Aircraft control device

The aircraft control device optimizes power supply from multiple generators and drive sources to reduce battery and drive source deterioration, minimize fuel consumption, and enhance safety and operability by predicting charging needs based on flight state.

JP7580368B2Active Publication Date: 2024-11-11HONDA MOTOR CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2021211054
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-12-24
Publication Date
2024-11-11
Estimated Expiration
2041-12-24

AI Technical Summary

Technical Problem

Existing aircraft control systems that switch between a gas turbine engine and battery operation for fuel efficiency lead to increased battery deterioration and gas turbine engine wear due to frequent charging and maximum output operation.

Method used

A control device for an aircraft that includes multiple generators and drive sources, a switching control unit, and a charge amount control unit to optimize power supply from generators and battery based on flight state, predicting and timing charging to minimize battery discharge and drive source operation.

Benefits of technology

Reduces battery and drive source deterioration by optimizing power supply timing, minimizing fuel consumption, and enhancing safety and operability through rapid charging and response to output changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007580368000001
    Figure 0007580368000001
  • Figure 0007580368000002
    Figure 0007580368000002
  • Figure 0007580368000003
    Figure 0007580368000003
Patent Text Reader

Abstract

To provide a flight vehicle controller capable of suppressing the deterioration of a driving source and a battery while suppressing fuel consumption.SOLUTION: A flight vehicle controller 1 includes a generator 2, a driving source 3, a battery 4, an electric motor 5, a battery state detection section 8, and a charged amount control section 11. The battery state detection section 8 detects first charged electric energy which is the current charged amount of the battery. After a flight vehicle starts cruising, the charged amount control section 11 calculates second charged electric energy which is the charged amount of the battery 4 required for takeoff during the next flight, on the basis of flight plans 53 and 54 of the flight vehicle, predicts timing for supplying power from the generator 2 to the battery 4, on the basis of the first charged electric energy and the second charged electric energy, and starts power supply from the generator 2 to the battery 4 at this timing.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a control device for an aircraft. [Background technology]

[0002] In the past, aircraft equipped with a gas turbine engine and a battery that stores the electric power generated by the gas turbine engine have been known. For these aircraft, various techniques have been proposed for implementing more efficient flight control.

[0003] For example, Patent Document 1 discloses the configuration of a control system for switching between operating and stopping the gas turbine engine in an aircraft equipped with a gas turbine engine and a battery based on the amount of power stored in the battery. At least while the gas turbine engine is stopped, the power for rotating the electric motor (and the propeller) is switched from the power generated by the gas turbine engine to the power supplied by the battery. According to the technology described in Patent Document 1, by switching the output of the gas turbine engine and the battery, the gas turbine engine can always be used near the maximum output which provides the most fuel-efficient operation. This is said to improve the energy efficiency of the gas turbine engine. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-077361 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, in the technology described in Patent Document 1, whenever the amount of power in the battery decreases to a predetermined value, the battery is charged until the amount of power in the battery reaches a maximum. This increases the time the battery is charged and discharged, which may accelerate the deterioration of the battery. Furthermore, since the gas turbine engine is always operated at maximum output to improve fuel efficiency, there is a risk that the deterioration of the gas turbine engine may also accelerate.

[0006] Therefore, an object of the present invention is to provide a control device for an aircraft that can suppress deterioration of the drive source and battery while suppressing fuel consumption. [Means for solving the problem]

