Working machine, working machine control method, and construction management system

The work machine's position detection system, using GNSS and IMU, accurately records current topographical data by calculating distances and considering operator input, addressing deviations in construction work to ensure precise terrain mapping.

JP7576515B2Active Publication Date: 2024-10-31KOMATSU LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021092488
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-01
Publication Date
2024-10-31
Estimated Expiration
2039-04-22

AI Technical Summary

Technical Problem

Existing technologies fail to accurately update topographical data when construction work deviates from the designed terrain, particularly during embankment operations, leading to deviations from the actual current topography.

Method used

A work machine equipped with a position detection system, including GNSS and IMU, records current topographical data by calculating the distance between the bucket position and designed terrain within a predetermined range, and optionally using an operator input to record accurate data.

Benefits of technology

Enables highly accurate recording of current topographical data, aligning with the actual terrain conditions, regardless of deviations from the designed terrain, enhancing construction management accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007576515000001
    Figure 0007576515000001
  • Figure 0007576515000002
    Figure 0007576515000002
  • Figure 0007576515000003
    Figure 0007576515000003
Patent Text Reader

Abstract

To provide a work machine capable of recording the current terrain data with high accuracy.SOLUTION: A work machine comprises a work implement, a work implement position acquisition unit that acquires the position of the work implement, an operation reception unit provided so that operator operations can be received, and a recording unit that records the current terrain data according to the position of the work implement when the operator's operation is being accepted for the operation reception unit.SELECTED DRAWING: Figure 12
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to construction management of a work machine. [Background technology]

[0002] Conventionally, a technique has been developed for generating current terrain data based on position information of the bucket passing in order to obtain the current terrain that has been deformed as a result of construction of a construction target by a work machine (see Patent Document 1). Specifically, the construction management device described in Patent Document 1 identifies the trajectory of the bucket blade tip based on the position data of the bucket blade tip, and when the height of the position where the bucket blade tip passed is lower than the height of the current terrain data, updates the height of the current terrain data to the height where the bucket blade tip passed. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2014 / 167740 Summary of the Invention [Problem to be solved by the invention]

[0004] On the other hand, the technology described in Patent Document 1 updates the topographical data based on the lowest point of the bucket blade tip, so even if embankment work is carried out later at a position above the lowest point, the current topographical data is not updated. This may result in a deviation from the actual current topography.

[0005] An object of the present disclosure is to provide a work machine, a work machine control method, and a construction management system that are capable of recording current topographical data with high accuracy. [Means for solving the problem]

[0006] A work machine according to one aspect of the present disclosure includes a work machine, a work machine position acquisition unit that acquires the position of the work machine, an operation reception unit configured to accept operation from an operator, and a recording unit that records current terrain data corresponding to the position of the work machine when operation from the operator to the operation reception unit is accepted.

[0007] A work machine control method according to a certain aspect of the present disclosure is a control method for a work machine equipped with a work implement, and includes the steps of acquiring a position of the work implement, accepting an operator's operation input, and, when the operator's operation input is accepted, recording current terrain data corresponding to the position of the work implement.

[0008] A construction management system according to an aspect of the present disclosure includes a work machine and a construction management device connected to the work machine. The construction management device includes a work machine position acquisition unit that acquires the position of the work machine, an operation reception unit that is provided to be able to receive an operation from an operator, and a recording unit that records current topography data corresponding to the position of the work machine when the operation from the operator to the operation reception unit is received. Effect of the Invention

[0009] The work machine, work machine control method, and construction management system disclosed herein are capable of recording current topographical data with high accuracy. [Brief description of the drawings]

[0010] [Figure 1] 1 is an external view of a work machine 100 according to a first embodiment. [Diagram 2] FIG. 1 is a diagram illustrating a schematic diagram of a work machine 100 according to a first embodiment. [Diagram 3] A schematic block diagram showing the configuration of a control system for working machine 100 based on the first embodiment will be described. [Figure 4] 2 is a block diagram showing the configuration of a work machine controller 26 based on the first embodiment. FIG. [Diagram 5] 4 is a diagram showing a relationship between a plurality of contour points of a bucket 8 according to the first embodiment and a design terrain. FIG. [Figure 6] FIG. 13 is a diagram illustrating conventional recording of current topographical data according to a comparative example. [Figure 7] 5 is a diagram illustrating recording of current topographical data (part 1) by the work machine controller 26 according to the first embodiment. FIG. [Figure 8] 11 is a diagram illustrating recording of current topographical data (part 2) by the work machine controller 26 according to the first embodiment. FIG. [Figure 9] 5 is a flow diagram illustrating recording of current topographical data by a work machine controller 26 according to the first embodiment. FIG. [Figure 10] FIG. 11 is a block diagram showing the configuration of a work machine controller 26# based on a second embodiment. [Figure 11] 13 is a diagram illustrating the recording of current topographical data by a work machine controller 26 according to the second embodiment. FIG. [Figure 12] 13 is a flow diagram illustrating recording of current topographical data by a work machine controller 26 according to the second embodiment. FIG. [Figure 13] 13 is a diagram illustrating the recording of current topographical data by a work machine controller 26 according to the third embodiment. FIG. [Figure 14] 13 is a flowchart illustrating recording of current topographical data by a work machine controller 26 according to a third embodiment. FIG. [Figure 15] FIG. 11 is a diagram illustrating the configuration of a construction management system 1000 according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, an embodiment will be described with reference to the drawings. In the following description, the same components are denoted by the same reference numerals. They have the same names and functions. Therefore, detailed description thereof will not be repeated.

