Mobile station, transmission method and integrated circuit

The method addresses inefficiencies in NR-U resource allocation by associating SRS and PUSCH transmissions using partial interlace allocation, enhancing uplink reception quality and compliance with regulatory standards through implicit resource notification.

JP7579937B2Active Publication Date: 2024-11-08PANASONIC INTELLECTUAL PROPERTY CORP OF AMERICA
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023146789
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-01-09
Filing Date
2023-09-11
Publication Date
2024-11-08
Estimated Expiration
2039-09-12

AI Technical Summary

Technical Problem

Resource allocation methods in unlicensed bands for 5G communication systems, such as NR-U, have not been sufficiently studied, particularly in terms of interlace allocation and SRS resource notification, leading to inefficiencies and potential non-compliance with regulatory requirements like Occupied Channel Bandwidth (OCB) and carrier sense protocols.

Method used

A method for allocating resources in unlicensed bands by associating SRS and PUSCH transmissions using partial interlace allocation, where the frequency resources for SRS are determined based on the association with SRS parameters notified by the base station, allowing implicit notification of PUSCH allocation without additional control signals, thus adhering to OCB requirements and reducing signaling overhead.

Benefits of technology

This approach enables efficient resource allocation in unlicensed bands, improving uplink reception quality and reducing interference, while ensuring compliance with regulatory standards by optimizing SRS and PUSCH transmissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007579937000001
    Figure 0007579937000001
  • Figure 0007579937000002
    Figure 0007579937000002
  • Figure 0007579937000003
    Figure 0007579937000003
Patent Text Reader

Abstract

To appropriately allocate resources in unlicensed bands.SOLUTION: A mobile station includes a control circuit that determines resources to be used for sidelink transmission on the basis of the resource association between a sidelink reference signal and other sidelink signals different from the reference signal, and a transmission circuit that transmits or a receiving circuit that receives at least one of a reference signal and other side link signals using the resources, the resources on which other sidelink signals are placed are at least some of the resources indicated by control information, and in the association, a resource where one of the reference signal and the other sidelink signals is allocated is associated with a resource of the other of the reference signal and the other sidelink signals.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a mobile station, a base station, a transmission method, and a reception method. [Background technology]

[0002] A communication system called the fifth generation mobile communication system (5G) is being considered. The 3rd Generation Partnership Project (3GPP), an international standardization organization, is considering the advancement of the 5G communication system from the perspectives of both the advancement of the LTE / LTE-Advanced system and New Radio Access Technology (also called New RAT or NR), which is a new method that does not necessarily have backward compatibility with the LTE / LTE-Advanced system (for example, see Non-Patent Document 1).

[0003] In NR, in addition to licensed bands, operation in unlicensed bands is being considered, similar to LTE's License-Assisted Access (LAA) or Enhanced LAA (eLAA) (see, for example, Non-Patent Document 2). Operation in unlicensed bands is also called, for example, NR-based Access to Unlicensed Spectrum or NR-U. [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] RP-181726, "Revised WID on New Radio Access Technology", NTT DOCOMO, September 2018 [Non-Patent Document 2] RP-182878, "New WID on NR-based Access to Unlicensed Spectrum", Qualcomm, December 2018 [Non-Patent Document 3] ETSI EN 301 893 V2.1.1, "5 GHz RLAN; Harmonized Standard covering the essential requirements of article 3.2 of Directive 2014 / 53 / EU," May 2017 [Non-Patent Document 4] 3GPP TS 38.101-1 V15.3.0, "NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone (Release 15)," September 2018 [Non-Patent Document 5] 3GPP TS 36.213 V15.3.0, "Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 15)," September 2018 [Non-Patent Document 6] 3GPP TS 37.213 V15.1.0, "Physical layer procedure for shared spectrum channel access (Release 15)," September 2018 Summary of the Invention

[0005] However, resource allocation methods in unlicensed bands have not been thoroughly considered.

[0006] Non-limiting embodiments of the present disclosure contribute to providing a mobile station, a base station, a transmission method, and a reception method that can appropriately allocate resources in an unlicensed band.

[0007] A mobile station according to an embodiment of the present disclosure includes: a control circuit that determines a frequency resource to be used for uplink transmission based on a resource association between an uplink reference signal and another uplink signal different from the reference signal; and a transmission circuit that transmits at least one of the reference signal and the other uplink signal using the frequency resource.

[0008] These comprehensive or specific aspects may be realized as a system, an apparatus, a method, an integrated circuit, a computer program, or a recording medium, or may be realized as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.

[0009] According to an embodiment of the present disclosure, resources in an unlicensed band can be appropriately allocated.

[0010] Further advantages and benefits of an embodiment of the present disclosure will become apparent from the specification and drawings. Such advantages and / or benefits may be provided by some of the embodiments and features described in the specification and drawings, respectively, but not necessarily all of them may be provided to obtain one or more identical features. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 shows an example of interlace allocation. [Diagram 2] A diagram showing an example of SRS request parameters [Diagram 3] FIG. 1 is a block diagram showing a configuration example of a part of a base station according to a first embodiment; [Figure 4] FIG. 1 is a block diagram showing a configuration example of a part of a mobile station according to a first embodiment; [Diagram 5] FIG. 1 is a block diagram showing a configuration example of a base station according to a first embodiment; [Figure 6] FIG. 1 is a block diagram showing a configuration example of a mobile station according to a first embodiment; [Figure 7]A sequence diagram showing an example of setting a base station and a mobile station according to the first embodiment. [Figure 8] FIG. 13 is a diagram showing an example of an SRS request according to the first operation example of the first embodiment; [Figure 9] FIG. 1 is a diagram showing an example of association between cyclic shift numbers and allocated frequency resources of PUSCH according to an operation example 1 of the first embodiment; [Figure 10] FIG. 13 is a diagram showing an example of an SRS request according to an operation example 2 of the first embodiment; [Figure 11] FIG. 13 is a diagram showing an example of association between time positions and allocated frequency resources of PUSCH according to an operation example 2 of the first embodiment; [Figure 12] FIG. 11 is a diagram showing another example of association between cyclic shift numbers and time positions and allocated frequency resources of PUSCH according to the first embodiment. [Figure 13] A sequence diagram showing an example of setting a base station and a mobile station according to the second embodiment. [Figure 14] FIG. 13 is a diagram showing an example of an SRS request according to the second embodiment. [Figure 15] A sequence diagram showing an example of setting a base station and a mobile station according to a third embodiment. [Figure 16] FIG. 13 is a diagram showing an example of an SRS request according to the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings.

[0013] [Interlace Allocation] In unlicensed bands, the upper limit of power spectral density (PSD) is restricted by, for example, laws, regulations, standards, etc. For example, according to the standard of the European Telecommunications Standards Institute (ETSI), the upper limit of PSD in the band called 5 GHz is restricted to 10 dBm / MHz (17 dBm / MHz in some bands) for mobile stations (also called terminals or User Equipment (UE)) having a power control function (see, for example, Non-Patent Document 3).

[0014] In order for a mobile station to transmit a signal using a higher transmission power under the PSD restriction, a method (or allocation method) of arranging signals by spreading (or distributing) resources (hereinafter referred to as frequency resources) in the frequency domain is effective. In NR-U, for example, an allocation method called "interlace allocation" is being considered.

[0015] In interlace allocation, a certain band (e.g., 20 MHz) is divided into multiple interlaces. An interlace has, for example, multiple consecutive subcarrier groups. One consecutive subcarrier group may be, for example, one physical resource block (PRB: Physical Resource Block. One PRB has 12 subcarriers (subcarriers)). Furthermore, the multiple consecutive subcarrier groups that make up one interlace are distributed at equal or uneven intervals in the frequency domain.

[0016] Also, for example, different interlaces have different frequency resources, that is, the frequency resources constituting each interlace do not overlap.

[0017] For example, in the frequency bands lower than 6 GHz for NR, the maximum number of PRBs allocated in a 20 MHz band is 106, 53, and 26 for subcarrier spacings (SCS) of 15 kHz, 30 kHz, and 60 kHz, respectively (see, for example, Non-Patent Document 4).

[0018] In NR unlicensed bands (e.g., frequency bands below 7 GHz), interlace configuration is being considered based on the maximum number of PRB allocations mentioned above.

[0019] For example, in 3GPP NR-U, a 20 MHz band is divided into M interlaces, and each of the M interlaces has N PRBs (e.g., corresponding to the above-mentioned subcarrier group), and multiple combinations of M and N are considered. M and N are examples of parameters indicating the configuration of an interlace. Also, if the maximum allocation number of PRBs is not a multiple of M, the number of PRBs (e.g., N) in one interlace may be one more than the number of PRBs in another interlace.

[0020] As an example, the case of M=12 is considered when the subcarrier spacing is 15 kHz. As mentioned above, when the subcarrier spacing is 15 kHz, the maximum number of PRBs allocated is 106, which is not a multiple of M=12. Therefore, in the case of M=12, one interlace has 9 PRBs (N=9) and another interlace has 8 PRBs (N=8).

[0021] FIG. 1 shows an example of an interlace configuration for the above mentioned cases (SCS=15 kHz, M=12, N=8 or 9).

