Foundation penetration structure for piping and construction method for foundation penetration piping

By using a water-expandable water stop material sandwiched by a foam material and mortar, the installation of foundation penetration piping is simplified, improving workability and sealing performance.

JP7583582B2Active Publication Date: 2024-11-14SEKISUI CHEMICAL CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2020189970
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-16
Publication Date
2024-11-14
Estimated Expiration
2040-11-16

AI Technical Summary

Technical Problem

The installation of expandable water stop materials between through holes in foundations is cumbersome, requiring pressers from both sides, which complicates the foundation penetration work after the building is installed, reducing workability.

Method used

A water-expandable water stop material is installed in the gap between a through hole and a pipe, with a foam material on the indoor side and mortar on the outdoor side to sandwich and suppress longitudinal expansion, allowing radial expansion.

Benefits of technology

This configuration improves workability by allowing the water stop material to be easily pressed from both sides, enhancing sealing performance and simplifying the installation process without needing to access the building interior.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583582000001
    Figure 0007583582000001
  • Figure 0007583582000002
    Figure 0007583582000002
  • Figure 0007583582000003
    Figure 0007583582000003
Patent Text Reader

Abstract

To improve workability mainly to a retainer on an indoor side of a water stop material.SOLUTION: A water stop material 13 is installed in a circumferential direction in a clearance 12 between a penetration hole portion 11 formed on a foundation 4 and piping 2 inserted and disposed in the penetration hole portion 11. At a position closer to an indoor side 15 than the water stop material 13 in the clearance 12, a foamed material 16 is installed. At a position closer to an outdoor side 17 than the water stop material 13 in the clearance 12, mortar 18 is placed. The foamed material 16 may be installed in the penetration hole portion 11 together with the piping 2 while being attached on an outer peripheral surface of the piping 2. The foamed material 16 may be pasted to the outer peripheral surface of the piping 2 by an adhesive tape 25.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a foundation penetration structure for piping and a method for constructing foundation penetration piping. [Background technology]

[0002] 2. Description of the Related Art Buildings such as houses are provided with various types of piping, such as water supply pipes, drainage pipes, etc. These piping are installed so as to penetrate between the inside and outside of the foundation that supports the building on the ground (see, for example, Patent Document 1).

[0003] A through hole is formed in the foundation, and the pipe is inserted through the through hole. A water-stopping material is placed in the gap between the through hole and the pipe, and the water is stopped by the water-stopping material. In this way, the pipe becomes a foundation-penetrating pipe. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2018-151038 A Summary of the Invention [Problem to be solved by the invention]

[0005] When installing an expansive water-stopping material in the gap between the through-hole of the foundation and the pipe, a clamp is required to suppress the expansion of the water-stopping material from both the indoor side and the outdoor side. And when the work of passing the pipe through the through-hole (foundation penetration work) is performed after the building is installed on the foundation, for example, the work of installing the clamp on the indoor side must be performed by getting under the floor of the building, which makes the work difficult.

[0006] Therefore, a main object of the present invention is to contribute to improving the above-mentioned problems. [Means for solving the problem]

[0007] In response to the above problems, the present invention provides: A water-swelling water-stopping material is installed in a circumferential direction in a gap between a through-hole portion formed in a foundation of a building and a pipe inserted through the through-hole portion, A foam material is provided at a position inside the gap on the indoor side of the water-stopping material, At a position on the outdoor side of the water-stopping material in the gap, So that it is almost flush with the outdoor surface of the foundation. The mortar is poured It has three layers And, The foam material and the mortar sandwich and press the water-stopping material from both sides, The water-swellable water-stopping material is characterized by a foundation penetration structure for piping in which expansion in the longitudinal direction is suppressed and expansion in the radial direction is allowed. Effect of the Invention

[0008] According to the present invention, From the indoor side to the outdoor side, foam material, water-expandable waterproofing material, and mortar were installed in three layers in that order. The above-mentioned configuration can improve the workability of holding down the water-swelling material on the indoor side, etc. Also, by sandwiching and holding down the water-swelling water-swelling material from both sides inside the gap with the foam material and mortar, the water-swelling water-swelling material can be suppressed from expanding in the longitudinal direction and expanded in the radial direction. The surface of the foundation can then be smoothed by pouring mortar almost flush with the exterior surface of the foundation. [Brief description of the drawings]

