Communication method, device, equipment, and medium in a deactivated state of a secondary cell group
By determining and resetting signal and time measurements based on first information, the method optimizes terminal operations during SCG deactivation, improving flexibility and reducing power consumption.
Patent Information
- Application Number
- JP2023541811
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-01-08
- Filing Date
- 2021-12-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-21
AI Technical Summary
Existing communication systems lack clarity on how terminals should operate during the deactivated state of a secondary cell group (SCG), leading to unclear actions and potential inefficiencies.
A method and device for terminals to determine and reset signal and time measurements based on first information, such as beam failure detection or network instructions, to optimize operations during SCG deactivation.
Improves the flexibility and rationality of terminal behavior by adjusting measurements and reducing power consumption during SCG deactivation, enhancing communication efficiency.
Smart Images

Figure 0007575612000001 
Figure 0007575612000002 
Figure 0007575612000003
Abstract
Description
[Technical field]
[0001] The present application relates to the field of communications, and more particularly to a method, apparatus, device and medium for communication in a deactivated state of a secondary cell group. [Background technology]
[0002] In some communication network architectures, the network side includes a primary node (Master Node, Main Node, or Primary Node, MN or PN) and a secondary node (Secondary Node, SN). The cell group on the MN side is a primary cell group (Master Cell Group, Main Cell Group, or Primary Cell Group, MCG or PCG), which includes one primary cell (Primary Cell, PCell) and zero to multiple secondary cells (Secondary Cell, SCell). The cell group on the SN side is a secondary cell group (Secondary Cell Group, SCG), which includes one primary cell (Primary SCG Cell, PSCell) and zero to multiple secondary cells.
[0003] In a dual connectivity (DC) scenario, the MN and SN can perform data interaction simultaneously with a connected terminal. Considering energy saving and data transmission due to rapid activation of the SCG, if the amount of data transmission between the terminal and the network device is low or no data transmission occurs, the SCG can be configured to be in a deactivated state. Here, the deactivated state of the SCG is also equivalent to an SCG dormant state, an SCG suspend state, a PSCell deactivated state, a PSCell dormant state, or a PSCell suspend state.
[0004] Since it is unclear how to perform terminal actions when the SCG is inactive, terminal actions when the SCG is inactive are not currently supported by related solutions. Summary of the Invention [Problem to be solved by the invention]
[0005] The present application provides a method, device, equipment and medium for communication in a deactivated state of a secondary cell group to solve the problem that it is not clear how to perform the terminal side terminal behavior in a deactivated state of an SCG, and therefore there is still room for improving the rationality of the terminal side terminal behavior settings in a deactivated state of an SCG. [Means for solving the problem]
[0006] In a first aspect, the present application provides a communication method in a deactivated state of a secondary cell group, which is applied to a terminal, the communication method comprising: If a secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal for the SCG and / or a primary cell (PSCell) of the SCG; when first information is acquired, resetting the signal measurement and / or the time measurement based on the first information; Here, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or the time measurement, or the first information is instruction information of a network device received by the terminal.
[0007] Optionally, the signal measurement includes beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam failure of the PSCell.
[0008] Optionally, the step of resetting the signal measurements and / or the time measurements based on the first information comprises: 、 If the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure recovery, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement and / or report, radio resource management (RRM) measurement configured based on SCG measurement, radio link monitoring (RLM) measurement, and / or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information, and / or If the signal measurements further include one or more actions of the terminal with respect to the SCG, namely beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method includes a step of stopping execution of one or more of the signal measurements and / or time measurements of the terminal with respect to the SCG, or stopping execution of one or more of the signal measurements and / or time measurements of the terminal with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0009] Optionally, the time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates a timeout of an uplink TAT of the terminal for the PSCell.
[0010] Optionally, the step of resetting the signal measurement and / or the time measurement based on the first information further comprises: If the signal measurements include one or more actions of the terminal for the primary cell (PSCell), such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information; and / or If the signal measurements include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method includes a step of stopping execution of one or more of the signal measurements and / or time measurements of the terminal with respect to the SCG, or stopping execution of one or more of the signal measurements and / or time measurements of the terminal with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0011] Optionally, the signal measurements further include one or more of RRM measurements for the SCG, RLM measurements for the PSCell, and CSI-RS measurements for the SCG and / or the PSCell; The step of resetting the signal measurement and / or the time measurement based on the first information includes: For one or more of the signal measurements, if the measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; or and switching, for one or more of the signal measurements, the measurement period of the signal measurement from the second period to the first period based on the first information when the measurement period of the signal measurement is the second period; Here, the first period is greater than the second period.
[0012] Optionally, the signal measurement includes a beam failure recovery of the terminal for the PSCell, and the first information indicates that the terminal has successfully achieved beam failure recovery of the primary cell (PSCell); and / or The time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts an uplink TAT of the PSCell.
[0013] Optionally, the signal measurements further include one or more of RRM measurements for the SCG, RLM measurements for the PSCell, and CSI-RS measurements for the SCG and / or the PSCell; The step of resetting the signal measurement and / or the time measurement based on the first information includes: For one or more of the signal measurements, if the measurement period of the signal measurement is a second period, switching the measurement period of the signal measurement from the second period to a first period based on the first information; or and switching, for one or more of the signal measurements, the measurement period of the signal measurement from the first period to the second period based on the first information when the measurement period of the signal measurement is a first period; Here, the first period is greater than the second period.
[0014] Optionally, the signal measurements include RLM measurements of the terminal to the PSCell, and the first information indicates that the terminal has detected a radio link failure of the PSCell.
[0015] Optionally, the step of resetting the signal measurement and / or the time measurement based on the first information further comprises: If the signal measurements further include one or more actions of the terminal for the PSCell, namely, beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurements configured based on SCG measurements, and / or if the time measurements include an uplink TAT operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information; and / or If the signal measurements further include one or more actions of the terminal with respect to the SCG, namely beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method includes a step of stopping execution of one or more of the signal measurements and / or the time measurements with respect to the SCG, or stopping execution of one or more of the signal measurements and / or the time measurements with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0016] Optionally, the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the first information indicates that a timer for one or more of the signal measurements has timed out; The step of resetting the signal measurement and / or the time measurement based on the first information includes: when the measurement period of the signal measurement that has timed out is the second period, switching the measurement period of the signal measurement that has timed out from the second period to a first period based on the first information; when the measurement period of the signal measurement that has timed out is the first period, switching the measurement period of the signal measurement that has timed out from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0017] Optionally, the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the first information is indication information related to the one or more signal measurements transmitted from a network device and received by the terminal; The step of resetting the signal measurement and / or the time measurement based on the first information includes: When the measurement period of one or more of the signal measurements indicated by the first information is a second period, switching the measurement period of the signal measurements from the second period to a first period based on the first information; or and when a measurement period of one or more of the signal measurements indicated by the first information is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; Here, the first period is greater than the second period.
[0018] In a second aspect, the present application provides a terminal including a memory, a transceiver, and a processor, the memory is used to store a computer program; the transceiver is adapted to transmit and receive data under control of the processor; The processor reads the computer program in the memory and Determining signal and / or timing measurements of the terminal for a secondary cell group (SCG) and / or a primary cell (PSCell) of the SCG if the SCG is in a deactivated state; and when first information is obtained, to perform an operation of resetting the signal measurement and / or the time measurement based on the first information; Here, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or the time measurement, or the first information is instruction information of a network device received by the terminal.
[0019] In a third aspect, the present application provides a communication device in a deactivated state of a secondary cell group, the communication device being applied to a terminal, the communication device comprising: An acquisition unit used to determine signal measurements and / or timing measurements of the terminal for a secondary cell group (SCG) and / or a primary cell (PSCell) of the SCG when the SCG is in a deactivated state; a setting unit, which is used to reconfigure the signal measurement and / or the time measurement based on the first information when the first information is obtained; Here, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or the time measurement, or the first information is instruction information of a network device received by the terminal.
[0020] Optionally, the signal measurement includes beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam failure of the PSCell.
[0021] Optionally, the setting unit specifically comprises: If the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure recovery, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement and / or report, radio resource management (RRM) measurement configured based on SCG measurement, radio link monitoring (RLM) measurement, and / or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information, and / or If the signal measurements further include one or more actions of the terminal with respect to the SCG, such as beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method is used to stop execution of one or more of the signal measurements and / or time measurements of the terminal with respect to the SCG, or stop execution of one or more of the signal measurements and / or time measurements of the terminal with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0022] Optionally, the time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates a timeout of an uplink TAT of the terminal for the PSCell.
[0023] Optionally, the setting unit specifically comprises: If the signal measurements include one or more actions of the terminal for the primary cell (PSCell), such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information, and / or If the signal measurements include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the first information is used to stop execution of one or more of the signal measurements and / or time measurements of the terminal with respect to the SCG, or stop execution of one or more of the signal measurements and / or time measurements of the terminal with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG.
[0024] Optionally, the signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the configuration unit specifically: For one or more of the signal measurements, if a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; or for one or more of the signal measurements, when a measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; Here, the first period is greater than the second period.
[0025] Optionally, the signal measurement includes a beam failure recovery of the terminal for the PSCell, and the first information indicates that the terminal has successfully achieved beam failure recovery of the primary cell (PSCell); and / or The time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts an uplink TAT of the PSCell.
[0026] Optionally, the signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the configuration unit specifically: For one or more of the signal measurements, if the measurement period of the signal measurement is a second period, switching the measurement period of the signal measurement from the second period to a first period based on the first information; or for one or more of the signal measurements, when a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0027] Optionally, the signal measurements include RLM measurements of the terminal to the PSCell, and the first information indicates that the terminal has detected a radio link failure of the PSCell.
[0028] Optionally, the setting unit specifically comprises: If the signal measurements further include one or more actions of the terminal for the PSCell, namely, beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurements configured based on SCG measurements, and / or if the time measurements include an uplink TAT operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information, and / or If the signal measurements further include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the first information is used to stop execution of one or more of the signal measurements and / or the time measurements with respect to the SCG, or stop execution of one or more of the signal measurements and / or the time measurements with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG.
[0029] Optionally, the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the first information indicates that a timer for one or more of the signal measurements has timed out, and the configuration unit specifically: If the measurement period of the signal measurement that has timed out is a second period, switching the measurement period of the signal measurement that has timed out from the second period to a first period based on the first information; or when the measurement period of the signal measurement that has timed out is the first period, switching the measurement period of the signal measurement that has timed out from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0030] Optionally, the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the first information is indication information related to one or more of the signal measurements received by the terminal and transmitted from a network device, and the setting unit specifically: For one or more of the signal measurements indicated by the first information, if the measurement period of the signal measurement is a second period, switching the measurement period of the signal measurement from the second period to a first period based on the first information; or for one or more of the signal measurements indicated by the first information, when a measurement period of the signal measurement is a first period, switching a measurement period of the signal measurement from the first period to a second period based on the first information; Here, the first period is greater than the second period.
[0031] In a fourth aspect, the present application provides a processor-readable storage medium having a computer program stored thereon, the computer program being adapted to cause a processor to perform the method set forth in the first aspect.
[0032] In a fifth aspect, the present application provides a computer program product comprising a computer program which, when executed by a processor, realises the method set out in the first aspect above.
