Energy Trading System
The power trading system tracks power attributes during cancellation bids by generating bid data with attribute information, preventing fraudulent transactions and ensuring appropriate bid amounts, thus enhancing the success of resale or repurchase operations.
Patent Information
- Application Number
- JP2021170752
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-10-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-10-19
AI Technical Summary
Power trading systems that use blockchain technology do not track power attributes when making cancellation bids, leading to potential loss of added value, such as environmental value, in electricity transactions.
A power trading system and method that includes a bidding computer to generate bid data for cancellation bids, incorporating attribute information such as identification and power delivery period, ensuring that the attributes of electricity are tracked during cancellation bids, and the bid amount and price are adjusted to facilitate successful resale or repurchase.
Enables tracking of power attributes during cancellation bids, preventing fraudulent transactions, and ensuring that cancellation bids do not exceed the committed bid amount, thereby enhancing the success of resale or repurchase operations.
Smart Images

Figure 0007589667000001 
Figure 0007589667000002 
Figure 0007589667000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an energy trading system, a computer, and an energy trading method. [Background technology]
[0002] For example, JP 2020-9334 A (Patent Document 1) discloses an electricity trading platform that enables each member to buy and sell electricity. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-9334 A Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, energy trading systems that use blockchain technology to track the attributes of electricity have become known. However, in these systems, when a counter bid is made to cancel an already-contracted bid, the attributes of the electricity are not tracked. For this reason, depending on the electricity involved in the transaction, added value (e.g., environmental value) may be lost.
[0005] The present disclosure has been made to solve the above-mentioned problems, and its purpose is to provide an energy trading system, a computer, and an energy trading method that can track the attributes of electricity when a counter bid is made to cancel an already-contracted bid. [Means for solving the problem]
[0006] An energy trading system according to a first aspect of the present disclosure includes an energy trading computer and a bidding computer that submits a bid to the energy trading computer. The bidding computer includes a bidding unit and a generation unit. The bidding unit is configured to submit a bid for energy trading by sending bid data in a predetermined format to the energy trading computer. The generation unit is configured to transcribe predetermined information included in the bid data of the agreed bid, and generate bid data for a cancellation bid to cancel the agreed bid. The predetermined information includes attribute information that indicates attributes of the electricity related to the transaction. Hereinafter, the predetermined information is also referred to as "transcription information."
[0007] In the above energy trading system, attribute information included in the bid data of an agreed bid is transferred to the bid data of a counter bid, so that when a counter bid is made to counter an agreed bid, the attributes of the electricity can be tracked.
[0008] The bid data in the predetermined format may include a bid price and a bid amount. The generating unit may be configured to generate the bid data of the counter-bid such that the bid amount of the counter-bid does not exceed the bid amount of the contracted bid.
[0009] According to the above configuration, the bid volume of the counter bid is prevented from exceeding the bid volume of the contracted bid (i.e., the upper limit of the bid volume that can be countered). This makes it easier to generate appropriate bid data for the counter bid.
[0010] The contracted bid may be a buy bid and the counter bid may be a sell bid. The generator may be configured to generate bid data of the counter bid such that a bid price of the counter bid is lower than a bid price of the contracted bid.
[0011] According to the above configuration, the resale is executed at a price lower than the purchase price, which makes the resale more likely to be successful.
[0012] The contracted bid may be a sell bid and the counter bid may be a buy bid. The generator may be configured to generate bid data of the counter bid such that a bid price of the counter bid is higher than a bid price of the contracted bid.
[0013] According to the above configuration, the repurchase is executed at a price higher than the price at which the repurchase was made, which makes the repurchase more likely to be successful.
[0014] The posting information may further include an identification of the executed bid, an identification of the bidder, and a delivery period for the power.
[0015] By including the above information in addition to the attribute information in the bid data for the counter bid, it becomes easier for the energy trading computer to properly review the bids.
[0016] The generating unit may be configured to generate bidding data for counter-bidding to eliminate the imbalance of the simultaneous balancing amount. With such a configuration, the imbalance can be easily eliminated by the counter-bidding. The imbalance of the simultaneous balancing amount corresponds to, for example, the difference between the supply and demand plan value and the supply and demand actual value (actual supply and demand).
[0017] The energy trading computer may be configured to perform a review of whether to accept a bid when bid data is acquired from the bidding computer. The energy trading computer may be configured to accept a bid when the acquired bid data satisfies predetermined requirements in the review regarding a counter bid. The predetermined requirements include that the bidder of the agreed bid and the bidder of the counter bid are the same. Hereinafter, the predetermined requirements are also referred to as "bidding requirements."
[0018] According to the above configuration, it becomes easier to prevent fraudulent counter bids (resales or buybacks) made by anyone other than the principal (the bidder of the agreed bid).
[0019] The above-mentioned predetermined requirements further include that the power delivery periods of the agreed bid and the counter bid match, and that the bid amount of the counter bid does not exceed the bid amount of the agreed bid.
[0020] According to the above configuration, it becomes easier to eliminate counter bids (resales or buybacks) that exceed the contract range.
[0021] The bidding requirements may be set arbitrarily. The bidding requirements may further include a requirement that a counter bid in an agreed bid is not prohibited.
[0022] A computer according to a second aspect of the present disclosure is configured to make a bid for an energy transaction. The computer includes a bidding unit and a generation unit. The bidding unit is configured to make a bid for an energy transaction by sending bid data in a predetermined format. The generation unit is configured to transcribe predetermined information included in the bid data of an agreed bid, and generate bid data for a cancellation bid for canceling the agreed bid. The predetermined information includes attribute information indicating attributes of the energy involved in the transaction.
[0023] The computer also makes it possible to track the attributes of electricity when making a counter bid to cancel an already-contracted bid, similar to the energy trading system described above.
[0024] An energy trading method according to a third aspect of the present disclosure includes data generation and counter bidding. In the data generation, predetermined information included in the bidding data of the agreed bid is transcribed to generate bidding data of a counter bid for canceling the agreed bid. In the counter bidding, a bid for energy trading is made by sending the bidding data of the counter bid. The predetermined information includes attribute information indicating attributes of the electricity involved in the transaction.
