Information processing device, program, and information processing method

The information processing apparatus and method address user dissatisfaction by personalizing device control through user state consideration, ensuring tailored operation procedures that align with individual preferences and conditions.

JP7580612B2Active Publication Date: 2024-11-11MITSUBISHI ELECTRIC CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023539442
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-08-04
Publication Date
2024-11-11
Estimated Expiration
2041-08-04

AI Technical Summary

Technical Problem

Existing device control systems that rely solely on lifestyle patterns may not consider the unique preferences and states of individual users, leading to dissatisfaction and reduced usage.

Method used

An information processing apparatus and method that acquires device and user information to determine operation procedures based on user states, allowing for personalized control by generating operation patterns and adjusting load based on user conditions.

Benefits of technology

Enables device control that considers user states, improving user satisfaction by providing tailored operation procedures that account for individual preferences and conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007580612000001
    Figure 0007580612000001
  • Figure 0007580612000002
    Figure 0007580612000002
  • Figure 0007580612000003
    Figure 0007580612000003
Patent Text Reader

Abstract

A device control apparatus (120) is provided with: a device information acquisition unit (124) that acquires, from one or a plurality of devices, device information indicating at least operations performed by a user; a device information analysis unit (125) that analyzes the device information and thereby identifies an operation pattern that is a time series pattern in which the one or plurality of devices are operated; a user information acquisition unit (127) that acquires user information indicating the state of the user; and an operation procedure determination unit (128) that, from the operation pattern, determines, as an adopted operation procedure, an operation procedure that is a time series procedure for operating the one or plurality of devices so that the load on the user varies according to the state of the user.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an information processing device, a program, and an information processing method. [Background technology]

[0002] Conventionally, lifestyle pattern information characteristic of a user is extracted from the user's usage history of the device, and the device is controlled according to the user's lifestyle pattern or situation by utilizing the lifestyle pattern information. For example, Patent Document 1 discloses a technology for creating episode data by combining content related to a specific episode from lifestyle data as element data, a technology for analyzing the relationship between element data included in the episode data, a technology for identifying a lifestyle pattern characteristic of the user from the relationship between the element data, and a technology for controlling a device by utilizing the user's lifestyle pattern. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 3744932 Summary of the Invention [Problem to be solved by the invention]

[0004] However, whether or not a user desires to control devices using their lifestyle patterns depends on the individual characteristics of the user. Therefore, if the control content is determined based only on the lifestyle patterns, some users may feel that it is undesirable, and may not continue to use the device control service or may become less satisfied with the device control service.

[0005] Therefore, one or more aspects of the present disclosure aim to make it possible to determine control of an appliance by taking into account the state of a user using the appliance. [Means for solving the problem]

[0006] An information processing device according to one aspect of the present disclosure is characterized in that it includes a device information acquisition unit that acquires device information indicating at least operations performed by a user from one or more devices, a device information analysis unit that analyzes the device information to identify an operation pattern, which is a pattern in which the one or more devices are operated in a time series, a user information acquisition unit that acquires user information indicating a state of the user, and an operation procedure determination unit that determines, from the operation pattern, an operation procedure, which is a procedure for operating the one or more devices in a time series such that the load on the user varies depending on the state of the user, as an adopted operation procedure.

[0007] A program according to one aspect of the present disclosure is characterized in that it causes a computer to function as: a device information acquisition unit that acquires device information indicating at least operations performed by a user from one or more devices; a device information analysis unit that analyzes the device information to identify an operation pattern, which is a pattern in which the one or more devices are operated in a time series, by performing the analysis; a user information acquisition unit that acquires user information indicating a state of the user; and an operation procedure determination unit that determines, from the operation pattern, an operation procedure, which is a procedure for operating the one or more devices in a time series such that the load on the user varies depending on the state of the user, as an adopted operation procedure.

[0008] An information processing method according to one aspect of the present disclosure is characterized in that it acquires, from one or more devices, device information indicating at least operations performed by a user, identifies an operation pattern, which is a pattern in which the one or more devices are operated in a time series, by analyzing the device information, acquires user information indicating a state of the user, and determines, from the operation pattern, an operation procedure, which is a procedure for operating the one or more devices in a time series such that the load on the user varies depending on the state of the user, as an adopted operation procedure. Effect of the Invention

[0009] According to one or more aspects of the present disclosure, control of an appliance can be determined taking into account the state of a user who uses the appliance. [Brief description of the drawings]

[0010] [Figure 1] 1 is a block diagram illustrating a schematic configuration of a device control system including a device control device according to first and second embodiments. [Diagram 2] FIG. 2 is a schematic diagram showing examples of devices, device information, and sensors. [Diagram 3] 1 is a block diagram showing a configuration of a device control device according to a first embodiment. [Figure 4] FIG. 4 is a schematic diagram illustrating an example of event information. [Diagram 5] 13A and 13B are graphs showing the number of on or off operations for each predetermined time period during a predetermined period when the appliance is an EcoCute. [Figure 6] Graphs (A) and (B) show the number of times the appliance is turned on or off for each predetermined time period when the appliance is a cooking heater. [Figure 7] Graphs (A) and (B) show the operating times of an eco-cute and a cooking heater. [Figure 8] 13 is a table showing the probability that operations of devices are linked to each other. [Figure 9] 13 is an example showing the flow of traffic between devices. [Figure 10] FIG. 11 is a schematic diagram illustrating an example of flow line information. [Figure 11] 1 is a schematic diagram showing an example of user information including user attributes and user detection values; [Figure 12] FIG. 1 is a block diagram illustrating an example of a computer. [Figure 13] 13 is a flowchart showing the processing in a device information acquisition unit and a device information analysis unit. [Figure 14] 13 is a flowchart showing a process of a flow line distance specifying unit. [Figure 15]13 is a flowchart showing the processing in a user information acquisition unit and an operation procedure determination unit. [Figure 16] FIG. 11 is a block diagram showing a configuration of a device control device according to a second embodiment. [Figure 17] FIG. 11 is a block diagram showing a configuration of a device control device according to a third embodiment. [Figure 18] FIG. 4 is a schematic diagram illustrating an example of environmental information. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Embodiment 1 FIG. 1 is a block diagram showing a schematic configuration of a device control system 100 including a device control device 120 according to the first embodiment. The device control system 100 as an information processing system includes one or more devices 110 and a device control device 120 . The device 110 and the device control device 120 are connected to a network 101 . The network 101 may be either wired or wireless, and may be any of a local area network (LAN), a wide area network (WAN), and the Internet.