[0033] In a sixth aspect, the present application provides a communication system, said communication system comprising a network device and a terminal as described in the second aspect above. Effect of the Invention
[0034] The present application provides a communication transmission method, device, apparatus, and medium under a deactivated state of a secondary cell group, and the solution of the present application is applied to a terminal, and includes: when a secondary cell group (SCG) is in an inactivated state, determining a signal measurement and / or time measurement of the terminal for an SCG and / or a primary cell (PSCell) in the SCG; and when first information is obtained, reconfiguring the signal measurement and / or time measurement based on the first information, where the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or time measurement, or the first information is instruction information of a network device received by the terminal. Therefore, when the SCG is in an inactivated state, based on a communication state related to the signal measurement and / or time measurement of the terminal for the SCG and / or the PSCell in the SCG or according to an instruction of the network device, the terminal is triggered to adjust its own signal measurement and / or time measurement for the SCG and / or the PSCell in the SCG, thereby improving the rationality of the terminal side behavior configuration under the deactivated state of the SCG.
[0035] In addition, the contents explained in the above description are Original Application It is not intended to identify key or important features of the embodiments, Original Application It does not limit the scope of the invention. Original Application Other features of the present invention will become readily apparent from the following detailed description.
[0036] In order to more clearly describe the embodiments of the present application or the solutions of the prior art, the drawings that need to be used in the description of the embodiments or the prior art will be briefly described below. Of course, the drawings described below are Original Application These are just a few examples of the present invention, and a person skilled in the art can derive other drawings based on these drawings without any creative effort. [Brief description of the drawings]
[0037] [Figure 1] FIG. 2 is a schematic diagram of an application scenario provided by one embodiment of the present application; [Diagram 2] 1 is a flowchart of a communication method under a deactivated state of a secondary cell group provided by an embodiment of the present application; [Diagram 3] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 4] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Diagram 5] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 6] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 7] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 8] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 9] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 10] 1 is a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application; [Figure 11] 1 is a schematic diagram of a terminal provided according to one embodiment of the present application; [Figure 12] A schematic diagram of a communication device under a deactivated state of a secondary cell group provided by one embodiment of the present application. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0038] In this application, the term "and / or" describes a relationship between related objects and indicates that a three-way relationship may exist, for example, A and / or B may indicate three situations: A exists alone, A and B exist together, and B exists alone. Additionally, the character " / " generally indicates that the related objects before and after it are in an "or" relationship.
[0039] Hereinafter, the technical solutions of the present application will be described clearly and completely with reference to the drawings of the embodiments of the present application, and it should be understood that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments, and all other embodiments obtained by those skilled in the art based on the embodiments of the present application without creative work, all belong to the protection scope of the present application.
[0040] The technical solutions provided by the embodiments of the present application may be applied to various systems, such as 5G systems. For example, the applicable systems may be a global system of mobile communication (GSM) system, a code division multiple access (CDMA) system, a wideband code division multiple access (WCDMA), a general packet radio service (GPRS) system, a long term evolution (LTE) system, a LTE time division duplex (TDD) system, an advanced long term evolution (LTE-A) system, a universal mobile telecommunication system (UMTS), a worldwide interoperability for microwave access (WiMAX) communication system, a 5G New Radio (NR) system, etc. These various systems include terminals and network equipment. The system may include a core network portion such as an Evolved Packet System (EPS) or a 5G system (5GS).
[0041] The terminal according to the embodiment of the present application may be a device that provides voice and / or data connection to a user, a handheld device with wireless connectivity, or other processing device connected to a wireless modem. The name of the terminal may vary according to different systems, for example, in a 5G system, the terminal may be called User Equipment (UE). The wireless terminal may communicate with one or more Core Networks (CN) via a Radio Access Network (RAN), and the wireless terminal may be a mobile terminal such as a mobile phone (or called a "cellular" phone) and a computer with a mobile terminal, for example, a portable, pocket-sized, handheld, computer-embedded or vehicle-mounted mobile device that exchanges language and / or data with the radio access network. For example, devices such as Personal Communication Service (PCS) phones, cordless phones, Session Initiated Protocol (SIP) handsets, Wireless Local Loop (WLL) stations, Personal Digital Assistants (PDAs), etc. may be mentioned. A wireless terminal may also be called a system, a subscriber unit, a subscriber station, a mobile station, a remote station, an access point, a remote terminal, an access terminal, a user terminal, a user agent, or a user device, and is not limited to this embodiment.
[0042] The network equipment according to the embodiment of the present application may be a base station that may include multiple cells serving a terminal. Depending on the specific application scenario, the base station may be called an access point, or may be a device in an access network that communicates with a wireless terminal via one or more sectors on a radio interface, or may be other names. The network equipment may be used as a router between the wireless terminal and the rest of the access network, which may include an Internet Protocol (IP) communication network, to exchange received radio frames with Internet Protocol (IP) packets. The network equipment may also perform coordination to manage attributes of the radio interface. For example, the network device according to the embodiment of the present application may be a network device (Base Transceiver Station, BTS) in a Global System of Mobile communication (GSM) system or Code Division Multiple Access (CDMA), a network device (Node B) in a Wide-band Code Division Multiple Access (WCDMA), an evolved network device (evolutionary Node B, eNB, or e-NodeB) in a long term evolution (LTE) system, a 5G base station (gNB) in a 5G network architecture (next generation system), a Home evolved Node B (HeNB), a relay node, a home base station (femto), a pico base station (pico), or the like, and is not limited in the embodiment of the present application.In some network structures, the network equipment may include centralized unit (CU) nodes and distributed unit (DU) nodes, and the centralized units and distributed units may be located geographically separately.
[0043] Between the network device and the terminal, multi-input and multi-output (MIMO) transmission can be performed using one or more antennas, and the MIMO transmission can be single user MIMO (SU-MIMO) or multiple user MIMO (MU-MIMO). Depending on the form and number of antenna combinations, the MIMO transmission can be 2D-MIMO, 3D-MIMO, FD-MIMO, or massive-MIMO, or can be diversity transmission, precoding transmission, beamforming transmission, etc.
[0044] Below, some of the terms used in this application will be interpreted so that those skilled in the art can easily understand.
[0045] Dual Connectivity (DC) architecture is a network architecture in which a terminal in a connected state can simultaneously maintain connection and communication with two different access network devices and can use radio resources of the two different access network devices, one of which is a primary node (Master Node, Main Node or Primary Node, MN or PN) and the other is a secondary node (Secondary Node, SN), and the MN and SN are connected to the same core network device. Compared to the SN, the MN can provide the terminal with a signaling control function of the access network. The cell group on the MN side is a primary cell group (Master Cell Group, Main Cell Group or Primary Cell Group, MCG or PCG), and the MCG includes one primary cell (Primary Cell, PCell) and zero to multiple secondary cells (Secondary Cell, SCell). The cell group on the SN side is a secondary cell group (SCG), which includes one primary cell (Primary SCG Cell, PSCell) and zero to multiple secondary cells (Secondary Cells, SCells).
[0046] Here, the PCell is a cell that the UE initially accesses on the MN side, and the PCell and SCell in the MCG operate on different carriers and are combined by carrier aggregation (CA) technology. Similarly, the PSCell is a cell that the UE initially accesses on the SN side, and the PSCell and SCell in the SCG operate on different carriers and are combined by CA technology.
[0047] In a communication system to which the technical solutions provided by the embodiments of the present application can be applied, the network architecture adopts a multi-connection architecture, in which a terminal in a connected state can simultaneously maintain communication with at least two different access network devices, and the at least two different access network devices simultaneously connected to the terminal are divided into one MN and one or more secondary nodes (Secondary Nodes, SNs).
[0048] Figure 1 shows a schematic diagram of an application scenario to which the embodiments of the present application are applied, taking the case where the multi-connection architecture is a DC architecture as an example, in which, as shown in Figure 1, in this application scenario, a communication system includes a network device and a terminal 140, and the network device may include a core network device 130, one radio access network device 110 as an MN, and one radio access network device 120 as an SN, and the MN and the SN are connected to the same core network device 130 by wire or wirelessly. The terminal 140 is simultaneously connected to the MN and the SN by wirelessly.
[0049] Here, the core network device and the radio access network device in the application scenario may be independent and different physical devices, or the function of the core network device and the logic function of the radio access network device may be integrated in the same physical device, or a part of the function of the core network device and a part of the function of the radio access network device may be integrated in one physical device. The terminal may be fixed in position or mobile. Figure 1 is merely a schematic diagram, and the communication system may further include other network devices, such as a radio repeater device and a radio return device not shown in Figure 1.
[0050] In the inactive state of the SCG on the SN side, the terminal does not transmit data to the SCG. The terminal does not need to monitor the Physical Downlink Control Channel (PDCCH) for the SCG. However, in the inactive state of the SCG, it is not clear how many terminal actions between the terminal and the SCG are performed, such as Beam Failure Detection (BFD), Beam Failure Recovery (BFR), Channel State Information-Reference Signal (CSI-RS), Sounding Reference Signal (SRS) transmission, Radio Resource Management (RRM) measurement, Radio Link Monitoring (RLM) measurement, Timing Advance Timer (TAT) execution, and other terminal actions.
[0051] In order to solve the above problems, the embodiments of the present application provide a communication method, device, apparatus, and medium in a deactivated state of a secondary cell group. The communication method in a deactivated state of a secondary cell group provided by the embodiments of the present application is applied to a terminal side. In the method, when determining a signal measurement and / or a time measurement of a terminal for an SCG and / or a PSCell in the SCG when the SCG is in an inactivated state, if first information is obtained, the signal measurement and / or the time measurement of the terminal is reconfigured based on the first information, thereby triggering the terminal to adjust its own signal measurement and / or time measurement for the SCG and / or the PSCell, thereby improving the flexibility and rationality of the terminal side behavior configuration in the deactivated state of the SCG.
[0052] Here, the method and apparatus provided in the embodiments of the present application are conceived based on the same application invention, and the principles of problem solving by the method and apparatus are similar, so the implementations of the apparatus and method can refer to each other, and the overlapping parts will not be repeatedly described.
[0053] FIG. 2 is a flowchart of a communication method under a deactivated state of a secondary cell group provided by one embodiment of the present application. As shown in FIG. 2, the method of this embodiment may include the following steps:
[0054] In S201, when the SCG is in an inactive state, signal measurements and / or timing measurements of the terminal to the SCG and / or the PSCell of the SCG are determined.
[0055] The signal measurements include, for example, RRM measurements and RLM measurements, and the time measurements include, for example, uplink TAT time measurements.
[0056] Here, since the SCG includes one PSCell and zero to multiple SCells, the terminal's signal measurements and / or time measurements for the SCG may include the terminal's signal measurements and / or time measurements for the PSCell in the SCG, and / or the terminal's signal measurements and / or time measurements for one or multiple SCells in the SCG.
