Setting device, program, environment forming device, and setting method
The setting device addresses inefficiencies in conventional systems by allowing independent setting of connection conditions, enhancing data input efficiency and enabling detailed environmental testing through flexible test step management.
Patent Information
- Application Number
- JP2022048705
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-03-24
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-03-24
AI Technical Summary
Conventional setting devices require operators to divide test steps finely based on both environmental and connection conditions, leading to complex data input and decreased efficiency when current application to the test object is repeatedly turned on or off in short periods.
A setting device that allows independent setting of connection conditions relative to environmental conditions, enabling efficient test step division based only on environmental changes and enabling arbitrary switching of current application in constant value operations.
Improves operator data input efficiency by allowing independent setting of connection conditions, reducing the need for fine test step division and enabling detailed environmental testing.
Smart Images

Figure 0007579822000001 
Figure 0007579822000002 
Figure 0007579822000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a setting device, a program, an environment forming device, and a setting method. [Background technology]
[0002] A setting device according to the background art is disclosed in, for example, Patent Document 1 below. An operator sets environmental conditions (temperature, humidity, etc.) for each test step of a program operation by inputting data into a setting screen displayed on a display unit of an operation terminal. The setting device sets operation control information for controlling the program operation based on the environmental conditions acquired from the operation terminal. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-15585 A Summary of the Invention [Problem to be solved by the invention]
[0004] In an environmental test, an external control device such as a power supply device may be connected to the environmental test device to apply a current to the test object. In this case, the operator sets the connection conditions between the external control device and the test object, as well as the above-mentioned environmental conditions, by inputting data into an operation terminal. As the connection condition, the on or off of the relay between the external control device and the test object is set.
[0005] In conventional setting devices, the connection condition for each test step can only be set to either on or off. Therefore, when performing a test in which the current application to the test object is repeatedly turned on or off in a short period of time, even if the environmental conditions are constant, it is necessary to divide the test steps into small sections according to the switching of the current application on or off. As a result, the increase in the number of test steps makes the data input work by the operator complicated, and the work efficiency decreases.
[0006] The present invention has been made in view of the above circumstances, and has an object to provide a setting device, a program, an environment forming device, and a setting method that are capable of improving the efficiency of data input work by an operator. [Means for solving the problem]
[0007] A setting device according to one embodiment of the present invention is a setting device that sets operation control information for controlling the operation of an environmental forming device, and is equipped with an acquisition unit that acquires environmental setting information for setting environmental conditions to be formed by the environmental forming device and connection setting information for setting connection conditions between an object to which the environmental conditions are loaded and an external control device, a processing unit that generates the operation control information based on the environmental setting information and the connection setting information acquired by the acquisition unit, and an output unit that outputs the operation control information generated by the processing unit, wherein the processing unit is capable of setting the connection conditions independently of the setting of the environmental conditions.
[0008] According to this aspect, the processing unit can set the connection conditions independently of the setting of the environmental conditions. Therefore, in a program operation having a plurality of test steps, it is sufficient to divide the test steps according to the change of the environmental conditions, and it is not necessary to divide the test steps into small parts according to the switching of the connection conditions, so that the efficiency of the data input work by the operator can be improved. In addition, in a constant value operation in which the environmental value of the environmental condition is constant, it is possible to arbitrarily switch the application of current to the test object on or off by setting the connection conditions independent of the environmental conditions, so that a detailed environmental test can be performed.
[0009] In the above aspect, the processing unit is capable of changing and setting the connection condition for one of the environmental conditions.
[0010] According to this aspect, in programmed operation, the connection conditions can be changed and set for one test step, and in constant value operation, the connection conditions can be changed and set for a constant environmental value, making it possible to perform detailed environmental testing.
[0011] In the above aspect, the connection setting information includes setting information for a conduction period during which the object and the external control device are connected, and setting information for a cut-off period during which the object and the external control device are not connected.
[0012] According to this aspect, it is possible to arbitrarily set the conduction period or cut-off period between the target object and the external control device using the connection setting information.
[0013] In the above aspect, the connection setting information further includes setting information for repeating the conductive period and the cutoff period.
