adding up the tariffs for each combination calculated by the after-reduction application_combined tariff calculation means; and reduction rate adding means for calculating a tariff reduction rate based on the tariff for the product before the reduction is applied calculated by the before-reduction application_product tariff calculation means and the tariff for the product after the reduction is applied calculated by the after-reduction application_product tariff calculation means, and adding the calculated reduction rate for each product to the processing instruction acceptance data.

[0014] In addition, in the alert display device of the present invention, the control unit is further characterized by having a report output means for extracting the product identification data that meets specified conditions from the processing instruction acceptance data, and outputting a report including the extracted product identification data and a reduction rate alert, which is an alert corresponding to the reduction rate in the processing instruction acceptance data linked to the extracted product identification data.

[0015] In addition, the alert display device of the present invention is characterized in that the reduction rate alert notifies the user that for a product with a high reduction rate, the product has a high priority for import procedures.

[0016] In addition, in the alert display device of the present invention, the document further includes information in the raw material management master and the processing instruction dispensing data that corresponds to the extracted product identification data.

[0017] In addition, the alert display device of the present invention is characterized in that the reduction is based on Article 8 of the Temporary Tariff Measures Act, and the specified period is one year.

[0018] In addition, in the alert display method according to the present invention, when a product processed overseas using raw materials exported from within a country is re-imported into a country, if the period from the export permission date for the raw materials to the re-import date for the product is within a predetermined period, and the tariff on the re-import of the product is reduced in accordance with the ratio of the raw materials in the product, a reduction application alert can be displayed as an alert to inform the user that there is not much time between the scheduled re-import date for the product and the application deadline for the reduction, which is the deadline for the reduction to be applied. The alert display method is executed by an information processing device having a control unit and a storage unit, and the storage unit stores processing destination identification data for identifying a destination where the product will be processed, raw material identification data for identifying the raw materials, and a reduction application alert. a raw material management master including lot identification data for reducing the amount of the reduction and the application deadline, and an application deadline acquisition step executed by the control unit for acquiring from the raw material management master an application deadline linked to the processing destination identification data, raw material identification data, and lot identification data input when issuing a processing instruction for the product to the processing destination; a days calculation step for calculating the number of days obtained by subtracting the planned re-import date for the product input when issuing the processing instruction from the application deadline acquired in the application deadline acquisition step, for each combination of the processing destination identification data, the raw material identification data, and the lot identification data; and an alert display step for displaying the reduction application alert for the combination for which the number of days calculated in the days calculation step is equal to or less than a predetermined number of days.

[0019] In addition, in the alert display program according to the present invention, when a product processed overseas using raw materials exported from within the country is re-imported into the country, if the period from the export permission date for the raw materials to the re-import date for the product is within a predetermined period, and the tariff on the re-import of the product is reduced in accordance with the ratio of the raw materials in the product, a reduction application alert is displayed, which is an alert to inform the user that there is not much time between the scheduled re-import date for the product and the application deadline, which is the deadline for the reduction to be applied, and the like. The alert display program is executed by an information processing device having a control unit and a storage unit, and the storage unit stores processing destination identification data for identifying a destination where the product will be processed, raw material identification data for identifying the raw materials, and a lot of the raw materials. a raw material management master including lot identification data for distinguishing between the target product and the application deadline and the application deadline, and for causing the control unit to execute an application deadline acquisition step of acquiring from the raw material management master an application deadline linked to the processing destination identification data, raw material identification data, and lot identification data input when issuing a processing instruction for the product to the processing destination, a days calculation step of calculating the number of days obtained by subtracting the planned re-import date for the product input when issuing the processing instruction from the application deadline acquired in the application deadline acquisition step for each combination of the processing destination identification data, the raw material identification data, and the lot identification data, and an alert display step of displaying the reduction application alert for the combination for which the number of days calculated in the days calculation step is equal to or less than a predetermined number of days. Effect of the Invention

[0020] According to the present invention, when raw materials are input and product processing instructions are given to an overseas processing partner, an alert can be displayed for raw materials for which the deadline for provisional application is approaching or has passed. [Brief description of the drawings]

[0021] [Figure 1] FIG. 1 is a block diagram showing an example of the configuration of an alert display device. [Diagram 2] FIG. 2 is a diagram illustrating an example of movement data. [Diagram 3] FIG. 3 is a diagram illustrating an example of the raw material management master. [Figure 4] FIG. 4 is a diagram showing an example of processing instruction receiving data and processing instruction issuing data. [Diagram 5] FIG. 5 is a diagram illustrating an example of the alert application period management master. [Figure 6] FIG. 6 is a diagram showing an example of a display of a reduction application alert. [Figure 7] FIG. 7 is a diagram showing an example of calculation of a customs duty (estimate) on a product. [Figure 8] FIG. 8 is a diagram showing an example of calculation of customs duty (provisional 8) on a product. [Figure 9] FIG. 9 is a diagram showing an example of updated processing instruction receiving data. [Figure 10] FIG. 10 is a diagram showing an example of an extraction screen for extracting information required for outputting a provisional application list form. [Figure 11] FIG. 11 is a diagram illustrating an example of the alert reduction rate management master. [Figure 12] FIG. 12 is a diagram showing an example of information in the processing instruction delivery data and the raw material management master corresponding to the product in the extracted processing instruction receipt data. [Figure 13] FIG. 13 is a diagram showing an example of the output provisional application list form. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0022] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An alert display device, an alert display method, and an alert display program according to the present invention will be described in detail below with reference to the accompanying drawings. Note that the present invention is not limited to the present embodiment.

[0023] [1. Overview] When materials (fabrics, accessories, etc.) are exported from Japan, processed overseas, and then re-imported into Japan, Article 8 of the Tariff Temporary Measures Act (hereinafter referred to as "Temporary 8") exists as a system that allows for a reduction in tariffs on raw materials if certain conditions are met.

[0024] In recent years, with domestic labor costs rising sharply, an increasing number of companies in the apparel industry and other sectors are exporting raw materials and importing finished products. Companies that are required to reduce costs should actively aim to apply the provisional tax rate.