[0022] 1, a 20 MHz band (106 PRBs) is divided into M=12 interlaces. The 12 interlaces are assigned interlace numbers (or interlace indices) from 0 to 11, respectively.

[0023] Also, among the PRBs belonging to each interlace, the n-th PRB from the lowest frequency is sometimes called the “PRB belonging to cluster number n.” In the example of FIG. 1, there are nine clusters with cluster numbers #0 to #8.

[0024] In eLAA, for example, interlace allocation for uplink data channels (e.g., PUSCH: Physical Uplink Shared CHannel) is assumed. The method of notifying interlace allocation in eLAA is, for example, a notification method based on the interlace number of the interlace on which PUSCH is arranged. For example, according to Uplink resource allocation type 3 described in Non-Patent Document 5, a Resource Indication Value (RIV) is notified to a mobile station. The mobile station derives the interlace number of the interlace on which PUSCH is arranged based on the value of the RIV. Note that in the interlace allocation in eLAA, it is not possible to notify that "PUSCH is arranged in a part of the interlace (e.g., some PRBs)".

[0025] On the other hand, in NR-U, interlace allocation for uplink channels or reference signals (e.g., sounding reference signals (SRS)) is being considered. Note that uplink channels include, for example, PUSCH, uplink control channels (e.g., PUCCH: Physical Uplink Control CHannel), and random access channels (e.g., PRACH: Physical Random Access CHannel).

[0026] In addition, in NR-U, a method of allocating signals to PRBs that belong to some clusters among the PRBs included in an interlace is also being considered. Hereinafter, the method of allocating signals to PRBs that belong to some clusters among the PRBs included in an interlace is referred to as "allocation to partial interlaces."

[0027] By utilizing partial interlacing, signals from multiple mobile stations can be frequency-division multiplexed (FDM) onto one interlace, improving the efficiency of resource allocation.

[0028] However, as described above, in the eLAA uplink resource allocation type 3, notification of allocation to partial interlaces is not assumed. Also, in LTE and NR-U, a method of notifying allocation to partial interlaces has not been sufficiently discussed.

[0029] Therefore, in one embodiment of the present disclosure, a method of notifying allocation to partial interlaces will be described (see, for example, embodiment 1 described later).

[0030] In addition, in the case of allocation to a partial interlace, the OCB (Occupied Channel Bandwidth) is narrower than in the case of allocation to all PRBs belonging to an interlace. For example, ETSI has a provision that "if the OCB of some signals satisfies the requirement that the OCB of the entire bandwidth is 80-100% (hereinafter also referred to as the OCB requirement) within the same channel occupancy time (COT), the OCB of other signals may be less than 80%" (for example, see Non-Patent Document 3).

[0031] When partial interlacing is used, there is a possibility that the above-mentioned 80-100% OCB requirement may not be satisfied for a mobile station using partial interlacing. Therefore, when applying allocation to partial interlacing to PUSCH, in order to satisfy the OCB requirement according to the above-mentioned provision, it is assumed that, for example, another signal (e.g., SRS) transmitted at a timing different from the transmission timing of PUSCH within the same COT is transmitted so as to satisfy the OCB requirement.

[0032] [SRS] In NR-U, it is assumed that a mobile station transmits an SRS, similar to eLAA or NR Release 15 (NR Rel-15), etc. The purpose of the SRS is for a base station (also called a gNB, for example) that receives the SRS to estimate the uplink channel quality in the SRS resource.

[0033] In addition, in NR-U, aperiodic SRS may be introduced, similar to eLAA or NR Rel-15. The aperiodic SRS refers to an SRS whose transmission is dynamically instructed (or triggered) by an "SRS request" field included in downlink control information (e.g., DCI: Downlink Control Information). Figure 2 shows an example of a notification of an SRS request.

[0034] The mobile station may transmit the SRS using a resource (e.g., an "SRS resource") included in an SRS resource set associated with the notified SRS request value (any of 00 to 11 in FIG. 2). The SRS resource may include information such as a resource (e.g., a time resource and a frequency resource) in which the SRS is placed, the number of symbols (in other words, duration), a cyclic shift number of the SRS sequence, or a comb number.

[0035] Also, the SRS resource is, for example, a higher layer parameter notified from a base station to a mobile station in a higher layer. For example, in FIG. 2, the mobile station may control the transmission of the SRS by using an SRS resource set corresponding to the value of the SRS request notified by the DCI, among SRS resource sets including the SRS resource notified by the higher layer.

[0036] In addition, in NR-U, interlace allocation of SRS is being considered. By arranging SRS in an interlace, for example, it becomes easy to frequency-division multiplex the SRS with signals of other uplink channels (e.g., PUSCH, PUCCH, PRACH, etc.) that are interlace-allocated in the same manner as the SRS (e.g., transmitted by other mobile stations).

[0037] As described above, in NR Rel-15, SRS resources (for example, frequency resources and time resources) are configured by the SRS resource, which is a higher layer parameter.

[0038] However, the SRS resource configurable in LTE or NR is not a resource assuming interlace allocation, and there has been no sufficient discussion on how to notify the interlace arrangement of the SRS.

[0039] Therefore, in one embodiment of the present disclosure, a method of notifying allocation to partial interlaces will be described (see, for example, embodiment 2 or 3 described later).

[0040] In addition, in the SRS of NR Rel-15, time division multiplexing (TDM) is possible for the SRS and PUSCH transmitted from the same mobile station, but frequency division multiplexing (FDM) and code division multiplexing (CDM) are not assumed to be performed. In NR-U, as in NR Rel-15, the SRS and PUSCH transmitted from the same mobile station can be time division multiplexed.

[0041] In addition, in NR Rel-15, it is assumed that the SRS is arranged in the symbol following the PUSCH in the same slot. In addition, it is assumed that the SRS is allocated, for example, in the last 6 symbols of the slot. On the other hand, in NR-U, it is considered to eliminate the restriction on the allocation of the SRS such as in NR Rel-15 and to make it possible to allocate the SRS to any symbol in the slot. For example, it is considered to arrange the SRS in the symbol before the PUSCH in the same slot and perform time division multiplexing. The SRS arranged in the symbol before the PUSCH is called, for example, a "front-loaded SRS".

[0042] (Embodiment 1) In this embodiment, a method of notifying allocation to partial interlaces will be described.

[0043] [Communication system overview] The communication system according to this embodiment includes a base station (corresponding to a receiver) 100 and a mobile station (corresponding to a transmitter) 200.

[0044] Fig. 3 is a block diagram showing a configuration example of a part of base station 100 according to the present embodiment. In base station 100 shown in Fig. 3, control unit (corresponding to a control circuit) 101 determines a frequency resource to be used for uplink transmission based on resource association between an uplink reference signal (e.g., SRS) and another uplink signal (e.g., PUSCH) different from the reference signal. Receiving unit 106 receives at least one of the reference signal and the other uplink signal using the frequency resource.

[0045] Fig. 4 is a block diagram showing a configuration example of a part of mobile station 200 according to this embodiment. In mobile station 200 shown in Fig. 4, control unit (corresponding to a control circuit) 205 determines a frequency resource to be used for uplink transmission based on resource association between an uplink reference signal (e.g., SRS) and another uplink signal (e.g., PUSCH) different from the reference signal. Transmitter 209 transmits at least one of the reference signal and the other uplink signal using the frequency resource.

[0046] [Base station configuration] Fig. 5 is a block diagram showing an example of the configuration of base station 100 according to this embodiment. In Fig. 5, base station 100 has a control unit 101, an encoding and modulation unit 102, a signal mapping unit 103, a transmission unit 104, an antenna 105, a reception unit 106, a signal separation unit 107, a demodulation and decoding unit 108, and a channel quality estimation unit 109.

[0047] The control unit 101, for example, determines one or more SRS resource settings (for example, the SRS resource set or SRS resource shown in FIG. 2) and outputs an upper layer signal including information indicating the determined SRS resource settings to the coding and modulation unit 102.

[0048] Furthermore, the control unit 101 performs scheduling for an uplink data signal (for example, a PUSCH signal) and allocates SRS resources (for example, an SRS resource) based on the channel quality estimation value input from the channel quality estimation unit 109. Then, the control unit 101 generates PUSCH scheduling information and SRS resource information. The PUSCH scheduling information includes, for example, a modulation and coding scheme (MCS) setting, PUSCH resource allocation information (for example, RIV, etc.), and transmission power control information. The control unit 101 outputs downlink control information (for example, DCI) including at least one of the generated scheduling information and SRS resource allocation information to the signal arrangement unit 103. Furthermore, the control unit 101 outputs resource information indicating PUSCH and SRS resource allocation to the signal separation unit 107.

[0049] The coding and modulation section 102 performs error correction coding and modulation on the upper layer signal inputted from the control section 101 , and outputs the modulated signal to the signal mapping section 103 .

[0050] Signal mapping section 103 maps the signal input from encoding / modulating section 102 or DCI input from control section 101 to resources in the time domain and frequency domain. Signal mapping section 103 outputs the signal mapped to the resources to transmitting section 104.