[0057] In this embodiment, when the SCG is in an inactive state, although communication data transmission between the terminal and the SCG is stopped, it does not mean that signal measurement and / or time measurement between the terminal and the SCG is also stopped, so the terminal can determine the signal measurement and / or time measurement to be performed by the terminal itself for the SCG based on its own communication parameters, and / or only determine the signal measurement and / or time measurement to be performed by the terminal itself for the PSCell in the SCG. Here, the step of determining the signal measurement and / or time measurement of the terminal for the SCG includes the steps of determining the signal measurement and / or time measurement of the terminal for the PSCell in the SCG and determining the signal measurement and / or time measurement of the terminal for one or more SCells in the SCG.
[0058] For example, if the terminal side pre-configures the SCG to perform periodic RRM measurements and SRS transmissions, the terminal's signal measurements for the SCG include RRM measurements and SRS transmissions.
[0059] In S202, when the first information is acquired, the signal measurement and / or the time measurement is reset based on the first information.
[0060] Here, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or time measurement, in other words, the first information reflects a communication state between the terminal and the PSCell and an association between the communication state and the signal measurement and / or time measurement determined in S201. Alternatively, the first information is instruction information of a network device received by the terminal, which instructs the terminal to reconfigure the signal measurement and / or time measurement for the SCG and / or the PSCell in the SCG.
[0061] In this embodiment, the communication state between the terminal and the PSCell can be obtained based on the signal measurement and / or time measurement of the terminal for the PSCell. For example, the state of the radio link between the terminal and the PSCell can be obtained based on the RLM measurement of the terminal for the PSCell, and the channel state between the terminal and the PSCell can be obtained based on the CSI-RS measurement of the terminal for the PSCell.
[0062] In this embodiment, when the SCG is in a deactivated state, the terminal obtains first information indicating the communication state between the terminal and the PSCell, and can reconfigure signal measurements and / or time measurements based on the first information, whereby the reconfigured signal measurements and / or time measurements are applied by the communication between the terminal and the SCG in a deactivated state.
[0063] In an embodiment of the present application, when the SCG is in an inactive state, reconfiguring terminal-side signal measurements and / or time measurements based on first information related to the terminal's signal measurements and / or time measurements for the SCG and / or a PSCell in the SCG and indicating the communication state between the terminal and the PSCell, or based on network device instruction information received by the terminal, triggers adjustment of the terminal's signal measurements and / or time measurements for the SCG or the PSCell when the SCG is in an inactive state, thereby improving the flexibility and rationality of terminal-side behavior configuration when the SCG is in an inactive state.
[0064] In some embodiments, the terminal side signal measurement includes the terminal's detection of beam failure for the PSCell, and the first information indicates that the terminal has detected the beam failure of the PSCell. Thus, when the terminal detects the beam failure of the PSCell, the terminal reconfigures the terminal's signal measurement and / or time measurement for the SCG and / or the PSCell. Here, the terminal's detection of the beam failure of the PSCell means that the beam quality of the PSCell is poor, the channel state is poor, etc., and the beam failure of the PSCell significantly affects the communication between the terminal and the SCG. Therefore, when the terminal detects the beam failure of the PSCell, the terminal adjusts the terminal's signal measurement and / or time measurement for the SCG and / or the PSCell, which contributes to improving the rationality of the terminal device side behavior in the inactive state of the SCG.
[0065] The signal measurement based on the terminal side includes a beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal detects a beam failure of the PSCell, and Fig. 3 shows a flowchart of a communication method under a deactivated state of a secondary cell group provided by another embodiment of the present application. As shown in Fig. 3, the method according to this embodiment may include the following steps.
[0066] In S301, when the SCG is in an inactive state, signal measurements and / or timing measurements of the terminal for the PSCell of the SCG are determined.
[0067] Here, the implementation process of S301 can refer to the description of the above embodiment, and will not be described again here.
[0068] In S302, if the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on the SCG measurement, RLM measurement, and / or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, the terminal stops execution of one or more of the signal measurements and / or time measurements based on first information indicating that the terminal has detected beam failure of the PSCell.
[0069] Here, in a multi-connection scenario, the RRM measurements between the terminal and the network side include RRM measurements set based on MCG measurements and RRM measurements set based on SCG measurements, and when the SCG is in an inactive state, on the terminal side, the execution of the RRM measurements set based on MCG measurements has been decided, but it is not clear whether the RRM measurements set based on SCG measurements will be executed.
[0070] Here, the RRM measurement configured based on the SCG measurement is an RRM measurement that is performed by the terminal based on the measurement configuration sent to the terminal from the SN side.
[0071] In this embodiment, when the terminal's signal measurement for the PSCell includes beam failure detection, the terminal may detect the first information by the beam failure detection, that is, detect the beam failure of the PSCell. Since the beam failure of the PSCell significantly affects the communication between the terminal and the SCG, when the terminal detects the beam failure of the PSCell, the terminal may need to perform an operation such as disconnecting the connection with the PSCell once and then reestablishing the connection with the PSCell. In a communication environment of the beam failure of the PSCell, when the terminal still performs beam failure recovery, TAT operation, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurement, and RLM measurement for the PSCell, the necessity of performing these signal measurements and / or time measurements is not high, so in order to reduce the power consumption of the terminal in the inactive state of the SCG, the execution of one or more of the signal measurements and / or time measurements on the terminal side may be stopped. For example, the terminal's beam failure recovery and TAT operation for the PSCell are stopped.
[0072] In an embodiment of the present application, when a terminal performs one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement, RLM measurement, and TAT operation set based on SCG measurement for a PSCell in an SCG, if the terminal detects beam failure of the PSCell, the terminal stops execution of one or more of signal measurements and / or time measurements, thereby reducing the power consumption of the terminal side when the SCG is in an inactive state and improving the flexibility and rationality of terminal side behavior settings when the SCG is in an inactive state.
[0073] Considering that the SCG may include one or more SCells in addition to the PSCell. Thus, when the SCG includes the PSCell and one or more SCells, the signal measurement based on the terminal side includes a beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal has detected a beam failure of the PSCell. Figure 4 shows a flowchart of a communication method under a deactivated state of a secondary cell group provided by another embodiment of the present application. As shown in Figure 4, the method according to this embodiment may include the following steps.
[0074] In S401, when the SCG is in an inactive state, signal measurements and / or timing measurements of the terminal with respect to the SCG are determined.
[0075] Here, the implementation process of S401 can refer to the description of the above embodiment, and will not be described again here.
[0076] In S402, if the signal measurements further include one or more actions of the terminal with respect to the SCG, such as beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on the SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, based on first information indicating that the terminal has detected beam failure of the PSCell, stop execution of one or more of the terminal's signal measurements and / or time measurements with respect to the SCG, or stop execution of one or more of the terminal's signal measurements and / or time measurements with respect to the PSCell and / or the specified SCell in the SCG.
[0077] Here, the signal measurement further includes one or more actions of the terminal with respect to the SCG, such as beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on the SCG measurement, and RLM measurement, where: (1) Where the signal measurement further includes one or more actions of the terminal with respect to the PSCell in the SCG, such as beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on the SCG measurement, and RLM measurement, (2) The signal measurement further includes one or more actions of the terminal for one or more SCells in the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on the SCG measurement, and RLM measurement; and (3) The signal measurement may further include the two cases of (1) and (2) simultaneously.
[0078] In this embodiment, since the terminal's signal measurement for the SCG includes the terminal's beam failure detection for the PSCell, the terminal may detect the first information by performing beam failure detection for the PSCell, that is, detect the beam failure of the PSCell. When the PSCell beam failure occurs, if the terminal's signal measurement for the SCG further includes one or more of beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurement, RLM measurement, and / or if the terminal's time measurement includes the terminal's uplink TAT operation for the SCG, the necessity of performing these signal measurements and / or time measurements is not high, so the terminal can stop performing one or more of the signal measurements and / or time measurements, thereby reducing the terminal's power consumption under the inactive state of the SCG and improving the rationality of the terminal's behavior configuration.
[0079] In this embodiment, the step of the terminal stopping execution of one or more of the signal measurements and / or time measurements includes a step of the terminal stopping execution of one or more of the signal measurements and / or time measurements for the SCG, i.e., stopping execution of one or more of the signal measurements and / or time measurements for the PSCell and / or SCell in the SCG. Alternatively, the step of the terminal stopping execution of one or more of the signal measurements and / or time measurements includes a step of the terminal stopping execution of one or more of the signal measurements and / or time measurements for the PSCell and / or designated SCell in the SCG.
[0080] Here, the designated SCell in the SCG can refer to an SCell in the SCG that is not in a dormant state, so when reconfiguring signal measurement and / or time measurement of a terminal for an SCell in the SCG based on the first information, it is possible to reconfigure signal measurement and / or time measurement only for the designated SCell in the SCG.
[0081] In an embodiment of the present application, when the terminal's signal measurements with respect to the SCG include one or more actions of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement, RLM measurement configured based on the SCG measurement, and / or the terminal's time measurements include the terminal's uplink TAT operation with respect to the SCG, when the terminal detects beam failure of a PSCell in the SCG, the terminal stops execution of one or more of the signal measurements and / or time measurements of the SCG, or stops execution of one or more of the signal measurements and / or time measurements of the PSCell and / or a specified SCell in the SCG, thereby reducing the terminal's power consumption in the inactive state of the SCG and improving the flexibility and rationality of the terminal's action configuration.
[0082] In some embodiments, the terminal side time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal has detected a timeout of the uplink TAT of the PSCell, whereby the terminal reconfigures the terminal's signal measurement and / or time measurement for the SCG and / or the PSCell when it detects a timeout of the uplink TAT of the PSCell. Here, the terminal detects a timeout of the uplink TAT of the PSCell by the uplink TAT operation for the PSCell, and when the uplink TAT of the PSCell times out, an error may occur in uplink and downlink signal transmission between the terminal and the PSCell. Therefore, reconfiguring the terminal's signal measurement and / or time measurement for the SCG and / or the PSCell at this time contributes to improving the rationality of the terminal device side signal measurement and / or time measurement under the inactive state of the SCG.
[0083] The time measurement based on the terminal side includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal detects a timeout of the uplink TAT of the PSCell, and Figure 5 shows a flowchart of a communication method under a deactivated state of a secondary cell group provided by another embodiment of the present application. As shown in Figure 5, the method according to this embodiment may include the following steps.
[0084] In S501, when the SCG is in a deactivated state, signal measurements and / or timing measurements of the terminal for the PSCell in the SCG are determined.
[0085] Here, the implementation process of S501 can refer to the above-mentioned embodiment, and will not be described here repeatedly.
[0086] In S502, if the signal measurements include one or more actions of the terminal for the PSCell, namely, beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurement, and RLM measurement, the terminal stops performing one or more of the signal measurements and / or time measurements based on first information indicating that the terminal has detected a timeout of the uplink TAT of the PSCell.
[0087] In this embodiment, the terminal detects a timeout of the uplink TAT of the PSCell by an uplink TAT operation for the PSCell, and when the uplink TAT of the PSCell times out, if the signal measurement on the terminal side further includes one or more terminal actions for the PSCell, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on SCG measurement, and RLM measurement, there is no high need to perform these signal measurements and / or time measurements, so the terminal side can stop performing one or more of the signal measurements and / or time measurements in order to reduce the power consumption of the terminal when the SCG is in an inactive state.