[0025] As with the above-mentioned energy trading system, the above-mentioned energy trading method also makes it possible to track the attributes of electricity when a counter bid is made to cancel an already-contracted bid. Effect of the Invention
[0026] According to the present disclosure, it is possible to provide an energy trading system, a computer, and an energy trading method that can track the attributes of electricity when a counter bid is made to cancel an agreed bid. [Brief description of the drawings]
[0027] [Figure 1] FIG. 1 is a diagram for explaining an overview of an energy trading system according to an embodiment of the present disclosure. [Diagram 2] FIG. 13 is a diagram showing an example of a tag for a buying bid. [Diagram 3] FIG. 13 is a diagram showing an example of a tag for a selling bid. [Figure 4] FIG. 2 is a diagram illustrating an example of a power facility of the prosumer illustrated in FIG. [Diagram 5] FIG. 2 is a diagram illustrating an example of power equipment of a consumer illustrated in FIG. [Figure 6] FIG. 2 is a diagram illustrating a detailed configuration of a vehicle agent (bidding computer) according to an embodiment of the present disclosure. [Figure 7] 7 is a flowchart showing a bidding process executed by a vehicle agent shown in FIG. 6. [Figure 8] 8 is a flowchart showing details of the counterbid shown in FIG. 7. [Figure 9] 9 is a diagram showing a first modified example of the tags of the contracted bid and the counter bid shown in FIG. 8. [Figure 10] 9 is a diagram showing a second modified example of the tags of the contracted bid and the counter bid shown in FIG. 8. [Figure 11] 2 is a flowchart showing a process related to energy trading executed by an energy trading platform (energy trading computer) according to an embodiment of the present disclosure. [Figure 12] 12 is a flowchart showing a process related to screening of countervailing bids in the energy trading shown in FIG. 11. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present disclosure will now be described in detail with reference to the accompanying drawings, in which the same or corresponding parts are designated by the same reference numerals and will not be described repeatedly.
[0029] FIG. 1 is a diagram for explaining an outline of an energy trading system according to an embodiment of the present disclosure. With reference to FIG. 1, the energy trading platform PF according to this embodiment is a P2P (Peer to Peer) energy trading platform. For example, an aggregator uses the energy trading platform PF to operate an energy trading market. The energy trading platform PF enables energy trading between individuals. The energy trading platform PF includes a blockchain ledger, a bid screening mechanism, a matching mechanism, and a smart contract. The energy trading platform PF is embodied by a program stored in a storage device, a server that runs the program (such as an operating system), and a P2P network that interconnects the server and a group of computers (nodes). In this embodiment, the server that runs the program in the energy trading platform PF corresponds to an example of an "energy trading computer" according to the present disclosure.
[0030] Users of the energy trading platform PF buy and sell electricity transmitted and distributed through the power grid PG. The power grid PG is connected to power generation equipment and power storage equipment (not shown) installed in various buildings, as well as many power generation equipment and power storage equipment (not shown) owned by various electric power companies. The supply and demand balance of the power grid PG is adjusted so as to achieve simultaneous balancing. The aggregator corresponds to a BRP (Balance Responsible Party). Each user of the energy trading platform PF owns resources that can be electrically connected to the power grid PG.
[0031] Users of the energy trading platform PF are registered in advance in the energy trading platform PF. In this embodiment, a plurality of prosumers D1, a plurality of consumers D2, a plurality of power generation companies D3, and a plurality of electricity retailers D4 are registered in the energy trading platform PF. The number of users registered in the energy trading platform PF is arbitrary, and may be 5 or more and less than 100, or may be 100 or more.
[0032] Each registered user possesses an asset and an agent. In this embodiment, the resources possessed by each user function as assets. The agent has a function of bidding on the energy trading platform PF. This enables buying and selling of electricity on an individual basis. After the contract is concluded, the resource outputs the electricity sold by the user to the power grid PG and receives the electricity purchased by the user from the power grid PG.
[0033] A power meter is provided between the power system PG and the resource. The power meter measures at least one of the amount of power (reverse power amount) output by the resource to the power system PG and the amount of power received by the resource from the power system PG. The power meter sequentially transmits the measurement value to the energy trading platform PF. The measurement value of the power meter may be transmitted to the energy trading platform PF via an EMS (Energy Management System). The power meter may be a smart meter that measures daily power demand (amount of power used by a user) or may be a dedicated terminal introduced for power trading. A power meter may be provided for each resource, or one power meter (common power meter) may be provided for multiple resources. The EMS in the prosumer D1 may be configured to manage generated power and demanded power.
[0034] Hereinafter, the power trading carried out through the power trading platform PF will be described by taking as an example a case where a prosumer D1 sells power to a consumer D2.
[0035] First, the aggregator purchases tokens from an exchange (not shown). The tokens are used as fees for fulfilling the smart contract. Then, the node (agent) of the prosumer D1 makes a selling bid (price offer), and the node (agent) of the consumer D2 makes a buying bid (price request). When both bids are made to the energy trading platform PF, the bid screening mechanism performs screening to determine whether or not the bids are appropriate (bid screening). The bid screening mechanism performs bid screening according to a predetermined algorithm. Then, when both bids pass the bid screening, the matching mechanism performs funds validation and then matches the selling bid and the buying bid. The matching mechanism performs matching according to a predetermined algorithm.
[0036] A user (bidder) agent submits a bid for energy trading by sending bid data in a specified format (hereinafter referred to as "tag") to the energy trading platform PF (energy trading computer). The tag indicates the price and the amount of energy (kWh). Bidders can submit bids with additional information attached via the tag.
[0037] Fig. 2 is a diagram showing an example of a tag for a buying bid. Referring to Fig. 2, this tag includes a bidder ID (identification information of the bidder), a delivery period of electricity, a bid price, a bid amount (kWh), attribute information, and additional bid information (hereinafter referred to as "INFO").
[0038] The attribute information of the buying bid tag indicates the attributes of the electricity related to the buying bid. An agent of the buying bidder (for example, Consumer D2) can state the attributes (power generation method, production area, etc.) of the electricity that the bidder wishes to purchase in the buying bid tag. Examples of the power generation method include renewable energy in general, specific renewable energy (solar power generation, wind power generation, geothermal power generation, biomass power generation, etc.), and thermal power generation. The electricity production area may be an area specified by the name of a prefecture, or an area specified by longitude and latitude. An area on a map that a user arbitrarily specifies using a pointing device may be written in the tag. The agent of the buying bidder can purchase the electricity that the bidder desires by writing the purchase conditions related to the electricity attributes in the buying bid tag. By specifying renewable energy as the power generation method, electricity with high environmental value can be purchased. By specifying the local place of production, local production and local consumption becomes possible.