[0007] In order to solve the above problems, the control device for an aircraft according to the invention described in claim 1 (e.g., control device 1 in the embodiments) includes a generator (e.g., generator 2 in the embodiments) mounted on the aircraft, a driving source (e.g., gas turbine engine 3 in the embodiments) for driving the generator, a battery (e.g., battery 4 in the embodiments) for storing the electric power generated by the generator, an electric motor (e.g., electric motor 5 in the embodiments) driven by the electric power supplied from at least one of the generator and the battery, a propeller (e.g., propeller 6 in the embodiments) rotated by the electric motor, a switching control unit (e.g., switching control unit 7 in the embodiments) for switching the supply of electric power from the generator to the electric motor and the supply of electric power from the battery to the electric motor based on the flight state of the aircraft, and a first charged electric energy amount (e.g., and a charge amount control unit (for example, a charge amount control unit 11 in the embodiment) that controls the amount of power supplied from the generator to the battery based on the first amount of charging power detected by the battery state detection unit, and the charge amount control unit calculates a second amount of charging power (for example, a second amount of charging power P2 in the embodiment) which is the amount of charge of the battery required for takeoff during the next flight based on a flight plan of the aircraft (for example, a next flight plan 53 and a current flight plan 54 in the embodiment) after the aircraft starts cruising, predicts a timing (for example, a second charging timing T2 in the embodiment) for supplying power from the generator to the battery based on the first amount of charging power and the second amount of charging power, and starts the supply of power from the generator to the battery at the timing. The aircraft has a plurality of the generators and the driving sources, and when charging the battery, the plurality of generators and the driving sources are operated, and when discharging the battery, one of the plurality of generators and the driving sources (for example, the first generator 21 and the first gas turbine engine 31 in the embodiment) is operated. It is characterized by the following.

[0009] In addition, claims 2The control device for an aircraft of the invention described above is characterized in that it charges the battery using a plurality of generators and driving sources at both the timing when the aircraft transitions from takeoff to cruising (e.g., the first charging timing T1 in an embodiment) and the timing predicted by the charge amount control unit (e.g., the second charging timing T2 in an embodiment). Effect of the Invention

[0010] According to the control device for an aircraft as set forth in claim 1 of the present invention, the charge amount control unit charges the battery with the amount of power required for the next takeoff. Therefore, compared to the conventional technology in which the battery is charged to the maximum every time the charge amount decreases, the charge amount and the number of times the battery is charged and discharged can be reduced. This makes it possible to suppress deterioration of the battery. The charge amount control unit predicts the timing to start charging required to charge the battery with the power required for the next takeoff. By starting charging at the predicted timing, the drive source is operated only for the amount of power generated to ensure the power required for the next takeoff. This makes it possible to minimize fuel consumption in the drive source. In addition, the charge amount control unit controls the timing to supply power from the drive source to the battery. This makes it possible to reduce the operation time of the drive source, thereby suppressing deterioration of the drive source. Therefore, it is possible to provide a control device for an aircraft that can suppress deterioration of the drive source and battery while suppressing fuel consumption. Furthermore, when the aircraft lands, it stores the power required for the next takeoff in the battery, which reduces the time lost due to power supply when the aircraft is flying continuously, and enables the aircraft's flight plan to be carried out efficiently. Since the aircraft is equipped with multiple drive sources and generators, it is possible to respond to failures of the drive sources and generators, for example, and the safety of the aircraft can be improved. By operating the multiple drive sources and generators during charging, the battery can be charged quickly. This makes it possible to respond to sudden increases in required output, etc. This further increases the safety of the aircraft and improves the operability of the aircraft. On the other hand, by operating one of the multiple driving sources and generators when discharging the battery, deterioration of the driving sources and generators can be suppressed. Furthermore, since at least one of the driving sources and generators operates during discharging, the amount of discharge from the battery can also be suppressed. Therefore, the time the battery is charged and discharged can be reduced, and deterioration of the battery can be suppressed. In addition, the number of operating drive sources can be changed according to the required output, allowing an optimal operation point to be set, thereby minimizing the energy consumption of the drive sources.