[0088] In an embodiment of the present application, when the terminal side time measurements include an uplink TAT operation of the terminal for a PSCell in an SCG, and the terminal side signal measurements include one or more of the terminal's beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurement, and RLM measurement, when the terminal detects a timeout of the uplink TAT of the PSCell during uplink TAT operation, the terminal stops execution of one or more of these signal measurements and / or time measurements on the terminal side, thereby reducing the terminal side power consumption in an SCG inactive state and improving the flexibility and rationality of terminal side behavior settings in an SCG inactive state.
[0089] Considering that the SCG may include one or more SCells in addition to the PSCell. When the SCG includes the PSCell and one or more SCells, the time measurement based on the terminal side includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal detects a timeout of the uplink TAT of the PSCell, and Figure 6 shows a flowchart of a communication method under a deactivated state of a secondary cell group provided by another embodiment of the present application. As shown in Figure 6, the method according to this embodiment may include the following steps.
[0090] In S601, when the SCG is in an inactive state, signal measurements and / or timing measurements of the terminal with respect to the SCG are determined.
[0091] Here, the implementation process of S601 can refer to the above-mentioned embodiment, and will not be described here repeatedly.
[0092] In S602, if the signal measurements include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on the SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, based on first information indicating that the terminal has detected a timeout of the uplink TAT of the PSCell, the terminal stops performing one or more of the terminal's signal measurements and / or time measurements with respect to the SCG, or stops performing one or more of the terminal's signal measurements and / or time measurements with respect to the PSCell and / or a designated secondary cell (SCell) in the SCG.
[0093] Here, the signal measurement includes one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on the SCG measurement, and RLM measurement, where: (1) The terminal action includes one or more actions of the terminal with respect to the PSCell in the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement. (2) Where the terminal action includes one or more actions of the terminal for one or more SCells in the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement, (3) The actions of the terminal may include the two cases of (1) and (2) simultaneously.
[0094] In this embodiment, the terminal detects a timeout of the uplink TAT of the PSCell by an uplink TAT operation for the PSCell, and when the uplink TAT of the PSCell times out, if it is determined that the signal measurement on the terminal side includes one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurement, RLM measurement, and / or if it is determined that the time measurement on the terminal side includes an uplink TAT operation of the terminal with respect to the SCG, since there is no high need to perform these signal measurements and / or time measurements, the terminal can stop performing one or more of these signal measurements and / or time measurements, thereby reducing the power consumption of the terminal in an inactive state of the SCG and improving the rationality of the terminal side action setting.
[0095] In this embodiment, the step of the terminal stopping execution of one or more of the signal measurements and / or time measurements includes a step of the terminal stopping execution of one or more of the signal measurements and / or time measurements for an SCG, or a step of the terminal stopping execution of one or more of the signal measurements and / or time measurements for a PSCell and / or a designated SCell in the SCG, and specifically, the description of the above-mentioned embodiment may be referred to, and will not be repeated here.
[0096] In an embodiment of the present application, if it is determined that the terminal side time measurements include the terminal's uplink TAT operation for the PSCell in the SCG, and the terminal side signal measurements include one or more of the terminal's beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement set based on the SCG measurement, and RLM measurement, when the terminal detects a timeout of the PSCell's uplink TAT during uplink TAT operation, it stops execution of one or more of these signal measurements and / or time measurements on the terminal side, thereby reducing the terminal side power consumption in an SCG inactive state and improving the flexibility and rationality of terminal side behavior settings in an SCG inactive state.
[0097] In some embodiments, if the terminal-side based signal measurement includes a terminal's beam failure detection for the PSCell, and the first information indicates that the terminal has detected a beam failure of the PSCell, or the terminal-side based time measurement includes a terminal's uplink TAT operation for the PSCell, and the first information indicates that the terminal has detected a timeout of the uplink TAT of the PSCell, and the terminal-side signal measurement further includes one or more of an RRM measurement for an SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, the one or more signal measurements can be reconfigured, thereby improving the flexibility and rationality of terminal-side behavior configuration under an SCG inactive state.
[0098] Furthermore, in the process of reconfiguring one or more signal measurements, including RRM measurements for an SCG, RLM measurements for a PSCell, and CSI-RS measurements for an SCG and / or a PSCell, the measurement period of the one or more signal measurements can be adjusted, thereby improving the flexibility and rationality of the measurement period of the signal measurements when the SCG is in an inactive state.
[0099] Further, Fig. 7 shows a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application. As shown in Fig. 7, the method according to this embodiment may include the following steps:
[0100] In S701, when the SCG is in a deactivated state, when determining signal measurements and / or time measurements of the terminal for the SCG and / or a PSCell in the SCG, the signal measurements include beam failure detection for the PSCell and / or the time measurements include an uplink TAT operation for the PSCell, and the signal measurements further include one or more of RRM measurements for the SCG, RLM measurements for the PSCell, and CSI-RS measurements for the SCG and / or the PSCell.
[0101] Here, the RRM measurement for the SCG includes RRM measurement configured based on SCG measurement performed for the SCG, and the CSI-RS measurement for the SCG includes CSI-RS measurement for the PSCell and one or more SCells in the SCG.
[0102] Here, the implementation process of S701 can refer to the above-mentioned embodiment, and will not be described again here.
[0103] In step S702, for one or more signal measurements, when the measurement period of the signal measurement is a second period, first information indicating that the terminal has detected a beam obstruction of the PSCell or PSCell uplink TAT timeout The measurement period for signal measurement is switched from the second period to the first period based on the first information indicating that the first period has been detected.
[0104] Here, if the terminal side signal measurement includes a terminal beam failure detection for the PSCell, the first information indicates that the terminal has detected a beam failure of the PSCell. If the terminal side time measurement includes a terminal uplink TAT operation for the PSCell, the first information indicates that the terminal has detected a timeout of the uplink TAT of the PSCell.
[0105] Here, the first period is greater than the second period.
[0106] In this embodiment, when the terminal detects a beam failure of the PSCell and / or a timeout of the uplink TAT, it can be determined that the degree of necessity to perform the terminal's RRM measurements for the SCG, the RLM measurements for the PSCell, and the CSI-RS measurements for the SCG and / or the PSCell is low. Therefore, for the terminal's RRM measurements for the SCG, the RLM measurements for the PSCell, and the CSI-RS measurements for the SCG and / or the PSCell, if the measurement period for the signal measurements is the second period, the measurement period for the signal measurements can be switched from the second period to the first period so that the measurement period for the signal measurements is increased and the power consumption of the terminal is reduced.
[0107] Alternatively, when the terminal detects a beam failure of the PSCell and / or a timeout of the uplink TAT, in order to feed back the communication state between the terminal and the PSCell as quickly as possible, recover the beam as quickly as possible, or resolve the timeout of the uplink TAT as quickly as possible, it may be necessary to accelerate the RRM measurement of the terminal for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell. Therefore, in the RRM measurement of the terminal for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell, when the measurement period of the signal measurement is the first period, the measurement period of the signal measurement may be switched from the first period to the second period so that the measurement period of the signal measurement is shortened and the communication effect is improved.
[0108] In an embodiment of the present application, when the terminal's signal measurements for the SCG and / or the PSCell in the SCG include beam failure detection for the PSCell and / or the terminal's time measurements for the SCG and / or the PSCell in the SCG include uplink TAT operation for the PSCell, and the terminal side further includes one or more signal measurements of RRM measurements for the SCG, RLM measurements for the PSCell, and CSI-RS measurements for the SCG and / or the PSCell, when the terminal detects beam failure of the PSCell and / or a timeout of the uplink TAT, it adjusts the measurement period of one or more signal measurements, thereby improving the flexibility and rationality of terminal side behavior settings under an inactive state of the SCG.
[0109] In some embodiments, the terminal side signal measurement includes a terminal beam failure recovery for the PSCell, and the first information indicates that the terminal has successfully recovered the beam failure of the PSCell, and / or the terminal side time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts the uplink TAT of the PSCell, whereby the terminal successfully recovers the beam failure of the PSCell, and / or the terminal reconfigures the terminal's signal measurement and / or time measurement for the SCG and / or the PSCell when restarting the uplink TAT of the PSCell. Here, the terminal's successful beam failure recovery for the PSCell and / or the terminal restarting the uplink TAT of the PSCell means that the communication environment between the terminal and the SCG is restored, such as, for example, beam quality recovery of the PSCell, channel state recovery, etc. At this time, significant changes occur in the communication environment between the terminal and the SCG, and adjusting the terminal's signal measurement and / or time measurement for the SCG and / or PSCell contributes to improving the rationality of the terminal device's signal measurement and / or time measurement when the SCG is in an inactive state.
[0110] Furthermore, the terminal's actions further include one or more signal measurements, including RRM measurements for the SCG, RLM measurements for the PSCell, and CSI-RS measurements for the SCG and / or the PSCell, whereby the terminal reconfigures one or more signal measurements when the terminal successfully recovers from beam failure of the primary cell (PSCell) and / or when the terminal restarts the uplink TAT of the PSCell, thereby improving the flexibility and rationality of the terminal's signal measurement configuration under an inactive state of the SCG.
[0111] Furthermore, in the process of reconfiguring one or more signal measurements, including RRM measurements for an SCG, RLM measurements for a PSCell, and CSI-RS measurements for an SCG and / or a PSCell, the measurement period of the one or more signal measurements can be adjusted, thereby improving the flexibility and rationality of the measurement period of the signal measurements when the SCG is in an inactive state.
[0112] 8 shows a flowchart of a communication method under a deactivation state of a secondary cell group provided by another embodiment of the present application. As shown in FIG. 8, the method according to this embodiment may include the following steps:
[0113] In S801, when the SCG is in a deactivated state, when determining signal measurements and / or time measurements of the terminal for the SCG and / or a PSCell in the SCG, the signal measurements include beam failure recovery for the PSCell and / or the time measurements include an uplink TAT operation for the PSCell, and the signal measurements further include one or more of RRM measurements for the SCG, RLM measurements for the PSCell, and CSI-RS measurements for the SCG and / or the PSCell.
[0114] Here, the implementation process of S801 can refer to the above-mentioned embodiment, and will not be described here repeatedly.
[0115] In S802, for one or more signal measurements, if the measurement period of the signal measurement is a first period, the measurement period of the signal measurement is switched from the first period to a second period based on first information indicating that the terminal has successfully recovered from beam interference of the PSCell and / or indicating that the terminal should restart the uplink TAT of the PSCell.
[0116] Here, if the terminal side signal measurement includes a terminal beam interference recovery for the PSCell, the first information indicates that the terminal has successfully recovered from the beam interference of the PSCell. If the terminal side time measurement includes a terminal uplink TAT operation for the PSCell, the first information indicates that the terminal restarts the uplink TAT of the PSCell.
[0117] Here, the first period is greater than the second period.
[0118] In this embodiment, when the terminal has successfully recovered from the beam failure of the PSCell and / or when the terminal has restarted the uplink TAT of the PSCell, the communication environment between the terminal and the SCG is restored to normal, and the RRM measurement for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell are restored to perform measurements according to the normal period. Therefore, in the RRM measurement for the SCG of the terminal, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell, when the measurement period of the signal measurement is the first period, the measurement period of the signal measurement can be switched from the first period, which is longer, to the second period, and restored to the normal measurement period of the signal measurement.