[0009] [Figure 1] FIG. 2 is a vertical cross-sectional view of the foundation penetration structure for piping according to the present embodiment. [Figure 1A] FIG. 2 is a perspective view showing a foam material with a circular cross section. [Figure 1B] FIG. 2 is a perspective view showing a foam material with a rectangular cross section. [Diagram 2] 2 is a diagram showing a state in which a pipe with a foam material attached is inserted into a through hole of the foundation of FIG. 1 from the outdoor side. [Diagram 3] 2 is a diagram showing a state in which a water-stopping material is applied from the outdoor side into a gap between a through-hole portion and a pipe in FIG. 1. FIG. [Figure 4] FIG. 2 is a diagram showing the state in which mortar is poured into the gap in FIG. 1 from the outdoor side. [Diagram 5]FIG. 2 is a vertical cross-sectional view of a foundation penetration structure for piping according to a comparative example. [Figure 6] 6 is a diagram showing a state in which a backup jig is inserted from the indoor side into a gap between a through-hole portion and a pipe in FIG. 5. FIG. [Figure 7] 6 is a diagram showing a state in which a waterproofing material is applied from the outdoor side into a gap between a through-hole portion and a pipe in FIG. 5. FIG. [Figure 8] 6 is a diagram showing a state in which mortar is poured into the gap in FIG. 5 from both the indoor side and the outdoor side. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, the present embodiment will be described in detail with reference to the drawings. Figures 1 to 8 are for explaining this embodiment, with Figures 1 to 4 being an example and Figures 5 to 8 being comparative examples. EXAMPLES

[0011] <Configuration> The configuration of this embodiment will now be described.

[0012] As shown in Fig. 1, various types of piping 2, such as water supply pipes and drainage pipes, are installed in a building 1, such as a house. These piping 2 are installed so as to penetrate between the inside and outside of a foundation 4 that supports the building 1 on the ground GL. In this way, the piping 2 becomes foundation penetrating piping.

[0013] The building 1 may have any structure. For example, the building 1 may be a modular building. A modular building is a building 1 that can be constructed in a short period of time by transporting building units prefabricated in a factory to a construction site and assembling them at the construction site. The building units are assembled so as to be installed on a foundation 4.

[0014] The water supply pipe is a pipe that supplies water and hot water to Building 1. The drainage pipe is a pipe that leads wastewater generated in Building 1 to an external sewer system, etc. The ground level is the site on which Building 1 is to be installed.

[0015] The foundation 4 is a reinforced concrete structure that is placed on the ground GL and supports the lower part of the building 1 at a position higher than the ground GL. There are two types of foundations 4: a strip foundation and a slab foundation. A strip foundation is mainly composed of a rising portion 5 that rises from the ground GL. A slab foundation is mainly composed of the rising portion 5 and a horizontal, flat slab portion 6 that covers the ground GL inside the rising portion 5. The foundation 4 may be either a strip foundation or a slab foundation. In this embodiment, the foundation 4 is a slab foundation.

[0016] In addition to the basic configuration described above, this embodiment can have the following configuration.

[0017] (1) In the foundation penetration structure of the piping 2 of this embodiment, a water-stopping material 13 is installed circumferentially in the gap 12 between the through hole portion 11 formed in the foundation 4 and the piping 2 inserted into the through hole portion 11. A foam material 16 is placed at a position on the indoor side 15 of the water-stopping material 13 in the gap 12. Mortar 18 is poured at a position 17 on the outdoor side of the water-stopping material 13 in the gap 12.

[0018] Here, the through hole portion 11 is a hole that penetrates between the inside and outside of the foundation 4. The through hole portion 11 may be provided so as to penetrate the rising portion 5 of the foundation 4, may be provided so as to penetrate the slab portion 6, or may be provided so as to penetrate between the rising portion 5 and the slab portion 6. The through hole portion 11 may be provided almost horizontally or may be provided at an incline. When the through hole portion 11 is inclined, it is preferable to install it so that the indoor side 15 is higher and the outdoor side 17 is lower. In this embodiment, the through hole portion 11 penetrates the rising portion 5 at a position higher than the ground GL almost horizontally.

[0019] The through hole portion 11 is formed, for example, by embedding a pipe member 21 in the foundation 4 when the foundation 4 is poured.