[0039] The INFO of the buy bid tag is information indicating special notes regarding the buy bid. The agent of the buy bidder can state the conditions regarding the business partner in the INFO. The business partner may be specified by company name or personal ID. Self-consignment is possible by specifying the consignment source by personal ID. The agent of the buy bidder can specify the purchase conditions in detail using the INFO of the tag.
[0040] The bid ID is assigned by the energy trading platform PF, not by the bidder's agent. Specifically, when the bid screening mechanism obtains the above tag from the bidder, it performs bid screening (screening to see whether or not to accept the bid). Then, a bid ID (identification information of the bid) is assigned by the bid screening mechanism to the tag of the bid that passes the bid screening. The same applies to the tag of a sell bid, which will be described below.
[0041] Fig. 3 is a diagram showing an example of a tag for a selling bid. Referring to Fig. 3, this tag includes a bidder ID (identification information of the bidder), a delivery period of the electricity, a bid price, a bid amount (kWh), attribute information, and INFO (additional bid information).
[0042] The attribute information of the selling bid tag indicates the attributes of the electricity related to the selling bid. The agent of the selling bidder (for example, prosumer D1) writes the attributes of the electricity to be sold (power generation method, place of origin, certificate, etc.) in the selling bid tag. When the bidder sells electricity with a non-fossil certificate, the type of non-fossil certificate (for example, FIT non-fossil certificate with renewable energy designation, non-FIT non-fossil certificate with renewable energy designation, or non-FIT non-fossil certificate without renewable energy designation) is written in the tag. Note that renewable energy means "renewable energy". FIT means "Feed-in Tariff".
[0043] The INFO of the selling bid tag is information indicating special notes regarding the selling bid. The selling bidder's agent can state conditions regarding the trading partner in the INFO. The trading partner may be specified by a company name or an individual ID. Self-consignment is possible by specifying the consignment destination by an individual ID. The selling bidder's agent can also state a prohibition on resale as a sales condition in the INFO. Furthermore, the selling bidder's agent can state benefit information in the INFO indicating benefits provided in association with the energy trading. An example of a benefit is a coupon. The benefit information indicates the scope of use of the coupon (e.g., area or store) and the value of use (e.g., monetary value or service content). The coupon may be an electronic coupon. The selling bidder's agent can inform the energy trading platform PF of the sales conditions and benefit information through the INFO of the tag.
[0044] Referring again to FIG. 1, the matching mechanism considers not only the bid price, bid amount, and delivery period, but also additional information (attribute information and INFO) indicated by the tag, and performs matching so as to satisfy the purchase and sale conditions indicated by the tag. When matching between the prosumer D1 and the consumer D2 is successful, the consumer D2 pays the electricity fee to the aggregator in legal tender (e.g., JPY, USD, GBP, EUR, etc.). The aggregator then deposits the above tokens on the energy trading platform PF. The prosumer D1 supplies the amount of electricity (kWh) offered at the time of bidding to the power grid PG. The consumer D2 receives the amount of electricity (kWh) offered at the time of bidding from the power grid PG. The smart contract executes the energy trading after confirming the power supply (Proof of delivery). Specifically, the smart contract returns the above deposited tokens to the aggregator and updates the blockchain ledger (e.g., local network ledger) that records the transaction. Transactions are recorded on each node.
[0045] When the energy transaction is executed by the smart contract, the aggregator pays the prosumer D1 an amount of legal tender corresponding to the transaction result. The aggregator also settles the transaction costs (wheeling charges, platform costs, etc.).
[0046] The records of the blockchain ledger of the energy trading platform PF will be reflected in the ledger of an external platform (for example, the Ethereum ledger). In order to limit the amount of tokens in circulation, the aggregator will dispose of the tokens initially purchased at the exchange after the transaction is completed.
[0047] As described above, the aggregator plays a central role in token trading on the energy trading platform PF, electricity bill payment, and wheeling charge payment. Note that the processing by the aggregator is performed on a node (e.g., a server belonging to the aggregator) not shown.
[0048] Fig. 4 is a diagram showing an example of power equipment of a prosumer D1. Referring to Fig. 4 together with Fig. 1, a solar panel 110 is installed on the roof of a house 100A of the prosumer D1. A PCS (Power Conditioning System) 120, a distribution board 141, and a power load 142 are provided inside the house 100A. An EVSE (Electric Vehicle Supply Equipment) 150A is installed on the premises (outdoors) of the user's home. Furthermore, a smart meter 143 is installed between the power system PG and the distribution board 141.
[0049] The solar panel 110 generates power by utilizing sunlight. The solar panel 110 is a naturally variable power source whose power output fluctuates depending on weather conditions, and outputs the generated power to the PCS 120. The PCS 120 has a function of converting the generated power into system power (power of the power system PG). The PCS 120 includes a DC / DC converter 121, an inverter 122, and a control device 125. The control device 125 is configured to control each of the DC / DC converter 121 and the inverter 122 based on, for example, the power generated by the solar panel 110 and the power consumption (power demand) at the user's home.
[0050] The DC / DC converter 121 transforms the DC power generated by the solar panel 110 into a voltage corresponding to the grid power. Then, the inverter 122 converts the DC power output from the DC / DC converter 121 into AC power corresponding to the grid power and outputs it to the distribution board 141. The control device 125 can adjust the power input from the solar panel 110 to the distribution board 141 by controlling at least one of the DC / DC converter 121 and the inverter 122. The control device 125 may cause the power generated by the solar panel 110 to flow reversely to the power grid PG according to an instruction from a user.
[0051] The distribution board 141 is supplied with power (for example, three-phase AC power) from each of the power system PG and the solar panel 110 (PCS 120). The power load 142 is an electric device used indoors, and receives a supply of power from the distribution board 141. The power load 142 may be connected to the distribution board 141 via an outlet (not shown). The power load 142 may be a household electric machine or appliance such as a lighting fixture, an air conditioner, a cooking appliance, an information device, a refrigerator, or a washing machine.
[0052] The EVSE 150A is a facility that supplies power to the vehicle, and receives power from a distribution board 141. The vehicle and the power system PG are electrically connected to each other by connecting (plugging in) a connector 151 of a charging cable 152 connected to the main body of the EVSE 150A to an inlet of the vehicle. Hereinafter, the state in which the vehicle and the power system PG are electrically connected to each other is referred to as a "plugged-in state." Also, the state in which the vehicle and the power system PG are not electrically connected to each other is referred to as a "plugged-out state." A vehicle that is running is in the plugged-out state.