[0051] The transmitting section 104 performs radio transmission processing such as frequency conversion using a carrier wave on the signal input from the signal mapping section 103 , and outputs the signal after the radio transmission processing to the antenna 105 .

[0052] The antenna 105 radiates the signal input from the transmitting unit 104 (in other words, a downlink signal) toward the mobile station 200. In addition, the antenna 105 outputs the uplink signal (including, for example, a PUSCH and an SRS) received from the mobile station 200 to the receiving unit 106.

[0053] Receiving section 106 performs radio reception processing such as frequency conversion on the signal input from antenna 105 , and outputs the signal after reception processing to signal separating section 107 .

[0054] The signal separating unit 107 separates the PUSCH and the SRS from the signal input from the receiving unit 106, based on the resource information input from the control unit 101. The signal separating unit 107 outputs the data signal included in the separated PUSCH to the demodulation and decoding unit 108, and outputs the SRS to the channel quality estimation unit 109.

[0055] The demodulation / decoding unit 108 demodulates and decodes the data signal input from the signal separation unit 107, and outputs an uplink data signal.

[0056] The channel quality estimator 109 calculates a channel quality estimation value based on the SRS input from the signal separator 107 , and outputs the channel quality estimation value to the controller 101 .

[0057] [Mobile station configuration] Fig. 6 is a block diagram showing an example of the configuration of mobile station 200 according to this embodiment. In Fig. 6, mobile station 200 has antenna 201, receiving section 202, signal separating section 203, demodulating and decoding section 204, control section 205, SRS generating section 206, coding and modulating section 207, signal mapping section 208, and transmitting section 209.

[0058] The antenna 201 receives a downlink signal transmitted by the base station 100 (see, for example, FIG. 5), and outputs the signal to the receiving unit 202. The antenna 201 also radiates an uplink signal input from the transmitting unit 209 to the base station 100.

[0059] Receiving section 202 performs radio reception processing such as frequency conversion on the signal input from antenna 201 , and outputs the signal after radio reception processing to signal separating section 203 .

[0060] Signal separating section 203 separates, for example, a data signal and DCI from the signal inputted from receiving section 202. Of the separated signals, signal separating section 203 outputs the data signal to demodulation and decoding section 204 and outputs the DCI to control section 205.

[0061] The demodulation and decoding unit 204 demodulates and decodes the data signal inputted from the signal separation unit 203. The demodulation and decoding unit 204 outputs to the control unit 205 the upper layer signal obtained by decoding.

[0062] Control unit 205 derives allocated resources for the PUSCH and SRS notified by base station 100, based on the higher layer signal input from demodulation and decoding unit 204 and the DCI input from signal separation unit 203. Control unit 205 outputs resource information for the PUSCH and SRS to signal mapping unit 208, and outputs resource information for the SRS to SRS generation unit 206.

[0063] SRS generation section 206 generates an SRS based on the SRS resource information inputted from control section 205 , and outputs the SRS to signal mapping section 208 .

[0064] The coding and modulation unit 207 performs error correction coding and modulation on the uplink data signal, and outputs the modulated signal to the signal mapping unit 208 .

[0065] Signal mapping section 208 maps the signal inputted from coding and modulation section 207 and the SRS inputted from SRS generation section 206 to resources in the time and frequency domains, based on resource information of the PUSCH and SRS inputted from control section 205. Signal mapping section 208 outputs the signal mapped to the resources to transmission section 209.

[0066] The transmitting section 209 performs radio transmission processing such as frequency conversion using a carrier wave on the signal input from the signal mapping section 208 , and outputs the signal after the radio transmission processing to the antenna 201 .

[0067] [Example of operation of base station 100 and mobile station 200] Next, an example of the operation of the base station 100 (see FIG. 5) and the mobile station 200 (see FIG. 6) will be described.

[0068] FIG. 7 is a sequence diagram showing an example of processing performed by the base station 100 and the mobile station 200. As shown in FIG.

[0069] In FIG. 7, as an example, mobile station 200 transmits an SRS and an interlaced PUSCH (uplink data signal) based on an instruction from base station 100.

[0070] In FIG. 7, base station 100 sets higher layer parameters (for example, SRS resource parameters) (ST101).

[0071] Base station 100 notifies (in other words, sets) an SRS resource to mobile station 200 by using, for example, at least one of a higher layer signal and DCI (ST102). Note that the SRS resource may include information such as the position of the SRS in the time domain and frequency domain, and the cyclic shift number or comb number of the SRS sequence.

[0072] Base station 100 schedules uplink transmission of, for example, PUSCH, SRS, and the like (ST103).

[0073] Base station 100 instructs mobile station 200 to transmit PUSCH and SRS, for example, by using DCI (for example, at least one of RIV and SRS request) (ST104). At this time, base station 100 may instruct mobile station 200 of an interlace number to which PUSCH is to be allocated, for example, by using RIV. Furthermore, base station 100 may instruct mobile station 200 of an SRS resource to be used for SRS transmission in mobile station 200, from among SRS resources notified by, for example, a higher layer signal. For example, the SRS resource may be instructed by using an "SRS request" field, which will be described later.

[0074] Mobile station 200 checks resources allocated to uplink transmission of PUSCH, SRS, etc., based on the higher layer signal and DCI notified from base station 100 (ST105). For example, mobile station 200 checks the interlace number indicated by the RIV, and checks the SRS resource indicated by the SRS request. In the present embodiment, the allocated frequency resource of PUSCH is associated with, for example, the parameters of SRS notified by DCI from base station 100.

[0075] Furthermore, mobile station 200 determines whether or not the frequency resources allocated to the PUSCH are a "partial interlace" based on the resources allocated to the SRS (ST106). A method for determining whether or not an interlace is a "partial interlace" will be described later.

[0076] If the frequency resource in which the PUSCH is allocated (hereinafter also referred to as the "allocated frequency resource") is a "partial interlace" (ST106: Yes), mobile station 200 changes the frequency resource of the PUSCH from the frequency resource notified by base station 100 (e.g., the resource of the entire interlace indicated by the RIV) to the partial interlace (ST107).

[0077] On the other hand, if the allocated resources for the PUSCH are not "partial interlace" (ST106: No), mobile station 200 does not change the frequency resources for the PUSCH from the resources for the entire interlace.

[0078] Mobile station 200 then maps a PUSCH (in other words, an uplink data signal) to the determined allocation resource, and maps an SRS to the resource indicated by the SRS request (ST108). Mobile station 200 transmits the uplink signal mapped to the allocation resource to, for example, base station 100 (ST109).

[0079] Hereinafter, operation example 1 and operation example 2 of notifying resource allocation for PUSCH will be described respectively.

[0080] <Example 1> In the first operational example, the allocated frequency resource of the PUSCH is associated with the cyclic shift number of the SRS sequence set in the SRS resource, which is an SRS parameter notified by DCI from base station 100, for example.

[0081] FIG. 8 shows an example of an SRS request set for the mobile station 200. As shown in FIG.

[0082] 8, three patterns of SRS resources #1, #2, and #3 are set as SRS resources specified by an SRS request. Note that the SRS resource is not limited to three patterns, and two or four or more patterns may be set.

[0083] Also, for example, a different value may be set for the cyclic shift number of the SRS sequence for each SRS resource. In the example shown in Fig. 8, cyclic shift number #1 is set for SRS resource #1, cyclic shift number #2 is set for SRS resource #2, and cyclic shift number #3 is set for SRS resource #3.

[0084] Base station 100 indicates the SRS resource used by mobile station 200 for SRS transmission, for example, by an SRS request field (any of 00 to 11) included in DCI. Note that when the SRS request is "00", mobile station 200 does not transmit SRS.

[0085] Mobile station 200 determines the allocated frequency resource of the PUSCH based on the cyclic shift number of the SRS sequence set by the SRS request. For example, mobile station 200 determines the allocated frequency resource of the PUSCH from the cyclic shift number of the SRS based on the association between the cyclic shift number of the SRS and the allocated frequency resource of the PUSCH shown in FIG.

[0086] In the example shown in FIG. 9, each interlace has nine clusters (cluster numbers #0 to #8) as shown in FIG.

[0087] Furthermore, the association between the cyclic shift number of the SRS and the allocated frequency resource of the PUSCH shown in FIG. 9 may be defined by a standard, or may be set in the mobile station 200 by a higher layer signal, DCI, or the like.

[0088] In FIG. 9, when an SRS resource with cyclic shift number #1 is configured in mobile station 200, mobile station 200 sets all interlaces (e.g., cluster numbers #0 to #8) notified by the RIV included in the DCI from base station 100 as the allocated frequency resource for PUSCH.

[0089] 9, when an SRS resource with cyclic shift number #2 or #3 is configured in mobile station 200, mobile station 200 configures, as PUSCH allocation frequency resources, some frequency resources (in other words, some clusters) of the interlaces notified by the RIV included in the DCI from base station 100. In other words, when SRS request="10" or "11" shown in FIG. 9, mobile station 200 changes the allocation of the entire interlaces notified by the RIV to the allocation of partial interlaces.