[0012] (Embodiment 1) <Overall configuration of the work machine> FIG. 1 is an external view of a work machine 100 according to a first embodiment.

[0013] As shown in FIG. 1, a hydraulic excavator CM having a hydraulically operated work implement 2 will be described as an example of a work machine to which the concept of the present disclosure can be applied.

[0014] The hydraulic excavator CM includes a vehicle body 1 and a work machine 2.

[0015] The vehicle body 1 has a rotating body 3, a driver's cab 4, and a traveling device 5.

[0016] The rotating body 3 is disposed on the traveling device 5. The traveling device 5 supports the rotating body 3. The rotating body 3 is capable of rotating around a rotation axis AX. The cab 4 is provided with a driver's seat 4S where an operator sits. The operator operates the hydraulic excavator CM in the cab 4. The traveling device 5 has a pair of tracks 5Cr. The hydraulic excavator CM travels due to rotation of the tracks 5Cr. The traveling device 5 may be constituted by wheels (tires).

[0017] In the first embodiment, the positional relationship of each part will be described with reference to the operator seated in the driver's seat 4S. The front-rear direction refers to the front-rear direction of the operator seated in the driver's seat 4S. The left-right direction refers to the left-right direction with reference to the operator seated in the driver's seat 4S. The left-right direction coincides with the width direction of the vehicle (vehicle width direction). The direction directly facing the operator seated in the driver's seat 4S is the forward direction, and the direction opposite to the forward direction is the rearward direction. The right and left sides when the operator seated in the driver's seat 4S faces directly ahead are the right direction and the left direction, respectively.

[0018] The rotating body 3 has an engine room 9 in which an engine is housed, and a counterweight provided at the rear of the rotating body 3. A handrail 19 is provided in front of the engine room 9 in the rotating body 3. In the engine room 9, an engine, a hydraulic pump, etc. are arranged.

[0019] The work machine 2 is supported by a rotating body 3. The work machine 2 has a boom 6, an arm 7, a bucket 8, a boom cylinder 10, an arm cylinder 11, and a bucket cylinder 12.

[0020] The boom 6 is connected to the rotating structure 3 via a boom pin 13. The arm 7 is connected to the boom 6 via an arm pin 14. The bucket 8 is connected to the arm 7 via a bucket pin 15. The boom cylinder 10 drives the boom 6. The arm cylinder 11 drives the arm 7. The bucket cylinder 12 drives the bucket 8. The base end (boom foot) of the boom 6 is connected to the rotating structure 3. The tip end (boom top) of the boom 6 is connected to the base end (arm foot) of the arm 7. The tip end (arm top) of the arm 7 is connected to the base end of the bucket 8. The boom cylinder 10, the arm cylinder 11 and the bucket cylinder 12 are all hydraulic cylinders driven by hydraulic oil.

[0021] The boom 6 is capable of rotating relative to the rotating body 3 around a boom pin 13 which is a rotation axis. The arm 7 is capable of rotating relative to the boom 6 around an arm pin 14 which is a rotation axis parallel to the boom pin 13. The bucket 8 is capable of rotating relative to the arm 7 around a bucket pin 15 which is a rotation axis parallel to the boom pin 13 and the arm pin 14.

[0022] The bucket 8 and the work machine 2 are examples of the "bucket" and the "work machine" in the present disclosure.

[0023] FIG. 2 is a diagram illustrating a schematic diagram of a work machine 100 according to the first embodiment.

[0024] Fig. 2(A) shows a side view of the work machine 100. Fig. 2(B) shows a rear view of the work machine 100.

[0025] 2(A) and 2(B), the length L1 of the boom 6 is the distance between the boom pin 13 and the arm pin 14. The length L2 of the arm 7 is the distance between the arm pin 14 and the bucket pin 15. The length L3 of the bucket 8 is the distance between the bucket pin 15 and the cutting edge 8A of the bucket 8. The bucket 8 has multiple blades, and in this example, the tip of the bucket 8 is referred to as the cutting edge 8A.

[0026] Bucket 8 does not necessarily have to have a blade. The tip of bucket 8 may be formed of a straight steel plate.

[0027] The work machine 100 has a boom cylinder stroke sensor 16, an arm cylinder stroke sensor 17, and a bucket cylinder stroke sensor 18. The boom cylinder stroke sensor 16 is disposed in the boom cylinder 10. The arm cylinder stroke sensor 17 is disposed in the arm cylinder 11. The bucket cylinder stroke sensor 18 is disposed in the bucket cylinder 12. Note that the boom cylinder stroke sensor 16, the arm cylinder stroke sensor 17, and the bucket cylinder stroke sensor 18 are also collectively referred to as cylinder stroke sensors.