[0053] The vehicle 200A is an xEV that can run using electric power stored in a power storage device. The xEV is a vehicle that uses electric power as all or part of its power source. Specifically, the vehicle 200A includes an inlet 210, a charger 220, a battery 230, a motor 240, and an ECU (Electronic Control Unit) 250. The battery 230 is an energy storage device for running. The battery 230 can be a known vehicle power storage device (for example, a liquid type secondary battery, an all-solid-state secondary battery, or a battery pack). Examples of the vehicle secondary battery include a lithium ion battery and a nickel-metal hydride battery. The vehicle 200A runs on the power generated by the motor 240 by supplying electric power from the battery 230 to the motor 240. The motor 240 may be an MG (Motor Generator). The vehicle 200A is, for example, a BEV (Electric Vehicle). However, the present invention is not limited to this, and the vehicle included in the power equipment of the prosumer D1 (FIG. 1) may be an xEV other than a BEV.
[0054] The vehicle 200A is configured to be electrically connectable to the electric power system PG via the EVSE 150A. The inlet 210 is configured to be connectable to the connector 151 of the EVSE 150A. The charger 220 is located between the inlet 210 and the battery 230, and is controlled by the ECU 250. The charger 220 includes, for example, an inverter. When power is supplied from the electric power system PG to the vehicle 200A in the plugged-in state, the ECU 250 controls the charger 220 so that appropriate power is input from the inlet 210 to the battery 230.
[0055] The vehicle 200A has a V2H (Vehicle to Home) function. The vehicle 200A is configured to be able to supply power of the battery 230 to the house 100A (more specifically, the distribution board 141) via the EVSE 150A in a plugged-in state. Furthermore, the vehicle 200A has a V2G function (a function of bidirectionally exchanging power with the power grid PG). A discharge circuit (a power conversion circuit for discharging) may be built in the charger 220, the inlet 210, or the connector 151, or may be built in a discharge connector that can be attached to both the inlet 210 and the connector 151. Note that the vehicle included in the power equipment of the prosumer D1 (FIG. 1) may be a V1G type xEV (a type of xEV that receives power unilaterally from the power grid PG). The charger / discharger function may be installed in the EVSE instead of the vehicle.
[0056] The ECU 250 communicates with the mobile terminal 300A via a wireless communication device (not shown) mounted on the vehicle 200A. The mobile terminal 300A and the vehicle 200A perform short-range communication (i.e., direct communication within the range around the vehicle) such as NFC (Near Field Communication) or Bluetooth (registered trademark). The mobile terminal 300A is operated by a user. In this embodiment, a smartphone equipped with a touch panel display is adopted as the mobile terminal 300A. However, the present invention is not limited to this, and any mobile terminal can be adopted as the mobile terminal 300A, and a laptop, a tablet terminal, a wearable device (e.g., a smart watch or smart glasses), or an electronic key can also be adopted.
[0057] The vehicle 200A includes various sensors (not shown) that detect the state of the vehicle 200A. The vehicle 200A transmits the state of the vehicle 200A detected by these sensors to the mobile terminal 300A. The vehicle 200A transmits, for example, a current position (e.g., longitude and latitude), a SOC (State Of Charge), and a grid connection state (plugged-in state / plugged-out state) to the vehicle agent 500 via the mobile terminal 300A. The SOC of the vehicle 200A means the SOC of the battery 230. The SOC indicates the remaining amount of electricity stored in the power storage device, and is, for example, a ratio of the current amount of electricity stored to the amount of electricity stored in a fully charged state, expressed as 0 to 100%. In this embodiment, when the vehicle 200A switches from the plugged-out state to the plugged-in state, the mobile terminal 300A requests the user to input a travel start time. Then, the mobile terminal 300A transmits the input travel start time to the vehicle agent 500.
[0058] In this embodiment, a cloud server functions as the vehicle agent 500. The vehicle agent 500 is realized by a processor (not shown) and a program executed by the processor. The vehicle agent 500 is provided on the cloud by cloud computing. The configuration of the vehicle agent 500 will be described later (see FIG. 6). In the power equipment of the prosumer D1 shown in FIG. 4, each of the solar panel 110 (with PCS 120), the power load 142, and the vehicle 200A corresponds to a resource.
[0059] Fig. 5 is a diagram showing an example of power equipment of a consumer D2. Referring to Fig. 5 together with Fig. 1, a house 100B has the same configuration as the house 100A shown in Fig. 4, except that the house 100B does not have a solar panel 110 and a PCS 120. A mobile terminal 300B has the same configuration as the mobile terminal 300A shown in Fig. 4. A vehicle 200B and an EVSE 150B also have basically the same configuration as the vehicle 200A and the EVSE 150A shown in Fig. 4, respectively. However, the vehicle 200B is a V1G type BEV and does not have a V2H function.
[0060] For example, when a user who owns a vehicle enters into a specified contract with an aggregator, the aggregator registers the user in the energy trading platform PF and further prepares a vehicle agent 500 for the user on the cloud. A vehicle agent 500 is prepared for each user who enters into the above-mentioned contract with the aggregator. These vehicle agents 500 are distinguished and managed for each user by a user ID. In addition, the aggregator prepares a database on the cloud by cloud computing. In this database, information of each user registered in the energy trading platform PF is distinguished and managed by a user ID. Users can use the vehicle agents 500 and database in a cloud environment.
[0061] Fig. 6 is a diagram showing a detailed configuration of the vehicle agent 500. Referring to Fig. 6, the energy trading system according to this embodiment includes a cloud server functioning as the vehicle agent 500, an energy trading platform PF, a vehicle 200, and a mobile terminal 300. The vehicle agent 500 corresponds to an example of a "bidding computer" according to the present disclosure. The vehicle 200 is a vehicle owned by a user registered in the energy trading platform PF, and has, for example, the same configuration as the above-mentioned vehicle 200A (Fig. 4). The mobile terminal 300 is a device carried by a user registered in the energy trading platform PF, and has, for example, the same configuration as the above-mentioned mobile terminal 300A (Fig. 4).