[0025] The conditions for application of provisional eight are as follows: 1. In principle, raw materials must be re-imported within one year from the date of export permission. 2. When applying for import procedures for the product (tax reduction procedures), the export procedure documents for the raw materials must be presented.

[0026] Previously, when starting the import procedure for a product, the person in charge would manually search for the export procedure documents for the raw materials to check whether the provisional 8 was applicable. However, this method had problems such as not being able to grasp in advance which items were subject to the provisional 8 (i.e., not being able to grasp how much cost reduction could be achieved), and the need to carry out cumbersome work to apply the provisional 8.

[0027] Therefore, in this embodiment, for example, a system is provided that can link and manage information on the export of raw materials and information on planned product imports, making it possible to extract products to which the provisional quota is applicable in a list format and to determine whether the provisional quota is applicable at the time of processing instructions.

[0028] In addition, in this embodiment, for example, it is possible to calculate expected tariffs, thereby making it possible to visualize the expected cost reduction rate when the provisional tariff is applied.

[0029] In this embodiment, for example, when the provisional application target is output, the following alerts 1 and 2 can be output. 1. When there are XX days left until the deadline for applying the provisional Eight, an alert stating "XX days left until the deadline for applying the provisional Eight" can now be output. 2. When comparing the cost rate when Provisional 8 is applied with the cost rate when it is not applied, if there is a discrepancy of YY% (i.e., if the cost reduction rate is higher when Provisional 8 is applied), an alert will be issued and the message "Import procedure priority: High" will be output. The values ​​for XX days and YY% can be set separately in the master.

[0030] By the above mechanism, in this embodiment, for example, the following effects 1 to 3 are obtained. 1. We are now able to implement strict cost management. 2. It has become possible to extract the targets of provisional application in a list format, which has led to the prevention of omissions in the application of provisional application, thereby ensuring cost reduction. 3. By outputting the aforementioned alert when issuing processing instructions and when extracting items for which temporary work is to be performed, employees can be made aware of the need to reduce costs in their daily work. The specific configuration and operation will be described below.

[0031] [2. Configuration] An example of the configuration of an alert display device according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of an alert display device.

[0032] The alert display device is a commercially available desktop personal computer. Note that the alert display device is not limited to stationary information processing devices such as desktop personal computers, but may be portable information processing devices such as commercially available notebook personal computers, PDAs (Personal Digital Assistants), smartphones, and tablet personal computers.

[0033] The alert display device comprises a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. The units comprised in the alert display device are communicatively connected via any communication path.

[0034] The communication interface unit 104 communicatively connects the alert display device to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the alert display device and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that data such as various masters described below may be stored in the server 200, for example.

[0035] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

[0036] Various databases, tables, files, etc. are stored in the storage unit 106. Computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes are recorded in the storage unit 106. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106.

[0037] The memory unit 106 includes, for example, movement data 106a, raw material management master 106b, processing instruction receiving data 106c, processing instruction discharging data 106d, alert_application period management master 106e, customs duty rate master 106f, temporary tax reduction rate master 106g, and alert_reduction rate management master 106h.

[0038] According to the alert display device 100 of this embodiment, when a product that has been processed overseas using raw materials exported from within the country is re-imported into the country, if the period from the export permission date for the raw materials to the re-import date of the product is within a specified period, and the tariff on the re-import of the product is reduced in accordance with the proportion of the raw materials in the product, a reduction application alert can be displayed, which is an alert to inform the user that there is not enough time between the scheduled re-import date of the product and the application deadline, which is the deadline for the reduction to be applied.

[0039] The reduction is based on, for example, Article 8 of the Temporary Tariff Measures Law (hereinafter referred to as "Temporary 8"). The specified period is, for example, one year.

[0040] The transfer data 106a is data that manages information on the raw materials transferred from within the country to overseas. As shown in Fig. 2, the transfer data 106a includes, for example, transfer identification data (transfer number) for identifying each transfer, the transfer date of the raw materials, transfer source identification data (transfer source warehouse) for identifying the source from which the raw materials are transferred, processing destination identification data (processing destination code) for identifying the destination to which the product is processed, transfer destination identification data (transfer destination) for identifying the destination to which the raw materials are transferred, row number within the same transfer number, raw material identification data (product code and product name) for identifying the raw materials, lot identification data (lot number) for identifying the lot of the raw materials, and transfer quantity (quantity) of the raw materials.

[0041] The raw material management master 106b is a master for managing the application deadline and export information, etc., for the raw materials. The raw material management master 106b is generated based on the transfer data 106a. As shown in FIG. 3 and other figures, the raw material management master 106b includes, for example, the processing destination identification data (processing destination code), the inventory location of the raw materials, the raw material identification data (product code and product name), the lot identification data (lot number), the planned export quantity (export quantity) of the raw materials, the exported quantity (dispatched quantity) of the raw materials, the transfer identification data (transfer number), the row number within the same transfer number, the export permission date for the raw materials, the provisional application deadline for the raw materials (provisional application deadline), the export permission number, the invoice number, and the like.

[0042] As described above, in the provisional tax reduction, if the period from the export permission date for the raw materials to the re-import date for the product is within one year, the provisional tax reduction deadline is set, for example, exactly one year after the export permission date for the raw materials. For example, in the records in the first to third rows from the top of the raw materials management master 106b in FIG. 3, the provisional tax reduction deadline is set to "2023 / 1 / 31", which is exactly one year after the export permission date for the raw materials, 2022 / 1 / 31.

[0043] The processing instruction receiving data 106c is data for managing receiving information about the product. As shown in Fig. 4 and other figures, the processing instruction receiving data 106c includes, for example, processing instruction identification data (processing instruction number) for identifying the processing instruction of the product to be processed at the processing destination, the processing instruction date, the planned re-import date for the product (planned processing completion (import) date), the processing destination identification data (processing destination code and processing destination), a row number within the same processing instruction number, item identification data (item code) for identifying the item to which the product belongs, product identification data (product code (product) and product name) for identifying the product, the received quantity of the product, and the price of the product.