[0028] The stroke length of the boom cylinder 10 is determined based on the detection result of the boom cylinder stroke sensor 16. The stroke length of the arm cylinder 11 is determined based on the detection result of the arm cylinder stroke sensor 17. The stroke length of the bucket cylinder 12 is determined based on the detection result of the bucket cylinder stroke sensor 18.

[0029] In this example, the stroke lengths of the boom cylinder 10, the arm cylinder 11, and the bucket cylinder 12 are also referred to as the boom cylinder length, the arm cylinder length, and the bucket cylinder length, respectively. In this example, the boom cylinder length, the arm cylinder length, and the bucket cylinder length are also collectively referred to as cylinder length data L. It is also possible to employ a method of detecting the stroke length using an angle sensor.

[0030] The work machine 100 is equipped with a position detection device 20 capable of detecting the position of the work machine 100 .

[0031] The position detection device 20 includes an antenna 21, a global coordinate calculation unit 23, and an IMU (Inertial Measurement Unit) 24.

[0032] The antenna 21 is, for example, an antenna for Global Navigation Satellite Systems (GNSS). The antenna 21 is, for example, an antenna for Real Time Kinematic-Global Navigation Satellite Systems (RTK-GNSS).

[0033] The antenna 21 is provided on the rotating body 3. In this example, the antenna 21 is provided on the handrail 19 of the rotating body 3. The antenna 21 may be provided rearward of the engine room 9. For example, the antenna 21 may be provided on the counterweight of the rotating body 3. The antenna 21 outputs a signal corresponding to the received radio waves (GNSS radio waves) to the global coordinate calculation unit 23.

[0034] The global coordinate calculation unit 23 detects the installation position P1 of the antenna 21 in the global coordinate system. The global coordinate system is a three-dimensional coordinate system (Xg, Yg, Zg) based on a reference position Pr installed in the work area. In this example, the reference position Pr is the position of the tip of a reference pile set in the work area. The local coordinate system is a three-dimensional coordinate system indicated by (X, Y, Z) with the work machine 100 as the reference. The reference position of the local coordinate system is data indicating a reference position P2 located on the rotation axis (rotation center) AX of the rotating body 3.

[0035] In this example, the antenna 21 has a first antenna 21A and a second antenna 21B that are provided on the rotating body 3 so as to be spaced apart from each other in the vehicle width direction.

[0036] The global coordinate calculation unit 23 detects an installation position P1a of the first antenna 21A and an installation position P1b of the second antenna 21B. The global coordinate calculation unit 23 acquires reference position data P expressed in global coordinates. In this example, the reference position data P is data indicating a reference position P2 located on a rotation axis (center of rotation) AX of the rotating body 3. The reference position data P may be data indicating an installation position P1.

[0037] In this example, the global coordinate calculation unit 23 generates revolving unit orientation data Q based on two installation positions P1a and P1b. The revolving unit orientation data Q is determined based on an angle that a straight line determined by the installation positions P1a and P1b makes with respect to a reference orientation of the global coordinates (e.g., north). The revolving unit orientation data Q indicates the orientation in which the revolving unit 3 (work machine 2) is facing. The global coordinate calculation unit 23 outputs the reference position data P and the revolving unit orientation data Q to the work machine controller 26, which will be described later.

[0038] The IMU 24 is provided on the rotating unit 3. In this example, the IMU 24 is disposed below the cab 4. A high-rigidity frame is disposed below the cab 4 on the rotating unit 3. The IMU 24 is disposed on the frame. The IMU 24 may be disposed to the side (right or left side) of the rotation axis AX (reference position P2) of the rotating unit 3. The IMU 24 detects an inclination angle θ4 of the vehicle body 1 in the left-right direction and an inclination angle θ5 of the vehicle body 1 in the front-rear direction.

[0039] <Control system configuration> FIG. 3 is a schematic block diagram showing the configuration of a control system of the work machine 100 based on the first embodiment.

[0040] As shown in FIG. 3, the work machine 100 has a boom cylinder stroke sensor 16, an arm cylinder stroke sensor 17, a bucket cylinder stroke sensor 18, an antenna 21, a global coordinate calculation unit 23, an IMU 24, an operation device 25, a work machine controller 26, and a hydraulic device 64.

[0041] The operating device 25 is disposed in the operator's cab 4. The operating device 25 is operated by an operator. The operating device 25 receives an operator operation for driving the work machine 2. In this example, the operating device 25 is a pilot hydraulic type operating device.

[0042] The hydraulic device 64 includes a hydraulic oil tank, a hydraulic pump, a flow control valve, and an electromagnetic proportional control valve (not shown). The hydraulic pump is driven by the power of an engine (not shown), and supplies hydraulic oil to the boom cylinder 10, the arm cylinder 11, and the bucket cylinder 12 via the flow control valve.

[0043] The operating device 25 has a first operating lever 25R and a second operating lever 25L. The first operating lever 25R is disposed, for example, on the right side of the driver's seat 4S. The second operating lever 25L is disposed, for example, on the left side of the driver's seat 4S. With the first operating lever 25R and the second operating lever 25L, forward / backward / left / right movements correspond to movements of two axes. The boom 6 and the bucket 8 are operated by the first operating lever 25R. The arm 7 and the rotating body 3 are operated by the second operating lever 25L.