[0062] Predetermined application software (hereinafter, simply referred to as an "app") is installed in the mobile terminal 300. The mobile terminal 300 can exchange information with the vehicle agent 500 through the app. A user can operate the app, for example, through a touch panel display of the mobile terminal 300. In addition, the touch panel display of the mobile terminal 300 notifies the user of information.
[0063] The vehicle agent 500 executes processing while accessing a database on the cloud. The database includes information about the user (for example, the specifications of the power equipment shown in FIG. 4 or FIG. 5). The vehicle agent 500 includes an information collection agent 510, a prediction agent 520, and a bidding agent 530.
[0064] The information collection agent 510 is configured to obtain and store vehicle information relating to the vehicle 200 and user information relating to the user.
[0065] The information collection agent 510 sequentially receives the measured values of the above-mentioned power meter (for example, the smart meter 143 shown in FIG. 4 or FIG. 5). The information collection agent 510 acquires user information (hereinafter referred to as "supply and demand information") indicating the user's supply and demand situation regarding the power grid PG from the user's power meter. In addition, the information collection agent 510 acquires vehicle information (for example, location, SOC, grid connection state, and driving start time) from the mobile terminal 300.
[0066] The prediction agent 520 includes a price prediction unit 521 and an electric power prediction unit 522. The prediction agent 520 is configured to divide a day (for example, the next day) into predetermined time units and predict the electric power price, the available storage capacity, and the required electric power amount for each divided time period. The predetermined time unit may be about 30 minutes, may be 1 hour or more and less than 3 hours, or may be 3 hours or more.
[0067] The price prediction unit 521 is configured to predict the electricity price (electricity buying and selling price) for each time period in the energy trading platform PF based on meteorological information (information indicating current or future weather conditions), market price information (information indicating the electricity price in the electricity market), and the trading situation in the energy trading platform PF. For example, the price prediction unit 521 can predict the amount of VRE (variable renewable energy) power generation based on meteorological forecast data (weather, temperature, wind, etc.). The more the amount of VRE power generation, the lower the electricity price tends to be.
[0068] The power prediction unit 522 is configured to predict the amount of power required for each time period based on the supply and demand information acquired by the information collection agent 510. Specifically, the power prediction unit 522 predicts the demand (power consumption) and power generation for each time period based on, for example, accumulated supply and demand history information (information indicating past supply and demand conditions) and meteorological information (for example, weather forecast information), and calculates the amount of power required for each time period from the obtained prediction data. The amount of power required is calculated, for example, by subtracting the amount of power generation from the amount of demand. The greater the amount of demand, the greater the amount of power required. When the amount of power generation exceeds the amount of demand, the power prediction unit 522 predicts the amount of surplus power instead of the amount of power required. The amount of surplus power is calculated, for example, by subtracting the amount of demand from the amount of power generation.
[0069] The power prediction unit 522 is configured to predict the power storage margin for each time period based on the vehicle information acquired by the information collection agent 510. When the vehicle 200 is in a plugged-in state, the power storage margin is larger than when the vehicle 200 is in a plugged-out state. The vehicle 200 in a plugged-in state can store the power supplied from the power grid PG in the battery 230 (FIG. 4). The lower the SOC of the vehicle 200 in a plugged-in state, the larger the power storage margin. The power prediction unit 522 can predict the timing at which the vehicle 200 in a plugged-in state will become a plugged-out state (hereinafter referred to as "grid disconnection timing") based on the travel start time acquired by the information collection agent 510. In addition, the power prediction unit 522 can predict the timing at which the vehicle 200 in a plugged-out state will become a plugged-in state (hereinafter referred to as "grid connection timing") based on the position and SOC of the vehicle 200. In this embodiment, the information collection agent 510 sequentially acquires the position and SOC of the vehicle 200. The mobile terminal 300 may request the user to input a driving end time indicating the grid connection timing, and transmit the input driving end time to the vehicle agent 500. In this embodiment, the power prediction unit 522 can predict the grid connection timing based on the driving end time.
[0070] The user purchases the electricity shortage (required amount of electricity) from the energy trading platform PF. The user also sells the surplus electricity (surplus amount of electricity) from the energy trading platform PF. The bidding agent 530 performs automatic bidding for the energy trading on behalf of the user. The bidding agent 530 performs bidding according to a predetermined bidding algorithm. The user can set bidding conditions in the bidding algorithm. Specifically, the bidding agent 530 performs bidding on the energy trading platform PF based on the information predicted by the prediction agent 520. The bidding agent 530 performs bidding to purchase the required amount of electricity for each time slot based on the electricity price for each time slot and the storage capacity for each time slot. The bidding agent 530 also performs bidding to sell the surplus amount of electricity for each time slot based on the electricity price for each time slot and the storage capacity for each time slot.
[0071] The bidding agent 530 basically makes a bid to maximize profits from buying and selling electricity (or to reduce electricity costs). However, if bidding conditions are set by the user, the bidding agent 530 makes a bid in accordance with those conditions. For example, if a target renewable energy rate is set, the bidding agent 530 makes a bid to achieve the target renewable energy rate.
[0072] The power storage capacity allows (absorbs) a discrepancy between the timing of power supply and the timing of power usage. The greater the power storage capacity, the greater the degree of freedom in bidding. For example, the bidding agent 530 can purchase and store electricity in advance during a time period when the price is low, in order to use electricity during a time period when the demand for electricity is high. The mobile terminal 300 may transmit charge / discharge parameters (parameters related to charge / discharge control) to the vehicle 200 according to instructions from the vehicle agent 500. The ECU 250 (FIG. 4) may execute charge / discharge control of the battery 230 according to instructions from the vehicle agent 500.
[0073] After the bidding agent 530 makes a bid, the bidding result (result of the energy trading) is sent from the energy trading platform PF to the information collecting agent 510. For an agreed bid, a tag of the agreed bid (see FIG. 8 described later) is sent from the energy trading platform PF to the information collecting agent 510. The tag of the agreed bid is stored in a database on the cloud. The energy prediction unit 522 updates the required amount of energy and the surplus amount of energy according to the result of the energy trading. For example, when a part of the required amount of energy is sold on the energy trading platform PF, the energy prediction unit 522 updates the required amount of energy by subtracting the sold amount of energy from the required amount of energy.