[0014] According to this aspect, the number of repetitions of the conductive period and the cutoff period, etc. can be arbitrarily set by the connection setting information.
[0015] In the above aspect, the connection setting information includes a connection condition after connection control between the object and the external control device is terminated.
[0016] According to this aspect, the connection conditions after the connection control between the environment forming device and the external control device is terminated can be set arbitrarily using the connection setting information.
[0017] A program according to one aspect of the present invention causes a processor mounted on a setting device that sets operation control information for controlling the operation of an environmental forming device to execute an acquisition step of acquiring environmental setting information for setting environmental conditions to be formed by the environmental forming device and connection setting information for setting connection conditions between an object to which the environmental conditions are loaded and an external control device, a processing step of generating the operation control information based on the environmental setting information and the connection setting information acquired in the acquisition step, and an output step of outputting the operation control information generated in the processing step, wherein the processing step makes it possible to set the connection conditions independently of the setting of the environmental conditions.
[0018] According to this aspect, in the processing step, the connection conditions can be set independently of the setting of the environmental conditions. Therefore, in a program operation having a plurality of test steps, the test steps can be divided according to the change of the environmental conditions, and there is no need to divide the test steps into smaller parts according to the switching of the connection conditions, so that the efficiency of the data input work by the operator can be improved. In addition, in a constant value operation in which the environmental value of the environmental condition is constant, the application of current to the test object can be arbitrarily switched on or off by setting the connection conditions independent of the environmental conditions, so that a detailed environmental test can be performed.
[0019] An environmental forming device according to one embodiment of the present invention is an environmental forming device comprising a storage section for storing an object and an environmental control section for controlling the environment within the storage section, and further comprising a setting section for setting operation control information for controlling the operation of the environmental forming device, the setting section having an acquisition section for acquiring environmental setting information for setting the environmental conditions to be formed by the environmental forming device and connection setting information for setting the connection conditions between the object and an external control device, a processing section for generating the operation control information based on the environmental setting information and the connection setting information acquired by the acquisition section, and an output section for outputting the operation control information generated by the processing section, and the processing section is capable of setting the connection conditions independently of the setting of the environmental conditions.
[0020] According to this aspect, the processing unit can set the connection conditions independently of the setting of the environmental conditions. Therefore, in a program operation having a plurality of test steps, it is sufficient to divide the test steps according to the change of the environmental conditions, and it is not necessary to divide the test steps into small parts according to the switching of the connection conditions, so that the efficiency of the data input work by the operator can be improved. In addition, in a constant value operation in which the environmental value of the environmental condition is constant, it is possible to arbitrarily switch the application of current to the test object on or off by setting the connection conditions independent of the environmental conditions, so that a detailed environmental test can be performed.
[0021] A setting method according to one aspect of the present disclosure is a setting method for setting operation control information for controlling the operation of an environmental forming device, and includes an acquisition step of acquiring environmental setting information for setting environmental conditions to be formed by the environmental forming device and connection setting information for setting connection conditions between an object to which the environmental conditions are loaded and an external control device, a processing step of generating the operation control information based on the environmental setting information and the connection setting information acquired in the acquisition step, and an output step of outputting the operation control information generated in the processing step, wherein the processing step makes it possible to set the connection conditions independently of the setting of the environmental conditions.