[0119] Alternatively, when the terminal has successfully recovered from the beam failure of the PSCell and / or when the terminal has restarted the uplink TAT of the PSCell, since the communication environment between the terminal and the SCG has been restored to normal, it is not necessary to perform signal measurement according to the normal period in the inactive state of the SCG, and a longer measurement period can be used. Thus, in the RRM measurement of the terminal for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell, if the measurement period of the signal measurement is the second period, the measurement period of the signal measurement can be switched from the second period to the first period, thereby reducing the power consumption of the terminal in the inactive state of the SCG.
[0120] In an embodiment of the present application, when a terminal performs beam failure recovery and / or uplink TAT operation for a PSCell in an SCG, and the terminal side signal measurement further includes one or more of RRM measurement for the SCG, RLM measurement for the PSCell, and CSI-RS measurement for the SCG and / or PSCell, when the terminal successfully recovers from beam failure of the PSCell and / or when the terminal restarts the uplink TAT of the PSCell, the terminal adjusts the measurement period of one or more signal measurements, thereby improving the flexibility and rationality of terminal side behavior configuration when the SCG is in an inactive state.
[0121] In some embodiments, the terminal side signal measurements include terminal RLM measurements for the PSCell, and the first information indicates that the terminal has detected that a radio link failure has occurred in the PSCell, whereby the terminal reconfigures the terminal's signal measurements and / or time measurements for the SCG and / or the PSCell when it detects that a radio link failure has occurred in the PSCell.
[0122] Here, the occurrence of a radio link failure in the PSCell means that the communication equipment of the PSCell has failed, significantly affecting the communication environment between the terminal and the SCG. In this case, reconfiguring the terminal's signal measurement and / or time measurement for the SCG and / or PSCell contributes to improving the flexibility and rationality of terminal-side behavior configuration when the SCG is in an inactive state.
[0123] The signal measurement based on the terminal side includes a RLM measurement of the terminal for the PSCell, and the first information indicates that the terminal detects that a radio link failure occurs in the PSCell, and Fig. 9 shows a flowchart of a communication method under a deactivated state of a secondary cell group provided by another embodiment of the present application. As shown in Fig. 9, the method according to this embodiment may include the following steps.
[0124] In S901, when the SCG is in an inactive state, signal measurements and / or timing measurements of the terminal for the PSCell of the SCG are determined.
[0125] Here, the implementation process of S901 can refer to the description of the above embodiment, and will not be described again here.
[0126] In S902, if the signal measurements further include one or more actions of the terminal with respect to the PSCell, namely, beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurements set based on the SCG measurements, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the PSCell, the terminal stops performing one or more of the signal measurements and / or the time measurements based on first information indicating that the terminal has detected that a radio link failure has occurred in the PSCell.
[0127] In this embodiment, when the terminal's signal measurement for the PSCell includes an RLM measurement, the terminal may detect the first information by the RLM measurement, that is, detect that a radio link failure has occurred in the PSCell. When the terminal detects that a radio link failure has occurred in the PSCell, when the terminal performs one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on SCG measurement, and uplink TAT operation for the PSCell, the necessity of performing these signal measurements and / or time measurements is not high, so that the terminal side may stop performing one or more of the signal measurements and / or time measurements in order to reduce the power consumption of the terminal in the inactive state of the SCG.
[0128] In an embodiment of the present application, the terminal's signal measurements for the PSCell in the SCG include RLM detection, and when the terminal performs one or more of beam failure detection, beam failure recovery, TAT operation, SRS transmission, CSI-RS measurement and / or reporting, and RRM measurements configured based on the SCG measurements for the PSCell, if the terminal detects that a radio link failure has occurred in the PSCell, it stops execution of one or more of these signal measurements and / or time measurements on the terminal side, thereby reducing the power consumption on the terminal side when the SCG is inactive and improving the flexibility and rationality of the terminal side behavior settings when the SCG is inactive.
[0129] Considering that the SCG may include one or more SCells in addition to the PSCell. When the SCG includes the PSCell and one or more SCells, the terminal-side based signal measurement includes the terminal's RLM measurement for the PSCell, and the first information indicates that the terminal detects that a radio link failure occurs in the PSCell, and Figure 10 shows a flowchart of a communication method under a deactivated state of a secondary cell group provided by another embodiment of the present application. As shown in Figure 10, the method according to this embodiment may include the following steps.
[0130] In S1001, when the SCG is in an inactive state, signal measurements and / or time measurements of the terminal with respect to the SCG are determined.
[0131] Here, the implementation process of S1001 can refer to the description of the above embodiment, and will not be described again here.
[0132] In S1002, if the signal measurements include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the terminal stops execution of one or more of the signal measurements and / or time measurements of the SCG, or stops execution of one or more of the signal measurements and / or time measurements of the PSCell and / or a designated secondary cell (SCell) in the SCG based on first information indicating that the terminal has detected that a radio link failure has occurred in the PSCell.
[0133] Here, the signal measurement further includes one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, uplink TAT operation, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurement, and RLM measurement, where: (1) Where the signal measurement further includes one or more actions of the terminal with respect to the PSCell in the SCG, such as beam failure detection, beam failure recovery, uplink TAT operation, SRS transmission, CSI-RS measurement and / or report, and RRM measurement configured based on the SCG measurement; (2) Where the signal measurement further includes one or more actions of the terminal for one or more SCells in the SCG, such as beam failure detection, beam failure recovery, uplink TAT operation, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on the SCG measurement, and RLM measurement, (3) The signal measurement may further include the two cases of (1) and (2) simultaneously.
[0134] In this embodiment, the terminal may detect the first information by performing RLM measurement on the PSCell, that is, detect that a radio link failure has occurred in the PSCell. When a radio link failure occurs in the PSCell, when the terminal performs one or more of beam failure recovery, beam failure detection, uplink TAT operation, SRS transmission, CSI-RS measurement and / or report, RRM measurement set based on the SCG measurement, and RLM measurement on the SCG, the necessity of performing these signal measurements and / or time measurements is not high, so the terminal can stop performing one or more of the signal measurements and / or time measurements on the SCG, or stop performing one or more of the signal measurements and / or time measurements on the PSCell and / or the designated SCell in the SCG, thereby reducing the power consumption of the terminal in the inactive state of the SCG and improving the rationality of the terminal side behavior configuration.
[0135] Here, the meaning of the designated SCell can be referred to in the above-mentioned embodiment, and will not be described again here.
[0136] In an embodiment of the present application, when the terminal performs one or more of beam failure detection, beam failure recovery, TAT operation, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement for the SCG, when the terminal detects that a radio link failure has occurred in a PSCell in the SCG, S.C.G. or stop execution of one or more of the signal measurements and / or time measurements of the PSCell and / or the designated SCell in the SCG, thereby reducing the power consumption on the terminal side when the SCG is in an inactive state and improving the flexibility and rationality of the behavior settings on the terminal side.
[0137] In some embodiments, the terminal side includes one or more signal measurements of RRM measurements for an SCG, RLM measurements for a PSCell, and CSI-RS measurements for an SCG and / or a PSCell, and the first information indicates that a timer for one or more signal measurements has timed out, thereby reconfiguring the one or more signal measurements that have timed out when the timer for one or more signal measurements has timed out, thereby improving the flexibility and rationality of the terminal side signal measurement configuration when the SCG is in an inactive state.
[0138] Furthermore, in the process of reconfiguring one or more signal measurements that have timed out, when the timers of one or more of the signal measurements, among the RRM measurements for the SCG, the RLM measurements for the PSCell, and the CSI-RS measurements for the SCG and / or the PSCell, time out, the measurement period of the one or more signal measurements that have timed out is adjusted, thereby improving the flexibility and rationality of setting the measurement period of the signal measurements on the terminal side when the SCG is in an inactive state.
[0139] When adjusting the measurement period of one or more timed-out signal measurements, one possible implementation is to switch the measurement period of the timed-out signal measurement from the second period to a first period based on the detected first information if the measurement period of the timed-out signal measurement is a second period, where the first period is greater than the second period. Thus, for the timed-out signal measurement, switch the short measurement period to a long measurement period, and re-time the signal measurement.
[0140] When adjusting the measurement period of one or more timed out signal measurements, another possible implementation is to switch the measurement period of the timed out signal measurement from the first period to a second period based on the detected first information if the measurement period of the timed out signal measurement is a first period, and thus switch from a long measurement period to a short measurement period for the timed out signal measurement and time the signal measurement again.
[0141] Furthermore, the same timer may be employed to perform time measurements for one or more of the signal measurements among the RRM measurement for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell, so that the timer times out means that the RRM measurement for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell have timed out. Alternatively, different timers may be employed to perform time measurements for one or more of the signal measurements among the RRM measurement for the SCG, the RLM measurement for the PSCell, and the CSI-RS measurement for the SCG and / or the PSCell, so that if a timer that has timed out exists, the signal measurement for that timer may be determined as the signal measurement that has timed out, and the signal measurement that has timed out may be reconfigured.
[0142] In some embodiments, the terminal's action includes one or more signal measurements among RRM measurements for an SCG, RLM measurements for a PSCell, and CSI-RS measurements for an SCG and / or a PSCell, and the first information is indication information related to one or more signal measurements received by the terminal and transmitted from a network device. Thus, the terminal reconfigures one or more signal measurements indicated by the first information based on the first information, in other words, reconfigures one or more signal measurements indicated by a network device based on indication information related to one or more signal measurements received by the terminal and transmitted from a network device, thereby improving the flexibility and rationality of signal measurement configuration under a deactivated state of the SCG. For example, the first information is indication information related to RLM measurements for a PSCell received by the terminal and transmitted from a network device, and reconfigures a signal measurement that is an RLM measurement for a PSCell based on the first information.
[0143] Furthermore, when reconfiguring one or more signal measurements indicated by the first information, the measurement period of one or more signal measurements indicated by the first information can be reconfigured, thereby improving the flexibility and rationality of setting the measurement period of signal measurements when the SCG is in an inactive state.
[0144] One possible implementation form of reconfiguring the measurement period of one or more signal measurements indicated by the first information includes, for one or more signal measurements indicated by the first information, if the measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information.
[0145] One possible implementation form of reconfiguring the measurement period of one or more signal measurements indicated by the first information includes, for one or more signal measurements indicated by the first information, if the measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information.
[0146] Therefore, based on the instruction information of the network device for one or more signal measurements, the measurement period of the one or more signal measurements is alternately switched and adjusted, thereby effectively improving the flexibility and rationality of setting the measurement period of the one or more signal measurements under the inactive state of the SCG.
[0147] Furthermore, the network device may issue instructions for one or more signal measurements among the RRM measurements for the SCG, the RLM measurements for the PSCell, and the CSI-RS measurements for the SCG and / or the PSCell, respectively, or may issue instructions for one or more signal measurements among the RRM measurements for the SCG, the RLM measurements for the PSCell, and the CSI-RS measurements for the SCG and / or the PSCell simultaneously using the same instruction information.
[0148] An embodiment of the present application provides a terminal, which may include, as shown in FIG. 11, a transceiver 1101, a processor 1102 and a memory 1103.
[0149] The transceiver 1101 is used to transmit and receive data under the control of the processor 1102 .