[0012] Claims of the invention 2According to the control device for an aircraft described in the above, the number of times the battery is rapidly charged is limited, thereby reducing the time for the battery to be charged and discharged, and suppressing battery deterioration. Here, the aircraft consumes the most power during takeoff. Therefore, by charging at the timing when the aircraft transitions from takeoff to cruising, charging can be started before the battery charge reaches the minimum charge level. This reduces the load on the battery and suppresses battery deterioration. [Brief description of the drawings]

[0013] [Figure 1] FIG. 2 is a circuit configuration diagram of a control device for an aircraft according to an embodiment. [Diagram 2] 5 is a graph showing the timing of charging and discharging a battery according to an embodiment. [Diagram 3] 4 is a flowchart showing a flow of control by a control device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

[0015] (Air vehicle control device) FIG. 1 is a circuit configuration diagram of a control device 1 (hereinafter, sometimes simply referred to as the control device 1) for an aircraft according to an embodiment. The control device 1 is mounted on the airframe of an aircraft (not shown), such as an airplane. The control device 1 constitutes a hybrid propulsion system that propels the aircraft using multiple electric motors 5 driven by electric power generated by a generator 2, which will be described in detail later. The control device 1 includes a drive source 3, a generator 2, a battery 4, an electric motor 5, a propeller 6, a switching control unit 7, a battery state detection unit 8, a flight state detection unit 9, a flight plan acquisition unit 10, and a charge amount control unit 11.

[0016] (Drive source) The driving source 3 is, for example, a gas turbine engine. In the present embodiment, the gas turbine engine 3 is described as an example of the driving source, but is not limited thereto. The driving source 3 may be any power device for operating the generator 2 to generate electric power, and may be, for example, a fuel cell or the like. In this embodiment, a plurality of gas turbine engines 3 (two in this embodiment) are provided. In the following description, when the plurality of gas turbine engines 3 are not to be distinguished from one another, they may be simply referred to as gas turbine engines 3. Each gas turbine engine 3 has a compressor and a turbine. The compressor compresses intake air taken in through a ventilation hole (not shown) provided in the aircraft fuselage. The turbine is connected to the compressor via a rotating shaft and rotates integrally with the compressor.

[0017] (Generator) The generators 2 are connected to each gas turbine engine 3. In this embodiment, a plurality of generators 2 (two in this embodiment) are provided corresponding to the gas turbine engines 3. In the following description, when the plurality of generators 2 are not distinguished from one another, they may be simply referred to as generators 2. A speed change mechanism or the like may be provided between the generators 2 and the gas turbine engines 3. The generators 2 generate electric power (AC power) by driving a turbine. The AC power generated by the generators 2 is converted to DC power by a converter in a power drive unit (PDU) and stored in a battery 4.

[0018] (Battery) The battery 4 stores surplus power not consumed by the electric motor 5 out of the power generated in the generator 2 by driving the gas turbine engine 3. The power stored in the battery 4 can be used to drive the electric motor 5. In other words, when the power generated by the converter exceeds the power consumed by the inverter, the battery 4 absorbs the surplus power and charges. On the other hand, when the power generated by the converter falls below the power consumed by the inverter, the battery 4 discharges to make up for the power shortage.

[0019] (Electric motor) The electric motor 5 is, for example, a brushless DC motor having a rotor and a stator. The electric motor 5 is connected to the generator 2 and the battery 4. At least one of the discharged power from the battery 4 and the power from the generator 2 is supplied to the electric motor 5. The electric motor 5 may include an auxiliary motor for maintaining the attitude or for horizontal propulsion (not shown), etc.

[0020] (propeller) The propeller 6 is connected to the electric motor 5. A propeller shaft is provided between the electric motor 5 and the propeller 6, mechanically connecting the electric motor 5 and the propeller 6. The propeller 6 rotates as the rotor of the electric motor 5 rotates in response to a control signal. The control signal is a signal for controlling the aircraft based on the operation of the pilot or instructions in the autopilot.

[0021] In other words, the aircraft is configured such that an electric motor 5 is driven by electricity generated by a generator 2 driven mainly by a gas turbine engine 3, and thrust is obtained by a propeller 6 rotated by the electric motor 5. In addition, surplus electricity generated by the generator 2 is stored in a battery 4, and electricity from the battery 4 can be used as electricity to drive the electric motor 5 as necessary.