[0022] According to this aspect, in the processing step, the connection conditions can be set independently of the setting of the environmental conditions. Therefore, in a program operation having a plurality of test steps, the test steps can be divided according to the change of the environmental conditions, and there is no need to divide the test steps into smaller parts according to the switching of the connection conditions, so that the efficiency of the data input work by the operator can be improved. In addition, in a constant value operation in which the environmental value of the environmental condition is constant, the application of current to the test object can be arbitrarily switched on or off by setting the connection conditions independent of the environmental conditions, so that a detailed environmental test can be performed. Effect of the Invention
[0023] According to the present invention, it is possible to improve the efficiency of data input operations by an operator. [Brief description of the drawings]
[0024] [Figure 1] 1 is a diagram showing an overall configuration of an environmental testing system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram illustrating a configuration of a setting device. [Diagram 3] 10 is a flowchart showing the flow of a setting process executed by a data processing unit. [Figure 4] FIG. 13 is a simplified diagram showing an example of an input screen for environmental conditions. [Diagram 5]FIG. 13 is a simplified diagram showing an example of an input screen for connection conditions. [Figure 6] FIG. 13 is a simplified diagram showing an example of an input screen on which data is input. [Figure 7] FIG. 13 is a simplified diagram showing an example of an input screen for connection conditions. [Figure 8] FIG. 2 is a simplified diagram illustrating an example of a setting screen displayed on a display unit of an operation terminal. [Figure 9] FIG. 13 is a diagram showing a configuration of an environmental testing device according to a first modified example. [Figure 10] FIG. 13 is a diagram showing a configuration of an environmental testing device according to a second modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In addition, elements with the same reference numerals in different drawings indicate the same or corresponding elements.
[0026] 1 is a diagram showing the overall configuration of an environmental testing system according to an embodiment of the present invention. As shown in Fig. 1, the environmental testing system includes a setting device 1, an environmental testing device 2, an external control device 3, an operation terminal 4, and a communication network 5.
[0027] The communication network 5 is any communication network such as the Internet or an intranet that supports any communication method such as IP.
[0028] The setting device 1 is a server device or the like connected to a communication network 5 .
[0029] The environmental test device 2 is an example of an environment forming device, and in the example of this embodiment, is a temperature and humidity test device connected to the communication network 5. The temperature and humidity test device evaluates the performance, etc. of the object W by applying temperature stress and humidity stress to the object W. However, the environment forming device may be a heat treatment device, etc.
[0030] The environmental test apparatus 2 has a control unit 11, an environmental control unit 12, a storage unit 13, and a connection unit 14. The control unit 11 is configured using a processor such as a CPU. The environmental control unit 12 is configured using a heating device, a cooling device, a humidifying device, a dehumidifying device, etc. The storage unit 13 is a chamber surrounded by a heat-insulating housing, and an object W is stored inside. The connection unit 14 is configured using a relay that is controlled to be turned on or off by the control unit 11. The object W is, for example, an electronic component such as a circuit board. Note that the connection unit 14 may not be configured as a part of the environmental test apparatus 2, but may be disposed between the environmental test apparatus 2 and the external control device 3.
[0031] The external control device 3 is a control device that externally controls the object W, and in this embodiment, is a power supply device for applying a current to the object W. The external control device 3 is externally connected to the object W via a relay provided in the connection unit 14. The control unit 11 connects the external control device 3 and the object W by turning on the relay (i.e., brings them into a conductive state), and disconnects the connection between the external control device 3 and the object W by turning off the relay (i.e., brings them into a disconnected state).
[0032] The operation terminal 4 is a personal computer or the like connected to the communication network 5. The operation terminal 4 has an input unit 21 such as a keyboard or a mouse, a processing unit 22 such as a CPU, and a display unit 23 such as a liquid crystal display.
[0033] FIG. 2 is a diagram showing the configuration of the setting device 1. As shown in FIG. 2, the setting device 1 has a data processing unit 31, a data communication unit 32, and a data storage unit 33, which are connected to each other via a bus. The data processing unit 31 is configured using a processor such as a CPU. The data communication unit 32 is configured using a communication module corresponding to the communication method of the communication network 5 such as IP. The data storage unit 33 is configured using any computer-readable storage medium such as an HDD, SSD, or semiconductor memory. A program 50 is stored in the data storage unit 33. The data processing unit 31 has an acquisition unit 41, a processing unit 42, and an output unit 43 as functions realized by the CPU executing the program 50 read from the data storage unit 33.
[0034] FIG. 3 is a flowchart showing the flow of the setting process executed by the data processing unit 31.