[0012] The device 110 is a target to be controlled by the device control device 120. For example, the device 110 is a home appliance such as an air conditioner, a television, a refrigerator, a cooking heater, a range, an eco-friendly water heater, or a light. The device 110 is connectable to the network 101, and transmits device information, which is made up of status information and sensor information, to the device control device 120 via the network 101. It is sufficient that the device information includes at least the status information.

[0013] The state information indicates, for example, an operation status indicating an operation performed by a user, such as turning on or off the device 110, a setting status indicating the settings of the device 110, or an operation status indicating the operation of the device 110. Here, the state information indicates at least the operation status.

[0014] The sensor information indicates the contents detected by a sensor provided in the device 110, such as a temperature and humidity sensor, a human presence sensor, an illuminance sensor, or an open / close sensor. The sensor information does not have to be included in the device information. Therefore, the sensor does not have to exist. Furthermore, multiple sensors may exist. FIG. 2 is a schematic diagram showing an example of a device 110, device information, and sensors.

[0015] FIG. 3 is a block diagram showing a configuration of the device control device 120 according to the first embodiment. The equipment control device 120 is an information processing device that includes a communication unit 121, an input unit 122, a memory unit 123, an equipment information acquisition unit 124, an equipment information analysis unit 125, a traffic line distance determination unit 126, a user information acquisition unit 127, an operation procedure determination unit 128, and an output unit 129.

[0016] The communication unit 121 performs communication via the network 101 . The input unit 122 receives an input. For example, the input unit 122 receives an input from a user of the device 110. The storage unit 123 stores information and programs required for processing by the device control device 120.

[0017] The device information acquisition unit 124 acquires device information from the device 110 via the communication unit 121. The acquired device information is provided to the device information analysis unit 125.

[0018] The device information analysis unit 125 analyzes the device information to identify an operation pattern in which the device 110 is operated in time series.

[0019] For example, the device information analysis unit 125 analyzes the device information to identify an event and its time, and stores device identification information, which is identification information for identifying the device 110, and event information indicating the event and the time in the storage unit 123. Here, the device identification information is the device name, but is not limited to the device name. An event is a change in the situation indicated by the device information, and the device information acquisition unit 124 may provide the device information analysis unit 125 with the situation after the change as an event. FIG. 4 is a schematic diagram illustrating an example of event information.

[0020] Furthermore, the device information analysis unit 125 refers to the event information stored in the storage unit 123, and counts the number of operations for each predetermined time period in a predetermined period for each device 110, thereby identifying an operation pattern for each device 110. Then, the device information analysis unit 125 stores in the storage unit 123 operation pattern information indicating the operation pattern identified for each device 110.

[0021] 5(A) and (B) are graphs showing the number of times of on or off operations for each predetermined time period in a predetermined period when the device 110 is an EcoCute. FIG. 5(A) is a graph showing the number of ON operations for each predetermined time period, and FIG. 5(B) is a graph showing the number of OFF operations for each predetermined time period.

[0022] 6A and 6B are graphs showing the number of times the device 110 is turned on or off for each predetermined time period when the device 110 is a cooking heater. FIG. 6(A) is a graph showing the number of ON operations for each predetermined time period, and FIG. 6(B) is a graph showing the number of OFF operations for each predetermined time period.

[0023] 5(A) and (B) or 6(A) and (B), the device information analysis unit 125 can identify an operation pattern in which, if the number of operations exceeds a threshold, the operation is performed during a time period and at a time included in the time period. The time included in the time period may be the start time, the middle time, or the end time of the time period.

[0024] 7(A) and (B) are graphs showing the operation times of the EcoCute and the cooking heater. FIG. 7(A) is a graph showing the operating time of an EcoCute, and FIG. 7(B) is a graph showing the operating time of a cooking heater. For example, the device information analysis unit 125 can specify a graph as shown in Fig. 7(A) by calculating the average value of the operation time of the EcoCute from the on time to the off time in a predetermined period. The device information analysis unit 125 can specify a graph as shown in Fig. 7(B) by calculating the average value of the operation time of the cooking heater from the on time to the off time in a predetermined period. Then, the device information analysis unit 125 can identify the operation pattern of the device 110 by referring to a graph such as that shown in FIG. 7(A) or FIG. 7(B).

[0025] FIG. 8 is a table showing the probability that operations of the devices 110 are linked to each other. In Fig. 8, the operations that are the triggering events are turning on or off the power of the EcoCute and turning on or off the power of the cooking heater, and the operations linked to the trigger are turning on or off the power of the EcoCute and turning on or off the power of the cooking heater. Fig. 8 also shows the probability that the operation linked to the triggering operation will be performed. The probability here is shown as the ratio of the number of times the linked operation was performed within a predetermined time to the number of times the triggering operation was performed.

[0026] Then, by referring to a table such as that shown in FIG. 8, the device information analysis unit 125 can modify the operation pattern identified as described above by assuming that when the probability exceeds a threshold, a linked operation is performed when a triggering operation is performed. In this case, an operation that is performed a small number of times but has a high probability of being performed after a certain operation is performed can be included in the operation pattern. Additionally, regression analysis may be used to calculate the probability of operation of a certain device 110 .