[0022] (Switching control unit) The switching control unit 7 switches between the supply of power from the generator 2 to the electric motor 5 and the supply of power from the battery 4 to the electric motor 5. Specifically, the switching control unit 7 controls the generator 2, the battery 4, and the electric motor 5 to be in at least one of the following states (i) to (iii). (i) A state in which power is supplied from the generator 2 to the electric motor 5 and power supply from the battery 4 to the electric motor 5 is stopped. (ii) A state in which the supply of power from the generator 2 to the electric motor 5 is stopped and power is supplied from the battery 4 to the electric motor 5. (iii) A state in which power is supplied to the electric motor 5 from both the generator 2 and the battery 4. At this time, the ratio of the amount of power supplied from each of the generator 2 and the battery 4 can be changed as necessary. The switching control unit 7 performs control to switch to any one of the above states (i) to (iii) based on the flight state of the aircraft.

[0023] (Battery status detection section) The battery state detection unit 8 detects the charging state of the battery 4. The battery state detection unit 8 detects, as the charging state of the battery 4, for example, the current charging amount (first charging energy amount P1) of the battery 4, the charging speed during charging, the discharging speed during discharging, etc.

[0024] (Flight status detection section) The flight state detection unit 9 detects the flight state of the aircraft by acquiring detection results from various sensors mounted on the aircraft. Specifically, the flight state detection unit 9 detects, for example, the current altitude, speed, and attitude of the aircraft, and calculates the required output of the aircraft based on this information. In addition, the flight state detection unit 9 detects information such as the power consumption of the electric motor 5, the operating state of the gas turbine, instructions from the pilot, and the flight path. The flight state detection unit 9 may also acquire information on the flight state other than those described above, such as various information via a flight controller.

[0025] (Flight Plan Acquisition Division) The flight plan acquisition unit 10 acquires a flight plan for the aircraft. The flight plan includes information on takeoff, ascent, cruising, descent, landing, etc. of the aircraft. The flight plan includes at least a current flight plan 54 and a next flight plan 53. Note that "ascent" and "descent" in the embodiment are included in "cruise" in the claims.

[0026] (Charging amount control unit) The results of the battery state detection unit 8, the flight state detection unit 9, and the flight plan acquisition unit 10 are output to the charge amount control unit 11. Based on the results of the battery state detection unit 8, the flight state detection unit 9, and the flight plan acquisition unit 10, the charge amount control unit 11 controls the power supply from the generator 2 to the battery 4, the power supply from the generator 2 to the electric motor 5, and the power supply from the battery 4 to the electric motor 5. The control result in the charge amount control unit 11 is output to the switching control unit 7. Based on a signal from the charge amount control unit 11, the switching control unit 7 switches between the supply of power from the generator 2 to the electric motor 5 and the supply of power from the battery 4 to the electric motor 5.

[0027] Fig. 2 is a graph showing the timing of charging and discharging the battery 4 according to the embodiment. The horizontal axis (bottom) of Fig. 2 represents the attitude of the aircraft. The horizontal axis (top) of Fig. 2 represents the charging and discharging state of the battery 4. The vertical axis of Fig. 2 represents the state of charge (SOC) of the battery 4. As shown in FIG. 2, the charge amount control unit 11 controls the charging and discharging of the battery 4.

[0028] 1 and 2, when the aircraft takes off, electric power is supplied from both the generator 2 and the battery 4 to the electric motor 5. That is, the charge amount control unit 11 controls the electric motor 5 to receive the electric power generated by the generator 2 by driving the gas turbine engine 3, and also controls the battery 4 to be discharged so that the electric power from the battery 4 is supplied to the electric motor 5.

[0029] When the aircraft reaches timing T1 (the timing when the aircraft starts ascending in this embodiment), the switching control unit 7 switches to a state in which power is supplied from the generator 2 to the electric motor 5 and power supply from the battery 4 to the electric motor 5 is stopped. As a result, the power required to drive the electric motor 5 is supplied to the electric motor 5 out of the power generated by the generator 2 by driving the gas turbine engine 3. The remaining power generated by the generator 2 that is not consumed by the electric motor 5 is supplied to the battery 4. In other words, the charge amount control unit 11 charges the battery 4 with the power generated by driving the gas turbine engine 3. When charging the battery 4 during ascent, the multiple generators 2 and gas turbine engines 3 are all operating.

