Excavator management device, excavator
The excavator management device addresses the issue of inappropriate operational data in abnormality detection by excluding specific data ranges, ensuring accurate abnormality determination through a learning unit that filters out irrelevant data, thereby improving the reliability of abnormality detection in excavators.
Patent Information
- Application Number
- JP2022510063
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-03-27
- Filing Date
- 2021-03-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-03-19
AI Technical Summary
Existing abnormality determination models for excavators may include inappropriate operational data during normal times, which can affect the accuracy of abnormality detection.
An excavator management device that uses a learning unit to determine an appropriate range of operational data for training, excluding data from periods such as before delivery, during repairs, and immediately after repairs, by employing a range determining unit to exclude certain time periods and data ranges based on vehicle information and malfunction data.
Ensures the use of appropriate learning data, improving the accuracy of abnormality determination models by excluding irrelevant data, thereby enhancing the reliability of abnormality detection in excavators.
Smart Images

Figure 0007575164000001 
Figure 0007575164000002 
Figure 0007575164000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a management system for a shovel. Place, Regarding shovels. [Background technology]
[0002] Conventionally, a technique is known for determining whether or not a work machine is abnormal by using multiple reference data representing operating waveforms of the work machine when it is operating normally and verification data consisting of a time series of features of the work machine's operating variables. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2015-83731 A Summary of the Invention [Problem to be solved by the invention]
[0004] Incidentally, in recent years, there are cases where an abnormality determination model is generated using operational data of a work machine as learning data, and the presence or absence of an abnormality in the work machine is determined using this abnormality determination model.
[0005] In this case, it is common to use normal operation data, when the work machine is operating normally, as learning data, but the normal operation data may include operation data that is inappropriate for use as learning data.
[0006] In view of the above circumstances, an object of the present invention is to use an appropriate range of learning data. [Means for solving the problem]
[0007] The management device for a shovel according to an embodiment of the present invention is a device for managing a shovel that manages a shovel by storing operation data indicating an operation of the shovel according to a time when the presence or absence of an abnormality of the shovel is determined. and operation data when the shovel is in a normal state.a learning unit that learns a relationship between the operation data of the shovel and an abnormality degree of the shovel using the above data as learning data; and a range determination unit that determines a range of the operation data to be excluded from the learning data based on vehicle information including operation data indicating an operation of the shovel and malfunction information related to a malfunction of the shovel, and the range determination unit determines the range of the learning data from the operation data from which the range has been excluded, based on a time point at which the process of determining the presence or absence of the abnormality is executed. .
[0011] A shovel according to an embodiment of the present invention is an shovel that communicates with a management device, and has an input device for inputting a start date of maintenance of the shovel and a completion date of maintenance of the shovel, and a communication device that transmits operation data indicating the operation of the shovel and information indicating the start date and the completion date inputted from the input device to the management device having a learning unit that learns the relationship between the operation data of the shovel and the degree of abnormality of the shovel, using a data set that receives as input operation data corresponding to a time for determining whether or not there is an abnormality in the shovel and outputs information indicating no abnormality as learning data.
[0012] A shovel according to an embodiment of the present invention is a shovel that communicates with a management device, and has a start switch for inputting a start date for maintenance of the shovel, and a completion switch for inputting a completion date for maintenance of the shovel. Effect of the Invention
[0013] An appropriate range of training data can be used. [Brief description of the drawings]
[0014] [Figure 1] FIG. 1 is a schematic diagram showing an example of a management system for an excavator. [Diagram 2] FIG. 1 is a configuration diagram showing an example of a management system for an excavator. [Diagram 3] FIG. 2 illustrates an example of a hardware configuration of a management apparatus. [Figure 4] FIG. 4 illustrates an example of a master information storage unit; [Diagram 5] FIG. 4 illustrates an example of a defect information storage unit; [Figure 6] FIG. 4 illustrates an example of an operation information storage unit. [Figure 7] FIG. 2 is a diagram illustrating an example of a vehicle information storage unit. [Figure 8] FIG. 2 is a diagram illustrating functions of a management device. [Figure 9] FIG. 4 is a diagram illustrating an example of parameters stored in a parameter storage unit. [Figure 10] 10 is a flowchart illustrating a process of a management device. [Figure 11A] FIG. 11 is a first diagram illustrating the process of the data range determination unit. [Figure 11B] FIG. 11 is a second diagram illustrating the process of the data range determination unit. [Figure 12A] FIG. 11 is a first diagram showing an example of an output of a result of an abnormality determination. [Figure 12B] FIG. 11 is a second diagram showing an example of an output of the result of an abnormality determination. [Figure 13] 13 is a flowchart illustrating a process of a management device according to another embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] (Embodiment) DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment will be described below with reference to the drawings. Fig. 1 is a schematic diagram showing an example of a management system for an excavator.
[0016] The shovel management system SYS of this embodiment includes a shovel 100, a management device 300, and a support device 400 for the shovel 100. In the shovel management system SYS, the shovel 100, the management device 300, and the support device 400 communicate with each other via a network. The management device 300 manages the shovel 100. The support device 400 supports the work of the shovel 100. In the following description, the shovel management system SYS will be referred to as the management system SYS.
[0017] The excavator 100 of this embodiment is an example of a work machine. The excavator 100 includes a lower traveling body 1, an upper rotating body 3 rotatably mounted on the lower traveling body 1 via a rotating mechanism 2, a boom 4, an arm 5, and a bucket 6 as attachments (working devices), and a cabin 10.
[0018] The lower traveling body 1 includes, for example, a pair of left and right crawlers, and each of the crawlers is hydraulically driven by traveling hydraulic motors 1A, 1B (see FIG. 2) to be self-propelled.
[0019] The upper rotating body 3 rotates relative to the lower traveling body 1 by being driven by a swing hydraulic motor 2A (see FIG. 2).
[0020] The boom 4 is pivotally attached to the front center of the upper rotating body 3 so as to be able to tilt up and down, an arm 5 is pivotally attached to the tip of the boom 4 so as to be able to rotate up and down, and a bucket 6 is pivotally attached to the tip of the arm 5 so as to be able to rotate up and down. The boom 4, arm 5, and bucket 6 are hydraulically driven by a boom cylinder 7, an arm cylinder 8, and a bucket cylinder 9, respectively.
[0021] The cabin 10 is a control room in which an operator (worker) rides, and is mounted on the front left side of the upper rotating body 3.
[0022] The shovel 100 can communicate with the management device 300 via a predetermined communication network NW, which may include, for example, a mobile communication network terminated in a base station, a satellite communication network using a communication satellite in the sky, the Internet, or the like.
[0023] Moreover, the management device 300 of this embodiment acquires performance information indicating the actual performance of work from the shovel 100.
[0024] The performance information includes performance information regarding the work pattern of a specific type of work (e.g., repetitive work such as excavation work, loading work, finishing work, etc.) (hereinafter referred to as "work pattern performance information") and performance information regarding the environmental conditions during the work (hereinafter referred to as "environmental condition performance information").
[0025] The work pattern refers to a series of motion patterns including idling of the shovel 100 when performing a predetermined type of work. Idling refers to a time when the shovel 100 is not being operated. For example, the work pattern includes motion trajectories of motion elements such as the lower traveling body 1, the upper rotating body 3, the boom 4, the arm 5, and the bucket 6 during work. The work pattern performance information is specifically information detected by various sensors that indicates the performance of the work pattern of the shovel 100 when the shovel 100 actually performs a predetermined type of work. The environmental conditions may include external environmental conditions such as conditions related to the surrounding environment of the shovel 100, as well as internal environmental conditions such as variable specifications of the shovel 100 that affect the operation of the shovel 100 (for example, arm length, bucket type, etc.).
[0026] When the excavator 100 acquires the work pattern result information and the environmental condition result information, the excavator 100 transmits (uploads) various information including the work pattern result information and the environmental condition result information to the management device 300.
[0027] In the management system SYS, the management device 300 creates an abnormality determination model for determining whether or not an abnormality exists in the shovel 100, using the work pattern record information and environmental condition record information received from the shovel 100 as learning data.
[0028] More specifically, the management device 300 identifies the work pattern record information and the environmental condition record information to be used for the learning data from the work pattern record information and the environmental condition record information when the shovel 100 is operating normally. In the following description, information including the work pattern record information and the environmental condition record information may be referred to as operation data of the shovel 100.
[0029] Then, the management device 300 of this embodiment generates an abnormality determination model by learning using the identified operational data as learning data, and determines whether or not an abnormality exists in the shovel 100.
[0030] 1, the management system SYS includes one shovel 100, but is not limited to this. The management system SYS may include any number of shovels 100, and all shovels 100 capable of communicating with the management device 300 may be included in the management system SYS.
[0031] Moreover, the management device 300 of this embodiment is an information processing device installed at a location geographically separated from the shovel 100. The management device 300 is, for example, installed in a management center or the like provided outside the work site where the shovel 100 works, and is a server device mainly composed of one or a plurality of server computers or the like. In this case, the server device may be a company server operated by the business operator who operates the management system SYS or an associated business operator related to the business operator, or may be a cloud server.
[0032] The support device 400 of the present embodiment may be, for example, a portable terminal device such as a smartphone or a tablet. When information including, for example, the start date of maintenance of the shovel 100 and the completion date of the maintenance is input, the support device 400 transmits the input information to the management device 300.
[0033] Next, the management system SYS of this embodiment will be further described with reference to Fig. 2. Fig. 2 is a configuration diagram showing an example of a management system for an excavator.
[0034] In the figure, mechanical power lines are indicated by double lines, high-pressure hydraulic lines are indicated by thick solid lines, pilot lines are indicated by dashed lines, and electrical drive and control lines are indicated by thin solid lines.