[0027] When the number of devices 110 is greater than one, the flow line distance identifying unit 126 identifies the flow line distance between the devices 110 and generates flow line information indicating the identified flow line distance. For example, the flow line distance identifying unit 126 identifies the flow line distance, which is the distance traveled by the user, for each combination of two devices 110 included in the plurality of devices 110. The flow line information is stored in the storage unit 123.

[0028] Here, the flow line distance between the devices 110 is different from the straight-line distance between the devices 110 and is the distance that the user needs to travel when operating the devices 110. The flow line distance may be input by the user via the input unit 122. Alternatively, the flow line distance identifying unit 126 may acquire a floor plan of the building in which the device 110 is installed and the location in which the device 110 is installed via the communication unit 121 or the input unit 122, and identify the flow line distance from these. In this case, the flow line distance identifying unit 126 may identify the distance in the case where the device 110 passes through a door without penetrating a wall as the flow line distance. Furthermore, when the user information acquisition unit 127 acquires the user's number of steps, the flow line distance determination unit 126 can also estimate the flow line distance between the two devices 110 from the device information acquired by the device information acquisition unit 124, based on the user's number of steps when the two devices 110 are operated.

[0029] FIG. 9 is an example showing the flow of traffic between devices 110. In FIG. In FIG. 9, the flow line between the appliances 110, a cooking heater 110a and an eco-cute 110b, is shown. As shown in FIG. 9, a flow line 102 is a route along which a user moves from a cooking heater 110a to an eco-cute 110b through doors 103a, 103b, and 103c.

[0030] FIG. 10 is a schematic diagram illustrating an example of the flow line information. As shown in Fig. 10, the flow line information indicates the flow line distance between the devices 110. Note that in Fig. 10, meters are used as the unit of the flow line distance.

[0031] 3, the user information acquisition unit 127 acquires user information indicating the state of the user. The user information includes the user's age, information capable of identifying whether the user is healthy or unhealthy, information capable of identifying the user's fatigue level, and information capable of identifying the user's number of steps.

[0032] Specifically, the user information acquiring unit 127 acquires, via the communication unit 121 or the input unit 122, user attributes that are attributes related to the user and user detection values ​​that are physical quantities detected from the user, as user information.

[0033] The user attributes include, for example, age or gender. The user detection value is body temperature, heart rate, number of steps, etc. Instead of the heart rate, the respiration rate may be used. Furthermore, the heart rate or respiration rate is assumed to have a normal value and a current value. The normal value of the heart rate or respiration rate may be obtained from the user via the input unit 122 or the communication unit 121, or may be estimated from a history of the current value. A part of the user detection value may be obtained from a wearable device or the like via the communication unit 121. FIG. 11 is a schematic diagram showing an example of user information including user attributes and user detection values.

[0034] 3, the operation procedure determination unit 128 determines an operation procedure for the device 110. For example, the operation procedure determination unit 128 determines, as the adopted operation procedure, an operation procedure for operating the device 110 in a time series such that the load on the user varies depending on the state of the user, from the operation pattern identified by the device information analysis unit 125. Here, the operation procedure determination unit 128 generates a normal operation procedure, which is a procedure by which the user operates the device 110 in a time series, from the operation pattern, generates a light-load operation procedure, which is an operation procedure that imposes a lighter load on the user than the normal operation procedure, from the normal operation procedure, and generates a heavy-load operation procedure, which is an operation procedure that imposes a heavier load on the user than the normal operation procedure, from the normal operation procedure. Then, the operation procedure determination unit 128 selects one operation procedure from the normal operation procedure, the light-load operation procedure, and the heavy-load operation procedure according to the user's state, and determines the selected one operation procedure as an adopted operation procedure.

[0035] Specifically, the operation procedure determination unit 128 generates a normal operation procedure, which is a normal operation procedure, by combining the operation patterns for each device 110 identified by the device information analysis unit 125. Since the operation patterns are identified for each device 110 as operations for each time, the operation procedure determination unit 128 can generate a normal operation procedure by incorporating the operation patterns of all devices 110 into the time of day.

[0036] Next, the operation procedure determination unit 128 generates an operation procedure that imposes a lighter load on the user than the normal operation procedure as a light-load operation procedure. Examples of light-load operation procedures include a first light-load operation procedure that shortens the total movement distance by rearranging the order of the operations included in the normal operation procedure, a second light-load operation procedure that removes operations that are not necessarily required from the operations included in the normal operation procedure, and a third light-load operation procedure that automatically controls operations that are set in advance to be automatically controlled from the operations included in the normal operation procedure.

[0037] In other words, the first light-load operation procedure is an operation procedure generated by changing the order of operations included in the normal operation procedure so that the total distance traveled by the user in the first light-load operation procedure is shorter than the total distance traveled by the user in the normal operation procedure. The second light-load operation procedure is an operation procedure generated by omitting at least one operation included in the normal operation procedure. Moreover, the third light-load operation procedure is an operation procedure generated by automatically performing at least one operation included in the normal operation procedure.

[0038] For example, the user inputs via the input unit 122 which of the first light-load operation procedure, the second light-load operation procedure, and the third light-load operation procedure to be selected as the light-load operation procedure, and the selected operation procedure is used as the light-load operation procedure.

[0039] Note that operations that are not necessarily required may be set in advance by the user via the input unit 122. Furthermore, the operation procedure determination unit 128 may determine that an operation that is performed periodically, such as hourly, daily, weekly, or monthly, is a necessary operation and that other operations are not necessarily necessary operations, based on the operation pattern information stored in the storage unit 123. For example, the operation procedure determination unit 128 may determine that an operation is performed periodically when the ratio of the number of times that an operation is actually performed to the number of times that an operation is necessarily performed periodically in a certain period of time is greater than a predetermined threshold value.