[0030] When the aircraft starts cruising, the switching control unit 7 switches to a state in which power is supplied from both the generator 2 and the battery 4 to the electric motor 5. As a result, all of the power generated by the generator 2 by driving the gas turbine engine 3 is supplied to the electric motor 5. Furthermore, power from the battery 4 is supplied to the electric motor 5. That is, the charge amount control unit 11 discharges the battery 4. When discharging the battery 4 during cruising, one of the multiple generators 2 and gas turbine engines 3 is operated. In this embodiment, of the two generators 2 and gas turbine engines 3, only the first generator 21 and the first gas turbine engine 31 are operated, and the operation of the second generator 22 and the second gas turbine engine 32 is stopped.

[0031] When the aircraft reaches timing T2 (the timing when the aircraft starts descending in this embodiment), the switching control unit 7 switches again to a state in which power is supplied from the generator 2 to the electric motor 5 and power supply from the battery 4 to the electric motor 5 is stopped. As a result, the electric power required for driving the electric motor 5 is supplied to the electric motor 5 out of the electric power generated by the generator 2 by driving the gas turbine engine 3. The remaining electric power generated by the generator 2 that is not consumed by the electric motor 5 is supplied to the battery 4. In other words, the charge amount control unit 11 charges the battery 4 with the electric power generated by driving the gas turbine engine 3. When charging the battery 4 during descent, the multiple generators 2 and gas turbine engines 3 are all operated, as in the case of ascent.

[0032] When the aircraft begins to land, the switching control unit 7 switches to a state in which power is supplied from both the generator 2 and the battery 4 to the electric motor 5. As a result, power is supplied to the electric motor 5 from both the gas turbine engine 3 and the battery 4. In other words, the charge amount control unit 11 causes the power generated by the generator 2 by driving the gas turbine engine 3 to be supplied to the electric motor 5, and also causes the battery 4 to be discharged to supply power from the battery 4 to the electric motor 5.

[0033] In this way, the charge amount control unit 11 charges the battery 4 at a predetermined timing during the flight of the aircraft. In this embodiment, the charge amount control unit 11 charges the battery 4 by the multiple generators 2 and the gas turbine engine 3 at two timings: a timing (first charge timing T1) when the aircraft transitions from takeoff to cruising (including ascent) and a timing (second charge timing T2) predicted by the charge amount control unit 11.

[0034] As described above, the first charging timing T1 is the timing when the aircraft transitions from takeoff to cruising (ascent). Since the power consumption of the battery 4 is the largest during takeoff, a significant decrease in the charge level of the battery 4 is suppressed by starting charging the battery 4 immediately after takeoff.

[0035] The second charging timing T2 is a timing after the aircraft starts cruising, predicted by the charge amount control unit 11 as necessary to charge the battery 4 with the power required until the landing of this flight and at the next takeoff. In other words, the charge amount control unit 11 calculates the amount of power required in the future based on the current flight plan 54 and the next flight plan 53, and predicts the second charging timing T2 from the time required to charge the battery 4 with that amount of power.

[0036] The predictive control in the charge amount control unit 11 will be described in detail below. First, the charge amount control unit 11 starts predictive control of the charge start timing at a predetermined timing (in this embodiment, the third timing T3 immediately after the aircraft transitions from ascent to cruising) after the aircraft starts cruising. When the predictive control starts, the charge amount control unit 11 calculates the charge amount (second charging power amount P2) of the battery 4 required for takeoff during the next flight based on the next flight plan 53 of the aircraft.