[0035] First, in step SP11, the acquisition unit 41 acquires the environment setting information and the connection setting information. The environment setting information is information for setting the environment conditions that the environmental test device 2 forms in the storage unit 13 by the environment control unit 12. In the example of this embodiment, the environment conditions are temperature conditions and humidity conditions. The connection setting information is information for setting the connection conditions between the object W and the external control device 3. The connection conditions are setting information for turning on or off the relay between the object W and the external control device 3. As will be described later, the environment setting information and the connection setting information are input to the operation terminal 4 by the operator by inputting data using the input unit 21, and are transmitted from the operation terminal 4 to the setting device 1 via the communication network 5. The acquisition unit 41 acquires the environment setting information and the connection setting information that the data communication unit 32 has received from the operation terminal 4 from the data communication unit 32.
[0036] Next, in step SP12, the processing unit 42 generates operation control information for controlling the operation of the environmental test device 2 based on the environmental setting information and the connection setting information acquired by the acquisition unit 41 in step SP11. When the operator presses a confirmation button in the input screen 61 described later, operation information to that effect is transmitted from the operation terminal 4 to the setting device 1. The processing unit 42 generates operation control information by confirming the setting contents of the input screen 61 being edited as a result of the acquisition unit 41 acquiring the operation information. The environmental test device 2 can execute a program operation having a plurality of test steps. In the program operation, the operation control information includes the environmental conditions set for each test step and the connection conditions set independently of the setting of the environmental conditions. In addition, the environmental test device 2 can execute a constant value operation in which the environmental values of the environmental conditions are constant. In the constant value operation, the operation control information includes the environmental conditions in which the environmental values are constant and the connection conditions set independently of the setting of the environmental conditions. Here, "independently settable" means that the relay can be set to on or off multiple times for one environmental condition, that is, the connection conditions can be changed and set for one environmental condition. Note that instead of the processing procedure in which the operation control information is generated after all operations by the operator are completed (step SP12 is executed only once after step SP11), a processing procedure in which the operation contents are sequentially reflected in the operation control information every time an operation is performed by the operator (step SP11 and step SP12 are repeatedly executed alternately) may be used. The same applies to the first and second modified examples described later.
[0037] Next, in step SP13, the output unit 43 outputs the operation control information generated by the processing unit 42 in step SP12. The operation control information output from the output unit 43 is transmitted from the data communication unit 32 to the environmental testing device 2 via the communication network 5. The control unit 11 controls the operation of the environment control unit 12 and the above-mentioned relay based on the received operation control information.
[0038] Fig. 4 is a simplified diagram showing an example of an input screen 61 for environmental conditions. Fig. 4 shows an example of the input screen 61 in program operation. Image data for the input screen 61 is transmitted from the setting device 1 to the operation terminal 4 via the communication network 5, and the input screen 61 is displayed on the display unit 23 of the operation terminal 4. The operator inputs data to the input screen 61 by operating the keyboard or mouse of the input unit 21, or the like.
[0039] In the input field 71, the number of the test step to be set among a plurality of test steps constituting the program operation is input.
[0040] In the input field 72, the set temperature value for the test step is input.
[0041] In the selection field 73, whether or not to perform temperature gradient control in the test step is selected.
[0042] In the input field 74, a set value for the temperature change rate when performing temperature gradient control is input.
[0043] In the input field 75, the humidity setting value for the corresponding test step is input.
[0044] In the selection field 76, whether or not humidity gradient control is performed in the test step is selected.
[0045] In the selection field 77, whether or not humidity control is performed in the test step is selected.
[0046] In the selection field 78, whether or not to control the exposure time in the test step is selected.
[0047] In the input field 79, a set value of the test time for the test step is input.
[0048] The icon 80 labeled "Step Details" is selected by clicking or the like when setting detailed items for the test step. The icon 80 is also selected when calling up an input screen 62 for connection conditions for the test step, which will be described later.
[0049] The setting value display fields 81 to 83 display representative setting values that have already been set for each of three consecutive test steps.
[0050] A graph showing the transition of the environmental value corresponding to the set environmental condition is displayed in the graph display field 84 .
[0051] 5 is a simplified diagram showing an example of an input screen 62 for connection conditions in program operation. The operator can call up the input screen 62 by selecting an icon 80 on the input screen 61. Image data for the input screen 62 is transmitted from the setting device 1 to the operation terminal 4 via the communication network 5, and the input screen 62 is displayed on the display unit 23 of the operation terminal 4. The operator inputs data to the input screen 62 by operating the keyboard or mouse of the input unit 21, or the like.