[0040] Furthermore, the operation procedure determination unit 128 may determine that an operation that is correlated with conditions other than time, such as an operation that is not performed on a rainy day, an operation that is performed only when the temperature is high, or an operation that is performed only when the user is in good spirits, is an operation that is not performed regularly and is not necessarily necessary.

[0041] Next, the operation procedure determination unit 128 generates an operation procedure that imposes a heavier load on the user than the normal operation procedure as a heavy-load operation procedure. For example, the operation procedure determination unit 128 determines, as the heavy-load operation procedure, an operation procedure with a flow line distance that is closest to a target flow line distance obtained by adding a predetermined distance to the flow line distance of the normal operation procedure by changing the order of operations included in the normal operation procedure. The added distance may be, for example, predetermined, and may be input from the user via the input unit 122. In other words, a heavy-load operation procedure is an operation procedure that is generated by changing the order of operations included in a normal operation procedure so that the total movement distance traveled by a user in the heavy-load operation procedure is longer than the total movement distance traveled by a user in the normal operation procedure.

[0042] Then, the operation procedure determination unit 128 specifies the user's age as condition A from the user attributes acquired by the user information acquisition unit 127.

[0043] Furthermore, the operation procedure determination unit 128 identifies the user's physical condition from the user detection value acquired by the user information acquisition unit 127, and identifies the physical condition value that is a value according to the user's physical condition as the condition B. For example, the operation procedure determination unit 128 identifies whether the user is healthy or unhealthy from the user detection value, and if the user is healthy, sets a predetermined first value as the health value, and if the user is unhealthy, sets a predetermined second value as the health value, where the first value is smaller than the second value. Furthermore, the operation procedure determination unit 128 identifies the user's fatigue level from the user detection value, and sets a larger value as the user's fatigue level is higher. For example, the operation procedure determination unit 128 may determine that the greater the change in heart rate, the higher the fatigue level. Then, the operation procedure determination unit 128 may determine the sum of the health value and the fatigue value as the physical condition value.

[0044] Further, the operation procedure determination unit 128 specifies, as a condition C, a physical strength value that is smaller as the user's physical strength remains, from the user detection value acquired by the user information acquisition unit 127. For example, the operation procedure determination unit 128 sets a fourth value as the physical strength value when the user's number of steps is smaller than usual, sets a fifth value as the physical strength value when the user's number of steps is normal, and sets a sixth value as the physical strength value when the user's number of steps is larger than usual. Here, the fourth value<the fifth value<the sixth value. Note that the operation procedure determination unit 128 may receive an input of the number of steps per day in a normal case from the user via the input unit 122. Further, the operation procedure determination unit 128 may estimate a range of the number of steps in a normal case from the history of the user detection value. For example, the operation procedure determination unit 128 may obtain an average value of the number of steps per day of the user. Then, the operation procedure determination unit 128 divides the number of steps or the average number of steps input by the user by 24, which is the time in a day, and multiplies the result by the current time to obtain a value, to which a predetermined number of steps is added or subtracted, thereby obtaining a range of the number of steps in a normal case. In this case, if the number of steps of the user is within the obtained range, the number of steps of the user is normal, if the number of steps of the user is less than the obtained range, the number of steps of the user is less than normal, and if the number of steps of the user is more than the obtained range, the number of steps of the user is more than normal.

[0045] Then, the operation procedure determination unit 128 calculates an operation procedure determination coefficient K by the following formula (1). K = condition A × weighting a + condition B × weighting b + condition C × weighting c (1) Here, the weighting a, the weighting b, and the weighting c are predefined weighting values, and are determined for each device 110.

[0046] The operation procedure determination unit 128 determines an adopted operation procedure, which is an operation procedure to be adopted, according to the value of the operation procedure determination coefficient K. For example, assuming that a predetermined threshold value is threshold value N, when K = N, the operation procedure determination unit 128 determines to adopt the normal operation procedure as the adopted operation procedure, when K > N, determines to adopt the light load operation procedure as the adopted operation procedure, and when K < N, determines to adopt the heavy load operation procedure as the adopted operation procedure.

[0047] As described above, the operation procedure determination unit 128 can make it easier to select the light load operation procedure as the adopted operation procedure as the user's age is higher, and make it easier to select the heavy load operation procedure as the adopted operation procedure as the user's age is lower. Also, when the user is unhealthy, the operation procedure determination unit 128 can make it easier to select the light load operation procedure as the adopted operation procedure than when the user is healthy. Further, the operation procedure determination unit 128 can make it easier to select the light load operation procedure as the adopted operation procedure as the user's fatigue level is higher, and make it easier to select the heavy load operation procedure as the adopted operation procedure as the user's fatigue level is lower. In addition, the operation procedure determination unit 128 can make it easier to select the light load operation procedure as the adopted operation procedure as the user's number of steps is more, and make it easier to select the heavy load operation procedure as the adopted operation procedure as the user's number of steps is less.

[0048] The output unit 129 outputs the determined adopted operation procedure. Here, the output unit 129 functions as a display unit that displays various screen images, and the output unit 129 displays the adopted operation procedure to show the determined adopted operation procedure to the user.

[0049] The device control device 120 described above can be realized by, for example, a computer 10 as shown in FIG. 12. The computer 10 includes a processor 11 such as a CPU (Central Processing Unit), a memory 12, an auxiliary storage device 13 such as an HDD (Hard Disk Drive), a communication device 14 such as a NIC (Network Interface Card) for communication, an input device 15 such as a keyboard or a mouse, and an output device 16 such as a speaker or a display.

[0050] For example, the communication unit 121 can be realized by the communication device 14 , the input unit 122 can be realized by the input device 15 , and the output unit 129 can be realized by the output device 16 .