[0037] Next, the charge amount control unit 11 predicts a second charging timing T2 at which power is supplied from the generator 2 to the battery 4 based on a first charging amount P1, which is the current charge amount of the battery 4, a second charging amount P2, which is the charge amount of the battery 4 required for the next takeoff, and a third charging amount P3, which is the charge amount of the battery 4 required until landing in the current flight plan 54. The second charging amount P2 is the total value of the battery 4 power required at least from the start of the next flight plan 53 until takeoff is completed. The third charging amount P3 is the total value of the battery 4 power required from the time when the charge amount control unit 11 starts prediction control (the current time) until the remaining cruise, descent, and landing in the current flight plan 54 are completed.

[0038] The charging amount control unit 11 predicts the second charging timing T2 so that the residual SOC predicted value obtained by subtracting the sum of the second charging amount P2 and the third charging amount P3 from the first charging amount P1 at the time the flight is completed will be equal to or greater than a preset first target charging amount PN (P1-(P2+P3)≧PN). In this embodiment, the first target charging amount PN is set to 50% of the total amount of chargeable energy of the battery 4 (i.e., the charging capacity of the battery 4). Note that the value of the first target charging amount PN is not limited to this. When the state of the aircraft reaches the predicted second charging timing T2, the charge amount control unit 11 starts charging the battery 4 by causing the generator 2 to supply power to the battery 4.

[0039] That is, prediction starts at the third timing T3 in Fig. 2, and charging starts at the predicted second charging timing T2. Note that, in the example shown in Fig. 2, the second charging timing T2 coincides with the timing of transition from cruising to descent, but this is not limited thereto. The second charging timing T2 may be set at a predetermined timing during cruising (including "during cruising" and "during descent" in the embodiment), for example.

[0040] (Control flow in the charge amount control unit) Fig. 3 is a flowchart showing the flow of control by the control device 1 according to the embodiment. Hereinafter, the flow of control in the charge amount control unit 11 will be described in more detail with reference to Fig. 3. Please also refer to Fig. 1 for each reference symbol.

[0041] First, the charge amount control unit 11 detects the state of the battery 4 by acquiring a result from the battery state detection unit 8 (step S01). The charge amount control unit 11 acquires at least a first charging energy amount P1 which is the current charge amount of the battery 4. Next, the charge amount control unit 11 acquires the current flight plan 54 and the next flight plan 53 from the flight plan acquisition unit 10 (step S03).

[0042] Next, the charge amount control unit 11 determines whether the aircraft information is normal by acquiring information from a flight controller, etc. (step S05). If it is determined to be normal (YES in step S05), the charge amount control unit 11 further determines whether the aircraft has started cruising (step S07).

[0043] If it is determined in step S05 that the aircraft information is not normal (NO in step S05), or if it is determined in step S07 that cruising has not started (NO in step S07), the process proceeds to step S25.

[0044] In step S25, it is determined whether the first charging energy P1, which is the current charge amount of the battery 4, is equal to or greater than the second target charging energy PT. The second target charging energy PT is set to a value different from the first target charging energy PN. If the first charging energy P1 is equal to or greater than the second target charging energy PT (YES in step S25), the charging energy control unit 11 outputs the energy to the gas turbine engine 3 without charging the battery 4 (step S19). Then, this process ends.

[0045] If the first amount of charging energy P1 is smaller than the second target amount of charging energy PT in step S25 (NO in step S25), the charging amount control unit 11 causes the battery 4 to be charged and also causes the battery 4 to be output to the gas turbine engine 3 (step S27). After that, the charging amount control unit 11 determines whether the first amount of charging energy P1 has reached the second target amount of charging energy PT (step S29). The charging amount control unit 11 continues charging the battery 4 and outputting the energy from the gas turbine engine 3 until the first amount of charging energy P1 reaches the second target amount of charging energy PT. When the first amount of charging energy P1 reaches the second target amount of charging energy PT (YES in step S29), the process proceeds to step S19, where the charging of the battery 4 is stopped and the energy is output to the gas turbine engine 3, and the process ends.