[0090] For example, when cyclic shift number #2, mobile station 200 allocates PUSCH in frequency resources of cluster numbers #0 to #4 among the interlaces (e.g., cluster numbers #0 to #8) notified by the RIV. Also, when cyclic shift number #3, mobile station 200 allocates PUSCH in frequency resources of cluster numbers #5 to #8 among the interlaces (e.g., cluster numbers #0 to #8) notified by the RIV.

[0091] In this manner, in operation example 1, the allocated frequency resource of the PUSCH associated with at least one of the cyclic shift numbers (cyclic shift numbers #2 and #3 in FIG. 9 ) of the SRS sequence, which is a parameter of the SRS resource notified to mobile station 200 by the SRS request, is a portion of the frequency resources (e.g., partial interlaces) of the frequency resources (e.g., interlaces) of the PUSCH notified by the DCI (e.g., RIV).

[0092] For example, base station 100 notifies mobile station 200 of allocation to partial interlaces by notifying SRS request="10" or "11" shown in Fig. 9. In other words, in operation example 1, allocation of PUSCH to partial interlaces is implicitly notified from base station 100 to mobile station 200 by notifying the cyclic shift number of the SRS sequence.

[0093] As a result, according to the first operation example, base station 100 can notify mobile station 200 of the allocation of PUSCH to partial interlaces without adding a control signal for the allocation of PUSCH.

[0094] In the operation example 1, as an example, a case has been described in which a cyclic shift number is used to identify the allocated frequency resource of the PUSCH shown in Fig. 9. However, the parameter of the SRS used to identify the allocated frequency resource of the PUSCH is not limited to the cyclic shift number, and may be another parameter of the SRS (for example, a comb number or a time resource).

[0095] <Example 2> In the second operation example, the allocated frequency resource of the PUSCH is associated with the time position of the SRS set in the SRS resource, which is a parameter of the SRS notified by the DCI from the base station 100, for example.

[0096] FIG. 10 shows an example of an SRS request set for the mobile station 200. As shown in FIG.

[0097] 10, three patterns of SRS resources #1, #2, and #3 are set as SRS resources specified by an SRS request. Note that the SRS resource is not limited to three patterns, and two or four or more patterns may be set.

[0098] Also, for example, a different value may be set for the time position of the SRS for each SRS resource. In the example shown in Fig. 10, time position #A is set for SRS resource #1, time position #B is set for SRS resource #2, and time position #C is set for SRS resource #3.

[0099] Also, here, time position #A indicates "a position (e.g., a symbol position) after a PUSCH arranged in the same slot", and time positions #B and #C indicate "positions before a PUSCH arranged in the same slot".

[0100] Base station 100 indicates the SRS resource used by mobile station 200 for SRS transmission, for example, by an SRS request field (any of 00 to 11) included in DCI. Note that when the SRS request is "00", mobile station 200 does not transmit SRS.

[0101] Mobile station 200 determines the frequency resource to be allocated to the PUSCH based on the time position of the SRS set by the SRS request. For example, mobile station 200 determines the frequency resource to be allocated to the PUSCH from the time position of the SRS based on the association between the time position of the SRS and the frequency resource to be allocated to the PUSCH shown in FIG.

[0102] In the example shown in FIG. 11, each interlace has nine clusters (cluster numbers #0 to #8) as shown in FIG.

[0103] Furthermore, the association between the time positions of the SRS and the allocated frequency resources of the PUSCH shown in FIG. 11 may be defined by a standard, or may be set in mobile station 200 by higher layer signaling, DCI, or the like.

[0104] In FIG. 11, when an SRS resource at time position #A is configured in mobile station 200, mobile station 200 sets all interlaces (e.g., cluster numbers #0 to #8) notified by the RIV included in the DCI from base station 100 as allocated frequency resources for PUSCH.

[0105] 11, when an SRS resource at time position #B or #C is configured in mobile station 200, mobile station 200 configures, as PUSCH allocation frequency resources, some frequency resources (in other words, some clusters) of the interlaces notified by the RIV included in the DCI from base station 100. In other words, when SRS request="10" or "11" shown in FIG. 10, mobile station 200 changes the allocation of the entire interlaces notified by the RIV to the allocation of partial interlaces.

[0106] For example, in the case of time position #B, mobile station 200 allocates PUSCH in frequency resources of cluster numbers #0 to #4 among the interlaces (e.g., cluster numbers #0 to #8) notified by the RIV. Also, in the case of time position #C, mobile station 200 allocates PUSCH in frequency resources of cluster numbers #5 to #8 among the interlaces (e.g., cluster numbers #0 to #8) notified by the RIV.

[0107] In this manner, in the second operational example, the allocated frequency resource of the PUSCH associated with at least one of the time positions of the SRS (in FIG. 11, time positions #B and #C earlier than the PUSCH), which is a parameter of the SRS resource notified to the mobile station 200 by the SRS request, is a portion of the frequency resources (e.g., partial interlaces) of the frequency resources (e.g., interlaces) of the PUSCH notified by the DCI (e.g., RIV).

[0108] For example, base station 100 notifies mobile station 200 of allocation to partial interlaces by notifying SRS request="10" or "11" shown in Fig. 10. In other words, in operation example 2, allocation of PUSCH to partial interlaces is implicitly notified from base station 100 to mobile station 200 by notifying the time position of the SRS.

[0109] As a result, according to the second operation example, base station 100 can notify mobile station 200 of the allocation of PUSCH to partial interlaces without adding a control signal for the allocation of PUSCH.

[0110] Also, for example, when the mobile station 200 transmits an SRS with a wider band than the PUSCH in a symbol (in other words, a time position) before the PUSCH arranged in a partial interlace in the same slot, the transmission power at least during the transmission period of the SRS is higher than the transmission power during the transmission period of the PUSCH. Therefore, at least during the transmission period of the SRS in the mobile station 200, the possibility that other wireless devices (e.g., wireless devices using the same unlicensed band) existing around the mobile station 200 will succeed in carrier sense and will be unlikely to start transmitting a signal is low. Therefore, according to the operation example 2, the SRS transmitted from the mobile station 200 is highly likely to be properly received by the base station 100, and thus the reception quality of the uplink can be improved.

[0111] In the second operation example, the PUSCH and the SRS are assumed to be in the same slot in the context of their time positions. However, the above-described method may be applied based on the context of the PUSCH and the SRS in the context of their time positions in time slots of different lengths. For example, when the PUSCH and the SRS are allocated across multiple consecutive slots by one DCI transmission, the mobile station 200 may determine whether the PUSCH is allocated to a partial interlace according to the context of the SRS and the "PUSCH allocated by the same DCI."

[0112] Also, in the second operation example, a case where the time position of the SRS is used to determine the frequency resource allocated to the PUSCH has been described. However, the time position of the SRS and a combination of parameters of other SRS resources (e.g., cyclic shift number or comb number) may be used to determine the frequency resource allocated to the PUSCH. In other words, the second operation example and the first operation example may be combined. As an example, FIG. 12 shows an example where the time position of the SRS and the cyclic shift number of the SRS sequence are used to determine the frequency resource allocated to the PUSCH. As shown in FIG. 12, when the time position #B of the SRS indicates that the PUSCH is to be allocated to a partial interlace, the cyclic shift number of the SRS may indicate a different cluster as the cluster in which the PUSCH is allocated.

[0113] In addition, in the operation example 2, a case has been described in which allocation to a partial interlace is notified when the time position of the SRS is a position before the PUSCH, but allocation to a partial interlace may also be notified when the time position of the SRS is a position after the PUSCH.

[0114] Operation example 1 and operation example 2 have been described above.

[0115] In this manner, in this embodiment, resources are associated between the SRS resource and the PUSCH. The base station 100 and the mobile station 200 determine a frequency resource to be used for uplink transmission, for example, based on the resource association between the SRS and the PUSCH. Then, the mobile station 200 transmits at least one of the SRS and the PUSCH using the determined frequency resource.

[0116] In the present embodiment, for example, in the above association, the allocated frequency resource of the PUSCH is associated with the parameters of the SRS notified by the DCI (for example, the cyclic shift number of the SRS sequence, the cyclic shift number of the SRS sequence, etc.). Also, the allocated frequency resource of the PUSCH associated with at least one of the parameters of the SRS is a part of the interlaces of the interlaces notified by the DCI (for example, the RIV), that is, a partial interlace.

[0117] As a result, base station 100 can implicitly notify allocation of PUSCH to partial interlaces by notifying SRS resource. Therefore, according to this embodiment, allocation of PUSCH to partial interlaces can be notified without increasing signaling overhead. Therefore, according to this embodiment, resources can be appropriately allocated in operation in an unlicensed band.

[0118] (Variation 1 of the first embodiment) In the first embodiment, for example, in partial interlace allocation of PUSCH, it is assumed that an interlace is divided into partial interlaces of approximately the same size, such as cluster numbers #0 to #4 or cluster numbers #5 to #8, as shown in Figures 9 and 11. This makes it possible to achieve fair resource allocation to multiple mobile stations 200 allocated to each partial interlace.

[0119] However, each partial interlace does not have to be set to approximately the same size. For example, the sizes of the partial interlaces may be different, such as eight clusters with cluster numbers #0 to #7 and one cluster with cluster number #8. This allows flexible resource allocation to mobile station 200.