[0020] The pipe member 21 may be a void pipe made of paper or a flexible resin, or may be a resin pipe, but in order to prevent the through hole portion 11 from deforming, it is preferable to use a hard resin pipe such as a PVC pipe having a required thickness and strength for the pipe member 21. In the case of a void pipe, the void pipe can be removed from the foundation 4 after the foundation 4 is poured. In the case of a hard resin pipe, the resin pipe is left in the foundation 4 even after the foundation 4 is poured. As a result, the internal space of the pipe member 21 becomes the through hole portion 11.

[0021] It is preferable that the through hole 11 is linear and of uniform diameter. In this embodiment, the through hole 11 is formed by embedding a single pipe member 21 (e.g., a cylindrical PVC pipe) made of hard resin and straight with the same length as the thickness of the rising portion 5 inside the rising portion 5. The pipe member 21 is embedded in the foundation 4 so that it is approximately horizontal, both ends are approximately flush with both sides of the rising portion 5, and the surface of the rising portion 5 is approximately perpendicular to the rising portion 5.

[0022] The pipe 2 is a tubular member that is passed through the inside of the through hole portion 11, and can be, for example, a water supply pipe, a drain pipe, or the like, as described above. The pipe 2 can also be, for example, a heat medium supply / discharge pipe such as a refrigerant pipe or a heat medium pipe. It is preferable that at least the portion of the pipe 2 that passes through the through hole portion 11 is linear with a uniform diameter. For this purpose, it is preferable that the pipe 2 has a cross-sectional shape similar to that of the through hole portion 11, but is at least one size smaller than the through hole portion 11. In this embodiment, the pipe 2 is a cylindrical pipe.

[0023] The gap 12 is a gap formed between the through hole portion 11 (its inner peripheral surface) and the pipe 2 (its outer peripheral surface). In this embodiment, the through hole portion 11 and the pipe 2 each have a circular cross section, so that an annular gap 12 is formed between the through hole portion 11 and the pipe 2. It is preferable that the gap 12 has a substantially uniform size in the circumferential direction. In order to make the gap 12 substantially uniform in the circumferential direction, it is preferable to apply the water-stopping material 13, the foam material 16, and the mortar 18 before the pipe 2 is completely fixed. This is because there is a high possibility that the gap 12 will not be uniform in the circumferential direction if the pipe 2 is completely fixed.

[0024] The water stop material 13 is a member for sealing the through hole portion 11 to prevent, for example, rainwater from entering from the outdoor side 17 to the indoor side 15. Any water stop material 13 may be used, but it is preferable to use an expandable material in order to improve the sealing performance for the gap 12. For the expandable water stop material 13, for example, a water expandable clay sealant using clay such as bentonite can be used. For the water stop material 13, a string-shaped material is cut to an amount that provides an optimal filling amount. The string-shaped water stop material 13 is used with an optimal length and a thickness optimally selected according to the inner diameter of the through hole portion 11, the outer diameter of the pipe 2, the size of the gap 12, and the circumferential length of the gap 12. In addition to the above, the expandable water stop material 13 can be, for example, a caulking-type water expandable one-component sealant, which is injected into the gap 12.

[0025] The water-stopping material 13 is installed at a position in the middle of the gap 12 between the through-hole portion 11 and the pipe 2 in the longitudinal direction (axial direction of the through-hole portion 11). The expansive water-stopping material 13 expands after installation, so a press is required on both sides of the water-stopping material 13. Therefore, the water-stopping material 13 is installed in a position relative to the gap 12 such that portions (spaces) for installing the foam material 16 and mortar 18 that serve as presses are left on both sides of the water-stopping material 13 (the indoor side 15 and the outdoor side 17). Even in the case of a non-expansive water-stopping material 13, it is expected that the sealing properties of the water-stopping material 13 can be improved by pressing and compressing the water-stopping material 13 from both sides.

[0026] The circumferential direction refers to a direction going around the inner circumferential surface of the through hole portion 11 and the outer circumferential surface of the pipe 2.

[0027] The indoor side 15 refers to the inside of the building 1. The indoor side 15 from the water-stopping material 13 refers to the portion from the water-stopping material 13 to the opening of the through-hole portion 11 on the indoor side 15 to the right in the figure.