[0150] Here, in FIG. 11, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits of one or more processors represented by processor 1102 and memory represented by memory 1103 to each other. The bus architecture may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and will not be described further herein. The bus interface provides an interface. The transceiver 1101 may be comprised of multiple elements including transmitters and receivers that provide a unit for communicating with various other devices over a transmission medium, including a transmission medium such as a wireless channel, a wired channel, an optical cable, etc. Optionally, Terminal may further include a user interface 1104, which may be an interface that can connect required devices externally or internally according to different user equipment, and the connected devices include, but are not limited to, a keypad, a display, a speaker, a microphone, a joystick, etc.
[0151] The processor 1102 manages the bus architecture and general processing, and the memory 1103 may store data used by the processor 1102 in performing operations.
[0152] Alternatively, the processor 1102 may be a central processing unit (CPU), an Application Specific Integrated Circuit (ASIC), a Field-Programmable Gate Array (FPGA) or a Complex Programmable Logic Device (CPLD), and the processor may employ a multi-core architecture.
[0153] The processor 1102 is used to execute any of the methods related to the terminal device provided by the embodiments of the present application according to the executable instructions obtained by calling the computer program stored in the memory 1103. The processor and the memory may be physically separated from each other.
[0154] The processor 1102 executes a computer program stored in the memory 1103 to perform the following operations: when the secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal to the secondary cell group (SCG) and / or a primary cell (PSCell) of the SCG; When the first information is obtained, the signal measurement and / or the time measurement are reset based on the first information; Here, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or the time measurement, or the first information is indication information of a network device received by the terminal.
[0155] Optionally, the signal measurement includes beam obstruction detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam obstruction of the PSCell.
[0156] Optionally, the processor 1102 may specifically: If the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure recovery, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement and / or report, radio resource management (RRM) measurement configured based on the SCG measurement, radio link monitoring (RLM) measurement, and / or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or time measurements based on the first information, and / or If the signal measurement further includes one or more actions of the terminal with respect to the SCG, such as beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on the SCG measurement, RLM measurement, and / or if the time measurement includes an uplink TAT operation of the terminal with respect to the SCG, the signal measurement is used to stop execution of one or more of the terminal's signal measurements and / or time measurements with respect to the SCG, or stop execution of one or more of the terminal's signal measurements and / or time measurements with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0157] Optionally, the time measurement includes an uplink TAT operation of the terminal to the PSCell, and the first information indicates a timeout of the uplink TAT of the terminal to the PSCell.
[0158] Optionally, the processor 1102 may specifically: Where the signal measurements include one or more actions of the terminal for a primary cell (PSCell), namely, beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement, stopping execution of one or more of the signal measurements and / or time measurements based on the first information; and / or Where the signal measurements include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on the SCG measurements, RLM measurement, and / or where the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method is used to stop, based on the first information, the performance of one or more of the terminal's signal measurements and / or time measurements with respect to the SCG, or stop the performance of one or more of the terminal's signal measurements and / or time measurements with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG.
[0159] Optionally, the signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the processor 1102 specifically: For one or more signal measurements, when a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; or for one or more signal measurements, when a measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; Here, the first period is greater than the second period.
[0160] Optionally, the signal measurement includes a beam obstruction recovery of the terminal to the PSCell, and the first information indicates that the beam obstruction recovery of the terminal to the primary cell (PSCell) has been successful; and / or The time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts the uplink TAT of the PSCell.
[0161] Optionally, the signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG and / or the PSCell, and the processor 1102 specifically: For one or more signal measurements, if the measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; or for one or more signal measurements, when a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; Here, the first period is greater than the second period.
[0162] Optionally, the signal measurements include RLM measurements of the terminal with respect to the PSCell, and the first information indicates that the terminal has detected that a radio link failure has occurred with the PSCell.
[0163] Optionally, the processor 1102 may specifically: If the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, and RRM measurements configured based on the SCG measurements, and / or if the time measurements include an uplink TAT operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information, and / or If the signal measurements further include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on the SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method is used to stop execution of one or more signal measurements and / or time measurements of the SCG, or stop execution of one or more signal measurements and / or time measurements of a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0164] Optionally, the signal measurements include one or more of an RRM measurement for an SCG, an RLM measurement for a PSCell, and a CSI-RS measurement for an SCG and / or a PSCell, and the first information indicates that a timer for the one or more signal measurements has timed out, and the processor 1102 specifically: If the measurement period of the timed-out signal measurement is the second period, switching the measurement period of the timed-out signal measurement from the second period to the first period based on the first information; or when the measurement period of the timed-out signal measurement is the first period, switching the measurement period of the timed-out signal measurement from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0165] Optionally, the signal measurements include one or more of an RRM measurement for an SCG, an RLM measurement for a PSCell, and a CSI-RS measurement for an SCG and / or a PSCell, and the first information is indication information related to the one or more signal measurements received by the terminal and transmitted from the network device, and the processor 1102 specifically: For one or more signal measurements indicated by the first information, if the measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; or for one or more signal measurements indicated by the first information, when the measurement period of the signal measurement is the first period, switching the measurement period of the signal measurement from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0166] It should be noted that since the above-mentioned apparatus provided by the present application can realize all the steps of the method implemented by the terminal in the above-mentioned method embodiment and can achieve similar technical effects, the parts of this embodiment that are similar to the method embodiment and the beneficial effects thereof will not be described in further detail here.
[0167] On the terminal side, one embodiment of the present application provides a communication device under a deactivated state of a secondary cell group, and as shown in FIG. 12 , in this embodiment, the communication device under a deactivated state of a secondary cell group includes an acquisition unit 1201 and a setting unit 1202.
[0168] The acquisition unit 1201 is used to determine signal measurements and / or time measurements of a terminal for a secondary cell group (SCG) and / or a primary cell (PSCell) of the SCG when the SCG is in a deactivated state; The setting unit 1202 is used to reconfigure the signal measurement and / or the time measurement according to the first information when the first information is obtained; Here, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement and / or the time measurement, or the first information is indication information of a network device received by the terminal.
[0169] Optionally, the signal measurement includes beam obstruction detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam obstruction of the PSCell.
[0170] Optionally, the setting unit 1202 specifically: If the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure recovery, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement and / or report, radio resource management (RRM) measurement configured based on the SCG measurement, radio link monitoring (RLM) measurement, and / or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or time measurements based on the first information, and / or If the signal measurement further includes one or more actions of the terminal with respect to the SCG, such as beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on the SCG measurement, RLM measurement, and / or if the time measurement includes an uplink TAT operation of the terminal with respect to the SCG, the signal measurement is used to stop execution of one or more of the terminal's signal measurements and / or time measurements with respect to the SCG, or stop execution of one or more of the terminal's signal measurements and / or time measurements with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0171] Optionally, the time measurement includes an uplink TAT operation of the terminal to the PSCell, and the first information indicates a timeout of the uplink TAT of the terminal to the PSCell.
[0172] Optionally, the setting unit 1202 specifically: Where the signal measurements include one or more actions of the terminal for a primary cell (PSCell), namely, beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement, stopping execution of one or more of the signal measurements and / or time measurements based on the first information; and / or Where the signal measurements include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on the SCG measurements, RLM measurement, and / or where the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method is used to stop, based on the first information, the performance of one or more of the terminal's signal measurements and / or time measurements with respect to the SCG, or stop the performance of one or more of the terminal's signal measurements and / or time measurements with respect to a PSCell and / or a designated secondary cell (SCell) in the SCG.
[0173] Optionally, the signal measurements further include one or more of an RRM measurement for an SCG, an RLM measurement for a PSCell, and a CSI-RS measurement for an SCG and / or a PSCell, and the setting unit 1202 specifically: For one or more signal measurements, when a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; or for one or more signal measurements, when a measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; Here, the first period is greater than the second period.
[0174] Optionally, the signal measurement includes a beam obstruction recovery of the terminal to the PSCell, and the first information indicates that the beam obstruction recovery of the terminal to the primary cell (PSCell) is successful; and / or The time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts the uplink TAT of the PSCell.
[0175] Optionally, the signal measurements further include one or more of an RRM measurement for an SCG, an RLM measurement for a PSCell, and a CSI-RS measurement for an SCG and / or a PSCell, and the setting unit 1202 specifically: For one or more signal measurements, if the measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; or for one or more signal measurements, when a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; Here, the first period is greater than the second period.
[0176] Optionally, the signal measurements include RLM measurements of the terminal with respect to the PSCell, and the first information indicates that the terminal has detected that a radio link failure has occurred with the PSCell.
[0177] Optionally, the setting unit 1202 specifically: If the signal measurements further include one or more actions of the terminal for the PSCell, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, and RRM measurements configured based on the SCG measurements, and / or if the time measurements include an uplink TAT operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements and / or the time measurements based on the first information, and / or If the signal measurements further include one or more actions of the terminal with respect to the SCG, such as beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurement configured based on the SCG measurements, RLM measurement, and / or if the time measurements include an uplink TAT operation of the terminal with respect to the SCG, the method is used to stop execution of one or more signal measurements and / or time measurements of the SCG, or stop execution of one or more signal measurements and / or time measurements of a PSCell and / or a designated secondary cell (SCell) in the SCG based on the first information.
[0178] Optionally, the signal measurements include one or more of an RRM measurement for an SCG, an RLM measurement for a PSCell, and a CSI-RS measurement for an SCG and / or a PSCell, and the first information indicates that a timer for the one or more signal measurements has timed out, and the setting unit 1202 specifically: If the measurement period of the timed-out signal measurement is the second period, switching the measurement period of the timed-out signal measurement from the second period to the first period based on the first information; or when the measurement period of the timed-out signal measurement is the first period, switching the measurement period of the timed-out signal measurement from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0179] Optionally, the signal measurements include one or more of an RRM measurement for an SCG, an RLM measurement for a PSCell, and a CSI-RS measurement for an SCG and / or a PSCell, and the first information is indication information related to one or more signal measurements received by the terminal and transmitted from a network device, and the setting unit 1202 specifically: For one or more signal measurements indicated by the first information, if the measurement period of the signal measurement is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; or for one or more signal measurements indicated by the first information, when the measurement period of the signal measurement is the first period, switching the measurement period of the signal measurement from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0180] It should be noted that since the above-mentioned apparatus provided by the present application can realize all the steps of the method implemented by the terminal in the above-mentioned method embodiment and can achieve similar technical effects, the parts of this embodiment that are similar to the method embodiment and the beneficial effects thereof will not be described in further detail here.
[0181] Example 1
[0182] If a secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal for the SCG and / or a primary cell (PSCell) of the SCG; When the first information is acquired, the signal measurement and / or the time measurement are reset based on the first information.
[0183] Here, the first information may be a communication status between the terminal and the PSCell related to the signal measurement and / or the time measurement detected by the terminal, or the first information may be instruction information of a network device received by the terminal.
[0184] Optionally, the determined signal measurements include beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam failure of the PSCell.