[0046] On the other hand, if both steps S05 and S07 are YES, the process proceeds to step S09. In step S09, the charging amount control unit 11 first calculates the second charging energy P2 based on the next flight plan 53 acquired in step S03, and calculates the third charging energy P3 based on the current flight plan 54. The charging amount control unit 11 then determines whether the residual SOC prediction value, which is the value obtained by subtracting the total value of the second charging energy P2 and the third charging energy P3 from the first charging energy P1, is equal to or greater than the first target charging energy PN (P1-(P2+P3)≧PN) (step S09). If the residual SOC prediction value is equal to or greater than the first target charging energy PN (YES in step S09), the process proceeds to step S19, where the battery 4 is not charged and the gas turbine engine 3 is outputted, and the process ends.

[0047] If the remaining SOC predicted value is smaller than the first target charging energy PN in step S09 (NO in step S09), the charging amount control unit 11 calculates the required amount of power for the battery 4 based on the difference between the remaining SOC predicted value and the first target charging energy PN. Furthermore, the charging amount control unit 11 predicts a second charging timing T2, which is the timing to start charging the battery 4, based on the time required to charge the battery 4 with the calculated amount of power, the output of the gas turbine engine 3, etc. (step S11).

[0048] Next, the charge amount control unit 11 determines whether the current flight state coincides with the predicted second charging timing T2 (step S13). The process of step S13 is repeatedly executed until the current flight state coincides with the predicted second charging timing T2.

[0049] When the current flight state coincides with the predicted second charging timing T2 (YES in step S13), the charging amount control unit 11 causes the battery 4 to be charged and also causes the gas turbine engine 3 to output power (step S15). After that, the charging amount control unit 11 determines whether the remaining SOC predicted value has reached the first target charging energy amount PN (step S17). The charging amount control unit 11 continues charging the battery 4 and outputting power from the gas turbine engine 3 until the remaining SOC predicted value reaches the first target charging energy amount PN.

[0050] When the residual SOC predicted value reaches the first target charging energy PN (YES in step S17), the process proceeds to step S19, where charging of the battery 4 is stopped and output to the gas turbine engine 3, and the process ends. This ends the process of this flowchart.

[0051] (Action, effect) Next, the operation and effects of the above-mentioned aircraft control device 1 will be described. According to the control device 1 of the flying object of this embodiment, the charge amount control unit 11 charges the battery 4 with the amount of power required for the next takeoff. Therefore, compared to the conventional technology in which the battery is charged to the maximum every time the charge amount decreases, the charge amount of the battery 4 and the number of times it is charged and discharged can be reduced. This makes it possible to suppress deterioration of the battery 4. The charge amount control unit 11 predicts the timing to start charging required to charge the battery 4 with the power required for the next takeoff. By starting charging at the predicted timing, the drive source (gas turbine engine 3) is operated only for the amount of power generated to ensure the power required for the next takeoff. This makes it possible to minimize fuel consumption in the gas turbine engine 3. In addition, the charge amount control unit 11 controls the timing T2 at which power is supplied from the gas turbine engine 3 to the battery 4. This makes it possible to reduce the operating time of the gas turbine engine 3, thereby suppressing deterioration of the gas turbine engine 3. Therefore, it is possible to provide the control device 1 for an aircraft that can suppress deterioration of the gas turbine engine 3 and the battery 4 while suppressing fuel consumption. Furthermore, at the time of landing, the aircraft stores the power required for the next takeoff in the battery 4. This reduces the time loss due to power supply when the aircraft is flying continuously, and enables the aircraft's flight plan to be implemented efficiently.

[0052] Since the aircraft is equipped with multiple gas turbine engines 3 and generators 2, it is possible to respond to failures of the gas turbine engines 3 and generators 2, for example, and the safety of the aircraft can be improved. By operating multiple gas turbine engines 3 and generators 2 during charging, the battery 4 can be charged quickly. This makes it possible to respond to sudden increases in required output, etc. This further enhances the safety of the aircraft and improves the operability of the aircraft. On the other hand, by operating one of the multiple gas turbine engines 3 and generators 2 during discharging of the battery 4, deterioration of the gas turbine engines 3 and generators 2 can be suppressed. Furthermore, since at least one of the gas turbine engines 3 and generators 2 operates during discharging, the amount of discharge from the battery 4 can also be suppressed. Therefore, the time for which the battery 4 is charged and discharged can be reduced, and deterioration of the battery 4 can be suppressed. In addition, an optimal operation point can be set by changing the number of gas turbine engines 3 in operation according to the required output, and thus the energy consumption in the gas turbine engines 3 can be minimized.