[0028] The foam material 16 is a member that is light, flexible, and capable of elastic deformation due to the inclusion of many air bubbles inside. The foam material 16 can be used in the form of a long, thin string-like member having the same length as the perimeter of the gap 12 and a uniform thickness that is the same as or slightly larger than the size of the gap 12, formed into a circular (ring) shape. The foam material 16 is accurately installed in the gap 12 at a position on the indoor side 15 rather than the installation position of the water-stopping material 13.

[0029] It is preferable to use a member with a uniform cross section, such as a circular cross section as shown in Fig. 1A or a rectangular cross section as shown in Fig. 1B, for the foam material 16. In this embodiment, the foam material 16 is a string-like member of an optimum thickness made of a material such as silicone foam 16a or urethane foam 16b, which is cut to an optimum length and rolled into a ring shape. Note that the foam material 16 may be one that is already in a ring shape from the beginning. The foam material 16 is left inside the gap 12 even after construction.

[0030] The outdoor side 17 refers to the outside of the building 1. The outdoor side 17 of the water-stopping material 13 refers to the portion from the water-stopping material 13 to the opening of the through-hole portion 11 on the outdoor side 17 on the left side in the figure.

[0031] The mortar 18 is a fluid, hardening building material made by mixing sand (fine aggregate) and cement with water. The mortar 18 is filled in the portion of the gap 12 that is closer to the exterior side 17 than the water-stopping material 13 so that it is flush with the surface of the exterior side 17 of the foundation 4.

[0032] (2) The foam material 16 may be installed in the through-hole portion 11 together with the pipe 2 in a state where the foam material 16 is attached to the outer peripheral surface of the pipe 2 .

[0033] Here, the outer peripheral surface of the pipe 2 is a cylindrical surface exposed to the outside of the cylindrical pipe 2. The foam material 16 may be integrated with the pipe 2 by, for example, first bonding the end faces of the foam material 16 together to form a ring shape, which is then fitted (externally fitted) onto the outer peripheral surface of the pipe 2, and then attaching the foam material 16 with an adhesive so that it does not move relative to the pipe 2.

[0034] In addition, the foam material 16 may be wound around the outer peripheral surface of the pipe 2 in a ring shape and then bonded with an adhesive to be integrated with the pipe 2. In this case, the end faces of the foam material 16 wound around the outer peripheral surface of the pipe 2 are later bonded together with an adhesive.

[0035] The foam material 16 may be, for example, the silicone foam 16a (or urethane foam 16b) described above.

[0036] As a result, the foam material 16 is inserted into the through-hole portion 11 together with the piping 2. Then, by inserting and arranging the piping 2 into the through-hole portion 11, the foam material 16 is inserted and installed in the gap 12. At this time, since the foam material 16 has a uniform thickness in the circumferential direction, the gap 12 can be blocked in a uniform state in the circumferential direction.

[0037] The piping 2 may be inserted into the through-hole portion 11 from the indoor side 15, or may be inserted into the through-hole portion 11 from the outdoor side 17. In this embodiment, the piping 2 is inserted into the through-hole portion 11 from the indoor side 15.

[0038] (3) Foam material 16 may be attached to the outer circumferential surface of pipe 2 with adhesive tape 25 (FIG. 1B).

[0039] Here, the adhesive tape 25 is an adhesive fixing member formed by applying a layer of adhesive to the surface of a tape-like base material. For example, the foam material 16 may be integrated with the pipe 2 by applying an adhesive tape 25 such as a double-sided tape to one side thereof and wrapping the foam material 16 around the outer circumferential surface of the pipe 2 with the side to which the double-sided tape is applied facing inward. The foam material 16 may be integrated with the pipe 2 by applying an adhesive layer to one side thereof and forming the foam material 16 into the adhesive tape 25 itself. In this way, the foam material 16 can be directly applied to the outer circumferential surface of the pipe 2.

[0040] When attaching the foam material 16 to the pipe 2 with the adhesive tape 25, the end faces of the foam material 16 attached to the outer peripheral surface of the pipe 2 are later bonded together with an adhesive tape 25 such as a double-sided tape or an adhesive. For the foam material 16, for example, the above-mentioned urethane foam 16b (or silicone foam 16a) can be used.