[0052] In the input selection field 91, a time setting value is input into each of a plurality of (six in this example) condition input fields, and the relay operation setting (relay on or off) within each input setting time is selected. However, the number of settable condition input fields is not limited to six, and may be any number. In this way, in the input screen 62 for one test step, the relay on period and off period during one test step can be set independently of the environmental condition setting.
[0053] In the input selection field 92, multiple (two in this example) repetition patterns are input, and the on and off repetition of the relay is set. However, the number of repetition patterns that can be set is not limited to two, and may be any number equal to or greater than one. Specifically, in the input selection field 92, the presence or absence of repetition control is selected, and the numbers of the condition to be the first and last condition of the repetition among the multiple conditions included in the input selection field 91 are input. In the input selection field 92, it is also selected whether the set condition is to be repeated until the test step is completed, or to be repeated a specified number of times. If the specified number of times is selected, the number of repetitions is input. The number of repetitions is not limited to multiple, and may be one, that is, the set condition is executed only once.
[0054] A graph display field 93 displays a graph showing the on / off transition of the relay corresponding to the set connection condition.
[0055] FIG. 6 is a simplified diagram showing an example of an input screen 62 on which data has been input.
[0056] In input selection field 91, a 10 minute off period is set in condition input field 1, a 10 minute on period is set in condition input field 2, a 10 minute off period is set in condition input field 3, a 5 minute off period is set in condition input field 4, a 5 minute on period is set in condition input field 5, and a 5 minute off period is set in condition input field 6.
[0057] In input selection field 92, repetition pattern 1 is set to repeat the conditions from condition input field 2 to condition input field 3 three times, and repetition pattern 2 is set to repeat the conditions from condition input field 5 to condition input field 6 until the end of the test step.
[0058] As a result of entering the above data into input selection fields 91 and 92, a graph is displayed in graph display field 93 that shows the following shape: off from 0 to 10 minutes, 10 minutes on and 10 minutes off repeated three times from 10 to 70 minutes, off from 70 to 75 minutes, and 5 minutes on and 5 minutes off repeated from 75 minutes onwards until the end of the test step.
[0059] 7 is a simplified diagram showing an example of an input screen 63 for connection conditions in constant value operation. Input selection fields 91, 92 and a graph display field 93 are similar to the input screen 62 shown in FIG.
[0060] In the input selection field 94, any one of on, off, and final maintain is selected as the connection condition after the connection control between the environmental testing device 2 and the external control device 3 is completed. If on is selected in the input selection field 94, the relay is forcibly set to on after the connection control based on the input selection fields 91 and 92 is completed. If off is selected in the input selection field 94, the relay is forcibly set to off after the connection control is completed. If final maintain is selected in the input selection field 94, the relay maintains the state it had at the time of completion of the connection control after the connection control is completed.
[0061] The input selection field 94 may be omitted from the input screen 63 for the constant value operation, or the input selection field 94 may be added to the input screen 62 for the program operation. In the example of this embodiment, the program operation and the constant value operation can be switched and executed in one environmental test apparatus 2, but the environmental test apparatus may be capable of executing only the program operation, or may be capable of executing only the constant value operation. Furthermore, in an environmental test apparatus 2 capable of executing both the program operation and the constant value operation, different input screens may be used for the program operation and the constant value operation with respect to the environmental conditions or connection conditions, or a common input screen may be used.
[0062] FIG. 8 is a simplified diagram showing an example of a setting screen 64 displayed on the display unit 23 of the operation terminal 4. In the setting screen 64, a plurality of connection conditions between the environmental test device 2 and the external control device 3 can be set. In this example, six connection settings 1 to 6 can be set, but the present invention is not limited to this. For each of the connection settings 1 to 6, the operator can select whether or not to perform independent control of the connection conditions. When the independent control is selected as ON, as described in the above embodiment, the processing unit 42 can set the connection conditions independently of the setting of the environmental conditions. When the independent control is selected as OFF, as in the conventional technology, the processing unit 42 sets the connection conditions to ON or OFF for each test step in the program operation, and sets the connection conditions to ON or OFF for the entire period in the constant value operation, or divides the constant value operation into steps according to the ON / OFF condition to be set.