[0044] The sensor controller 30 calculates the boom cylinder length based on the detection result of the boom cylinder stroke sensor 16. The boom cylinder stroke sensor 16 outputs a pulse associated with the orbiting motion to the sensor controller 30. The sensor controller 30 calculates the boom cylinder length based on the pulse output from the boom cylinder stroke sensor 16.

[0045] Similarly, the sensor controller 30 calculates the arm cylinder length based on the detection result of the arm cylinder stroke sensor 17. The sensor controller 30 calculates the bucket cylinder length based on the detection result of the bucket cylinder stroke sensor 18.

[0046] The sensor controller 30 calculates the inclination angle θ1 of the boom 6 with respect to the vertical direction of the revolving structure 3 from the boom cylinder length acquired based on the detection result of the boom cylinder stroke sensor 16. The sensor controller 30 calculates the inclination angle θ2 of the arm 7 with respect to the boom 6 from the arm cylinder length acquired based on the detection result of the arm cylinder stroke sensor 17. The sensor controller 30 calculates the inclination angle θ3 of the blade tip 8A of the bucket 8 with respect to the arm 7 from the bucket cylinder length acquired based on the detection result of the bucket cylinder stroke sensor 18.

[0047] Based on the inclination angles θ1, θ2, θ3 calculated above, the inclination angle θ4 in the left-right direction of the vehicle body 1, the inclination angle θ5 in the front-rear direction of the vehicle body 1, the reference position data P, and the rotating body orientation data Q, it is possible to identify the positions of the boom 6, arm 7, and bucket 8 of the work machine 100, and bucket position data indicating the three-dimensional position of the bucket 8 can be generated.

[0048] It should be noted that the inclination angle θ1 of the boom 6, the inclination angle θ2 of the arm 7, and the inclination angle θ3 of the bucket 8 do not have to be detected by a cylinder stroke sensor. The inclination angle θ1 of the boom 6 may be detected by an angle detector such as a rotary encoder. The angle detector detects the bending angle of the boom 6 with respect to the rotating body 3 to detect the inclination angle θ1. Similarly, the inclination angle θ2 of the arm 7 may be detected by an angle detector attached to the arm 7. The inclination angle θ3 of the bucket 8 may be detected by an angle detector attached to the bucket 8.

[0049] <Work machine controller configuration> FIG. 4 is a block diagram showing the configuration of the work machine controller 26 based on the first embodiment.

[0050] As shown in FIG. 4, the work machine controller 26 includes a detection information acquisition unit 102, a bucket position acquisition unit 104, a target construction data storage unit 106, a distance calculation unit 108, and a bucket position recording unit 110.

[0051] The detection information acquisition unit 102 acquires the tilt angles θ1, θ2, θ3, θ4, and θ5 from the sensor controller 30, and the reference position data P and the rotating body orientation data Q from the global coordinate calculation unit 23.

[0052] The bucket position acquisition unit 104 is able to identify the positions of the boom 6, arm 7, and bucket 8 of the work machine 100 based on the information acquired by the detection information acquisition unit 102, and calculates (acquires) bucket position data indicating the three-dimensional position of the bucket 8.

[0053] The target construction data storage unit 106 stores target construction data that represents the design topography of the construction site. The target construction data is three-dimensional data expressed in a global coordinate system, and includes three-dimensional topography data consisting of a plurality of triangular polygons that represent the design topography. Each of the triangular polygons that constitute the target construction data has a common side with other adjacent triangular polygons. The target construction data represents a continuous plane consisting of a plurality of planes. The target construction data is stored in the target construction data storage unit 106 by being read from an external storage medium. The target construction data is not limited to the external storage medium, and may be acquired from an external server via a network and stored.

[0054] The distance calculation unit 108 calculates the distance between the position of the bucket 8 and the designed terrain of the construction target. As an example, the distance calculation unit 108 calculates the distance between the blade tip position of the bucket 8 and the designed terrain of the construction target. The distance calculation unit 108 calculates the distance in the perpendicular direction from the blade tip position of the bucket 8 to the designed terrain of the construction target. The distance calculation unit 108 is not limited to the blade tip position, and may calculate the distance between each of multiple contour points of the bucket 8 and the designed terrain of the construction target. The contour point may be one of the multiple contour points.

[0055] FIG. 5 is a diagram showing the relationship between a plurality of contour points of the bucket 8 according to the first embodiment and the design terrain.

[0056] 5, the multiple contour points E of bucket 8 are intersections of multiple transverse lines and multiple transverse sections of bucket 8. The multiple transverse lines of bucket 8 consist of a cutting edge line along which cutting edges 8A of bucket 8 are aligned, and multiple lines parallel to the cutting edge line in areas such as bottom surface 8B and butt 8C of the bucket. The multiple longitudinal sections of bucket 8 consist of both side surfaces of bucket 8 and surfaces parallel to both side surfaces that divide the both side surfaces.

[0057] 4 again, the distance calculation unit 108 calculates the distance in the vertical direction to the designed terrain for each of the multiple contour points E. The distance calculation unit 108 calculates the distance between the contour point E corresponding to the shortest distance among the multiple contour points E and the designed terrain as the distance between the position of the bucket 8 and the designed terrain of the construction target.