[0041] (4) The following explains the construction method for foundation penetration piping.

[0042] The construction method for foundation penetration piping is as follows: A foam material 16 is attached to the outer peripheral surface of the pipe 2, The pipe 2 with the foam material 16 attached to its outer periphery is inserted into the through hole 11 formed in the foundation 4, so that the foam material 16 is positioned inside the through hole 11, and the gap 12 between the through hole 11 and the pipe 2 is filled in the circumferential direction with the foam material 16 (FIG. 2). A waterproofing material 13 is placed in the gap 12 so as to be located on the outdoor side 17 of the foam material 16 (FIG. 3). Mortar 18 may be poured on the outdoor side 17 of the water-stopping material 13 in the gap 12 (FIG. 4).

[0043] Here, the foundation penetrating piping refers to the piping 2 that penetrates the foundation 4, as described above.

[0044] More specifically, in step 1 of the construction method for the foundation penetrating piping, first, the inner diameter of the through hole portion 11 is confirmed (inner diameter confirmation step).

[0045] In step 2, an optimal water-swelling clay sealant is cut to an optimal length and with an optimal thickness according to the inner diameter of the through-hole portion 11 and the outer diameter of the pipe 2 to prepare an optimal water-stopping material 13. The water-swelling clay sealant 13 is immersed in water and moistened until the water-easily absorbent film on the surface dissolves (water-swelling material preparation step). Note that if the water-swelling material 13 is a caulking-type water-swelling one-component sealant, this water-sealing material preparation step is not necessary.

[0046] In step 3, foam material 16 is attached in advance to the outer periphery of pipe 2 outside through hole 11. Foam material 16 can be attached to the outer periphery of pipe 2 by, for example, adhesive or adhesive tape 25. Then, pipe 2 with foam material 16 attached is inserted into through hole 11 formed in foundation 4 so that foam material 16 is positioned at a predetermined position inside through hole 11. Pipe 2 may be inserted into through hole 11 from either indoor side 15 or outdoor side 17. However, in order to install foam material 16 with good workability, it is preferable to insert from outdoor side 17 (installation step of pipe 2 with foam material 16).

[0047] In step 4, the inside of the through hole 11 (gap 12 between the through hole 11 and the pipe 2) is filled with the water-stopping material 13 from the outdoor side 17 (water-stopping material filling step). The water-stopping material 13 is filled from the position where it contacts the foam material 16 to a position slightly behind the opening of the through hole 11 on the outdoor side 17 (for example, a position about 20 mm behind the opening). When the water-stopping material 13 is a caulking-type water-expandable one-component sealant, the water-stopping material 13 is injected into the gap 12 from the outdoor side 17. The water-stopping material 13 is applied with a finger, a long and thin tool, etc., so that the thickness (filling thickness) in the axial direction of the through hole 11 is secured to a required amount (for example, about 40 mm) or more, the thickness in the circumferential direction is uniform, and the water-stopping material 13 fits the inner surface of the through hole 11 and the outer surface of the pipe 2. After the application of the water-stopping material 13, the application state of the water-stopping material 13 is checked at least at three or more positions that are approximately uniformly spaced in the circumferential direction (water-stopping material application state checking step).

[0048] In step 5, mortar 18 is filled into the opening on the outdoor side 17 of the through-hole 11 (mortar filling step). To ensure and improve water-stopping performance, the mortar 18 is poked with an adjustment tool 31 such as a spatula to destroy any internal voids. The surface of the mortar 18 is adjusted so that it is flush with the surface of the outdoor side 17 of the through-hole 11. The mortar 18 is adjusted so that the required thickness in the axial direction is ensured (for example, about 20 mm). Note that the foam material 16 is left attached to the indoor side 15 of the through-hole 11.

[0049] As a result of the above, the piping 2 penetrating the foundation 4 (foundation penetrating piping) is installed.

[0050] <Effects> According to this embodiment, the following effects can be obtained.

[0051] (Effects 1) The foundation penetration structure for the pipe 2 is such that the pipe 2 is inserted and arranged in the through-hole portion 11 of the foundation 4, and a water-stopping material 13 is installed in the circumferential direction in the gap 12 between the through-hole portion 11 and the pipe 2 inserted and arranged in the through-hole portion 11. For example, a water-expandable clay sealant using clay such as bentonite, or a caulking-type water-expandable one-component sealant is used as the water-stopping material 13. The expansive water-stopping material 13 needs to be pressed from both the indoor side 15 and the outdoor side 17 in order to ensure high sealing performance all around the gap 12 by suppressing expansion in the longitudinal direction and expanding appropriately in the radial direction.