[0074] The bidding agent 530 includes a determination unit 531, a generation unit 532, and a bidding unit 533. The determination unit 531 determines whether or not to make a bid. The determination unit 531 also determines whether or not to make a counter bid to cancel the contracted bid. When the determination unit 531 determines that a bid is to be made, the generation unit 532 generates the above-mentioned tag (bid data in a predetermined format). When the determination unit 531 also determines that a counter bid is to be made, the generation unit 532 transcribes predetermined information (transcription information) included in the tag of the contracted bid to generate a tag of the counter bid. In this embodiment, the transcription information includes a bid ID (identification information of the contracted bid), a bidder ID (identification information of the bidder), a delivery period of the power, and power attribute information (information indicating the attributes of the power involved in the transaction). The bidding unit 533 makes a bid for the power transaction by sending the tag generated by the generation unit 532 to the power trading platform PF. The determining unit 531, the generating unit 532, and the bidding unit 533 operate in accordance with the bidding algorithm, whereby bidding is carried out in the above-mentioned manner.
[0075] Fig. 7 is a flowchart showing a process related to bidding executed by the vehicle agent 500. The process shown in this flowchart is repeatedly executed by the vehicle agent 500 of the prosumer D1 that owns the power facility shown in Fig. 2, for example. In this case, the vehicle 200A and the mobile terminal 300A shown in Fig. 4 function as the vehicle 200 and the mobile terminal 300 shown in Fig. 6, respectively. In the following, each step in the flowchart will be simply denoted as "S".
[0076] 6 and 7, in S11, the vehicle agent 500 monitors the balancing amount for the power system PG. Specifically, in S11, the generation unit 532 determines whether the imbalance of the balancing amount (the difference between the planned value and the actual supply and demand) is within a predetermined tolerance range, and if the imbalance exceeds the tolerance range (YES in S11), the process proceeds to S12. In this embodiment, the demand amount and the power generation amount predicted by the power prediction unit 522 for each time period correspond to the planned value for each time period. In addition, the supply and demand information acquired by the information collection agent 510 indicates the actual supply and demand.
[0077] The determination in S11 corresponds to a determination as to whether or not to make a bid. A YES determination in S11 (i.e., an imbalance of simultaneous and equal amounts has occurred) means that a bid will be made. A NO determination in S11 means that a bid will not be made. As long as a NO determination is made in S11, the determination in S11 is repeatedly executed.
[0078] In S12, the determination unit 531 determines whether or not to make a counter bid to cancel the agreed bid. For example, if it is predicted that the agreed bid cannot be fulfilled due to the occurrence of an imbalance, the determination is YES in S12 and the process proceeds to S14. On the other hand, if there is no agreed bid that cannot be fulfilled, the determination is NO in S12 and the process proceeds to S13. In S13, the vehicle agent 500 makes a normal bid (a new bid that is not a counter bid). Specifically, the generation unit 532 generates a tag for a bid to resolve the imbalance of the simultaneous and equal amounts, and the bidding unit 533 sends the tag to the energy trading platform PF.
[0079] In S14, a counter bid is executed. FIG. 8 is a flowchart showing the details of S14. With reference to FIG. 8 together with FIG. 6, in S141, the generation unit 532 selects a contracted bid to be countered. For example, the generation unit 532 selects one of the contracted bids that is predicted not to be executed. If the contracted bid selected in S141 is a buy bid, the counter bid becomes a sell bid. If the contracted bid selected in S141 is a sell bid, the counter bid becomes a buy bid. In one example, a contracted bid indicated by a tag T11 shown in FIG. 8 is selected in S141. The tag T11 is a buy bid tag.
[0080] In the next step S142, the generation unit 532 determines the bid amount of the counter bid. The generation unit 532 determines the bid amount of the counter bid within the range of the bid amount of the contracted bid selected in S141. For example, the generation unit 532 sets the bid amount of the counter bid to the bid amount of the contracted bid that cannot be fulfilled. However, this is not limited to the above, and the generation unit 532 may set the entire bid amount of the contracted bid, including the bid amount that can be fulfilled, as the bid amount of the counter bid. Furthermore, the generation unit 532 may set the bid amount specified by the user as the bid amount of the counter bid. For example, in step S142, the generation unit 532 may request the mobile terminal 300 to input the bid amount. Then, the mobile terminal 300 may request the user to input the bid amount in accordance with the request from the generation unit 532, and transmit the input bid amount to the vehicle agent 500.
[0081] In the next step S143, the generation unit 532 determines the bid price of the counter bid. The generation unit 532 determines the price of the counter bid based on the bid price of the contracted bid selected in S141, for example. If the counter bid is a sell bid, the generation unit 532 determines the bid price of the counter bid so that the bid price of the counter bid is lower than the bid price of the contracted bid. This makes it easier for the resale to be successful. Also, if the counter bid is a buy bid, the generation unit 532 determines the bid price of the counter bid so that the bid price of the counter bid is higher than the bid price of the contracted bid. This makes it easier for the buyback to be successful.
[0082] The generation unit 532 may determine the price obtained by multiplying the bid price of the agreed bid by a predetermined factor as the bid price of the counter bid. Furthermore, the generation unit 532 may determine a price at which the bid can be reliably agreed as the bid price of the counter bid based on market price information. The generation unit 532 may determine the price obtained by multiplying the market price by a predetermined factor as the bid price of the counter bid. Furthermore, the generation unit 532 may determine the bid price specified by the user as the bid price of the counter bid. For example, in S143, the generation unit 532 may request the bid price from the mobile terminal 300. Then, the mobile terminal 300 may request the user to input a bid price in accordance with the request from the generation unit 532, and transmit the input bid price to the vehicle agent 500.
[0083] In the next S144, the generation unit 532 writes the bid amount and bid price determined in S142 and S143, and transcribes the transcription information included in the tag of the contracted bid to generate a tag of the counter bid. The transcription information is, for example, a bid ID, a bidder ID, a power delivery period, and power attribute information. In one example, a tag T21 of the counter bid shown in FIG. 8 is generated by the processing of S144. The tag T21 is a sell bid tag. As shown in FIG. 8, the bidder ID, the delivery period, and the attribute information of the tag T11 and the tag T21 are the same. In addition, the bid ID of the tag T11 is transcribed into the INFO of the tag T21 as information identifying the bid to be resold.