[0044] As shown in FIG. 9, the processing instruction acceptance data 106c may further include, for example, a customs duty on the product before the customs duty reduction under Provisional No. 8 is applied (tariff (estimated)), a customs duty on the product after the customs duty reduction under Provisional No. 8 is applied (tariff (provisional No. 8)), and a reduction rate (reduction rate when Provisional No. 8 is applied) indicating the extent to which the customs duty (provisional No. 8) has been reduced compared to the customs duty (estimated).

[0045] The processing instruction delivery data 106d is data for managing delivery information for the raw materials. As shown in Fig. 4, the processing instruction delivery data 106d includes, for example, the processing instruction identification data (processing instruction No.), the processing instruction date, the planned re-import date for the product (planned date of completion of processing (import)), the processing destination identification data (processing destination code and processing destination), the processing accounting warehouse, the row No. in the same processing instruction No., the raw material identification data (product code (raw material) and product name), the lot identification data (lot No.), the delivery quantity (quantity) of the raw material, and a flag (provisional No. application FLG) for identifying whether or not the reduction by the provisional No. is applied.

[0046] In the column of the provisional 8 application FLG in the processing instruction delivery data 106d in Fig. 4, the check shown in the square frame is a flag indicating that the provisional 8 reduction is applied. The flag indicating that the provisional 8 reduction is applied is given when the number of days obtained by subtracting the planned re-import date of the product from the provisional 8 application deadline is 0 or more (in other words, when the planned re-import date of the product has not yet passed the provisional 8 application deadline).

[0047] The alert application period management master 106e is a master that manages the alert contents of the reduction application alert. In the alert application period management master 106e, as shown in Fig. 5, different alerts are set according to the number of days obtained by subtracting the planned re-import date of the product from the provisional application period. Specifically, as shown in Fig. 5, different alerts are set according to how many of the four criteria, "less than 0 days," "30 days or less," "60 days or less," and "90 days or less," the number of days subtracted corresponds to (◯).

[0048] The tariff rate master 106f is a master that manages the normal tariff rate for the product. As shown in Fig. 7, the tariff rate master 106f includes, for example, the item identification data and the normal tariff rate. Note that the actual tariff rate is set in more detail depending on factors such as the item and the destination country, but since this embodiment is intended only to easily check the prospects for cost reduction, the tariff rate master 106f sets the tariff rate on an item basis. If more precise tariff rates are desired, the number of management items in the tariff rate master 106f can be increased.

[0049] The provisional 8 tax reduction rate master 106g is a master that manages the reduction rate of customs duties when the provisional 8 tax reduction is applied. The provisional 8 tax reduction rate master 106g includes, for example, the reduction rate of customs duties when the provisional 8 tax reduction is applied, as shown in Fig. 8. For example, if the customs duty calculated using the customs duty rate master 106f is 2,000 yen and the reduction rate is 80%, the customs duty when the provisional 8 tax reduction is applied will be 400 yen, which is the amount obtained by reducing 80% of 2,000 yen (1,600 yen) from 2,000 yen.

[0050] The alert_reduction rate management master 106h is a master that manages the alert contents of the reduction rate alert, which is an alert according to the reduction rate. In the alert_reduction rate management master 106h, different alerts are set according to the value of the reduction rate, as shown in FIG.

[0051] The control unit 102 is a CPU or the like that performs overall control of the alert display device. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, and required data, and executes various information processing based on these stored programs.

[0052] The control unit 102 conceptually includes, for example, (1) an application deadline acquisition unit 102a as application deadline acquisition means for acquiring, from the raw material management master, an application deadline linked to the processing destination identification data, raw material identification data, and lot identification data input when issuing a processing instruction for the product to the processing destination; (2) a number of days calculation unit 102b as number of days calculation means for calculating, for each combination of the processing destination identification data, the raw material identification data, and the lot identification data, the number of days obtained by subtracting the planned re-import date for the product input when issuing the processing instruction from the application deadline acquired by the application deadline acquisition means; (3) an alert display unit 102c as alert display means for displaying the reduction application alert for the combination for which the number of days calculated by the number of days calculation means is equal to or less than a predetermined number of days; and (4) an application flag addition unit for updating the processing instruction issue data by adding a flag indicating that the reduction is applied to the combination of the processing destination identification data, the raw material identification data, and the lot identification data for which the number of days calculated by the number of days calculation means is equal to or greater than 0. (5) a pre-reduction application_product tariff calculation unit 102e as a pre-reduction application_product tariff calculation means that calculates the tariff for the product before the reduction is applied for each product by multiplying the amount of the product specified by the product identification data in the processing instruction acceptance data by a tariff rate; and (6) a pre-reduction application_product tariff calculation unit 102f as a pre-reduction application_product tariff calculation means that calculates the tariff for each product before the reduction is applied for each product by prorating the tariff for each product calculated by the pre-reduction application_product tariff calculation means in accordance with the dispensing quantity for each combination in the processing instruction dispensing data that is linked to the same processing instruction identification data in the processing instruction acceptance data. a pre-reduction application_combined tariff calculation unit 102f as a pre-reduction application_combined tariff calculation means for calculating the tariff for each of the combinations before the reduction is applied; and (7) for the combinations to which a flag indicating that the reduction is applied is not added in the processing instruction delivery data, the tariff for each of the combinations before the reduction is applied calculated by the pre-reduction application_combined tariff calculation means is used as the tariff for each of the combinations after the reduction is applied, and for the combinations to which a flag indicating that the reduction is applied is added in the processing instruction delivery data,(8) a post-reduction application_combined tariff calculation unit 102g as a post-reduction application_combined tariff calculation means that calculates a tariff for each of the combinations after the reduction is applied by using the tariff for each of the combinations before the reduction is applied calculated by the pre-reduction application_combined tariff calculation means and a predetermined reduction rate; (9) a post-reduction application_product tariff calculation unit 102h as a post-reduction application_product tariff calculation means that calculates a tariff for the product after the reduction is applied for each of the products by adding up the tariffs for each of the combinations calculated by the post-reduction application_combined tariff calculation means; (10) a reduction rate adding unit 102i as reduction rate adding means for calculating a reduction rate of the tariff based on the tariff on the product and the tariff on the product after the reduction is applied calculated by the reduction application_product tariff calculation means, and adding the calculated reduction rate for each product to the processing instruction acceptance data; and (11) a report output unit 102j as report output means for extracting the product identification data that matches a specified condition from the processing instruction acceptance data, and outputting a report including the extracted product identification data and a reduction rate alert that is an alert according to the reduction rate in the processing instruction acceptance data linked to the extracted product identification data.