[0120] When setting partial interlaces, an interlace may be divided into three or more partial interlaces, which enables resource allocation based on partial interlaces to a larger number of mobile stations 200.

[0121] (Variation 2 of the first embodiment) In the first embodiment, for example, as shown in Figures 9 and 11, in partial interlace allocation of PUSCH, it is assumed that interlaces are divided into partial interlaces, such as cluster numbers #0 to #4 and cluster numbers #5 to #8, each of which has adjacent clusters.

[0122] However, for example, an interlace may be divided into partial interlaces having non-adjacent clusters, such as clusters with cluster numbers #0, #2, #4, #6, and #8 (e.g., clusters with even numbers) and clusters with cluster numbers #1, #3, #5, and #7 (e.g., clusters with odd numbers). This can reduce the possibility that base station 100 fails to receive all PRBs in the partial interlace, even if the propagation characteristics of a specific frequency are poor due to the effects of fading, etc.

[0123] (Variation 3 of the First Embodiment) 11, when partial interlace allocation of PUSCH is instructed to mobile station 200, it is not necessary to instruct which cluster in the interlace notified by the RIV is to be used by mobile station 200. For example, mobile station 200 may allocate PUSCH to a partial interlace including a cluster determined without depending on an instruction from base station 100. This can reduce the number of patterns of SRS resource for notifying partial interlace from base station 100 to mobile station 200, making it easier to design the system.

[0124] (Variation 4 of the First Embodiment) In the first embodiment, the frequency resource in which the SRS is arranged may be selected from among resources in which the PUSCH in the same slot is allocated, as in the second or third embodiment described later. For example, when the PUSCH is allocated to the entire interlace or a partial interlace, the SRS may also be arranged in the entire interlace or a partial interlace. In this case, the frequency resource of the SRS may not be notified in advance by a higher layer parameter (e.g., the SRS resource) or the like, or even if information on the frequency resource included in the SRS resource is notified, the information may be ignored and the SRS may be set. By arranging the SRS in an interlace, for example, frequency division multiplexing of the SRS with signals of other uplink channels (e.g., PUSCH / PUCCH / PRACH, etc.) similarly allocated to the interlace (e.g., transmitted by other mobile stations) is facilitated.

[0125] (Embodiment 2) In this embodiment, a method of notifying interlace allocation of an SRS will be described.

[0126] Since the base station and mobile station according to this embodiment have the same basic configuration as base station 100 and mobile station 200 according to the first embodiment, the description will be given with reference to FIGS.

[0127] In this embodiment, the frequency resources between the SRS and the PUSCH are associated with each other. In this association, for example, the frequency resource in which the SRS is arranged is at least one of the frequency resources (for example, interlaces) in which the PUSCH is arranged.

[0128] For example, when mobile station 200 transmits a PUSCH and an SRS in an uplink in an unlicensed band (for example, referred to as an NR-U uplink), mobile station 200 derives a resource in which to allocate an SRS, based on resource information of the PUSCH.

[0129] Fig. 13 is a sequence diagram showing an example of processing by base station 100 and mobile station 200. In Fig. 13, the same operations as those in the first embodiment (see Fig. 7, for example) are denoted by the same reference numerals, and description thereof will be omitted.

[0130] In FIG. 13, as an example, mobile station 200 transmits an SRS and an interlaced PUSCH (uplink data signal) based on an instruction from base station 100.

[0131] 13, base station 100 notifies (or sets) higher layer parameters (for example, SRS resource parameters) to mobile station 200 (ST102), as in the first embodiment. Also, base station 100 instructs mobile station 200 to transmit PUSCH and SRS by using DCI (for example, at least one of SRS request and RIV), as in the first embodiment (ST104).

[0132] FIG. 14 shows an example of an SRS request set for the mobile station 200. As shown in FIG.

[0133] 14, three patterns of SRS resources #1, #2, and #3 are set as SRS resources specified by an SRS request. Note that the SRS resource is not limited to three patterns, and two or four or more patterns may be set.

[0134] Furthermore, in the example shown in FIG. 14, when SRS request="11" (in other words, SRS resource #3) is notified (or set) to mobile station 200, it may be notified that "the frequency resource for SRS is selected from the frequency resources allocated to PUSCH" (in other words, "the frequency mapping of SRS is the same as the frequency mapping of PUSCH").

[0135] Here, an interlace is assigned to the PUSCH. Therefore, the assignment of SRS to interlaces is notified from base station 100 to mobile station 200 by the notification of SRS request="11" shown in Fig. 14. In other words, in Fig. 14, the notification of SRS request="11" instructs a change in SRS resource assignment from an assignment based on an SRS resource to an interlace assignment of SRS.

[0136] In the case of SRS request="11" shown in FIG. 14, mobile station 200 changes the SRS resource allocation from resource allocation based on SRS resource #3 notified by the SRS request to, for example, an allocation of the PUSCH allocated frequency resource notified by the RIV (in other words, interlace allocation).

[0137] On the other hand, when SRS request="01" or "10" shown in Fig. 14, mobile station 200 determines the allocation of SRS resources based on SRS resource #1 or #2 notified by the SRS request. In other words, in Fig. 14, when SRS request="01" or "10" is notified, no change in the allocation of SRS resources is instructed.

[0138] In Fig. 13, mobile station 200 determines whether or not an SRS resource change has been instructed, based on the value of the SRS request field notified by base station 100 (ST201). As described above, in the example shown in Fig. 14, when SRS request="11", mobile station 200 determines that an SRS resource change has been instructed (ST201: Yes). On the other hand, in the example shown in Fig. 14, when SRS request="01" or "10", mobile station 200 determines that an SRS resource change has not been instructed (ST201: No).

[0139] In FIG. 13, if no change in SRS resource is instructed (ST201: No), mobile station 200 uses, for example, frequency resources included in the SRS resource instructed by the SRS request (for example, SRS resource #1 or #2 shown in FIG. 14) for SRS transmission.

[0140] On the other hand, if an SRS resource change has been instructed (ST201: Yes), mobile station 200 changes the SRS frequency resource from the frequency resource instructed by the SRS request (e.g., SRS resource #3 shown in FIG. 14) to a frequency resource selected from the PUSCH allocated frequency resources instructed by the RIV (ST202). In other words, mobile station 200 may ignore information about the frequency resource included in SRS resource #3.

[0141] For example, in the example shown in FIG. 1, if PUSCH is allocated to interlace #0, mobile station 200 may allocate SRS to some or all of the PRBs belonging to interlace #0, similar to PUSCH, when SRS resource #3 is specified by SRS request ("11"). However, mobile station 200 determines resources other than the frequency resource for SRS (e.g., time position, cyclic shift number, comb number, etc.) based on parameters included in SRS resource #3 specified by SRS request ("11").

[0142] That is, when the parameter (e.g., SRS resource) of the SRS notified by the DCI (or SRS request) is a specific value (e.g., SRS resource #3 shown in FIG. 14), the frequency resource in which the SRS is arranged is at least one of the frequency resources allocated to the PUSCH. Meanwhile, other resources (e.g., time position, cyclic shift number, comb number, etc.) different from the frequency resource set in the SRS are determined based on a specific value (e.g., SRS resource #3 shown in FIG. 14).

[0143] In addition, the frequency resources (e.g., a part or all) to be used for the SRS among the PRBs belonging to the interlace allocated to the PUSCH may be separately notified to the mobile station 200, may be specified in advance, or may be determined individually by the mobile station 200.

[0144] In this manner, in this embodiment, resources are associated between the SRS resource and the PUSCH. The base station 100 and the mobile station 200 determine the frequency resource to be used for uplink transmission, for example, based on the association of resources between the SRS and the PUSCH. For example, in this embodiment, when the SRS resource (in other words, the value of the SRS request) notified to the mobile station 200 by the SRS request is a specific value, the frequency resource in which the SRS is arranged is at least a part of the frequency resource (for example, an interlace) allocated to the PUSCH notified by the DCI (for example, the RIV).

[0145] Thereby, for example, base station 100 can notify mobile station 200 of allocation of interlaces for SRS by notifying SRS request="11" as shown in Fig. 14. In other words, in this embodiment, by notifying an SRS request, it is possible to switch between allocation of interlaces for SRS and normal frequency resource allocation for SRS.

[0146] As described above, according to the present embodiment, base station 100 can notify mobile station 200 of the allocation of SRS to interlaces without adding a control signal for SRS allocation. Therefore, according to the present embodiment, resources can be appropriately allocated in operation in an unlicensed band.

[0147] (Variation 1 of the second embodiment) The PUSCH is not limited to being allocated to one interlace, but may be allocated to multiple interlaces.

[0148] In the second embodiment, when a frequency resource for an SRS is selected from frequency resources to which a PUSCH is allocated, and when a PUSCH is allocated to a plurality of interlaces, the SRS may be placed in some, but not all, of the interlaces to which a PUSCH is allocated.