[0035] The hydraulic drive system that hydraulically drives the hydraulic actuators of the excavator 100 of this embodiment includes the engine 11, the main pump 14, a regulator 14a, and a control valve 17. The hydraulic drive system of the excavator 100 also includes hydraulic actuators such as the traveling hydraulic motors 1A, 1B, the swing hydraulic motor 2A, the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9 that hydraulically drive the lower traveling body 1, the upper rotating body 3, the boom 4, the arm 5, and the bucket 6, respectively, as described above.
[0036] The engine 11 is a main power source in the hydraulic drive system, and is mounted, for example, on the rear of the upper rotating body 3. Specifically, the engine 11 rotates at a constant speed at a preset target rotation speed under the control of an engine control device (ECU: Engine Control Unit) 74, which will be described later, and drives the main pump 14 and the pilot pump 15. The engine 11 is, for example, a diesel engine that uses diesel as fuel.
[0037] The regulator 14a controls the discharge amount of the main pump 14. For example, the regulator 14a adjusts the angle (tilt angle) of the swash plate of the main pump 14 in response to a control command from the controller 30.
[0038] The main pump 14 is mounted on the rear of the upper rotating body 3, for example, like the engine 11, and supplies hydraulic oil to the control valve 17 through the high-pressure hydraulic line 16. The main pump 14 is driven by the engine 11 as described above. The main pump 14 is, for example, a variable displacement hydraulic pump, and as described above, under the control of the controller 30, the tilt angle of the swash plate is adjusted by the regulator 14a to adjust the stroke length of the piston, thereby controlling the discharge flow rate (discharge pressure).
[0039] The control valve 17 is, for example, mounted in the center of the upper rotating body 3, and is a hydraulic control device that controls the hydraulic drive system in response to an operator's operation of the operating device 26. As described above, the control valve 17 is connected to the main pump 14 via the high-pressure hydraulic line 16, and selectively supplies hydraulic oil supplied from the main pump 14 to the hydraulic actuators (travel hydraulic motors 1A, 1B, swing hydraulic motor 2A, boom cylinder 7, arm cylinder 8, and bucket cylinder 9) in response to the operating state of the operating device 26.
[0040] Specifically, the control valve 17 includes a plurality of control valves that control the flow rate and flow direction of the hydraulic oil supplied from the main pump 14 to each of the hydraulic actuators. For example, the control valve 17 includes a control valve corresponding to the boom 4 (boom cylinder 7). Also, for example, the control valve 17 includes a control valve corresponding to the arm 5 (arm cylinder 8).
[0041] Also, for example, the control valve 17 includes a control valve corresponding to the bucket 6 (bucket cylinder 9). Also, for example, the control valve 17 includes a control valve corresponding to the upper rotating body 3 (swing hydraulic motor 2A). Also, for example, the control valve 17 includes a right travel control valve and a left travel control valve corresponding to the right crawler and the left crawler of the lower traveling body 1, respectively.
[0042] The operating system of the shovel 100 according to this embodiment includes a pilot pump 15, an operating device 26, and an operating valve 31.
[0043] The pilot pump 15 is mounted, for example, on the rear of the upper rotating body 3, and supplies pilot pressure to the operating device 26 and the operating valve 31 via a pilot line 25. The pilot pump 15 is, for example, a fixed displacement hydraulic pump, and is driven by the engine 11 as described above.
[0044] The operation device 26 is provided near the cockpit of the cabin 10, and is an operation input means for the operator to operate various operating elements (lower traveling body 1, upper rotating body 3, boom 4, arm 5, bucket 6, etc.). In other words, the operation device 26 is an operation input means for the operator to operate the hydraulic actuators that drive the respective operating elements (i.e., traveling hydraulic motors 1A, 1B, swing hydraulic motor 2A, boom cylinder 7, arm cylinder 8, bucket cylinder 9, etc.). The operation device 26 has secondary pilot lines connected to the control valves 17, respectively.
[0045] As a result, a pilot pressure according to the operation states of the lower traveling body 1, the upper rotating body 3, the boom 4, the arm 5, the bucket 6, etc. in the operation device 26 can be input to the control valve 17. Therefore, the control valve 17 can drive each hydraulic actuator according to the operation state of the operation device 26.
[0046] The operating valve 31 adjusts the flow path area of the pilot line 25 in response to a control command (e.g., a control current) from the controller 30. In this way, the operating valve 31 can output a pilot pressure corresponding to the control command to the secondary pilot line using the primary pilot pressure supplied from the pilot pump 15 as the source pressure.
[0047] The operating valve 31 has a secondary port connected to the left and right pilot ports of the control valves corresponding to the respective hydraulic actuators of the control valve 17, and applies pilot pressure to the pilot ports of the control valves in response to a control command from the controller 30. As a result, even when the operating device 26 is not being operated by the operator, the controller 30 can supply hydraulic oil discharged from the pilot pump 15 to the pilot ports of the corresponding control valves in the control valve 17 via the operating valve 31 to operate the hydraulic actuators.
[0048] In addition to the operation valve 31, an electromagnetic relief valve may be provided to relieve excess hydraulic pressure generated in the hydraulic actuator to a hydraulic oil tank. This makes it possible to actively suppress the operation of the hydraulic actuator when, for example, the amount of operation of the operation device 26 by the operator is excessive. For example, an electromagnetic relief valve may be provided to relieve excess pressure in the bottom side oil chamber and rod side oil chamber of each of the boom cylinder 7, arm cylinder 8, and bucket cylinder 9 to the hydraulic oil tank.
[0049] The control system of the shovel 100 in this embodiment includes a controller 30, an ECU 74, a discharge pressure sensor 14b, an operating pressure sensor 15a, a display device 40, an input device 42, an imaging device 80, a state detection device S1, and a communication device T1.
[0050] The controller 30 performs drive control of the shovel 100. The functions of the controller 30 may be realized by any hardware, software, or a combination thereof. For example, the controller 30 is mainly configured with a computer including a processor such as a CPU (Central Processing Unit), a memory device such as a RAM (Random Access Memory), a non-volatile auxiliary storage device such as a ROM (Read Only Memory), and various interface devices for input and output. The controller 30 realizes various functions by, for example, executing various programs installed in the auxiliary storage device on the CPU.
[0051] For example, the controller 30 sets a target rotation speed based on a work mode, etc., that is set in advance by a predetermined operation by an operator or the like, and outputs a control command to the ECU 74, thereby performing drive control to rotate the engine 11 at a constant speed via the ECU 74.
[0052] Furthermore, for example, the controller 30 outputs a control command to the regulator 14a as necessary to change the discharge amount of the main pump 14, thereby performing so-called total horsepower control or negative control.
[0053] Furthermore, for example, the controller 30 may have a function (hereinafter, "upload function") of uploading various information related to the shovel 100 to the management device 300. Specifically, the controller 30 may transmit (upload) work pattern record information and environmental condition record information during a predetermined type of work by the shovel 100 to the management device 300 via the communication device T1.
[0054] The controller 30 includes an information transmission unit 301 as a functional unit relating to the upload function, which is realized by executing, on a CPU, one or more programs installed in an auxiliary storage device or the like, for example.
[0055] Also, for example, the controller 30 performs control related to a machine guidance function that guides (guides) the manual operation of the shovel 100 by the operator through the operation device 26. Also, the controller 30 may perform control related to a machine control function that automatically assists the manual operation of the shovel 100 by the operator through the operation device 26.
[0056] The controller 30 includes, for example, an operation pattern acquisition unit 302 and a machine guidance unit 303 as functional units related to the machine guidance function and the machine control function, which are realized by executing one or more programs installed in an auxiliary storage device or the like on a CPU.
[0057] Note that some of the functions of the controller 30 may be realized by another controller (control device). That is, the functions of the controller 30 may be realized in a distributed manner by a plurality of controllers. For example, the above-mentioned machine guidance function and machine control function may be realized by a dedicated controller (control device).
[0058] The ECU 74 controls various actuators (e.g., a fuel injection device, etc.) of the engine 11 in response to a control command from the controller 30, and rotates the engine 11 at a constant speed (constant speed control) at a set target speed (set speed). At this time, the ECU 74 performs the constant speed control of the engine 11 based on the speed of the engine 11 detected by the engine speed sensor 11a.
[0059] The discharge pressure sensor 14b detects the discharge pressure of the main pump 14. A detection signal corresponding to the discharge pressure detected by the discharge pressure sensor 14b is input to the controller 30.
[0060] As described above, the operating pressure sensor 15a detects the secondary pilot pressure of the operating device 26, that is, the pilot pressure corresponding to the operating state of each operating element (hydraulic actuator) in the operating device 26. A detection signal of the pilot pressure detected by the operating pressure sensor 15a, which corresponds to the operating state of the lower traveling body 1, the upper rotating body 3, the boom 4, the arm 5, the bucket 6, etc. in the operating device 26, is input to the controller 30.
[0061] The display device 40 is connected to the controller 30, and is provided at a position that is easily visible to an operator seated in the cabin 10 under the control of the controller 30, and displays various information images. The display device 40 is, for example, a liquid crystal display or an organic EL (Electroluminescence) display.
[0062] The input device 42 is provided within reach of an operator seated in the cabin 10, accepts various operations by the operator, and outputs signals corresponding to the contents of the operations. For example, the input device 42 is integrated with the display device 40.