[0058] The bucket position recording unit 110 records in memory the current terrain data corresponding to the position of the bucket 8 based on the distance calculated by the distance calculation unit 108. The bucket position recording unit 110 judges whether or not the distance calculated by the distance calculation unit 108 is within a predetermined range. When the bucket position recording unit 110 judges that the calculated distance is within the predetermined range, it records the bucket position data as current terrain data in memory. When the bucket position recording unit 110 judges that the distance calculated by the distance calculation unit 108 is not within the predetermined range, it does not record the bucket position data as current terrain data in memory. The bucket position data may be position data indicating the cutting edge of the bucket 8, or may be one point among a plurality of contour points E of the bucket 8.

[0059] The bucket position recording unit 110 updates the latest bucket position data as current terrain data when it determines that the distance calculated by the distance calculation unit 108 is within a predetermined range. For example, when the bucket 8 repeatedly moves to a point having the same X and Y coordinates of the three-dimensional data, the bucket position recording unit 110 updates the bucket position data of the latest Z coordinate as current terrain data when the distance calculated by the distance calculation unit 108 is within a predetermined range.

[0060] The bucket position acquisition unit 104, the distance calculation unit 108, and the bucket position recording unit 110 are examples of the "bucket position acquisition unit," "distance calculation unit," and "recording unit" of the present disclosure.

[0061] FIG. 6 is a diagram for explaining conventional recording of current topographical data according to a comparative example.

[0062] As shown in Fig. 6(A), a case is shown in which construction work is carried out on a work surface L0 at a construction site by operating a work machine including a bucket so as to approach the designed terrain R. Here, a case is shown in which a part of the work surface L0 is dug beyond the designed terrain R.

[0063] As shown in FIG. 6(B), a case is shown in which a work machine including a bucket is operated so as to approach the design topography R at the construction site, and construction work of a work surface L1 is carried out together with embankment work.

[0064] On the other hand, the conventional method updates the current topography data based on the lowest point of the blade tip of the bucket 8. Therefore, if construction work is performed together with banking work after digging beyond the design topography R, the work will be performed at a position above the lowest point. Therefore, the current topography data is not updated, and the state of the work surface L0 is maintained as the current topography data. Therefore, there is a possibility that the data may deviate from the actual current topography.

[0065] FIG. 7 is a diagram for explaining recording (part 1) of the current topographical data of the work machine controller 26 according to the first embodiment.

[0066] As shown in Fig. 7, a case is shown in which construction work is performed on a work surface L1 at a construction site by operating a work machine including a bucket so as to approach the designed terrain R. Here, a case is shown in which a part of the work surface L1 is excavated beyond the designed terrain R.

[0067] In the first embodiment, a region having a width d1 above the designed terrain R and a width d2 below the designed terrain R is set in advance as a predetermined range. The widths of the upper side d1 and the lower side d2 may be the same value or different values.

[0068] The distance calculation unit 108 calculates the distance between the design terrain R and the bucket 8.

[0069] When it is determined that the distance calculated by the distance calculation unit 108 is within a predetermined range, the bucket position recording unit 110 records the bucket position data in memory as current topography data.

[0070] The bucket position recording unit 110 records in memory the bucket position data corresponding to the working plane L1 when the distance calculated by the distance calculation unit 108 is within a predetermined range as current terrain data. When the distance calculated by the distance calculation unit 108 is outside the predetermined range, the bucket position recording unit 110 does not record the bucket position data in memory as current terrain data.

[0071] FIG. 8 is a diagram illustrating recording (part 2) of the current topographical data of the work machine controller 26 according to the first embodiment.

[0072] As shown in FIG. 8, a case is shown in which a work machine including a bucket is operated so as to approach the design topography R at a construction site, and construction work for a work surface L2 is carried out together with embankment work.

[0073] When it is determined that the distance calculated by the distance calculation unit 108 is within a predetermined range, the bucket position recording unit 110 records the bucket position data in memory as current topography data.

[0074] The bucket position recording unit 110 records in memory the bucket position data corresponding to the work plane L2 when the distance calculated by the distance calculation unit 108 is within a predetermined range as current terrain data. Therefore, the bucket position data corresponding to the latest work plane L2 is recorded as the current terrain data. Therefore, there is no deviation from the actual current terrain, and it is possible to record the latest current terrain data with high accuracy.

[0075] FIG. 9 is a flow diagram illustrating the recording of current topographical data by the work machine controller 26 according to the first embodiment.

[0076] Referring to FIG. 9, the work machine controller 26 acquires the detection information (step S2).

[0077] The detection information acquisition unit 102 acquires the tilt angles θ1, θ2, θ3, θ4, and θ5 from the sensor controller 30, and the reference position data P and the rotating body orientation data Q from the global coordinate calculation unit 23.

[0078] Next, the work machine controller 26 acquires the bucket position (step S4).

[0079] The bucket position acquisition unit 104 is able to identify the positions of the boom 6, arm 7, and bucket 8 of the work machine 100 based on the information acquired by the detection information acquisition unit 102, and calculates (acquires) bucket position data indicating the three-dimensional position of the bucket 8.

[0080] Next, the work machine controller 26 calculates the distance to the designed terrain (step S6).