[0084] FIG. 9 is a diagram showing a first modified example of the tag of an agreed bid and the tag of a counter bid. Referring to FIG. 9, the tag T12 includes bonus information (more specifically, coupon information) in the INFO. The type of coupon may be identified by various symbols (letters, numbers, etc.). When the tag T12 is the tag of an agreed bid, the bid ID, the bidder ID, the power delivery period, the power attribute information, and the bonus information are transcribed into the tag T22 of the counter bid. The bid ID and the bonus information are transcribed into the INFO of the tag T22. In addition, it is also written in the INFO of the tag T22 that the bid is a counter bid (more specifically, a bid for resale).
[0085] Fig. 10 is a diagram showing a second modified example of the tag of an agreed bid and the tag of a counter bid. Referring to Fig. 10, tag T13 is a sell bid tag. When tag T13 is a tag of an agreed bid, the bid ID, bidder ID, power delivery period, and power attribute information are transcribed into tag T23 of the counter bid, just as in the case where tag T11 (Fig. 8) described above is a tag of an agreed bid. Then, the fact that the bid is a counter bid (more specifically, a bid for repurchase) is written in the INFO of tag T23.
[0086] 6 and 8, after the process of S144, the bidding unit 533 makes a counter-bid by sending a tag of the counter-bid (the tag generated in S144) to the energy trading platform PF in S145. This completes the counter-bid (S14 in FIG. 7).
[0087] As described above, the energy trading method according to this embodiment includes data generation (S144 in FIG. 8) and counter-bid (S145 in FIG. 8). In the data generation, the above-mentioned transcription information included in the bidding data of the agreed-upon bid is transcribed to generate bidding data of a counter-bid for cancelling the agreed-upon bid. In the counter-bid, a bid for energy trading is made by sending the bidding data of the counter-bid. In the above-described energy trading method, the transcription information includes attribute information, which makes it possible to track the attributes of the electricity in the counter-bid.
[0088] In the vehicle agent 500 (bidding computer) according to this embodiment, the generation unit 532 is configured to generate bid data of a counter bid for eliminating the imbalance of simultaneous equivalent amounts. This makes it easier to eliminate the imbalance by counter bids. Furthermore, the generation unit 532 generates bid data of a counter bid so that the bid volume of the counter bid does not exceed the bid volume of the contracted bid. This prevents the bid volume of the counter bid from exceeding the bid volume of the contracted bid (i.e., the upper limit of the bid volume that can be cancelled). In this embodiment, the process shown in FIG. 7 is executed by the agent of each user registered in the energy trading platform PF (see FIG. 1).
[0089] Fig. 11 is a flowchart showing processes related to energy trading executed by the energy trading platform PF according to this embodiment. With reference to Fig. 11 together with Fig. 1, the energy trading method according to this embodiment includes bid screening (S1), matching (S2), energy trading (S3), and recording and notification (S4). Each process from S1 to S4 is executed by the energy trading platform PF (energy trading computer).
[0090] In S1, the energy trading platform PF (more specifically, the bid review mechanism) executes the bid review. In the bid review, it is reviewed whether the tag (bid data) is created in a specified format. In addition, in the review of the counter bid, it is reviewed for requirements different from those in the review of the normal bid.
[0091] Fig. 12 is a flowchart showing a process related to screening of a counter bid. With reference to Fig. 1 and Fig. 12, in S21, the energy trading platform PF identifies the contracted bid to be countered based on the identification information (bid ID) of the contracted bid described in the tag of the counter bid.
[0092] Next, the energy trading platform PF determines whether bidding requirements A, B, C, and D are satisfied in S22, S23, S24, and S25, respectively. Bidding requirement A is that the bidder of the agreed bid and the bidder of the counter bid are the same. Bidding requirement B is that the power delivery period of the agreed bid and the counter bid is the same. Bidding requirement C is that the bid volume of the counter bid does not exceed the bid volume of the agreed bid. Bidding requirement D is that counter bids are not prohibited in the agreed bid.
[0093] If all of the bidding requirements A to D are met (YES in all of S22 to S25), the energy trading platform PF determines in S261 to accept the bid. On the other hand, if any of the bidding requirements A to D are not met (NO in any of S22 to S25), the energy trading platform PF determines in S262 to reject the bid.
[0094] 11 again, the result of the bid screening is notified to a user terminal (e.g., mobile terminal 300) or an agent (e.g., vehicle agent 500). A user who is notified that the screening has been rejected (the bid has been rejected) may correct the tag and bid again.
[0095] If the bid passes the bid screening, the process proceeds to S2. In S2, the energy trading platform PF (more specifically, the matching mechanism) performs matching based on the tags that pass the screening. If the matching is successful, the energy trading platform PF (more specifically, the smart contract) executes the energy trading based on both tags that have been successfully matched in S3. Thereafter, the energy trading platform PF records and notifies the trading in S4. Specifically, the energy trading transaction is recorded in the blockchain ledger based on the tags. In addition, the tag of the agreed bid is notified from the energy trading platform PF to each of the user terminal (e.g., the mobile terminal 300) and the agent (e.g., the vehicle agent 500).
[0096] As described above, when the energy trading platform PF (energy trading computer) acquires bid data from a user's agent (bidding computer), it performs an examination to determine whether or not to accept the bid (S1 in FIG. 11). In the examination regarding counter bids, the energy trading platform PF accepts the bid if the acquired bid data satisfies predetermined requirements (bidding requirements A to D) (see FIG. 12). In the examination of counter bids, fraudulent counter bids (resale or buyback) made by anyone other than the principal (the bidder of the contracted bid) are rejected. In addition, counter bids (resale or buyback) that exceed the contract range and counter bids prohibited in the contracted bid are also rejected.
[0097] The above-mentioned predetermined requirements (requirements for accepting bids) are not limited to bidding requirements A to D, and may be changed as appropriate. For example, bidding requirement D (S25 in FIG. 12) may be omitted. Also, in screening of counter bids for resale, a bidding requirement may be added that the bid price of the counter bid is equal to or lower than the bid price of the contracted bid. Such requirements may prohibit resale for the purpose of making a profit.
[0098] 4, an on-board battery is used as a power storage device for storing the power generated by the solar panel 110 (photovoltaic power generation facility). However, the present invention is not limited to this, and the prosumer D1 (FIG. 1) may have a stationary power storage device as a power storage device for storing the power generated by the photovoltaic power generation facility.
[0099] In the above embodiment, the vehicle and the vehicle agent do not communicate directly, but communicate with each other via a mobile terminal. However, the present invention is not limited to this embodiment. The vehicle may be equipped with a wireless communication device (e.g., a Data Communication Module (DCM)) that can access a mobile communication network (telematics) and may wirelessly communicate directly with the vehicle agent. The vehicle may also communicate with the vehicle agent via an EVSE.