[0185] Optionally, when the first information indicates that the terminal has detected a beam failure of the PSCell, the step of reconfiguring the signal measurement based on the first information further comprises: If the first information indicates that the terminal has detected a beam failure of the PSCell, stopping execution of one or more of the following based on the first information: beam failure recovery of the terminal for the PSCell, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement and / or report, radio resource management (RRM) measurement configured based on SCG measurement, and radio link monitoring (RLM) measurement; If the first information indicates that the terminal has detected a beam failure of the PSCell, stopping execution of one or more of the following based on the first information: beam failure recovery of the terminal to the SCG, beam failure detection, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement; and If the first information indicates that the terminal has detected beam failure of the PSCell, the first information includes at least one of the following steps: stopping execution of one or more of the terminal's beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement and / or reporting, RRM measurements configured based on SCG measurements, and RLM measurements for a designated secondary cell (SCell) of the SCG based on the first information.
[0186] When the first information indicates that the terminal has detected a beam failure of the PSCell, the step of resetting the time measurement based on the first information includes: If the first information indicates that the terminal has detected a beam failure of the PSCell, stopping execution of an uplink timing advance timer (TAT) operation of the terminal for the PSCell included in the time measurement based on the first information; and / or If the first information indicates that the terminal has detected a beam failure of the PSCell, the step of stopping, based on the first information, execution of one or more time measurements of the terminal with respect to the SCG and / or execution of one or more time measurements of the terminal with respect to a designated secondary cell (SCell) of the SCG, wherein the time measurements include an uplink TAT operation of the terminal with respect to the SCG.
[0187] Example 2
[0188] If a secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal for the SCG and / or a primary cell (PSCell) of the SCG; When the first information is acquired, the signal measurement and / or the time measurement are reset based on the first information.
[0189] Here, the first information may be a communication status between the terminal and the PSCell related to the signal measurement and / or the time measurement detected by the terminal, or the first information may be instruction information of a network device received by the terminal.
[0190] Optionally, the determined time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates a timeout of an uplink TAT of the terminal for the PSCell.
[0191] Optionally, if the first information indicates a timeout of an uplink TAT of the terminal for the PSCell, the step of reconfiguring the signal measurement based on the first information further comprises: If the first information indicates a timeout of an uplink TAT of the terminal for the PSCell, stopping execution of one or more of beam failure recovery, Sounding Reference Signal (SRS) transmission, Channel State Information Reference Signal (CSI-RS) measurement and / or report, Radio Resource Management (RRM) measurement configured based on SCG measurement, and Radio Link Monitoring (RLM) measurement of the terminal for the PSCell based on the first information; If the first information indicates a timeout of an uplink TAT of the terminal for the PSCell, stopping execution of one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement of the terminal for the SCG based on the first information; and When the first information indicates a timeout of the uplink TAT of the terminal for the PSCell, the first information includes at least one of the steps of stopping execution of one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurements set based on SCG measurements, and RLM measurements of the terminal for a designated secondary cell (SCell) of the SCG based on the first information.
[0192] Optionally, if the first information indicates a timeout of an uplink TAT of the terminal for the PSCell, the step of reconfiguring the time measurement based on the first information further comprises: If the first information indicates a timeout of an uplink TAT of the terminal for the PSCell, the step includes stopping, based on the first information, execution of one or more time measurements of the terminal for the SCG and / or execution of one or more time measurements of the terminal for a designated secondary cell (SCell) of the SCG, wherein the time measurements include an uplink TAT operation of the terminal for the SCG.
[0193] Example 3
[0194] If a secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal for the SCG and / or a primary cell (PSCell) of the SCG; When the first information is acquired, the signal measurement and / or the time measurement are reset based on the first information.
[0195] Here, the first information may be a communication status between the terminal and the PSCell related to the signal measurement and / or the time measurement detected by the terminal, or the first information may be instruction information of a network device received by the terminal.
[0196] Alternatively, if the first information indicates a timeout of an uplink TAT of the terminal for the PSCell, or if the first information indicates that the terminal has detected a beam failure of the PSCell, or if the first information indicates that the terminal has successfully recovered from a beam failure of the primary cell (PSCell), or if the first information indicates that the terminal restarts an uplink TAT of the PSCell, and if signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, a CSI-RS measurement for the SCG, and a CSI-RS measurement for the PSCell, the step of reconfiguring the signal measurements based on the first information includes: The step of adjusting a measurement period of the signal measurement is included.
[0197] For example, for one or more of the signal measurements, if the measurement period of the signal measurement is a first period, the measurement period of the signal measurement is switched from the first period to a second period based on the first information, or, for one or more of the signal measurements, if the measurement period of the signal measurement is the second period, the measurement period of the signal measurement is switched from the second period to the first period based on the first information, where the first period is greater than the second period.
[0198] Example 4
[0199] If a secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal for the SCG and / or a primary cell (PSCell) of the SCG; When the first information is acquired, the signal measurement and / or the time measurement are reset based on the first information.
[0200] Here, the first information may be a communication status between the terminal and the PSCell related to the signal measurement and / or the time measurement detected by the terminal, or the first information may be instruction information of a network device received by the terminal.
[0201] Optionally, the signal measurements include RLM measurements of the terminal to the PSCell, and the first information indicates that the terminal has detected a radio link failure of the PSCell.
[0202] Optionally, when the first information indicates that the terminal has detected a radio link failure of the PSCell, the step of reconfiguring the signal measurement based on the first information includes: When the first information indicates that the terminal has detected a radio link failure of the PSCell, the step of reconfiguring the signal measurement based on the first information includes: If the first information indicates that the terminal has detected a radio link failure of the PSCell, stopping execution of one or more of the following based on the first information: beam failure recovery of the terminal for the PSCell, Sounding Reference Signal (SRS) transmission, Channel State Information Reference Signal (CSI-RS) measurement and / or report, and Radio Resource Management (RRM) measurement configured based on SCG measurement; If the first information indicates that the terminal has detected a radio link failure of the PSCell, stopping execution of one or more of the following of the terminal's beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or report, RRM measurement configured based on SCG measurement, and RLM measurement based on the first information; and When the first information indicates that the terminal has detected a radio link failure of the PSCell, the first information includes at least one of the steps of stopping execution of one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement and / or reporting, RRM measurements configured based on SCG measurements, and RLM measurements of the terminal for a designated secondary cell (SCell) of the SCG based on the first information.
[0203] Optionally, when the first information indicates that the terminal has detected a radio link failure of the PSCell, the step of reconfiguring the time measurement based on the first information further comprises: If the first information indicates that the terminal has detected a radio link failure of the PSCell, stopping execution of an uplink timing advance timer (TAT) operation of the terminal for the PSCell based on the first information; and / or If the first information indicates that the terminal has detected a radio link failure of the PSCell, the step of stopping, based on the first information, execution of one or more time measurements of the terminal with respect to the SCG and / or execution of one or more time measurements of the terminal with respect to a designated secondary cell (SCell) of the SCG, wherein the time measurements include an uplink TAT operation of the terminal with respect to the SCG.
[0204] Example 5
[0205] If a secondary cell group (SCG) is in a deactivated state, determining signal measurements and / or timing measurements of the terminal for the SCG and / or a primary cell (PSCell) of the SCG; When the first information is acquired, the signal measurement and / or the time measurement are reset based on the first information.
[0206] Here, the first information may be a communication status between the terminal and the PSCell related to the signal measurement and / or the time measurement detected by the terminal, or the first information may be instruction information of a network device received by the terminal.
[0207] Optionally, when the first information indicates that a timer of one or more of the signal measurements has timed out, or when the first information is indication information related to one or more of the signal measurements sent from a network device and received by the terminal, the step of reconfiguring the signal measurement based on the first information includes: When the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, a CSI-RS measurement for the SCG, and a CSI-RS measurement for the PSCell, the step of reconfiguring the signal measurements based on the first information includes: The step of adjusting a measurement period of the signal measurement is included.
[0208] Specifically, when the measurement period of the signal measurement that has timed out is the second period, the measurement period of the signal measurement that has timed out is switched from the second period to a first period based on the first information, or when the measurement period of the signal measurement that has timed out is the first period, switching the measurement period of the signal measurement that has timed out from the first period to the second period based on the first information; Here, the first period is greater than the second period.
[0209] Specifically, when the measurement period of one or more of the signal measurements indicated by the first information is a second period, the measurement period of the signal measurements is switched from the second period to a first period based on the first information, or when a measurement period of one or more of the signal measurements indicated by the first information is a first period, switching the measurement period of the signal measurements from the first period to a second period based on the first information; Here, the first period is greater than the second period.
[0210] In addition, the division of units in the embodiments of the present application is merely an example, and is merely a logical function division, and other division methods may be used when actually realizing the present application. In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above integrated units may be realized in the form of hardware or software functional units.
[0211] The above integrated units may be realized in the form of software functional units and stored in a processor-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present invention may be embodied in the form of a software product in which the part that essentially or contributes to the prior art, or all or a part of the technical solution, is stored in a storage medium that includes some instructions to make a computer device (which may be a personal computer, a server, or a network device, etc.) or a processor execute all or a part of the steps of the method according to each embodiment of the present application. The aforementioned storage medium includes various media capable of storing program code, such as a USB memory, a removable hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.
[0212] On the terminal side, an embodiment of the present application provides a processor-readable storage medium storing a computer program for causing a processor to execute any of the terminal-related methods provided by the embodiments of the present application, thereby enabling the processor to realize all the steps of the method implemented by the terminal in the above method embodiments and to achieve similar technical effects, so that the parts of this embodiment that are similar to the method embodiments and the beneficial effects thereof will not be described in further detail here.
[0213] The processor-readable storage medium can be any available medium or data storage device accessible by the processor, including, but not limited to, magnetic memory (e.g., floppy disks, hard disks, tapes, magneto-optical disks (MO), etc.), optical memory (e.g., CDs, DVDs, BDs, HVDs, etc.), and semiconductor memory (e.g., ROM, EPROM, EEPROM, non-volatile memory (NAND FLASH), solid-state drives (SSD)), etc.
[0214] On the terminal side, one embodiment of the present application further provides a computer program product including instructions, the computer program being stored in a storage medium, and at least one processor can read the computer program from the storage medium, and when the at least one processor executes the computer program, it can realize all the steps of the method implemented by the terminal in the above method embodiment, and can achieve similar technical effects, so the parts and beneficial effects of this embodiment that are similar to those of the method embodiment will not be described in further detail here.
[0215] The embodiment of the present application further provides a communication system including a network device and a terminal. The terminal is the terminal described in the above apparatus embodiment, and can realize all steps of the method implemented by the terminal in the above method embodiment, and can achieve similar technical effects, so the similar parts and beneficial effects of the embodiment and the method embodiment will not be described in detail here.
[0216] It should be understood by those skilled in the art that the embodiments of the present application may be provided as a method, a system, or a computer program product. Thus, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer usable storage mediums (including, but not limited to, magnetic disk memory, optical memory, etc.) that contain computer usable program code.