[0081] Distance calculation unit 108 calculates the distance between the position of bucket 8 calculated by bucket position acquisition unit 104 and the designed terrain of the work target. The distance between the position of bucket 8 and the designed terrain may be the distance between the blade tip position of bucket 8 and the designed terrain, or, as described in Fig. 5, the distance in the vertical direction to the design terrain of each of multiple contour points E of bucket 8 is calculated, and the distance between contour point E and the design terrain that is the shortest distance may be calculated as the distance between the bucket position and the designed terrain of the work target.

[0082] Next, the work machine controller 26 determines whether or not the distance is within a predetermined range (Step S8). The bucket position recording unit 110 determines whether or not the distance calculated by the distance calculation unit 108 is within a predetermined range.

[0083] Next, when work machine controller 26 determines that the distance is within the predetermined range (YES in step S8), it records in memory the current terrain data corresponding to the position of bucket 8. When it determines that the calculated distance is within the predetermined range, bucket position recording unit 110 records in memory the bucket position data calculated by bucket position acquisition unit 104 as current terrain data.

[0084] Next, the work machine controller 26 determines whether the work has been completed (step S12). The work machine controller 26 determines that the work has been completed if it determines that no operator operation has been received from the operating device 25 for a predetermined period of time. Alternatively, the work machine controller 26 may determine that the work has been completed if an instruction to stop the engine of the work machine 100 has been received.

[0085] In step S12, if the work machine controller 26 determines that the work has not been completed (NO in step S12), the process returns to step S2 and the above-described processing is repeated.

[0086] On the other hand, in step S12, if the work machine controller 26 determines that the work has been completed (YES in step S12), the process ends (END).

[0087] On the other hand, in step S8, when work machine controller 26 determines that the distance is not within the predetermined range (NO in step S8), it skips step S10 and proceeds to step S12. When bucket position recording unit 110 determines that the calculated distance is not within the predetermined range, it does not record the bucket position data calculated by bucket position acquisition unit 104 in memory as current terrain data.

[0088] Through this process, the work machine controller 26 records the bucket position data as current terrain data when the distance between the designed terrain R and the position of the bucket 8 is within a predetermined range during construction work near the designed terrain R. Therefore, it is possible to record highly accurate current terrain data during construction work near the designed terrain R.

[0089] (Embodiment 2) In the first embodiment, a case has been described in which the bucket position data is recorded as the current terrain data when the distance between the design terrain R and the bucket position is within a predetermined range.

[0090] In the second embodiment, a method for recording current topographical data that directly reflects the intention of the operator will be described.

[0091] FIG. 10 is a block diagram showing the configuration of work machine controller 26# based on the second embodiment.

[0092] As shown in FIG. 10, work machine controller 26# includes a detection information acquisition unit 102, a bucket position acquisition unit 104, a target construction data storage unit 106, a bucket position recording unit 110#, and a record button input receiving unit 112.

[0093] The operation device 25 further includes a record button 25P for recording the current topographical data.

[0094] Work machine controller 26# differs from work machine controller 26 in that distance calculation unit 108 is deleted, bucket position recording unit 110 is replaced with bucket position recording unit 110#, and a record button input receiving unit 112 is further provided. As the other configurations are the same, detailed description thereof will not be repeated.

[0095] The record button input receiving unit 112 receives input from the record button 25P.

[0096] Bucket position recording unit 110# records the bucket position data as current terrain data in accordance with the input of record button 25P accepted by record button input accepting unit 112. Therefore, it is possible to record the bucket position data at a position desired by the user as current terrain data in accordance with the user's input of record button 25P.

[0097] The record button 25P is an example of the "operation member" of the present disclosure.

[0098] FIG. 11 is a diagram for explaining the recording of the current topographical data by the work machine controller 26 according to the second embodiment.

[0099] 11A shows a case where a work machine including a bucket is operated at a construction site to carry out construction work on a work surface L3. Here, a case where over-digging has been performed in one part is shown.

[0100] In the second embodiment, bucket position recording unit 110# records bucket position data as designed terrain data in accordance with an input from record button 25P by the worker.

[0101] In this example, bucket position recording unit 110# records bucket position data corresponding to working surface L3 as current topography data.

[0102] As shown in FIG. 11(B), a case is shown in which a work machine including a bucket is operated at a construction site to carry out construction work on a work surface L4 as well as banking work.

[0103] In the second embodiment, bucket position recording unit 110# records bucket position data as designed terrain data in accordance with an input from record button 25P by the worker.

[0104] Therefore, the bucket position data corresponding to the latest working surface L4 according to the intention of the operator is recorded as the current terrain data. Therefore, there is no deviation from the actual current terrain, and it is possible to record the latest highly accurate current terrain data.

[0105] FIG. 12 is a flow diagram illustrating the recording of current topographical data by the work machine controller 26 according to the second embodiment.

[0106] Referring to FIG. 12, the work machine controller 26 acquires the detection information (step S2).

[0107] The detection information acquisition unit 102 acquires the tilt angles θ1, θ2, θ3, θ4, and θ5 from the sensor controller 30, and the reference position data P and the rotating body orientation data Q from the global coordinate calculation unit 23.