[0063] Furthermore, the input device 42 of this embodiment includes a switch 42a that is operated when starting maintenance of the shovel 100, and a switch 42b that is operated when the maintenance is completed. The switch 42a is an example of a maintenance start switch, and is operated by a worker or the like who performs maintenance on the shovel 100. The switch 42b is an example of a maintenance completion switch, and is operated by a worker or the like who has performed maintenance on the shovel 100.
[0064] Note that the switch 42a and the switch 42b in this embodiment may be displayed, for example, on a display of the support device 400. In this case, the user of the support device 400 may operate the switch 42a and the switch 42b.
[0065] The shovel 100 of this embodiment may, for example, notify surrounding workers that maintenance has started and that maintenance has been completed by operating the switches 42a and 42b at the start and end of maintenance (repair).
[0066] In this embodiment, by operating the switches 42a and 42b, the start date and the end date of the maintenance can be specified in Fig. 5 and Fig. 7, which will be described later. Note that, by operating the switches 42a and 42, in addition to specifying the date, the time may also be specified.
[0067] Furthermore, if it is determined from the image captured by the imaging device 80 that a person is present within a predetermined range from the shovel 100 before the actuator operates, the actuator may be disabled or put into a slow-speed state even if the operator operates the control lever. Specifically, if it is determined that a person is present within a predetermined range from the shovel 100, the actuator can be disabled by locking a gate lock valve (not shown). In the case of an electric control lever, the actuator can be disabled by disabling the signal from the controller 30 to the operation control valve.
[0068] The same is true when using another type of operating lever, provided that an operating control valve is used which outputs a pilot pressure corresponding to a control command from the controller 30 and applies the pilot pressure to the pilot port of the corresponding control valve in the control valve. When it is desired to operate the actuator at a very slow speed, the actuator can be put into a very slow state by reducing the signal from the controller 30 to the operating control valve.
[0069] In this way, when it is determined that the object to be detected is present within the predetermined range, the actuator is not driven even if the operating device is operated, or is driven at a slow speed with an output smaller than the input to the operating device.
[0070] Furthermore, when it is determined that a person is present within a predetermined range from the shovel 100 while the operator is operating the control lever, the operation of the actuator may be stopped or slowed down regardless of the operation of the operator. Specifically, when it is determined that a person is present within a predetermined range from the shovel 100, the actuator is stopped by setting the gate lock valve to a locked state.
[0071] When using an operation control valve that outputs a pilot pressure corresponding to a control command from the controller 30 and applies the pilot pressure to a pilot port of a corresponding control valve in the control valve, the actuator can be made inoperable by invalidating a signal from the controller 30 to the operation control valve or outputting a deceleration command. Also, if the detected object is a truck, stop control is not necessary.
[0072] The actuators are controlled to avoid the detected tracks. In this manner, the actuators are controlled based on easy recognition of the type of object detected.
[0073] Furthermore, the controller 30 stores the location, time, and operation details (traveling, turning, etc.) when it is determined that a person is present within a predetermined range from the shovel. Here, when the controller 30 is in the ON state, if a worker approaches the shovel to perform maintenance, the controller 30 determines that a person is present. However, this approach is for the purpose of performing maintenance based on normal work.
[0074] Therefore, when the worker operates the switch 42a, the controller 30 determines that the approach of the worker after the operation is an approach for performing maintenance, and can store a record of the determination of human detection (location, date and time, operation content, etc.) and a record of the approach during maintenance in association with each other. In other words, when the controller 30 receives an operation of the switch 42a while the controller 30 is in the ON state, the controller 30 determines that the approach of a person within the predetermined range is an approach for maintenance. Then, the controller 30 stores information indicating the record of the detection of a person approaching within the predetermined range and information indicating the approach of a person for maintenance in association with each other in a memory device or the like. The information indicating the record of the detection of a person approaching within the predetermined range includes the location, date and time at which the approach of the person was detected, etc.
[0075] The controller 30 of the shovel 100 transmits to the management device 300 a record indicating that human detection was determined (location, date and time, operation content, etc.) and a record indicating that the human detection was due to approach during maintenance in a correlated state. Thereafter, when the worker operates the switch 42b at the end of maintenance, the controller 30 determines that the maintenance is completed, and the correlation between the record indicating that human detection was determined and the record indicating that the human detection was due to approach during maintenance is also terminated. As a result, even if the management device 300 has a record indicating that human detection was determined (location, date and time, etc.), it is possible to understand that the cause of the determination of human detection was due to approach for maintenance.
[0076] The input device 42 may be provided separately from the display device 40. The input device 42 includes a touch panel mounted on the display of the display device 40, a knob switch provided at the tip of a lever included in the operation device 26, and a button switch, lever, toggle, etc. installed around the display device 40. A signal corresponding to the operation content on the input device 42 is taken into the controller 30.
[0077] The imaging device 80 captures images of the periphery of the shovel 100. The imaging device 80 includes a camera 80F that captures an image in front of the shovel 100, a camera 80L that captures an image to the left of the shovel 100, a camera 80R that captures an image to the right of the shovel 100, and a camera 80B that captures an image behind the shovel 100.
[0078] Camera 80F is attached, for example, to the ceiling of cabin 10, i.e., inside cabin 10. Camera 80F may also be attached to the outside of cabin 10, such as the roof of cabin 10 or the side of boom 4. Camera 80L is attached to the left end of the upper surface of upper rotating body 3, camera 80R is attached to the right end of the upper surface of upper rotating body 3, and camera 80B is attached to the rear end of the upper surface of upper rotating body 3.
[0079] The imaging devices 80 (cameras 80F, 80B, 80L, 80R) are, for example, monocular wide-angle cameras having a very wide angle of view. The imaging devices 80 may also be stereo cameras or distance imaging cameras. Images of the periphery of the shovel 100 captured by the imaging devices 80 (hereinafter, "peripheral images") are captured by the controller 30.
[0080] The state detection device S1 outputs detection information relating to various states of the shovel 100. The detection information output from the state detection device S1 is input to the controller 30.
[0081] For example, the state detection device S1 detects the posture and operation states of the attachments. Specifically, the state detection device S1 may detect the elevation and depression angles of the boom 4, the arm 5, and the bucket 6 (hereinafter, the "boom angle," the "arm angle," and the "bucket angle," respectively).
[0082] That is, the state detection device S1 may include a boom angle sensor, an arm angle sensor, and a bucket angle sensor that detect the boom angle, the arm angle, and the bucket angle, respectively.
[0083] Furthermore, the state detection device S1 may detect the acceleration, angular acceleration, etc. of the boom 4, the arm 5, and the bucket 6. In this case, the state detection device S1 may include, for example, a rotary encoder, an acceleration sensor, an angular acceleration sensor, a six-axis sensor, an IMU (Inertial Measurement Unit), etc., which are attached to each of the boom 4, the arm 5, and the bucket 6. Furthermore, the state detection device S1 may include cylinder sensors which detect the cylinder position, speed, acceleration, etc. of the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9 which drive the boom 4, the arm 5, and the bucket 6, respectively.
[0084] Furthermore, for example, the state detection device S1 detects the attitude state of the machine body, that is, the lower running body 1 and the upper rotating body 3. Specifically, the state detection device S1 may detect the inclination state of the machine body with respect to a horizontal plane. In this case, the state detection device S1 may include, for example, an inclination sensor attached to the upper rotating body 3, which detects the inclination angles of the upper rotating body 3 about two axes in the front-rear and left-right directions (hereinafter, "front-rear inclination angle" and "left-right inclination angle").
[0085] Furthermore, for example, the state detection device S1 detects the rotation state of the upper rotating body 3. Specifically, the state detection device S1 detects the rotation angular velocity and rotation angle of the upper rotating body 3. In this case, the state detection device S1 may include, for example, a gyro sensor, a resolver, a rotary encoder, and the like attached to the upper rotating body 3. In other words, the state detection device S1 may include a rotation angle sensor that detects the rotation angle, etc., of the upper rotating body 3.
[0086] Furthermore, for example, the state detection device S1 detects the acting state of a force acting on the excavator 100 through an attachment. Specifically, the state detection device S1 may detect the operating pressure (cylinder pressure) of a hydraulic actuator. In this case, the state detection device S1 may include pressure sensors that detect the pressures of the rod-side oil chamber and the bottom-side oil chamber of each of the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9.
[0087] Also, for example, the state detection device S1 may include a sensor that detects the displacement of a spool of a control valve in the control valve 17. Specifically, the state detection device S1 may include a boom spool displacement sensor that detects the displacement of a boom spool. Also, the state detection device S1 may include an arm spool displacement sensor that detects the displacement of an arm spool.
[0088] The state detection device S1 may also include a bucket spool displacement sensor that detects the displacement of the bucket spool. The state detection device S1 may also include a swing spool displacement sensor that detects the displacement of the swing spool. The state detection device S1 may also include a right travel spool displacement sensor and a left travel spool displacement sensor that detect the displacement of the right travel spool and the left travel spool that respectively configure the right travel control valve and the left travel control valve.
[0089] Furthermore, for example, the state detection device S1 detects the position of the shovel 100 and the orientation of the upper rotating body 3. In this case, the state detection device S1 may include, for example, a Global Navigation Satellite System (GNSS) compass, a GNSS sensor, an orientation sensor, and the like attached to the upper rotating body 3.
[0090] The communication device T1 communicates with external devices through the communication network NW. The communication device T1 is, for example, a mobile communication module compatible with mobile communication standards such as LTE (Long Term Evolution), 4G (4th Generation), and 5G (5th Generation), or a satellite communication module for connecting to a satellite communication network.
[0091] The information transmission unit 301 transmits the work pattern record information and the environmental condition record information during a predetermined type of work by the shovel 100 to the management device 300 via the communication device T1.