[0100] In the above embodiment, a mobile terminal is used as the user terminal. However, the present invention is not limited to this, and any terminal belonging to a user can be used as the user terminal. For example, the user terminal may be an in-vehicle terminal (e.g., a navigation system).
[0101] In the above embodiment, a vehicle (POV) owned by an individual is mentioned. However, the present invention is not limited to this, and a MaaS (Mobility as a Service) vehicle may be adopted instead of the POV. The MaaS vehicle is a vehicle managed by a MaaS operator.
[0102] The vehicle is not limited to a BEV that does not have an internal combustion engine, but may be a PHEV (plug-in hybrid vehicle) that has an internal combustion engine. The vehicle is not limited to a passenger car, but may be a bus or a truck. The vehicle may be configured to be capable of contactless charging. The vehicle may be configured to be capable of autonomous driving, or may have a flying function. The vehicle may be a vehicle that can run unmanned (for example, a robotaxi, an automated guided vehicle (AGV), or an agricultural machine).
[0103] In the above embodiment, the vehicle agent is provided on the cloud, but this is not limited thereto, and at least a part of the functions of the vehicle agent may be implemented in an on-premise server, a vehicle, or a mobile terminal.
[0104] The power system PG is not limited to a large-scale AC grid, and may be a microgrid or a DC (direct current) grid. The vehicle may be equipped with a charger or a charger / discharger for DC power.
[0105] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0106] 100A,100B House, 110 Solar panel, 141 Distribution board, 142 Power load, 143 Smart meter, 150A,150B EVSE, 152 Charging cable, 200 Vehicle, 210 Inlet, 220 Charger, 230 Battery, 240 Motor, 250 ECU, 300 Mobile terminal, 500 Vehicle agent, 510 Information collection agent, 520 Prediction agent, 521 Price prediction unit, 522 Power prediction unit, 530 Bidding agent, 531 Judgment unit, 532 Generation unit, 533 Bidding unit, PF Power trading platform, PG Power system, T11~T13,T21~T23 Tags.
Claims
1. An energy trading system including: an energy trading computer; and a bidding computer that submits a bid to the energy trading computer, the energy trading computer is configured to, when a bid by the bidding computer is contracted, send bid data of the contracted bid to the bidding computer; The bidding computer: a bidding unit that submits bids for power trading by sending bid data in a predetermined format to the power trading computer; A generation unit that transcribes predetermined information included in the bid data of the contracted bid to generate bid data of a counter bid for canceling the contracted bid; Including, the predetermined information includes attribute information indicating attributes of the electricity involved in the transaction, A plurality of users who own resources that can be electrically connected to an electric power grid are registered in the energy trading computer, a bidding computer is provided for each user registered in the energy trading computer; The electricity trading is buying and selling of electricity transmitted and distributed through the power grid, The generation unit is configured to generate bidding data for the counter-bidding to eliminate a simultaneous balance imbalance related to the power system; After the energy transaction is concluded, the resources of the user who sold the energy output the energy sold by the user to the energy grid, and the resources of the user who bought the energy receive the energy purchased by the user from the energy grid.
2. The bid data in the predetermined format includes a bid price and a bid amount, The energy trading system according to claim 1 , wherein the generation unit generates the bid data of the counter bid such that a bid volume of the counter bid does not exceed a bid volume of the contracted bid.
3. 3. The energy trading system of claim 2, wherein when the agreed bid is a buy bid and the counter bid is a sell bid, the generation unit generates bid data for the counter bid so that a bid price of the counter bid is lower than a bid price of the agreed bid.
4. 3. The energy trading system of claim 2, wherein when the agreed bid is a sell bid and the counter bid is a buy bid, the generation unit generates bid data for the counter bid such that a bid price of the counter bid is higher than a bid price of the agreed bid.
5. The attribute information indicates a generation method of the electricity related to the transaction, the bidding computer is configured to specify a consignment source using personal identification information in bidding data for a purchase bid; 5. The energy trading system according to claim 1, wherein the bidding computer is configured to specify a consignment destination using an individual's identification information in bidding data for a selling bid.
6. the energy trading computer is configured to, when receiving the bid data from the bidding computer, perform an examination to determine whether or not to accept the bid; the energy trading computer is configured to accept a bid if the acquired bid data satisfies a predetermined requirement in the review of the counter bid; 6. The energy trading system according to claim 1, wherein the predetermined requirement includes that a bidder of the agreed bid and a bidder of the counter bid are the same.
7. The specified requirements are: The contracted bid and the counter bid have the same power delivery period; The bid volume of the counter bid does not exceed the bid volume of the agreed bid; The energy trading system of claim 6 further comprising:
8. An energy trading system as described in claim 6 or 7, wherein when the energy trading computer determines to accept the counter bid, it executes an energy transaction to cancel the agreed bid based on the bidding data of the counter bid, and records the energy trading transaction in a blockchain ledger.
9. The bidding computer, with respect to a corresponding user, Predict the amount of electricity consumed and the amount of electricity generated for each time period. determining whether a difference between a supply and demand plan value indicated by the predicted power consumption amount and power generation amount and an actual supply and demand value is within a predetermined allowable range; If the difference exceeds the predetermined allowable range, the counter bid or a new bid that is not the counter bid is submitted. The energy trading system according to any one of claims 1 to 8, configured as follows:
10. When the bidding computer determines to make the counter bid, Select the executed bids that are to be countered by the counterbid; Determine the bid volume and bid price of the counterbid; generating bid data for the counter bid by recording the determined bid volume and bid price and transcribing the predetermined information from the bid data for the selected contracted bid; Sending the generated bid data of the counter bid to the energy trading computer. It is configured as follows: The energy trading system according to claim 9 , wherein the predetermined information further includes, in addition to the attribute information, identification information of the agreed bid, identification information of a bidder, and a delivery period of the energy.
Citation Information
Patent Citations
Method and system for mediating power transaction and recording medium recording software for power transaction mediation
JP2002056225A
Power trade mediation system and power trade mediation method
JP2019046155A
Electric power transaction platform
JP2020009334A
Electricity transaction control device controlling adjustment power amount to electricity transaction of user, program, and method
JP2021087298A
Method of optimizing market supply and demand dynamics for energy distribution and consumption
US20180204293A1