[0051] The device information acquisition unit 124, the device information analysis unit 125, the traffic line distance identification unit 126, the user information acquisition unit 127 and the operation procedure determination unit 128 can be realized by the processor 11 loading a program stored in the auxiliary storage device 13 into the memory 12 and executing the program.

[0052] Such a program may be provided via a network, or may be provided in a form recorded on a recording medium, i.e., as a program product.

[0053] Next, the operation of the device control device 120 will be described. FIG. 13 is a flowchart showing the processing in the device information acquisition unit 124 and the device information analysis unit 125. First, the device information acquisition unit 124 acquires device information from the device 110 via the communication unit 121 (S10). The acquired device information is provided to the device information analysis unit 125.

[0054] The device information analysis unit 125 analyzes the device information from the device information acquisition unit 124 to identify the event and its time, and stores device identification information, which is identification information for identifying the device 110, and event information indicating the event and the time in the memory unit 123 (S11).

[0055] The device information analysis unit 125 refers to the event information stored in the storage unit 123, and counts the number of operations for each predetermined time period in a predetermined period for each device 110, thereby identifying an operation pattern for each device 110 (S12). Then, the device information analysis unit 125 stores operation pattern information indicating the identified operation pattern in the storage unit 123.

[0056] Next, the device information analysis unit 125 determines whether the number of devices 110 connected to the network 101 is greater than 1 (S13). If the number of devices 110 connected to the network 101 is greater than 1 (Yes in S13), the process proceeds to step S14, and if the number of devices 110 connected to the network 101 is 1 (No in S13), the process ends.

[0057] In step S14, the device information analysis unit 125 refers to the event information stored in the memory unit 123 to determine the probability that an operation linked to a triggering operation will be performed, thereby identifying the relationship between the devices 110.

[0058] Then, based on the relationship identified in step S14, the device information analysis unit 125 corrects the operation pattern identified in step S12 if necessary (S15). For example, if the operation pattern does not include a linked operation whose probability calculated in step S14 exceeds a threshold, the operation pattern includes a linked operation after the trigger operation is performed.

[0059] FIG. 14 is a flowchart showing the process of the flow line distance identifying unit 126. Here, an example is shown in which the flow line distance is calculated using a floor plan of the building and the installation position of the device 110.

[0060] First, the flow line distance identification unit 126 acquires, via the communication unit 121 or the input unit 122, a floor plan of the building in which the device 110 is installed and the location where the device 110 is installed (S20).

[0061] Next, the flow line distance identification unit 126 determines whether the number of devices 110 connected to the network 101 is greater than 1 (S21). If the number of devices 110 connected to the network 101 is greater than 1 (Yes in S21), the process proceeds to step S22, and if the number of devices 110 connected to the network 101 is 1 (No in S21), the process ends.

[0062] In step S22, the flow line distance identification unit 126 identifies the flow line distance of a pair that can be selected from multiple devices 110 based on the floor plan of the building in which the devices 110 are installed and the location where the devices 110 are installed (S22).

[0063] Then, the flow line distance identifying unit 126 generates flow line information indicating the identified flow line distance, and the flow line information is stored in the storage unit 123 (S23).

[0064] FIG. 15 is a flowchart showing the processing in the user information acquisition unit 127 and the operation procedure determination unit 128. First, the user information acquisition unit 127 acquires user attributes, which are attributes related to the user, and user detection values, which are physical quantities detected from the user, as user information via the communication unit 121 or the input unit 122 (S30). The acquired user information is provided to the operation procedure determination unit 128.

[0065] The operation procedure determination unit 128 identifies the user's age, physical condition, and physical strength condition based on the user information from the user information acquisition unit 127 (S31).

[0066] The operation procedure determination unit 128 identifies a normal operation procedure, a light-load operation procedure, and a heavy-load operation procedure from the operation pattern for each device 110 identified by the device information analysis unit 125 (S32).

[0067] Then, the operation procedure determination unit 128 determines, based on the user's status such as the user's age, physical condition, and physical strength, one of the normal operation procedure, the light-load operation procedure, and the heavy-load operation procedure as the operation procedure to be adopted for the device 110 (S33).

[0068] As a result, for example, when the user is in good health as usual, the normal operating procedure that is the procedure that the user normally executes is likely to be adopted. On the other hand, when the user is tired, the light-load operation procedure is more likely to be adopted, which is an operation procedure that performs automatic control on behalf of the user and does not operate devices that are not necessarily required. Also, when the user is older, the light-load operation procedure is more likely to be adopted. Furthermore, when the number of steps of the user is smaller than usual and the user has physical strength, the heavy load operation procedure that increases the user's movement distance is more likely to be adopted. Also, when the user is young, the heavy load operation procedure is more likely to be adopted.

[0069] As described above, according to the first embodiment, it is possible to adopt an operation procedure according to the user's life pattern and the user's state. Therefore, it is possible to determine device control according to the user's attributes or real-time state, taking into account the user's movement line. Furthermore, according to the first embodiment, it is possible to obtain an effect of improving the user's health care by not only simply pursuing comfort but also eliminating the user's lack of exercise or recommending rest. Furthermore, according to the first embodiment, by taking into account the attributes of the user, it is possible to make device control decisions based on a static state, and by taking into account the state of the user, it is possible to make dynamic device control decisions.

[0070] The degree of fatigue of the user can also be detected from the ratio of low-frequency components to high-frequency components by performing heart rate variability analysis, for example.

[0071] Embodiment 2 As shown in FIG. 1, a device control system 200 in the second embodiment includes one or more devices 110 and a device control device 220 according to the second embodiment. The device 110 and the device control device 220 are connected to a network 101 . The device 110 in the second embodiment is similar to the device 110 in the first embodiment.