[0092] The work pattern result information transmitted by the information transmission unit 301 includes, for example, various types of detection information input from the state detection device S1.
[0093] Moreover, the environmental condition record information transmitted by the information transmission unit 301 includes, for example, an image of the surroundings of the shovel 100 input from the imaging device 80. Moreover, the environmental condition record information transmitted by the information transmission unit 301 may include information on the internal environmental conditions of the shovel 100, for example, information on variable specifications such as a large-capacity bucket specification, a long arm specification, a quick coupling specification, etc.
[0094] The information transmission unit 301, for example, sequentially determines whether or not a predetermined target type of work is being performed, and when it determines that the target type of work is being performed, links the work pattern performance information for the period when the work is being performed (i.e., various detection information input from the status detection device S1) and environmental condition information (i.e., images of the surroundings of the shovel 100 input from the imaging device 80) and records them in an internal memory, etc.
[0095] At this time, date and time information regarding the start and end of the target type of work and position information of the shovel 100 at the time of the work may also be stored in the internal memory in a manner that further links them to the set of work pattern record information and environmental condition record information. At this time, the date and time information may be acquired, for example, from a predetermined timekeeping means (for example, an RTC (Real Time Clock)) inside the controller 30. Then, the information transmission unit 301 transmits the set of the recorded work pattern record information and environmental condition record information to the management device 300 via the communication device T1 at a predetermined timing such as when the shovel 100 is keyed off (stopped). Furthermore, the information transmission unit 301 may transmit the set of the recorded work pattern record information and environmental condition record information to the management device 300 via the communication device T1 after the end of each time the target type of work is performed.
[0096] The environmental condition record information may include detection information detected by other sensors mounted on the shovel 100 instead of or in addition to the imaging device 80. For example, the shovel 100 may be mounted with other sensors such as a millimeter wave radar, a LIDAR (Light Detecting and Ranging), etc., and the environmental condition record information may include detection information from these distance sensors. The same applies to the current environmental condition information described below.
[0097] The environmental condition result information may also include weather information. The weather information may include, for example, detection information from a raindrop sensor, an illuminance sensor, etc., which may be included in the state detection device S1. The information transmission unit 301 may also transmit only the work pattern result information to the management device 300.
[0098] Furthermore, the information transmitting unit 301 may successively upload the detection information of the state detecting device S1 and the peripheral images of the shovel 100 captured by the imaging device 80 to the management device 300 via the communication device T1. In this case, the management device 300 may extract information on when a target type of work was performed from the information uploaded from the shovel 100, and generate work pattern performance information and environmental information.
[0099] When performing a predetermined type of work, the work pattern acquisition unit 302 acquires a work pattern (optimum work pattern) that is optimal for the current environmental conditions related to a predetermined target index from the management device 300. For example, in response to a predetermined operation (hereinafter, "acquisition request operation") performed by the operator on the input device 42, the work pattern acquisition unit 302 transmits a signal requesting acquisition of a work pattern (acquisition request signal) including information related to the current environmental conditions of the shovel 100 (hereinafter, "current environmental condition information") to the management device 300 via the communication device T1.
[0100] This allows the management device 300 to provide the shovel 100 with an optimal work pattern that matches the current environmental conditions of the shovel 100. The current environmental condition information includes, for example, the latest image of the surroundings of the shovel 100 captured by the imaging device 80.
[0101] The current environmental condition information may also include information on the internal environmental conditions of the shovel 100, for example, information on variable specifications such as a large-capacity bucket specification, a long arm specification, a quick coupling specification, etc. The current environmental condition information may also include detection information from a raindrop detection sensor, an illuminance sensor, etc. that may be included in the state detection device S1, that is, weather information. The work pattern acquisition unit 302 acquires information on the work pattern that is transmitted from the management device 300 in response to the acquisition request signal and received by the communication device T1.
[0102] The machine guidance unit 303 controls the machine guidance function and the machine control function. In other words, the machine guidance unit 303 supports the operation of various operation elements (the lower traveling body 1, the upper rotating body 3, and the attachments including the boom 4, the arm 5, and the bucket 6) by the operator through the operation device 26.
[0103] For example, when an operator operates the arm 5 via the operating device 26, the machine guidance unit 303 may automatically operate at least one of the boom 4 and the bucket 6 so that a predetermined target design surface (hereinafter simply referred to as the "design surface") coincides with the tip of the bucket 6 (e.g., the tip or back).
[0104] Additionally, the machine guidance unit 303 may automatically operate the arm 5 regardless of the operation state of the operation device 26 that operates the arm 5. In other words, the machine guidance unit 303 may cause the attachment to perform a predefined operation when triggered by the operation of the operation device 26 by the operator.
[0105] More specifically, the machine guidance unit 303 acquires various information from the state detection device S1, the imaging device 80, the communication device T1, the input device 42, etc. The machine guidance unit 303 also calculates, for example, the distance between the bucket 6 and the design surface based on the acquired information. The machine guidance unit 303 then appropriately controls the operation valve 31 in accordance with the calculated distance between the bucket 6 and the design surface, etc., and can automatically operate each hydraulic actuator by individually and automatically adjusting the pilot pressure acting on the control valve corresponding to the hydraulic actuator.
[0106] The operation valve 31 includes, for example, a boom proportional valve corresponding to the boom 4 (boom cylinder 7). The operation valve 31 also includes, for example, an arm proportional valve corresponding to the arm 5 (arm cylinder 8). The operation valve 31 also includes, for example, a bucket proportional valve corresponding to the bucket 6 (bucket cylinder 9). The operation valve 31 also includes, for example, a swing proportional valve corresponding to the upper swing body 3 (swing hydraulic motor 2A). The operation valve 31 also includes, for example, a right traveling proportional valve and a left traveling proportional valve corresponding to the right crawler and the left crawler of the lower traveling body 1, respectively.
[0107] The machine guidance unit 303 may automatically extend and retract at least one of the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9 in response to an opening and closing operation of the arm 5 relative to the operating device 26, for example, to assist in excavation work.
[0108] The excavation work is a work of excavating the ground along a design surface with the tip of the bucket 6. For example, when an operator manually operates the operation device 26 in the closing direction of the arm 5 (hereinafter, "arm closing operation"), the machine guidance unit 303 automatically extends and retracts at least one of the boom cylinder 7 and the bucket cylinder 9.
[0109] Furthermore, the machine guidance unit 303 may automatically extend and retract at least one of the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9 to assist in finishing work on a slope or a horizontal surface, for example. The finishing work includes, for example, pulling the bucket 6 toward you along the design surface while pressing the back surface of the bucket 6 against the ground.
[0110] For example, when an operator manually performs an arm closing operation on the operation device 26, the machine guidance unit 303 automatically extends and retracts at least one of the boom cylinder 7 and the bucket cylinder 9. This makes it possible to move the bucket 6 along a design surface, which is a slope (embankment) or horizontal surface after completion, while pressing the back surface of the bucket 6 against the slope (embankment) or horizontal surface before completion with a predetermined pressing force.
[0111] Furthermore, the machine guidance unit 303 may automatically rotate the swing hydraulic motor 2A to make the upper swing body 3 face the design surface. In this case, the machine guidance unit 303 may make the upper swing body 3 face the design surface by operating a predetermined switch included in the input device 42. Furthermore, the machine guidance unit 303 may make the upper swing body 3 face the design surface and start the machine control function by simply operating a predetermined switch.
[0112] Furthermore, for example, when a predetermined type of work (e.g., excavation work, loading work, finishing work, etc.) is being performed, the machine guidance unit 303 controls the operation of at least a portion of the attachment, upper rotating body 3, and lower running body 1 to match the work pattern (optimum work pattern) acquired by the work pattern acquisition unit 302 in accordance with the operation of the operating device 26 by the operator.
[0113] This allows the operator, regardless of his or her level of proficiency in operating the shovel 100, to adjust the operation of the shovel 100 to an optimal work pattern for the current environmental conditions of the shovel 100, which is output from the management device 300 so as to relatively increase a predetermined target indicator, for example, the evaluation of work speed.
[0114] Furthermore, the machine guidance unit 303 may control the operation of the shovel 100 based on the optimal work pattern, while causing the display device 40 to display the operation of the shovel 100 corresponding to the optimal work pattern for the operator. For example, when the machine guidance unit 303 controls the operation of the shovel 100 based on the optimal work pattern, it causes the display device 40 to display a video of a simulation result corresponding to the optimal work pattern. This allows the operator to proceed with the work while checking the content of the actual work pattern on the video on the display device 40.
[0115] The management device 300 of this embodiment has a master information storage unit 310, a defect information storage unit 320, an operation information storage unit 330, a vehicle information storage unit 340, an information collection unit 350, a data range determination unit 360, a learning unit 370, and an abnormality determination unit 380.
[0116] The master information storage unit 310 stores master information for identifying the shovel 100. The malfunction information storage unit 320 stores malfunction information relating to malfunctions of the shovel 100. The operation information storage unit 330 stores operation information relating to the operation of the shovel 100 transmitted from the shovel 100. The operation information includes operation data of the shovel 100. The vehicle information storage unit 340 stores vehicle information in which the master information, malfunction information, and operation information are associated with each other for each shovel 100. Details of each of the above-mentioned storage units will be described later.
[0117] The information collecting unit 350 of this embodiment collects information stored in the master information storage unit 310, the malfunction information storage unit 320, and the operation information storage unit 330, and stores the information in each storage unit. The information collecting unit 350 also associates the collected information to prepare vehicle information and stores the information in the vehicle information storage unit 340. Specifically, the information collecting unit 350 communicates with a system managed by a company that sells the shovel 100 or a system managed by a company that maintains the shovel 100, and collects master information and malfunction information. The information collecting unit 350 also collects operation information from the shovel 100. The information collecting unit 350 then stores the vehicle information in which the master information, malfunction information, and operation information are associated, in the vehicle information storage unit 340.