[0149] For example, the SRS may be arranged in one interlace having the minimum or maximum interlace number among multiple interlaces to which the PUSCH is allocated. For example, when the PUSCH is allocated to interlaces #0 and #1, the SRS may be arranged in a PRB belonging to either one of interlaces #0 and #1. This allows the SRS to be allocated to the minimum resources, thereby improving resource utilization efficiency and, for example, increasing resources available to other mobile stations.

[0150] (Variation 2 of the second embodiment) In the second embodiment, a case has been described in which one SRS request value ("11" in FIG. 14) is used to notify that "the frequency resource for SRS is selected from the frequency resources allocated to PUSCH". However, a plurality of SRS request values ​​may be used to notify that "the frequency resource for SRS is selected from the frequency resources allocated to PUSCH". This makes it possible to configure, in mobile station 200, more resources for SRS, such as the same frequency resource as PUSCH and other resources (e.g., cyclic shift number, time position, etc.) that differ for each SRS request, in addition to the effects described in the second embodiment.

[0151] Furthermore, the SRS resource associated with an SRS request for notifying that "the frequency resource for SRS is selected from the allocated frequency resources for PUSCH" may be the same as the SRS resource associated with an SRS request other than the SRS request. For example, SRS resource #1 or #2 may be notified instead of SRS resource #3 by notifying SRS request="11" in FIG. 14. This makes it possible to reduce the number of SRS resources to be preset, and to reduce higher layer signaling.

[0152] (Variation 3 of the second embodiment) In the second embodiment, a case has been described in which the frequency resource for the SRS is selected from among the frequency resources allocated to the PUSCH. However, the frequency resource for the SRS may be selected from among the frequency resources allocated to the PUSCH as long as the frequency resources for the SRS comply with a rule for preventing collision between the frequency resources for the SRS of different mobile stations 200.

[0153] The above rule may be, for example, "place the SRS at the minimum (or maximum) number+N (N is any integer) of the interlace numbers to which the PUSCH is assigned."

[0154] (Embodiment 3) [Career Sense] In unlicensed bands, in order to prevent interference between wireless devices, each wireless device is required to perform carrier sense before transmitting a signal to confirm that no nearby wireless devices are transmitting signals in the same frequency band.

[0155] In NR-U, similar to eLAA (see, for example, Non-Patent Document 6), it is assumed that carrier sensing such as Listen Before Talk (LBT) category 4 (or Type 1 UL channel access procedure) and LBT category 2 (or Type 2 UL channel access procedure) will be used. In LBT category 2, the period during which carrier sensing is performed (also referred to as LBT duration) is fixed at, for example, 25 microseconds. In LBT category 4, the period during which carrier sensing is performed is, for example, 25 microseconds or more and can be determined randomly.

[0156] In addition, in LBT category 4, the range of values ​​that can be taken as the length of the period during which carrier sensing is performed is assumed to be determined, for example, by a parameter called "channel access priority class." For example, the larger the value of channel access priority class, the larger the value indicating the length of the period during which carrier sensing is performed can be.

[0157] In this embodiment, a method of notifying interlace allocation of an SRS taking carrier sensing into consideration will be described.

[0158] Since the base station and mobile station according to this embodiment have the same basic configuration as base station 100 and mobile station 200 according to the first embodiment, the description will be given with reference to FIGS.

[0159] In the present embodiment, frequency resources between the SRS and the PUSCH are associated with each other, as in the case of the second embodiment. In this association, for example, the frequency resource in which the SRS is arranged is at least one of the frequency resources (for example, interlaces) in which the PUSCH is arranged.

[0160] Furthermore, for example, when mobile station 200 transmits a PUSCH and an SRS in an uplink in an unlicensed band (for example, an NR-U uplink), it derives a resource in which to place the SRS, based on the type of carrier sense and resource information of the PUSCH.

[0161] Fig. 15 is a sequence diagram showing an example of the processing of the base station 100 and the mobile station 200. In Fig. 15, the same operations as those in the first embodiment (see Fig. 7, for example) are denoted by the same reference numerals, and the description thereof will be omitted.

[0162] In FIG. 15, as an example, mobile station 200 transmits an SRS and an interlaced PUSCH (uplink data signal) based on an instruction from base station 100.

[0163] 15, base station 100 sets, as higher layer parameters, for example, parameters related to SRS resource and parameters related to carrier sensing that mobile station 200 performs before uplink transmission (ST301). The parameters related to carrier sensing may include, for example, parameters related to the length of a period during which carrier sensing is performed (for example, channel access priority class or LBT category, etc.).

[0164] Base station 100 notifies (or sets) mobile station 200 of the SRS resource, which is an upper layer parameter, and parameters related to carrier sense (ST302). Also, base station 100 instructs mobile station 200 to transmit PUSCH and SRS by using DCI (for example, at least one of SRS request and RIV), as in the first embodiment (ST104).

[0165] FIG. 16 shows an example of an SRS request set for the mobile station 200. As shown in FIG.

[0166] 16, three patterns of SRS resources #1, #2, and #3 are set in the SRS resource specified by the SRS request. Note that the SRS resource parameter is not limited to three patterns, and two patterns or four or more patterns may be set.

[0167] The setting of each SRS resource may include, for example, the time position, frequency position, and cyclic shift number of the SRS sequence of the SRS. Also, for example, a different value may be set for the time position of the SRS for each SRS resource. In the example shown in FIG. 16, the time position #A is set for SRS resource #1, the time position #B is set for SRS resource #2, and the time position #C is set for SRS resource #3.

[0168] In FIG. 15, mobile station 200 determines whether or not the SRS is to be placed in a symbol earlier than (in other words, at an earlier time position than) the PUSCH in the same slot, based on the time position of the SRS indicated in the SRS resource indicated by the SRS request from base station 100 (ST303).

[0169] Mobile station 200 also determines whether the period for performing carrier sensing is longer than a threshold, based on the parameters related to carrier sensing notified in ST 302 (ST 304).

[0170] For example, when the parameters related to carrier sensing are values ​​specified, the mobile station 200 may determine that the period for performing carrier sensing is longer than the threshold. As an example, when the LBT category is 4 and the channel access priority class is 4, the mobile station 200 may determine that the period for performing carrier sensing is longer than the threshold.

[0171] The specified value is not limited to LBT category 4 and channel access priority class=4, and may be other values. Furthermore, the determination of whether the period for performing carrier sensing is longer than the threshold value is not limited to the case where it is based on the LBT category and channel access priority class, and may be based on other parameters (for example, a calculated value of the period for performing carrier sensing).

[0172] In FIG. 15, if the SRS is not placed in a symbol before the PUSCH in the same slot (ST303: No), or if the period for performing carrier sensing is equal to or shorter than the threshold (ST304: No), mobile station 200 uses, for example, the frequency resource included in the SRS resource indicated by the SRS request, for SRS transmission.

[0173] On the other hand, if the SRS is placed in a symbol before the PUSCH in the same slot (ST303: Yes) and the period for performing carrier sensing is longer than the threshold (ST304: Yes), mobile station 200 changes the frequency resource of the SRS from the frequency resource indicated by the SRS request (for example, the SRS resource shown in FIG. 16) to a frequency resource selected from the PUSCH allocated frequency resources indicated by the RIV (ST305). In other words, mobile station 200 may ignore information about the frequency resource included in the SRS resource.

[0174] For example, in the example shown in Fig. 1, when the PUSCH is arranged in interlace #0, mobile station 200 may arrange the SRS in some or all of the PRBs belonging to interlace #0. However, mobile station 200 determines resources other than the frequency resource for the SRS (e.g., time position, cyclic shift number, comb number, etc.) based on parameters included in the SRS resource indicated by the SRS request.

[0175] That is, when the SRS is placed in a time position before the PUSCH in the same slot and the period for performing carrier sense is longer than a threshold, the frequency resource in which the SRS is placed is at least one of the frequency resources allocated to the PUSCH, while other resources (e.g., time position, cyclic shift number, comb number, etc.) different from the frequency resource set in the SRS are determined based on parameters indicated by the SRS request.

[0176] In addition, the frequency resources (e.g., a part or all) to be used for the SRS among the PRBs belonging to the interlace allocated to the PUSCH may be separately notified to the mobile station 200, may be specified in advance, or may be determined individually by the mobile station 200.

[0177] Here, for example, if mobile station 200 needs to acquire a longer COT in one carrier sense, the period for performing carrier sense is likely to be set longer (for example, see Non-Patent Document 6). The longer the period for performing carrier sense, the higher the possibility of detecting a signal from another wireless device, and the higher the possibility of mobile station 200 failing carrier sense. Therefore, the longer the period for performing carrier sense, the longer it takes for mobile station 200 to start transmitting a signal, and the higher the possibility of SRS transmission being delayed.

[0178] Also, different mobile stations (or wireless devices) can set different cyclic shifts or the like in the SRS sequences to make them orthogonal to each other, so that, for example, different mobile stations can transmit SRSs in the same frequency resource. On the other hand, there is no orthogonal relationship between SRSs and PUSCHs as described above. Therefore, if the SRS of mobile station 200 and a signal of another wireless device (for example, PUSCH) are transmitted in the same frequency resource, a collision occurs.