[0072] FIG. 16 is a block diagram showing a configuration of a device control device 220 according to the second embodiment. The device control device 220 includes a communication unit 121, an input unit 122, a memory unit 123, a device information acquisition unit 124, a device information analysis unit 125, a movement line distance identification unit 126, a user information acquisition unit 127, an operation procedure determination unit 228, an output unit 129, a device operation recommendation unit 230, and a device control unit 231. The communication unit 121, input unit 122, memory unit 123, device information acquisition unit 124, device information analysis unit 125, flow line distance determination unit 126, user information acquisition unit 127 and output unit 129 of the device control device 220 of embodiment 2 are similar to the communication unit 121, input unit 122, memory unit 123, device information acquisition unit 124, device information analysis unit 125, flow line distance determination unit 126, user information acquisition unit 127 and output unit 129 of the device control device 120 of embodiment 1.

[0073] The operation procedure determination unit 228 determines an adopted operation procedure, similar to the operation procedure determination unit 128 in the first embodiment, and notifies the device operation recommendation unit 230 of the adopted operation procedure thus determined.

[0074] Furthermore, when the device operation recommendation unit 230 recommends an adopted operation procedure to the user as described below, the operation procedure determination unit 228 feeds back the user's reaction to the decision of the adopted operation procedure. For example, the operation procedure determination unit 228 modifies the values ​​of the weights a, b, and c in the formula (1) which is the calculation formula for the above operation procedure determination coefficient K, according to the user's reaction to the recommended adopted operation procedure.

[0075] Specifically, when the operating procedure determination unit 228 determines the normal operating procedure as the adopted operating procedure, the operating procedure determination unit 228 does not modify the values ​​of the weighting a, the weighting b, and the weighting c in the formula (1). In addition, when the operation procedure determination unit 228 determines the light load operation procedure as the adopted operation procedure, in order to make it easier to adopt the light load operation procedure when the user operates as recommended, the values of the weight a, weight b, and weight c in the formula (1) are increased. For example, the operation procedure determination unit 228 multiplies the weight a, weight b, and weight c by a feedback value V that satisfies 1 < V < 2. On the other hand, when the operation procedure determination unit 228 determines the light load operation procedure as the adopted operation procedure and the user does not operate as recommended, in order to make it difficult to adopt the light load operation procedure, the values of the weight a, weight b, and weight c in the formula (1) are decreased. For example, the operation procedure determination unit 228 multiplies the weight a, weight b, and weight c by a feedback value V that satisfies 0 < V < 1.

[0076] Furthermore, when the operation procedure determination unit 228 determines the heavy load operation procedure as the adopted operation procedure, in order to make it easier to adopt the heavy load operation procedure when the user operates as recommended, the values of the weight a, weight b, and weight c in the formula (1) are decreased. For example, the operation procedure determination unit 228 multiplies the weight a, weight b, and weight c by a feedback value V that satisfies 0 < V < 1. On the other hand, when the operation procedure determination unit 228 determines the heavy load operation procedure as the adopted operation procedure and the user does not operate as recommended, in order to make it difficult to adopt the heavy load operation procedure, the values of the weight a, weight b, and weight c in the formula (1) are increased. For example, the operation procedure determination unit 228 multiplies the weight a, weight b, and weight c by a feedback value V that satisfies 1 < V < 2.

[0077] Note that the operation procedure determination unit 228 may grasp whether the user has operated as recommended, for example, by receiving an input from the user to the input unit 122. In addition, when the device information acquisition unit 124 acquires information indicating that the recommended operation has been performed within a predetermined period after the operation procedure determination unit 228 makes a recommendation to the user, the operation procedure determination unit 228 may determine that the user has operated as recommended.

[0078] The device operation recommendation unit 230 causes the output unit 129 to output a recommendation to perform a corresponding operation in accordance with the time sequence of the adopted operating procedure. For example, when it is time to perform an operation according to the adopted operating procedure, the device operation recommendation section 230 causes the output section 129 to display a screen image recommending that the operation be performed. Here, when the adopted operation procedure indicates that an operation is to be performed under automatic control, the device operation recommendation unit 230 causes the output unit 129 to display a screen image for inquiring of the user as to whether or not such an operation is to be performed under automatic control, and when the user responds that it is to be performed, instructs the device control unit 231 to cause the target device 110 to perform the action that would be taken when such an operation is performed.

[0079] In response to an instruction from the device operation recommendation unit 230, the device control unit 231 sends a command to the target device 110 via the communication unit 121 so as to perform control when the target operation is performed. The device 110 that receives such a command performs control when the target operation is performed in accordance with the command. In other words, when a user makes an input to the input unit 122 indicating that he or she will perform a corresponding operation, and the corresponding operation is an operation that is performed automatically, the device control unit 231 causes the device 110 that is the target of the corresponding operation to execute control when the corresponding operation is performed.

[0080] The device operation recommendation unit 230 and device control unit 231 described above can also be realized by the processor 11 loading a program stored in the auxiliary storage device 13 into the memory 12 and executing the program, as shown in FIG. 12.

[0081] As described above, according to the second embodiment, it is possible to notify the user to perform an operation in accordance with the determined adopted operating procedure. In the second embodiment, the device operation recommendation unit 230 inquires of the user whether or not to perform an operation by automatic control at the time when such an operation is to be performed, but the second embodiment is not limited to this example. For example, if the user has set the device control device 220 in advance to perform an operation by automatic control, the device operation recommendation unit 230 instructs the device control unit 231 to control the target device 110 to perform such an operation at the time when the operation is to be performed by automatic control.

[0082] Embodiment 3 As shown in FIG. 1, a device control system 300 according to the third embodiment includes one or more devices 110 and a device control device 320 according to the third embodiment. The device 110 and the device control device 320 are connected to a network 101 . The device 110 in the third embodiment is similar to the device 110 in the first embodiment.