[0052] In the existing foundation penetration structure of the pipe 2, as shown in the comparative example of Fig. 5 to Fig. 8, both the indoor side 15 and the outdoor side 17 of the water-stopping material 13 are secured with mortar 18. Therefore, when performing the work of passing the pipe 2 through the foundation after the installation of the building 1 (the work of passing the pipe 2 through the through hole portion 11 and fixing it), it becomes necessary to go under the floor of the building 1 and secure the indoor side 15 (applying mortar 18) from the indoor side 15, which makes the work less easy.

[0053] Furthermore, when pouring mortar 18 to hold down the indoor side 15, the following work was carried out after inserting the pipe 2 into the through-hole 11. That is, first, as shown in Fig. 6, a backup jig 52 is inserted into the gap 12 between the through-hole 11 and the pipe 2 from the indoor side 15 to a position 51 where the water-stopping material 13 is to be installed. A jig 53 such as a ruler is inserted into the gap 12 from the outdoor side 17 to measure whether the backup jig 52 is correctly inserted to the above-mentioned position 51.

[0054] Next, as shown in Fig. 7, the water-stopping material 13 is installed in the gap 12 from the outdoor side 17 so that it abuts against the backup jig 52. Then, after the water-stopping material 13 is installed in the gap 12, the backup jig 52 is removed from the gap 12 to the indoor side 15. Then, mortar 18 is poured into the gap 12 from both the indoor side 15 and the outdoor side 17. Therefore, when performing foundation penetration work after the installation of the building 1, the construction requires a great deal of work.

[0055] In contrast, in this embodiment, the foam material 16 is placed at a position on the indoor side 15 of the water-stopping material 13 in the gap 12, and the mortar 18 is poured at a position on the outdoor side 17 of the water-stopping material 13 in the gap 12. This makes it possible to compress the water-stopping material 13 placed in the gap 12 by pressing it down from both sides with the foam material 16 on the indoor side 15 and the mortar 18 on the outdoor side 17, or to suppress the expansion of the expansive water-stopping material 13.

[0056] A foam material 16 is used to hold down the indoor side 15 of the water-stopping material 13. The foam material 16 is flexible and elastically deformable due to the air bubbles contained therein, and the elastic force of the foam material 16 can effectively suppress the expansion of the water-stopping material 13 towards the indoor side 15. The foam material 16 is also easy to install at the indoor side 15 position within the gap 12. For example, the foam material 16 can be installed at an optimal position within the gap 12 simply by inserting it into the through-hole portion 11 together with the piping 2. The foam material 16 can be inserted and installed into the through-hole portion 11 from either the indoor side 15 or the outdoor side 17 by performing the insertion and installation together with the piping 2.

[0057] Therefore, even when the work of penetrating the pipes 2 into the foundation is performed after the building 1 is installed, it is not necessary to perform work such as going under the floor of the building 1 to hold down the indoor side 15 and installing the foam material 16 alone in the gap 12 from the indoor side 15, thereby improving workability.

[0058] Furthermore, by using mortar 18 to hold down the outdoor side 17, the mortar 18 can be painted in the same way as the foundation 4, and by applying the same paint to the mortar 18 as the foundation 4, the mortar 18 and the foundation 4 cannot be distinguished from each other, thereby ensuring and improving the appearance quality of the foundation 4.

[0059] (Function and Effect 2) The foundation penetration structure for the pipe 2 may be installed in the through-hole portion 11 together with the pipe 2 with the foam material 16 attached to the outer peripheral surface of the pipe 2. This allows the foam material 16 to be easily and reliably installed in the gap 12 from the outdoor side 17 simply by inserting the pipe 2, which is integrated with the foam material 16 attached to its outer peripheral surface, into the through-hole portion 11 from the outdoor side 17. In this case, since the foam material 16 is attached to the pipe 2, the foam material 16 can be placed in the appropriate position in the gap 12 simply by putting a mark on the pipe 2, and therefore the position of the foam material 16 can be easily adjusted.