[0053] The application deadline acquisition unit 102a acquires the provisional application deadline linked to the processing destination code, product code (raw material), and lot number entered when issuing a processing instruction for the product to the processing destination of the product from the raw material management master 106b, which includes the processing destination code, product code (raw material), lot number, and provisional application deadline.

[0054] The number of days calculation unit 102b calculates the number of days obtained by subtracting the planned re-import date for the product entered when giving the processing instruction from the provisional application deadline acquired by the application deadline acquisition unit 102a, for each combination of processing destination code, product code (raw material), and lot number.

[0055] The alert display unit 102c displays the reduction application alert for the combination in which the number of days calculated by the number of days calculation unit 102b is equal to or less than a predetermined number of days.

[0056] Specifically, when the number of days calculated by the number of days calculation unit 102b is less than the specified number of days and greater than or equal to 0 days (in other words, when the planned re-import date for the product has not yet passed the application deadline for the provisional amendment, but is approaching the application deadline for the provisional amendment), the alert display unit 102c displays the number of days for the alert corresponding to the number of days calculated by the number of days calculation unit 102b as the reduction application alert.

[0057] On the other hand, if the number of days calculated by the number of days calculation unit 102b is less than 0 days (in other words, if the planned re-import date for the product has already passed the application deadline for the provisional reduction), the alert display unit 102c displays the reduction application alert to the effect that the reduction will not be applied.

[0058] The application flag addition unit 102d updates the processing instruction issue data 106d by adding a flag (provisional eight application FLG = ON) indicating that the reduction applies to the combination of processing destination code, product code (raw material) and lot number for which the number of days calculated by the number of days calculation unit 102b is 0 or more (in other words, the combination for which the planned re-import date for the product has not yet passed the application deadline for provisional eight).

[0059] The pre-reduction_product tariff calculation unit 102e calculates the tariff for each product before the reduction is applied by multiplying the amount of the product identified by the product code (product) in the processing instruction acceptance data 106c by the tariff rate.

[0060] The pre-reduction application_combination tariff calculation unit 102f calculates the tariff for each combination before the reduction is applied by apportioning the tariff for each product calculated by the pre-reduction application_product tariff calculation unit 102e according to the dispensing quantity for each combination in the processing instruction dispensing data 106d that is linked to the same processing instruction No. in the processing instruction acceptance data 106c.

[0061] For those combinations to which a flag indicating that the reduction is applied (provisional application FLG = ON) has not been added in the processing instruction issue data 106d, the post-reduction application_combined tariff calculation unit 102g treats the tariff for each combination before the reduction is applied, calculated by the pre-reduction application_combined tariff calculation unit 102f, as the tariff for each combination after the reduction is applied.

[0062] On the other hand, for the combinations to which a flag indicating that the reduction is applied (provisional application FLG = ON) has been added in the processing instruction issue data 106d, the post-reduction application_combined tariff calculation unit 102g calculates the tariff for each combination after the reduction is applied, using the tariff for each combination before the reduction is applied calculated by the pre-reduction application_combined tariff calculation unit 102f and a default reduction rate.

[0063] The post-reduction application_product tariff calculation unit 102h calculates the tariff for the product after the reduction is applied for each product by adding up the tariffs for each combination calculated by the post-reduction application_combined tariff calculation unit 102g.

[0064] The reduction rate addition unit 102i calculates a reduction rate of customs duty based on the customs duty on the product before the reduction is applied calculated by the before-reduction_product tariff calculation unit 102e and the customs duty on the product after the reduction is applied calculated by the after-reduction_product tariff calculation unit 102h, and adds the calculated reduction rate for each product to the processing instruction acceptance data 106c.

[0065] The report output unit 102j extracts product codes (products) that meet specified conditions from the processing instruction acceptance data 106c, and outputs a report including the extracted product codes (products) and a reduction rate alert, which is an alert corresponding to the reduction rate in the processing instruction acceptance data 106c linked to the extracted product codes (products).

[0066] The reduction rate alert is preferably one that notifies the user that the product with a high reduction rate has a high priority for import procedures. In addition, the form preferably further includes information in the raw material management master 106b and the processing instruction delivery data 106d that corresponds to the extracted product code (product).

[0067] [3. Specific examples of processing] In this section, a specific example of the processing according to this embodiment will be described.

[0068] [3-1. Alert display when issuing processing instructions] This section explains the alert display when sending product processing instructions to an overseas processing company.

[0069] First, when raw materials are exported to an overseas processing destination, movement data 106a is registered as shown in Figure 2. Then, based on the registered movement data 106a, raw materials management master 106b is generated as shown in Figure 3. As shown in the raw materials management master 106b in Figure 3, the provisional application deadline for each raw material is exactly one year after the date of export permission for the raw materials.

[0070] By serially managing raw materials using the raw material management master 106b, information required for applying the provisional tariff can be managed. By selecting raw materials by serial number when issuing a processing instruction for a product, it is possible to determine the date by which the product must be imported in order for the provisional tariff to be applied.

[0071] Next, as shown in FIG. 4, when issuing a processing instruction to an overseas processing destination, processing instruction receiving data 106c and processing instruction issuing data 106d are registered as shown in FIG.

[0072] Here, the processing instruction delivery data 106d is registered by inputting necessary information from the processing instruction delivery input screen as shown in Fig. 6, and during the registration, an alert is displayed as necessary according to the procedure described in the following (1) to (3). Then, together with or after the display of the alert, the provisional application FLG is added as described in the following (4).

[0073] (1) Acquisition of application deadline The application deadline acquisition unit 102a acquires the provisional application deadline linked to the combination of the processing destination code, product code (raw material), and lot number entered on the processing instruction delivery input screen from the raw material management master 106b in FIG.