[0179] For example, in mobile station 200, if an SRS is placed in a symbol before a PUSCH in the same slot, and SRS transmission is delayed due to a carrier sense failure, the SRS is more likely to collide with a PUSCH transmitted by another wireless device.

[0180] In contrast, in this embodiment, when there is a high possibility that the transmission of an SRS arranged at an earlier time than the PUSCH will be delayed by carrier sense, the SRS is arranged, for example, in an interlace assigned to the PUSCH. This reduces the possibility that the frequency resource of the SRS transmitted by mobile station 200 overlaps with the frequency resource of a signal (for example, a PUSCH) transmitted by another radio device, so that even if the SRS transmission is delayed, it is possible to reduce the occurrence of collision between the SRS transmitted by mobile station 200 and the PUSCH transmitted by the other radio device.

[0181] In this manner, in this embodiment, resources are associated between the SRS resource and the PUSCH. The base station 100 and the mobile station 200 determine the frequency resource to be used for uplink transmission, for example, based on the resource association between the SRS and the PUSCH. For example, in this embodiment, when the SRS is arranged in a symbol before the PUSCH and the period for performing carrier sense is longer than a threshold, the frequency resource in which the SRS is arranged is at least a part of the frequency resource (for example, an interlace) allocated to the PUSCH notified by the DCI (for example, the RIV).

[0182] Thereby, for example, base station 100 can notify mobile station 200 of the allocation of interlaces for SRS in accordance with the SRS request (e.g., the time position of the SRS) and parameters related to carrier sense. In other words, in this embodiment, it is possible to switch between the allocation of interlaces for SRS and normal frequency resource allocation for SRS by notifying the SRS request and parameters related to carrier sense.

[0183] As described above, according to the present embodiment, base station 100 can notify mobile station 200 of the allocation of SRS to interlaces without adding a control signal for SRS allocation. Therefore, according to the present embodiment, resources can be appropriately allocated in an operation in an unlicensed band.

[0184] (Variation 1 of the third embodiment) In embodiment 3, the criteria (or conditions) for determining whether the period during which carrier sensing is performed is longer than a threshold value are "the time position of the SRS is before the PUSCH in the same slot" and "the period during which carrier sensing is performed is longer than a threshold value."

[0185] However, instead of this condition, for example, the condition that "the time position of the SRS is a position before the PUSCH in the same slot" and "the previous carrier sense in the COT has failed" may be used. For example, when the above-mentioned condition is satisfied, mobile station 200 may change the frequency resource of the SRS from the frequency resource indicated by the SRS request to a frequency resource selected from the frequency resources allocated to the PUSCH (for example, ST305 in FIG. 15). In this case, base station 100 may determine the frequency resource of the SRS (for example, either the resource indicated by the SRS request or the frequency resource allocated to the PUSCH) based on, for example, "whether or not the reception of the allocated SRS is delayed". In this way, the frequency resource of the SRS can be determined based more faithfully on the delay in SRS transmission due to the failure of carrier sense.

[0186] (Variation 2 of the third embodiment) The PUSCH is not limited to being allocated to one interlace, but may be allocated to multiple interlaces.

[0187] In the third embodiment, when a frequency resource for an SRS is selected from frequency resources to which a PUSCH is allocated, and when a PUSCH is allocated to a plurality of interlaces, the SRS may be placed in some, but not all, of the interlaces to which a PUSCH is allocated.

[0188] For example, the SRS may be arranged in one interlace having the minimum or maximum interlace number among multiple interlaces to which the PUSCH is allocated. For example, when the PUSCH is allocated to interlaces #0 and #1, the SRS may be arranged in a PRB belonging to either one of interlaces #0 and #1. This allows the SRS to be allocated to the minimum resources, thereby improving resource utilization efficiency and, for example, increasing resources available to other mobile stations.

[0189] (Variation 3 of the third embodiment) In the third embodiment, a case has been described in which the frequency resource for the SRS is selected from among the frequency resources allocated to the PUSCH. However, the frequency resource for the SRS may be selected from among the frequency resources allocated to the PUSCH as long as the frequency resource for the SRS conforms to a rule for preventing collision between the frequency resources for the SRS of different mobile stations 200.

[0190] The above rule may be, for example, "place the SRS at the minimum (or maximum) number+N (N is any integer) of the interlace numbers to which the PUSCH is assigned."

[0191] The embodiments of the present disclosure have been described above.

[0192] (Other embodiments) In each of the above embodiments, the relationship between SRS and PUSCH resources in the uplink where the mobile station is the transmitter and the base station is the receiver is assumed. However, an embodiment of the present disclosure is not limited to this, and may be applied to the relationship between a downlink reference signal and a downlink channel resource in the downlink where the base station is the transmitter and the mobile station is the receiver. Alternatively, an embodiment of the present disclosure may be applied to the relationship between a reference signal and a channel resource in communication between mobile stations (e.g., inter-vehicle communication), i.e., in a sidelink, or other communications.

[0193] In addition, in the above embodiments, the number of bits of the SRS request field included in the DCI has been described as 2 bits, but the size of the SRS request may be other numbers of bits. For example, the SRS request field may be extended to 3 bits or more.

[0194] Furthermore, in each of the above embodiments, when the allocated frequency resource of the PUSCH or SRS is changed, the number of subcarriers on which the PUSCH or SRS is arranged may be adjusted to a number that does not include prime factors other than 2, 3, and 5. In this case, when the PUSCH or SRS is transmitted by a transmitter including a Discrete Fourier Transform (DFT) unit (not shown), the amount of DFT calculation can be reduced.

[0195] In addition, in each of the above embodiments, the arrangement relationship between PUSCH and SRS has been described. However, it is not limited to PUSCH, and other uplink channels may be used. For example, the above embodiments may be applied to the arrangement relationship between PUCCH, PRACH, or a combination of multiple channels and SRS. For example, a resource in which at least one of PUSCH, PUCCH, and PRACH is arranged may be notified in association with allocation information of SRS. Or, for example, a resource in which SRS is arranged may be notified in association with allocation information of at least one of PUSCH, PUCCH, and PRACH.

[0196] Also, in the above-mentioned embodiments, a single SRS resource is designated by the value of one SRS request. However, a plurality of SRS resources (for example, an SRS resource set) may be designated by the value of one SRS request. For example, in the first embodiment, a certain SRS request may designate a plurality of SRS resources having different cyclic shift numbers. In this case, the mobile station 200 may determine the frequency resource to be allocated to the PUSCH based on the cyclic shift number included in at least one of the plurality of SRS resources. For example, the mobile station 200 may determine the frequency resource to be allocated to the PUSCH based on the minimum or maximum cyclic shift number among the plurality of SRS resources. Alternatively, for example, the mobile station 200 may determine the frequency resource to be allocated to the PUSCH based on the cyclic shift number included in the SRS resource having the minimum or maximum identification number (also called SRS resource ID) among the plurality of SRS resources.

[0197] In each of the above embodiments, the SRS request may indicate multiple SRS resource sets, or some of the parameters of the SRS request may be set to unused (e.g., reserved) for new applications expected in the future.

[0198] Also, in each of the above embodiments, a case where SRS transmission is instructed by DCI or the like (in other words, aperiodic SRS) has been described. However, an embodiment of the present disclosure is not limited to aperiodic SRS and may be applied to other signals (e.g., reference signals or synchronization signals). For example, the embodiment of the present disclosure may be applied to an SRS resource used for transmitting periodic SRS or semi-persistent SRS instructed by a higher layer or the like. Alternatively, the embodiment of the present disclosure may be applied to reference signals other than SRS, such as the following: Channel State Information - Reference Signal (CSI-RS) DeModulation Reference Signal (DMRS) Phase Tracking - Reference Signal (PT-RS) Tracking Reference Signal (TRS) Discovery Signal / Discovery Reference Signal (DRS) Primary Synchronization Signal (PSS) Secondary Synchronization Signal (SSS)

[0199] In addition, in each of the above embodiments, a case where the SRS is transmitted in the same slot as the PUSCH has been described. However, an embodiment of the present disclosure is not limited to this case, and may be applied to the SRS in a slot or COT in which the PUSCH is not transmitted. For example, in the second and third embodiments, when the SRS request indicates a specific value, the mobile station 200 may change the frequency resource of the SRS in the slot or COT in which the PUSCH is not transmitted to a frequency resource selected from the allocated frequency resources of the PUSCH previously transmitted by the mobile station 200, for example, the most recently transmitted PUSCH.

[0200] Alternatively, an embodiment of the present disclosure may be applied to transmission of an uplink channel (e.g., PUCCH or PRACH) whose transmission is instructed by DCI or the like, instead of a reference signal. For example, a resource in which a PUSCH is arranged may be notified in association with allocation information of a PUCCH or PRACH, or a resource in which a PUCCH or PRACH is arranged may be notified in association with allocation information of a PUSCH.

[0201] In addition, in each of the above embodiments, as an example of an interlace configuration, a case where the number of clusters is 9, M=12, N=8 or 9, is assumed. However, the interlace configuration may be other configurations. The interlace configuration (e.g., values ​​of N and M, etc.) may be preset for each subcarrier interval according to a standard, or may be set (or notified) by at least one of a higher layer signal and a control signal.