[0118] The data range determination unit 360 determines the range of the operation data included in the operation information stored in the operation information storage unit 330 that will be used as learning data to be input to the learning unit 370, based on the vehicle information stored in the vehicle information storage unit 340 and the time when the presence or absence of an abnormality in the excavator 100 is determined.
[0119] The learning unit 370 learns, based on the learning data, the relationship between the operation data of the shovel 100 and the presence or absence of an abnormality in the shovel 100. Specifically, the learning unit 370 generates an abnormality determination model that associates the input operation data with the presence or absence of an abnormality in the shovel 100, based on the operation data when no abnormality is present (learning data).
[0120] The abnormality determination unit 380 determines the presence or absence of an abnormality in the shovel 100 based on the output of the abnormality determination model, and outputs the determination result.
[0121] The management device 300 of this embodiment will be further described below. Fig. 3 is a diagram showing an example of the hardware configuration of the management device.
[0122] The management device 300 of this embodiment is a computer including an input device 311, an output device 312, a drive device 313, an auxiliary storage device 314, a memory device 315, an arithmetic processing device 316, and an interface device 317, all of which are interconnected via a bus B.
[0123] The input device 311 is a device for inputting various types of information and is realized by, for example, a keyboard, a pointing device, etc. The output device 312 is for outputting various types of information and is realized by, for example, a display, etc. The interface device 317 includes a LAN card, etc., and is used for connecting to a network.
[0124] The programs that realize the information collecting unit 350, data range determining unit 360, learning unit 370, and anomaly determining unit 380 of the management device 300 are at least a part of various programs that control the management device 300. The programs are provided, for example, by distribution of a storage medium 318 or by downloading from a network. The storage medium 318 that records the programs can be of various types, including storage media that optically, electrically, or magnetically record information, such as a CD-ROM, a flexible disk, or a magneto-optical disk, and semiconductor memories that electrically record information, such as a ROM or a flash memory.
[0125] Furthermore, when a storage medium 318 on which the program is recorded is set in the drive device 313, the program is installed in the auxiliary storage device 314 from the storage medium 318 via the drive device 313. Programs downloaded from the network are installed in the auxiliary storage device 314 via the interface device 317.
[0126] The auxiliary storage device 314 realizes each storage unit and the like of the management device 300, and stores the programs installed in the management device 300 as well as various files, data, and the like required by the management device 300. The memory device 315 reads out and stores the programs from the auxiliary storage device 314 when the management device 300 is started. The arithmetic processing device 316 realizes various processes as described below in accordance with the programs stored in the memory device 315.
[0127] Next, each storage unit included in the management device 300 will be described with reference to Fig. 4 to Fig. 7. Fig. 4 is a diagram showing an example of a master information storage unit.
[0128] The master information stored in the master information storage unit 310 of this embodiment includes information items such as the machine identification number, delivery date, and delivery location, and the item "machine identification number" is associated with the other items.
[0129] The master information in this embodiment is information including values of the items “machine identification number”, “delivery date”, and “delivery location”. The master information in this embodiment is information managed by, for example, a sales company of the excavator 100, collected by the information collecting unit 350, and stored in the master information storing unit 310.
[0130] The value of the item "Machine Identification Number" is identification information for identifying the shovel 100. The value of the item "Delivery Date" indicates the date on which the shovel 100 was delivered to the company or the like that purchased or rented the shovel 100. The value of the item "Delivery Date" may also be the date on which the shovel 100 was delivered to the work site where work is performed using the shovel 100.
[0131] The value of the item "delivery location" indicates the location of a work site where work is performed using the shovel 100. The value of the item "delivery location" may also indicate the location of a company that purchased or rented the shovel 100. The master information storage unit 310 may also include location information such as latitude and longitude that indicates the location of the work site where work is performed using the shovel 100.
[0132] 5 is a diagram showing an example of the defect information storage unit. The defect information stored in the defect information storage unit 320 has, as information items, a machine identification number, a defect occurrence date, and a repair completion date, and the item "machine identification number" is associated with other items.
[0133] The malfunction information in this embodiment is information including values of the items “machine identification number,” “date of malfunction occurrence,” “repair start date,” and “repair completion date.” The malfunction information in this embodiment is information managed by, for example, a company or the like that manages the maintenance, etc., of the excavator 100, and is collected by the information collecting unit 350 and stored in the malfunction information storing unit 320.
[0134] The value of the item "Date of Malfunction Occurrence" indicates the date on which an operational malfunction occurred in the shovel 100. More specifically, the value of the item "Date of Malfunction Occurrence" may indicate, for example, the date on which an operator of the shovel 100 noticed the occurrence of the malfunction and notified a maintenance company or the like of the malfunction. Also, the value of the item "Date of Malfunction Occurrence" may indicate, for example, the date on which a worker or the like performing maintenance on the shovel 100 confirmed the malfunction of the shovel 100.
[0135] The value of the item "repair start date" indicates the date when repair (maintenance) of the shovel 100 started. Specifically, the value of the item "repair start date" indicates the date when the switch 42a was operated by a worker or the like performing maintenance on the shovel 100.
[0136] The value of the item "repair completion date" indicates the date on which repair (maintenance) was completed for the shovel 100. Specifically, the value of the item "repair completion date" indicates the date on which the switch 42b was operated by a worker or the like who performed maintenance on the shovel 100.
[0137] In this manner, the management device 300 of this embodiment manages the start and end dates of maintenance in association with the date on which the malfunction occurred, thereby enabling the administrator of the management system SYS to grasp the period from when the malfunction occurred to when maintenance started, the number of days required for maintenance, etc.
[0138] 6 is a diagram illustrating an example of the operation information storage unit. The operation information stored in the operation information storage unit 330 of this embodiment includes, as information items, the machine identification number, acquisition date and time, operation data, and the presence or absence of repair work, and the item "machine identification number" is associated with other items.
[0139] The operation information in this embodiment is information including values of the items “machine identification number”, “acquisition date and time”, “operation data”, and “type of work”. The operation information in this embodiment is information transmitted by the information transmitting unit 301 of the shovel 100 via the communication device T1, received by the information collecting unit 350, and stored in the operation information storage unit 330.
[0140] The value of the item "Acquisition Date and Time" indicates the date and time when the operation data was acquired. The value of the item "Operation Data" is information including the work pattern result information and the environmental condition result information transmitted from the shovel 100. In other words, the value of the item "Operation Data" is information including various detection information output from the status detection device S1, and is information indicating the operation of the shovel 100.
[0141] The value of the item "type of work" indicates the type of work being performed by the shovel 100. Specifically, the value of the item "type of work" indicates whether the work being performed by the shovel 100 is normal work or repair work. Repair work for the shovel 100 is, for example, work (motion) performed in the process of repairing the shovel 100.
[0142] FIG. 7 is a diagram illustrating an example of the vehicle information storage unit.
[0143] The information collecting unit 350 of this embodiment collects master information, malfunction information, and operation information for each machine identification number from the master information storage unit 310, malfunction information storage unit 320, and operation information storage unit 330, respectively, and stores vehicle information in which these pieces of information are associated with each other in the vehicle information storage unit 340. Therefore, it can be said that the vehicle information is information generated by the information collecting unit 350.
[0144] The vehicle information in this embodiment includes the following information items: vehicle identification number, delivery date, delivery location, date of malfunction, date of repair completion, acquisition date and time, operation data, and type of work, and the item "vehicle identification number" is associated with the other items.
[0145] The vehicle information in this embodiment is information that includes values for the items "vehicle identification number," "delivery date," "delivery location," "date of malfunction," "repair start date," "repair completion date," "acquisition date and time," "operational data," and "type of work."
[0146] In the example of Figure 7, it can be seen that the excavator 100 identified by the machine identification number "XL-0029" was delivered to XX units in XX city on July 31, 2018, a malfunction occurred on August 10, 2019, repairs started on August 11, 2019, and the repairs were completed on August 15, 2019. It can also be seen that operation data was acquired on August 20, 2019 while the excavator 100 identified by the machine identification number "XL-0029" was performing normal work.
[0147] Next, functions of the management device 300 of this embodiment will be described with reference to Fig. 8. Fig. 8 is a diagram for explaining the functions of the management device.
[0148] The management device 300 of this embodiment includes a storage unit 305 , an information collection unit 350 , a data range determination unit 360 , a learning unit 370 , and an abnormality determination unit 380 .
[0149] The storage unit 305 is realized, for example, by an auxiliary storage device 314 or a memory device 315. Moreover, the information collecting unit 350, the data range determining unit 360, the learning unit 370, and the anomaly determining unit 380 are realized by the calculation processing unit 316 reading and executing programs stored in the memory device 315 or the like.
[0150] The information collecting unit 350 of this embodiment collects master information, malfunction information, and operation information, and stores them in the master information storage unit 310, the malfunction information storage unit 320, and the operation information storage unit 330. In addition, the information collecting unit 350 generates vehicle information in which the master information, malfunction information, and operation information are associated with each other for each machine identification number of the excavator 100, and stores the vehicle information storage unit 340.
[0151] The data range determination unit 360 determines a range of the operational data to be used as learning data for learning by the learning unit 370. The data range determination unit 360 will be described below.
[0152] The data range determination unit 360 includes an input reception unit 361 , a parameter storage unit 362 , a reference flag assignment unit 363 , an exclusion range determination unit 364 , an adoption range determination unit 365 , and a learning data output unit 366 .