[0108] Next, the work machine controller 26 acquires the bucket position (step S4).

[0109] The bucket position acquisition unit 104 is able to identify the positions of the boom 6, arm 7, and bucket 8 of the work machine 100 based on the information acquired by the detection information acquisition unit 102, and calculates (acquires) bucket position data indicating the three-dimensional position of the bucket 8.

[0110] Next, the work machine controller 26 determines whether or not input from the record button 25P has been accepted (Step S9). The record button input accepting unit 112 determines whether or not input from the record button 25P has been accepted.

[0111] Next, when work machine controller 26 determines that input from record button 25P has been received (YES in step S9), it records in memory the current terrain data corresponding to the position of bucket 8. When there is input from record button 25P, record button input receiving unit 112 notifies bucket position recording unit 110 of that fact. Bucket position recording unit 110 records the bucket position data calculated by bucket position acquisition unit 104 in accordance with the notification from record button input receiving unit 112 in memory as current terrain data.

[0112] Next, the work machine controller 26 determines whether the work has been completed (step S12). The work machine controller 26 determines that the work has been completed if it determines that no operator operation has been received from the operating device 25 for a predetermined period of time. Alternatively, the work machine controller 26 may determine that the work has been completed if an instruction to stop the engine of the work machine 100 has been received.

[0113] In step S12, if the work machine controller 26 determines that the work has not been completed (NO in step S12), the process returns to step S2 and the above-described processing is repeated.

[0114] On the other hand, in step S12, if the work machine controller 26 determines that the work has been completed (YES in step S12), the process ends (END).

[0115] On the other hand, in step S9, when work machine controller 26 determines that input from record button 25P has not been accepted (NO in step S9), it skips step S10 and proceeds to step S12. When there is no notification from record button input accepting unit 112, bucket position recording unit 110 does not record the bucket position data calculated by bucket position acquisition unit 104 in memory as current terrain data.

[0116] Through this process, during construction work, work unit controller 26 records bucket position data as current terrain data in accordance with input from record button 25P. Therefore, it is possible to record the latest, highly accurate current terrain data in accordance with the user's intention.

[0117] In this example, a method has been described in which a record button 25P is provided on the operation device 25 and the record button input receiving unit 112 receives input from the record button, but this is not limited to a record button and may be a record switch, or any other means may be used as long as it is an operating member capable of receiving an operation for recording.

[0118] (Embodiment 3) In the third embodiment, a method of combining the method of the first embodiment and the method of the second embodiment will be described.

[0119] FIG. 13 is a diagram for explaining the recording of the current topography data by the work machine controller 26 according to the third embodiment.

[0120] As shown in Fig. 13, a case is shown in which construction work is performed at a construction site by operating a work machine including a bucket so as to approach the designed terrain R. Specifically, a case is shown in which construction work is performed on a work surface L5 at a position away from the designed terrain R.

[0121] In the method of the first embodiment, when the distance between the design terrain R and the position of the bucket 8 is within a predetermined range, the bucket position data is recorded as the current terrain data. Therefore, when construction work is performed by operating a work machine including a bucket at a position away from the design terrain R, as in this case, the bucket position data is not recorded as the current terrain data.

[0122] However, if it were possible to record the working conditions during the excavation work as current topographical data, convenience during construction work would be improved.

[0123] In the third embodiment, when the distance between the designed terrain R and the bucket position is within a predetermined range, the bucket position data is recorded as the current terrain data. Even when the distance between the designed terrain R and the bucket position is not within the predetermined range, the bucket position data is recorded as the current terrain data when the input of the record button 25P is accepted.

[0124] This process enables the work machine controller 26 to record the situation during the progress of excavation work as current topography data, and enables recording of current topography data that matches the actual current topography.

[0125] FIG. 14 is a flow diagram illustrating recording of current topographical data by the work machine controller 26 according to the third embodiment.

[0126] Referring to Fig. 14, compared to the flow diagram of Fig. 9, a difference is that step S14 is added. The rest of the flow is similar to that described in Fig. 9, and therefore detailed description thereof will not be repeated.

[0127] In step S14, when work machine controller 26 determines that the distance is not within the predetermined range (NO in step S8), it determines whether or not record button 25P has been input (step S14). Record button input receiving unit 112 receives input from record button 25P and outputs a message to that effect to bucket position recording unit 110.

[0128] In step S14, if work machine controller 26 determines that record button 25P has been input, the process proceeds to step S10, and the current terrain data corresponding to the bucket position is recorded in memory. If the calculated distance is within a predetermined range, bucket position recording unit 110 records the bucket position data calculated by bucket position acquisition unit 104 in memory as current terrain data.

[0129] On the other hand, in step S14, if work machine controller 26 determines that there is no input from record button 25P, it skips step S10 and proceeds to step S12. If bucket position recording unit 110 determines that there is no input from record button 25P, it does not record the bucket position data calculated by bucket position acquisition unit 104 in memory as current terrain data.

[0130] With this method, bucket position data in which the distance between the designed terrain R and the bucket position is within a predetermined range near the designed terrain R is recorded as current terrain data. Even if the distance between the designed terrain R and the bucket position is not within the predetermined range, the bucket position data is recorded as current terrain data according to the input of the record button 25P. Therefore, it is possible to record the latest highly accurate current terrain data that matches the current terrain according to the user's intention.