[0202] In addition, in each of the above-mentioned embodiments, as an example of an interlace configuration, a case where PRBs are distributed and arranged at equal intervals in frequency has been described. However, the interlace configuration is not limited to this. For example, the interlace configuration does not have to be in units of PRB, and may be a configuration in which a group of less than 12 subcarriers (e.g., sub-PRB or fractional PRB) or a unit of one subcarrier is distributed and arranged in the frequency domain. Furthermore, within an interlace, the intervals between the distributed resources may be equal or unequal.

[0203] In addition, in each of the above embodiments, the "higher layer signal" may be called, for example, an "RRC signal" or a "MAC signal".

[0204] The present disclosure can be realized by software, hardware, or software linked to hardware. Each functional block used in the description of the above embodiment may be realized partially or entirely as an LSI, which is an integrated circuit, and each process described in the above embodiment may be controlled partially or entirely by one LSI or a combination of LSIs. The LSI may be composed of individual chips, or may be composed of one chip to include some or all of the functional blocks. The LSI may have input and output data. Depending on the degree of integration, the LSI may be called an IC, a system LSI, a super LSI, or an ultra LSI. The method of integration is not limited to LSI, and may be realized by a dedicated circuit, a general-purpose processor, or a dedicated processor. In addition, a field programmable gate array (FPGA) that can be programmed after LSI manufacture, or a reconfigurable processor that can reconfigure the connections and settings of circuit cells inside the LSI may be used. The present disclosure may be realized as digital processing or analog processing. Furthermore, if a new integrated circuit technology that can replace LSI appears due to the progress of semiconductor technology or a derivative technology, it is possible to integrate the functional blocks using that technology. The application of biotechnology is also a possibility.

[0205] The present disclosure may be implemented in any type of apparatus, device, or system with communications capabilities (collectively, communications apparatus), including, but not limited to, telephones (e.g., cell phones, smartphones, etc.), tablets, personal computers (PCs) (e.g., laptops, desktops, notebooks, etc.), cameras (e.g., digital still / video cameras), digital players (e.g., digital audio / video players), wearable devices (e.g., wearable cameras, smart watches, tracking devices, etc.), game consoles, digital book readers, telehealth / telemedicine devices, communications-enabled vehicles or mobile conveyances (e.g., cars, planes, ships, etc.), and combinations of the above-mentioned devices.

[0206] Communications Equipment includes, but is not limited to portable or mobile equipment, non-portable or fixed equipment, devices and systems of any kind, such as smart home devices (appliances, lighting equipment, smart meters or metering devices, control panels, etc.), vending machines and any other "Things" that may exist on an Internet of Things (IoT) network.

[0207] Communications include data communications via cellular systems, wireless LAN systems, communications satellite systems, etc., as well as data communications via combinations of these.

[0208] A communications apparatus also includes devices, such as controllers and sensors, connected or coupled to a communications device that performs the communications functions described in this disclosure, such as controllers and sensors that generate control and data signals used by the communications device to perform the communications functions of the communications apparatus.

[0209] The communication apparatus also includes infrastructure facilities, such as base stations, access points, and any other apparatus, device, or system that communicates with or controls the various apparatuses listed above, but are not limited to these.

[0210] A mobile station according to an embodiment of the present disclosure includes: a control circuit that determines a frequency resource to be used for uplink transmission based on a resource association between an uplink reference signal and another uplink signal different from the reference signal; and a transmission circuit that transmits at least one of the reference signal and the other uplink signal using the frequency resource.

[0211] In a mobile station according to an embodiment of the present disclosure, in the association, the frequency resource in which the other uplink signal is allocated is associated with a parameter of the reference signal notified by control information.

[0212] In a mobile station according to an embodiment of the present disclosure, the frequency resource associated with at least one of the parameters is a portion of frequency resources of the other uplink signal notified by the control information.

[0213] In a mobile station according to an embodiment of the present disclosure, the parameter indicates a time position at which the reference signal is located, and the portion of frequency resources is associated with the parameter indicating a first time position, the first time position being an earlier time position than the other uplink signals.

[0214] In a mobile station according to an embodiment of the present disclosure, in the association, the frequency resource in which the reference signal is allocated is at least one of the frequency resources in which the other uplink signal notified by control information is allocated.

[0215] In a mobile station according to one embodiment of the present disclosure, when a parameter of the reference signal notified by the control information is a specific value, the frequency resource to which the reference signal is allocated is the at least one resource, and another resource different from the frequency resource to be set for the reference signal is determined based on the specific value.

[0216] In a mobile station according to one embodiment of the present disclosure, when the reference signal is placed at an earlier time position than the other uplink signals and when a period for performing carrier sensing is longer than a threshold, the frequency resource in which the reference signal is placed is the at least one resource.

[0217] In a mobile station according to one embodiment of the present disclosure, when the reference signal is placed at an earlier time position than the other uplink signals and carrier sensing has failed, the frequency resource in which the reference signal is placed is the at least one resource.

[0218] A base station according to one embodiment of the present disclosure includes a control circuit that determines a frequency resource to be used for uplink transmission based on a resource association between an uplink reference signal and another uplink signal different from the reference signal, and a receiving circuit that receives at least one of the reference signal and the other uplink signal using the frequency resource.

[0219] A transmission method according to one embodiment of the present disclosure determines a frequency resource to be used for uplink transmission based on a resource association between an uplink reference signal and another uplink signal different from the reference signal, and transmits at least one of the reference signal and the other uplink signal using the frequency resource.

[0220] A receiving method according to one embodiment of the present disclosure determines a frequency resource to be used for uplink transmission based on a resource association between an uplink reference signal and another uplink signal different from the reference signal, and receives at least one of the reference signal and the other uplink signal using the frequency resource.

[0221] The disclosures of the specification, drawings and abstract contained in Japanese Patent Application No. 2019-001858, filed on January 9, 2019, are incorporated herein by reference in their entirety. [Industrial Applicability]

[0222] An embodiment of the present disclosure is useful in a mobile communication system. [Explanation of symbols]

[0223] 100 base stations 101,205 Control section 102,207 Coding and modulation section 103,208 Signal arrangement section 104,209 Transmitter 105,201 Antennas 106,202 Receiver 107,203 Signal separation section 108,204 Demodulation and Decoding Section 109 Channel quality estimation unit 200 Mobile Station 206 SRS generation section

Claims

1. a control circuit for determining resources to be used for sidelink transmission based on a resource association between a sidelink reference signal and another sidelink signal different from the sidelink reference signal; a transmitting circuit for transmitting or receiving at least one of the reference signal and the other sidelink signal using the resource; Equipped with the resources in which the other sidelink signals are arranged are at least a part of resources notified by control information, In the association, a resource in which one of the reference signal and the other sidelink signal is located is associated with a resource in which the other of the reference signal and the other sidelink signal is located. Mobile station.

2. In the association, the resource on which the other sidelink signal is arranged is associated with a parameter of the reference signal notified by the control information. The mobile station of claim 1 .

3. The resource associated with at least one of the parameters is a part of the resources of the other sidelink signal notified by the control information. The mobile station of claim 2.

4. The parameter indicates a time position at which the reference signal is placed, the subset of resources is associated with the parameter indicative of a first time position, the first time position being an earlier time position than the other sidelink signals. The mobile station of claim 3.

5. In the association, the resource to which the reference signal is arranged is at least one of the resources to which the other sidelink signal notified by the control information is arranged. The mobile station of claim 1 .

6. When the parameter of the reference signal notified by the control information is a specific value, the resource in which the reference signal is arranged is the at least one resource, and other resources different from the resource set in the reference signal are determined based on the specific value. The mobile station of claim 5.

7. When the reference signal is arranged at an earlier time position than the other sidelink signals and when a period for performing carrier sensing is longer than a threshold, the resource in which the reference signal is arranged is the at least one resource. The mobile station of claim 5.

8. When the reference signal is arranged at an earlier time position than the other sidelink signals and carrier sensing has failed, the resource on which the reference signal is arranged is the at least one resource. The mobile station of claim 5.

9. The mobile station determining resources to be used for sidelink transmission based on a resource association between a sidelink reference signal and another sidelink signal different from the sidelink reference signal; Transmitting or receiving at least one of the reference signal and the other sidelink signal using the resources; the resources in which the other sidelink signals are arranged are at least a part of resources notified by control information, In the association, a resource in which one of the reference signal and the other sidelink signal is located is associated with a resource in which the other of the reference signal and the other sidelink signal is located. Transmission method.

10. An integrated circuit for a mobile station, comprising: determining resources to be used for sidelink transmission based on a resource association between a sidelink reference signal and another sidelink signal different from the sidelink reference signal; and controlling reception or transmission of the reference signal and / or the other sidelink signal using the resources. the resources in which the other sidelink signals are arranged are at least a part of resources notified by control information, In the association, a resource in which one of the reference signal and the other sidelink signal is located is associated with a resource in which the other of the reference signal and the other sidelink signal is located. Integrated circuits.

Citation Information

Patent Citations

  • Synchronization signal and synchronization channel transmission method in wireless communication system supporting inter-terminal communication, and apparatus therefor

    JP2017509221A