[0153] The input receiving unit 361 receives various inputs to the management device 300. Specifically, the input receiving unit 361 receives input of information indicating the time to perform an abnormality determination, which will be described later. The information indicating the time to perform an abnormality determination indicates the day on which the abnormality determination process is to be executed by the abnormality determination unit 380. In the following description, the day on which the abnormality determination process is to be executed may be referred to as the execution day.
[0154] The parameter storage unit 362 stores parameters referenced by the exclusion range determination unit 364 and the adoption range determination unit 365. The parameters stored in the parameter storage unit 362 may be set arbitrarily by an administrator of the management system SYS, etc. The parameters stored in the parameter storage unit 362 will be described in detail later.
[0155] The reference flag assigning unit 363 refers to the vehicle information, determines a first exclusion range in the operational data that cannot become learned data, and assigns a flag based on the first exclusion range to the operational data.
[0156] The exclusion range determination unit 364 determines the second exclusion range based on the parameters stored in the parameter storage unit 362 and the first exclusion range.
[0157] In other words, the reference flag assignment unit 363 and the exclusion range determination unit 364 of the present embodiment are an example of a range determination unit that determines a range to be excluded from the learning data in the operation information included in the vehicle information.
[0158] The adoption range determination unit 365 refers to the parameters stored in the parameter storage unit 362 and the second exclusion range, and determines the range of operational data to be adopted as learning data based on the time for making the abnormality determination accepted by the input acceptance unit 361.
[0159] In the following description, the operational data in the range determined by the adoption range determination unit 365 may be referred to as learning data. In other words, the learning data is operational data acquired during the period determined by the adoption range determination unit 365.
[0160] The learning data output unit 366 outputs the learning data to the learning unit 370.
[0161] The learning unit 370 uses the learning data as input, performs learning, and generates anomaly determination model 375. That is, the learning unit 370 uses operation data corresponding to the time when the presence or absence of an abnormality of the shovel 100 is determined as input, and uses a data set that outputs information indicating the absence of an abnormality as learning data to generate an abnormality determination model 375. In other words, the learning unit 370 uses operation data under normal conditions and a data set that outputs information indicating the absence of an abnormality to generate an abnormality determination model that associates the input operation data with the degree of abnormality of the shovel 100.
[0162] Then, when the operation data to be subjected to the abnormality determination process is input, the learning unit 370 uses the operation data as an input to the abnormality determination model 375 to obtain an index value indicating the presence or absence of an abnormality in the shovel 100. In the following description, the operation data to be input to the abnormality determination model 375 may be referred to as determination data.
[0163] The learning unit 370 of the present embodiment may use, for example, machine learning as a learning method. Examples of machine learning techniques include deep learning, autoencoder, and SVM (support vector machine).
[0164] The abnormality determination unit 380 refers to the information indicating the time when the abnormality determination is to be performed and the parameters, identifies the range of operational data to be used for the abnormality determination, and inputs the identified operational data to the learning unit 370 as determination data.
[0165] Furthermore, the abnormality determination unit 380 determines the presence or absence of an abnormality in the shovel 100 based on the index value output from the learning unit 370. Specifically, for example, the abnormality determination unit 380 may determine that an abnormality exists when the index value output from the learning unit 370 is larger than a predetermined threshold value.
[0166] In this embodiment, the determination by the abnormality determination unit 380 may be performed, for example, during a warm-up mode, an automatic regeneration mode, a manual regeneration mode, or even during cooling operation of the supercharger of the engine 11 (in a turbo cooling mode).
[0167] In this embodiment, the range of operational data used as learning data may indicate a range on a time axis, and the range used as judgment data may indicate the number of pieces of operational data.
[0168] Specifically, the learning data may be a group of operational data acquired during a period determined by the adoption range determination unit 365. Furthermore, the determination data may be a group of operational data including a predetermined number of operational data acquired before the date on which anomaly determination is performed.
[0169] Next, the parameters held by the parameter holding unit 362 will be described with reference to Fig. 9. Fig. 9 is a diagram showing an example of parameters held by the parameter holding unit.
[0170] The parameter storage unit 362 of this embodiment may store, for example, parameter names and values in association with each other.
[0171] In the example of FIG. 9, the parameter storage unit 362 stores XX days as the defect occurrence period, XX days as the post-repair reserve period, and XX days as the buffer period.
[0172] The malfunction occurrence period is a parameter that is set in consideration of the possibility that a malfunction has occurred in the operation of the shovel 100 before the malfunction occurrence date. Specifically, for example, it may take several days from when a malfunction occurs in the shovel 100 until the operator notices the malfunction and notifies a maintenance company or the like of the occurrence of the malfunction. In such a case, the malfunction has occurred in the operation of the shovel 100 since before the malfunction occurrence date, and the operation data during this period is inappropriate as learning data.
[0173] The post-repair reserve period is a parameter that is set in consideration of the possibility that the operation of the excavator 100 immediately after repair is completed may differ from normal operation, and the possibility that the actual repair completion date may not match the repair completion date inputted into the system. Specifically, for example, there may be cases where, after a repair completion date is inputted as if the repair had been completed once, additional parts that need to be repaired are found. In this case, the operation of the excavator 100 immediately after the inputted repair completion date may differ from normal operation, and the operation data during this period is inappropriate as learning data.
[0174] The buffer period is a parameter set in consideration of separating the judgment data from the learning data. For example, if the time when the operational data to be the judgment data is acquired is close to the time when the operational data adopted as the learning data is acquired, the learning data and the judgment data may be similar to each other.
[0175] In this case, since the abnormality judgment model 375 is generated using learning data similar to the judgment data, even if there is an abnormality in the operation of the shovel 100, it may be deemed to be in a normal state, which may hinder improvement in the accuracy of detecting abnormalities.
[0176] The parameter storage unit 362 of this embodiment stores parameters that are set taking the above into consideration.
[0177] Next, the process of the management device 300 of this embodiment will be described with reference to Fig. 10. Fig. 10 is a flowchart illustrating the process of the management device.
[0178] The management device 300 of this embodiment determines whether or not the input of the execution date and the machine identification information has been received by the input receiving unit 361 of the data range determination unit 360 (step S1001). Note that in this embodiment, only the machine identification number of the excavator 100 that is the target of the abnormality determination process may be input.
[0179] In step S1001, if the input of the execution date and the machine identification information has not been accepted, the management device 300 waits until the input of the execution date is accepted.
[0180] In step S100, when input of the execution date and vehicle identification information is accepted, the data range determination unit 360 searches the vehicle information storage unit 340 by the vehicle identification number (step S1002).
[0181] Next, the data range determination unit 360 determines a first exclusion range that cannot be learning data in the operational data included in the vehicle information by referring to the vehicle information acquired as a result of the search in step S1002 through the reference flag assignment unit 363 (step S1003). The reference flag assignment unit 363 assigns a flag based on the first exclusion range to the operational data.
[0182] Next, the data range determination unit 360 determines a second exclusion range by the exclusion range determination unit 364 based on the defect occurrence period, the post-repair reserve period, and the first exclusion range stored in the parameter storage unit 362 (step S1004).
[0183] Next, the data range determination unit 360 determines the range of operational data to be adopted as learning data based on the number of operational data to be used as judgment data and the buffer period stored in the parameter storage unit 362 by the adoption range determination unit 365 (step S1005).
[0184] Next, the data range determination unit 360 causes the learning data output unit 366 to extract the operational data within the range determined in step S1005 as learning data, and outputs the learning data to the learning unit 370 (step S1006).
[0185] Next, the learning unit 370 of the management device 300 generates the abnormality determination model 375 based on the learning data (step S1007).
[0186] Next, the management device 300 causes the abnormality determination unit 380 to extract operation data to be used for determination from the vehicle information storage unit 340 based on the execution date, and inputs the data to the abnormality determination model 375 (learning unit 370) (step S1008).
[0187] Next, the abnormality determination unit 380 outputs the output of the abnormality determination model 375 together with information indicating the range of the operational data used as the learning data (step S1009), and ends the process.
[0188] The processing of the data range determination unit 360 of this embodiment will be further described below with reference to Figures 11A and 11B. Figure 11A is a first diagram for explaining the processing of the data range determination unit, and is a diagram for explaining a first exclusion range and a second exclusion range. Figure 11B is a second diagram for explaining the processing of the data range determination unit, and is a diagram for explaining the range of learning data.
[0189] The examples of Figures 11A and 11B show a case where the input receiving unit 361 searches the vehicle information storage unit 340 using the vehicle identification number received as input, and vehicle information including operation data for the period from time ts to time te is extracted. The time may indicate a date. Therefore, the examples of Figures 11A and 11B show that operation data for the period from date ts to date te is extracted.
[0190] In the data range determination unit 360 of this embodiment, when the extracted vehicle information includes a delivery date t0, the reference flag assignment unit 363 assigns a flag indicating that a period k1 from the date ts to the delivery date t0 is a period during which the operational data is not used as learning data.
[0191] The operation data acquired in the period k1 is information indicating the operation of the excavator 100 before it is delivered to the delivery site. In other words, the operation data acquired in the period k1 is information indicating the operation performed in an environment different from the delivery site. For this reason, in this embodiment, the operation data acquired in the period k1 is not used as learning data for abnormality determination performed after the excavator 100 is delivered to the delivery site.
[0192] Here, the reference flag assigning unit 363 assigns a flag "0" to the period k1, which indicates that the period k1 is a period before the delivery date and that the operational data is not used as learning data.