[0063] Fig. 9 is a diagram showing the configuration of an environmental test device 2 according to a first modified example. The functions of the setting device 1 and the operation terminal 4 shown in Fig. 1 are implemented in the environmental test device 2. The environmental test device 2 includes a setting unit 15 having the same functions as the setting device 1, and an operation unit 16 having the same functions as the operation terminal 4. However, the implementation of the operation unit 16 in the environmental test device 2 may be omitted, and the environmental setting information and connection setting information may be transmitted from the operation terminal 4 to the setting unit 15 via the communication network 5.
[0064] The setting unit 15 has a data processing unit 31, a data communication unit 32, and a data storage unit 33 similar to those in FIG. 2. The data processing unit 31 has an acquisition unit 41, a processing unit 42, and an output unit 43 similar to those in FIG. 2. The data communication unit 32 is connected to the control unit 11. The data processing unit 31 may be shared with a control unit or a data processing unit (not shown) of the environmental test device 2. The data storage unit 33 may be shared with a data storage unit (not shown) of the environmental test device 2. The acquisition unit 41 acquires environmental setting information and connection setting information, the processing unit 42 generates operation control information based on the environmental setting information and the connection setting information acquired by the acquisition unit 41, and the output unit 43 outputs the operation control information generated by the processing unit 42. The processing unit 42 can set the connection conditions independently of the setting of the environmental conditions. The operation control information output from the output unit 43 is input to the control unit 11 via the data communication unit 32. The control unit 11 controls the operation of the environmental control unit 12 and the above relay based on the input operation control information.
[0065] The operation unit 16 has a display unit 23, a processing unit 22, and an input unit 21 similar to those in FIG. 1. The display unit 23, the processing unit 22, and the input unit 21 of the operation unit 16 may be common to the display unit, the processing unit, and the input unit (not shown) of the environmental test device 2, respectively. The control unit 11 and the setting unit 15 may be connected to the operation terminal 4 via a communication network 5. That is, the setting unit 15 may transmit image data of the input screens 61 to 63 and the setting screen 64 to the operation terminal 4, and receive environmental setting information and connection setting information from the operation terminal 4. The operation terminal 4 and the communication network 5 may be omitted.
[0066] FIG. 10 is a diagram showing a configuration of an environmental test device 2 according to a second modified example. The function of the setting device 1 shown in FIG. 1 is implemented in an operation terminal 4. The operation terminal 4 includes a setting unit 15 having the same function as the setting device 1. The setting unit 15 includes a data processing unit 31, a data communication unit 32, and a data storage unit 33 similar to those in FIG. 2. The data processing unit 31 includes an acquisition unit 41, a processing unit 42, and an output unit 43 similar to those in FIG. 2. The data processing unit 31 may be shared with the processing unit 22 included in the operation terminal 4. The data storage unit 33 may be shared with a data storage unit (not shown) included in the operation terminal 4. The acquisition unit 41 acquires environmental setting information and connection setting information, the processing unit 42 generates operation control information based on the environmental setting information and connection setting information acquired by the acquisition unit 41, and the output unit 43 outputs the operation control information generated by the processing unit 42. The processing unit 42 can set connection conditions independently of the setting of environmental conditions. The operation control information output from the output unit 43 is input to the control unit 11 via the data communication unit 32 and the communication network 5. The control unit 11 controls the operation of the environment control unit 12 and the above relays based on the input operation control information. Instead of connecting the operation terminal 4 to the communication network 5, the operation control information generated by the setting unit 15 of the operation terminal 4 may be stored in a storage medium such as a USB memory, and the control unit 11 may read out the operation control information from the storage medium.