[0053] By limiting the number of times the battery 4 is quickly charged, the time it takes for the battery 4 to be charged and discharged can be reduced, and deterioration of the battery 4 can be suppressed. Here, the aircraft consumes the most power during takeoff. Therefore, by charging at the timing T1 when the aircraft transitions from takeoff to cruising, charging can be started before the charge level of the battery 4 reaches the minimum charge level. This reduces the load on the battery 4, and suppresses deterioration of the battery 4.

[0054] The technical scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, in the above embodiment, a configuration including two generators 2 and two gas turbine engines 3 has been described, but three or more generators 2 and three or more gas turbine engines 3 may be provided.

[0055] Although the gas turbine engine 3 is used as the driving source in the above embodiment, the present invention is not limited to this. For example, a fuel cell or the like may be used as the driving source. The charge amount control unit 11 may be connected to a control unit of the aircraft that controls the operation of the aircraft, etc. The charge amount control unit 11 may be configured as a part of the control unit of the aircraft. The second target charging energy amount PT and the first target charging energy amount PN may be set to the same value.

[0056] In addition, within the scope of the invention, the components in the above-described embodiments may be replaced with well-known components, and the above-described embodiments may be combined as appropriate. [Explanation of symbols]

[0057] 1 Aircraft control device 2. Generator 3 Gas turbine engine (power source) 4 Battery 5 Electric motor 6 Propellers 7 Switching control section 8 Battery status detector 9 Flight status detection section 10 Flight Plan Acquisition Division 11. Charge amount control section 53 Next Flight Plan (Flight Plan) 54 Current flight plan (flight plan) P1 First charging power amount P2 Second charging energy P3 Third charging power amount T1 First charge timing (the timing of transition from takeoff to cruising) T2 Second charging timing (predicted timing) PN First target charging power amount Second target charge amount of PT

Claims

1. A generator mounted on the aircraft; A drive source that drives the generator; a battery that stores the electricity generated by the generator; an electric motor driven by electric power supplied from at least one of the generator and the battery; a propeller rotated by the electric motor; and a switching control unit that switches between a supply of power from the generator to the electric motor and a supply of power from the battery to the electric motor based on a flight state of the aircraft; a battery state detection unit for detecting a first charging energy amount, which is a current charging energy amount of the battery; a charge amount control unit that controls an amount of electric power supplied from the generator to the battery based on the first charge amount detected by the battery state detection unit; Equipped with The charge amount control unit is After the aircraft starts cruising, a second charging power amount is calculated based on a flight plan of the aircraft, which is a charging amount of the battery required for takeoff during the next flight; predicting a timing for supplying electric power from the generator to the battery based on the first amount of charged electric power and the second amount of charged electric power; At the timing, the power generator starts supplying power to the battery; The aircraft includes a plurality of the generators and a plurality of the driving sources, When charging the battery, the generators and the driving sources are operated; A control device for an aircraft, characterized in that when discharging the battery, one of the multiple generators and the driving sources is operated.

2. The control device for an aircraft as described in claim 1, characterized in that the battery is charged by a plurality of generators and driving sources at both the timing when the aircraft transitions from takeoff to cruising and the timing predicted by the charge amount control unit.

Citation Information

Patent Citations

  • Hybrid-electric propulsion system for aircraft

    JP2019039420A

  • Control system for aircraft, control method for aircraft, control program for aircraft, and aircraft

    JP2019077361A

  • Power generation and distribution for vehicle propulsion

    JP2019506327A

  • Active voltage control for hybrid electric aircraft

    JP2020182372A

  • Cooling of power systems for unmanned aerial vehicles.

    JP2020511350A