[0083] FIG. 17 is a block diagram showing a configuration of a device control device 320 according to the third embodiment. The device control device 320 includes a communication unit 121, an input unit 122, a memory unit 123, a device information acquisition unit 124, a device information analysis unit 125, a movement line distance identification unit 126, a user information acquisition unit 127, an operation procedure determination unit 328, an output unit 129, a device operation recommendation unit 230, a device control unit 231, and an environmental information acquisition unit 333.

[0084] The communication unit 121, input unit 122, memory unit 123, device information acquisition unit 124, device information analysis unit 125, flow line distance determination unit 126, user information acquisition unit 127 and output unit 129 of the device control device 320 of embodiment 3 are similar to the communication unit 121, input unit 122, memory unit 123, device information acquisition unit 124, device information analysis unit 125, flow line distance determination unit 126, user information acquisition unit 127 and output unit 129 of the device control device 120 of embodiment 1. Furthermore, the device operation recommendation section 230 and the device control section 231 of the device control device 320 according to the third embodiment are similar to the device operation recommendation section 230 and the device control section 231 of the device control device 220 according to the second embodiment.

[0085] The environment information acquisition unit 333 acquires environment information indicating physical quantities related to the environment of the device 110 via the communication unit 121 or the input unit 122. An example of the environment information used in the third embodiment is shown in FIG. The environmental information may be acquired from a sensor provided in the device 110, for example, but may also be acquired from an independent sensor or from outside via the Internet. The acquired environmental information is provided to the operation procedure determination unit 328.

[0086] The operation procedure determination unit 328 determines an operation procedure for the device 110. For example, the operation procedure determination unit 328 determines, as an adopted operation procedure, an operation procedure for operating the device 110 in a time series such that the load on the user varies depending on the state of the user and the physical quantity indicated by the environmental information, based on the operation pattern identified by the device information analysis unit 125 and the environmental information acquired by the environmental information acquisition unit 333.

[0087] Specifically, the operation procedure determination unit 328 calculates an operation procedure determination coefficient K by the following formula (2). K = condition A × weight a + condition B × weight b + condition C × weight c + condition D × weight d (2) Here, condition A, condition B, condition C, weighting a, weighting b, and weighting c are the same as those in formula (1) above.

[0088] Condition D is a value determined by environmental information. For example, condition D may be calculated by multiple regression analysis using temperature, humidity, atmospheric pressure, and weather as explanatory variables and the extent to which the condition D affects the execution of a user's action as a response variable. The weighting d is a predetermined weighting value that is determined for each device 110.

[0089] Then, in the same manner as in the first embodiment, the operation procedure determination unit 328 determines the adopted operation procedure, which is the operation procedure to be adopted, according to the value of the operation procedure determination coefficient K. For example, assuming that a predetermined threshold value is the threshold value N, when K = N, the operation procedure determination unit 328 adopts the normal operation procedure as the adopted operation procedure; when K > N, the operation procedure determination unit 328 adopts the light load operation procedure as the adopted operation procedure; and when K < N, the operation procedure determination unit 328 adopts the heavy load operation procedure as the adopted operation procedure. Note that the normal operation procedure, the light load operation procedure, and the heavy load operation procedure are the same as those in the first embodiment.

[0090] Furthermore, when the equipment operation recommendation unit 230 recommends the adopted operation procedure to the user, the operation procedure determination unit 328 feeds back the user's reaction to the determination of the adopted operation procedure. For example, the operation procedure determination unit 328 corrects the values of the weights a, b, c, and d in the formula (2), which is the calculation formula of the above operation procedure determination coefficient K, according to the user's reaction to the recommended adopted operation procedure. The method for correcting the values of the weights is the same as that in the second embodiment.

[0091] As described above, according to the third embodiment, for example, in addition to the equipment state, the traffic line information, and the user information, it is possible to determine the operation procedure in consideration of physical discomfort caused by a sudden change in air pressure and the like. It is also possible to perform equipment control to prevent physical discomfort caused by the temperature difference. Furthermore, it is also possible to determine equipment operation and equipment control to cope with changes in the autonomic nerve balance due to the sunshine duration.

[0092] In the above-described first to third embodiments, each of the device control devices 120, 220, and 320 includes the input unit 122 and the output unit 129, but the first to third embodiments are not limited to such examples. At least one of the input unit 122 and the output unit 129 may not be included in each of the device control devices 120, 220, and 320. In such a case, for example, an input unit or an output unit included in another device connected to the network 101 via the communication unit 121 may be used. When at least one of the input unit 122 and the output unit 129 is not included in each of the device control devices 120, 220, and 320, at least one of the input device 15 and the output device 16 may not be included in the computer 10 shown in FIG. 12.

[0093] For example, in the above-described first to third embodiments, the output unit 129 displays the adopted operation procedure determined by the user, but the first to third embodiments are not limited to such examples. For example, the output unit 129 may output the adopted operation procedure by voice. In addition, in the second or third embodiment, the output unit 129 may output by voice a recommendation to perform the corresponding operation according to the time sequence of the adopted operation procedure.

[0094] Furthermore, some or all of the functional units included in each of the device control devices 120, 220, 320 may be realized by a cloud on the Internet. [Explanation of symbols]

[0095] 100,200,300 Equipment control system, 110 Equipment, 120,220,320 Equipment control device, 121 Communication unit, 122 Input unit, 123 Memory unit, 124 Equipment information acquisition unit, 125 Equipment information analysis unit, 126 Movement line distance identification unit, 127 User information acquisition unit, 128,228,328 Operation procedure determination unit, 129 Output unit, 230 Equipment operation recommendation unit, 231 Equipment control unit, 333 Environmental information acquisition unit.