[0074] If the input combinations are the six shown in the processing instruction delivery input screen of Figure 6 (the third and fourth lines have the same content), the application deadline acquisition unit 102a acquires the provisional application deadline for each combination as follows. · Processing code: KA0001, Product code: KI0001, Lot number: L001 → 2023 / 1 / 31 · Processing code: KA0001, Product code: KIB0001, Lot number: L001 → 2023 / 1 / 31 · Processing code: KA0001, Product code: KIR0001, Lot number: L002 → 2023 / 2 / 28 · Processing code: KA0001, Product code: KIR0001, Lot number: L002 → 2023 / 2 / 28 · Processing code: KA0001, Product code: KIY0001, Lot number: L001 → 2023 / 3 / 31 · Processing code: KA0001, Product code: KIG0001, Lot number: L001 → 2023 / 3 / 31

[0075] (2) Calculation of number of days Next, the number of days calculation unit 102b calculates the number of days for each combination by subtracting the planned processing completion (import) date entered on the processing instruction delivery input screen from the provisional application deadline acquired by the application deadline acquisition unit 102a.

[0076] If the input planned import dates are the six combinations shown in the processing instruction delivery input screen of FIG. 6, the number of days calculation unit 102b calculates the number of days for each combination as follows. · Processing code: KA0001, Product code: KI0001, Lot number: L001 → 123 days · Processing code: KA0001, Product code: KIB0001, Lot number: L001 → 123 days · Processing code: KA0001, Product code: KIR0001, Lot number: L002 → 151 days · Processing code: KA0001, Product code: KIR0001, Lot number: L002 → -1 day · Processing code: KA0001, Product code: KIY0001, Lot number: L001 → 30 days · Processing code: KA0001, Product code: KIG0001, Lot number: L001 → 30 days

[0077] (3) Display of mitigation application alert Then, the alert display unit 102c displays the alert according to the number of days calculated by the number of days calculation unit 102b. Note that the alert_application period management master 106e is assumed to be registered in advance with the contents shown in FIG.

[0078] Referring to the alert_application period management master 106e in FIG. 5, the 123 days, 123 days, and 151 days calculated by the number of days calculation unit 102b do not fall under any of "less than 0 days," "30 days or less," "60 days or less," or "90 days or less" (in other words, they do not meet all four criteria).

[0079] In this case, as shown in "Alert contents displayed on screen" in Fig. 6, "No alert" will be displayed and no alert will be displayed. In other words, when the records in the first to third rows from the top of the processing instruction delivery data 106d in Fig. 4 are registered, no alert will be displayed.

[0080] On the other hand, referring to the alert_application period management master 106e in FIG. 5, the -1 day calculated by the number of days calculation unit 102b corresponds to all of “less than 0 days,” “30 days or less,” “60 days or less,” and “90 days or less” (in other words, it corresponds to all four criteria).

[0081] In this case, the alert display unit 102c displays an alert of "provisional application period expired" as shown in "Alert content displayed on screen" in Fig. 6. That is, when the record in the fourth line from the top of the processing instruction issue data 106d in Fig. 4 is registered, the alert of "provisional application period expired" is displayed.

[0082] Also, referring to the alert_application period management master 106e in FIG. 5, the 30 days calculated by the day number calculation unit 102b falls into three categories: “30 days or less,” “60 days or less,” and “90 days or less” (in other words, it meets three criteria).

[0083] In this case, the alert display unit 102c displays an alert of "30 days until the provisional application deadline" as shown in "Alert content displayed on screen" in Fig. 6. That is, when the records in the 5th and 6th rows from the top of the processing instruction issue data 106d in Fig. 4 are registered, the alert of "30 days until the provisional application deadline" is displayed.

[0084] (4) Adding application flag For records that are determined to be "outside the provisional application period" in (3), the application flag addition unit 102d turns OFF (does not check) the provisional application FLG in the processing instruction issue data 106d. In contrast, for other records, the application flag addition unit 102d turns ON (checks) the provisional application FLG in the processing instruction issue data 106d. The updated provisional application FLG is as shown in the rightmost column in the processing instruction issue data 106d in FIG. 4.

[0085] As described above in section [3-1], according to the alert display device 100 of this embodiment, when inputting raw materials and issuing instructions to an overseas processing company to process the product, an alert can be displayed for raw materials whose provisional application deadline is approaching or has passed.

[0086] This means, for example, that it is no longer necessary for a person in charge to manually decide whether or not the provisional eight applies to each raw material, significantly reducing the amount of work required and successfully eliminating errors in judgment.

[0087] The person in charge can then take action to change the raw materials for which an alert has been displayed to those with a different lot with a later application deadline, or to bring forward the planned re-import date without changing the lot, so that the provisional eighth rule is applied to all raw materials without exception. This allows for strict cost management and also leads to cost reduction.

[0088] [3-2. Calculation of customs duties] This section explains how to calculate customs duties before the application of Provisional No. 8 (tariff (estimated)) and after the application of Provisional No. 8 (tariff (provisional No. 8)).

[0089] [3-2-1. Calculation of (estimated) customs duties on products] First, the (estimated) customs duty for the product is calculated. In this item, it is assumed that the customs duty rate master 106f is set as shown in FIG.

[0090] The pre-reduction_product tariff calculation unit 102e multiplies the product price in the processing instruction acceptance data 106c in FIG. 4 by the tariff rate in the tariff rate master 106f in FIG. 7 to calculate the tariff (estimate) for the product.

[0091] Specifically, the pre-reduction_product tariff calculation unit 102e calculates the tariff (estimated) for product A identified by item code HI01 as follows: price of product A 50,000 yen x tariff rate 10% = 5,000 yen, as shown in FIG.

[0092] Furthermore, the pre-reduction_product tariff calculation unit 102e calculates the tariff (estimate) for product B identified by item code HI02 as follows: price of product B 30,000 yen x tariff rate 15% = 4,500 yen, as shown in FIG.