[0060] (Effect 3) The foundation penetration structure of the pipe 2 may be such that the foam material 16 is attached to the outer peripheral surface of the pipe 2 with the adhesive tape 25. This allows the foam material 16 to be easily and reliably attached to the outer peripheral surface of the pipe 2 simply by attaching the foam material 16 to the outer peripheral surface of the pipe 2 with the adhesive tape 25. This reduces the effort required to attach the foam material 16 to the pipe 2. Then, by inserting the pipe 2 to which the foam material 16 is attached with the adhesive tape 25 into the through-hole portion 11 together with the foam material 16 (from the outdoor side 17 or the indoor side 15), the foam material 16 can be accurately installed in the appropriate position within the gap 12.

[0061] (Function and Effect 4) The construction method of the foundation penetration piping may be such that the foam material 16 is attached to the outer peripheral surface of the piping 2, and the piping 2 with the foam material 16 attached to the outer peripheral surface is inserted and arranged into the through hole portion 11 formed in the foundation 4, the foam material 16 is positioned inside the through hole portion 11, the gap 12 between the through hole portion 11 and the piping 2 is blocked in the circumferential direction with the foam material 16, the water stop material 13 is installed in the gap 12 so as to be located on the outdoor side 17 of the foam material 16, and the mortar 18 is poured in the gap 12 on the outdoor side 17 of the water stop material 13. As a result, the foam material 16 can be easily installed in the gap 12 as a hold-down for the indoor side 15 of the water stop material 13, so that the foundation penetration work of the piping 2 can be easily performed from the outdoor side 17 even after the building 1 is installed. In addition, according to the construction method of the foundation penetration piping, the same function and effect as the foundation penetration structure of the piping 2 described above can be obtained. [Explanation of symbols]

[0062] 2 Piping 4 Basics 11 Through hole section 12 Gap 13 Water-stopping materials 15 Indoor side 16 Foam material 17 Outdoor side 18 Mortar 25 Adhesive Tape

Claims

1. A water-swelling water-stopping material is installed in a circumferential direction in a gap between a through-hole portion formed in a foundation of a building and a pipe inserted through the through-hole portion, A foam material is provided at a position inside the gap on the indoor side of the water-stopping material, In the gap, at a position on the outdoor side of the water-stopping material, mortar is poured so as to be approximately flush with the outdoor surface of the foundation, forming three layers. The foam material and the mortar sandwich and press the water-stopping material from both sides, A foundation penetration structure for piping, characterized in that the water-swellable water-stopping material is restricted in its longitudinal expansion and is expanded in a radial direction.

2. The foundation penetration structure for piping according to claim 1, The foaming material is attached to the outer peripheral surface of the pipe, The pipe is installed in the through hole portion, The water-swellable water-stopping material is installed from the outdoor side so that a circumferential thickness thereof is uniform after the pipe is inserted into the through-hole portion, A foundation penetration structure for piping, characterized in that the mortar is installed from the outdoor side after the water-expanding water-stopping material is installed.

3. The foundation penetration structure for the piping according to claim 2, A foundation penetration structure for piping, characterized in that the foam material is attached to the outer peripheral surface of the piping with adhesive tape.

4. Attach foam material to the outer surface of the pipe, The piping having the foam material attached to its outer peripheral surface is inserted and disposed in a through-hole portion formed in a foundation of a building, thereby positioning the foam material inside the through-hole portion and sealing a gap between the through-hole portion and the piping in the circumferential direction with the foam material; A water-swellable waterproofing material is placed in the gap so as to be located on the outdoor side of the foam material; A construction method for foundation penetration piping, characterized in that mortar is poured into the gap on the outdoor side of the water-swelling material, and the water-expandable water-swelling material is sandwiched and held down on both sides between the foam material and the mortar, thereby suppressing the longitudinal expansion of the water-swelling material while allowing it to expand in the radial direction.

Citation Information

Patent Citations

  • Floor antiseep system is worn to pipeline

    CN204647577U

  • Circulating pipe says wall plugging device

    CN207673965U

  • Water proofing construction for tubular body piercing section of underground cons truction

    JP1980165341A

  • Thermal expansion material for fire protection

    JP2000240854A

  • Wall penetrating structure of piping

    JP2012037036A