[0193] In this embodiment, when the value of the item "type of work" included in the vehicle information is "repair work", the operation data is not adopted as learning data. Therefore, the reference flag assigning unit 363 assigns a flag "0" to the period in which the type of work is "repair work", indicating that the operation data is not used as learning data.
[0194] In addition, when the extracted vehicle information includes the defect occurrence date t1 and the repair completion date t2, the reference flag assignment unit 363 assigns a flag “2” to the period k2 from the defect occurrence date t1 to the repair completion date t2, indicating that this is a defect repair period and that this is a period in which the operational data is not used as learning data.
[0195] In this embodiment, the period to which a flag is assigned by the reference flag assigning unit 363 is set as the first exclusion range. Therefore, the period k1 before the delivery of the shovel 100 and the period k2 during which a malfunction of the shovel 100 is repaired are set as the first exclusion range in which operation data acquired during these periods cannot become learning data.
[0196] Furthermore, the reference flag assigning unit 363 of this embodiment assigns a flag "1" to periods other than the periods to which flags "0" and "2" are assigned, indicating that the operational data is a period during which it can become learning data.
[0197] Next, the data range determination section 360 causes the exclusion range determination section 364 to refer to the defect occurrence period and the post-repair reserve period stored in the parameter storage section 362 and determine a second exclusion range.
[0198] Specifically, the exclusion range determination unit 364 identifies date t3, which is the number of days prior to the defect occurrence date t1 that is set as the defect appearance period, and sets the period k3 (first period) from date t3 to the defect occurrence date t1 as the second exclusion range, and assigns a flag "3" to indicate that this is the second exclusion range.
[0199] In addition, the exclusion range determination unit 364 identifies a date t4 that is the number of days that has elapsed since the repair completion date t2, which is set as the post-repair reserve period, and sets a period k4 (second period) from the repair completion date t2 to the date t4 as a second exclusion range, and assigns a flag "3" indicating that this is the second exclusion range.
[0200] In this manner, in this embodiment, a second exclusion range is set before the defect occurrence date and after the repair completion date included in the vehicle information.
[0201] Therefore, according to this embodiment, even if the date on which a malfunction actually occurred does not match the date on which an operator of the shovel 100 or the like reported the occurrence of the malfunction, it is possible to prevent inappropriate operational data from being used as learning data.
[0202] Furthermore, according to this embodiment, even if the date on which the shovel 100 actually resumes operating in the same manner as before the occurrence of a malfunction does not coincide with the date on which repairs to the shovel 100 are completed, it is possible to prevent inappropriate operational data from being used as learning data.
[0203] 11A, the operational data acquired during the period from date t0 to date t3 and the operational data acquired during the period from date t4 to date te are data that can become learning data. That is, in this embodiment, the operational data acquired during the period to which the flag "1" is assigned can become learning data.
[0204] Next, the data range determination unit 360 specifies a period for which the operational data is to be adopted as learning data, from among the periods for which the adoption range determination unit 365 has assigned a flag of "1".
[0205] First, the adoption range determination unit 365 refers to the parameter storage unit 362, and identifies a date t6 that precedes the execution date t5 of the abnormality determination process accepted by the input acceptance unit 361 by a period k5 that is set as a buffer period.
[0206] In this embodiment, a predetermined number of data amounts including the operational data acquired on the execution date t5 are acquired as determination data to be input to the anomaly determination model 375. In other words, the determination data is a predetermined number of operational data groups acquired immediately before the execution date t5.
[0207] Therefore, in this embodiment, it is preferable that the period k5 is longer than the period during which the determination data is acquired.
[0208] The buffer period may be set according to the type of abnormality. For example, when determining the presence or absence of an abnormality that appears as a sudden change in the operation data, the buffer period may be the same as the period for acquiring the determination data. Also, for example, when determining the presence or absence of an abnormality that appears as a gradual change in the operation data, the buffer period is preferably longer than the period for acquiring the determination data.
[0209] Next, the adoption range determination unit 365 identifies a period before date t6, to which a flag "1" has been assigned, and to which the number of acquired operational data pieces is equal to or greater than a predetermined number. Then, the adoption range determination unit 365 sets the operational data pieces acquired during the identified period as learning data. Here, the "predetermined number" refers to a number that is sufficient as learning data. The number of operational data pieces to be adopted as learning data may be set in advance.
[0210] In the example of Fig. 11B, there is a period k6 from date t4 to date t6 before date t6, which is a period to which a flag "1" is assigned. However, in the example of Fig. 11B, the amount of operational data acquired in period k6 is less than a predetermined number, which is not a sufficient amount of data to serve as learning data.
[0211] Therefore, the adoption range determination unit 365 identifies a period before date t3 that is a period before date t6 and is a period for which a flag "1" is assigned. In this case, the adoption range determination unit 365 may identify a period before date t3 in which the total number of historical data acquired in period k6 is equal to or greater than a predetermined number. In the example of FIG. 11B, in addition to period k6, period k7 from date t7 to date t3 is identified as a period for which a flag "1" is assigned and the acquired historical data is equal to or greater than a predetermined number.
[0212] Therefore, the data range determination unit 360 outputs the groups of operational data acquired in each of the periods k6 and k7 as learning data to the learning unit 370. The learning unit 370 generates an abnormality determination model 375 based on this learning data.
[0213] In this way, according to this embodiment, it is possible to determine a range of appropriate learning data in the operation data collected from the shovel 100. In other words, according to this embodiment, the learning unit 370 can use appropriate learning data (operation data) to learn the relationship between the operation data and the presence or absence of an abnormality in the shovel.
[0214] Next, a description will be given of an example of output of the result of the abnormality determination process by the abnormality determination unit 380. The abnormality determination unit 380 inputs a predetermined number of operation data groups including the operation data acquired on the execution date t5 to the abnormality determination model 375 as determination data, and outputs the result of determining whether or not there is an abnormality based on the output.
[0215] Fig. 12A is a first diagram showing an example of an output of a result of an abnormality determination, and Fig. 12B is a first diagram showing an example of an output of a result of an abnormality determination. Screens 121A and 121B shown in Fig. 12A and Fig. 12B, respectively, are displayed on, for example, the display device 40 of the management device 300.
[0216] Screen 121A includes display areas 122, 123, 124, 125, and 126. Display area 122 displays a message indicating the result of abnormality determination processing, and information indicating the execution date of the abnormality determination processing.
[0217] In the display area 123, for example, a video captured by the imaging device 80 of the shovel 100 on the execution date is displayed.
[0218] Display area 124 and display area 125 display, for example, the result of the determination of the presence or absence of an abnormality by anomaly determination section 380. The result of the determination of the presence or absence of an abnormality may be determined, for example, according to an index value output from anomaly determination model 375. For example, in this embodiment, it may be determined that an abnormality exists when the index value output from anomaly determination model 375 is greater than a predetermined threshold value. In the following description, the index value output from anomaly determination model 375 may be expressed as an abnormality degree.
[0219] The display area 124 may display, for example, a graph showing the variation in the degree of abnormality, and the display area 125 may display, for example, a message showing the degree of abnormality. The display area 126 displays operation buttons and the like for playing a video or the like of a portion of the display area 123 where the degree of abnormality has exceeded a predetermined threshold.
[0220] Also, in the graph showing the variation in the degree of abnormality, a marker 124a indicating a learning period in which the operation data is adopted as learning data and a marker 124b indicating an evaluation period in which the operation data is adopted as evaluation data may be displayed in the display area 124. Also, in the display area 124, the markers 124a and 124b may be displayed in different manners.
[0221] On screen 121A, the fluctuation in the degree of abnormality during the learning period indicated by marker 124a is smaller than the fluctuation in the degree of abnormality during the evaluation period indicated by marker 124b, and it can be seen that the operating data used for learning was operating data under normal conditions.
[0222] 12B includes display areas 127 and 128. Display area 127 displays information indicating a period during which the operational data used in the learning data was acquired. Display area 128 displays information indicating a period excluded from the period during which the learning data is acquired. In other words, display area 128 displays information indicating a period during which the acquired operational data cannot become learning data.
[0223] In this manner, in this embodiment, the period during which the operation data was used is displayed as the learning data used to generate the anomaly determination model 375. Therefore, according to this embodiment, the period during which the learning data was acquired can be visualized, and the worker performing maintenance or the like on the shovel 100 can have a deeper understanding of the determination result of the presence or absence of an abnormality.
[0224] Furthermore, in this embodiment, the presence or absence of an abnormality is determined using anomaly determination model 375 based on learning data within an appropriate range, so that the reliability of the determination result can be improved.
[0225] In addition, in this embodiment, the operation data collected from the shovel 100 that is the subject of the determination of the presence or absence of an abnormality is used as the learning data, but this is not limited to this. The learning data may be adopted, for example, from operation data collected from another shovel other than the shovel 100 that is the subject of the determination of the presence or absence of an abnormality. In this case, the other shovel may be the same model as the shovel 100 that is the subject of the determination of the presence or absence of an abnormality.
[0226] In addition, in this embodiment, the work machine from which operation data is acquired as learning data is the shovel 100, but this is not limited to this. This embodiment can also be used for abnormality determination of work machines other than the shovel 100.
[0227] In the present embodiment, the abnormality determination model 375 outputs an index value indicating the presence or absence of an abnormality, and the abnormality determination section 380 determines the presence or absence of an abnormality based on the index value, but the present invention is not limited to this. In this embodiment, the abnormality determination model 375 may also determine the presence or absence of an abnormality.
[0228] In this embodiment, the index value output by the abnormality determination model 375 may be output as a determination result of the presence or absence of an abnormality. In this case, the determination process by the abnormality determination unit 380 using the index value becomes unnecessary.