Claims

1. a device information acquisition unit that acquires device information indicating at least an operation performed by a user from one or more devices; a device information analysis unit that identifies an operation pattern, which is a pattern in which the one or more devices are operated in a time series, by analyzing the device information; a user information acquisition unit that acquires user information indicating a state of the user; and an operation procedure determination unit that determines, from the operation patterns, an operation procedure that operates the one or more devices in a time series such that a load on the user varies depending on a state of the user, as an adopted operation procedure. An information processing device comprising:

2. the operation procedure determination unit generates, from the operation pattern, a normal operation procedure which is a procedure by which the user operates the one or more devices in a time series, generates, from the normal operation procedure, a light-load operation procedure which is an operation procedure that imposes a lighter load on the user than the normal operation procedure, and generates, from the normal operation procedure, a heavy-load operation procedure which is an operation procedure that imposes a heavier load on the user than the normal operation procedure, selects one operation procedure from the normal operation procedure, the light-load operation procedure, and the heavy-load operation procedure according to a state of the user, and determines the selected one operation procedure as the adopted operation procedure.

2. The information processing apparatus according to claim 1,

3. The user information indicates at least an age of the user; The operation procedure determination unit is configured to make the light-load operation procedure more likely to be selected as the adopted operation procedure as the user is older, and to make the heavy-load operation procedure more likely to be selected as the adopted operation procedure as the user is younger.

3. The information processing apparatus according to claim 2,

4. The user information includes at least information that can identify whether the user is healthy or unhealthy; The operation procedure determination unit is configured to select the light-load operation procedure as the adopted operation procedure more easily when the user is unhealthy than when the user is healthy.

3. The information processing apparatus according to claim 2,

5. The user information includes at least information that can identify a fatigue level of the user, The operation procedure determination unit is configured to select the light-load operation procedure as the adopted operation procedure more easily as the user's fatigue level is higher, and to select the heavy-load operation procedure as the adopted operation procedure more easily as the user's fatigue level is lower.

3. The information processing apparatus according to claim 2,

6. The user information includes at least information that can identify the number of steps of the user, The operation procedure determination unit is configured to make the light-load operation procedure more likely to be selected as the adopted operation procedure as the number of steps of the user increases, and to make the heavy-load operation procedure more likely to be selected as the adopted operation procedure as the number of steps of the user decreases.

3. The information processing apparatus according to claim 2,

7. The operation procedure determination unit generates the light-load operation procedure by omitting at least one operation included in the normal operation procedure.

7. The information processing device according to claim 2, wherein:

8. The operation procedure determination unit generates the light-load operation procedure by automatically performing at least one operation included in the normal operation procedure.

3. The information processing apparatus according to claim 2,

9. a flow line distance specification unit that specifies a flow line distance, which is a distance traveled by the user, for each combination of two devices included in the plurality of devices; The operation procedure determination unit generates the light-load operation procedure by changing an order of operations included in the normal operation procedure so that a total of the movement line distance traveled by the user in the light-load operation procedure is shorter than a total of the movement line distance traveled by the user in the normal operation procedure.

3. The information processing apparatus according to claim 2,

10. a flow line distance specification unit that specifies a flow line distance, which is a distance traveled by the user, for each combination of two devices included in the plurality of devices; The operation procedure determination unit generates the heavy-load operation procedure by changing an order of operations included in the normal operation procedure so that a total of the movement line distance traveled by the user in the heavy-load operation procedure is longer than a total of the movement line distance traveled by the user in the normal operation procedure.

3. The information processing apparatus according to claim 2,

11. Further comprising an output unit for outputting the adopted operation procedure. The information processing device according to claim 1 ,

12. An output unit; a device operation recommendation unit that causes the output unit to perform an output recommending that a corresponding operation be performed in accordance with a time series in the adopted operation procedure, The operation procedure determination unit feeds back a user's reaction to the output to the determination of the adopted operation procedure. The information processing device according to claim 1 ,

13. An output unit; an input unit that accepts input from the user; a device operation recommendation unit that causes the output unit to perform an output recommending that a corresponding operation be performed in accordance with a time series in the adopted operation procedure; and a device control unit that, when the user inputs to the input unit an input indicating that the corresponding operation is to be performed and the corresponding operation is an operation that is to be performed automatically, causes a device that is a target of the corresponding operation among the one or more devices to perform control when the corresponding operation is performed. The information processing device according to claim 1 ,

14. An environmental information acquisition unit that acquires environmental information indicating a physical quantity related to an environment of the one or more devices, The operation procedure determination unit determines the adopted operation procedure based on the operation pattern and the environmental information such that a load on the user varies depending on a state of the user and the physical quantity. The information processing device according to claim 1 ,

15. Computer, a device information acquisition unit that acquires device information indicating at least an operation performed by a user from one or more devices; a device information analysis unit that identifies an operation pattern, which is a pattern in which the one or more devices are operated in a time series, by analyzing the device information; A user information acquisition unit that acquires user information indicating a state of the user; and and determining, from the operation pattern, an operation procedure that is a procedure for operating the one or more devices in a time series such that a load on the user varies depending on a state of the user, as an adopted operation procedure. A program characterized by.

16. Acquire device information indicating at least an operation performed by a user from one or more devices; By analyzing the device information, an operation pattern is identified, which is a pattern in which the one or more devices are operated in a time series; acquiring user information indicating a status of the user; determining, as an adopted operation procedure, an operation procedure for operating the one or more devices in a time series such that a load on the user varies depending on a state of the user, from the operation patterns; An information processing method comprising:

Citation Information

Patent Citations

  • System for monitoring life

    JP2005284535A

  • Device linkage control device

    JP3744932B2

  • Device linkage control apparatus

    WO2004010232A1

  • Information notification apparatus and information display method

    WO2014049948A1