[0093] [3-2-2. Calculation of customs duties (provisional 8) on products] Next, the calculation of the tariff (provisional 8) on the product is performed. As the raw materials that make up the product may be a mixture of those to which Provisional 8 applies and those to which it does not, even if the reduction rate of the tariff at the time of application of Provisional 8 is directly subtracted from the amount of the product, the tariff on the product at the time of application of Provisional 8 cannot be accurately calculated. For this reason, it is necessary to first calculate the tariff for each raw material before the application of Provisional 8, as explained in (1) below, then calculate the tariff for each raw material after the application of Provisional 8, taking into account the raw materials to which Provisional 8 applies and those to which it does not apply, as explained in (2) below, and finally calculate the tariff for each product after the application of Provisional 8, as explained in (3) below.

[0094] In this item, the provisional tax reduction rate master 106g is set as shown in Fig. 8. In addition, the "processing instruction NO", "quantity" and "provisional tax reduction rate FLG" in the processing instruction delivery data 106d in Fig. 8 are information extracted from the processing instruction delivery data 106d in Fig. 4.

[0095] (1) Calculation of customs duties (estimated) for combinations First, the pre-reduction_combined tariff calculation unit 102f calculates the tariff (estimated) for the combination by apportioning the tariff (estimated) for each product calculated in [3-2-1] according to the quantity for each combination of the processing destination code, raw material, and lot number in the processing instruction delivery data 106d in Figure 4 that is linked to the same processing instruction number in the processing instruction receipt data 106c in Figure 4.

[0096] Specifically, the pre-reduction_combined tariff calculation unit 102f calculates the tariff (estimated) for the combination of 2,500 yen, 1,250 yen, and 1,250 yen by apportioning the tariff (estimated) for product A of 5,000 yen calculated in [3-2-1] proportionately according to the quantities of 200 m, 100 m, and 100 m, respectively.

[0097] In addition, the pre-reduction_combined tariff calculation unit 102f calculates the tariff (estimated) for the combination of 1,000 yen, 1,500 yen, and 2,000 yen by apportioning the tariff (estimated) for product B of 4,500 yen calculated in [3-2-1] proportionately according to the quantities of 100 m, 150 m, and 200 m, respectively.

[0098] The tariff (estimate) for the combination calculated in this manner is shown as "prorated tariff" in the processing instruction delivery data 106d in FIG.

[0099] (2) Calculation of customs duties (provisional eight) for combinations Next, for the combination in which the Provisional Eight Application FLG is OFF in the processing instruction issue data 106d in Figure 4, the reduced-reduced_combined tariff calculation unit 102g treats the prorated tariff for the combination calculated in (1) as the Provisional Eight Applied Tariff for the combination.

[0100] Specifically, the prorated tariff for the combination in which the provisional 8 application FLG is OFF is only 1,000 yen, as shown in the processing instruction delivery data 106d in Fig. 8. Therefore, the reduced-combined tariff calculation unit 102g treats this 1,000 yen as the provisional 8 application tariff as it is, as shown in Fig. 8.

[0101] On the other hand, for the combination in which the Provisional Eight Application FLG is ON in the processing instruction issue data 106d of Figure 4, the after-reduction_combined tariff calculation unit 102g calculates the Provisional Eight applied tariff using the prorated tariff for the combination calculated in (1) and the reduction rate of 80% in the Provisional Eight tax reduction rate master 106g of Figure 8.

[0102] Specifically, the prorated tariffs for combinations in which the provisional 8 application FLG is ON are 2,500 yen, 1,250 yen, 1,250 yen, 1,500 yen, and 2,000 yen, as shown in the processing instruction delivery data 106d in Fig. 8. Therefore, the reduced-combined tariff calculation unit 102g subtracts the reduction rate of 80% from each of these amounts to calculate provisional 8 application tariffs of 500 yen, 250 yen, 250 yen, 300 yen, and 400 yen, as shown in Fig. 8.

[0103] (3) Calculation of customs duties (provisional 8) on products Then, the post-reduced_product tariff calculation unit 102h calculates the tariff (provisional 8) on the product by adding up the provisional 8-applied tariffs calculated in (2).

[0104] Specifically, the post-reduced product tariff calculation unit 102h calculates a tariff (provisional 8) for product A of 1,000 yen by adding together 500 yen, 250 yen, and 250 yen of the provisional 8-applied tariffs calculated in (2), as shown in Figure 8.

[0105] In addition, the post-reduced product tariff calculation unit 102h calculates a tariff (provisional 8) for product B of 1,700 yen by adding together 1,000 yen, 300 yen, and 400 yen of the provisional 8-applied tariffs calculated in (2), as shown in Figure 8.

[0106] [3-2-3. Addition of reduction rate] Finally, the reduction rate adding unit 102i calculates a reduction rate of the customs duty based on the (estimated) customs duty for the product calculated in [3-2-1] and the (provisional) customs duty for the product calculated in [3-2-2].

[0107] Specifically, for product A, the customs duty (estimated) calculated in [3-2-1] is 5,000 yen, and the customs duty (provisional) calculated in [3-2-2] is 1,000 yen, so the reduction rate addition unit 102i calculates a customs duty reduction rate for product A of 80%.

[0108] In addition, for product B, the customs duty (estimated) calculated in [3-2-1] is 4,500 yen, and the customs duty (provisional) calculated in [3-2-2] is 1,700 yen, so the reduction rate addition unit 102i calculates a customs duty reduction rate for product B of 62%.

[0109] Then, the reduction rate adding unit 102i adds the tariff (estimated) for each product calculated in [3-2-1], the tariff (provisional 8) for each product calculated in [3-2-2], and the reduction rate of tariff for each product calculated in this item [3-2-3] (reduction rate when provisional 8 is applied) to the processing instruction receiving data 106c of Figure 4, thereby updating the processing instruction receiving data 106c as shown in Figure 9.

[0110] [3-3. Alert display when printing reports] This section explains the alert display when printing the provisional application list.

[0111] In this item, it is assumed that the raw material management master 106b is set to the content shown in Fig. 3, the processing instruction delivery data 106d is set to the content shown in Fig. 4, and the alert_reduction rate management master 106h is set to the content shown in Fig. 11. It is also assumed that the processing instruction receiving data 106c is set to the content updated in [3-2] as shown in Fig. 9.