[0229] (Other embodiments) Another embodiment will be described below with reference to the drawings. In this embodiment, the data range determination unit 360 compares the distribution of the operational data acquired before the operational data acquired in the first exclusion range and the second exclusion range and the distribution of the operational data acquired after the operational data acquired in the first exclusion range and the second exclusion range, among the operational data set as learning data.
[0230] In the following description, operation data acquired before the operation data acquired in the first exclusion range and the second exclusion range may be referred to as first operation data, and operation data acquired after the operation data acquired in the first exclusion range and the second exclusion range may be referred to as second operation data.
[0231] In other words, in this embodiment, the historical data acquired in the period k7 may be expressed as first historical data, and the historical data acquired in the period k6 may be expressed as second historical data.
[0232] In this embodiment, when a comparison of the distributions of the first operational data and the second operational data shows that the distributions are different, the first operational data is excluded from the learning data.
[0233] The operation of the management device 300 of this embodiment will be described below with reference to Fig. 13. Fig. 13 is a flowchart illustrating the process of the management device of another embodiment.
[0234] The processing from step S1301 to step S1305 in FIG. 13 is similar to the processing from step S1001 to step S1005 in FIG. 10, and therefore the description thereof will be omitted.
[0235] 13, when the range of operational data to be adopted as learning data is determined, the adoption range determination unit 365 compares the distribution of the first operational data with the distribution of the second operational data among the operational data adopted as learning data (step S1306). Note that the distribution of the operational data may be indicated by, for example, the feature amount of the operational data.
[0236] Next, the adoption range determination unit 365 determines whether the two distributions are similar (step S1307). Specifically, the adoption range determination unit 365 may obtain a similarity between the two, and determine that the distribution of the first operational data and the distribution of the second operational data are similar when the similarity is equal to or greater than a predetermined threshold.
[0237] If it is determined in step S1307 that they are similar, the management device 300 proceeds to step S1309, which will be described later.
[0238] If it is determined in step S1307 that they are not similar, the adoption range determination unit 365 excludes the first operational data from the learning data, sets the second operational data as the learning data (step S1308), and proceeds to step S1309, which will be described later. In other words, if it is determined in step S1307 that they are not similar, the adoption range determination unit 365 sets the operational data acquired after the operational data acquired in the first exclusion range and the second exclusion range as the learning data.
[0239] The processing from step S1309 to step S1312 in FIG. 13 is similar to the processing from step S1006 to step S1009 in FIG. 10, and therefore the description thereof will be omitted.
[0240] 13 will be specifically described below with reference to Fig. 11B. In the management device 300 of this embodiment, the range of historical data adopted as learning data is historical data acquired in periods k6 and k7.
[0241] In this embodiment, the operational data acquired in period k7 is regarded as the first operational data, and the operational data acquired in period k6 is regarded as the second operational data, and the distributions of the two are compared. If it is determined that the first operational data and the second operational data are not similar, the data range determination unit 360 determines the operational data acquired in period k6 as learning data. In this case, the number of operational data acquired in period k6 is equal to or greater than a predetermined number.
[0242] In this embodiment, the operational data when no abnormalities are detected before repairs is compared with the operational data when no abnormalities are detected after repairs, and only if they are similar are both adopted as learning data.
[0243] Therefore, according to this embodiment, even if the operational data when no abnormality is assumed to exist changes due to a change in the operating environment caused by repair (maintenance), the operation data is not affected by the change. Therefore, according to this embodiment, even after repair is completed (after maintenance is performed), a sign of failure can be appropriately detected.
[0244] Although the preferred embodiments of the present invention have been described in detail above, the present invention is not limited to the above-described embodiments, and various modifications and substitutions can be made to the above-described embodiments without departing from the scope of the present invention.
[0245] This international application also claims priority based on Japanese patent application No. 2020-057513, filed on March 27, 2020, the entire contents of which are incorporated herein by reference. [Explanation of symbols]
[0246] 30 Controller 31 Operating valve 40 Display device 42 Input Devices 80 Imaging device 80B, 80F, 80L, 80R Camera 100 Shovel 300 Management device 301 Information Transmission Department 302 Work pattern acquisition unit 303 Machine Guidance Department 310 Master information storage unit 320 Defect information storage unit 330 Operation information storage unit 340 Vehicle information storage unit 350 Information Gathering Department 360 Data range determination unit 370 Learning Department 380 Abnormality determination section
Claims
1. a learning unit that learns a relationship between the operation data of the shovel and an abnormality level of the shovel by using operation data indicating an operation of the shovel that corresponds to a time when it is determined whether or not there is an abnormality in the shovel and that is operation data when there is no abnormality in the shovel as learning data; a range determination unit that determines a range of the operation data to be excluded from the learning data based on vehicle information including operation data indicating an operation of the shovel and malfunction information related to a malfunction of the shovel, The range determination unit is The excavator management device determines the range of the learning data from the operation data excluding the range, based on the point in time when the process of determining the presence or absence of the abnormality is executed.
2. A learning unit that learns a relationship between the operation data of the shovel and the degree of abnormality of the shovel using operation data indicating the operation of a shovel that corresponds to a time when it is determined whether or not there is an abnormality in the shovel as learning data, and the operation data when the shovel is in a state where there is no abnormality, A management device for an excavator that displays, on a display device, the result of the determination of the presence or absence of an abnormality and information indicating the period during which the operational data that has been set as the learned data was acquired.
3. A learning unit which learns a relationship between the operation data of the shovel and the degree of abnormality of the shovel by using operation data indicating the operation of a shovel that corresponds to a time when it is determined whether or not there is an abnormality in the shovel as learning data, the operation data being when the shovel is in a state where there is no abnormality in the shovel; and a range determination unit that determines a range of the operation data to be excluded from the learning data based on vehicle information including operation data indicating an operation of the shovel and malfunction information related to a malfunction of the shovel, The operational data to be excluded from the learning data is The operational data is acquired during a first period from a time when the malfunction occurs, which is indicated by the malfunction information, to a time going back a predetermined period, and the operational data is acquired during a second period from a time when the repair is completed, which is indicated by the malfunction information, to a time when a predetermined period has elapsed, comparing first operational data acquired before the first period with second operational data acquired after the second period among operational data included in the learning data; A management device for an excavator that determines whether or not to exclude the first operation data from the learning data depending on a result of the comparison.
4. A shovel management device as described in any one of claims 1 to 3, wherein when executing the process of determining the presence or absence of an abnormality, the period during which the operational data input to the learning unit was acquired and the period during which the operational data that is to be the learning data was acquired are discontinuous.
5. The operational data to be excluded from the learning data is The excavator management device according to claim 1 , wherein the operation data is acquired during a first period from a time point at which the malfunction indicated by the malfunction information occurred to a time point that is a predetermined period prior to the time point.
6. The operational data to be excluded from the learning data is The excavator management device according to claim 5 , wherein the operation data is acquired during a second period from the time when the repair indicated by the defect information is completed to the time when a predetermined period has elapsed.
7. comparing first operational data acquired before the first period with second operational data acquired after the second period among operational data included in the learning data; The excavator management device according to claim 6 , further comprising: a determination as to whether or not to exclude the first operational data from the learning data, depending on a result of the comparison.
8. The excavator management device according to claim 7, wherein when it is determined that the first operation data and the second operation data are similar, the first operation data and the second operation data are set as learning data.
9. The defect information is The shovel management device according to claim 1 or 3, further comprising information indicating a date on which maintenance of the shovel was started and information indicating a date on which maintenance of the shovel was completed.
10. The excavator management device according to claim 1 , wherein the result of the determination of the presence or absence of an abnormality and information indicating a period during which the operational data that is set as the learning data was acquired are displayed on a display device.
11. an abnormality determination unit that determines the presence or absence of an abnormality according to the abnormality degree of the shovel, The learning unit is receiving an input of operation data of the shovel extracted based on an execution date of executing the process of determining the presence or absence of an abnormality, and outputting an abnormality degree of the shovel to the abnormality determination unit; The excavator management device according to any one of claims 1 to 10.
12. The management device of the shovel is A shovel management device as described in any one of claims 1 to 11, which accepts notification from the shovel support device of a start date on which maintenance of the shovel was started and a completion date on which maintenance of the shovel was completed, which are input in the support device.
13. The management device of the shovel is when a start button for inputting a start date for starting maintenance of the shovel is operated in the support device, a notification of the start date is received from the support device; The shovel management device according to claim 12, wherein when a completion button for inputting a completion date when the maintenance of the shovel was completed is operated on the support device, notification of the completion date is received from the support device.
14. A shovel that communicates with a management device, a communication device which transmits operation data indicating operations of the shovel and information indicating a start date and a completion date of maintenance of the shovel to the management device having a learning unit which learns a relationship between the operation data of the shovel and a degree of abnormality of the shovel, the operation data being corresponding to a time when it is determined whether or not there is an abnormality in the shovel, the operation data being when the shovel is considered to be in an abnormality-free state as learning data; a start switch for inputting a start date of the maintenance of the shovel, and a completion switch for inputting a completion date of the maintenance of the shovel; A controller for controlling the operation of the shovel, The controller: The shovel stores in a storage device information indicating a record when a person approaching within a predetermined range is detected by operating the start switch, in association with information indicating that the person has approached for maintenance purposes.
Citation Information
Patent Citations
System and method for maintenance of machine, and program for making computer execute the method
JP2003034953A
Diagnostic device and diagnostic method
JP2007257366A
Learning diagnostic system, state diagnostic device, and state learning device for work machine
JP2010236302A
Management device for work machine and method for determining abnormality in work machine
JP2015083731A
Facility monitoring device and facility monitoring method
JP2018013914A