[0067] According to this embodiment, the processing unit 42 can set the connection conditions independently of the setting of the environmental conditions. Therefore, in a program operation having a plurality of test steps, it is sufficient to divide the test steps in accordance with the change of the environmental conditions, and it is not necessary to divide the test steps into small parts in accordance with the switching of the connection conditions, so that the efficiency of the data input work by the operator can be improved. Also, in a constant value operation in which the environmental value of the environmental condition is constant, it is possible to arbitrarily switch the application of current to the object W on or off by setting the connection conditions independent of the environmental conditions, so that a detailed environmental test can be performed.
[0068] Furthermore, according to this embodiment, the conduction period or cut-off period between the environmental test device 2 and the external control device 3 can be arbitrarily set by the connection setting information.
[0069] Furthermore, according to this embodiment, the number of repetitions of the conductive period and the cutoff period, etc. can be arbitrarily set by the connection setting information.
[0070] Furthermore, according to this embodiment, the connection conditions after the connection control between the environmental test device 2 and the external control device 3 is completed can be set arbitrarily using the connection setting information. [Explanation of symbols]
[0071] 1 Setting device 2. Environmental testing equipment 3 External control device 4 Operation terminal 11 Control section 12 Environmental Control Section 13 Storage unit 31 Data Processing Unit 33 Data storage unit 41 Acquisition Department 42 Processing section 43 Output section 50 Programs W Object
Claims
1. A setting device for setting operation control information for controlling the operation of an environment forming device, an acquisition unit that acquires environmental setting information for setting an environmental condition formed by the environmental forming device and connection setting information for setting a connection condition between an object to which the environmental condition is applied and an external control device; a processing unit that generates the operation control information based on the environmental setting information and the connection setting information acquired by the acquisition unit; an output unit that outputs the operation control information generated by the processing unit; Equipped with The processing unit is capable of setting the connection conditions independently of setting of the environmental conditions.
2. The setting device according to claim 1 , wherein the processing unit is capable of changing and setting the connection condition for one of the environmental conditions.
3. The setting device according to claim 1 , wherein the connection setting information includes setting information for a conductive period during which the object and the external control device are connected, and setting information for a disconnected period during which the object and the external control device are not connected.
4. The setting device according to claim 3 , wherein the connection setting information further includes setting information for repeating the conductive period and the cut-off period.
5. 5. The setting device according to claim 1, wherein the connection setting information includes a connection condition after connection control between the object and the external control device is terminated.
6. A processor mounted on a setting device that sets operation control information for controlling the operation of the environment forming device, an acquisition step of acquiring environmental setting information for setting an environmental condition formed by the environmental forming device and connection setting information for setting a connection condition between an object to which the environmental condition is applied and an external control device; a processing step of generating the operation control information based on the environment setting information and the connection setting information acquired in the acquisition step; an output step of outputting the operation control information generated in the processing step; Run the command, A program, wherein in the processing step, the connection conditions can be set independently of the setting of the environmental conditions.
7. A storage section for storing an object; An environment control unit for controlling an environment within the container; An environment forming device comprising: A setting unit for setting operation control information for controlling the operation of the environment forming device is further provided, The setting unit is an acquisition unit that acquires environment setting information for setting an environment condition to be formed by the environment forming device and connection setting information for setting a connection condition between the object and an external control device; a processing unit that generates the operation control information based on the environmental setting information and the connection setting information acquired by the acquisition unit; an output unit that outputs the operation control information generated by the processing unit; having The processing unit is capable of setting the connection conditions independently of setting the environmental conditions.
8. A setting method for setting operation control information for controlling an operation of an environment forming device, comprising: an acquisition step of acquiring environmental setting information for setting an environmental condition formed by the environmental forming device and connection setting information for setting a connection condition between an object to which the environmental condition is applied and an external control device; a processing step of generating the operation control information based on the environment setting information and the connection setting information acquired in the acquisition step; an output step of outputting the operation control information generated in the processing step; Equipped with A setting method, wherein in the processing step, the connection conditions can be set independently of setting of the environmental conditions.
Citation Information
Patent Citations
Countable multi-section time control circulation system and method
CN113848502A
Environment testing device
JP2019015585A
Environment management device, environment formation system, program, and method for managing environment
JP2022012795A