[0217] The present application will be described with reference to flowcharts and / or block diagrams of methods, apparatuses, and computer program products according to embodiments of the present application. It should be understood that each flow and / or block of the flowcharts and / or block diagrams, and combinations of flows and / or blocks of the flowcharts and / or block diagrams, can be realized by computer-executable instructions. These computer-executable instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine such that the instructions executed by the processor of the computer or other programmable data processing device generate an apparatus for implementing the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0218] These processor-executable instructions may also be stored in a processor-readable memory that can cause a computer or other programmable data processing device to operate in a particular manner, such that the instructions stored in the processor-readable memory produce an article of manufacture that includes an instruction apparatus that implements the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0219] These processor-executable instructions may also be loaded onto a computer or other programmable data processing device such that a sequence of operational steps are performed on the computer or other programmable device to generate a computer-implemented process, such that the instructions executing on the computer or other programmable device provide steps for implementing the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0220] It is obvious that those skilled in the art can make various modifications and variations to the present application without departing from the spirit and scope of the present application. Therefore, the present application intends to cover these modifications and variations as long as they fall within the scope of the claims of the present application and their technical equivalents.
[0221] This application claims priority to a Chinese patent application bearing application number 202110025123.0 and entitled "Communication method, device, apparatus and medium under inactive state of secondary cell group" filed with the China Patent Office on January 8, 2021, the entire contents of which are incorporated herein by reference.
Claims
1. A communication method in a deactivated state of a secondary cell group, which is applied to a terminal, comprising: determining signal or time measurements of a Secondary Cell Group (SCG) or a Primary Cell (PSCell) of the SCG if the SCG is in a deactivated state; When first information is acquired, resetting the signal measurement or the time measurement based on the first information; Wherein, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement or the time measurement, or the first information is instruction information of a network device received by the terminal; The signal measurement includes beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam failure of the PSCell; or The signal measurement includes an RLM measurement of the terminal for the PSCell, and the first information indicates that the terminal has detected a radio link failure of the PSCell.
2. When the first information indicates that the terminal has detected a beam failure of the PSCell, the step of reconfiguring the signal measurement or the time measurement based on the first information includes: If the signal measurements further include one or more of beam failure recovery, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement or report, radio resource management (RRM) measurement set based on SCG measurement, radio link monitoring (RLM) measurement of the PSCell, or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, stopping execution of the signal measurements or the time measurements based on the first information, or 2. The method of claim 1, further comprising: if the signal measurements further include one or more of beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement or report, RRM measurement set based on SCG measurement, RLM measurement of the SCG, or if the time measurements include an uplink TAT operation of the terminal for the SCG, stopping execution of one or more signal measurements or time measurements for the SCG, or stopping execution of one or more signal measurements or time measurements for a PSCell or a designated secondary cell (SCell) in the SCG based on the first information.
3. The signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell; When the first information indicates that the terminal has detected a beam failure of the PSCell, the step of reconfiguring the signal measurement or the time measurement based on the first information includes: For one or more of the signal measurements, if a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; or and switching, for one or more of the signal measurements, the measurement period of the signal measurement from the second period to the first period based on the first information when the measurement period of the signal measurement is the second period; 2. The method of claim 1, wherein the first period is greater than the second period.
4. When the first information indicates that the terminal has detected a radio link failure of the PSCell, reconfiguring the behavior of the terminal based on the first information includes: If the signal measurements further include one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement or report, RRM measurements configured based on SCG measurements of the PSCell, or if the time measurements include an uplink TAT operation of the terminal for the PSCell, stopping execution of the signal measurements or the time measurements based on the first information; or The method of claim 1, further comprising: if the signal measurements further include one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement or report, RRM measurement set based on SCG measurement, RLM measurement of the SCG, or if the time measurements include an uplink TAT operation of the terminal for the SCG, stopping execution of one or more of the signal measurements or the time measurements for the SCG, or stopping execution of one or more of the signal measurements or the time measurements for a PSCell or a designated SCell in the SCG based on the first information.
5. A communication method in a deactivated state of a secondary cell group, which is applied to a terminal, comprising: determining signal or time measurements of a Secondary Cell Group (SCG) or a Primary Cell (PSCell) of the SCG if the SCG is in a deactivated state; When first information is acquired, resetting the signal measurement or the time measurement based on the first information; Wherein, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement or the time measurement, or the first information is instruction information of a network device received by the terminal; Where: The time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates a timeout of an uplink TAT of the terminal for the PSCell. If the signal measurement includes a beam failure recovery of the terminal for the PSCell, and the first information indicates that the terminal has successfully recovered from the beam failure of the primary cell (PSCell), or if the time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts an uplink TAT of the PSCell,2.
3. if the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell, and the first information indicates that a timer for one or more of the signal measurements has timed out; and the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell, and the first information is indication information related to the one or more signal measurements received by the terminal and transmitted from a network device4.
6. For the above case 1, The step of resetting the signal measurement or the time measurement based on the first information includes: If the signal measurements include one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement or report, RRM measurement configured based on SCG measurement, RLM measurement of the PSCell, stopping execution of one or more of the signal measurements or the time measurements based on the first information; or The method of claim 5, further comprising the step of: stopping execution of one or more signal or time measurements for the SCG, or stopping execution of one or more signal or time measurements for a PSCell or a designated SCell in the SCG, based on the first information, if the signal measurements include one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement or report, RRM measurements set based on SCG measurements, RLM measurements of the SCG, or if the time measurements include an uplink TAT operation of the terminal for the SCG.
7. For the above case 2, The signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell; The step of resetting the signal measurement or the time measurement based on the first information includes: For one or more of the signal measurements, if the measurement period of the signal measurement is a second period, switching the measurement period of the signal measurement from the second period to a first period based on the first information; or and switching, for one or more of the signal measurements, the measurement period of the signal measurement from the first period to the second period based on the first information when the measurement period of the signal measurement is a first period; 6. The method of claim 5, wherein the first period is greater than the second period.
8. For the above case 3, The step of resetting the signal measurement or the time measurement based on the first information includes: If the measurement period of the signal measurement that has timed out is the second period, switching the measurement period of the signal measurement that has timed out from the second period to a first period based on the first information; or if the measurement period of the signal measurement that has timed out is the first period, switching the measurement period of the signal measurement that has timed out from the first period to the second period based on the first information; 6. The method of claim 5, wherein the first period is greater than the second period.
9. For the above case 4, The step of resetting the signal measurement or the time measurement based on the first information includes: When the measurement period of one or more of the signal measurements indicated by the first information is a second period, switching the measurement period of the signal measurement from the second period to a first period based on the first information; or and when a measurement period of one or more of the signal measurements indicated by the first information is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; 6. The method of claim 5, wherein the first period is greater than the second period.
10. A communication device in a deactivated state of a secondary cell group, which is applied to a terminal, an acquisition unit used to determine signal or time measurements of a secondary cell group (SCG) or a primary cell (PSCell) of the SCG when the SCG is in a deactivated state; a setting unit, which is used to reconfigure the signal measurement or the time measurement based on the first information when the first information is obtained; Wherein, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement or the time measurement, or the first information is instruction information of a network device received by the terminal; The signal measurement includes beam failure detection of the terminal for the PSCell, and the first information indicates that the terminal has detected beam failure of the PSCell; or The signal measurement includes an RLM measurement of the terminal for the PSCell, and the first information indicates that the terminal has detected a radio link failure of the PSCell.
11. The setting unit specifically includes: When the first information indicates that the terminal has detected a beam failure of the PSCell, resetting the signal measurement or the time measurement based on the first information, If the signal measurements further include one or more of beam failure recovery, sounding reference signal (SRS) transmission, channel state information reference signal (CSI-RS) measurement or report, radio resource management (RRM) measurement set based on SCG measurement, radio link monitoring (RLM) measurement of the PSCell, or if the time measurements include an uplink timing advance timer (TAT) operation of the terminal for the PSCell, stopping execution of the signal measurements or the time measurements based on the first information, or The communication device in a deactivated state of a secondary cell group according to claim 10, characterized in that, when the signal measurements further include one or more of beam failure recovery, beam failure detection, SRS transmission, CSI-RS measurement or report, RRM measurement, RLM measurement set based on SCG measurement, or when the time measurements include an uplink TAT operation of the terminal for the SCG, the communication device in a deactivated state of a secondary cell group according to claim 10, further includes stopping execution of one or more signal measurements or time measurements for the SCG, or stopping execution of one or more signal measurements or time measurements for a PSCell or a designated secondary cell (SCell) in the SCG based on the first information.
12. The setting unit specifically includes: The signal measurements further include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell; When the first information indicates that the terminal has detected a beam failure of the PSCell, resetting the signal measurement or the time measurement based on the first information, For one or more of the signal measurements, if a measurement period of the signal measurement is a first period, switching the measurement period of the signal measurement from the first period to a second period based on the first information; or and when a measurement period of one or more of the signal measurements is the second period, switching the measurement period of the signal measurement from the second period to the first period based on the first information; The communication device under a deactivated state of a secondary cell group according to claim 10, characterized in that the first period is greater than the second period.
13. The setting unit specifically includes: When the first information indicates that the terminal has detected a radio link failure of the PSCell, reconfiguring an operation of the terminal based on the first information. If the signal measurements further include one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement or report, RRM measurements configured based on SCG measurements of the PSCell, or if the time measurements include an uplink TAT operation of the terminal for the PSCell, stopping execution of one or more of the signal measurements or the time measurements based on the first information; or The communication device in a deactivated state of a secondary cell group according to claim 10, characterized in that, when the signal measurements further include one or more of beam failure detection, beam failure recovery, SRS transmission, CSI-RS measurement or report, RRM measurement, RLM measurement set based on SCG measurement, or when the time measurements include an uplink TAT operation of the terminal for the SCG, the communication device is used to include stopping execution of one or more of the signal measurements or the time measurements for the SCG based on the first information, or stopping execution of one or more of the signal measurements or the time measurements for a PSCell or a designated SCell in the SCG.
14. A communication device in a deactivated state of a secondary cell group, which is applied to a terminal, an acquisition unit used to determine signal or time measurements of a secondary cell group (SCG) or a primary cell (PSCell) of the SCG when the SCG is in a deactivated state; a setting unit, which is used to reconfigure the signal measurement or the time measurement based on the first information when the first information is obtained; Wherein, the first information indicates a communication state between the terminal and the PSCell related to the signal measurement or the time measurement, or the first information is instruction information of a network device received by the terminal; Where: The time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates a timeout of an uplink TAT of the terminal for the PSCell. If the signal measurement includes a beam failure recovery of the terminal for the PSCell, and the first information indicates that the terminal has successfully recovered from the beam failure of the primary cell (PSCell), or if the time measurement includes an uplink TAT operation of the terminal for the PSCell, and the first information indicates that the terminal restarts an uplink TAT of the PSCell,2.
3. if the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell, and the first information indicates that a timer for one or more of the signal measurements has timed out; and The communication device in a deactivated state of a secondary cell group, characterized in that the signal measurements include one or more of an RRM measurement for the SCG, an RLM measurement for the PSCell, and a CSI-RS measurement for the SCG or the PSCell, and the first information includes at least one of the following: indication information related to one or more of the signal measurements received by the terminal and transmitted from a network device4.
15. A processor-readable storage medium having a computer program stored therein, the computer program being used to cause a processor to execute a method according to any one of claims 1 to 9.
Citation Information
Patent Citations
Configuration method for beam failure, and terminal
EP3780897A1
Configuration method for beam failure, and terminal
WO2019184629A1
Fast secondary cell group activation and deactivation using a suspended state
WO2020113442A1