[0131] (Embodiment 4) In the above embodiment, a case has been described in which the current terrain data is generated in the work machine, but the current terrain data may be generated in an external device other than the work machine.

[0132] FIG. 15 is a diagram illustrating the configuration of a construction management system 1000 according to the fourth embodiment.

[0133] Referring to FIG. 15, the construction management system 1000 includes a work machine 100 and a construction management device 200.

[0134] The work machine 100 and the construction management device 200 are connected via a network N.

[0135] The work machine 100 transmits information from the sensor controller 30 and the global coordinate calculation unit 23 to the construction management device 200 via the network N.

[0136] The construction management device 200 has each functional block of the work machine controller 26 described in FIG. 4, and the construction management device 200 calculates (acquires) bucket position data and records it in memory as current topography data.

[0137] By using the method according to the fourth embodiment, the construction management device 200, which is an external device, calculates bucket position data and records it in memory as current topography data, thereby making it possible to reduce the processing load on the work machine 100.

[0138] In this example, a case will be described in which bucket position data is calculated in the construction management device 200 and recorded in memory as current terrain data, but this is not limited to this, and some of the processing may be performed on the work machine 100 side and the remaining processing may be performed on the construction management device 200 side.

[0139] In the above embodiment, a hydraulic excavator is given as an example of a work machine, but the present invention is not limited to hydraulic excavators and can be applied to other types of work machines such as bulldozers and wheel loaders.

[0140] Although the embodiments of the present disclosure have been described above, the embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the scope of the claims, and it is intended to include all modifications within the scope and meaning equivalent to the scope of the claims. [Explanation of symbols]

[0141] 1 vehicle body, 2 work machine, 3 rotating body, 4 driver's cab, 4S driver's seat, 5 running gear, 5Cr track, 6 boom, 7 arm, 8 bucket, 8A cutting edge, 8B bottom, 9 engine room, 10 boom cylinder, 11 arm cylinder, 12 bucket cylinder, 13 boom pin, 14 arm pin, 15 bucket pin, 16 boom cylinder stroke sensor, 17 arm cylinder stroke sensor, 18 bucket cylinder stroke sensor, 19 handrail, 20 position detection device, 21 antenna, 21A first antenna, 21B second antenna, 23 global coordinate calculation unit, 25 operation device, 25L second operation lever, 25P record button, 25R first operation lever, 26, 26# work machine controller, 30 sensor controller, 64 hydraulic device, 100 work machine, 102 detection information acquisition unit, 104 Bucket position acquisition unit, 106 target construction data storage unit, 108 distance calculation unit, 110, 110# bucket position recording unit, 112 record button input reception unit, 200 construction management device, 1000 construction management system.

Claims

1. A working machine, A work machine position acquisition unit that acquires a position of the work machine; a distance calculation unit that calculates a distance between each of the positions of the plurality of contour points of the work machine and a point that is closest to the designed topography of the construction target according to the position of the work machine acquired by the work machine position acquisition unit; an operation reception unit that is provided to be able to receive an operation from an operator; a recording unit that records position data indicating a position of the work implement as current topographical data when an operation from an operator via the operation receiving unit is being received, the operation reception unit has a record button, When the recording unit receives an operation of the record button by an operator, the recording unit records position data indicating the position of the work implement at the closest point calculated by the distance calculation unit as current topography data.

2. The work machine of claim 1 , wherein the work implement has a cutting edge.

3. A control method for a work machine equipped with a work implement, comprising: Obtaining a position of the work implement; A step of calculating a distance between each of the positions of a plurality of contour points of the work machine and a point that is closest to the designed topography of the construction target according to the acquired position of the work machine; receiving an input of an operation from an operator; and a step of recording position data indicating a position of the work implement as current topographical data when the input of the operation of the operator is received, The step of accepting an input of an operation by the operator includes a step of accepting an operation by the operator on a record button, A work machine control method in which the recording step, when accepting operation of the operator on the record button, records position data indicating the position of the work machine at the closest point calculated by the distance calculation step as current terrain data.

4. A work machine having a work implement; A work machine position acquisition unit that acquires a position of the work machine; a distance calculation unit that calculates a distance between each of the positions of the plurality of contour points of the work machine and a point that is closest to the designed topography of the construction target according to the position of the work machine acquired by the work machine position acquisition unit; an operation reception unit that is provided to be able to receive an operation from an operator; a recording unit that records position data indicating a position of the work implement as current topographical data when an operation from an operator via the operation receiving unit is being received, the operation reception unit has a record button, A construction management system in which, when the recording unit receives an operator's operation on the record button, it records position data indicating the position of the work machine at the closest point calculated by the distance calculation unit as current terrain data.

Citation Information

Patent Citations

  • Construction work support system for work vehicle, and protection target position data creation system

    JP2017155563A

  • Work vehicle control system, control method, and work vehicle

    JP2018021425A

  • Excavator display system and excavator

    WO2014077221A1

  • Construction management device for excavating equipment, construction management device for hydraulic shovel, excavating equipment, and construction management system

    WO2014167740A1