[0112] First, as shown in FIG. 10, the conditions of "processing instruction date," "expected processing completion date," "processing instruction No.," "processing destination code," "received product code," and "reduction rate when applying provisional discount" are specified on the extraction screen.

[0113] The report output unit 102j extracts two records from the processing instruction received data 106c in Fig. 9 as records that meet the specified conditions. If "Processing completion schedule exceeded" is checked on the extraction screen in Fig. 10, the report output unit 102j extracts only records in the processing instruction received data 106c that have a processing completion schedule date that is earlier than the "Reference date" in the upper right corner of the screen, and that do not include processing results.

[0114] Here, the report output unit 102j acquires a reduction rate alert corresponding to the reduction rate in the extracted record from the alert_reduction rate management master 106h in Fig. 11. Specifically, the report output unit 102j acquires a reduction rate alert "import procedure priority: high" for a reduction rate of 80%, and acquires a reduction rate alert "import procedure priority: medium" for a reduction rate of 62%.

[0115] The report output unit 102j also acquires information in the processing instruction delivery data 106d and the raw material management master 106b corresponding to the extracted record. Specifically, the report output unit 102j acquires corresponding information from the processing instruction delivery data 106d in Fig. 4 using the processing instruction number in the extracted record as a key, as shown in Fig. 12. Next, the report output unit 102j acquires corresponding information from the raw material management master 106b in Fig. 3 using the processing destination code, product code (raw material), and lot number in the acquired information as keys, as shown in Fig. 12.

[0116] Then, the report output unit 102j outputs a report of a provisional application list including the information in the record extracted from the processing instruction acceptance data 106c, the acquired reduction rate alert, the information acquired from the processing instruction delivery data 106d, and the information acquired from the raw material management master 106b, as shown in Figure 13.

[0117] In addition, the order of display of each product in this form is as follows: 1. The reduction rate in the processing instruction receiving data 106c is in descending order. 2. Among products with the same reduction rate, the order is ascending according to the planned processing completion date in the processing instruction acceptance data 106c. 3. Among products having the same reduction rate and the same planned processing completion date, the products are sorted in ascending order of the processing instruction number in the processing instruction acceptance data 106c.

[0118] As described above in section [3-3], the alert display device 100 according to this embodiment can extract products having a reduction rate equal to or greater than a predetermined value from the processing instruction acceptance data 106c, and display a reduction rate alert corresponding to the reduction rate in the form. This allows management to make a decision to prioritize import procedures for products with high reduction rates, for example. In this example, for product A, the reduction rate alert "Import procedure priority: high" is displayed in the form, so that import procedures should be prioritized.

[0119] In addition, as explained in this section [3-3], according to the alert display device 100 of this embodiment, by checking the box for “Processing Completion Plan Exceeded” on the extraction screen, records having a processing completion (import) plan date that is before the reference date can be extracted from the processing instruction acceptance data 106c. This makes it possible to identify products for which import procedures are delayed.

[0120] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0121] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.

[0122] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0123] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0124] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0125] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0126] Furthermore, with regard to the alert display device 100, the components shown in the figures are merely conceptual functional elements, and do not necessarily have to be physically configured as shown in the figures.

[0127] For example, the processing functions of the alert display device 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium that includes programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the alert display device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form the control unit.

[0128] In addition, this computer program may be stored in an application program server connected to the alert display device 100 via any network, and it is also possible to download all or part of it as needed.

[0129] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0130] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0131] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0132] The alert display device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The alert display device 100 may be realized by installing software (including programs, data, etc.) that causes the device to realize the processing described in this embodiment.

[0133] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]

[0134] INDUSTRIAL APPLICABILITY The present invention is useful in industries that export raw materials from within the country and re-import products that are processed overseas using the raw materials, and is particularly useful in the apparel industry, jewelry industry, and the like. [Explanation of symbols]

[0135] 100 Alert display device 102 Control section 102a Application period acquisition section 102b Days calculation section 102c Alert display section 102d Application flag addition section 102e Before Reduction Application_Product Tariff Calculation Section 102f Before reduction application_Combined tariff calculation section 102g After reduction application_Combined tariff calculation section 102h After reduction application_Product tariff calculation department 102i Reduction rate addition section 102j Report Output Unit 104 Communication interface section 106 Storage section 106a Movement Data 106b Raw materials management master 106c Processing instruction receipt data 106d Processing instruction delivery data 106e Alert_Application Period Management Master 106f Tariff rate master 106g Temporary 8 Tax Reduction Rate Master 106h Alert_Reduction rate management master 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network

Claims

1. An alert display device having a control unit and a storage unit, capable of displaying a reduction application alert, which is an alert to inform a user that there is not enough time between the scheduled re-import date of the product and the application deadline for the reduction, when a product processed overseas using raw materials exported from within the country is re-imported into the country and a tariff on the re-import of the product is reduced according to the ratio of the raw materials of the product if the period from the export permission date of the raw materials to the re-import date of the product is within a predetermined period, The storage unit includes: A raw material management master including processing destination identification data for identifying a processing destination of the product, raw material identification data for identifying the raw material, lot identification data for identifying the lot of the raw material, and the application deadline. is stored, The control unit is an application deadline acquisition means for acquiring an application deadline associated with processing destination identification data, raw material identification data, and lot identification data inputted when issuing a processing instruction to the processing destination from the raw material management master; a number of days calculation means for calculating the number of days obtained by subtracting a planned re-import date for the product input when issuing the processing instruction from the application deadline acquired by the application deadline acquisition means for each combination of the processing destination identification data, the raw material identification data, and the lot identification data; an alert display means for displaying the reduction application alert for the combination in which the number of days calculated by the number of days calculation means is equal to or less than a predetermined number of days; To have An alert display device comprising:

2. The alert display means includes: When the number of days calculated by the number of days calculation means is equal to or less than the predetermined number of days and equal to or greater than 0 days, a number of days for an alert corresponding to the number of days calculated by the number of days calculation means is displayed as the reduction applicable alert, When the number of days calculated by the number of days calculation means is smaller than 0 days, displaying the fact that the reduction is not applied as the reduction application alert; The alert display device according to claim 1 .

3. The storage unit includes: processing instruction acceptance data for managing acceptance information regarding the product, the processing instruction acceptance data including processing instruction identification data for identifying the processing instruction and product identification data for identifying the product; processing instruction delivery data for managing delivery information regarding the raw materials, the processing instruction identification data, the combination of the processing destination identification data, the raw material identification data, and the lot identification data, and the delivery quantity of the raw materials; is further stored, The control unit is an application flag adding means for updating the processing instruction delivery data by adding a flag indicating that the reduction is applied to the combination of the processing destination identification data, the raw material identification data, and the lot identification data for which the number of days calculated by the number of days calculation means is 0 or more; Further comprising: The alert display device according to claim 1 or 2,

4. The control unit is a pre-reduction application_product tariff calculation means for calculating the tariff on the product before the reduction is applied for each product by multiplying the price of the product identified by the product identification data in the processing instruction acceptance data by a tariff rate; a pre-reduction application_combined tariff calculation means for calculating a tariff for each of the combinations before the reduction is applied by apportioning the tariff for each of the products calculated by the pre-reduction application_product tariff calculation means in accordance with the delivery quantity for each of the combinations in the processing instruction delivery data associated with the same processing instruction identification data in the processing instruction acceptance data; for the combination to which a flag indicating that the reduction is applied is not added in the processing instruction delivery data, the tariff for each of the combinations before the reduction is applied calculated by the before-reduction-application_combined tariff calculation means is used as it is as the tariff for each of the combinations after the reduction is applied, and for the combination to which a flag indicating that the reduction is applied is added in the processing instruction delivery data, a after-reduction-application_combined tariff calculation means calculates the tariff for each of the combinations after the reduction is applied using the tariff for each of the combinations before the reduction is applied calculated by the before-reduction-application_combined tariff calculation means and a default reduction rate; a post-reduction application_product tariff calculation means for calculating a tariff for each of the products after the reduction is applied by adding up the tariffs for each of the combinations calculated by the post-reduction application_combination tariff calculation means; a reduction rate adding means for calculating a reduction rate of a tariff based on the tariff on the product before the reduction is applied, which is calculated by the before-reduction application_product tariff calculation means, and the tariff on the product after the reduction is applied, which is calculated by the after-reduction application_product tariff calculation means, and adding the calculated reduction rate for each product to the processing instruction acceptance data; Further comprising: The alert display device according to claim 3 .

5. The control unit is A form output means for extracting the product identification data that matches a specified condition from the processing instruction acceptance data, and outputting a form including the extracted product identification data and a reduction rate alert that is an alert corresponding to the reduction rate in the processing instruction acceptance data linked to the extracted product identification data. Further comprising: The alert display device according to claim 4 .

6. The reduction rate alert, The product with a high reduction rate is to be notified that it will have a high priority for import procedures. The alert display device according to claim 5 .

7. The document is: Further including information in the raw material management master and the processing instruction delivery data corresponding to the extracted product identification data; The alert display device according to claim 5 or 6,

8. The reduction is based on Article 8 of the Temporary Tariff Measures Law, The predetermined period is one year; The alert display device according to any one of claims 1 to 7.

9. An alert display method executed by an information processing device having a control unit and a storage unit, which is capable of displaying a reduction application alert, which is an alert to inform a user that there is not much time between the scheduled re-import date of the product and the application deadline for the reduction, in a case where a product processed overseas using raw materials exported from within a country is re-imported into a country and a tariff on the re-import of the product is reduced in accordance with a ratio of the raw materials of the product if the period from the export permission date of the raw materials to the re-import date of the product is within a predetermined period, The storage unit includes: A raw material management master including processing destination identification data for identifying a processing destination of the product, raw material identification data for identifying the raw material, lot identification data for identifying the lot of the raw material, and the application deadline. is stored, Executed by the control unit, an application deadline acquisition step of acquiring, from the raw material management master, application deadlines associated with processing destination identification data, raw material identification data, and lot identification data input when issuing a processing instruction to the processing destination of the product; a number of days calculation step of calculating the number of days obtained by subtracting the planned re-import date of the product input when issuing the processing instruction from the application deadline acquired in the application deadline acquisition step for each combination of the processing destination identification data, the raw material identification data, and the lot identification data; an alert display step of displaying the reduction application alert for the combination in which the number of days calculated in the number of days calculation step is equal to or less than a predetermined number of days; containing, The method for displaying an alert is characterized by the above.

10. An alert display program executed by an information processing device having a control unit and a storage unit, which is capable of displaying a reduction application alert, which is an alert to inform a user that there is not much time between the scheduled re-import date of the product and the application deadline for the reduction, in a case where a product processed overseas using raw materials exported from within the country is re-imported into the country and a tariff on the re-import of the product is reduced in accordance with a ratio of the raw materials of the product if the period from the export permission date of the raw materials to the re-import date of the product is within a predetermined period, The storage unit includes: A raw material management master including processing destination identification data for identifying a processing destination of the product, raw material identification data for identifying the raw material, lot identification data for identifying the lot of the raw material, and the application deadline. is stored, To cause the control unit to execute an application deadline acquisition step of acquiring, from the raw material management master, application deadlines associated with processing destination identification data, raw material identification data, and lot identification data input when issuing a processing instruction to the processing destination of the product; a number of days calculation step of calculating the number of days obtained by subtracting the planned re-import date of the product input when issuing the processing instruction from the application deadline acquired in the application deadline acquisition step for each combination of the processing destination identification data, the raw material identification data, and the lot identification data; an alert display step of displaying the reduction application alert for the combination in which the number of days calculated in the number of days calculation step is equal to or less than a predetermined number of days; containing, An alert display program characterized by the above.

Citation Information

Patent Citations

  • Method of managing outsourced processing and assembling work and processing and assembling re-import work

    JP2003281417A

  • Apparel consignment manufacturing trade information management system

    JP2005284958A

  • Commercial transaction support program

    JP2007041806A